Backup Documents 03/08/2022 Item #16A 2 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 A 2
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1. Eric Johnson Zoning, GMD IT/ 03/03/2022
2.
3 County Attorney Office County Attorney Office
1- 1
4. BCC Office Board of County
Commissioners LI/I by fr! 3/Ii/2 2-
5. Minutes and Records Clerk of Court's Office
alil 31I 2oaa 9,a i
• PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Eric Johnson/Growth Management Dept. Phone Number 252-2931
Contact/ Department
Agenda Date Item was March 8,2022 Agenda Item Number 16 A.2.
Approved by the BCC
Type of Document Resolution Number of Original 1
Attached ao?a---30 Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? EJ
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be EJ
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the EJ
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's EJ
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip EJ
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 3-8-22 and all changes made during iv(..„.
the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes,if applicable. �1J�
9. Initials of attorney verifying that the attached document is the version approved by the
BCC, all changes directed by the BCC have been made, and the document is ready for the , 1 f\
Chairman's signature. �\
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
16A 2
RESOLUTION NO. 2022- 36
RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA AMENDING THE ADMINISTRATIVE
CODE FOR LAND DEVELOPMENT, WHICH WAS CREATED BY
ORDINANCE NO.2013-57,TO ESTABLISH A REVIEW PROCESS FOR
THE LIMITED DENSITY BONUS POOL ALLOCATION; AND
PROVIDING AN EFFECTIVE DATE. [PL202110001033]
WHEREAS, the Board of County Commissioners adopted Ordinance No. 2013-57 on
September 24, 2013 to establish an Administrative Code; and
WHEREAS, Ordinance No. 2013-57 provides for the adoption of Exhibit "B", the
Administrative Code for Land Development, which shall be maintained by the County Manager
or designee; and
WHEREAS, Ordinance No. 2013-57 also provides that amendments required to maintain
the Administrative Code for Land Development shall be made by resolution adopted by the Board;
and
WHEREAS, the Board desires to revise the Administrative Code for Land Development,
to establish a review process for the limited density bonus pool allocation as detailed in Exhibit
"A" attached hereto and incorporated herein;
NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA,that the Administrative Code for Land
Development, which was created by Ordinance No. 2013-57, is hereby amended as reflected in
Exhibit"A" attached hereto and incorporated herein.
This Resolution shall become effective on the date of adoption by the Board.
[21-LDS-00150/1688146/117 1 of 2
12-17-21
16A 2
-�,
THIS RESOLUTION ADOPTED by majority vote this 5 day of Al, a" G� , 2022.
ATTEST: BOARD OF COUNTY COMMISSIONERS
CRYSTAL K. KINZEL, CLERK COLLIER COUNTY, FLORIDA
61-)Ae
By: ' t�►/ By: rik AN- 0.46
e u 1 C1: 1°, Wil'am J. McDaniel, Jr., Chairman
A Attest,es t0 Chainniq P
signatureonly.,
I
Approved as to form and legality:
J 1 -- ----_ �-,-
1/,
I -i
eidFF. Ashton-Cicko cti
Managing Assistant County Attorney
Attachments: Exhibit "A": Chapter 3, Section E, Mixed Use Project (MUP) — Public Hearing
for use of Bonus Density Pool and/or other Deviations; Chapter Four, Section F —
Mixed Use Project — Administrative Approval, Chapter 6, Section N, Limited
Density Bonus Pool Allocation (LDBPA), Chapter 12, Acronyms
[21-LDS-00150/1688146/117 2 of 2
12-17-21
I6A 2
Exhibit A — Administrative Code Changes
Collier County Land Development Code I Administrative Procedures Manual
Chapter 3 / Quasi-Judicial Procedures with a Public Hearing
Chapter 3. Quasi-Judicial Procedures with a Public Hearing
* * * * * * * * * * * * *
E. Mixed Use Project (MUP) - Public Hearing for use of Bonus Density Pool
and/or other Deviations
Reference LDC sections 4.02.16 C.8, 10.02.15 and LDC Public Notice subsection 10.03.06 N.
Applicability This procedure applies to a request for a mixed use project(MUP)within the Bayshore
Gateway Triangle Community Redevelopment Area which seeks to utilize the Bonus
Density Pool and/or other deviations. This does not include the Limited Density Pool
Allocation.
Eligible Property owners in the following zoning districts:
Applicants 1. Bayshore Zoning Overlay , Neighborhood Commercial (BZOBM4Uo-
NC)Subdistrict
2. Bayshore Zoning Overlay Mixed Use District,Waterfront(BZOBMUD-W)Subdistrict
3. Gateway Triangle Zoning Overlay, Mixed Use District
(GTZOCTMUD-MXD)Subdistrict
Pre-application A pre-application meeting is required.
