Agenda 12/14/2021 Item #16A 6 (Resolution - Final Acceptance for Fronterra Phase 1 PL20150001982 )16.A.6
12/14/2021
EXECUTIVE SUMMARY
Recommendation to approve a Resolution for final acceptance of the private roadway and drainage
improvements for the final plat of Fronterra Phase 1, Application Number PL20150001982, and
authorize the release of the maintenance security.
OBJECTIVE: To have the Board of County Commissioners (Board) grant final acceptance of the
infrastructure improvements associated with the subdivision, and release the maintenance security.
CONSIDERATIONS:
1) On October 3, 2018, the Growth Management Department granted preliminary acceptance of the
roadway and drainage improvements in Fronterra Phase 1.
2) The roadway and drainage improvements will be maintained by the Fronterra Community
Development District, CCC Fronterra, LLC, BC Naples Investments, LLP, and Fronterra
Property Owners Association, Inc.
3) The required improvements have been constructed in accordance with the Land Development
Code. The Growth Management Department has inspected the improvements on September 30,
2021 and is recommending final acceptance of the improvements.
4) A resolution for final acceptance has been prepared by staff and approved by the County
Attorney's Office. The resolution is a requirement of Section 10.02.05 C of the Land
Development Code. A copy of the document is attached.
FISCAL IMPACT: The roadway and drainage improvements will be maintained by the Fronterra
Community Development District, CCC Fronterra, LLC, BC Naples Investments, LLP, and Fronterra
Property Owners Association, Inc. The existing security in the amount of $356,962.41 will be released
upon Board approval. The original security in the amount of $2,770,555.23 has been reduced to the
current amount of $356,962.41 based on the previous work performed and completed pursuant to the
terms of the Construction and Maintenance Agreement dated August 17, 2017.
GROWTH MANAGEMENT IMPACT: There is no growth management impact.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval. - DDP
RECOMMENDATION: To grant final acceptance of the roadway and drainage improvements in
Fronterra Phase 1, Application Number PL20150001982, and authorize:
1. The Chairman to execute the attached resolution authorizing final acceptance of the
improvements.
2. The Clerk of Courts to release the maintenance security.
Prepared By: Lucia S. Martin, Associate Project Manager, Development Review
ATTACHMENT(S)
1. Location Map (PDF)
2. Bond Basis (PDF)
3. Resolution (PDF)
4. Plat Map (PDF)
Packet Pg. 722
16.A.6
12/14/2021
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.6
Doe ID: 20421
Item Summary: Recommendation to approve a Resolution for final acceptance of the private
roadway and drainage improvements for the final plat of Fronterra Phase 1, Application Number
PL20150001982, and authorize the release of the maintenance security.
Meeting Date: 12/14/2021
Prepared by:
Title: Technician — Growth Management Development Review
Name: Lucia Martin
10/18/2021 1:36 PM
Submitted by:
Title: Environmental Specialist — Growth Management Department
Name: Jaime Cook
10/18/2021 1:36 PM
Approved By:
Review:
Growth Management Department
Growth Management Department
Growth Management Department
Growth Management Department
County Attorney's Office
Office of Management and Budget
County Attorney's Office
Office of Management and Budget
County Manager's Office
Board of County Commissioners
Lissett DeLaRosa
Growth Management Department
Jaime Cook
Additional Reviewer
Trinity Scott
Transportation
James C French
Growth Management
Derek D. Perry
Level 2 Attorney Review
Debra Windsor
Level 3 OMB Gatekeeper Review
Jeffrey A. Klatzkow Level 3 County Attorney's Office Review
Laura Zautcke
Additional Reviewer
Geoffrey Willig
Level 4 County Manager Review
Geoffrey Willig
Meeting Pending
Completed
10/21/2021 12:51 PM
Completed
11/09/2021 2:23 PM
Skipped
10/20/2021 2:41 PM
Completed
11/10/2021 12:47 AM
Completed
11/29/2021 10:29 AM
Completed
11/29/2021 10:45 AM
Completed
11/29/2021 2:14 PM
Completed
11/30/2021 9:24 AM
Completed
12/02/2021 9:51 AM
12/14/2021 9:00 AM
Packet Pg. 723
16.A.6.a
FRONTERRA PHASE 1
LOCATION MAP
Packet Pg. 724
16.A.6. b
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this 1-1— day of AUGUST / / 20 17 between
Cc-c ftron-Vurr, "hereinafter referred to as "Developer," and the Board of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board.
