Loading...
Bayshore Beautification MSTU Agenda 03/09/2022 Bayshore CRA Offices: 3299 Tamiami Trail E, Unit 103, Naples, Florida 34112 Phone: 239-252-8844 Online: www.bayshorecra.com Collier County Community Redevelopment Agency (CRA) Bayshore Gateway Triangle Local Redevelopment Advisory Board and Bayshore Beautification MSTU Advisory Committee AGENDA 3299 Tamiami Trail E, 3rd Floor BCC Board Chambers Naples, FL 34112 March 9, 2022 Time: 5:30 PM to 8:00 PM 1. Call to order/Quorum a. Karen Beatty, Chair, CRA Advisory Board b. Maurice Gutierrez, Chair, Bayshore MSTU Advisory Committee 2. Participation by Board Members via virtual attendance a. CRA Advisory Board- Motion to approve b. MSTU Advisory Board- Motion to approve 3. Pledge of Allegiance 4. Introductions 5. Approval of the Agenda a. CRA Advisory Board b. MSTU Advisory Board 6. Meeting Minutes: a. CRA minutes for February 1, 2022 (CRA Action Item) b. MSTU minutes for February 2, 2022 (MSTU Action Item) 7. Reports: a. Collier County Sheriff’s Office b. Private Development Reports-(Attachment) Laura DeJohn, Johnson Engineering 8. Community Business Presentations: a. Viage Marina, 3470 Bayshore Drive – Site Development Review (Attachment) (CRA Action Item) 4.A.2 Packet Pg. 22 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Bayshore CRA Offices: 3299 Tamiami Trail E, Unit 103, Naples, Florida 34112 Phone: 239-252-8844 Online: www.bayshorecra.com 9. Old Business: a. Sabal Shores Street Lighting Update-Reduced Street Lighting to 6 vs. 7 (Attachment) (CRA Action Item) b. CRA Training Update 10. New Business: a. Dunkin Donuts Commercial Grant Program Application-(Attachment) (CRA Action Item) b. Draft 2021 Annual Report- Hand out at meeting 11. Work Plans 2022/2023 - Attachment a. CRA (CRA Action Item) b. MSTU (MSTU Action Item) 12. Staff Reports a. Directors Report- (Attachment) b. Project Managers Report- (Attachment) c. Insurance Claims Report- (Attachment) d. CRA Financials- (Attachment) e. MSTU Financials- (Attachment) 13. Other Agencies: a. Code Enforcement- (Attachment) 14. Communications 15. Public Comment 16. Staff Comments 17. Advisory Board General Communications 18. Next Meeting Dates: a. CRA - Tuesday, April 5, 2022 @ 6pm b. MSTU – Wednesday, April 6, 2022 @ 5pm BCC/CRA/MSTU’s Joint Workshop May 3rd @ 9am TBD 19. Adjournment 4.A.2 Packet Pg. 23 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 1 February 1, 2022 Meeting Minutes Item 6a BAYSHORE/GATEWAY TRIANGLE COMMUNITY REDEVELOPMENT LOCAL ADVISORY BOARD MINUTES OF THE FEBRUARY 1, 2022 MEETING The meeting of the Bayshore/Gateway Triangle Community Redevelopment Advisory Board was called to order by Chairwoman, Karen Beatty at 6:00 p.m. I. Roll Call: Advisory Board Members Present: Maurice Gutierrez, Al Schantzen, Kathi Kilburn, Steve Rigsbee, Mike Sherman and Karen Beatty. Camille Kielty attended virtually. Motion to approve voting privileges by members remotely made by Maurice Gutierrez, seconded by Mike Sherman. Motion passed unanimously. CRA Staff Present: Debrah Forester, CRA Director, Tami Scott, Project Manager and Shirley Garcia, Operations Coordinator. II. Pledge of Allegiance: Led by Karen Beatty. III. Adoption of Agenda: Steve Rigsbee made a motion to accept the agenda as written, Maurice Gutierrez second. Approved unanimously. IV. Approval of Minutes: a. January 18, 2022 Meeting Minutes -Al Schantzen made a motion to approve the minutes as written, Camille Kielty seconded the motion. Approved unanimously. V. Community / Business - Presentations a. Collier County Sheriff’s Office: Sergeant Tuff attended to provide the crime report from the previous month. There was 1 commercial burglary at the Real Macaw which occurred after hours, about $900 worth of alcohol was stolen. There was one attempted burglary at Planet Fitness at Gulf Gate Plaza, there were 2 robberies in the Bayshore area. There were a eight accidents reported and one drug arrest. As follow-up to the question last month regarding a pedestrian accident - Sergeant Tuff checked on the crash and speeding was not a factor, it was an intoxicated pedestrian that stepped out into traffic and was hit. He reminded everyone to lock their vehicles and recommends calling into the non-emergency line 252-9300 if anyone has any concerns or sees something. The best way for the deputies to catch something is if someone calls it in. Ms. Forester asked about the panhandling ordinance and how they will enforce it. Sergeant Tuff said the panhandlers cannot hinder traffic. They can step off the sidewalk and get the money but if they are in the middle of the lane interfering with the traffic, they can get arrested. Ms. Kilburn raised concerns with jaywalkers and people not crossing at the pedestrian crosswalks especially at night when visibility is poor. 4.A.2 Packet Pg. 24 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 2 b. Jacob Winge, President of East Naples Civic Association-Ms. Forester noted that Mr. Winge had a conflict with another meeting tonight so she will invite him to our next regular CRA meeting. c. Isle of Collier - Phase 17 – Fleischmann Parcel Update – Michael Elgin- Mr. Elgin noted they anticipate closing on the property in early February and anticipates selling lots in the fourth quarter of 2023. He provided a presentation with the proposed improvements to South Bayshore Drive to accommodate the new development (parcel recently purchased by Stock Development) on the west side of Bayshore and the connection into the existing Isle of Collier development on the east side. He noted that Stock Development is already selling lots. A roundabout will be installed on South Bayshore to facilitate traffic flow between east and west sides of the community. Each side will be gated. The entrance gates are recessed and there will be streetlighting that is consistent with the light fixtures used throughout Isle of Collier. The roundabout will have brick pavers and no structures or landscaping can be installed in the center of the roundabout to accommodate large trucks and emergency vehicles. There will be sufficient pedestrian crossings on all 4 sides and some traffic calming devices. They will maintain any landscaping in the county’s right of way via a maintenance agreement. Mike Sherman asked about bike lanes and Mr. Elgin noted that they will continue a 10 ft. multi use path through the crosswalks and into both developments. Ms. Forester asked about working together on the type of light and landscaping to complement what the MSTU has installed. Norm Trebilcock, the project’s traffic engineer spoke regarding the lighting fixtures and noted his work with FPL to assure they photometrics meet pedestrian safety needs. He also was available to answer any questions regarding the roundabout. Mr. Elgin hopes to have all the improvements done by next fall. Mike Sherman was asking how soon traffic will be using Hamilton Ave, Mr. Elgin replied that Stock Development could have folks living there by the end of 2023. Al Schantzen was concerned about the stormwater run off due to the project. Mr. Trebilcock noted that they are capturing their own water run off into their development and the existing water shed will all run naturally to the south as it always has. VI. Reports: a. Private Development Update- i. Update – PL20210000695 – Temporary Use Permit – As follow-up from last month’s discussion, staff reported that the permit was only for a construction/administration office to accommodate Isle’s of Collier project. A different application would be needed to allow model home sales center. ii. PL20210002947 Preliminary Lot Layout -Gulfview and Bayshore- Another follow-up from last month’s meeting, Ms. Forester noted the attachment that shows the preliminary site layout for the vacant 10 acre parcel Mike Sherman asked if this will be a gated community, Laura DeJohn didn’t see on the drawing if it was gated or not, but they are allowed to have gates. This site is located on the east side of Bayshore Drive, south of Barrett. 4.A.2 Packet Pg. 25 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 3 VII. Old Business: a. GMP and Land Development Code Changes Review- Ms. Forester noted the Code Changes that was postponed on the BCC Agenda from January and moved to February 8th, however it may be delayed again and staff will keep them posted on the date. She asked Ms. DeJohn to attend and provide them a quick refresh before it goes to the BCC. Ms. DeJohn gave a brief presentation and noted some minor changes the Planning Commission recommended. b. 17 acres update- Ms. Forester received a message from the County Manager’s Office in regard to the future of the 17 acres and it will be moved from the February 8 BCC meeting because he had some questions. The item will be moved to a future Board date. Ms. Forester noted she also received a letter of intent from Cody Shadley regarding a potential purchase of the property. Ms. Forester stated she advised him to wait until the BCC provided direction on the parcel – whether to open it up for sale and give everyone the chance to submit proposals or to move forward with the Stantec proposal. Mr. Shadley’s proposal incorporates a mixed-use project with retail and residential, a performing arts center, garden dining with a boutique hotel. The price would be $2.5 Million with no contribution to the boardwalk. After much discussion by the board Karen Beatty made a motion to move forward with the Stantec Proposal put all unsolicited offers aside until the completion of the boardwalk, second by Al Schantzen, approved unanimously. c. Mural Ordinance Update- Ms. Forester noted the draft is at the County Attorney’s Office and needs to be reviewed by Growth Management Division and she will keep them posted once those reviews are completed. d. Gateway Triangle Linwood Way & Bayside St. Stormwater Improvements- Richard Orth, Stormwater Department noted Q Grady Minor was selected to complete the work for the Gateway Triangle area (Bayside Street and Linwood Way) due to their previous experience with the Gateway Triangle Stormwater Master Plan. He reviewed the proposed scope of work which has the following tasks: site assessments, design permitting and bid documents, bidding and construction assistance, project close-out; and public meetings. Mr. Orth is hoping that both areas will run at the same time since there doesn’t seem to be as many issues on Bayside as on Linwood Way. The total cost from Site Assessment through the end of construction overview will be $186,705. Maurice Gutierrez made a motion to move forward, second by Karen Beatty, approved unanimously. e. Ozzlyn Gardens Residential Grant Extension- Ms. Forester asked Mr. Johnson if the code violation was corrected before the board allows the extension. Mr. Johnson noted they requested an extension at the Special Magistrate Hearing because the only issue is the Site Development Plan through Growth Management Division which takes time. Ms. Forester asked the Advisory Board if they would process payment for the two items that are completed and not related