Loading...
Backup Documents 04/12/2022 Item #16A20 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 A 2 0 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office ., Nf�G AC. L f— l - ,��► 2-- 4. BCC Office Board of County Commissioners by/1ji/ L/Z6/zZ 5. Minutes and Records Clerk of Court's Office y/2 1/L �� PRIMARY CONTACT INFORMATION � �' Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Andrew Miller—GMD—Capital Project Contact/ Department Planning, Impact Fees and Program Management(239.252.2922) Agenda Date Item was 04/12/2022 Agenda Item Number 16.A.20. Approved by the BCC Type of Document WO — Ardaman & Associates, Inc. — Sediment Number of Original 1 Attached Testing-$5,395.00 Documents Attached PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature FEB 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be FEB signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's FEB signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 04/12/2022 and all changes made during FEB N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the FEB N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16A ? O WORK ORDER/PURCHASE ORDER Contract 18-7432-TE"PSL—Testing Category" Contract Expiration Date: September 7, 2025" This Work Order is for professional testing services for work known as: Project Name: Sediment Compliance Criteria Testing Services for Wiggins Pass/Doctors Pass Dredge 2021-2022 Project No: 80288.1 & 90549.1 The work is specified in the proposal dated March 1, 2022, which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to: Ardaman &Associates, Inc./ Scope of Work: As detailed in the attached proposal and the following: * Task I Sieve Samples * Task II Carbonate Samples Schedule of Work: Complete work within 45/days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement# 18-7432-TE will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreementferenced above, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs (LS±RC) ❑Time & Material (T&M) (established hourly rate— Schedule A) ❑ Cost Plus Fixed Fee(CPFF), as provided in the attached proposal. Task I $4,165.00' Task II $1,230.00 TOTAL FEE $5,395.00 • Digitally signed by MillerAndrew MillerAndrew Date:2022.03.03 15:54:35 PREPARED BY: -05'00' Andrew Miller, P.E., Manager Date ScottTrinity Digitally signed by ScottTrinity APPROVED BY: Date 2022A3 04 100707 36-05'00' Trinity Scott, Division Director Date ScottTrinity Digitally signed by ScottTrinity Date:2022.03.10 09:18:21-osoo APPROVED BY: Trinity Scott, Department Head Date y the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or Page 1 of 3 :CAC) I 6 A 2 0 currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Ardaman& Associates,Inc. sign Ilic Ivan Sokolic DateDigitally 2022 03ed 04by 08van 24Soko 18-05'00. Ivan Sokolic, Senior Engineer/Branch Manager Date (Remainder of page intentionally left blank) Page 2 of 3 'CAO I 6 A 2 0 IN WITNESS WHEREOF,the parties hereto,have each,respectively, by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS , Clerk of Courts COLLIER CO A . r / ,K_(De• By: • C. By: ' Will" L. McDaniel,Jr., Chairman Dated: `Y ! . �- (SEAL) Attest as to Chaff man's Ardaman&Associates,Inc. signature only. Digitally signed by Ivan Sokolic Ivan Sokolic Date:2022.03 04 08.24.34 By: 05'00' Signature Ivan Sokolic, Senior Engineer/Branch Manager TType/print signature and titleT TType/pri witne s nameT • Secon. ' itness TType/print witness nameT Approved as to Form and Legality: /ir Assistant County Attorney ir �.i - ct,J J Print Name Page 3 of 3 Ardaman & Associates, Inc. 1 6 A 2 0 Geotechnical,Environmental and Materials Consultants Revised March 01, 2022 Ardaman Proposal No. 22-039 Collier County Coastal Zone Management Growth Management Department 2685 South Horseshoe Drive, Unit 103 Naples, FL 34104 Attention: Ms. Farron Bevard Operations Analyst Subject: Sediment Compliance Criteria Testing Services Wiggins Pass / Doctors Pass Dredge 2021-2022 Contract No. 18-7432-TE — PSL—Testing Category Dear Ms. Bevard: As requested, Ardaman &Associates, Inc. (Ardaman) is pleased to submit this quote to perform the laboratory testing on the sand materials sampled by your site representative. The samples will be delivered to our lab. Samples will be evaluated for Munsell color (Value (Chroma = 1) of 7 or