Agenda 02/22/2022 Item #16E3 (Risk Management Administrative & Minor Claims)02/22/2022
EXECUTIVE SUMMARY
OBJECTIVE: To settle routine, administrative and minor claims matters which promotes the efficient
use of resources and the efficient administration of the program; and allows for a timely response to
claimants and/or their representatives.
CONSIDERATIONS: Resolution 04-15 grants limited authority to the Risk Management Division
Director to settle certain damage claims against Collier County and to authorize the payment of
investigation and adjustment expenses as presented to the County’s Risk Management Program.
Authority is delegated as follows:
• Bodily Injury Liability- Premises, Auto, Operations: Non-litigated claims less than $50,000
• Property Damage Liability Claims- Premises, Auto, Operations: Non-litigated claims less than
$75,000
• Errors, Omissions, Professional Liability, Employment Practices Liability: Non-litigated claims
less than $50,000
• Property Losses to County Owned Property: Full authority
• Workers’ Compensation: Full authority subject to the provisions of F.S. 440 and subject to
approval by the Judge of Compensation as needed
• Employer’s Liability: Non-litigated claims less than $50,000
• Subrogation- Bodily Injury and Property Damage: Full authority to pursue non-litigated
subrogation recoveries
• Subrogation- Workers’ Compensation: Full authority to pursue non-litigated subrogation
recoveries.
Pursuant to the Resolution, claims are settled and paid according to the loss verification procedures
contained in the Resolution which include the completion of claim forms, documentation of evidence,
valuation, and the determination of a finding of liability where applicable. Closed claim files are also
subject to review by the external auditor. A listing of claim files closed during the first quarter of FY 22
is attached. The report may include claims and/or settlements previously approved by the Board of
Commissioners as well as litigated files with a final court determination.
FISCAL IMPACT: Funds are budgeted and available in Fund 516-121650-645920 (Property and
Casualty Self Insurance Fund) and 518-121630-645928 (Workers’ Compensation Fund) for the payment
of claims and settlements. For the first quarter of FY 22, 50 files were closed with total expenditures of
$172,047.06. Reinsurance recoveries for the first quarter of FY 22 were $5,924.94. During the same
period, 10 subrogation files were closed, and the Risk Management Division recovered $16,428.03 in
funds owed the County.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this
item.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, raises no legal
issues and requires majority vote for approval. -JAK
RECOMMENDATION: That the Board of County Commissioners accepts the attached Settlement
Report and ratifies the actions taken therein.
PREPARED BY: Jeff Walker CPCU, ARM, Division Director, Risk Management Division.
16.E.2
Packet Pg. 1105
02/22/2022
ATTACHMENT(S)
1. All Lines Closed Claim Report 1st QTR FY 22 (PDF)
2. Subrogation Closed Claim Report 1st QTR FY 22 (PDF)
3. Resolution 2004-15 PDF0001 (PDF)
16.E.2
Packet Pg. 1106
02/22/2022
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.E.2
Doc ID: 21137
Item Summary: Recommendation to ratify Property, Casualty, Workers’ Compensation and
Subrogation claim files settled and/or closed by the Risk Management Division Director pursuant to
Resolution # 2004-15 for the first quarter of FY 22.
Meeting Date: 02/22/2022
Prepared by:
Title: Operations Coordinator – Risk Management
Name: Greily Gonzalez
01/21/2022 1:07 PM
Submitted by:
Title: Division Director - Risk Management – Risk Management
Name: Jeff Walker
01/21/2022 1:07 PM
Approved By:
Review:
Risk Management Jeff Walker Director Review Completed 01/21/2022 1:15 PM
Agenda Clerk Preview Michael Cox Agenda Clerk Preview Completed 01/24/2022 12:37 PM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 01/24/2022 1:12 PM
Office of Management and Budget Laura Wells Additional Reviewer Completed 01/25/2022 4:46 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 01/26/2022 10:40 AM
County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 02/15/2022 2:02 PM
Board of County Commissioners Geoffrey Willig Meeting Pending 02/22/2022 9:00 AM
16.E.2
Packet Pg. 1107
Med/BI/Comp Expense Ind/PD/Coll Recovery Deductible Legal Other Total Inc
Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total
Date of Loss Date Report to RiskStatus Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total
Coverage Cause
355.25 26.90 0.00 0.00 0.00 0.00 0.00 382.15
10/6/2021 10/7/2021 10/20/2021 355.25 26.90 0.00 0.00 0.00 0.00 0.00 382.15
10 1500
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8/16/2021 8/18/2021 10/1/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10
162.35 5.95 0.00 0.00 0.00 0.00 0.00 168.30
10/11/2021 10/11/2021 12/29/2021 162.35 5.95 0.00 0.00 0.00 0.00 0.00 168.30
10 1700
416.05 17.85 175.84 0.00 0.00 0.00 0.00 609.74
10/15/2021 10/16/2021 12/10/2021 416.05 17.85 175.84 0.00 0.00 0.00 0.00 609.74
10 1500
12,802.09 2,430.09 1,031.00 0.00 0.00 0.00 0.00 16,263.18
5/12/2021 5/14/2021 11/24/2021 12,802.09 2,430.09 1,031.00 0.00 0.00 0.00 0.00 16,263.18
10 1500
Division
Carrier Accident Desc.
Major Coverage: 10 - Workers' Compensation
1010062111904
Collier County Government
Closed Claim Report- All Lines
1st QTR FY 2022
Valued as of:1/20/2022
Claim Number Claimant Name
1010112111913
EMSE
Employee was lowering the head
rest on the stretcher during a 911
call, and the monitor fell off and
landed on her right foot just above
the steel toe.
1010152111936
PELB
Employee was using a hedge
trimmer all day, and is
complaining of left wrist pain &
swollen left hand.
1008162111770
EMSE
EMT was exposed to source's
saliva while providing patient
care. Source was Covid +, unk.
other occupational diseases.
Major Coverage: 10 - Workers' Compensation
EMSE
Employee injured left lower back
while trying to manage a difficult
patient.
1005122111425
EMSE
Employee was picking up a
medical bag when she felt a
sharp pain in her right shoulder.
16.E.2.a
Packet Pg. 1108 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
76.50 14.50 0.00 0.00 0.00 0.00 0.00 91.00
11/12/2021 11/12/2021 11/24/2021 76.50 14.50 0.00 0.00 0.00 0.00 0.00 91.00
10 1400
0.00 14.50 0.00 0.00 0.00 0.00 0.00 14.50
12/4/2021 12/7/2021 12/28/2021 0.00 14.50 0.00 0.00 0.00 0.00 0.00 14.50
10 1300
0.00 14.50 0.00 0.00 0.00 0.00 0.00 14.50
12/4/2021 12/6/2021 12/22/2021 0.00 14.50 0.00 0.00 0.00 0.00 0.00 14.50
10 1500
7,823.48 406.70 0.00 0.00 0.00 0.00 0.00 8,230.18
5/2/2021 5/12/2021 11/10/2021 7,823.48 406.70 0.00 0.00 0.00 0.00 0.00 8,230.18
10 1700
400.76 37.41 0.00 0.00 0.00 0.00 0.00 438.17
9/20/2021 9/20/2021 10/11/2021 400.76 37.41 0.00 0.00 0.00 0.00 0.00 438.17
10 1200
241.80 22.36 0.00 0.00 0.00 0.00 0.00 264.16
7/13/2021 7/13/2021 10/21/2021 241.80 22.36 0.00 0.00 0.00 0.00 0.00 264.16
10 1400
207.64 5.95 0.00 0.00 0.00 0.00 0.00 213.59
10/12/2021 10/13/2021 12/9/2021 207.64 5.95 0.00 0.00 0.00 0.00 0.00 213.59
10 1300
2,223.51 95.45 0.00 0.00 0.00 0.00 0.00 2,318.96
8/9/2021 8/10/2021 12/10/2021 2,223.51 95.45 0.00 0.00 0.00 0.00 0.00 2,318.96
10 1300
1011122112022
WATE
Employee was involved in a
motor vehicle accident, and is
complaining of Neck Strain.
1012042112067
1005022111418
EMSE
Employee was trying to enter
station through bay door, and
while walking through the
doorway, the door closed striking
employee in his left arm and
shoulder.
1009202111845
SOEE
Employee tripped and fell while
unloading supplies, and fracture
left wrist and laceration to head.
1012042112064
FMGE
Employee was painting at East
Naples Community Park, and
pulled muscle in mid back.
Major Coverage: 10 - Workers' Compensation
1010122111919
BPRI
Employee tripped and fell on pipe
stub that was sticking up from out
of ground.
1008092111747
WATE
Employee had laceration to head,
when he bumped it on pipe while
preparing to clean odor control
system.
1007132111654
RMSE
Employee was rear ended by
another vehicle and is
complaining of lower back pain.
MHCP
Employee tripped and fell on left
hand and arm, over nails that
were sticking up in the parking lot
in front of community center.
16.E.2.a
Packet Pg. 1109 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
14,031.49 592.80 1,989.47 0.00 0.00 0.00 0.00 16,613.76
7/29/2021 7/29/2021 10/28/2021 14,031.49 592.80 1,989.47 0.00 0.00 0.00 0.00 16,613.76
10 1300
579.17 60.54 0.00 0.00 0.00 0.00 0.00 639.71
9/1/2021 9/1/2021 10/11/2021 579.17 60.54 0.00 0.00 0.00 0.00 0.00 639.71
10 1300
375.38 26.40 0.00 0.00 0.00 0.00 0.00 401.78
10/1/2021 10/1/2021 10/15/2021 375.38 26.40 0.00 0.00 0.00 0.00 0.00 401.78
10 1200
181.05 20.45 0.00 0.00 0.00 0.00 0.00 201.50
10/19/2021 10/19/2021 11/30/2021 181.05 20.45 0.00 0.00 0.00 0.00 0.00 201.50
10 1300
311.34 48.64 0.00 0.00 0.00 0.00 0.00 359.98
10/26/2021 10/27/2021 10/31/2021 311.34 48.64 0.00 0.00 0.00 0.00 0.00 359.98
10 1300
466.20 17.85 0.00 0.00 0.00 0.00 0.00 484.05
10/8/2021 10/8/2021 12/9/2021 466.20 17.85 0.00 0.00 0.00 0.00 0.00 484.05
10 1300
626.71 54.59 0.00 0.00 0.00 0.00 0.00 681.30
9/16/2021 10/15/2021 10/29/2021 626.71 54.59 0.00 0.00 0.00 0.00 0.00 681.30
10 1500
41,280.77 3,913.43 3,196.31 0.00 0.00 0.00 0.00 48,390.51
41,280.77 3,913.43 3,196.31 0.00 0.00 0.00 0.00 48,390.51
1009012111806
BPRI
Employee tripped and fell outside
from property located at 7117
Pelican Bay Blvd, and injured left
knee, wrist and laceration to left
ear
1010012111878
1007292111704
TXCE
Employee tripped over yellow
textured domed ADA mat.