Initiation The applicant files a "Mixed Use Project Plan (MUP) with Deviations-Public Hearing,"with
the Planning&Zoning Division.
Application MUPs that require a public hearing shall follow the applicable submittal requirements of a
Contents Conditional Use in Chapter 3 C. of the Administrative Code. In addition, pursuant to LDC
subsection 10.02.15 A.2.,the applicant shall prepare a conceptual plan depicting mixed
use development and noting all deviations.
Completeness The Planning&Zoning Division will review the application for completeness. After
and Processing of submission of the completed application packet accompanied with the required fee,the
Application applicant will receive a mailed or electronic response notifying the applicant that the
petition is being processed.Accompanying that response will be a receipt for the payment
and the tracking number(i.e.,XXX201200000)assigned to the petition.This petition
tracking number should be noted on all future correspondence regarding the petition.
Notice Notification requirements are as follows: q See Chapter 8 of the Administrative Code for
additional notice information.
1. NIM:The NIM shall be completed at least 15 days before the advertised Planning
Commission hearing.The NIM shall be advertised and a mailed written notice shall be
Page 1 of 9
16A 2
Exhibit A — Administrative Code Changes
Collier County Land Development Code I Administrative Procedures Manual
Chapter 3 / Quasi-Judicial Procedures with a Public Hearing
given to property owners in the notification area at least 15 days prior to the NIM
meeting.
2. Mailed Notice:Written notice shall be sent to property owners in the notification
area at least 15 days before the advertised Planning Commission hearing.
3. Newspaper Advertisements:The legal advertisement shall be published at least 15
days before each advertised public hearing in a newspaper of general circulation.The
advertisement shall include at a minimum:
• Date,time, and location of the hearing;
• Description of the proposed land uses;and
• 2 in.x 3 in. map of the project location for the BZA advertisement.
4. Sign: (see format below) Posted at least 15 days before the advertised Planning
Commission hearing date.
PUBLIC HEARING REQUESTING MIXED USE PROJECT
APPROVAL
PETITION NUMBER: _
TO ALLOW:
(Request-Sufficiently clear to describe the project)
LOCATION:
DATE: TIME:
CONTACT:
THE ABOVE TO BE HELD IN THE BOARD OF COUNTY
COMMISSIONERS CHAMBERS,THIRD FLOOR,COLLIER
COUNTY GOVERNMENT CENTER, 3299 TAMIAMI TRAIL
EAST,NAPLES,FLORIDA,34112.
Public Hearing 1. The EAC shall hold at least 1 advertised public hearing, if required.
2. The Planning Commission shall hold at least 1 advertised public hearing.
3. The BZA shall hold at least 1 advertised public hearing.
Decision maker The BZA,following recommendations from both the EAC, if required,and the Planning
Commission.
Review Process The Planning&Zoning Division will review the application, identify whether additional
materials are needed, prepare a Staff Report,and schedule a hearing date before the EAC,
if required, and Planning Commission to present the petition for review.
Following the recommendation by the Planning Commission,the Planning&Zoning
Division will prepare an Executive Summary and schedule a hearing date before the BZA to
present the petition for review.
Page 2 of 9
16A 2
Exhibit A — Administrative Code Changes
Collier County Land Development Code I Administrative Procedures Manual
Chapter 3 I Quasi-Judicial Procedures with a Public Hearing
Updated Resolution 2022-###
# # # # # # # # # # # # #
Page 3 of 9
16A 2
Exhibit A — Administrative Code Changes
Collier County Land Development Code I Administrative Procedures Manual
Chapter 4 / Administrative Procedures
Chapter 4. Administrative Procedures
* * * * * * * * * * * * *
F. Mixed Use Project- Administrative Approval
Reference LDC sections 10.02.15 and 4.02.16.
Applicability This procedure applies to a request for a mixed use project(MUP)within the Bayshore
Gateway Triangle Community Redevelopment Area that is not seeking a Density Bonus
and/or is eligible for administrative deviations pursuant to LDC subsections 10.02.15 A.1
and 10.02.15 B.
Eligible Applicants Property owners in the following zoning districts:
Bayshore Zoning Overlay Mixed Use District, Neighborhood Commercial
(BZOBMUD-NC)Subdistrict
Bayshore Zoning Overlay Mixed Usc District,Waterfront(BZOBMI�3-W)
Subdistrict
Gateway Triangle Zoning Mixed Usc District Overlay, Mixed Use District
(GTZOCTMUD-MXD)Subdistrict.
Pre-application A pre-application meeting is required.