lighter), silt (minus #230 sieve, maximum 3%) and shell content (plus #4 sieve, maximum 1%) and screened using the following U.S. Standard Sieve Numbers: 3/4", 5/8", 7/16", 5/16", 3.5, 4, 5, 7, 10, 14, 18, 25, 35, 45, 60, 80, 120, 170, 200 and 230. Selected samples will be tested for carbonate content. In addition, mean grain-size (compliance range 0.30mm - 0.50mm) will be calculated by moment method and sorting value will be calculated. Our laboratory results will be summarized on a grain-size distribution report that will include the Sample Number, Mean Grain-Size (mm), Sorting Value (phi), Silt Content (%), Carbonate Content (%) and Munsell Color. Costs for these tests will be as follows (Estimate): Wiggins Doctors Construction Location Pass Pass Sub-Total Unit Rate Cost Number of Required Sieve Samples 12 5 17 $245.00 $4,165.00 (no Carbonates testing) Number of Required Carbonate Samples 4 2 6 $205.00 $1,230.00 (no Sieves analysis) Total $5,395.00 9970 Bavaria Road,Fort Myers,Florida 33913 Phone(239)768-6600-Fax(239)768-0409 Florida: Bartow, Fort Myers,Miami,Orlando,Port St.Lucie,Sarasota,Tallahassee,Tampa,West Palm Beach Louisiana: Alexandria,Baton Rouge,New Orleans,Shreveport COY 16 A 20 Collier County Growth Management Department Ardaman Proposal No. 22-039 Page No. 2 This proposal is offered for an acceptance period of 90 days following its submittal to you. After this time, the proposed costs may be subject to change. At your request, after the acceptance period has elapsed, we will re-evaluate our proposal, and reissue it reflecting changes in work scope and cost, if necessary. We estimate that it will take 45 days to complete testing for the samples subject of this proposal. This time is estimated from the date samples are received by our laboratory in Fort Myers. If this quote meets with your approval, please authorize us to proceed by issuing us a Work Order or Purchase Order. We appreciate the opportunity to offer our services to your project and look forward to working with you. Should you have any questions regarding this proposal, please do not hesitate to contact this office. Very truly yours, ARDAMAN &ASSOCIATES, INC. A. Jamie Peters Ivan Sokolic, P.E. CMT Coordinator Senior Engineer/ Branch Manager Ardaman&Associates,Inc. 16A20 Nor I. Ardaman & Associates, Inc. am& Geotechnical,Environmental and / Materials Consultants Revised March 01, 2022 Ardaman Proposal No. 22-039 Collier County Coastal Zone Management Growth Management Department 2685 South Horseshoe Drive, Unit 103 Naples, FL 34104 Attention: Ms. Farron Bevard Operations Analyst Subject: Sediment Compliance Criteria Testing Services Wiggins Pass/ Doctors Pass Dredge 2021-2022 Contract No. 18-7432-TE— PSL—Testing Category Dear Ms. Bevard: As requested, Ardaman &Associates, Inc. (Ardaman) is pleased to submit this quote to perform the laboratory testing on the sand materials sampled by your site representative. The samples will be delivered to our lab. Samples will be evaluated for Munsell color (Value (Chroma = 1) of 7 or lighter), silt (minus #230 sieve, maximum 3%) and shell content (plus #4 sieve, maximum 1%) and screened using the following U.S. Standard Sieve Numbers: 3/4", 5/8", 7/16", 5/16", 3.5, 4, 5, 7, 10, 14, 18, 25, 35, 45, 60, 80, 120, 170, 200 and 230. Selected samples will be tested for carbonate content. In addition, mean grain-size (compliance range 0.30mm - 0.50mm) will be calculated by moment method and sorting value will be calculated. Our laboratory results will be summarized on a grain-size distribution report that will include the Sample Number, Mean Grain-Size (mm), Sorting Value (phi), Silt Content (%), Carbonate Content (%) and Munsell Color. Costs for these tests will be as follows (Estimate): Wiggins Doctors Construction Location Pass Pass Sub-Total Unit Rate Cost Number of Required Sieve Samples 12 5 17 $245.00 $4,165.00/ (no Carbonates testing) Number of Required Carbonate Samples 4 2 6 $205.00 $1,230.00 (no Sieves analysis) Total $5,395.00 / 9970 Bavaria Road,Fort Myers,Florida 33913 Phone(239)768-6600-Fax(239)768-0409 Florida. Bartow,Fort Myers,Miami,Orlando,Port St.Lucie,Sarasota.Tallahassee,Tampa,West Palm Beach Louisiana: Alexandria.Baton Rouge.New Orleans.Shreveport C! t,O1 16A2 0 Collier County Growth Management Department Ardaman Proposal