Employee was leaving to go for
lunch, and fell off the curb
injuring her Left ankle and Right
2nd/3rd toes while getting into her
vehicle.
1010262111968
LIBE
Employee tripped walking around
doing morning inspection, and
stubbed right big toe on the
sidewalk.
1010082111908
CMAO
Employee was on an emergency
call when he had a syncopal
episode resulting in him striking
his face on the asphalt.
Major Coverage: 10 - Workers' Compensation
1010192111946
GMAO
Total by Major Coverage 20 Claims
PSVE
Employee was on the boat ramp
at Cocohatchee Park and slipped,
landing on his right hand/arm,
then ended up landing on his
chin.
1009162111932
LIBE
Employee was bending rotating
audio books from one end to the
other, and is complaining of left
lower back and left lower leg pain
below knee.
16.E.2.a
Packet Pg. 1110 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3/18/2021 3/18/2021 11/12/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21 3000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8/26/2021 9/10/2021 10/27/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20
75,000.00 400.73 0.00 0.00 0.00 0.00 0.00 75,400.73
10/8/2019 10/8/2019 11/16/2021 75,000.00 400.73 0.00 0.00 0.00 0.00 0.00 75,400.73
21 2050
75,000.00 400.73 0.00 0.00 0.00 0.00 0.00 75,400.73
75,000.00 400.73 0.00 0.00 0.00 0.00 0.00 75,400.73
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7/29/2021 7/29/2021 10/31/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
32
0.00 0.00 4,946.40 0.00 0.00 0.00 0.00 4,946.40
3/31/2021 3/31/2021 12/15/2021 0.00 0.00 4,946.40 0.00 0.00 0.00 0.00 4,946.40
Major Coverage: 20 - General Liability
2103182111265 KRAEMER, CLAUDIA
MHCP
Claimant was operating a 50CC
scooter w/ 9 year old passenger
on back and exiting Marco South
Beach lot, behind several other
vehicles, when auto exit arm
came down and struck her in
face, causing a mark to her right
cheek and causing her head to
LIBE
Patron tripped and fell outside
east side of library building. Staff
member called 911 and Naples
Fire and Rescue and the EMTs
arrived. They took him for x-rays.
Patron could not stand on his
own, his left hip was giving him
pain.
Total by Major Coverage 3 Claims
Major Coverage: 30 - Auto Liability
3207292111706 CHIRILLO, MICHELLE
2008262111825 PYOTT, ALAN
WATE
At 421 Bayside Ave customer is
requesting re-imbursement for
additional repairs by his
landscaping company to take
place. We were on site on August
26th to install a meter for his
neighbor’s property and restored
the property to original condition.
2110081909693 KENNEY, WILLIAM
BPRI
County vehicle CC2-2318 was
parked next to a blue Hyundai,
when turning to exit , made
contact with other vehicle with no
visible damage.
3203312111309 Payne, David
RMSE
16.E.2.a
Packet Pg. 1111 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
32 3000
0.00 0.00 4,946.40 0.00 0.00 0.00 0.00 4,946.40
0.00 0.00 4,946.40 0.00 0.00 0.00 0.00 4,946.40
0.00 0.00 985.69 0.00 0.00 0.00 0.00 985.69
10/25/2021 10/26/2021 12/31/2021 0.00 0.00 985.69 0.00 0.00 0.00 0.00 985.69
41 2450
0.00 0.00 1,041.17 0.00 0.00 0.00 0.00 1,041.17
7/19/2021 7/19/2021 12/31/2021 0.00 0.00 1,041.17 0.00 0.00 0.00 0.00 1,041.17
41 3400
570.58 0.00 0.00 0.00 0.00 0.00 0.00 570.58
7/20/2021 7/23/2021 10/8/2021 570.58 0.00 0.00 0.00 0.00 0.00 0.00 570.58
42
0.00 0.00 748.75 0.00 0.00 0.00 0.00 748.75
6/9/2021 6/9/2021 10/14/2021 0.00 0.00 748.75 0.00 0.00 0.00 0.00 748.75
41 3000
784.34 0.00 0.00 0.00 0.00 0.00 0.00 784.34
7/19/2019 7/31/2019 12/28/2021 784.34 0.00 0.00 0.00 0.00 0.00 0.00 784.34
42 5900
Total by Major Coverage 2 Claims
Major Coverage: 40 - Auto Physical Damage
4110252111959 Solid Waste Division
SOWE
Employee was traveling
southbound on Collier Blvd north
of I-75 upon the light turning
green, the car in front of our
employee moved forward and
then stopped abruptly causing our
employee to hit into the back of
their vehicle.
Right front bumper of County
Vehicle hit left rear bumper of
third party vehicle.
LDSD
A trailer holding small landscaping
rocks hit a bump while driving on I-
75S and release all the rocks onto
the road. One hit the windshield
of my county vehicle and left a
crack on the driver's side.
Major Coverage: 40 - Auto Physical Damage
4106092111517 Parks and Recreation
MHCP
4107192111665 Water Division
WATE
Tractor is utilize to cut overgrown
bushes in South Reverse
Osmosis Well Field. After being
utilized for this task Friday a pre-
use inspection showed a dent in
the rear left corner of the roof.
4207202111684 Development Review Inspection
Lifting up fertilizer hopper control
lever used to open and close hit
the window when it was raised to
high.
4207191909427 Traffic Operations
TECM
Stopped by Fleet for a windshield
wiper replacement, the service
technician pointed out a chip in
the windshield, the thought was it
might spread, so a stars report
was completed.
16.E.2.a
Packet Pg. 1112 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
0.00 0.00 7,584.79 0.00 0.00 0.00 0.00 7,584.79
2/16/2021 2/16/2021 10/8/2021 0.00 0.00 7,584.79 0.00 0.00 0.00 0.00 7,584.79
41 3000
0.00 0.00 203.10 0.00 0.00 0.00 0.00 203.10
6/2/2021 6/3/2021 10/8/2021 0.00 0.00 203.10 0.00 0.00 0.00 0.00 203.10
41 3000
0.00 0.00 3,433.26 0.00 0.00 0.00 0.00 3,433.26
8/2/2021 9/3/2021 10/8/2021 0.00 0.00 3,433.26 0.00 0.00 0.00 0.00 3,433.26
41
0.00 0.00 3,058.16 0.00 0.00 0.00 0.00 3,058.16
9/20/2021 9/20/2021 10/27/2021 0.00 0.00 3,058.16 0.00 0.00 0.00 0.00 3,058.16
41
0.00 0.00 959.57 0.00 0.00 0.00 0.00 959.57
9/24/2021 10/4/2021 10/8/2021 0.00 0.00 959.57 0.00 0.00 0.00 0.00 959.57
42
0.00 0.00 2,294.62 0.00 0.00 0.00 0.00 2,294.62
7/18/2021 7/18/2021 12/29/2021 0.00 0.00 2,294.62 0.00 0.00 0.00 0.00 2,294.62
41 2150
RMSE
County vehicle CC2-1200 was
traveling north bound on Pelican
Bay Blvd when it struck Vehicle
#2 down the passenger side.
4106022111493 Parks and Recreation
MHCP
Employee mowing in front of the
shop and didn't see a fence cap in
the grass. Blades hit the fence
cap which in turn hit the work
truck.
Stopped by Fleet for a windshield
wiper replacement, the service
technician pointed out a chip in
the windshield, the thought was it
might spread, so a stars report
was completed.
4102162111150 Road Maintenance Division
WWTE
When backing up to road,
employee hit a tree / scraped
door on passenger side and
knocked off door handle.
4209242111889 Public Services
PSVE
Employee was driving CC2-985 to
Ft. Lauderdale for training when
something hit the windshield and
it ended up cracking it.
Major Coverage: 40 - Auto Physical Damage
4108022111807 Public Utilities
PUAO
Employee was driving North
bound on Joseph Ln and he
moved over to avoid a larger
vehicle and scraped a road work
sign that was very close to the
roadway. No injuries/damage to
employee or any other persons or
vehicles.
4109202111848 Wastewater Division
4107182111664 Parks & Recreation
MHCP
Employee was riding on the John
Deer when he drove over multiple
tree roots sticking out of the
ground causing the tires on the
John Deer to turn directions into
the tree. John Deer tire rods were
damaged (Steering) and left side
fender was broken.