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of certain plat of a subdivision to be known as: FRONTERRA PHASE 1
B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set
forth, Developer and the Board do hereby covenant and agree as follows:
Developer will cause to be constructed: Roadway, Drainage, water & sewer improvements
within I A months from the date of approval said subdivision plat, said improvements
hereinafter referred to as the required improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of $ 2, 770,55523 - which amount represents 10% of a
the total contract cost to complete the construction plus 100% of the estimated cost of to complete
the required improvements at the date of this Agreement. i7L
3. In the event of default by the Developer or failure of the Developer to complete such improvements c
within the time required by the Land Development Code, Collier may call upon the subdivision
performance security to insure satisfactory completion of the required improvements. ,n
4. The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished to be
reviewed and approved by the County Manager or his designee for compliance with the Collier
County Land Development Code.
The County Manager or his designee shall, within sixty (60) days of receipt of the statement of
substantial completion, either: a) notify the Developer in writing of his preliminary approval of the
improvements; or b) notify the Developer in writing of his refusal to approve improvements,
therewith specifying those conditions which the Developer must fulfill in order to obtain the County
Manager's approval of the improvements. However, in no event shall the County Manager or his
designee refuse preliminary approval of the improvements if they are in fact constructed and
submitted for approval in accordance with the requirements of this Agreement.
6. The Developer shall maintain all required improvements for a minimum period of one year after
preliminary approval by the County Manager or his designee. After the one year maintenance period
by the Developer has terminated, the Developer shall petition the County Manager or his designee to
inspect the required improvements. The County Manager or his designee shall inspect the
improvements and, if found to be still in compliance with the Land Development Code as reflected by
final approval by the Board, the Board shall release the remaining 10% of the subdivision
performance security. The Developer's responsibility for maintenance of the required improvements
shall continue unless or until the Board accepts maintenance responsibility for and by the County.
Packet Pg. 725
16.A.6. b
7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter
the Developer may request the County Manager or his designee to reduce the dollar amount of the
subdivision performance security on the basis of work complete, Each request for a reduction in the
dollar amount of the subdivision performance security shall be accompanied by a statement of
substantial completion by the Developer's engineer together with the project records necessary for
review by the County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the improvements
completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager or his designee may call upon the subdivision
performance security to secure satisfactory completion, repair and maintenance of the required
improvements. The Board shall have the right to construct and maintain, or cause to be constructed
or maintained, pursuant to public advertisement and receipt and acceptance of bids, the
improvements required herein. The Developer, as principal under the subdivision performance
security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the
final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent
costs, together with any damages, either direct or consequential, which the Board may sustain on
account of the failure of the Developer to fulfill all of the provisions of this Agreement.
9. All of the terms, covenants and conditions herein contained are and shall be binding upon the
Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by
their duly authorized representatives this �-1 day of AUGUST / / 2017
SIGNED IN THE PRESENCE OF:
(Name of Entity) CC FRONTERRA, LLC
' - V, 11-� 0—
By:
1 1
rinted Name S (�� vj -e V-�
J
/
e/p C MI'v"14r-r�,
Printed Name/Title V�c�
(President, VP, or CEO)
(Provide Proper Evidence of Authority)
Printed Name
ATTEST:
DWIGHT E.BROCK, CLERIK
BOARD O OL Y COMMISSION S
OF COL OUNTY, FLORIDA
By:
Deputy Cl%i6ll, 16 al
By:
C PENNY TAYLOR, CHAIRM
Approved 0 0 ality:
Scott A. Stone, Assistant County Attorney
N
O
N
Packet Pg. 726
16.A.6. b
2017 FLORIDA LIMITED LIABILITY COMPANY ANNUAL REPORT
DOCUMENT# L16000045776
Entity Name: CCC FRONTERRA, LLC
