Loading...
Backup Document 06/14/2022 Item #16A18 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 6 I TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office016 County Attorney Office �,Nn 4. BCC Office Board of County V1 I' 1 I!i" Commissioners (A/e1 Ly 01,51 4/ i/z..'a. 5. Minutes and Records Clerk of Court's Office (0j 3 �� - PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Andrew Miller—GMD—Capital Project Phone Number 239.252.2922 Contact/ Department Planning, Impact Fees and Program Management Agenda Date Item was 06/14/2022 Agenda Item Number 16.A. 18. Approved by the BCC Type of Document Work Order — Humiston & Moore Engineers — Number of Original 1 Attached Professional Support Services for App. Prep. Of Documents Attached USACE Permit—S.Marco-$34,132.00 PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature FEB 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be FEB signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's FEB signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 06/14/2022 and all changes made during FEB N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the FEB N/A is not BCC, all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16A18 Ann P. Jennejohn From: Ann P.Jennejohn Sent: Tuesday, June 21, 2022 4:34 PM To: MillerAndrew Subject: Work Order (Item #16A18 6-14-22 BCC Meeting) Attachments: Item #16A18 6-14-22 BCC Meeting (Work Order Contract#18-7432-CZ).pdf Hi Andrew, Please see the attached for your records, approved by the 13CC June 14, 2022 (Item #16A18) Thank you! Ann Jennejohn 13MR Senior Deputy Clerk II 0.0 rr Clerk to the Value Adjustment Board Office: 239-252-8406 Fax: 239-252-8408 (if applicable) Ann.Jennejohn@CollierClerk.cowi. 'a. e� Office of the Clerk of the Circuit Court & Comptroller of Collier County 3299 Tawiavni Trail, Suite #401 Naples, FL 34112-5324 www.Coll ierClerk.covn i 16A18 WORK ORDER/PURCHASE ORDER Contract 18-7432-CZ"Professional Services Library Coastal Engineering Category" Contract Expiration Date: March 9,2025 This Work Order is for professional Engineering Services for work known as: Project Name: South Marco Beach Restoration - USACE Permit Project No: 90071.1 The work is specified in the proposal dated April 21, 2022, which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to: Humiston &Moore Engineers Scope of Work: As detailed in the attached proposal and the following: * Task I Permit Drawings&Draft Application, USACE Pre-Application Meeting * Task II Federal Permitting * Task III Subconsultant Schedule of Work: Complete work within 365 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement# 18-7432-CZ will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation:, In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): Jlegotiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs (LS+RC) Time & Material (T&M) (established hourly rate—Schedule A) Cost Plus Fixed Fee(CPFF), as provided in the attached proposal. Task I $15,078.00 (T&M) Task II $14,054.00 (T&M) Task III $ 5,000.00 (LS) TOTAL FEE $34,132.00 Digitally signed by MillerAndrew MillerAndrew Date 2022.05.05 07.46 14 PREPARED BY: -04.00' Andrew Miller,Manager-CZM Date Johnssen b Digitally signed by 8:36:5en_b Date 2022.05 09 08:36:56 APPROVED BY: — -04'00' Beth Johnssen,Di vi<ssiosngnDdirector Date S cottT ri n i ty DatetT202ity 2.05.11 14:18:36 APPROVED BY: Q4QQ Trinity Scott, Department Head Date Page 1 of 3 CAO 16A18 By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that, to the best of their knowledge and belief,all relevant facts concerning past, present, or currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Humiston & Moore Engineers Brett D. Moore, Digitally signed by Brett D.Moore, P.E.,D CE P.E., D.CE. Date:2022.05.05 11:15:28-04'00' Brett D. Moore, P.E., D.CE., President Date (Remainder of page intentionally left blank) Page 2 of 3 CM 1 6 A 1 8 IN WITNESS WHEREOF,the parties hereto, have each,respectively,by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COU* Y COMMISSIONERS , Clerk of Courts COLLIER CO I i • 61). By: C• By: 1...• Airy - 4, Date .41111111. .' , William L. McDaniel,Jr., Chairman tS 11kOnan's Humiston &Moore Engineers wignaturenr y; Brett D. Moore,DI MaoorelPE.,D.CE.tt 11q Stt i°'` By: P.E., D.CE. Date1116:03.04'00'2022.06.05 First Witness Signature Brett D. Moore, P.E., D.CE., President TType/print witness namel' Second Witness l'Type/print witness name prove .