16.E.2.a
Packet Pg. 1113 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
0.00 0.00 1,258.42 0.00 0.00 0.00 0.00 1,258.42
9/14/2021 9/16/2021 12/15/2021 0.00 0.00 1,258.42 0.00 0.00 0.00 0.00 1,258.42
41 2450
1,354.92 0.00 21,567.53 0.00 0.00 0.00 0.00 22,922.45
1,354.92 0.00 21,567.53 0.00 0.00 0.00 0.00 22,922.45
0.00 0.00 0.00 5,722.90 0.00 0.00 0.00 0.00
11/15/2019 11/12/2021 12/20/2021 0.00 0.00 0.00 5,722.90 0.00 0.00 0.00 0.00
53 3000
669.00 0.00 0.00 0.00 0.00 0.00 0.00 669.00
11/6/2021 11/18/2021 12/20/2021 669.00 0.00 0.00 0.00 0.00 0.00 0.00 669.00
50 3000
1,370.00 0.00 0.00 0.00 0.00 0.00 0.00 1,370.00
1/28/2021 5/6/2021 11/18/2021 1,370.00 0.00 0.00 0.00 0.00 0.00 0.00 1,370.00
50 2900
746.40 0.00 0.00 0.00 0.00 0.00 0.00 746.40
8/20/2021 8/20/2021 12/30/2021 746.40 0.00 0.00 0.00 0.00 0.00 0.00 746.40
53 3000
5,342.94 0.00 0.00 0.00 0.00 0.00 0.00 5,342.94
5/20/2021 5/20/2021 12/20/2021 5,342.94 0.00 0.00 0.00 0.00 0.00 0.00 5,342.94
GMAO
Driving East on Tamiami Trl E;
pouring rain, wipers on high, low
visibility, when a truck was just
stopped, no lights or brake lights
on at the intersection of 41 and
Rattlesnake Hammock Rd. When
I noticed the vehicle I immediately
hit brakes
Total by Major Coverage 12 Claims
Major Coverage: 50 - Property
5011151912017 Public Transit & Neighborhood
Enhancement Dept vs Rosanna C
Pichardo
Employee was riding on the John
Deer when he drove over multiple
tree roots sticking out of the
ground causing the tires on the
John Deer to turn directions into
the tree. John Deer tire rods were
damaged (Steering) and left side
fender was broken.
Major Coverage: 40 - Auto Physical Damage
4109142112015 Growth Management Division
5001282111404 Human Resources
HURE
A racoon got in to the HR Building
over night and damaged the
blinds.
5008202111776 Transportation & Engineering
Division
PTNE
A Lumec light pole was hit on
23rd Avenue SW and Sunshine
Blvd.
5011062112037 Parks & Recreation
MHCP
A vehicle "CRASH" at the
Vanderbilt Beach Access, by
unknown vehicle make or model,
causing the destruction of one
commemorative bench and
damage to another located at the
scene. Unknown if there were any
injuries. CCSO did respond.
TECM
Ped pole down
5005202111442 Traffic Operations
TECM
16.E.2.a
Packet Pg. 1114 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
53 3000
381.99 0.00 0.00 0.00 0.00 0.00 0.00 381.99
6/14/2021 6/14/2021 11/18/2021 381.99 0.00 0.00 0.00 0.00 0.00 0.00 381.99
53 3000
644.36 0.00 0.00 0.00 0.00 0.00 0.00 644.36
7/4/2021 7/7/2021 10/31/2021 644.36 0.00 0.00 0.00 0.00 0.00 0.00 644.36
53 3000
691.92 0.00 0.00 0.00 0.00 0.00 0.00 691.92
8/24/2021 8/25/2021 10/31/2021 691.92 0.00 0.00 0.00 0.00 0.00 0.00 691.92
53 3000
322.91 0.00 0.00 0.00 0.00 0.00 0.00 322.91
8/6/2021 8/6/2021 10/31/2021 322.91 0.00 0.00 0.00 0.00 0.00 0.00 322.91
53 3000
2,779.30 95.00 0.00 0.00 0.00 0.00 0.00 2,874.30
7/20/2021 7/22/2021 10/14/2021 2,779.30 95.00 0.00 0.00 0.00 0.00 0.00 2,874.30
50 5400
6,870.65 0.00 0.00 0.00 0.00 0.00 0.00 6,870.65
2/22/2021 2/23/2021 11/29/2021 6,870.65 0.00 0.00 0.00 0.00 0.00 0.00 6,870.65
53 3000
Major Coverage: 50 - Property
5006142111525 Traffic Operations
TECM
VM from weekend at 3:52 am Ped
signal not working at Davis Blvd.
and Radio rd. Staff found ped
pole down
5007042111622 Transportation & Engineering
Division
Street light on ground pole 3
5008062111734 Transportation & Engineering
Division
TECM
School flasher down (call from
CCSO LT Boyd say it down while
driving by it)
Major Coverage: 50 - Property
5007202111681 Museum
TECM
Received e-mail from Road Maint.
on call weekend report about a
ped sign down at Pine Ridge and
Collier. Checked With our TMC
and they saw a Pedestrian pole
down.
5008242111792 Transportation & Engineering
Division
TECM
Ped pole down New Market Rd @
Charlotte St
MUSE
A bad lightning storm came in on
Tuesday roughly 2:00 pm - 5:00
pm and power went down several
times throughout the storm. Many
times, the power would go off for
minutes, come back on, then go
back off again. There is a fire
panel problem now.
5002222111168 Traffic Operations
TECM
Employee on way home saw pole
down and confirmed that the
street light and fiber pull box was
damaged.
16.E.2.a
Packet Pg. 1115 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
0.00 0.00 0.00 202.04 0.00 0.00 0.00 0.00
6/5/2021 9/28/2021 10/28/2021 0.00 0.00 0.00 202.04 0.00 0.00 0.00 0.00
53 3000
19,819.47 95.00 0.00 5,924.94 0.00 0.00 0.00 19,914.47
19,819.47 95.00 0.00 5,924.94 0.00 0.00 0.00 19,914.47
0.00 0.00 0.00 0.00 0.00 472.50 0.00 472.50
4/20/2020 5/20/2020 10/6/2021 0.00 0.00 0.00 0.00 0.00 472.50 0.00 472.50
67
0.00 0.00 0.00 0.00 0.00 472.50 0.00 472.50
0.00 0.00 0.00 0.00 0.00 472.50 0.00 472.50
137,455.16 4,409.16 29,710.24 5,924.94 0.00 472.50 0.00 172,047.06
137,455.16 4,409.16 29,710.24 5,924.94 0.00 472.50 0.00 172,047.06
5006052111865 Transportation & Engineering
Division vs Hilario Santiago
TECM
Sign down due to car accident
Total by Major Coverage 12 Claims
Major Coverage: 60 - Public Officials Errors and Ommissions
6704202010347 Supervisor Of Elections
SOEE
Received complaint, plaintiffs
alleged they will be unable to vote
safely at their assigned polling
places, unless vote by mail
procedures are adjusted to
address the current reality. They
will be unable to vote by mail as
well.
Total by Major Coverage 1 Claim
Grand Totals: 50 Claims
16.E.2.a
Packet Pg. 1116 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
-15-
1/20/2022
2:06:35 PM
16.E.2.a
Packet Pg. 1117 Attachment: All Lines Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed By
Collier County Government
Subrogation Closed Claim Report
1st QTR FY 2022
Valued as of:1/20/2022
Total Inc Ind/PD/CollExpense RecoveryMed/BI/Comp Deductible Legal Other
Claim Number Claimant Name Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total
Coverage Carrier
Division
Cause
Date of Loss
Accident Desc.
Date Report to RiskStatus Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Growth Management v.
Progressive Insurance
4105212111446
10/29/20215/21/2021 5/21/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00BPRI
41 While in a building performing an
inspection, a outside contractor
vehicle backed into the parked
county vehicle which was
unoccupied at the time.
Inspector immediately returned
to the vehicle and called police.
3000
1,813.60 0.00 0.00 0.00 2,140.00 1,813.60 0.00 0.00Code Enforcement Division v.
Allstate Insurance
4110222010776
10/11/202110/22/2020 10/23/2020 0.00 1,813.60 0.00 2,140.00 1,813.60 0.00 0.00 0.00CENE
41 County vehicle was rear ended
by another vehicle.
3000
0.00 0.00 0.00 0.00 7,895.12 0.00 0.00 0.00Traffic Operations v. Geico5010282010793
10/7/202110/28/2020 10/28/2020 0.00 0.00 0.00 7,895.12 0.00 0.00 0.00 0.00TECM
50 Street light down due to car
accident.
3000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Traffic Operations v. United
Auto Insurance
5008302010582
10/7/20218/30/2020 8/31/2020 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00TECM
50 Street Light pole down from
accident.
3000
0.00 0.00 0.00 0.00 6,392.91 0.00 0.00 0.00Traffic Operations v. Amica5010302010801
10/7/202110/30/2020 10/30/2020 0.00 0.00 0.00 6,392.91 0.00 0.00 0.00 0.00TECM
50 Light pole hit due to car
accident.
3000
1,547.96 0.00 0.00 0.00 0.00 0.00 0.00 1,547.96Road Maintenance Division v.
Shanya Seda Parker
5009191911192
11/29/20219/19/2019 3/1/2021 1,547.96 0.00 0.00 0.00 1,547.96 0.00 0.00 0.00RMSE
50 Traffic accident damaged
guardrail.
3000
-1-
2:03:48PM
1/20/2022
16.E.2.b
Packet Pg. 1118 Attachment: Subrogation Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed
Collier County Government
Subrogation Closed Claim Report
1st QTR FY 2022
Valued as of:1/20/2022
Total Inc Ind/PD/CollExpense RecoveryMed/BI/Comp Deductible Legal Other
Claim Number Claimant Name Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total Incurred Total
Coverage Carrier
Division
Cause
Date of Loss
Accident Desc.
Date Report to RiskStatus Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total Paid Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Road Maintenance Division vs.
Daneisha Laquisha Soto
5003222111291
10/19/20213/22/2021 3/25/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00RMSE
53 Traffic accident causing
Guardrail damages.
3000
784.34 0.00 0.00 0.00 0.00 0.00 0.00 784.34Solid Waste Division4211012112003
12/15/202111/1/2021 11/5/2021 784.34 0.00 0.00 0.00 784.34 0.00 0.00 0.00SOWE
42 Cracked windshield5900
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Transportation & Engineering
Division vs FPL Contractor Pike
5009212111850
12/15/20219/21/2021 9/22/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00TECM
50 Ped pole damage from FPL
Contractor PIKE Jake Lewis
336-964-1908 Main Foreman
Kevin Davis 239-478-4529
2900
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Traffic Operations vs LLC EAN
Holdings
5006162111543
11/16/20216/16/2021 6/17/2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00TECM
53 Upright for signal was damaged
by car accident (not sure when)
at Immokalee rd. and Collier Blvd.
