Agenda 04/12/2022 Item #16C 4 (Budget Amendments Within Wastewater User Fee Capital Project Fund 414)04/12/2022 EXECUTIVE SUMMARY Recommendation to authorize the budget amendments totaling $3,000,000 to reallocate funding within the Wastewater User Fee Capital Project Fund (414) to fund near term needs in the Collier County Water-Sewer District’s wastewater collections system. OBJECTIVE: To realign funding within the Wastewater User Fee Capital Project Fund (414) consistent with established priorities. CONSIDERATIONS: The scopes of work of the projects listed below are consistent with the FY 2022 Budget approved by the Board on September 23, 2021. Due to increases in costs of FY 2022 approved construction projects as well as the need for newly identified projects, engineering studies and material purchases, a reallocation of funds is needed to complete prioritized projects within fund 414. Funds will be drawn from program 72009 “Western Interconnect.” Sufficient funds are available in this program to cover projects projected for current fiscal year and FY 2023. The budget forecast for FY 2024 includes funds to complete all projects under this program. The program to benefit from this reallocation of funds is Project 70240 “Collections Operating TSP”. The prioritized projects benefiting from this reallocation are listed below: Pelican Bay Blvd Gravity Main Replacement: Reallocated funds will be used for the construction phase. The project consists of replacing a portion of a critical 40-year-old gravity main along Pelican Bay Blvd that is nearing the end of its life cycle. This project will allow for continuous, compliant operation of the system and will reduce the amount of infiltration and inflow to the wastewater system in this area ($1,130,000 budget amendment). Basin 302 Infiltration and Inflow (I/I) Program: Reallocated funds will be used to fund a study to detect infiltration and inflow (I/I) in the Basin 302 wastewater system and to provide recommendations for rehabilitating the system to eliminate the I/I ($160,000 budget amendment). MPS 302 Force Main Replacement: Reallocated funds will be used for material purchases and the construction phase. The project consists of replacing a portion of the existing 30-inch force main from master pump station (MPS) 302 to the South County Water Reclamation Facility (SCWRF). This portion of pipe has failed previously resulting in sanitary sewer overflows (SSO’s) ($662,000.00 budget amendment). Pump Station Rehabilitations: Reallocated funds will be used for the design/bidding and construction phases. This project consists of rehabilitating aged pump stati ons ensuring continuous operations and bringing the pump stations to current standards. Pump stations that will benefit from the fund reallocation are PS 109.05 and PS 179.02 for the construction phase and, PS 121.02, PS 312.27, PS 308.04, PS 309.02, and PS 309.10 for the design/bidding phase ($1,048,000.00 budget amendment). All projects will be procured separately in accordance with the County’s Procurement Ordinance. FISCAL IMPACT: A budget amendment in the amount of $3,000,000, is necessary to reallocate project funding within the Wastewater User Fee Capital Project Fund (414). Projects receiving funds are within the 70240 “Collections Operating TSP” funded program. No expenditures are authorized by this item. 16.C.4 Packet Pg. 1160 04/12/2022 GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities and to remain in compliance with all regulatory programs. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, raises no legal issues and requires majority vote for approval. -JAK RECOMMENDATION: To authorize the budget amendments in the amount of $3,000,000 to reallocate funding within the Wastewater User Fee Capital Project Fund (414). Prepared By: Daniel Roman, PE, Principal Project Manager, Engineering & Project Management Division ATTACHMENT(S) 1. Pump Stations Location Map (PDF) 2. Basin 302 Location Map (PDF) 16.C.4 Packet Pg. 1161 04/12/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.4 Doc ID: 21543 Item Summary: Recommendation to authorize the budget amendments totaling $3,000,000 to reallocate funding within the Wastewater User Fee Capital Project Fund (414) to fund near term needs in the Collier County Water-Sewer District’s wastewater collections system. Meeting Date: 04/12/2022 Prepared by: Title: – Public Utilities Planning and Project Management Name: Daniel Roman 03/07/2022 9:03 AM Submitted by: Title: Director – Public Utilities Planning and Project Management Name: Matthew McLean 03/07/2022 9:03 AM Approved By: Review: Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 03/08/2022 11:52 AM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 03/09/2022 2:16 PM Public Utilities Planning and Project Management Matthew McLean Additional Reviewer Completed 03/15/2022 3:19 PM Capital Project Planning, Impact Fees, and Program Management Beth Johnssen Additional Reviewer Completed 03/17/2022 7:13 AM Public Utilities Operations Support Jennifer Morse Additional Reviewer Completed 03/17/2022 11:34 AM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/18/2022 4:00 PM Public Utilities Department Joseph Bellone Level 2 Division Administrator Review Completed 03/18/2022 4:02 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/21/2022 8:29 AM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 03/21/2022 3:03 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/21/2022 3:34 PM Office of Management and Budget Susan Usher Additional Reviewer Completed 03/23/2022 10:51 AM County Manager's Office Mark Isackson Level 4 County Manager Review Completed 04/05/2022 11:55 AM Board of County Commissioners Geoffrey Willig Meeting Pending 04/12/2022 9:00 AM 16.C.4 Packet Pg. 1162 16.C.4.b Packet Pg. 1163 Attachment: Pump Stations Location Map (21543 : Budget Amendment for Multiple Wastewater Projects) 16.C.4.c Packet Pg. 1164 Attachment: Basin 302 Location Map (21543 : Budget Amendment for Multiple Wastewater Projects)