to the violation or if they would like to wait and see 4.A.2 Packet Pg. 26 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 4 The board agreed to pay for the items completed and see if they complete the third item and not be in violation before they recommend the extension. VIII. New Business: IX. Staff Report: a. CRA Directors Report- Ms. Forester provided the report and asked if anyone has any questions. b. Project Manager Report- Ms. Scott provided the updates on her list of projects. Ms. Scott provided an update on the CRA parking lot, the gates are going to be installed, the plaques at the parking lot have ben ordered and the signs. Road Maintenance has agreed to partner with the CRA for the fence under the bridge. Regarding the Linwood Way landscape buffer, City of Naples installed the water meter and the contractor has installed the back flow and waiting for inspection to proceed with installing the irrigation and hedge. Ms. Forester noted Ms. Scott is working with Pickleball organization to see if they would like to partner regarding banners on the light poles along Thomasson for the pickleball opening. c. Maintenance Report: Ms. Forester provided the current maintenance report and noted the insurance claims and the pavers that are being repaired. d. Financial Report: Ms. Forester provided the current financial if anyone had any questions. X. Other Agency’s: a. Collier County Code Enforcement: Ms. Forester noted the Code enforcement report attached to the agenda packet and introduced John Johnson to answer any questions. Mr. Johnson noted the noise case that is going to a hearing on Friday morning as a repeat violation, the County will request the amplified music permit be revoked for a year. Al Schantzen asked about the 2449 Manorca Ave that Mr. Buonocore asked about at the last meeting and provided the update from the zoning department that determined this property is a legal non-conforming lot since it was split. Maurice Gutierrez asked about Naples Bay Marina and the dock case, Mr. Johnson updated that case that the marina needs a site development plan in order to get a permit for the boat lifts. Steve Rigsbee asked about the Hookah Lounge and requests help from the CRA Director and Code Enforcement to set up a meeting to ask the owner what his plans are. Ms. Forester noted maybe send a letter to the owner to touch base. XI. Communications and Correspondence: 4.A.2 Packet Pg. 27 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 5 a. Tamiami Trail Business Owner Advisory Board Vacancy-Ms. Forester noted the vacancy if anyone was interested in applying. b. Fifth Third Ribbon Cutting Flyer- Ms. Forester provided the Fifth Third Bank Ribbon Cutting Ceremony flyer and noted if anyone would like to attend please do. XII. Public Comments: Kathy and Dean Smart asked the Board what the vision for the 17acres is, money or more about community. Karen Beatty replied all about the community. XIII. Staff Comments: Ms. Forester wanted to mention the rules of Sunshine Law, for example if there is a group email, she wanted to remind the board to only respond to the person who sent it and not to everyone that was in the email. Just as a precautionary measure and to be careful. XIII. Advisory Board General Communications: Camille Kielty asked about the FRA President and a joint BCC/CRA training session that was discussed at previous meeting and asked staff to set that up. Ms. Forester noted she will give them a couple of options to choose from for the meeting. XIV. Next Meeting Date: a. March 9, 2022 @ 5:30pm CRA/MSTU Joint Workshop b. May 3, 2022 BCC/CRA/MSTU Joint Workshop 9am XIV. Adjournment – The meeting adjourned at 8:55 p.m. ________________________________________ Chairwoman, Karen Beatty 4.A.2 Packet Pg. 28 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Item 6b 1 February 2, 2022 Meeting Minutes BAYSHORE BEAUTIFICATION MSTU MINUTES OF THE FEBRUARY 2, 2022 MEETING The meeting of the Bayshore Beautification MSTU Advisory Committee was called to order by Maurice Gutierrez at 5:25 p.m. located at 3299 Tamiami Trail E, BCC Board Room 3rd Floor. I. Roll Call: Advisory Board Members Present: George Douglas, Maurice Gutierrez, Sandra Arafet, and Susan Crum. Bob Messmer attended virtually. Jim Bixler had an excused absence. John Smith was absent. Motion to approve voting privileges by members remotely made by Maurice Gutierrez, seconded by Sandra Arafet. Motion passed unanimously. MSTU Staff Present: Debrah Forester, CRA Director Tami Scott, Project Manager and Shirley Garcia, Operations Coordinator. II. Pledge of Allegiance: Led by Maurice Gutierrez. III. Adoption of Agenda: Sandra Arafet made a motion to accept the Agenda as written, second by Susan Crum. Motion passed unanimously. IV. Adoption of Minutes: George Douglas made a motion to accept the previous meeting minutes as written, Sandra Arafet seconded. Passed Unanimously. V. Landscape Report: a. Update on Landscaping – Armando from A&M was in attendance and provided the monthly report and updates. Armando mentioned the pump at the irrigation box is not working again and Ms. Scott called for the repair so no water is being pushed out until its fixed. The stakes on the palms are starting to be removed from the Thomasson Drive project. Ms. Scott noted monthly walking tours with A&M will start in March and invited everyone to attend to view the conditions of the area. The tours will be held on the second Wednesday of every month at 10am. Notices will be sent out. VI. Community / Business Presentations: VII. Old Business: a. GMP and Land Development Code Changes- - Ms. Forester noted this item will not be on the February 8th BCC meeting agenda. VIII. New Business: 4.A.2 Packet Pg. 29 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Item 6b 2 IX. Staff Reports: a. CRA Directors Report- Ms. Forester provided the report and highlighted some of the projects. Del’s demolition is out of bid and it should begin within the next 60 days. b. Project Manager Report- Tami Scott highlighted a couple of projects: the sign at the CRA parking lot will be installed identifying some rules similar to park rules. New fencing under the Haldeman Creek bridge will be funded by the CRA and Road Maintenance. Stormwater Project has started at Pine, Weeks and Becca Avenue and the scope of work for the stormwater project in the Gateway Triangle area (Bayside Street and Linwood Way) was approved by the CRA Advisory Board and is pending final procurement approval. Staff is working with Transit to finalize the procurement documents to start the design for the bus shelter on Thomasson as approved by the MSTU. c. Maintenance Report- The monthly maintenance report was attached if anyone had any questions. d. Financial Report- The financial report was attached if anyone had any questions. X. Public Comments: XI. Staff Comments: XII. Advisory Committee Comments: XIII. Next Meeting Date: a. March 9, 2022 @ 5:30pm Joint CRA Meeting in the BCC Board Room b. May 3, 2022 Joint BCC/CRA/MSTU Workshop 9am XIV. Adjournment: 6:39 pm ______________________________________ Chairman Maurice Gutierrez 4.A.2 Packet Pg. 30 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 1 of 10 March 2022 Private Development Update Please Note: Projects with *and highlight have been updated since the last report Yellow highlight indicates old project with recent activity; Green highlight indicates new project Zoning Petitions Mini-Triangle MPUD (PUDA): PL20210001100* Location: 1991 and 1911 Tamiami Trail; 2000 and 2054 Davis Blvd. Owner: Metropolitan Naples LLC Status: Pre-application meeting held 6/9/2021. First applicant submittal on 2/4/2022. Amend Mini Triangle Mixed Use Subdistrict [companion item Mini-Triangle Small Scale GMPA (PL-20210001101)] to allow for the conversion of hotel units to multifamily residential units (not to exceed 491 dwelling units) and to amend the min./max. retail and office square footage for a combined minimum of 25,000 15,000 SF office/retail and a maximum of 130,000 SF of commercial/office/retail. Mini-Triangle MPUD (Small Scape GMPA): PL20210001101* Location: 1991 and 1911 Tamiami Trail; 2000 and 2054 Davis Blvd. Owner: Metropolitan Naples LLC Status: Pre-application meeting held 6/9/2021. First applicant submittal on 2/7/22. Amend the Mini-Triangle MPUD-GTMUD-MXD (Ordinance 2018-025) and companion item Mini-Triangle Mixed Use Subdistrict to allow for the conversion of hotel units to multifamily residential units (not to exceed 491 dwelling units) and to amend the min./max. retail and office square footage for a combined minimum of 25,000 15,000 SF office/retail and a maximum of 130,000 SF of commercial/office/retail. Item 7b 4.A.2 Packet Pg. 31 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 2 of 10 St. Matthew’s House PUD to PUD Rezoning (PUDR): PL20210000176* Location: 2001 Airport Rd S. Status: NIM held 8/11/2021. Third submittal approved by staff on 10/21/2021. CCPC voted 3-2 to recommend approval on 12/16/2021; BCC approved 5-0 on 01/25/2022 with conditions to add security camera to rear of property and exchange contact information between applicant and neighboring apartment complex to discuss any future trespassing issues. Amendment the existing Devoe Pontiac CPUD to expand the PUD boundary to the north and south and change the name of the PUD to St. Matthew’s House Commercial Planned Unit Development (CPUD). The rezone proposes to increase the number of homeless shelter beds from 104 to 150, and request 130,000 square feet of general commercial, office, social service, and warehouse uses. Brookside Marina Rezone: PL20190001540 Location: 2015 and 2025 Davis Blvd. Status: Incomplete submittal 3 letter issued on 12/14/21. NIM held on 01/06/2022. Rezone of the submerged lands only from RSF-4 to C-4. Notwithstanding the straight C-4 zoning and to ensure GMP consistency, the permitted uses for the submerged lands will be limited to water-related or water-dependent uses associated with a marina. Uses include wet boat slips (with or without lifts/davits), boat lift canopies, boat ramps (one ramp exists already), small recreational boat rentals, operation of charter or party fishing boats, canoe/kayak/rowboat rentals, houseboat rentals, and tourist guide boat operations. Jet ski rentals are excluded, but requesting ability to rent a wet slip to a private jet ski owner. Live- aboard vessels also excluded. Item 7b 4.A.2 Packet Pg. 32 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 3 of 10 Promenade at the Boat Yard Rezone: PL20210000021* Location:2707 Bayview Drive Status: Second applicant submittal on 7/29/2021. Staff comment letter issued on 9/7/2021. Applicant requested withdraw on 2/16/2022. This property is currently zoned RSF-4-BMUD-R4 and is proposed to be rezoned to RSF- 4-BMUD-W in order to create the necessary space for an outdoor boating storage rack, as part of the boatyard. Promenade at the Boat Yard Rezone: PL20210000020* Location: 2736, 2754, and 2772 Bayview Drive Status: Status: NIM held May 11, 2021. Fourth applicant submittal on 12/23/2021. Staff issued fifth comment letter on 2/3/2022. The subject properties are currently zoned RSF-4-BMUD-R4 and are proposed to be rezoned to RSF-4- BMUD-NC (neighborhood commercial) to construct a 3-story building with ground level parking, second floor of retail, and 3rd floor residential along the south side of Bayview Drive. Naples Boat Yard Variance: PL20200000007* Location: 2775 Bayview Drive Status: Originally a PUD Rezone, applicants have changed the request to a Variance. NIM meeting held May 11, 2021. Staff issued fourth comment review letter on 2/3/2022. The applicant is proposing a complete site renovation to construct a boat storage facility along the north side of Bayview Dr. This petition requests a variance from the 20-foot rear yard waterfront setback to allow for a building to be 10 feet from the waterfront, and for a small office on the NE corner of the site to be setback back 0 feet from the waterfront. Item 7b 4.A.2 Packet Pg. 33 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 4 of 10 Naples Boat Yard (ZLTR): PL20210003148* Location: 2707 Bayview Drive Status: Applicant first submittal on 12/02/2021. Withdrawn on 12/07/2021 (entered in error). (relates to Promenade at the Boat Yard Rezone: PL20210000021) Applicant requests clarification on how a rezone will affect the property owner’s rights prior to any redevelopment. 