3000
2,332.30
2,332.30
0.00
0.00
1,813.60
1,813.60
16,428.03
16,428.03 0.00
0.00 0.00
0.00
0.00
0.00
4,145.90
4,145.90Grand Totals: 10 Claims
-2-
2:03:48PM
1/20/2022
16.E.2.b
Packet Pg. 1119 Attachment: Subrogation Closed Claim Report 1st QTR FY 22 (21137 : Ratification of Claims Files Closed
02/22/2022
EXECUTIVE SUMMARY
Recommendation to approve the administrative reports prepared by the Procurement Services
Division for change orders and other contractual modifications requiring Board approval.
OBJECTIVE: To promote accountability and provide transpar ency to the public and gain the
Board’s approval/ratification for various procurement -related transactions.
CONSIDERATIONS: In accordance with the Board’s Procurement Ordinance 2017-08 and the
Procurement Manual, the Procurement Services Division produces a regular administrative report which
provides for Board approval of the following transactions:
• Change Orders that do not exceed ten (10%) of the current Board approved aggregate amount,
and/or require change in schedule (number of days);
• Amendments to contracts;
• After the fact memos from various County Divisions, as requested by the Clerk’s Finance staff
for the timely process of invoices.
• Other items as determined by the County Manager or designee that require Board approval.
This administrative report includes the following:
• Five (5) change orders that in aggregate modify contracts by $11,339.08 and add 216 calendar
days to completion periods, see attached summary and backup for details; and
• Zero (0) amendments this period with a fiscal impact of $0.00; and
• Four (4) after the fact memos with a fiscal impact of $167.40 for additional services
FISCAL IMPACT: The net total for the nine (9) items is $11,506.48.
LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority
vote for Board action. -JAK
GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this
action.
RECOMMENDATION: To ratify/approve change orders and/or contract amendments and other items
as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08.
Prepared By: Sara Schneeberger, Procurement Strategist, Procurement Services
ATTACHMENT(S)
1. 0222 Change Order Report - FY22 (PDF)
2. 0222 Change Order Backup - FY22 (PDF)
3. 0222 After the Fact Report - FY22 (PDF)
4. 0222 After the Fact Backup - FY22 (PDF)
16.E.3
Packet Pg. 1126
02/22/2022
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.E.3
Doc ID: 21275
Item Summary: Recommendation to approve the administrative reports prepared by the
Procurement Services Division for change orders and other contractual modifications requiring Board
approval.
Meeting Date: 02/22/2022
Prepared by:
Title: Business Technology Analyst, Senior – Procurement Services
Name: Sara Schneeberger
02/08/2022 9:58 AM
Submitted by:
Title: Manager - Procurement – Procurement Services
Name: Sandra Herrera
02/08/2022 9:58 AM
Approved By:
Review:
Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Completed 02/08/2022 10:41 AM
Procurement Services Sandra Herrera Additional Reviewer Completed 02/08/2022 10:58 AM
Procurement Services Catherine Bigelow Additional Reviewer Completed 02/09/2022 8:35 AM
Agenda Clerk Preview Michael Cox Agenda Clerk Preview Completed 02/09/2022 11:25 AM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 02/09/2022 12:19 PM
Office of Management and Budget Laura Wells Additional Reviewer Completed 02/10/2022 9:32 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/10/2022 10:34 AM
County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 02/15/2022 2:02 PM
Board of County Commissioners Geoffrey Willig Meeting Pending 02/22/2022 9:00 AM
16.E.3
Packet Pg. 1127
Item page #Contract/ Grant No.Change #DateProject Name Vendor Name Division - Project Manager
Original Contract
Amount
Current Contract
Amount
Current Change
Order Amount
Revised Contract
Amount
% Over
Board
Approved
Amount
Contract
Length
Change in
length
(Days)
Updated
contract
length
Change in
length
(%)
1 1 18-7474 10 1/24/2022
Design-Build of NESA Interim
WWTP Mitchell & Stark Construction Co., Inc. PUEPMD - Craig Pajer $77,653,700.00 $65,294,913.22 ($20,626.57)$65,274,286.65 -0.03% 1065 120 1185 11.27%
2 7 20-7769 5 1/20/2022 SCRWTP Reactor Tank #4 Mitchell & Stark Construction Co., Inc. PUEPMD - Alicia Abbott $3,843,000.00 $3,843,000.00 $0.00 $3,843,000.00 0.00% 474 32 506 6.75%
3 18 21-7869 3 2/2/2022
Pelican Bay Sidewalk
Improvements Phase I Coastal Concrete Products, Inc.Pelican Bay Services -
Lisa Jacob $649,263.75 $676,145.31 $15,622.40 $691,767.71 2.31% 259 0 259 0.00%
4 24 19-7671 3 1/26/2022
SCWRF Reclaimed Water
Storage Tank Improvements PWC Joint Venture, LLC PUEPMD - Peter Schalt $1,294,000.00 $1,294,000.00 $0.00 $1,294,000.00 0.00% 500 64 564 12.80%
5 30 21-7828 1 1/31/2022
Collier Beach Renourishment
2021-2022 Coastal Protection Engineering
Capital Project Planning, Impact
Fees & Program Management -
Andrew Miller
$524,595.50 $524,595.50 $16,343.25 $540,938.75 3.12% 365 0 365 0.00%
Meeting Date Total number of Change Orders
Total Dollar
Change
Total
Change in
Days
2/22/2022 5 $11,339.08 216
16.E.3.a
Packet Pg. 1128 Attachment: 0222 Change Order Report - FY22 (21275 : Procurement Services administrative reports)
01212022
1 116.E.3.b
Packet Pg. 1129 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Approved by: ________________________________________
Beth Johnssen, Wastewater Director
Approved by: ________________________________________
Craig Pajer, Interim EPMD Director
Approved by: ________________________________________
Joseph Bellone, Operations Support Director
Approved by: ________________________________________
Dr. George Yilmaz, Public Utilities Administrator
2 16.E.3.b
Packet Pg. 1130 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.)
PROCUREMENT USE ONLY
Admin BCC
Rpt BCC ES
Contract # 18-7474
Change Order/Amendment Summary
CO# AMD# Description
COST TIME
Justification Additive (+) Deductive (-) Days
Added
New
Amount
1 DMP of Segment 1
Pipe $ (712,038.98)
0 975 Sales Tax Savings
2 DMP of Segment 3
Pipe $ (3,560,265.85)
0 975 Sales Tax Savings
3 DMP of Segment
4A Pipe $ (1,769,881.61)
0 975 Sales Tax Savings
4 DMP of Evoqua
WWTP $ (2,569,881.14)
0 975 Sales Tax Savings
5 DMP of Segment
4B Pipe $ (566,934.52)
0 975 Sales Tax Savings
6 DMP of Effluent
Filters $ (413,373.68)
0 975 Sales Tax Savings
7
DMP of Pump
Skids & Blowers
$ (1,211,448.49) 0 975 Sales Tax Savings
8 Cancel Blower
DMP $ 137,942.49 0 975 Required fast delivery
9 Change to IQ
WWTP $ (1,692,905) 90 1,065 Value Engineering
10 Change to PLCs $ (20,626.57) 120 1,185 Value Engineering
3 16.E.3.b
Packet Pg. 1131 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Date:11/18/2021
C2062-005C.O.R. #
Change Order Request
Project #:Project Name:C2062C2062 NESA Segment 3 Interim WWTP
G.C. #
We hereby propose to make the following changes:
PLC and Control Upgrades
Mitchell and Starke Construction Company Inc
Michael P. Westhafer
6001 Shirley Street
Naples, FL 34109
Fax:(239) 597-2165 (239) 566-7865
From:Cogburn Bros., Inc.
Raymond Smith
Phone:Fax:
3300 Faye Road
Jacksonville, FL 32226
To:
Attn:
Phone:(904) 358-7344 (904) 358-2805
Per request of Collier County, the RIO panels were changed to individual PLC's
This resulted in a reduction of the overall quantity of control panels and a slight reduction in cost.
Please also note the required increase in schedule time partly as a result of these requested changes, and also due to
worldwide material shortages.
All standard Covid and Force Majure Conditions Apply.
It may take up to 3 months to obtain all the required materials for this project
Change Order Price ($20,626.57)
Authorized Signature Date of Acceptance
Raymond Smith
Author Date Sent
11/18/2021
Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby
accepted. All work to be performed under same terms and conditions as specified in original
contract unless otherwise specified.
This price is good for 5 days. If conditions change, this price is void.
We are requesting a time extension of 90 days in conjunction with this change.
Page 1 of 2
4 16.E.3.b
Packet Pg. 1132 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Date:11/18/2021
C2062-005C.O.R. #
Change Order Request
Project #:Project Name:C2062C2062 NESA Segment 3 Interim WWTP
G.C. #
Labor
Labor Type Man Hrs $/Hr Burden Fringe TotalTax Total Labor
Electrician Working
Foreman
5.00 $125.00 $0.00 $0.00 $0.00 $625.00
Journeyman
Electrician
0.00 $95.00 $0.00 $0.00 $0.00 $0.00
Apprentice Electrician 0.00 $45.00 $0.00 $0.00 $0.00 $0.00
Administrative 6.00 $25.00 $0.00 $0.00 $0.00 $150.00
$775.00 Sub Total $0.00
Grand Total $775.00 $0.00
Subcontracts
Total Company Description
($21,313.60)Revere PLC Changes
($21,313.60)Sub Total
Grand Total ($21,313.60)
$775.00 Total
$116.25 Overhead
Subcontract ($19,376.00)
Markup Subcontract ($1,937.60)
($204.22)Bond
($20,626.57)Total
Page 2 of 2
5 16.E.3.b
Packet Pg. 1133 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Revere Control Systems, Inc. // 3810 Drane Field Road, Suite 7 // Lakeland, FL 33811 // 836.226.0219 // www.reverecontrol.com
Birmingham, AL // Lakeland, FL // Charlotte, NC // Texarkana, TX // Houston, TX
November 18, 2021
Mr. Raymond Smith
Cogburn Bros Inc
Jacksonville, Florida 32226
Reference: Collier Co NESA Interim WWTP 100% Design Cost – PLC Change
Dear Mr. Smith:
Revere is pleased to offer this proposal for change in cost on the 100% design of the Collier County NESA
Interim WWTP project due to the change in PLC selection.