Initiation The applicant files a "Mixed Use Project Plan(MUP)—Administrative Approval"
application with the Development Review Division.
Application Pursuant to LDC subsection 10.02.15 A.1.b, MUPs that may be administratively approved
Contents shall follow the applicable submittal requirements of a site development plan. <=>See
Chapter 4 I. of the Administrative Code for additional information.
Completeness and The Planning&Zoning Division will review the application for completeness. After
Processing of submission of the completed application packet accompanied with the required fee,the
Application applicant will receive a mailed or electronic response notifying the applicant that the
petition is being processed.Accompanying that response will be a receipt for the payment
and the tracking number(i.e.,XXX201200000) assigned to the petition.This petition
tracking number should be noted on all future correspondence regarding the petition.
Notice No notice is required.
Public Hearing No public hearing is required.
Decision maker The County Manager or designee.
Staff Review The Development Review Division will review the application, identify whether additional
Process materials are needed and prepare a letter of approval or denial utilizing the criteria
identified in the LDC subsection 10.02.15 A.1. and 10.02.15 B.
Appeals Administrative appeals shall be in accordance with the Code of Laws and Ordinances
section 250-58.
Page 4 of 9
Exhibit A — Administrative Code Changes 1 b A 2
Collier County Land Development Code I Administrative Procedures Manual
Chapter 4 I Administrative Procedures
Resolution 2022-11#41
Page 5 of 9
I6A 2
Exhibit A — Administrative Code Changes
Collier County Land Development Code I Administrative Procedures Manual
Chapter 6 I Waivers, Exemptions, and Reductions
Chapter 6. Waivers, Exemptions, and Reductions
* * * * * * * * * * * * *
N. Limited Density Bonus Pool Allocation (LDBPA)
Reference LDC section 4.02.16 C. and LDC section 10.03.06 R.
Applicability Property Owners in the Bayshore Zoning Overlay District (BZO) and Gateway Triangle
Zoning Overlay District (GTZO), which are zoned as either multi-family or mixed use, 2
contiguous acres or less are allowed to add 2 units per acre when satisfying the criteria of
LDC section 4.02.16.C.10.
Initiation The applicant files a "Limited Density Bonus Pool"application with the Planning&Zoning
Division.
Pre-Application A pre-application meeting is required.
Application A limited density pool application must include the following,in addition to the Application
Contents Contents and Requirements for an SDP, SDPA, or SIP. C=4> See Chapter 4 1.2 — 1.4 of the
Administrative Code.
Submittal Credentials: Pursuant to LDC section 10.02.03, the engineering plans shall be
signed and sealed by the applicant's professional engineer licensed to practice in
the State of Florida. For projects subject to LDC section 5.05.08, architectural
drawings,shall be signed and sealed by a licensed architect,registered in the State
of Florida. Landscape plans shall be signed and sealed by licensed landscape
architect, registered in State of Florida.
Sheet size:The site improvement plan and the coversheet shall be prepared on a maximum
size sheet measuring 24 inches by 36 inches, drawn to scale showing the areas
affected by the amendment. The sheet must clearly show the change "clouded"
and clearly delineate the area and scope of the work to be done.
The application must include the following:
1. A narrative of the redevelopment project and how it is consistent with the standards
for approval, LDC section 4.02.16.C10.
2. Submittal of a Traffic Impact Statement.
3. Demonstrated compliance with the County's access management policies.
Notice Notification requirements are as follows. C* See Chapter 8 of the Administrative Code for
additional notice information.
1. Mailed Notice:Written notice shall be sent to property owners in the notification
area at least 15 days before the first advertised hearing.
2. Newspaper Advertisement:The legal advertisement shall be published at least 15
days before each advertised hearing in a newspaper of general circulation.The
advertisement shall include at a minimum:
a. Date,time,and location of the hearing;
Page 6 of 9
1 6 A 2
Exhibit A — Administrative Code Changes
Collier County Land Development Code I Administrative Procedures Manual
Chapter 6 I Waivers, Exemptions, and Reductions
b. Application number and project name;
c. 2 in.x 3 in. map of project location;and
d. Description of location.
Public Hearing The Hearing Examiner or Planning Commission shall hold at least 1 advertised public
hearing. G>See Chapter 9 of the Administrative Code for the Office of the Hearing
Examiner procedures.
If the petition is heard by the Planning Commission, one BZA hearing is required.
Decision maker The Hearing Examiner or BZA.
Review Process The Zoning Division will review the application and identify whether additional materials
are needed. Staff will prepare a Staff Report utilizing the criteria established in LDC
section 4.02.16 C.10.d.to present to the decision maker.