2605 Linda Dr (AVA): PL20220000220* Location: 2065 Linda Drive Status: Applicant first submittal on 1/11/2022. Staff issued Administrative Variance approval Letter on 2/8/2022. Applicant requests a variance for minor-after-the-fact yard encroachment for a screen enclosure that is 0.4 Feet into the 10’ rear setback, at subject property 2605 Linda Dr. Starbucks - 3260Tamiami Trail E – (PDI): PL20220000435* Location: 3260 Tamiami Trail E Status: Pre-application meeting on 2/15/2022. Applicant is requesting to increase allowed sign height from 25 feet to 29 feet for the constructed sign on site. Item 7b 4.A.2 Packet Pg. 34 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 5 of 10 Development Review Petitions 3300 David Boulevard (Joey D’s) (SDP): PL20220001088* Location: 3300 David Blvd. Status: Applicant requested pre-application meeting on 2/11/2022. Pending staff scheduling per phone call with Andy Youngblood on 2/24/2022. Applicant proposes SDP to convert existing property to a car wash. ICP Phase 16 (Temporary Use): PL20210003324* Location: 8712 Bayshore Dr Status: Applicant first submittal on 12/27/2021. Staff approval on 01/05/2022. Applicant proposes installation of temporary construction trailer office. Arbutus Landing (SDP): PL20210003327* Location: 2766 Arbutus St Status: Pre-application meeting held on 01/13/2021. Applicant requested a pre-application meeting to decide if a SIP or SDP application is required to build 6 residential single family homes on a 170x250 lot. Applicant is also considering rowhouses (townhomes). Applicant would like multiple boat slips/docs. Rehabilitation Plans for Pump Station 308.06 (SDPI): PL20210003085* Location: 2850 Terrance Ave Status: Staff issued comment review letter on 12/10/2021. Applicant second submittal on 2/8/2022. Rehabilitation of Collier County Duplex Pump Station 308.06, including the removal of the existing valve vault, wet well rehab, new pumps, new wet well top, new discharge piping, new control panel, FDOT gravity wall and new antenna. Also included will be improvements to a portion of the pump station site including a new fence, new concrete driveway, stabilized access and gravel ground cover. Item 7b 4.A.2 Packet Pg. 35 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 6 of 10 Metropolitan Naples Lot 2 - Luxury Condominium (SDP): PL20210003215* Location: 1936 Davis Blvd Status: Pre-application meeting on 01/04/2022. Applicant first submittal on 2/4/2022. Staff review is due on 2/28/2022. Applicant proposes an SDP for a 15-story structure with 57 multi-family units and 6,500 sf retail. Naples Classic Car Site Plan with Deviation (DR): PL20210002480* Location: 3045 Davis Blvd. Status: Pre-application meeting held on 11/3/21. Applicant second submittal on 1/31/2022. Staff review comment due on 03/01/2022. Applicant proposes to rebuild an existing structure to improve the safety and function of the site. Due to the placement of the existing building on the East property line with no setback, a deviation for redevelopment is required. 3063 Connecticut Ave (LS): PL20210002448* Location: 3063 Connecticut Ave Status: Staff comment letter issued on 10/14/2021. Applicant second submittal on 02/15/2022. Applicant proposes lot split to sell the western 50 foot section of the property. Current total property size is 165 x 135 ft. Item 7b 4.A.2 Packet Pg. 36 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 7 of 10 Naples Boat Yard Site Improvement Plan (SIP): PL20210000148 Location: 2775 Bayview Dr. Status: First GMD Review Letter sent out on 4/13/2021. Applicant resubmittal on 9/08/2021. Staff comment letter issued 11/01/2021. The Naples Boat Yard is proposing to renovate the concrete dock to accommodate their traveling boat lift. The 239 Bayshore & Areca Hotel/Restaurant SDP: PL20210001360 Location: 3467 Bayshore Drive Status: Pre-application meeting held on 6/16/2021. First applicant submittal on 11/30/2021. Staff issued comment letter on 12/30/2021. At the pre-application meeting applicant proposed a three story mixed-use with commercial, destination resort, distillery, and restaurant uses on the first floor and lodging on the second and third floors. The proposed vehicular access to the site will be provided from Areca Avenue. Alcohol Distance Waiver required if sale of alcoholic beverage for on-site consumption. First submittal proposes a new three (3) story building (6,300 S.F.), a parking lot, and associated site improvements. The first floor will include a covered outdoor dining area, restaurant, two offices, and retail stores. The second and third floors will be hotel rooms (8 total) and the roof (terrace) will include a pool and bar. 22 parking spaces total proposed. Francis Shadowlawn Properties, LLC (Annis Landing) (FP): PL20210002023 Location: 1948 Shadowlawn Dr Status: Pre-application meeting held on 9/7/2021; Incomplete submittal letter issued by staff on 11/24/21. Applicant submittal on 11/24/2021. Staff issued comment letter on 12/23/2021. The request is for a minor sub-division plat to put up a shed with no electric and no plumbing. Item 7b 4.A.2 Packet Pg. 37 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 8 of 10 Bayshore Mixed Use Development PPL: PL20210002947 Location: Parcel 61841080008 (east of Bayshore Drive and north of Van Buren Ave) Status: Pre-application meeting held on 12/7/21. Pre-app meeting for a mixed use development with commercial in the front and single family residential in the rest of the lot. The commercial section is divided into two outparcels and 34 lots are proposed for the residential. 2372 Davis Blvd Mixed Use (SDP): PL20210002356 Location: 2372 Davis Blvd Status: Pre-application meeting held on 10/12/2021. The applicant is proposing to change the use from car dealership to restaurant with dumpster enclosure. Peters Wine Storage 2947 Peters Ave (SDP): PL20210002457 Location: 2947 Peters Ave Status: Pre-application meeting held on 10/19/2021. Proposing an SDP for a single story approximately 4500 sf wine storage building on the east side of Peters Avenue approximately 400 ft. south of US 41 (adjacent to Courthouse Shadows) Item 7b 4.A.2 Packet Pg. 38 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 9 of 10 Approved Projects Metropolitan Naples - Lot 1 Mixed Use Development SDP: PL20200002428* Location: Mini Triangle, 2000 & 2054 Davis Blvd. Status: SDP Approval issued 1/13/22. SDP for a 9-story residential tower over a 6-story podium that will contain 270 multi-family units, parking and approximately 7,600 sf of commercial uses within Lot 1. All access, drainage, and utility connections for the 1.57ac Lot 1 were previously designed and approved under the Metropolitan Naples PL20200001193. This SDP details the driveway, sidewalk, utility service, downspout, and yard drain connections from the building to the ROW. Windstar of Naples Bay Clubhouse SDPA: PL20210001972* Location: 1700 Windstar Blvd Status: Pre-application meeting on 9/14/2021. Third applicant submittal on 02/09/2022. Staff approval letter issued on 2/11/2022. The request is for a clubhouse expansion, cart barn expansion, addition of (2) Bocce Ball Courts, (23) golf cart parking spaces, and associated infrastructure improvements. Windstar of Naples Bay Clubhouse Expansion APR: PL20210002095* Location: 1700 Windstar Blvd Status: Third applicant submittal on 01/31/2022. Staff issued approval on 02/07/2022. Administrative Parking Reduction request for proposed improvements which require 291 parking spaces, per LDC 4.05.04. An APR is requested to allow use of the existing 203 parking spaces, in conjunction with 20 private golf cart spaces, and 48 bicycle parking spaces; a reduction of 88 vehicular parking spaces. This is an additional reduction of 43 spaces from the previously approved APR. Naples Botanical Garden Horticultural Campus SDPA: PL20190002586* Location: 4820 Bayshore Drive Status: Pre-application meeting held on 12/18/19. Staff approval letter issued on 2/24/2022. The purpose of this application is to modify and expand the previously permitted grow house and recycle center to include the new horticultural center. The complex consists of a new horticultural maintenance office and shop, several horticultural buildings (a.k.a. Item 7b 4.A.2 Packet Pg. 39 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Page 10 of 10 green houses) and open-air structures, RO/emergency generator building, sun nursery and supporting private access roads, parking areas, utilities, drainage facilities, dry pre- treatment water quality areas and code landscaping. The Project also includes a new turn lane, which will connect to the existing project entrance, and utility improvements within the Bayshore Drive public right-of-way. Courthouse Shadows Apartments (SDPA): PL20210001899* Location: 3290 Tamiami Trail E Status: Applicant second submittal on 12/20/2021. Staff approval issued on 2/17/2021. The proposed development will consist of a 300-unit multi-family residential community with 5 residential buildings, a clubhouse that is incorporated in Building #1, detached garages, a trash compactor building, a maintenance building, a pool amenity area, and an outdoor covered lounge and pool bathroom that is incorporated in Building #6. This application is proposing to change location of Garage #7 and subsequently revise the grading and drainage infrastructure necessary with this change. Metropolitan Naples PPL: PL20200001193 Location: Mini-triangle parcels 2054 Davis Blvd. Status: Comment letter issued on 05/20/2021. Applicant’s third submittal on 10/25/21. Staff approval with stipulations on 11/22/2021. This project proposes to create 3 separate parcels with the intent to have separate SDP’s for each parcel. The applicant proposes to construct the infrastructure required to provide services and ingress/egress to the three individual development tracts within the project boundary. The intent is to subdivide the project into three separate development tracts consistent with the current zoning approval and allow each tract to be developed as the market supports the land use for each individual tract. Our goal is to develop the infrastructure now that the zoning has been approved and proceed with the vertical improvements for each tract as market conditions support each land use. Isles of Collier Preserve Phase 16 (Parcel T) (PPL): PL20210000695 Location: 8530 Bayshore Drive (between Bayshore Dr and Hamilton Ave) Status: Approved 10/19/2021. The request is to divide the property into 61 single family units designated as lots and 9 tracts (including private right-of-way, easements and open space), approximately 47 acres. Item 7b 4.A.2 Packet Pg. 40 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU TEL TEL TEL TEL WMB WMB WMB X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SCALE:1" = 20'10' TYPE D LANDSCAPE BUFFER 10' TYPE D LANDSCAPE BUFFER EXIST. 