•Change to Overall Design – CREDIT of $19,376
o Reduced total amount of enclosures by one from initial design, but increased enclosure sizes for
five of the six panels still in scope (Plant panel remained the same size as when it was bid)
o Changed PLC from ControlLogix to CompactLogix
o Update PLC enclosure internal designs based on 100% drawings, including changing all the RIO
panels to PLC panels
Regarding schedule impact, the change of the system based on the modification from RIO panels to individual
PLC panels resulted in delays due to the redesign, submittal, and approval process. In addition, with recent labor
and material shortages world-wide, the industry is experiencing ever-increasing lead times on a variety of
components including enclosures, PLC cards, and even surge suppression. For example, enclosure lead times last
year were around 8-10 weeks, but are now 16-18 weeks. Lead times on PLC cards were 4 weeks but have
increased to 16-17 weeks. The current plan is to deliver the control panels on-site mid February, but this could
change if material delays get worse.
Current Project Schedule:
•Delivery of all PLC panel parts by January 20th (PLC cards are severely delayed)
•Complete build of panels by February 3rd
•Load programming and factory test by February 14th
•Deliver panels to site by February 18th
•Site installation by March 23rd
•Revere calibration and field panel testing by April 18th
Thank you for your consideration of our proposal. If you have any questions, please contact me.
Regards,
Shawn Poole, PMP
Project Manager
Revere Control Systems, Inc.
(586)5 24-5606
6 16.E.3.b
Packet Pg. 1134 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
7 216.E.3.b
Packet Pg. 1135 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
8 16.E.3.b
Packet Pg. 1136 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
9 16.E.3.b
Packet Pg. 1137 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Collier County Planning & Project Management Department
WORK DIRECTIVE CHANGE
CHANGE #13 DATE OF ISSUANCE: June 8, 2021
Work Order/Purchase Order #: 4500204556 Contract No. 20-7769
PROJECT#: 70135.2
OWNER: Collier County Board of County Commissioners
PROJECT: SCRWTP Reactor Tank 4
CONTRACTOR: Mitchell & Stark Construction, Inc.
You are directed to proceed promptly with the following change(s):
DESCRIPTION: Provide 1-inch polymer feed piping between the chemical building and feed point at Reactor 4.
PURPOSE OF WORK DIRECTIVE CHANGE: Polymer is added in the reaction zone of the lime softening
reactors as a flocculant aide to control effluent turbidity. There exists a combination of ¾-inch and 1-inch piping
feeding polymer to the existing reactors. For commonality, the County desires the new piping to be increased to
1-inch diameter.
The Contractor will be installing the new polymer line in an existing chemical trench to serve reactor 4. Having
the Contractor provide the new increased diameter piping will allow for the work to be installed in the location
identified in the Contract drawings. There is no cost effective alternative because if the ¾-inch piping is installed,
it would need to be removed and replaced to achieve the desired 1-inch pipe size.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a
Change Order based thereon will involve one or more of the following methods of determining the effect of the
changes(s).
Method of determining change in Contract Price: Method of determining change in Contract Times:
Unit Prices Contractor’s records
Lump Sum Engineer’s record
Other: TIME & MATERIALS Other County Inspector observations and Contractor field records
Use of Allowance Funds: estimated $3,000
Estimated increase in Contract Price: $0.00 Estimated change in Work Order Time: 0
Increase or decrease by 0 calendar days.
RECOMMENDED BY (Engineer of Record): _____________________________Date: _06/08/21_________
REVIEWED BY (Owner’s Representative): _________________________________Date: ________
Alicia Abbott, EI., PMP, Project Manager
AUTHORIZED BY (Owner’s Representative): _________________________________Date: ________
Benjamin Bullert, P.E. – Principal Project Manager
10 16.E.3.b
Packet Pg. 1138 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Collier County SCRWTP Reactor Tank #4
Work Directive #13 Cost Estimate - Polymer Line
Cost Summary Direct Labor 7% Other Direct
and Material and
Activity Unit Quantity Materials Equipment w/ Tax Subcontract Markup Unit Price Total
Materials 0.00 0.00 0.00
Ferguson - 1" materials ls 1.00 462.86 495.26 46.29 541.55 541.55
Ferguson - credit 3/4" materials ls -1.00 337.24 360.85 33.72 394.57 -394.57
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
Subcontracts 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
M&S Labor 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
146.98
146.98
For estimating purposes only. Actual time and materials may vary based on conditions encountered
11 16.E.3.b
Packet Pg. 1139 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Collier County Planning & Project Management Department
WORK DIRECTIVE CHANGE
CHANGE #14 (Revision 1) DATE OF ISSUANCE: Revised October 4, 2021
Work Order/Purchase Order #: 4500204556 Contract No. 20-7769
PROJECT#: 70135.2
OWNER: Collier County Board of County Commissioners
PROJECT: SCRWTP Reactor Tank 4
CONTRACTOR: Mitchell & Stark Construction, Inc.
You are directed to proceed promptly with the following change(s):
DESCRIPTION: Reactor 4 overflow piping connection to thickener overflow.
PURPOSE OF WORK DIRECTIVE CHANGE: The Contractor submitted request for information (RFI) No. 28
which identified duct banks that were determined to be in conflict with the routing of the reactor 4 overflow piping
connection to the existing piping. An option proposed by the Contractor was to install the piping aboveground in
lieu of buried. This option would inhibit access for crane and other vehicles in between reactors 3 and 4, therefore,
the County preferred a buried option be considered. It was identified that the reactor 4 overflow could be buried
and connected to the thickener overflow. This work directive requests the Contractor to locate existing utilities to
confirm the revised routing and provide the following modifications.
1. Provide pressure class 350 ductile iron restrained joint piping for the buried portion in lieu of PVC (with
cement mortar lining – this change is necessary due to the limited depth of bury of the existing piping).
2. Provide a tapping sleeve and performing tapping for a 12-inch connection to the 16-inch thickener drain
line. (Sleeve shall be per Collier County Standard Specification 31 12 00, Paragraph 2.3.F).
3. Routing shall be as described in the attached sketch, subject to field review/confirmation with the
inspector.
The Contractor is currently installing new reactor overflow piping as part of the construction of reactor 4. Having
the Contractor change the connection point of the reactor overflow will allow for the work to be installed
concurrent with the existing project, allow for startup of the new reactor 4, and minimize future crane and other
vehicle interferences. The alternative is to install the piping below the duct bank conflicts in the current alignment
or install the piping aboveground resulting in interferences with either option. Revising the alignment and
connecting the reactor 4 overflow piping to the thickener overflow piping in the current project minimizes the
potential interferences as well as minimizes operational challenges associated with a deep pipeline (with respect
to solids accumulation and complicated future maintenance).
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a
Change Order based thereon will involve one or more of the following methods of determining the effect of the
changes(s).
Method of determining change in Contract Price: Method of determining change in Contract Times:
Unit Prices Contractor’s records
Lump Sum Engineer’s record
Other: TIME & MATERIALS Other County Inspector observations and Contractor field records
12 16.E.3.b
Packet Pg. 1140 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Use of Allowance Funds: estimated $20,000 Estimated change in Work Order Time: 0
Estimated increase in Contract Price: $0.00 Increase or decrease by 0 calendar days.
RECOMMENDED BY (Engineer of Record): _____________________________Date: __________
REVIEWED BY (Owner’s Representative): _________________________________Date: ________
Alicia Abbott, EI., PMP, Project Manager
AUTHORIZED BY (Owner’s Representative): _________________________________Date: ________
Benjamin Bullert, P.E. – Principal Project Manager
13 16.E.3.b
Packet Pg. 1141 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Collier County SCRWTP Reactor Tank #4
Work Directive #14 - Overflow
Cost Summary Direct Labor 7% Other Direct
$17,173.44 and Material and
Activity Unit Quantity Materials Equipment w/ Tax Subcontract Markup Unit Price Total
Materials 0.00 0.00 0.00
Ferguson - Additional Materials ls 1.00 8000.00 8560.00 800.00 9360.00 9360.00
Ferguson - Credit Materials ls 1.00 2396.10 2563.83 239.61 2803.44 2803.44
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
Subcontracts 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
M&S Labor 0.00 0.00 0.00
Project Manager hr 2.00 90.00 0.00 90.00 180.00
Field Supervisor hr 8.00 55.00 0.00 55.00 440.00
Operator hr 8.00 50.00 0.00 50.00 400.00
Pipe Layer hr 16.00 40.00 0.00 40.00 640.00
Laborer hr 16.00 30.00 0.00 30.00 480.00
Pickup & Tools hr 16.00 60.00 0.00 60.00 960.00
544 Loader hr 8.00 95.00 0.00 95.00 760.00
JD 50 Excavator hr 0.00 65.00 0.00 65.00 0.00
JD 120 Excavator hr 8.00 130.00 0.00 130.00 1040.00
3 Inch Pump day 1.00 40.00 0.00 40.00 40.00
Plate Compactor day 1.00 70.00 0.00 70.00 70.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
17173.44
17,173.44
For estimating purposes only. Actual time and materials may vary based on conditions encountered
14 16.E.3.b
Packet Pg. 1142 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Collier County Planning & Project Management Department
WORK DIRECTIVE CHANGE
CHANGE #15 DATE OF ISSUANCE: June 18, 2021
Work Order/Purchase Order #: 4500204556 Contract No. 20-7769
PROJECT#: 70135.2
OWNER: Collier County Board of County Commissioners
PROJECT: SCRWTP Reactor Tank 4
CONTRACTOR: Mitchell & Stark Construction, Inc.
You are directed to proceed promptly with the following change(s):
DESCRIPTION: Relocate existing carbon dioxide (CO2) feed diffuser assembly.
PURPOSE OF WORK DIRECTIVE CHANGE: The effluent piping from reactors 2, 3, and 4 is being replaced
with new above ground piping. The above ground piping will connect in three new locations to the recarbonation
basin wall. As a result, the existing CO2 gas feed assembly needs to be relocated north to provide uniform feed
regardless of which of the four reactors are in service. Contractor is requested to perform the following:
1. Remove existing gas feed assembly and clean by pressure washing and using small chipping hammers to
remove existing buildup on the diffuser assembly. County will inspect and advise when cleaning effort
is complete. Cut existing anchors flush to concrete.