Current Principal Place of Business:
2020 SALZEDO STREET, SUITE 200
CORAL GABLES. FL 33134
Current Mailing Address:
2020 SALZEDO STREET, SUITE 200
CORAL GABLES, FL 33134 US
FEI Number: APPLIED FOR
Name and Address of Current Registered Agent:
EISENACHER, HAROLD
2020 SALZEDO STREET, SUITE 200
CORAL GABLES, FL 33134 US
FILED
Apr 11, 2017
Secretary of State
CC9582731197
Certificate of Status Desired: No
The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent
Authorized Person(s) Detail
Title PRESIDENT
Name CARR,JAMES
Address 2020 SALZEDO STREET, SUITE 200
City -State -Zip: CORAL GABLES FL 33134
Title VP, TREASURER, ASST. SECRETARY
Name EISENACHER, HAROLD
Address 2020 SALZEDO STREET, SUITE 200
City -State -Zip: CORAL GABLES FL 33134
Date
Title VP
Name IBARRIA, DIANA
Address 2020 SALZEDO STREET, SUITE 200
City -State -Zip: CORAL GABLES FL 33134
Title
VP, SECRETARY, ASST. TREASURER
Name
MIYARES, ANDRES
Address
2020 SALZEDO STREET, SUITE 200
City -State -Zip:
CORAL GABLES FL 33134
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under
oath, that I am a managing member or manager of the limited liability company or the receiver or trustee empowered to execute this report as required by Chapter 605, Florida Statutes, and
that my name appears above, or on an attachment with all other like empowered.
SIGNATURE: HAROLD EISENACHER VP 04/11/2017
Electronic Signature of Signing Authorized Person(s) Detail Date
Packet Pg. 727
16.A.6. b
PERFORMANCE BOND
No. 106506927
KNOW ALL PERSONS BY THESE PRESENTS: that
CCC Fronterra, LLC
135 San Lorenzo Avenue, Suite 750
Coral Gables, Florida 33146
(hereinafter referred to as "Owner") and
Travelers Casualty and Surety Company of America
One Tower Square, 3B
Hartford, CT 06813
(800)873-1477
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter
referred to as "County") in the total aggregate sum of Two million seven hundred seventy thousand five
hundred fiftv-five and 23 cents Dollars ($2,770,555.23) in lawful money of the United States, for the payment
of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or
plural, as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
c
the Board a certain subdivision plat named Fronterra Phase 1 and that certain subdivision shall include
specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter "Land
Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed c
and shall continue until the date of final acceptance by the Board of County Commissioners of the specific
improvements described in the Land Development Regulations (hereinafter the "Guaranty Period")
NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in
accordance with the Land Development Regulations during the guaranty period established by the County,
and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save harmless
the County from and against all costs and damages which it may suffer by reason of Owner's failure to do
so, and shall reimburse and repay the County all outlay and expense which the County may incur in making
good any default, then this obligation shall be void, otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no
change, extension of time, alteration, addition or deletion to the proposed specific improvements shall in
any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension
of time, alteration, addition or deletion to the proposed specific improvements.
PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner
and the Surety to the full and faithful performance in accordance with the Land Development Regulations.
The term "Amendment," wherever used in this Bond, and whether referring to this Bond, or other documents
shall include any alteration, addition or modification of any character whatsoever.
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed
this 1711 day of August, 2017.
Packet Pg. 728
7SES
:
Printed Name �I �J Vj f `',/,
Printed Name Alli'64S f ei�rz
WITNESSES:
Printed Name=--r^'uali E (4s�ltl.
1111i,C,,y ,
Printed Name 0'iA
CCC Fronterra, LLC
By:A,—LA
AY�6 — �z
Printed Name/Title
(Provide Proper Evidence of Authority)
BC Naples Investment, LLP
By: Barron Management, LLC
By: ✓Jll' —^"--
Brian Goguen, iefOperating Officer
Printed Name/Title
(Provide Proper Evidence of Authority)
ACKNOWLEDGEMENT
STATE OF IF L
COUNTY OF INA Q nj
THE FOREGOING PERFORMANCE BgND WAS ACKNOWLEDGED BEEWE ME THIS (i41bAY OF
AUGUST 2017, BY f-_tOe, �Y AS �V OF CCC
FRONTERRA, LLC WHO IS PERSONALLY KNOWN l O ME, OR HAS PRODUCED AS
IDENTIFICATION -
Public - State of Florida
LISSETTEVIERA (SEAL)
�((�SL, ti•.... s
„ MY COMMISSION # GG 072508
�tSJV�G =yam, pg= EXPIRES: June 12 2021
Printed Name
.E°d: `.`•'• Banded Thru No1My Pubic Undewrilers11
N
0
Packet Pg. 729
16.A.6. b
WITNESSES:
Printed Name
Printed Name
WITNESSES:
Printed Name Cata f- OXS%LL
t
Printed Name Mkkc,�7.�'� fin.