10' VEGETATED AREA 15' TYPE B LANDSCAPE BUFFER 15' TYPE B LANDSCAPE BUFFER EXISTING WALL EXISTING WALL EXISTING CHAIN LINK FENCE TO REMAIN RIVERVIEW DRIVE (PUBLIC) LAKEVIEW DRIVE (PUBLIC)BAYSHORE DRIVE(PUBLIC)14' 5.16' 8.67' 11.14' 5.89' 9'18'19.09'45°' PROPOSED WHITE VINYL FENCE TO TIE INTO EXISTING CHAINLINK FENCE PROPOSED WHITE VINYL FENCE LOCATED 3-FEET OFF PROPERTY LINE PER COORDINATION WITH BAYSHORE CRA PROPOSED WHITE VINYL FENCE LOCATED 5-FEET OFF PROPERTY LINE RELOCATED BOAT RACKS PROP. 5' SIDEWALK FOR ADA ACCESS BOLLARD (TYP.) REMOVE EXIST. CHAINLINK FENCE REMOVE EXIST. CHAINLINK FENCE 12'5'1 8 'EXIST. 10' VEGETATED AREA REVISIONS: No:Revision:Date: 00 5'10'20'40'60' Bar Scale: 1" = 20' CIVIL ENGINEERING · LANDSCAPE ARCHITECTURE · ENVIRONMENTAL CONSULTING · LAND PLANNING · SITE PLANNING · CONSTRUCTION MANAGEMENT · OWNER REPRESENTATIVE PROJECT: TITLE: OWNER/CLIENT/CONSULTANT: PROFESSIONAL SEALS: Sheet Number:of File Number: Project Number: Vertical Scale: Horizontal Scale: Date: Drawn by: Designed by: City B 1 1 E D C A County:[Save Date: 2/28/2022 12:57:52 PM] [Saved By: JWoodward] [Plot Date: 2/28/2022 12:59:07 PM] [Plotted By: Jenna Woodward] [Original Size: 24x36] [Drawing Path: P:\Active_Projects\P-VIAG-001\001_NaplesBayMarina\Drawings-Civil\Active\Sheet_Files\P-VIAG-001-001-004LP.dwg]2 2 3 3 4 4 5 5 6 6 PROFESSIONAL ENGINEER: FLORIDA LICENSE NUMBER: SEC:RGE:TWP: NOTES:  GROGHQ GDWH PDUNZD\ NDSOHV )ORULGD  PKRQH  )D[  EPDLO LQIR#SHQHQJFRP WHEVLWH ZZZSHQHQJFRP )ORULGD EQJLQHHULQJ CHUWLILFDWH RI AXWKRUL]DWLRQ  )ORULGD LDQGVFDSH CHUWLILFDWH RI AXWKRUL]DWLRQ LC NAPLES BAY MARINA ZONING DATA SHEET AND TABLES VIAGE MARINAS, LLC JENAN WOODWARD 84212 14 50 25 NAPLES COLLIER JAW JAW 2/2022 1" = 20' N.T.S. P-VIAG-001-001 P-VIAG-001-001-004LP ----4 DATUM NOTE: ALL ELEVATIONS ARE BASED ON NAVD 88 (NORTH AMERICAN VERTICAL DATUM OF 1988). GENERAL SHEET NOTES SHEET KEYNOTES 1.XXXX 1.XXXX TABLES R19'R10'R10'R19' PARKING TABLE BUILDING USE BUILDING UNITS REQUIRED PARKING RATIO (PER LEE COUNTY LDC) REQUIRED NO. OF SPACES (PER LEE COUNTY LDC) BOAT STORAGE 74 STORAGE BAYS 1 SPACE / 5 BAYS 15 SPACES TOTAL REQUIRED 15 SPACES TOTAL PROVIDED =14 SPACES THIS SITE PLAN IS ONE PARKING SPACE DEFICIENT (APR WILL BE REQUIRED) 4.A.2 Packet Pg. 41 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) March 9, 2022 SUBJECT: Sabal Shore Lighting Update Sabal Shores street lighting: Staff received a request from one of the property owners on Areca, who would like to eliminate light number 3 shown on the layout below. The light is located on the south side of areca diagonal from Basin street. Once a decision is made regarding light 3 staff will send the FPL agreement to the CAO for review and approval Item 9a 4.A.2 Packet Pg. 42 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Bayshore Gateway Triangle CRA • Bayshore Beautification MSTU Haldeman Creek MSTU February 22, 2022 Bayshore Gateway Triangle CRA Commercial Building Improvement Grant (CBIG) Applicant: G & C Shadow LLC 6685 Collier Blvd Naples, Florida 34114 Project Location: 3400 Tamiami Trail East Naples, Florida 34112 (Comthouse Shadows -Vacant Burger King) Project Scope: Renovate existing vacant building to new Dunkin Donuts shop. Exterior Estimates: Contractor A-Bild More, Pompano Beach Florida 33060 Repair and waterproof existing monolithic Prep and paint building Frame, sheath, and stucco monolithic Install stacked stone around perimeter of building Install new Durolast roofing system Total Contractor B-Adam Peters, Naples Florida 34102 Repair and waterproof existing monolithic Prep and paint building Frame, sheath, and stucco monolithic Install stacked stone around perimeter of building Install new Durolast roofing system Total $ 6,500.00 $11,740.00 $14,000.00 $ 8,900.00 $52,250.00 $93,390.00 $ 7,475.00 $13,501.00 $16,100.00 $10,235.00 $57,000.00 $104,311.00 Maximum exterior grant is 50 % of the total cost or a maximum of $30,000 Attachments: l .CBIG Application 2.Exterior Estimates 3.Photos of Existing Conditions Offices: 3299 Tamiami Trail E., Unit 103, Naples, Florida 34112 Phone: 239-252-8844 Online: www.BGTCRA.com Item 10a 4.A.2 Packet Pg. 43 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) $ 1,025,000 $ 450,000 $ 596,131 $ 282,970 $ 879,101 $ 879,101 $ 879,101 $ 879,101 Collier County Proper ty AppraiserProperty Summar y Parcel No 28750000727 SiteAddress*Disclaimer 3400TAMIAMITRL E Site City NAPLES Site Zone*Note 34112 Name / Address G&C SHADOWS LLC 6685 COLLIER BLVD City NAPLES State FL Zip 34114 Map No.Strap No.Section Township Range Acres  *Estimated 5A12 248200 C 15A12 12 50 25 0.46 Legal COURTHOUSE SHADOWS TRACT C Millage Area 63 Millage Rates   *Calculations Sub./Condo 248200 - COURTHOUSE SHADOWS School Other Total Use Code 22 - DRIVE-IN RESTAURANTS 4.889 8.8897 13.7787 Latest Sales Histor y (Not all Sales are listed due to Confidentiality) Date Book-Page Amount 09/15/20 5818-3174 12/16/97 2371-2847  2021 Certified Tax Roll (Subject to Change) Land Value (+) Improved Value (=) Market Value (=) Assessed Value (=) School Taxable Value (=) Taxable Value If all Values shown above equal 0 this parcel was created after theFinal Tax Roll   4.A.2 Packet Pg. 44 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 4.A.2 Packet Pg. 45 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification ITEM  11REDEVELOPMENT GOALS/ObjectivesCRA Plan Page ReferenceRELEVANT PROJECTS INITIATEDSTATUSCRA Amount CommitmentMSTU BudgetOther* BalanceLAND USE & URBAN DESIGN5.3.2Achieve consistent land uses5‐3‐16 Land Use  Regulatory Changes Initiated in 2020 ‐Public Hearing Process initiated in 2021. Adoption scheduled for 2022$72,940Achieve consistent design character5‐3‐22 Land Use  Regulatory ChangesResidential Grant Program 5‐3‐16$23,348 awarded in FY21On hold pending revisions$212,424Commercial Grant Program 5‐3‐22$76,094 awarded in FY21On‐going. Revisions Needed$365,095PUBLIC SPACE, PARKS, & OPEN SPACE5.3.26Increase Access to parks and public gathering spaces5‐3‐2617 Acre Catalyst SitePurchased in 2016. Request for Proposal to design connection to Sugden Park published in 2021. Pending Board direction$2,347,388Ensure a clean and well maintained public realm5‐3‐30CRA Property MaintenanceOngoing maintenance of CRA property$26,091Community Safety Improvements5‐3‐30 Haldeman Creek Security BridgeJoint Project with RM ‐ January 2022 Purchase order opened. $14,10114101 $85,899DEVELOPMENT5.3.31Improve marketing, branding and communications5‐3‐32 Branding Initiated in 2022 Phase 1 ‐ Target Completion August 2022$51,700Public Art5‐3‐32 Public Art Committee Ordinance Ordinance approved in FY21.Mural Ordinance Pending Review and Adoption $100,000Capitalize on current and potential real estate and development opportunities5‐3‐34Mini Triangle Catalyst Project Cell Tower Relocation Agreement Pending Final CO on new tower. $600,000Del's Acquisition of 1.84 Ac Site (Del's)Demolition Scheduled for First quarter 22Highest Best Use Study$2,126,600$762,670TRANSPORTATION, CONNECTIVITY, & WALKABILITY5.3.42Hamilton Avenue EnhancementsConstruction Contract awarded in FY21Construction scheduled for FY22. Coordinating with Facilities and Parks and Recreation$1,855,000North Bayshore Drive EnhancementsPreliminary Design in FY20Accessment Management Plan started January 2022. Completion December 2022$82,675 $82,675$817,325Linwood Drive Beautification Improvements5‐3‐50Design scheduled for 2022$700,000Increase and enhance alternative mode options/Complete Streets5‐3‐56 Bayshore Drive Shuttle Service St. Pete Beach Shuttle not an option Will need BCC approval to seek proposals$100,000General Road Improvments$500,000Sabal Shores Neighborhood ImprovementsFire Suppresssion Phase 3 completedAdditional Streetlights pending installationRoad Maintenance scheduling stormwater maintenance and resurfacingTBDCRA Parking LotImprove parking options in commercial area5‐3‐56 Surface Parking LotLand Purchased in 2018 for $377,360. 2019 ‐Design and Permitting ‐ $16,656 Remaining items to be finalized. EV Charging Stations and Signage outstanding$485,914Maintenance$14,086INFRASTRUCTURE5‐3‐59Stormwater$1,262,759Ensure infrastructure will effectively achieve its primary purpose. Strategy 1 ‐ Stormwater Master Plan 5‐3‐59StormwaterBecca, Pine, Weeks Project 1Design scheduled for 2022$319,892Ensure infrastructure will effectively achieve its primary purpose. Strategy 1 ‐ Stormwater Master Plan 5‐3‐59StormwaterGateway Triangle Area 4Design scheduled for 2022$186,769Gateway Triangle Stormwater Pond 5‐3‐59StormwaterFrancis Lot purchase. Cost Share with Collier CountyDemolitian Complete$167,320Coordinate with other jurisdictions and government for infrastructure planning and funding5‐3‐61Fire Suppression Next Phases Partnership with the City of NaplesCity of Naples improving water lines on Hamilton Ave. City completing update to strategic plan. Will continue to coordinate. PROCESS5.3.66Ensure targeted and balanced distribution of CRA Planning and implementation efforts5‐3‐66Gateway Neighborhood Initiative Stormwater projects initiated in FY21/FY22Coordinate with MSTU5‐3‐67Bayshore Drive Access Management PlanJoint Funding effortAccess Management Plan joint programBayshore MSTU ‐ otherBoundary ExpansioinIsle of Collier PUD Commitment Completion by December 2022CURRENT PROJECT STATUS REPORT4.A.2Packet Pg. 46Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory CRA ItemsProject CRA Plan Page ReferenceRELEVANT PROJECTSGateway Triangle Neighborhood Master Plan 5.3.2/5.3.42/5.3.42Connected to Linwood EnhancmentsHolly Avenue 5.3.2/5.3.42/5.3.42Stormwater/ Limited Road/HousingLimited Road Maintenance 5‐3‐59Andrews/WoodsideBranding/Collateral Material5‐3‐32Implementation of Acccess Management Plan 5.3.42Other Priorities ‐DiscussionBayshore MSTU Hamilton AvenueBayshore Drive Medians ‐ Short‐termThomasson Drive ‐ BannersOutcome of Branding Phase 1Christmas