2. Reinstall gas feed diffuser assembly over the new reactor 4 piping inlet, approximately 10’-6” north of
the current location. Anchorage to be installed in the top of wall to match existing size and materials.
3. Extend existing 1-inch CO2 gas feed piping and connect to diffuser in new location. Piping shall be
threaded stainless steel to match existing. Support to recarbonation basin wall per Typical Detail P660.
The Contractor is currently installing new reactor effluent piping and supports to connect to the recarbonation
basin. Having the Contractor relocate the CO2 diffuser assembly will allow for the work to be installed concurrent
with the existing project, allow for startup of the new reactor 4, and minimize future interferences. The alternative
is to wait to install the CO2 piping and supports in a separate project in which there would be interferences with
the reactor effluent piping complicating its construction and provide operational limitations for which reactors
can be operated. Providing the CO2 piping in the current project minimizes the potential interferences as well as
allows operators the flexibility to operate any reactor at any time.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a
Change Order based thereon will involve one or more of the following methods of determining the effect of the
changes(s).
Method of determining change in Contract Price: Method of determining change in Contract Times:
Unit Prices Contractor’s records
Lump Sum Engineer’s record
Other: TIME & MATERIALS Other County Inspector observations and Contractor field records
Use of Allowance Funds: estimated $5,000 Estimated change in Work Order Time: 0
Estimated increase in Contract Price: $0.00 Increase or decrease by 0 calendar days.
15 16.E.3.b
Packet Pg. 1143 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
RECOMMENDED BY (Engineer of Record): _____________________________Date: _06/18/21_________
REVIEWED BY (Owner’s Representative): _________________________________Date: ________
Alicia Abbott, EI., PMP, Project Manager
AUTHORIZED BY (Owner’s Representative): _________________________________Date: ________
Benjamin Bullert, P.E. – Principal Project Manager
16 16.E.3.b
Packet Pg. 1144 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Collier County SCRWTP Reactor Tank #4
Work Directive #15 Cost Estimate - CO2 Sparger
Cost Summary Direct Labor 7% Other Direct
and Material and
Activity Unit Quantity Materials Equipment w/ Tax Subcontract Markup Unit Price Total
Materials 0.00 0.00 0.00
Motto Corporation ls 1.00 2004.00 2144.28 200.00 200.40 2544.68 2544.68
Ferguson Stainless Material ls 1.00 10000.00 10700.00 1000.00 11700.00 11700.00
Ferguson PVC Material ls 1.00 3000.00 3210.00 300.00 3510.00 3510.00
0.00 0.00 0.00
0.00 0.00 0.00
Subcontracts 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
M&S Labor 0.00 0.00 0.00
Project Manager hr 8.00 90.00 0.00 90.00 720.00
Field Supervisor hr 16.00 55.00 0.00 55.00 880.00
Operator hr 32.00 50.00 0.00 50.00 1600.00
Pipe Layer hr 48.00 40.00 0.00 40.00 1920.00
Pickup & Tools hr 48.00 60.00 0.00 60.00 2880.00
544 Loader hr 16.00 95.00 0.00 95.00 1520.00
3 Inch Pump day 1.00 40.00 0.00 40.00 40.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
27314.68
27,314.68
For estimating purposes only. Actual time and materials may vary based on conditions encountered
17 16.E.3.b
Packet Pg. 1145 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
18 316.E.3.b
Packet Pg. 1146 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
19 16.E.3.b
Packet Pg. 1147 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
20 16.E.3.b
Packet Pg. 1148 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
21 16.E.3.b
Packet Pg. 1149 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
22 16.E.3.b
Packet Pg. 1150 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
23 16.E.3.b
Packet Pg. 1151 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
24 416.E.3.b
Packet Pg. 1152 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
25 16.E.3.b
Packet Pg. 1153 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY
Admin BCC
Rpt BCC ES
Change Order/Amendment Summary
CO# AMD# Description
COST TIME
Justification Additive (+) Deductive (-) Days
Added
New
Amount
3 -
Time request due to
WD#9 and delays in
procurement of
Materials
$0.00
$0.00
62
564
Time extension due to unforeseen
conditions regarding procurement
and delivery of materials, and
changes associated to WD#9.
1
2
-
-
64
500
73
$0.00
$0.00
$0.00
$0.00
Time request due to
changes described
in WD#2
Time request due to
changes described
in WD#1
Allow Contractor to use Allowance for
costs related to WD #1 and time
extension associated to unforeseen
conditions related to WD #2.
438
Time extension associated with WD
#1 due to unforeseen conditions
related to existing PCCP pipes.
26 16.E.3.b
Packet Pg. 1154 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
01/26/22 10:49 AM
Collier County Engineering & Project Management Division
WORK DIRECTIVE CHANGE
CONTRACT # /PROJECT NAME: WORK DIRECTIVE # 09
SCWRF Reclaimed Water Storage
Tank Improvements
PURCHASE ORDER #: 4500195019 DATE OF ISSUANCE: 07/06/21 – Original
01/20/22 - Revised
OWNER: Collier County Board of Commissioners PROJECT#: 19-7671
CONTRACTOR: Public Works Constructors (PWC) ENGINEER/DESIGN PROFESSIONAL: Stantec
Consulting Services, Inc.
You are directed to proceed promptly with the following change(s):
Description: Contractor shall relocate proposed 36-inch butterfly valve (Valve V/5) and valve vault as shown in
the attached plans. Furthermore, Contractor shall restrain the existing 36-inch ductile iron pipe as shown in the
attached plans. This work will be measured for payment as Time and Materials.
Purpose of Work Directive Change: The project was designed and bid with a proposed 36-inch diameter isolation valve
to be installed on what was understood to be an existing 36-inch diameter DIP. This understanding was based on existing
utility information provided to Stantec. During construction, it was determined that the existing pipeline material is
Prestressed Concrete Cylinder Pipe (PCCP). Installing a cut-in valve or connection on PCCP requires special adapters and
typically longer shutdown durations because of the additional time it takes to demolish and remove PCCP, as well as the
curing time needed for the concrete mortar around the new PCCP transition adaptors (these allow the pipe to transition from
PCCP to Ductile Iron or Polyvinylchloride (PVC) pipe). Recently, the Contractor performed an exploratory excavation of
the existing 36-inch diameter main that conveys water from the existing Reclaimed Water Storage tank and was able to
determine the existing pipe material is ductile iron pipe (DIP) and the existing condition is suitable for cutting in a proposed
isolation valve.
Reason/Justification: If the proposed 36-inch diameter isolation valve is installed on the DIP instead of the PCCP, it will
reduce duration needed for a shutdown and contractor to complete their work. Furthermore, this change will have significant
savings in construction costs since no special adapters will be needed to install the valve.
Reducing the duration of the shutdown and contractor’s work will benefit the County in two different ways as follows:
1) Because there are several different projects currently on-going at the SCWRF, the plant is limited in how long of a
duration they can keep the existing 36-inch effluent Reclaimed Water Storage tank pipeline out of service for
installation of the proposed isolation valve. The shorter the shutdown, the less chance there is for an overflow event
at the plant; and
2) Because installation of the proposed valve on the PCCP would be measured for payment on time and material basis
since the actual pipe material is different than what was shown on the bid plans (see above for reason in discrepancy
of existing pipe material), the County would save money on the additional time it would take the Contractor to cut-
in a 36-inch valve on the existing PCCP.
Attachments: 36-INCH-VALVE_RELOCATION-SD1-2021 06 29
27 16.E.3.b
Packet Pg. 1155 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
01/26/22 10:49 AM
WD#9 was revised on January 20, 2022 to add 64 additional days to the Substantial Completion date due to delays in
procurement of materials for WD#9 and not being able to finish the remaining project activities. A timeline summary of
events is described below:
July 6, 2021 – Signed Work Directive #9 issued to Contractor. On this date, Contractor only had 34 days
remaining to achieve Substantial Completion and 79 days achieve Final Completion.
July 23, 2021 – Contractor discussed with EOR the challenges for obtaining the materials for Work Directive #9
due to supply shortages.
July 30, 2021 – The Owner issued a Stop Work Order due to material supply shortages. On this date, the
Contractor only had 10 days remaining to achieve Substantial Completion date and 55 days remaining to achieve
Final Completion Date.
August 3, 2021 – Contractor obtained a quote from a vendor and the Corrugated Metal Pipe (CMP) submittal was
issued to the EOR for review and approval.
August 5, 2021 – EOR returned CMP submittal with Approved status.
August 31, 2021 – Contractor received quote for grating from Dixie Metal Products, with an anticipated delivery
date of 6-8 weeks after submittal approval.
September 24, 2021 – Contractor notified EOR and Owner that additional material procurement delays were
experienced beyond the Contractor’s control.
October 6, 2021 – Contractor provided grating submittal to EOR for review. EOR returned grating submittal on
same date with comments to be addressed by Contractor.
October 6, 2021 – CMP material delivered to Contractor.
October 14, 2021 – Contractor submitted second grating submittal.
October 18, 2021 – EOR returned grating submittal with Approved status.
October 18, 2021 – Contractor issued purchase order to Dixie Metal Products for grating material.
December 1, 2021 – Grating material delivered to Contractor.
December 9, 2021 –Contractor provided an updated schedule to perform the work described in Work Directive #9
and to finish the project. The schedule showed Contractor needing 64 additional days to achieve Substantial
Completion due to the time associated with waiting for the CMP and grating materials to be delivered, as well as
the actual time needed to complete the work described in Work Directive #9.
If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any
claim for a Change Order based thereon will involve one or more of the following methods of determining the
effect of the changes(s).
Method of determining change in Method of determining change in Contract Times:
Contract/Allowance Price:
Unit Prices Contractor’s records
Lump Sum Engineer’s record
Time & Material Other Contractor’s Proposal
Other
Estimated decrease in Allowance: Estimated change in Contract Time:
$TBD Increase by 64 calendar days.