No. 22-039 Page No. 2 This proposal is offered for an acceptance period of 90 days following its submittal to you.After this time, the proposed costs may be subject to change. At your request, after the acceptance period has elapsed, we will re-evaluate our proposal, and reissue it reflecting changes in work scope and cost, if necessary. We estimate that it will take 45 days to complete testing for the samples subject of this proposal. This time is estimated from the date samples are received by our laboratory in Fort Myers. If this quote meets with your approval, please authorize us to proceed by issuing us a Work Order or Purchase Order. We appreciate the opportunity to offer our services to your project and look forward to working with you. Should you have any questions regarding this proposal,please do not hesitate to contact this office. Very truly yours, ARDAMAN &ASSOCIATES, INC. A. Jamie Peters Ivan Sokolic, P.E. CMT Coordinator Senior Engineer/Branch Manager MN/11111 —_ Ardaman&Associates.,tnc. - cAa From: Fevardfarron To: :okolic,Ivan Cc: MillerAndrew;Keehn.Steglagru DarcoChristooher;HumohriesLarrv•peters.ramie•Croft.Kelly DigelowCatherine Subject: RE:Quote Request:DEP Permit Requirement-Sediment Testing-10 monuments Date: Wednesday,March 2,2022 11:57:36 AM Attachments: 22-039Rev.03 CollierCo-Sediment Comoliance Criteria Testing Services.Collier Co.odf imege003.onq Good Morning Ivan- Happy Wednesday! I just spoke with Procurement in regards to the Ardaman&Associates,Inc.quote dated March 1,2022 (Revised)and was directed to page 26 of the contract: The above hourly rates are applicable to Time and Materials task(s) only. The above list may not be all inclusive. Hourly rates for additional categories required to provide particular project services shall be mutually agreed upon by the County and firm, in writing, on a project by project basis, as needed, and will be set forth in the Work Order agreed upon by the parties. After review of the attached quote,we find the quoted rates to be reasonable and match those rates provided during the 2021-2022 Collier Beach Renourishment projefr I will begin the Work Order process for the attached quote and will submit it to the following groups for approval: • Coastal Advisory Committee(CAC)-March 10,2022 • Tourist Development Council(TDC)-March 28,2022 • Board of County Commissioners(BCC)-April 12,2022 Once we have the executed Work Order in hand,we will then request a Purchase Order.When we receive the PO,we will contact you to discuss a commencement date for the Notice to Proceed. Please let me know if you have any questions or concerns. I hope you have a happy day! Respectfully, Farron Bevard Operations Analyst Co*er County We are committed to your success! Growth Management Department Capital Project Planning, Impact Fees& Program Management Division Coastal Zone Management Section Farron.Bevard@colliercountyfl.gov 2685 South Horseshoe Drive,Unit 103 1611 20 Coter County Direct Select Form Request Date Contract No. Proposal Cost Estimate Construction Cost Estimate 02.08.22 18-7432-TE $15,000.00 / $2,197,180.00 Requested By (Use name as it appears in Outlook): Division/Department: Andrew Miller Capital Project Planning, Impact Fees&Program Management Administrative Agent(If different from Requestor): Library Category:Testing Vendor Name:Ardaman & Associates, Inc. Work Assignment Title: Sediment Testing Description of Requested Services: Dredge fill sediment testing and QA/QC required as a permit condition for both Wiggins and Doctors Pass Dredge. Justification: 0 Past experience with project (Select all that apply and explain ❑ Continuation of previous work assignment below) ❑ Unique qualifications ❑ Other Comments/ Explanation of Direct Select: Ardeman performs sediment testing on our truck haul renourishments and dredge projects. Ardeman provides a valuable service for a reasonable price and has a proven track record of understanding DEP permit requirements. Ggbaly signed by Requestor:Andy Miller Signature:MillerAndrew pMaIk2M02r2ew.2 09 14 48 19 Date: •0500 Ggnaly signed by Division Director: Signature:SCottTrinitys`nnTnnity oale zo2zoz.to toszsa Date: ii -05'00' BI elowCa Digitalysgnedby 9 Date 202202 ne Date: Procurement Director: Signature:rive Gate 202202.1770 Ob 27 -05'00' Revised 06117/2021