Implementatio of Access Management PlanAdditional Service ‐ MaintenanceStaff’s top project picks for 2022:Fix irrigation in all mediansReplant median 19 and 20 Install urn at median 19 to replace pagoda Relocate bromeliads from Christmas tree throughout BayshoreInstall square planters at CRA parking lot Install vertical planters in center isle at CRA parking lotClean up bed in front of CRA shopInstall hose bib on either side of bridge and center of bridge in medianOther Priorities ‐DiscussionProjects/Programs for FY22/FY23Item 114.A.2Packet Pg. 47Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Item 12a CRA and County PROJECT UPDATES – March 2022 1.DEL’S PROPERTY ACQUISITION - Closed on November 20, 2020. Survey of property identified some issues. ROW easement was approved by the BCC on 11/9. Final survey work is completed. Bids for demolition were received. Staff is reviewing for lowest bidder and will proceed to award. Demolition to begin once Notice To Proceed is sent to selected contractor. Completion anticipated by early summer. Following demolition, highest and best use analysis to be conducted. PUBLIC ART PLAN –Mural ordinance was discussed at CCPC meeting on December 16, 2021 and tabled due to discussion regarding regulation of free speech. The County Attorney’s office is reviewing and developing an alternative process. Draft program outlined to be presented for discussion and review. John Melleky is the new Arts and Cultural Manager. He will be managing the Public Art Committee. To apply to participate in the PAC, please visit: How to Apply: To apply for an advisory committee vacancy, submit an application online at https://www.colliercountyfl.gov/government/advisory-boards-and-authorities/online-advisory-board- application After you complete the application, click on “Submit Form.” To receive an immediate e-mail confirmation that your application was received, you must include your e-mail address in the application. Residents interested in applying for advisory committee positions may also obtain an application by calling 239-252-8400, or from https://www.colliercountyfl.gov/home/showpublisheddocument/25235/635883137282070000 Please email to DL-AdvisoryBoardOn-LineApplications@colliercountyfl.gov or mail to: Advisory Board Coordinator, County Attorney's Office, 3299 Tamiami Trail East, Suite 800, Naples, Florida 34112. 2.17 AC - BOARDWALK – The County Manager’s Office (CMO) is reviewing the Stantec Proposal evaluating the costs and it is their intent to find a best value solution to develop a boardwalk and gain access to Sugden Park while addressing some of the stormwater demands for the Bayview area. Staff is waiting for direction from CMO. 3.BRANDING - Paradise Advertising and Marketing, Inc. – First site visit was completed on February 1, 2022. Paradise is reviewing information and will be presenting updated schedule based on input received. 4.BAYSHORE ACCESS MANAGEMENT PLAN – Kick off meeting with consultant and staff held January 10, 2022. Tami Scott will be the project manager. Data collection took place in February. Staff will be meeting to review modeling standards in March. 5.SHUTTLE SERVICE – On-demand Service. Unable to use St. Pete Beach contract, will need to submit formal request for proposals. Need confirmation from CRA Board to proceed, will add to May Joint meeting. 6.LAND USE REGULATIONS/BONUS DENSITY AMENDMENT – CCPC recommended approval. Comprehensive Plan amendment approved on February 22. Land Development Code changes scheduled for March meeting. Swale enclosure amending Collier County Code of Laws and Ordinances is scheduled for a first reading in March. Amendments regarding 4.A.2 Packet Pg. 48 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Item 12a swale enclosure provision has raised some concerns and is being reviewed by CMO staff. Consultant contract extended to March 31, 2021. 7.Francis Avenue lot – Demolition is completed. Contractor added hydroseed and straw and will maintain for 30 days. Staff is seeking a quote to clear the adjoining lot so the two lots remain clear and open for the community. 8.Conservation Collier Cycle 10 Properties – The Bayshore Parcels (Forrest G Amaranth Trust – 71 acres) was reviewed on December 9th by Conservation Collier Land Acquisition Advisory Committee (CCLAAC) and recommended for acquisition. BCC at the January 25th voted to move forward with acquisition process for this parcel as well as other parcels on the “A” list. Will continue to track for final acquisition. 9.Linwood Sidewalk – Safe Routes to School Project – PE – 2022/2023 and Construction 2024/2025 10.Peters Avenue – five-foot sidewalk from Collee Court to US41. $389,000 CDBG grant awarded and managed by Transportation Planning department. The sidewalk will be placed on the residential side of the street. Construction contract approved in November. Pre-construction meeting is December 3. Anticipate Notice to Proceed in January 2022. Completion anticipated April 2022. Laurie Beard (GMD) is project manager 11.Pine Street – FDOT Funded Becca to US41 – PE 2022/2023. Construction 2024/2025. Will coordinate with stormwater study. 12.Commercial Drive Stormwater Improvements – Off-site improvements will be completed by mini-triangle developer. Improvements have been designed and permitted. The project will replace a 15-inch diameter drainage pipe across Commercial Drive with a 30- inch drainage pipe to improve stormwater conveyance to the Gateway Triangle stormwater management pond. The project will install a 36-inch connection pipe in the alley just west of commercial Drive to improve stormwater management connections which will help reduce flooding in this alley. 13.April 13, 2021 BCC approved construction contract for the East Naples Community Park Welcome Center,” to Curran Young Construction, LLC, in the amount of $2,965,622.28. Construction underway. Opening scheduled for April. 14.Gateway Triangle Neighborhood Focus Initiative- Neighborhood Watch meeting held 2/28/22. Staff attended and will assist as needed. 4.A.2 Packet Pg. 49 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Item 12b Item 12b Bayshore Gateway Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU PROJECT UPDATES Tami Scott March 09, 2022 CRA Parking Lot: Staff is working on additional items: bench signage for Jean Harvey have been completed and staff will schedule meeting to discuss location, entry gates have been ordered, site signage has been ordered, charging station in process, parking signs on Bayshore Drive have been order and scheduled for install. Fence under Bayshore Bridge: Revised scope of project went back out to bid, one bidder responded Carter Fence. Total cost $28,202.00 Staff has requested a PO be opened to start the work. CBIG Grant for Southern Region Development / Sunbelt on Davis: Request for extension has been completed, application is with the CAO for review and approval. SIG Grant for Ozlyn Garden Villas Condominium: Request for partial payment $6,633.00 has been completed, application is with the CAO for review and approval. New CBIG Grant: G&C Shadow LLC, Renovation of existing Burger King Building at court House shadows. Convert to a Dunkin Donuts MSTU Landscape Contract: It appears that all the irrigation has been repaired, total cost approximately $6,175.00 Staff has scheduled monthly walk thru meetings with A & M Property Maintenance, LLC for the second Wednesday of each month. 10:00 am meet at Del’s all are welcome. Stormwater: Two projects underway 1- Becca, Weeks, and Pine – Notice to proceed has been issued to Bolt Engineering of Cape Coral, Florida 33904 (Progress report attached) 2- Gateway Triangle- workorder request has been completed to retain Q. Grady Minor. Once the work order is approved a notice to process will be sent to the vender. South Bayshore: Isles of Collier is working on an entrance off Bayshore. Substantial amount of truck traffic, Staff is looking into the SDP to verify what was approved in terms of construction activity and hours of operation. Sabal Shores street lighting: Staff has received the contract from FPL. Staff also received a request from one of the property owners on Areca, would like to eliminate light number 3 shown on our layout. The light is located on the south side of areca diagonal from Basin street. Once a decision is made regarding light 3 staff will send the FPL agreement to the CAO for review and approval. 4.A.2 Packet Pg. 50 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) Item 12b Thomasson Drive Landscaping: MSTU Staff met with Wright Construction and Hannula landscaping and spoke with the McGee Associates. • Crape Myrtle trees are not dead; however, they are dormant. Hannula seems to think the cold snap triggered the dormancy. • Yellowing of palm trees, Hannula does not believe the palms are dying but they do appear to need additional fertilizer. At the time Hannula looked at the trees they had been fertilized once, Hannula will send MSTU staff a suggested fertilizer type and schedule. Bus stop on Thomasson drive: The Board has agreed to move forward with the partnership to modify two bus stop number 134 Thomasson / Lombardy drive. The funds have been sent to PTNE to start the design work. Linwood Way: Water meter installed and approved, irrigation lines underway, hedge installation schedule for mid-March 2022. Hamilton Avenue: • Haskins Inc is close to completion of the City of Naples waterline. Total cost to upgrade the water line is $ 482,183.53 paid for by the City of Naples. • Haskins Inc. will start the road construction project approximate 2-29-2022, once the construction on the roadway starts it will prevent the ability to park trailers or vehicles in the swales. • Bi-weekly meetings have started, Wednesday at 10:00 am. • Project Manager assigned to the project is Olivier Sureau Collier County Facilities. Olivier.sureau@colliercountyfl.gov • Danford Street is NOT part of this project and is still in design. FDOT Project: US41 F DOT Safety Improvement Project – Construction start date is December 6, 2021. There are 300 calendar days of contract time. 7 existing light decorative poles are called out be removed as well as the “porkchop” at the corner of Bayshore and US41. 