RECOMMENDED: AUTHORIZED:
By: By:
Engineer Owner’s Representative
Miguel Perez, PE
28 16.E.3.b
Packet Pg. 1156 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
01/26/22 10:49 AM
Approved Original Allowance Amount $150,000.00
Remaining Allowance After WD #8 $0.00
This Allowance Decrease $TBD*
Remaining Allowance Balance $0.00
*A change order is necessary to fund this from a viable WBS source.
29 16.E.3.b
Packet Pg. 1157 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.)PROCUREMENT USE ONLY
Admin BCC
Rpt BCC ES
Contract Modification Work Order Modification
Contract #: Change #: Purchase Order #: Project #:
Contractor/Firm Name: Contract/Project:
Project Manager Name: r: Division Name:
Original Contract/Work Order Amount $ 524,595.50 5/11/2021; 11G Original BCC Approval Date; Agenda Item #
Current BCC Approved Amount $ 524,595.50 5/11/2021; 11G Last BCC Approval Date; Agenda Item #
Current Contract/Work Order Amount $ 524,595.50 5/17/2022 SAP Contract Expiration Date (Master)
Dollar Amount of this Change $ 16,343.25 3.12% Total Change from Original Amount
Revised Contract/Work Order Total $ 540,938.75 3.12% Change from Current BCC Approved Amount
Cumulative Changes $ 16,343.25 3.12% Change from Current Amount
Completion Date, Description of the Task(s) Change, and Rationale for the Change
Notice to Proceed Original Last Approved Revised Date
Date Completion Date Date (Includes this change)
# of Days Added Select Tasks Add new task(s) Delete task(s) Change task(s) Other
Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or
the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact
if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed.
Prepared by: ___________________________________________________________________________ Date: ________________
(Project Manager Name and Division)
Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same
terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The
adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant /
Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs.
Accepted by: ___________________________________________________________________________ Date: ________________
(Contractor / Vendor / Consultant / Design Professional and Name of Firm, if project applicable)
Accepted by: ___________________________________________________________________________ Date: ________________
(Design Professional and Name of Firm, if project applicable)
Approved by: ___________________________________________________________________________ Date:________________
(Division Director or Designee)
Approved by: ___________________________________________________________________________ Date: ________________
(Procurement Professional)
Procurement Services
Change Order Form
90066,
90068, 50126
Coastal Protection Engineering
450021090321-7828 1
Collier Beach Renourishment 2021-2022
CPP, IF & PMAndrew Miller
5/17/20225/17/20225/17/2022
0
5/17/2021
1. FDEP Permit requirements call for Sediment Compliance Testing at each R-Monument within the Renourishment Project limits.
This Change Order will allow the Consultant (CPE) to perform the required compliance testing, as testing and permitting is part of
existing tasks located within Schedule A – Statement of Work – (Task 5 – Naples – Construction Observations and Project
Certifications – Paragraphs 1 and 4; Task 10 – Vanderbilt – Construction Observations and Project Certifications – Paragraphs 1 and
4; Task 15 – Pelican Bay – Construction Observations and Project Certifications – Paragraphs 1 and 4).
2. Permitting efforts were included within the original contract. The task for permitting is needed to be expanded to cover sediment
analysis required for permit compliance.
3. DEP permit requirements for geotechnical testing of beach sand will not be met within the time frame required (90 days after final
stand placement date).
BCC
Rpt
30 516.E.3.b
Packet Pg. 1158 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.)
PROCUREMENT USE ONLY
Admin BCC
Rpt BCC ES
Change Order/Amendment Summary
CO# AMD# Description
COST TIME
JustificationAdditive (+) Deductive (-)
Days
Added
New
Amount
1 -
Adding Sediment
Testing Tasks $16,343.25 0 0 365 Per DEP Requirements
31 16.E.3.b
Packet Pg. 1159 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
From:Tara Brenner
To:BevardFarron
Subject:Revised sand analysis proposal
Date:Friday, January 21, 2022 5:38:49 PM
Attachments:image001.png
image002.png
21-278Rev.01 Coastal Protection Engineering - Sediment Compliance Criteria Testing.pdf
EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender
and use extreme caution when opening attachments or clicking links.
Hi Farron,
As discussed, we now have the proposal for analyses to cover the “during” and “post” construction
sediment samples that the County will collect and deliver to Ardaman.
If you are able to apply the 5% contract mark-up to this task it results in a total of $16,343.25.
Details/breakdown by reach are in the attached Ardaman proposal.
When you’re coordinating next week, don’t hesitate to reach out if you need anything from me.
Have a GREAT weekend,
Tara Brenner, PG, PE
Senior Coastal Engineer
Mobile: 631-896-9137
tbrenner@coastalprotectioneng.com
Coastal Protection Engineering
5301 N. Federal Hwy, Suite 335
Boca Raton, FL 33487
32 16.E.3.b
Packet Pg. 1160 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Ardaman & Associates, Inc.
Geotechnical, Environmental and
Materials Consultants
9970 Bavaria Road, Fort Myers, Florida 33913 Phone: (239) 768-6600 Fax: (239) 768-0409
Louisiana: Baton Rouge, New Orleans, Shreveport
Florida: Bartow, Cocoa, Fort Myers, Miami, Orlando, Port St. Lucie, Sarasota, Tallahassee, Tampa, W. Palm Beach
Revised January 22, 2022
Ardaman Proposal No. 21-278Rev.01
Coastal Protection Engineering
5301 N. Federal Hwy, Suite 335
Boca Raton, FL 33487
Attention: Ms. Tara Brenner, PG, PE
Operations Analyst
Subject: Quote for Sediment Compliance Criteria Testing Services
Collier County Beach Renourishment Project
Dear Ms. Brenner:
As requested, Ardaman & Associates, Inc. (Ardaman) is pleased to submit this quote to perform
the laboratory testing on the sand materials sampled by your site representative. The samples
will be delivered to our lab.
Samples will be evaluated for Munsell color (Value (Chroma = 1) of 7 or lighter), silt (minus #230
sieve, maximum 3%) and shell content (plus #4 sieve, maximum 1%) and screened using the
following U.S. Standard Sieve Numbers: 3/4", 5/8", 7/16", 5/16", 3.5, 4, 5, 7, 10, 14, 18, 25, 35,
45, 60, 80, 120, 170, 200 and 230. Each sample will be tested for carbonate content. In addition,
mean grain-size (compliance range 0.30mm - 0.50mm) will be calculated by moment method and
sorting value will be calculated.
Our laboratory results will be summarized on a grain-size distribution report that will include the
Sample Number, Mean Grain-Size (mm), Sorting Value (phi), Silt Content (%), Carbonate Content
(%) and Munsell Color.
Costs for these tests will be as follows:
Construction Location Naples Vanderbilt Pelican
Bay Total Unit
Rate Cost
Number of Required
Sieve Samples
(no Carbonates testing)
24 25 7 56 $245.00 $13,720.00
Number of Required
Carbonate Samples
(no Sieves analysis)
5 3 1 9 $205.00 $1,845.00
Total $15,565.00
33 16.E.3.b
Packet Pg. 1161 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Coastal Protection Engineering Ardaman Proposal No. 21-278Rev.01
Page No. 2
Ardaman & Associates, Inc.
This proposal is offered for an acceptance period of 45 days following its submittal to you. After
this time, the proposed costs may be subject to change. At your request, after the acceptance
period has elapsed, we will re-evaluate our proposal, and reissue it reflecting changes in work
scope and cost, if necessary.
If this quote meets with your approval, please authorize us to proceed by issuing us a Work Order
or Purchase Order.
We appreciate the opportunity to offer our services to your project and look forward to working
with you. If you agree with this proposal, please sign and return the attached Proposal/Project
Acceptance Agreement or provide us with the appropriate Notice to Proceed.
Should you have any questions regarding this proposal, please do not hesitate to contact this
office.
Very truly yours,
ARDAMAN & ASSOCIATES, INC.
Florida Registry No. 00005950
A. Jamie Peters Ivan Sokolic, P.E.
CMT Coordinator Branch Manager
Distribution: 1 - Addressee + electronic pdf
Attachment(s): Proposal/Project Acceptance Agreement
Ivan Sokolic Digitally signed by Ivan Sokolic
Date: 2022.01.21 17:27:19
-05'00'
34 16.E.3.b
Packet Pg. 1162 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Ardaman & Associates, Inc.
Geotechnical, Environmental and
Materials Consultants
PROPERTY OWNER IDENTIFICATION:
Name:
Property Identification Number:
Address:
City/State:Zip Code:Phone:
Attention:Title:
SPECIAL INSTRUCTIONS:
Report(s) Recipient's E-mail Address:
PAYMENT TERMS:
PROPOSAL ACCEPTANCE:
Accepted this ___ day of _____________ , 2022.
(Print or type individual, firm or corporate body name)
(Signature of authorized representative)
(Print or type name of authorized representative and title)
BILLING ADDRESS OF SIGNEE (include phone and fax number):
Phone: Fax/Email:
REVISION 8.2017 - FL
By accepting this Proposal, the Terms and Conditions of this Proposal, including the Terms on this page, and
Ardaman & Associates,Inc.’s General Conditions appearing on the following page of this Proposal, are
incorporated herein by reference. In the event this Proposal Acceptance was received by facsimile, Client
hereby confirms that the above-described Proposal, the Terms and Conditions of this Proposal, including the
Terms on this page, and Ardaman & Associates,Inc.’s General Conditions have been made available and are
incorporated in this agreement.
PROPOSAL/PROJECT ACCEPTANCE AND AGREEMENT
PROJECT INFORMATION:
Client Name:
Project Name:Proposed Project: Laboratory Testing Services
Project Location:Sediment Compliance Criteria Testing Services, Collier County, Florida
Proposal Number and Date:21-2785HY - January , 2022
Description of Services:Construction Materials Testing
Suggested Fees:$,; To be invoiced in accordance with attached unit rates for actual services rendered
Payment shall be due within 30 days after date of each periodic invoice. Interest at the rate of 18% per annum
(or the highest rate allowable by law) shall accrue on all amounts not paid within 30 days after date of invoice.
All attorney fees and expenses associated with collection of past due invoices will be paid by Client. Failure to
timely pay any invoice shall constitute a waiver of any and all claims arising from or related to Ardaman &
Associates, Inc.’s services, including but not limited to the services described in this Proposal.