• t Form and 1Leeggality: Y 1 ssistant ounty Attorney colleen ereefl Print Name Page 3 of 3 I6A18 South Marco island Beach Restoration Professional Services Federal Permit Prepared by Humiston&Moore Engineers 4-21-2022 SCOPE OF WORK SOUTH MARCO BEACH RESTORATION USACE PERMIT CONTRAcr18-7432-CZ APRIL 21,2022 (valid for 90 days) Introduction:The following is a scope of services for obtaining a new permit from the U.S.Army Corps of Engineers (USACE) for the dredging of sand from Caxambas Pass and placement of the sand as beach restoration along the south segment of Marco Island.The previous permit SAJ-2005-2726(SP/MOD-MMB) was issued for 15 years and expired January 5,2021.A new application will be necessary to issue the same permit for the next 15-years, which is the maximum time period that the state FDEP issues permits for beach restoration. This Project has been completed on approximate 7-year intervals and the last project was completed in 2020 and is currently being monitored. The new USACE permit application will need to be reviewed with the National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service (FWS). With no changes up front the processing may be processed more efficiently to reestablish authorization for beach fill. Following permit issuance, future permit modifications may be filed potentially for the expansion of the sand source depending on the monitoring and in-filling rates at the borrow area. Services provided by H&M will be invoiced based on Time and Materials. The budget and tasks are proposed based on past permitting, project implementation and project performance. An amount of $5,000 is allotted for limited environmental assessment of submerged resources in case requested by the federal resource agencies.This budget assumes no additional technical analysis or justification based on initial conference with USACE staff. Task 1: Permit Drawings,draft application and formal Federal Pre-application meeting Permit Drawings: Engineer shall prepare drawings in support of a permit application for activities previously authorized under USACE permit SAJ-2005-2726(SP/MOD-MMB) for the restoration of the South portion of Marco Island. Sand sources include the Borrow Area in Caxambas Pass as well as use of truck hauling of sand from an acceptable inland source. Plans will be prepared based on the latest monitoring data for the beach and borrow area. Application for the work will be prepared on USACE Engineering Form 4345.Supporting documentation will be compiled in a brief summary for review by the USACE and federal resource agencies(NMFS and FWS).This will include a summary of beach nourishment events at the site, relevant Programmatic Biological Opinions and past compliance records of the project and project performance through project monitoring. Pre-Application Meetings: Upon completion of the permit drawings and draft application by the County, Engineer will coordinate with County and Jacksonville District USACE staff and meet on a formal pre- application basis. Staff of NMFS and FWS will be invited to join the meeting. Deliverable: Permit Drawings and summary of meetings with USACE. Task 1(TM) Estimate: $15,078.00 Task 2: USACE Permitting Page 1 of 2 C:\Users\farronbevard\Desktop\Submitted 2022-Permitting USACE for South Marco Beach Restoration SOW 5-4-2022.docx 16 i8 South Marco Island Beach Restoration Professional Services Federal Permit Prepared by Humiston&Moore Engineers 4-21-2022 Federal Permit Application: Based on feedback from federal agencies, Engineer will prepare and file the necessary permit application for the Beach Restoration of South Marco Island using either the same borrow area from Caxambas Pass or an inland mine depending on sand availability and scope of the fill project. Engineer will utilize existing physical and biological data to initiate the permitting process. Requests for Additional Information (RAI): Engineer will respond to RAls to complete the application for the federal permit so that the public notice may be issued in a timely manner. Engineer will coordinate with the U.S. Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS) as necessary during the permit coordination.Engineer will coordinate all responses through Coastal Zone Management and keep the County and City of Marco informed as stakeholders.Local County staff expertise and physical and biological monitoring of the previous projects completed at this location will be potential resources in addressing questions from the federal staff. Response time to Agency requests will depend on scope of information requested. If new data collection is required, Task 3 will be used to obtain additional site biological data. Deliverable:Approved USACE Permit Modifications and approved Permit Drawings. Task 2(TM) Estimate$14,054.00 Task 3:Subconsultant Earth Tech—Subconsultant Environmental subconsultant to address request for additional site biological data including assessment of submerged aquatic vegetation and natural resources in vicinity of borrow area, if needed. Deliverable:Environmental Resource Survey Report Task 3 (TM)Estimate $5,000 The Tasks listed above will be completed in 365 days from the NTP Professional Services as referenced herein will be provided based on a Time and Materials Basis for a total Not to exceed budget of$34,132. Application fees will be addressed separately by County. Professional services will be provided in accordance with Contract 18-7432-CZ between Engineer and County. Proposal valid for 90 days Sincerely yours, HUMISTON&M OORE ENGINEERS Brett D. Moore,P.E., D.CE. President Page 2 of 2 C:\Users\farronbevard\Desktop\Submitted 2022-Permitting USACE for South Marco Beach Restoration SOW 5-4-2022.docx I6A1 South Marco Beach Restroration-USACE Permitting 4/14/2022 Prepred by Humiston Moore Engineers South Marco Beach Restoration - —.— Project-USACE Permitting Estimate — — 1.Permit Drawings and Drafft Application,USACE Pre-application Meetiing Data review and development of updated— — —` 1.a permit drawings.meet with county 13,380.00 1.b Pre-application meetings 1,698.00 Task 1 Subtotal: 15,078.00 2-Federal Permitting Prepare USACE Submittal,supporting 2.a documentation,plans,reports,RAI 6,486.00 2.b Federal Permitting-USACE 7,568.00 Task 2 Subtotal: 14,054.00 3-Subconsultant 3IBiological data collection 5,000.00 Task 3 Subtotal 5,000.00 Total: 34,132.00 Summary Breakdown of Cost Estimate—RATE/UNIT HOURS/QT COST AMOUNT Principal Engineer 231 25 5,775.00 Senior Engineer 177 8 1,416.00 Project Manager 160 0 0.00 Engineer 130 80 10,400.00 Senior Designer 140 0 0.00 Designer 105 44 4,620.00 Senior Technician 103 44 4,532.00 Inspector 93 0 0.00 Technician 83 2 166.00 Cadd Technician 107 16 1,712.00 Clerical/AdministrativeAdmin/clerical 73 7 511.00 Environmental 1 5,000.00 5,000.00 EXPENSE 0 0.00 Project Total: 34"132•00 F:\Collier\900-South-Marco-Caxambas\2022-USAGE Permitting\2022 Costs Federal Permitting South Marco Beach Restoration Project 04 14 1 of 1 CV.- .) 1 6 A 1 8 South Marco Beach Restoration Project-USACE Permitting Contract No.:18-7432-CZ Project No.90071.1 Date:April 21,2022 Estimate Tasks 1. Permit Drawings and Drafft Application,USACE Pre-application Meetiing 2-Federal Permitting 3-Environmetnal Site Data Collection 1.Permit Drawings and Draft Application,USACE Pre-application Meeting RATE/UNIT HOURS/QTY AMOUNT Principal Engineer $231 11 $2,541 Senior Engineer $177 2 $354 Engineer $130 44 $5,720 Senior Technician $103 44 $4,532 Cadd Technician $107 16 $1,712 Clerical/AdministrativeAdmin/clerical $73 3 $219 Subtotal Task 1: $15,078 (T&M) 2-Federal Permitting RATE/UNIT HOURS/QTY AMOUNT Principal Engineer $231 14 $3,234 Senior Engineer $177 6 $1,062 Engineer $130 36 $4,680 Designer $105 44 $4,620 Technician $83 2 $166 Clerical/AdministrativeAdmin/clerical $73 4 $292 Subtotal Task 2: $14,054 (T&M) 3-Environmetnal Site Data Collection Earth Tech Subconsultant $5,000 Subtotal Task 3: $5,000 (LS) Grand Total $34,132 DocuSign Envelope ID.48AA2CF9-7EBA-4898-A562-21 BE50C5C49A I 6 A 1 8 SCHEDULE B-ATTACHMENT 1 RATE SCHEDULE Title Hourly Rate Principal Senior Project Manager $203 Project Manager $160 Senior Engineer $177 Engineer $130 Senior Inspector $126 Inspector $93 Senior Planner $150 Planner $120 Senior Designer $140 _ Designer $105 Environmental Specialist $120 Senior Environmental Specialist $167 Scientist/Geologist $115 Senior Scientist/Geologist $153 Marine Biologist/Hydrogeologist $120 Senior Marine Biologist/H-ydrogeologist $145 --_--_ Senior GIS Specialist _-+— ---_.