4.A.2 Packet Pg. 51 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 4.A.2Packet Pg. 52Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 4.A.2Packet Pg. 53Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 4.A.2Packet Pg. 54Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) 4.A.2Packet Pg. 55Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Committee-March 9, 2022) February Status Insurance Claims Tracker Item 12c Stars Report #Invoice # Date of damage Submit to Risk Date Description of damage Amount of repair & Replacement CCSO Incident report number Total Paid Reimbursement Date Outstanding balance 5004092111364 20439.06 4/9/2021 4/19/2021 Damage to light pole 35 on Bayshore Drive $7,714.69 21-7324353 5007302112262 21477.01 7/30/2021 2/8/2022 Damage to light pole at Windstar $ 3,873.69 no report found 5009032112264 20439.10 9/3/2021 2/8/2022 Damage to light pole 50 at 3570 Bayshore Drive $ 8,204.69 no report found 5010192112266 10/19/2021 2/10/2022 Damage Trash Can/Bench, Fox Tail Palm $ 5,707.36 21-382379 5001242212267 21477.03 1/24/2022 2/10/2022 Damage to #31 Lunar/Bayshore Drive $ 3,993.69 no report found $29,494.12 $ 29,494.12 Total $ 29,494.12 4.A.2 Packet Pg. 56 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 187 BAYSHORE/GATEWAY TR 840,518.63 1,703,901.83-863,383.20 ** REVENUE Sub Total 2,867,800.00-3,487,823.50-3,487,823.50-2,838,024.98-649,798.52- * REVENUE - OPERATING Su 20,000.00-20,000.00-20,000.00-6,574.98-13,425.02- 361170 OVERNIGHT INTEREST 706.69-706.69 361180 INVESTMENT IN 20,000.00-20,000.00-20,000.00-6,574.98-13,425.02- * CONTRIBUTION AND TRANS 2,847,800.00-3,467,823.50-3,467,823.50-2,831,450.00-636,373.50- 481001 TRANS FRM 001 2,188,000.00-2,188,000.00-2,188,000.00-2,188,000.00- 481111 TRANS FRM 111 495,300.00-495,300.00-495,300.00-495,300.00- 481163 TRANS FRM 163 125,500.00-125,500.00-125,500.00-62,750.00-62,750.00- 481164 TRANS FRM 164 11,300.00-11,300.00-11,300.00-11,300.00- 481186 TRANS FRM 186 74,100.00-74,100.00-74,100.00-74,100.00- 482160 ADV/REPAY FRM 160 554,600.00-554,600.00-554,600.00-554,600.00- 489200 CARRY FORWARD 600,000.00 600,000.00 600,000.00 600,000.00 489201 CARRY FORWARD 620,023.50-620,023.50-620,023.50- 489900 NEG 5% EST RE 1,000.00 1,000.00 1,000.00 1,000.00 ** EXPENSE Sub Total 2,860,200.00 2,860,200.00 600,000.00 1,669,523.50 840,518.63 1,134,829.84 702,923.79- * PERSONAL SERVICE 446,200.00 446,200.00 453,800.00 29,313 134,711.11 289,775.89 * OPERATING EXPENSE 543,100.00 543,100.00 561,923.50 211,205.63 87,768.73 264,149.14 631400 ENG FEES 50,000.00 50,000.00 55,267.00 50.00 5,217.00 50,000.00 631600 APPRAISAL FEE 7,500.00 7,500.00 7,500.00 7,500.00 634207 IT CAP ALLOCA 9,400.00 9,400.00 9,400.00 4,700.00 4,700.00 634210 IT OFFICE AUT 15,700.00 15,700.00 15,700.00 7,850.00 7,850.00 634970 INDIRECT COST 67,000.00 67,000.00 67,000.00 67,000.00 634980 INTERDEPT PAY 20,000.00 20,000.00 31,000.00 11,000.00 20,000.00 634990 LANDSCAPE INCIDEN 25,000.00 25,000.00 25,000.00 25,000.00 634999 OTHER CONTRAC 200,000.00 200,000.00 203,756.50 91,291.60 38,036.10 74,428.80 639967 TEMPORARY LABOR 45,000.00 45,000.00 45,000.00 45,000.00 640300 TRAVEL PROF D 8,000.00 8,000.00 8,000.00 1,805.06 6,194.94 641230 TELEPHONE ACC 1,800.00 1,800.00 1,800.00 1,800.00 Fund 187 Bayshore/Gateway Triangle Item 12d 4.A.2 Packet Pg. 57 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available 641700 CELLULAR TELE 1,500.00 1,500.00 1,500.00 361.74 1,138.26 641900 TELEPHONE SYSTEM 0.66 0.66- 641950 POST FREIGHT 300.00 300.00 300.00 93.37 206.63 641951 POSTAGE 1,200.00 1,200.00 1,200.00 643100 ELECTRICITY 2,000.00 2,000.00 2,000.00 1,927.37 1,032.63 960.00- 643400 WATER AND SEW 5,000.00 5,000.00 5,000.00 3,225.63 2,793.37 1,019.00- 644620 LEASE EQUIPME 2,000.00 2,000.00 2,000.00 1,854.23 1,345.77 1,200.00- 645100 INSURANCE GEN 2,800.00 2,800.00 2,800.00 1,400.00 1,400.00 645260 AUTO INSURANC 500.00 500.00 500.00 250.00 250.00 646180 BUILDING RM ISF 1,659.63 1,659.63- 646311 SPRINKLER SYSTEM 200.00 200.00 200.00 200.00 646360 MAINT OF GROU 30,000.00 30,000.00 30,000.00 20,656.80 14,343.20 5,000.00- 646430 FLEET MAINT ISF 64.00 64.00- 646440 FLEET MAINT PARTS 22.83 22.83- 646445 FLEET NON MAI 100.00 100.00 100.00 20.70 79.30 647110 PRINTING AND 5,000.00 5,000.00 5,000.00 5,000.00 648160 OTHER ADS 300.00 300.00 300.00 300.00 648170 MARKETING AND 5,000.00 5,000.00 5,000.00 5,000.00 648174 REGISTRATION FEES 955.00 955.00- 649030 CLERKS RECORD 2,500.00 2,500.00 2,500.00 2,500.00 649100 LEGAL ADVERTI 4,500.00 4,500.00 4,500.00 4,500.00 649990 OTHER MISCELLAN 500.00 500.00 500.00 500.00 651110 OFFICE SUPPLI 3,000.00 3,000.00 3,000.00 595.73 2,404.27 651210 COPYING CHARG 5,000.00 5,000.00 5,000.00 5,000.00 651910 MINOR OFFICE E 1,500.00 1,500.00 1,500.00 1,500.00 651930 MINOR OFFICE F 1,500.00 1,500.00 1,500.00 1,500.00 651950 MINOR DATA PR 3,500.00 3,500.00 3,500.00 3,500.00 652210 FOOD OPERATIN 1,000.00 1,000.00 1,000.00 1,000.00 652490 FUEL AND LUB 300.00 300.00 300.00 185.07 114.93 652920 COMPUTER SOFT 3,000.00 3,000.00 3,000.00 3,000.00 652990 OTHER OPERATI 3,000.00 3,000.00 3,000.00 2,239.87 760.13 654110 BOOKS PUB SUB 500.00 500.00 500.00 500.00 654210 DUES AND MEMB 4,000.00 4,000.00 4,000.00 2,557.00 1,443.00 654360 OTHER TRAININ 4,000.00 4,000.00 4,000.00 240.00 3,760.00 * CAPITAL OUTLAY 600,000.00 600,000.00 600,000.00 763100 IMPROVEMENTS 600,000.00 600,000.00 600,000.00 * TRANSFERS 1,770,900.00 1,770,900.00 53,800.00 912,350.00 858,550.00 910010 TRANS TO 001 53,800.00 53,800.00 53,800.00 53,800.00 917870 TRANS TO 001 GEN 1,717,100.00 1,717,100.00 858,550.00 858,550.00 Item 12d 4.A.2 Packet Pg. 58 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 787 BAYSHORE CRA PROJEC 428,772.15 809,757.47-380,985.32 ** REVENUE Sub Total 1,741,700.00-1,741,700.00-4,669,008.68-863,640.11-7,239,568.57- * REVENUE - OPERATING Su 24,600.00-24,600.00-24,600.00-5,090.11-19,509.89- 361170 OVERNIGHT INTEREST 523.19-523.19 361180 INVESTMENT IN 24,600.00-24,600.00-24,600.00-5,090.11-19,509.89- * CONTRIBUTION AND TRANS 1,717,100.00-1,717,100.00-4,644,408.68-858,550.00-7,220,058.68- 481187 TRANS FRM 187 1,717,100.00-1,717,100.00-1,717,100.00 858,550.00-858,550.00- 489201 CARRY FORWARD 6,361,508.68-6,361,508.68- 489900 NEG 5% EST REV 1,200.00 1,200.00 1,200.00 ** EXPENSE Sub Total #REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF! * OPERATING EXPENSE 2,279,171.45 361,485.22 63,013.73 1,854,672.50 631650 ABSTRACT FEES 7,562.50 7,562.50 631800 ENVIRONMENTAL 25,000.00 25,000.00 634980 INTERDEPT PAYMENT 2,227.00 2,227.00- 634999 OTHER CONTRAC 2,191,625.00 361,485.22 50,430.78 1,779,709.00 639990 OTHER CONTRAC 53,983.95 10,328.95 43,655.00 649030 CLERKS RECORD 1,000.00 27.00 973.00 * CAPITAL OUTLAY 1,485,500.00 1,485,500.00 5,238,960.46 68,800.00 11,414.65 5,158,745.81 761100 LAND CAPITAL 763100 IMPROVEMENTS 1,485,500.00 1,485,500.00 5,238,960.46 68,800.00 11,414.65 5,158,745.81 * GRANTS AND DEBT SERVIC 255,000.00 255,000.00 583,876.77 59,165.96 524,710.81 884200 RESIDENTIAL R 255,000.00 255,000.00 583,876.77 59,165.96 524,710.81 * RESERVES #REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF! Fund 787 Bayshore CRA Projects Item 12d 4.A.2 Packet Pg. 59 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendment Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50197 BAYSHORE CRA PROJEC 55,000.00 55,000.00 #REF!218,781.24 #REF!13,071.96 205,709.28 ** EXPENSE Sub Total #REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF! * OPERATING EXPENSE #REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF! * GRANTS AND DEBT SERVIC 55,000.00 55,000.00 218,781.24 13,071.96 205,709.28 884200 RESIDENTIAL R 55,000.00 55,000.00 218,781.24 13,071.96 205,709.28 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendment Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50198 BAYSHORE CRA PROJEC 200,000.00 200,000.00 #REF!#REF!365,095.53 #REF!46,094.00 319,001.53 ** EXPENSE Sub Total #REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF! * OPERATING EXPENSE #REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF! * GRANTS AND DEBT SERVIC 200,000.00 200,000.00 365,095.53 46,094.00 319,001.53 884200 RESIDENTIAL R 200,000.00 200,000.00 365,095.53 46,094.00 319,001.53 Fund 787 Project 50197 Residential Grants Fund 787 Project 50198 Commercial Grants Item 12d 4.A.2 Packet Pg. 60 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50203 BAYSHORE CRA PROJEC 350,000.00 350,000.00 1,781,005.00 279,431.22 52,045.78 1,449,528.00 ** EXPENSE Sub Total 350,000.00 350,000.00 1,387,380.00 1,387,380.00 * CAPITAL OUTLAY 350,000.00 350,000.00 1,387,380.00 1,387,380.00 634980 INTERDEPT PAYMENT 1,615.00 1,615.00- 634999 OTHER CONTRACTUAL 393,625.00 279,431.22 50,430.78 63,763.00 761100 LAND CAPITAL OUTL 763100 IMPROVEMENTS 350,000.00 350,000.00 1,387,380.00 1,387,380.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50204 BAYSHORE CRA PROJEC 150,000.00 150,000.00 700,000.00 700,000.00 ** EXPENSE Sub Total 150,000.00 150,000.00 350,000.00 350,000.00 * CAPITAL OUTLAY 150,000.00 150,000.00 350,000.00 350,000.00 634999 OTHER CONTRACTUAL 350000.00 350,000.00 763100 IMPROVEMENTS 150,000.00 150,000.00 350,000.00 350,000.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50206 BAYSHORE CRA PROJEC 185,500.00 185,500.00 773,025.95 10,355.95 762,670.00 ** EXPENSE Sub Total 185,500.00 185,500.00 773,025.95 10,355.95 762,670.00 * OPERATING EXPENSE 87,546.45 10,355.95 77,190.50 631650 ABSTRACT FEES 7,562.50 7,562.50 631800 ENVIRONMENTAL 25,000.00 25,000.00 634980 INTERDEPT PAYMENT 639990 OTHER CONTRAC 53,983.95 10,328.95 43,655.00 649030 CLERKS RECORD 1,000.00 27.00 973.00 * CAPITAL OUTLAY 185,500.00 185,500.00 685,479.50 685,479.50 761100 LAND CAPITAL 763100 IMPROVEMENTS 185,500.00 185,500.00 685,479.50 685,479.50 Fund 787 Project 50204 Linwood Fund 787 Project 50206 Ackerman-Dells Fund 787 Project 50203 Stormwater Item 12d 4.A.2 Packet Pg. 61 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendment Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50207 BAYSHORE CRA PROJEC 66,100.96 40,600.00 11,414.65 14,086.31 ** EXPENSE Sub Total 66,100.96 40,600.00 11,414.65 14,086.31 * CAPITAL OUTLAY 66,100.96 40,600.00 11,414.65 14,086.31 763100 IMPROVEMENTS 66,100.96 40,600.00 11,414.65 14,086.31 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50208 BAYSHORE CRA PROJEC 300,000.00 300,000.00 2,348,000.00 612.00 2,347,388.00 ** EXPENSE Sub Total 300,000.00 300,000.00 2,348,000.00 2,348,000.00 * OPERATING EXPENSE 698,000.00 698,000.00 634980 INTERDEPT PAYMENT 612.00 612.00- 639999 OTHER CONTRAC 698,000.00 698,000.00 * CAPITAL OUTLAY 300,000.00 300,000.00 1,650,000.00 1,650,000.00 763100 IMPROVEMENTS 300,000.00 300,000.00 1,650,000.00 1,650,000.00 Fund 787 Project 50207 Bayshore Parking Lot Fund 787 Project 50208 17 Acre Site Item 12d 4.A.2 Packet Pg. 62 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 50255 BAYSHORE CRA PROJEC 100,000.00 100,000.00 100,000.00 100,000.00 ** EXPENSE Sub Total 100,000.00 100,000.00 100,000.00 100,000.00 * OPERATING EXPENSE 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC * CAPITAL OUTLAY 100,000.00 100,000.00 100,000.00 100,000.00 763100 IMPROVEMENTS 100,000.00 100,000.00 100,000.00 100,000.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 50256 BAYSHORE CRA PROJEC 100,000.00 100,000.00 100,000.00 28,200.00 71,800.00 ** EXPENSE Sub Total 100,000.00 100,000.00 100,000.00 28,200.00 71,800.00 * OPERATING EXPENSE 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC * CAPITAL OUTLAY 100,000.00 100,000.00 100,000.00 28,200.00 71,800.00 763100 IMPROVEMENTS 100,000.00 100,000.00 100,000.00 28,200.00 71,800.