35 16.E.3.b
Packet Pg. 1163 Attachment: 0222 Change Order Backup - FY22 (21275 : Procurement Services administrative reports)
Item Page #Contract or
Purchase Order Date Description of Project Vendor Name Division - Director
Fiscal Impact for
Additional Services Outstanding Invoices Description
1 1 4500212407 1/26/2022
SAP EMS Step
Compensation Plan Phoenix Business, Inc.Human Resources -
Amy Lyberg $0.00 $24,360.00 Division staff utilized a Clerk's contract that expired due to a renewal of the
contract not occurring.
2 3
19-7525
4500208074 1/28/2022 IFAS Wind Retrofit Capital Contractors, LLC
Facilities Management -
Ed Finn $0.00 $19,925.00 Division staff did not submit a change order to extend time as required by
contract, allowing the project to expire.
3 6 4500214477 2/4/2022
FY22 International
Campaigns Paradise Advertising & Marketing, Inc. Tourism - Paul Beirnes $0.00 $4,740.00 The proposal, required by contract, was not signed until after the work was
completed.
4 9 NA 2/7/2022 Title VI Documents Palm Printing GMD/CAT - Michelle Arnold $167.40 $167.40 Division staff intended to pay for these services via p-card immediately
after they were performed, but never received the invoice.
Meeting Date Total number of After the
Fact Memos
Fiscal Impact for Additional
Services Outstanding Invoices
2/22/2022 4 $167.40 $49,192.40
16.E.3.c
Packet Pg. 1164 Attachment: 0222 After the Fact Report - FY22 (21275 : Procurement Services administrative reports)
After the Fact Form
Revised 06/17/2021
Instructions
As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement
Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or
contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order,
when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and
services not covered by the current contract or purchase order. All such “After the Fact Procurements” will be reported to the
County Manager.
Requester Name: Division:
Division Director: Vendor Name:
Amount:Contract #:Purchase Order:
Why is this deemed a non-compliant purchase?Choose one.
Contract Ordinance Manual P-Card Other
Details of Purchase: Explain the circumstances behind this purchase.
Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable?
Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring?
The requestor affirms that to the best of their knowledge the information provided in this document is true.
Requested by: Signature: Date:
Division Director: Signature: Date:
1 116.E.3.d
Packet Pg. 1165 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
PHOENIX BUSINESS, INC.
6021 Midnight Pass Rd. Unit 3
Sarasota, FL 34242 US
3107799132
vineeta@phoenixteam.com
www.phoenixteam.com
BILL TO
Collier County Board of County
Commissioners
Attn: Accounts Payable
3299 Tamiami Trl E Ste 700
Naples FL 34112-5749
INVOICE 6906
DATE 12/03/2021 TERMS Net 30
P.O. NUMBER
4500212407
DESCRIPTION QTY RATE AMOUNT
SAP EMS Step Compensation Plan - Consulting hours for Prem
Juvvadi - 08/2021
42 140.00 5,880.00
SAP EMS Step Compensation Plan - Consulting hours for Prem
Juvvadi - 09/2021
120 140.00 16,800.00
SAP EMS Step Compensation Plan - Consulting hours for Prem
Juvvadi - 10/2021
12 140.00 1,680.00
Thank you for your business!
Payment details: Please see below details for EFT and
confirmation information to be sent to
invoices@phoenixteam.com
Account Name: Phoenix Business Inc.
Bank Name: Wells Fargo
Account Number:5104180004
Routing Number (Wire transfer): 121000248
Routing Number (Direct Deposit): 111900659
Swift Code: WFBIUS6S
TOTAL DUE $24,360.00
2 16.E.3.d
Packet Pg. 1166 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
Instructions
As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement
Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or
contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order,
when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and
services not covered by the current contract or purchase order.
County Manager.
Requester Name: Division:
Division Director: Vendor Name:
Amount: Contract #: Purchase Order:
Why is this deemed a non-compliant purchase? Choose one.
Contract Ordinance Manual P-Card Other
Details of Purchase: Explain the circumstances behind this purchase.
Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable?
Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring?
The requestor affirms that to the best of their knowledge the information provided in this document is true.
Requested by: Signature: Date:
Division Director: Signature: Date:
Collier County
After the Fact Form
James K. Morton Facilities Management
Ed Finn Capital Contractors, LLC
$19,925.00 19-7525 4500208074
The subject construction contract involves retrofitting windows and doors at IFAS (University Extension
Building) to improve hurricane impact resistance. RFQ 2020-200 required that the work be completed within
90 days after receipt of the Notice to Proceed (“NTP”). A 90-day NTP was issued on 6/16/2020 with a final
completion date of February 14, 2021. A Work Suspension revised the Final Date to 5/16/2021.
Covid-19 related supply issues created delays in production and delivery of the windows and doors. As a
result, project completion was delayed beyond 5/16/2021. In order to make payment for work performed
beyond the contract date approval of an After-The-Fact Procurement Form is required. Work was
satisfactorily completed on October 27, 2021. The final payment invoice is dated 11/4/2021
To obtain approval to pay invoice “Inv_175_cc100338_PO4500208074_PA2 - FINAL Date: November 4,
2021” in the amount of $19,925.00 to Capital Contractors, LLC who has satisfactorily performed the work
assignment.
Additional training on contract Notice to Proceed requirements has been provided to staff and
workflow/procedures have been modified to include a quality assurance review by qualified staff to
minimize After-The-Fact procurement corrections.
James K. Morton MortonJames Digitally signed by MortonJames
Date: 2022.01.24 11:42:22 -05'00'
Ed Finn FinnEd Digitally signed by FinnEd
Date: 2022.01.28 16:03:53
-05'00'
3 2
16.E.3.d
Packet Pg. 1167 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
4 16.E.3.d
Packet Pg. 1168 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
5 16.E.3.d
Packet Pg. 1169 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
After the Fact Form
Revised 06/17/2021
Instructions
As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement
Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or
contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order,
when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and
services not covered by the current contract or purchase order. All such “After the Fact Procurements” will be reported to the
County Manager.
Requester Name: Division:
Division Director: Vendor Name:
Amount:Contract #:Purchase Order:
Why is this deemed a non-compliant purchase?Choose one.
Contract Ordinance Manual P-Card Other
Details of Purchase: Explain the circumstances behind this purchase.
Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable?
Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring?
The requestor affirms that to the best of their knowledge the information provided in this document is true.
Requested by: Signature: Date:
Division Director: Signature: Date:
6 316.E.3.d
Packet Pg. 1170 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
7 16.E.3.d
Packet Pg. 1171 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
Media Estimate
Naples, Marco Island, the Everglades CVB
Paul Beirnes
2660 Horseshoe Dr. N. #105
Naples, FL 34104
150 Second Avenue North
Suite #800
St. Petersburg, FL 33701
invoices@paradiseadv.com
Date: 12/3/2021
Division Name: Naples, Marco Island and the Everglades Tourism
Project Name:
Project Number:
Estimate Name:
Estimate Number:
FY22 International Campaign UK_Orlandoattractions.com Graft_Media Buy
2021-CCT-1458
FY22 International Campaign UK_Orlandoattractions.com Graft_Media Estimate
21-01569 Rev: 0
Job Type: FY22 Media
Media Type: Digital
Media Approved By: Cyndy Murrieta
Client Project Number: 4500214477
Estimate Description: The following is a negotiated digital media buy for they FY22 International Campaign.
Expenses
Blog Posts and Video Feature $4,740.00
Vendor: Orlandoattrations.com- Graft
Flight Dates: 10/1/21-9/30/22
Markets: International (UK)
Tactics: Blog Posts and Video Feature
Description:
Renewal of Annual Contract on OrlandoAttractions.com. Has already been live with no interruption
to presence on site.
- Destination Blog Post Every Month on OrlandoAttractions.com Home Page: Monthly feature
story on OrlandoAttractions.com remains on the homepage for 7 days. (Client supplies copy and
images)
- Destination Blog Post On 40 Additional Information Pages: For those same 7 days your blog post
featured on approx. 40 additional theme park pages including those in the Disney, Universal and
SeaWorld sections.
- Permanent Video Feature Page: Permanent content in the ‘Explore’ Florida destination guide.
Your page features a video player with the destination video of your choice, editorial, stills, Google
directions to your location and social media links. Your LIVE Facebook and Twitter feeds are also
displayed along with your three most recent blog posts.
Deliverables: Refreshed Copy, images, links, etc. (as needed)
Materials Due: Vendor has materials from last year and is working with Jennifer/Amber for new
materials as needed
$4,740.00
Total $4,740.00
Please sign and return upon receipt.
Failure to return to Agency in a timely manner may result in altered job cost estimates and new estimates may need to be generated by the Agency for Client approval.
Client signature authorizes Agency to proceed with media planning, negotiation, buying and fulfillment on their behalf as stipulated above and as per overall contract terms
between the Parties. Client signature denotes approval to commence with the assignment(s), approval of costs noted above, and agreement to pay the above amount
within 30 days of receipt of invoice. Agency policy is to pay all vendor costs within 48 hours after payment is received from the Client unless otherwise determined at the
sole discretion of Agency. If and when applicable, Agency shall assess monthly late fees of 1.5% on all unpaid, past due balances or as stipulated within contract terms
between the Parties.
**WE'VE MOVED! NOTE OUR NEW OFFICE ADDRESS EFFECTIVE 12/15/2021**
8 16.E.3.d
Packet Pg. 1172 Attachment: 0222 After the Fact Backup - FY22 (21275 : Procurement Services administrative reports)
Instructions
As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement
Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or
contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order,
when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and
services not covered by the current contract or purchase order.
County Manager.
Requester Name: Division:
Division Director: Vendor Name:
Amount: Contract #: Purchase Order:
Why is this deemed a non-compliant purchase? Choose one.
Contract Ordinance Manual P-Card Other
Details of Purchase: Explain the circumstances behind this purchase.
Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable?
Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring?
The requestor affirms that to the best of their knowledge the information provided in this document is true.
Requested by: Signature: Date:
Division Director: Signature: Date:
Collier County
After the Fact Form
9 416.E.3.d