STATE OF _
COUNTY OF
THE FOREGOING
AUGUST
FRONTERRA, L
IDENTIFICATION.
CCC Fronterra, LLC
By:_
Printed Name/Title
{,Provide Proper Evidence of Authority)
BC Naples Investment, LLP
By: Barron Collier Management, LLC
By: ✓V--
Brian Goguen, C�iefOperating Officer
Printed Name/Title
(Provide Proper Evidence of Authority)
ACKNOWLEDGEMENT
PEbfFORMANCE BOND WAS ACKNOWLEDGED
2017, BY AS
WHO IS PERSONALLY KNOWN TO ME, OR -
Notary Puj2ric - State of Florida
Printed Name
BEF¢RE ME THIS I`��AY OF
OF CCC
PRODUCED AS
(SEAL)
Packet Pg. 730
16.A.6. b
STATE OF FLORIDA
COUNTY OF COLLIER
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS ! 7I AY OF
,tune kii64— 2017, BY Brian Goquen AS Chief Operating Officer OF BC Naples Investment LLP
WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS IDENTIFICATION.
Notary Public - State of Florida
Printed Name 44 -VIII-N , l/�U,Spr,
WIT ESSES:
Robin Griffin
i yam'
v` 0
Lorraine Jones -Murray
STATE OF Florida
COUNTY OF Collier
�" •'i •. KIM D. DAVIDSON
MY COMMISSION # FF 070690 SEAL)
a EXPIRES: February 19, 2018
Bonded Thru Notary Public Underwriters
Trav rs Casualty and Surety Company of America
F
By:
I
4 (/i
Charity A. Moser, Attorney -In -Fact
ACKNOWLEDGEMENT
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 171t DAY OF
_August 2017, BY _Charity A. Moser AS Attorney -In -Fact OF _Travelers Casualty and Surety Company
of America WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS
41DENTIATION.
is - State Flor (SEAL)
je
Printed Name
r"+kg UWANA.BODOR
.: MY COMMISSION # FF 941634
'a= EXPIRES: April 6, 202o
Bond* Thru Notary Public Underwriters
N
O
N
Packet Pg. 731
16.A.6. b
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT' HE RED rORDER
POWER OF ATTORNEY
TRAVELERSFarmington Casualty Company St. Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 229466
Certificate No, 0 0 7 ®®,") 3 3 1
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Huntley A. Hornbeck II, Kristin M. Neiert, Marc E. Williams, Stephen J. Benza, Charity A. Moser, and Dawn Y. Colecchio
of the City of Naples , State of Florida , their true and lawful Attorneys) -in -Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this
day of October 2016
5th
T_
Farmington Casualty Company St. Paul Mercury Insurance Company tV
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company N
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company N
St. Paul Guardian Insurance Company
G�SUq�y TM� yY FIFE 6-4 Ok�K.�KSG �.•Pt' � gU 9.k JP�1Y AHO �A06Why rG�ii1.�
n'
:
O � •b P f�,p•FONAj i Q '
° � y � ° 1977 r+cronooa4tto �, _ �, t•:,ml jW;�t'eoanr�';�: �
ttwrro
z HOC
y 19J�t �.SEALiof�`:.SSAL'a`° 1896
ry • *�' J � S�Rnnct� v.........y:+air o..... -d 'r gar Fill
State of Connecticut
City of Hartford ss.