--_ $155 — --_-__-_—--_ GIS Specialist $115 Clerical/Administrative $73 Senior Technician $103 _ Technician $83 Surveyor and Mapper $125 CADD Technician $107 Survey Crew-2 man $145 Survey Crew-3 man $180 Survey Crew-4 man $215 Senior Architect $160 Architect $125 The above hourly rates are applicable to Time and Materials task(s) only. The above list may not be all inclusive. Hourly rates for additional categories required to provide particular project services shall be mutually agreed upon by the County and firm, in writing, on a project by project basis, as needed, and will be set forth in the Work Order agreed upon by the parties. ® Grant Funded: The above rates are for purposes of providing estimate(s), as required by the grantor agency. * * * * * Page 2 of 3 First Amendment to Agreement# 18-7432-CZ. Humiston&Moore Engineers,P.A. C.AO 1 6 A 1 8 2 p� tett EARTH TECH ENVIRONMENTAL FROM FOR . QUOTE NUMBER Jeremy Sterk Humiston&Moore Engineers 2184 Earth Tech Environmental TO DATE 10600 Jolea Avenue Brett Moore April 28,2022 Bonita Springs,FL 34135 EMAIL VALID UNTIL www.eteflorida.com bdm@humistonandmoore.com May 28,2022 at 1:00PM PHONE ADDRESS 239-304-0030 5679 Strand Court Naples FL 34110 COPY TO Matthew Fleming ETE Proposal for Environmental Consulting Services - South Marco Beach Restoration Project Project:South Marco Beach Restoration Project Reconnaissance Seagrass\Benthic Resources Survey. Thank you for the opportunity. Earth Tech Environmental,LLC(ETE)appreciates the opportunity to provide you with the following agreement for professional environmental services. Scope of Professional Services: ETE is proposing the following Scope of Services for this project: 16A18 Benthic Resource Survey(Lump Sum): 5,000.00 x1 An in water survey of benthic resources(i.e.,oyster reefs and SAV)in the vicinity of the borrow area at 5,000.00 Caxambas Pass.The purpose of this survey is to delineate the edges of any benthic resources and to document their current condition.This information shall be used to minimize potential impacts to benthic resources.Benthic survey will be conducted by SCUBA certified consultants experienced in benthic observations and identification.ETE will prepare a report summarizing field findings and identified resources will be GPS located with ArcGIS shapefiles provided to the engineer.This is a lump sum task(per survey event).ETE will supply all equipment necessary to complete the survey,including boats and SCUBA gear.This is a reconnaissance survey-if more detailed analysis is required by the County or FDEP,an additional scope and cost will be provided. Total $5,000.00 We appreciate your business! Thank you for allowing Earth Tech Environmental LLC to provide you and your community with environmental services.This proposal can be authorized by digitally signing below.You can also print a PDF version of this agreement,sign,and return a copy to us. Payment Options: ETE accepts cash,check,or credit cards for services.A 3.8%convenience fee is added to all credit card transactions. co14: ty Administrative Services Department Procurement Services Division Direct Select Form Request Date Contract No. Proposal Cost Estimate Construction Cost Estimate 04/14/22 18-7432-CZ $35,000.00 N/A Requested By(Use name as it appears in Outlook): Division/Department: Andrew Miller Transportation Services - CZM Administrative Agent(If different from Requestor): Library Category: Coastal Engineering Vendor Name: Humiston & Moore Engineers Work Assignment Title: South Marco Beach Restoration - USACE Permitting Description of Requested Services: Application for new long term USACE permit for South Marco Island beach renourishment/ restoration. Justification: E] Past experience with project (Select all that apply and explain ❑ Continuation of previous work assignment below) ❑ Unique qualifications ❑ Other Comments/Explanation of Direct Select: H&M is overly familiar with the permitting requirements and recently designed the 2020 South Marco Renourishment under the previous USACE permit. { Ogaally signed by Requestor: Andrew Miller Signature:MillerAndrew Dat.2o12.M t5,058:46 Date: -04'00 Digitally signed by Division Director: Signature:Johnssen_b _ Date:2022.04.2006.15.06 Date: •04'00' Bi elowCathe 2 'y"gnetl0y Procurement Director: Si nature: 9 8ipe.20220425 g tine Data:2022 04 25 12 19 54 Date: CM)