Page 7 of 9
16A 2
Exhibit A — Administrative Code Changes
Chapter 12. Acronyms
A-Rural Agricultural Zoning District FIAM-Financial Impact Analysis Module
ACOE-Army Corps of Engineers FIRS-Florida Interstate Highway System
ACP-Agricultural Clearing Permit FLUCFCS-Land Use Cover and Forms Classification
ACSC-Area of Critical State Concern System
ADT-Average Daily Trips FLUE-Future Land Use Element
ASI-Area of Significant Influence FLUM-Future Land Use Map
BCC-Board of Collier County Commissioners FP-Final Plat
BD-Boat Dock Petition FS-Florida Statutes
BZOBM}UD-Bayshore Zoning Overlay Dr +xed FSA-Flow way Stewardship Area
U-se4 District GC-Golf Course
BP-Business Park District GGAMP-Golden Gate Area Master Plan
BZA-Board of Zoning Appeals GGPPOCO- Golden Gate Pkwy Professional Office
C-1-Commercial Professional General Office District Commerciai Overlay District
C-2-Commercial Convenience District GMP-Growth Management Plan
C-3-Commercial Intermediate District GPCD-Gallons Per Capita per Day
C-4-General Commercial District GT-Gopher Tortoise
C-5-Heavy Commercial District GTZO-Gateway Triangle Zoning Overlay District
CCME-Conservation and Coastal Management GWP-Ground Water Protection Zone
Element GZO-Goodland Zoning Overlay
CCPC-Collier County Planning Commission HSA-Habitat Stewardship Area
CCSL(P)-Coastal Construction Setback Line (Permit) I-Industrial Zoning District
CDD-Community Development District ICBSD-Immokalee Central Business Subdistrict
CEB-Code Enforcement Board LDC-Land Development Code
CF-Community Facility LOS-Level of Service
CIE-Capital Improvement Element LPA-Local Planning Agency
CIP-Capital Improvement Program LSPA-Littoral Shelf Planting Area
CMO-Corridor Management Overlay M/F-Multi-family Use or Zoning
C.O.-Certificate of Occupancy MH-Mobile Home
CON-Conservation Zoning District MHO-Mobile Home Overlay
CRD-Compact Rural Development MLW-Mean Low Water
CSP-Conceptual Site Plan MPP-Manatee Protection Plan
CU-Conditional Use NBMO-North Belle Meade Overlay
DBH-Diameter at Breast Height NC-Neighborhood Commercial District
DEO-Department of Economic Opportunity NRPA-Natural Resource Protection Area
D.O.-Development Order O.C.-On Center
DRI-Development of Regional Impact P-Public Use District
DSWT-Dry Season Water Table PPL-Plans and Plat
E-Estates Zoning District PSI-Pounds Per Square Inch
EAC-Environmental Advisory Council PSP-Preliminary Subdivision Plat
EIS-Environmental Impact Statement PUD-Planned Unit Development
EPA-Environmental Protection Agency RSF-Residential Single-Family Districts
EXP-Excavation Permit RCW-Red Cockaded Woodpecker
FAC-Florida Administrative Code RFMU-Rural Fringe Mixed Use District
FDEP-Florida Department of Environmental RLS-Request for Legal Service
Protection RLSA(0)-Rural Lands Stewardship Area (Overlay)
FDOT-Florida Department of Transportation RMF-Residential Multi-Family Districts
FFWCC-Florida Fish &Wildlife Conservation RNC-Residential Neighborhood Commercial
Commission Subdistrict
Page 8 of 9
1 6 A 2
Exhibit A — Administrative Code Changes
R.O.W.—Right of Way TCEA—Transportation Concurrency Exception Areas
RSF—Residential Single-Family TCMA—Transportation Concurrency Management
SBCO—Santa Barbara Commercial Overlay District Areas
SBR—School Board Review TDR—Transfer of Development Rights
SDP—Site Development Plan TP—Turtle Permit
S/F—Single Family Use/Zoning TTRVC—Travel Trailer Recreational Vehicle
SFWMD—South Florida Water Management District Campground
SIP—Site Improvement Plan USFWS—United States Fish &Wildlife Service
SLR—Sound Level Reduction VOB—Vehicle on the Beach Permit
SRA—Stewardship Receiving Area VR—Village Residential Zoning District
SSA—Stewardship Sending Area VRP—Vegetation Removal Permit
ST—Special Treatment Zoning Overlay VRSFP—Vegetation Removal &Site Fill Permit
ST-NAR—Special Treatment-Natural Aquifer W—Waterfront District
Recharge WRA—Water Retention Area (within RLSA)
SWFRPC—Southwest Florida Regional Planning
Council
# # # # # # # # # # # # #
Page 9 of 9