Backup Documents 05/10/2022 Item #16C1 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO l 6 C
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATUR
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1. County Attorney Office County Attorney
1---1 r.
2. BCC Office Board of County ���� � /� S1(21 22_
Commissioners
3. Minutes and Records Clerk of Court's Office
ck 6I(312, b-r
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Cindy M. Erb Phone Number 239-252-8917
Contact/ Department
Agenda Date Item was May 10, 2022 Agenda Item Number 16C 1
Approved by the BCC
Type of Document Termination of Temporary Number of Original 1
Attached Construction Easement Documents Attached
PO number or account Account: Fund , Cost Center , Object See attached
number if document is Code 649030, Project
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature?
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman,with the exception of most letters,must be reviewed and signed \4 by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the N/A
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip N/A
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 5/10/2022 ,and all changes made A=,
during the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes,if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the
BCC,all changes directed by the BCC have been made, and the document is ready for the 0(1) (...... 't+
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
Memorandum 1 b C 1
TO: Minutes & Records
FROM: Cindy Erb, Property Acquisition Specialist, Sr., Real Property Management
DATE: May 10, 2022
RE: Termination of Temporary Construction Easement - Amerisite
This item was accepted by the BCC on May 10, 2022, Agenda Item 16C1.
Please attest to Commissioner McDaniel's signature as Chairman on the Termination of
Temporary Construction Easement.
Also, please forward the Termination of Temporary Construction Easement to the Recording
Department for recordation. A recording form is attached.
Please contact me if you have any questions or comments at Extension 8917.
Thank you!
I. 6C1
Ann P. Jennejohn
From: Ann P.Jennejohn
Sent: Friday, May 20, 2022 2:58 PM
To: erb_c
Subject: Item #16C1 5-10-22 BCC Meeting
Attachments: Backup Documents 05_10_2022 Item #16C1.pdf
Hi Civtdy,
Please see the attached for your records.
(receipt attached last page)
Thavtk you!
Ann ✓ennejotin
13MR Sevtior Deputy Clerk 1I
tco��kk Clerk to the Value Adjustw►evtt Board
�.�`` �•, Office: 239-252-8406
Fax: 239-252-8408 (if applicable)
Avu&Jetartejokin@CollierClerk.com
r'.,, 1/441 Office of the Clerk of the Circuit Court
k" e' \ & Comptroller of Collier Couvtty
3299 Tavvtiawti Trail, Suite #401
Naples, FL 34112-5324
www.CollierClerk.cowt
i
16C1
This Document Prepared
By and Return to:
Stacy H. Krumin,Esquire INSTR 6252821 OR 6127 PG 1120
Squire Patton Boggs(US)LLP RECORDED 5/16/2022 8 33 AM PAGES 4
One Tampa City Center CLERK OF THE CIRCUIT COURT AND COMPTROLLER
201 N.Franklin Street, Suite 2100 COLLIER COUNTY FLORIDA
REC$35.50
Tampa,Florida 33602
Office: (813)202-1300
TERMINATION OF TEMPORARY CONSTRUCTION EASEMENT
THIS TERMINATION OF TEMPORARY CONSTRUCTION EASEMENT (the
"Termination") is made as of this JQf day of ; t , 2022, by COLLIER
COUNTY, FLORIDA, as the Governing Body of Collier Coun and as Ex-Officio Governing
Board of the Collier County Water-Sewer District("County").
WITNESSETH:
WHEREAS, on October 18, 2005, County acquired easements over certain property in
Collier County, Florida, pursuant to an Order of Taking, recorded November 4, 2005 in Official
Records Book 3927, Page 3199 of the Public Records of Collier County (the "Order");
WHEREAS, the Order contains several Access and Utility Easements and one (1)
Temporary Construction Easement Parcel 711 more particularly described on Exhibit "A"
attached hereto and made a part hereof(the "Easement") which Easement was created to provide
for land area necessary for the construction of the facilities within the Access and Utility
Easements; and
WHEREAS, the Easement Area is located on land owned by SD San Marino, LLC, a
Florida limited liability company ("Owner"); and
WHEREAS, the construction of the proposed facilities is complete; and
WHEREAS, the County desires to formally terminate the Easement and Owner desires
to evidence such abandonment and termination of the Easement; and
WHEREAS, County owns all right, title and interest in and to the Easement.
NOW, THEREFORE, in consideration of ten dollars ($10.00) and other good and
valuable considerations, the receipt and sufficiency of which are hereby acknowledged, the
County does hereby (a) cancel and terminate the Easement and all of its provisions; (b) remove
the Easement of record and deem it of no further force and effect; (c) declare that no portion of
the property set forth in the Easement shall from this day forward be burdened by or receive the
benefit of the Easement. All Access and Utility Easements set forth in the Order shall remain in
full force and effect.
[22-EIS-04653/1716402/1]
010-9313-0191/1/AMERICAS Page 1 of 2
Ch°
1 6C 1
IN WITNESS WHEREOF, County has executed this Termination as of the date and
year first above written.
COUNTY:
ATTE "" . BOARD OF COUNTY COMMISSIONERS
CRY AL,; 'KINZEL,• Clerk COLLIER CO AC RIDA
.,,t; c - / t , - e)* ''' ,
By -9 ��' By: �,..•- PI
At4s'takoQpa anS+ putt' Clerk Wil f.m L. McDaniel, Jr., Chairman
signature only.
Approved as to form and sufficiency:
4(L-Derek D. erry
Assistant County Attorney �\ ly
[22-EIS-04653/1716402/1]
010-9313-0191/1/AMERICAS Page 2 of 2
CAO
16C1
Exhibit
[22-EIS-04653/1716402/1]
010-9313-0191/I/AMERICAS Page 1 of 2 Exhibit "A"
-IO
I 6 C 1
SKETCH AND DESCRIPTION OF A
TEMPORARY CONSTRUCTION EASEMENT
FOR PRODUCTION WELL NO. 18
IN THE SW 1/4 OF THE SW 1/4 OF SECTION 14. 7WP 50 S.