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 50258 BAYSHORE CRA PROJEC 100,000.00 100,000.00 500,000.00 500,000.00 ** EXPENSE Sub Total 100,000.00 100,000.00 500,000.00 500,000.00 * OPERATING EXPENSE 250,000.00 250,000.00 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC 250,000.00 250,000.00 Fund 787 Project 50255 17 Public Art Fund 787 Project 50256 Commun. Safety Improve Fund 787 Project 50258 General Rd Improve Item 12d 4.A.2 Packet Pg. 63 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory * CAPITAL OUTLAY 100,000.00 100,000.00 250,000.00 250,000.00 763100 IMPROVEMENTS 100,000.00 100,000.00 250,000.00 250,000.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 50259 BAYSHORE CRA PROJEC 150,000.00 150,000.00 150,000.00 150,000.00 ** EXPENSE Sub Total 150,000.00 150,000.00 150,000.00 150,000.00 * OPERATING EXPENSE 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC * CAPITAL OUTLAY 150,000.00 150,000.00 150,000.00 150,000.00 763100 IMPROVEMENTS 150,000.00 150,000.00 150,000.00 150,000.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 50262 BAYSHORE CRA PROJEC 150,000.00 150,000.00 900,000.00 82,054.00 817,946.00 ** EXPENSE Sub Total 150,000.00 150,000.00 900,000.00 82,054.00 817,946.00 * OPERATING EXPENSE 500,000.00 82,054.00 417,946.00 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC 500,000.00 82,054.00 417,946.00 *CAPITAL OUTLAY 150,000.00 150,000.00 400,000.00 400,000.00 763100 IMPROVEMENTS 150,000.00 150,000.00 400,000.00 400,000.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 50263 BAYSHORE CRA PROJEC 100,000.00 100,000.00 ** EXPENSE Sub Total 100,000.00 100,000.00 Fund 787 Project 50262 N Bayshore Enhance Fund 787 Project 50263 Complete Streets Fund 787 Project 50259 Multi-Modal Improve Item 12d4.A.2 Packet Pg. 64 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory * OPERATING EXPENSE 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC * CAPITAL OUTLAY 100,000.00 100,000.00 763100 IMPROVEMENTS 100,000.00 100,000.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitme nt Actual Available **** Grand Total-Fund/ CI *** 99787 BAYSHORE CRA PROJEC 8,102,008.68-864,163.30-7,237,845.38- 361170 OVERNIGHT INTEREST 523.19-523.19 361180 INVESTMENT INTEREST 24,600.00 24,600.00 24,600.00-5,090.11-19,509.89- 481187 TRANS FRM 187 GAT 1,717,100.00 1,717,100.00 1,717,100.00-858,550.00-858,550.00- 489201 CARRY FORWARD OF 6,361,508.68-6,361,508.68- 489900 NEG 5% EST REV 1,200.00 1,200.00 1,200.00 * OPERATING EXPENSE 634980 INTERDEPT PAYMENT 639999 OTHER CONTRAC * CAPITAL OUTLAY Fund 787 Project 99787 Reserves Item 12d4.A.2 Packet Pg. 65 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 163 BAYSHORE/AVALON MST 177,320.04 616,682.96-439,362.92 ** REVENUE Sub Total 1,701,400.00-1,701,400.00-1,706,595.75-1,260,902.63-445,693.12- * REVENUE - OPERATING Su 1,425,500.00-1,425,500.00-1,425,500.00-1,260,902.63-164,597.37- 311100 CUR AD VALORE 1,425,500.00-1,425,500.00-1,425,500.00-1,259,760.76-165,739.24- 311200 DEL AD VALORE 82.79 82.79- 361170 OVERNIGHT INT 117.96-117.96 361180 INVESTMENT INTEREST 1,022.90-1,022.90 361320 INTEREST TAX 83.80-83.80 * CONTRIBUTION AND TRANS 275,900.00-275,900.00-281,095.75-281,095.75- 486600 TRANS FROM PR 489200 CARRY FORWARD 347,200.00-347,200.00-347,200.00-347,200.00- 489201 CARRY FORWARD OF 5,195.75-5,195.75- 489900 NEG 5% EST RE 71,300.00 71,300.00 71,300.00 71,300.00 ** EXPENSE Sub Total 1,700,900.00 1,701,400.00 1,704,195.75 177,320.04 644,219.67 885,056.04 * OPERATING EXPENSE 573,400.00 573,900.00 576,695.75 177,320.04 97,431.00 304,344.71 631400 ENG FEES 50,000.00 50,000.00 50,000.00 50,000.00 634970 INDIRECT COST 6,500.00 6,500.00 6,500.00 6,500.00 634980 INTERDEPT PAYMENT 10,000.00 10,000.00 10,000.00 3,028.83 6,971.17 634990 LANDSCAPE INC 50,000.00 50,000.00 50,000.00 79,885.86 31,614.46 61,500.32- 634999 OTHER CONTRAC 305,700.00 305,700.00 310,895.75 12,924.00 26,510.00 271,461.75 641951 POSTAGE 1,000.00 1,000.00 1,000.00 643100 ELECTRICITY 50,000.00 50,000.00 50,000.00 37,294.78 8,705.22 4,000.00 643400 WATER AND SEWER 15,000.00 15,000.00 15,000.00 4,746.72 3,753.28 6,500.00 645100 INSURANCE GEN 1,000.00 1,000.00 1,000.00 500.00 500.00 645260 AUTO INSURANC 900.00 900.00 450.00 450.00 646311 SPRINKLER SYS 10,000.00 10,000.00 10,000.00 119.43 119.43-10,000.00 646318 MULCH 15,000.00 15,000.00 15,000.00 4,500.00 10,500.00 646360 MAINT OF GROU 20,000.00 20,000.00 20,000.00 20,000.00 646430 FLEET MAINT I 900.00 900.00 900.00 1,664.00 764.00- 646440 FLEET MAINT P 200.00 200.00 200.00 200.00 646445 FLEET NON MAI 500.00 500.00 69.75 430.25 Fund 163 Bayshore MSTU Item 12e 4.A.2 Packet Pg. 66 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory 646451 LIGHTING MAIN 35,000.00 35,000.00 35,000.00 30,149.25 11,510.11 6,659.36- 649000 SALES TAX EXPENSE 4.83 4.83- 648170 MARKETING & PROMO 649100 LEGAL ADVERTI 1,500.00 1,500.00 1,500.00 1,500.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available 652310 FERT HERB CHEM 500.00 $500.00 500.00 250.00 250.00 652490 FUEL AND LUB 200.00 200.00 200.00 114.03 85.97 652990 OTHER OPERATI 9,625.92 9,625.92- * TRANSFERS 1,030,300.00 1,030,300.00 1,030,300.00 515,150.00 515,150.00 911600 TRANS TO 160 904,800.00 904,800.00 904,800.00 452,400.00 452,400.00 911870 TRANS TO 187 125,500.00 125,500.00 125,500.00 62,750.00 62,750.00 * TRANSFER CONST 42,600.00 42,600.00 42,600.00 31,638.67 10,961.33 930600 PA BUDGET TR 12,600.00 12,600.00 12,600.00 5,264.90 7,335.10 930700 TC BUDGET TR 30,000.00 30,000.00 30,000.00 26,373.77 3,626.23 * RESERVES 54,600.00 54,600.00 54,600.00 54,600.00 993000 RESV FOR CAPI 54,600.00 54,600.00 54,600.00 54,600.00 Item 12e 4.A.2 Packet Pg. 67 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 160 BAYSHORE/AVALON PR 2,068,120.93 125,062.30-1,943,058.63- ** REVENUE Sub Total 904,800.00-904,800.00-1,782,778.85-458,409.78-3,133,969.07- * REVENUE - OPERATING Su 6,009.78-6,009.78 361170 OVERNIGHT INT 432.20-432.20 361180 INVESTMENT IN 5,577.58-5,577.58 * CONTRIBUTION AND TRANS 904,800.00-904,800.00-1,782,778.85-452,400.00-3,139,978.85- 481163 TRANS FRM 163 904,800.00-904,800.00-904,800.00 452,400.00-452,400.00- 489201 CARRY FORWARD 2,687,578.85-2,687,578.85- ** EXPENSE Sub Total 350,200.00 350,200.00 3,037,778.85 2,068,120.93 333,347.48 636,310.44 * OPERATING EXPENSE 11,635.00 11,635.00 631400 ENG FEES 11,635.00 11,635.00 646451 LIGHTING MAIN * CAPITAL OUTLAY 305,000.00 305,000.00 2,980,943.85 2,068,120.93 333,347.48 579,475.44 763100 IMPROVEMENTS 305,000.00 305,000.00 2,980,943.85 2,068,120.93 333,347.48 579,475.44 * RESERVES 45,200.00 45,200.00 45,200.00 45,200.00 921870 ADV/REPAY TO 187 554600.00 554600.00 554,600.00 554,600.00 993000 RESV FOR CAPI 45,200.00 45,200.00 45,200.00 45,200.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50174 BAYSHORE/AVALON PR 250,000.00 250,000.00 590,416.00 173,712.00 416,704.00 ** EXPENSE Sub Total 250,000.00 250,000.00 590,416.00 173,712.00 416,704.00 * CAPITAL OUTLAY 250,000.00 250,000.00 590,416.00 173,712.00 416,704.00 763100 IMPROVEMENTS 250,000.00 250,000.00 590,416.00 173,712.00 416,704.00 Fund 160 Bayshore Capital Projects Fund 160 Project 50174 North Bayshore Item 12e 4.A.2 Packet Pg. 68 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50173 BAYSHORE/AVALON PR 55,000.00 66,635.00 66,635.00 ** EXPENSE Sub Total 11,635.00 11,635.00 * OPERATING EXPENSE 11,635.00 11,635.00 631400 ENG FEES 11,635.00 11,635.00 763100 IMPROVEMENTS GEN 55,000.00 55,000.00 55,000.00 Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50154 FEMA BAYSHORE/AV ** EXPENSE Sub Total * OPERATING EXPENSE 646451 LIGHTING MAIN * CAPITAL OUTLAY 763100 IMPROVEMENTS Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50172 BAYSHORE/AVALON PR 480,527.85 146,807.05 333,347.48 373.32 ** EXPENSE Sub Total 480,527.85 146,807.05 333,347.48 373.32 * OPERATING EXPENSE 631400 ENG FEES * CAPITAL OUTLAY 480,527.85 146,807.05 333,347.48 373.32 763100 IMPROVEMENTS 480,527.85 146,807.05 333,347.48 373.32 Fund 160 Project 50172 Thomasson Drive Fund 160 Project 50173 South Bayshore Fund 160 Project 50154 FEMA Item 12e 4.A.2 Packet Pg. 69 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50171 BAYSHORE/AVALON PR #REF!#REF!1,855,000.00 1,747,601.88 107,398.12 ** REVENUE Sub Total #REF!#REF!#REF!#REF!#REF!#REF! * CONTRIBUTION AND TRANS #REF!#REF!#REF!#REF!#REF!#REF! ** EXPENSE Sub Total 1,855,000.00 1,747,601.88 107,398.12 * CAPITAL OUTLAY 1,855,000.00 1,747,601.88 107,398.12 763100 IMPROVEMENTS 1,855,000.00 1,747,601.88 107,398.12 Fund 160 Project 50171 Hamilton Ave Parking Item 12e 4.A.2 Packet Pg. 70 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Bayshore CRA Open Cases Case Number Case Type Description Date Entered Location Description Detailed Description CESD20180010777 SD Open 08/24/2018 2727 Bayshore Drive, Unit 106 Interior renovations without a permit, see Contractor Licensing Case CECV20180010498. CEPM20190009270 PM Open 07/30/2019 2965 LUNAR ST - 53353080009 Complainant stated that the property has been vacant for over a year, overgrowth and debris throughout. CEPM20190014027 PM Open 11/20/2019 2978 Poplar St - 29831080005 Structure with roof and siding damage. CEPM20200000363 PM Open 01/10/2020 2862 Arbutus St - 81780360005 (note: CC Prop Appr. does not recognize these "common area" address points) permit number: PRBD20190522726. This permit is linked to 2862 Arbutus St - 81780360005 Docks that are failing and starting to fall into the water. Hazard for boats in the area. CESD20200002597 SD Open 03/09/2020 327 Pier A Unpermitted deck and sliding glass doors, see Contractor Licensing Case . CESD20200007077 SD Open 07/02/2020 2575 Barrett Ave - 81730600003 No permit for shed in rear, fence & awning in front of house. Also, it appears the back porch is falling apart. CENA20200010414 NA Open 09/24/2020 50891000007 - 2596 HOLLY AVE Prior cases : CENA Grass & weeds in excess of 18". Also - vegetative debris. Inclusion to Mandatory lot Mowing propgram as of today 10/8/2020 CEPM20200011324 PM Open 10/19/2020 2715 Holly Ave - 50890360007 Tenant called her walls are coming apart form the water damnage, the a/c is leaking, mold in the carpet and the bathrooms, and she has a rat problem. She is moving,m but doesnt want next tenant to suffer a she has. CESD20200011642 SD Open 10/27/2020 23120120009 - 2248 CURTIS ST Complaint of turning this single family home into a multi family unit with possible garage conversion, and now too many people living in them. *RE: AIMS 311 Service Request 51854* CESD20200012115 SD Open 11/10/2020 2775, 2781, and 2815 Bayview Dr - Orick Marina 61835200001 - 2775 BAYVIEW DR Orick Marine on Bayview has built/installed additional boat lifts without permits. CEPM20200013712 PM Open 12/23/2020 50890680004 - 2605 Holly Ave Property has a mobile home on it that the owner feels should be condemned. He has occupants in the mobile home that will not leave and that he is trying to evict. He would like to see if the County could inspect the mobile home and deem it unhabitable so the occupants would have no choice but to move out. He then intends to demolish the mobile home. CEPM20210000793 PM Open 01/25/2021 50890480000 - 2665 HOLLY AVE Mobile home has severe fire damage CESD20210001113 SD Open 02/01/2021 81731640004 - 2528 BARRETT AVE Multiple sheds and accessory structures. (Bayshore CRA) CENA20210001924 NA Open 02/24/2021 81780240002 - Unimproved lot at the west end of Becca Ave High grass & weeds in excess of 18" CEPM20210002299 PM Open 03/09/2021 29280440005 - 2648 VAN BUREN AVE House has shed in backyard that is old and rusted with a bunch of rats in it. CEV20210002337 V Open 03/10/2021 2311 Andrew Dr. Numerous unlicensed vehicles and all along the buffer hedge in a row all the way to the back of the property mostly trucks but all unlicensed CEPM20210003116 PM Open 03/30/2021 Along Commercial Dr Behind 2300 Davis Blvd. Economy Body Shop Graffiti on utility boxes Between Davis Blvd. & Kirkwood Dr. in the alley on backwall of Economy Body Shop CES20210003386 S Open 04/07/2021 2959 Davis Blvd.Flutter flags / Prohibited signs displayed at Walker' Marine CESD20210003927 SD Open 04/20/2021 3056 Van Buren Ave Van Buren and Bayshore. Unpermitted modification to trailer ending it's original DOT certification. Structure must be removed as it is a hazard to occupants and neighboring structures. Entire top of trailer and walls have been removed and replaced with site built materials without any permitting, engineering or inspection. CESD20210004109 SD Open 04/23/2021 3470 Bayshore Dr Bayshore CRA has received complaints regarding new boat racks being installed, noise and debris at the Marina located at the corner of Bayshore and Riverview. CEPM20210004918 PM Open 05/12/2021 71781320009 - 3385 BAYSHORE DR (mixed use building @ Coco & Bayshore) Property maintenance issues including damage post office boxes support, garbage being spread out by vultures, broken/boarded window in residence, untagged grey BMW. CEROW20210005287 ROW Open 05/21/2021 2626 Holly - 50891120000 CEROW20210003023 closed due to new owner. Expired ROW Permit CENA20210005555 NA Open 05/27/2021 County owned property to the west of complainant's property @ 2500 Lee St Exotics encroaching on complainant's property CESD20210006455 SD Open 06/21/2021 2620 Riverview Dr Naples Constant construction noise before 7 a.m. Large vegetation being removed,, interior of home was demolished and is being rebuilt for the last month. No permits posted Item 13a 4.A.2 Packet Pg. 71 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Bayshore CRA Open Cases CEPM20210006514 PM Open 06/21/2021 4621 Bayshore behind Bldg Q - behind the wooden fence 21800001709 - 4629 BAYSHORE DR – ABACO BAY CONDO Really long sistern is in bad shape (rotted / trees growing out of it) to where someone could fall in & drown. CEPM20210007650 PM Open 07/19/2021 00388200001 - 301 PIER C - Main address for NAPLES LAND YACHT HARBOR INC Site Address: 103 Pier K, Naples Land Yacht Harbor Mobile home that was crashed into by a stolen U-Haul box truck. The mobile home appears to have shifted off of its foundation. Occupant is refusing to leave but the complainant feels it is unsafe as the mobile home is now not level. CEVR20210008823 VR Open 08/17/2021 Parcel # 71800000420 - 3362 CANAL ST, and, Parcel # 71800000433 (same owner for both parcels) 2 side-by-side, unimproved lots have been cleared of vegetation with heavy equipment, had fill brought in to access across the ROW, and has no silt fencing. This work has been done without any permits for building, ROW and vegetation removal. CESD20210010342 SD Open 10/05/2021 2533 Barrett Avenue 81730680007 - 2533 BARRETT AVE Unpermitted interior and exterior renovations, see Contractor Licensing Case CECV20210009925. CEPM20210010622 PM Open 10/13/2021 00387280006 - 2200 CURTIS ST Screens missing from pool cage, water is green CESD20210010942 SD Open 10/21/2021 00392440006 - 3353 CAPTAINS CV Building a deck off the creek in his back yard. Referred to Code due to polluting the County waterway. CESD20210011314 SD Open 10/29/2021 48174440008 - 3165 LAKEVIEW DR Unpermitted dock renovation, see Contractor Licensing Case CECV20210010874. CENA20210011320 NA Open 10/31/2021 81731520001 - 2547 STORTER AVE Grass & weeds in excess of 18" CESD20210011366 SD Open 11/02/2021 (incorrect) 71800000307 - 3339 CANAL ST (incorrect) 71800000242 - 3399 CANAL ST New carport that showed up over the weekend. Permits? CESD20210011573 SD Open 11/05/2021 3212 Bayshore Dr. - 48171320008 - 3200 BAYSHORE DR Remodeling a room and adding a kitchen, adding walls and stairs ( no permits) CELU20210011982 LU Open 11/18/2021 50890480000 - 2665 HOLLY AVE With the removal of the primary structure (MH) via demo permit, there are household and vegetative debris is being stored on this property. Multiple travel trailers & utility trailers are being stored. This is all illegal outside storage. CESD20210011987 SD Open 11/18/2021 2564 Van Buren Ave 29280560309 - 2564 VAN BUREN AVE Home occupied without C/O on permit. Also check status of expired tank permit PRBD20210416602 & rejected pool enclosure permit PRBD20210840479 CESD20210013187 SD Open 12/22/2021 71781480004 - 3032 COCO AVE Unpermitted exterior widow and door replacement, see Contractor Licensing Case CECV20210012744. CEPM20210013352 PM Open 12/29/2021 48173680005 - 2649 LAKEVIEW DR bulk head seems to be cut by the neighbor and is very concerned about his safety as the neighbor threatened him, and also he has a boat parked in the front of the property half way into his property for weeks, there is a fence on the property that the neighbor has put a roof on which collects the rainwater and dumps it on his property. CEAU20220000580 AU Open 01/18/2022 48173680005 - 2649 LAKEVIEW DR Fence built without a permit (from case # CEPM20210013352) CENA20220000745 NA Open 01/20/2022 3260 Tamiami Trl (Starbucks) - 30480040100 Vacant lot is reported to be the "1st" lot off Peters Ave Trash behind Starbucks and on vacant lot next to it Item 13a 4.A.2 Packet Pg. 72 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Bayshore CRA March 2020 Case Number Case Type Description Date Entered Detailed Description Location Description CENA20220000842 NA Open 01/25/2022 Garbage & litter on vacant parcel (Referred from CENA20220000745)30480120004 - 2947 PETERS AVE CESS20220000847 SS Closed 01/25/2022 "Junk Cars" snipe sign strapped to a county STOP sign in the ROW at the corner of Republic Drive & Bayshore Drive Republic Drive & Bayshore Drive CESS20220000892 SS Closed 01/26/2022 "Junk Cars" snipe sign strapped to a STOP sign in the county ROW at the intersection of Karen Drive & Bayshore Drive.Karen Drive & Bayshore Drive CESS20220000896 SS Closed 01/26/2022 "Junk Cars" snipe sign strapped to a SPEED LIMIT sign in the county ROW at the intersection of Van Buren & Bayshore Drive.Van Buren & Bayshore Drive. CENA20220000993 NA Open 01/27/2022 Easement not being maintained - high grass (8ft +/-)Adjacent to 2506 Van Buren Ave CENA20220001016 NA Closed 01/28/2022 Homeless, tent, garbage on vacant lot @ Bayshore & VanBuren 29280040007 - 3849 BAYSHORE DR CES20220001114 S Closed 02/01/2022 Flutter flags, snipe sign & sandwich board sign in the ROW at The Garden School of Naples The Garden School of Naples - 77821480007 - 6051 BAYSHORE DR CESS20220001116 SS Closed 02/01/2022 "Junk Cars" snipe sign strapped to a speed limit sign in the county ROW at the intersection of Van Buren & Bayshore.Van Buren & Bayshore CENA20220001120 NA Closed 02/01/2022 Garbage and debris from homeless camp 2 Vacant parcels on the NW corner of Linda Drive & Bayshore Drive 55700040001 and 55700080003 (same owner) CENA20220001170 NA Open 02/02/2022 Uncontrolled growth of grass & weeds in excess of 18"61841080008 (10 acres on Bayshore) CELU20220001172 LU Closed 02/02/2022 Caller stated that her pest controller advised that fire ants are coming from the tree on the vacant lot (folio 48730410003) next to her property. Also she stated that cars are driving through the vacant lot, and it's not a roadway. folio 48730410003 CEOCC20220001197 OCC Closed 02/02/2022 OL/BTR inspection not completed Food truck has Violations for Fire extinguisher inspection and mounting Hood service and maintenance 2880 Becca Ave CES20220001286 S Closed 02/06/2022 "MECHANIC ON DUTY" and "TIRES" snipe signs in the county ROW 23170000108 - 4000 BAYSHORE DR CENA20220001457 NA Closed 02/09/2022 Graffiti on the wall of a structure 4097 Bayshore - 53353600007 Item 13a 4.A.2 Packet Pg. 73 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory Bayshore CRA March 2020 CESS20220001499 SS Closed 02/10/2022 "Junk Cars" snipe sign strapped to a STOP sign in the county ROW at the intersection of Johns St and Floridan Ave Johns St and Floridan Ave CEV20220001518 V Open 02/10/2022 Unlicensed vehicles (1 truck, 1 car), a commercial vehicle, and vehicles parked on the grass at a residential property. 3001 Cottage Grove Ave - 23370640009 CENA20220001520 NA Closed 02/10/2022 High grass & weeds 3001 Cottage Grove Ave - 23370640009 CEV20220001576 V Open 02/14/2022 Commercial vehicle parked on residential lot, and, unlicensed vehicles on the property. (Bayshore CRA) 3162 Cottage Grove Ave - 23371480006 CEOCC20220001579 OCC Open 02/14/2022 SF Home used as multi unit rental property. Living area in bottom of stilt home including bathroom, kitchen & bedrooms. Rental unit in top of stilt home has stairs to access without entering main floor at bottom for stilt. Home used as a 3 or 4 plex rental. 3162 Cottage Grove Ave - 23371480006 CEV20220001580 V Open 02/14/2022 (Complainant is Bayshore CRA) - Unlicensed vehicles on property. Over 1 ton vehicle parked at this residence. Fifth wheel parked in back yard. Trailer cannot be legally removed from lot as it requires permission from the neighboring lot owner.3190 Cottage Grove - 23371560007 CESD20220001581 SD Open 02/14/2022 (Complainant - Bayshore CRA) Home used as a multi-rental unit. Garage is living space. Illegal electric, water, sewer run into an unpermitted drain field.3190 Cottage Grove - 23371560007 CESD20220001586 SD Closed 02/14/2022 (Complainant - Bayshore CRA) - Unpermitted stairs & deck on side of home and built in side yard set back. Unpermitted rental unit built in bottom of stilt home - see side of home for ground floor entry. Half of garage used as 1 bedroom rental. A.C. unts in front for rental are not permitted. No fire escape from unit. No egress window from bedroom in rental unit. Unpermitted electrical, water, sewer, bedroom, kitchen, bathroom.3272 Cottage Grove - 23371800000 CES20220001718 S Closed 02/16/2022 "Junk Cars" snipe sign strapped to a STOP sign in the county ROW at the corner of Floridan Ave and Johns St.Floridan Ave and Johns St CENA20220001723 NA Open 02/16/2022 Bayshore CRA 1. 2054 Pelton- Junk yard, running a recycling business everyday 7am-10pm and cutting up the scraps and throwing the other junk in the piles stored in the yard (Occupational License and Illegal Land Use) 2. Unlicensed vehicles and trailers stored in the property 3. unpermitted garage conversion into residential living space in the rear 2054 Pelton CELU20220001804 LU Open 02/18/2022 Possible homeless camp as a tent has been observed. Across from 2969 Van Buren Ave, Iglesia Adventista Hispana De Naples property Item 13a 4.A.2 Packet Pg. 74 Attachment: Agenda Packet Joint Meeting 3-9-2022 (21774 : Bayshore Beautification MSTU Advisory