Loading...
Item 4.a.i PPT Off-Site Boat StorageGROWTH MANAGEMENT COMMUNITY DEVELOPMENT DEPARTMENT Off-Site Boat Storage in C-4 PL20210000766 May 25, 2022 Background: 2 •LDCA would affect two properties in the County, one of which is owned by the petitioner, the other owned by Collier County. •Petitioner’s property has been zoned C-4 since 1982. •Petitioner’s property is approximately 2.02 acres. Port of the Islands: 3 Image Courtesy of Google Earth 05/24/2022 Affected Parcels: 4 Public Boat Ramp: 5 Staff Analysis: 6 •Purpose and Intent of C-4 Staff Analysis: 7 •Boating-Related Uses by Zoning District Staff Analysis: 8 •Maximum Building Height by Zoning District •Minimum Required Setbacks in C-4 Staff Analysis (Public Notification): 9 •No required mailed notification for LDC amendments. •Mailed notification area for CU at petitioner’s site would normally require 500 feet. •LDCA proposes one (1) mile mailed notification area. •Staff recommends increasing public notification area. •Staff recommends NIM for CU be held between November 1 and April 1. Staff Analysis (SDP Considerations): 10 •LDCA requires additional landscaping for off-site boat storage. •Outdoor storage requires 7-foot wall but no greater than 8 feet. •Staff determined outdoor boat storage would not be subject to Manatee Protection Plan. Staff Recommendation: 11 Staff recommends that the DSAC-LDR Subcommittee recommend approval of Petition PL20210000766,subject to the following: •Change LDC section 5.05.02 G.1. to read as follows: The use of the boat yards and the dry storage of boats, boat trailers, trailered vessels, and other related vehicles at the off-site location shall be limited to the C-4 zoning district and require conditional use approval from the BZA in accordance with the standards and procedures set forth in LDC section 10.08.00 with a mailed notice requirement of 1,000 feet one mile (5,280 feet).” •The Neighborhood Information Meeting for the conditional use shall occur between November 1 and April 1. •A letter of no objection from the Public Services Department shall be required as part of the conditional use process, to ensure that associated impacts will not cause the public boat ramp to fall below an acceptable level of service.