NORTH LINE OF THEN 1/2 OF RGE 26 E, COLLIER COUNTY, FLORIDA
THE N 1/2 OF THE N 1/2 Cr -
THE SW 1/4 OF THE SW 1/4 �\ N87`35`04'E
100.16' "+
F.P,&L. R/W j
3 LASEMLNT
N 1/2 OF THE N 1/2 OF Ijay NTHEN1/2OFTHESW a,v — 17G'
1/4 OF THE SW 1/4 ;� 0�
FOLIO NO.; ," Lq PIIOPOSED 15'
004168000001 rn r:tn UTILITY
f a c' S87'35'26`W 5A5&tENT RO,C.
03 40.06' SE. CORNER OF
N 1/2 OF THE v
L
ka FROP(?SED N 1/2 OF iNC
gL-F1 OFGDA F'OYfR / F.RL�OU^ t ON do LICtiT CO. ua / Kf.L P O 18 N 1/2 OF THE
' R/ - RIGHT-DE-WAY 0 UTILITY EA5EME?IT SNf 1J4 Gf THE +n
P.O.B.-F'CVNT OF ECINNiNG p O SW 7/d y`w
,..,C.-POINT OF COMIIENCEUCNT 060.10` P'O'p` 210.34' {
I._ S67'35'26 W I S87'.552b
SOUTH LINE Of THEN 1/2 Or z r
NE N 1/2 Of THE H 1/2 OF•
�zvl
THE SW 1/4 OF THE SW 1/4 r� w
1�TiDN QLieI OF A PARCEL OF LAND LYING IN THE NORTH 1/2 w
SOUTHWEST 1/4 OF THE SCX1THw1:ST 1/4 Cf SE F CTION 14, TOWNSHIP 0 SOUTH, RANGE 26 EAST, COWER 1/2 OF THE NORTH 1/2 �OTHE
DUNTY,
FLORIDA:
COMMENCING AT THE SOUTHEAST CORNER OF Snap NORTH 1/2 OF THE NORTH 1/2 CF THE NORrr 1/2 OF THE
SOUTrIW+EST 1/4 OF THE SOUT'rIwwST 1/4, THENCE RUN Sri7'35'26-W, A DISTANCE OF 210.34 FEET ALONG THE
SOU H UNE OF SAID NORTH 1/2 OF THE NORTH 1/2 OF THE NORTH 1/2 CF THE SOUIHWEST 1/4 OF THE
SOUTHWEST 1/4 1E1 1H,E POINT OF BEG1.VNO4C; THENCE CONTINUE 587'35`26-W, A DISTANCE OF 60,TO FEET ALONG
SAID SOUTH UNE; THENCE RUN NDO.4?'35'E, A DISTANCE OF 167.52 FEET TO THE NORTH UNE OF SAID NORTH 1/2
OF THE NORTH 1/2 OF THE NORTH 1/2 CF THE SOUTHWEST 1/4 CF THE SOUTHWEST 1/4; THENCE RUN
N137"35'04`E. A DISTANCE OF 100.16 FEET ALONG SAD NORTH UNE, THENCE RUN SO0'49'35'w. A DISTANCE OF
117,45 FEET ALONG DIE WEST UNE OF A 170-FOOT FLORIDA POWER AN3 LIGHT COMPANY RICHT-OF-WAY
EASEuENT, A UNE THAT IS PARALLEL TO THE EAST UNE OF SAD NORTH 1/2 CF THE NORTH 1/2 OF THE NORTH
1/2 OF THE c" ITHWEST 1/4 OF THE SOUTHWEST 1/4; THENCE RUN 567'35'26-W, A DISTANCE OF 40,06 FEET
ALCNC A UNE THAT IS PARAJ.EL TO SAID SOUTH LINE: THENCE RUN 500'49'.5'W, A CCSTANCE CF 50.08 FEET
ALONG A LINE THAT IS PARALLEL TO SAID EAST UNE TO THE POINT OF DE(.NNING,
CONTAINING 14,750 SQUARE FEET OR 0,34 ACRES, MORE OR LESS.
��kir cSC L1CL�— THEACEL BEAR ING,, DISTANCES, AND AREAS FIELD CALCULATED ARE BASED ON A SURVEY OF
,TASTES F THE FIRM L86773) SECTION 14, BASIS OF BEARING; STATE PLANE
PROS oNAi SUTi ANO MAPPER ODCRDINATE SYSTEM, FLA- EAST ZONE, '83/90.
FtOfl1
THISz; ` o " ffeIN. THIS IS NOT A SURVEY
F1r EY C. COONER AND ASSOCIATES, INC.
SURAPPING
3900 COLONIAL BLVD. E ANFOR MYERS, FLORIDA 33912
PONE (232)277-0722 FAX: (232)277--7179 EMML• SURVE11NGCCOONER.CC3u!
CLIENT: Maier AND HANSEN. LLD DRAWN BY; ,NW
�' �E5C3'tlPTTON: CHECKED BY: ,I.N.w.
TEMP. CONSTRUCTION EASEMENTTHE18 GATE B/3/t14
SW 1/4 OF SCALE: 1"-&0' REV 10/20J04
/ THE SW 1/4 OF SEC 14-50-26 PROJECT No; D20901 DWG NaSEc14w-ToE{1C;5 SHEET: I OF 1
1
T
[22-EIS-04653/1716402/1]
010-9313-0191/1/AMERICAS Page 2 of 2 Exhibit "A"
0