By: cf
Robert L. Raney, Senior Vice President
On this the 5th day of October 2016 , before me personally appeared Robert L. Raney, who acknowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such. being authorized so to do, executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
i
G.Tt'T
In Witness Whereof, I hereunto set my hand and official seal. %UP(i�iV V
My Commission expires the 30th day of June, 2021. 91%G * Marie C. Tetreault, Notary Public
58440-5-16 Printed in U.S.A.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RE
�: . _- _. -_.:._ .,..._�. - Packet Pg. 732
16.A.6. b
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
This Power of Attorney is granted under and b" - the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company. Fidelity
4 and Guaranty Insurance Company, Fidelity a id Guaranty Insurance underwriters, Inc.. St. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance
j Company. St. Paul Mercury Insurance Comp my, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and united States
Fidelity and Guaranty Company, which resolu'ion; are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the Presidc;tt, any Vice Chairman, any Executive Vice President. any Senior Vice President. any Vice President, any Second Vice
President. the Treasurer. any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf
of the Company and may give such appointer such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds, recognizances. contra, is of indemnity, and other writings obligatory in the nature of a bond. recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at Lxy time may remove any such appointee and revoke the power given him or her: and it is
FURTHER RESOLVED, that the Chairma i the President, any Vice Chairman, any Executive Vice President, anv Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company, prodded that each such delegation is in writing acid a copy
thereof is filed in the office of the Secretary: and it is
FURTHER RESOLVED, that any bond, recognizance. contract of indemnity, or writing obligatory in the nature of a bond, recognizance. or conditional undertaking
shall be valid and binding upon the Company .hen (a) signed by the President. any Vice Chairman. any Executive Vice President, any Senior Vice President or any Vice
President, any Second Vice President. the Tre isurer, any Assistant Treasurer. the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant �e_retary: or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power
prescribed in his or her certificate or their Lertificates of authority or by one or more Company officers pursuant to a written delegation of authority: and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,
any Assistant Vice President, any Secretary, t ny Assistant Secretary, and the seal of the Company may he affixed by facsimile to any Power of Attorney or to ally
certificate relating thereto appointing Resideu Vice Presidents. Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligator; in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall be valid and binding upon the Compam- and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
1, Kevin E. Hughes. the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance
Underwriters, Inc., St. Paul Fire and Marine it surance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company. Travelers Casualty and
Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Aw rney executed by said Companies, which is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have here.utto set my hand and affixed the seals of said Companies this I I day of � , ,p' -
Kevin E. Hughes. Assistant Sec tart'
�GASUq� b < yF\RE 6 ; Q�t`M.. :M'rG9 Jp��.Aaµ. �Jp�Tv gryQS �swn`G, F�rgM
V TED - Z j tJa P�p��F'�m � Q�: �ORP O k4/,.yni 1'
"Osae.4S8AL,'D
�.. "w„^m:,w. IS . A� �4��"'. ' 1�' ' 61 F�+ f ' � "'• Attt`.
To verify the authenticity of this Power of Attorney, call 1-800 421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number. the
above -named individuals and the details of ta( bond to which the power is attached.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE 90RDF' Packet Pg. 733
16.A.6. b
f � � � � � � � � � Project: Fronterra PPL - PH 1
r Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
ENGINEERING *` Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
PHASE 1
CONTINGENCY
Calculation Summary SUB -TOTAL PERCENT DOLLAR
TOTAL
EARTHWORK $ 893,148.10 5% $ 44,657.41
$
937,805.51
PAVING $ 331,817.70 5% $ 16,590.89
$
348,408.59
DRAINAGE $ 345,972.00 5% $ 17,298.60
$
363,270.60
POTABLE WATER $ 183, 375.80 5% $ 9,168.79
$
192, 544.59
�
SANITARY SEWER $ 436,435.50 5% $ 21,821.78
$
458,257.28
d
IRRIGATION $ 111,000.00 5% $ 5,550.00
$
116,550.00
LIGHTING $ 50,000.00 5% $ 2,500.00
$
52,500.00
LANDSCAPING $ 47,000.00 5% $ 2,350.00
$
49,350.00
0
L
Total Probable Construction Cost: $ 2,398,749.10 5% $ 119,937.46
$
2,518,686.57
w
c
to
Paving, Drainage and Site
a
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND
m
SEALED BY DAVID J HURST, P.E. ON 03/27/17 USING A 100% Construction Cost:
$
1,857,884.70
SHA-1 AUTHENTICATION CODE.
Q
PRINTED COPIES OF THIS DOCUMENT ARE NOT Water and Sewer
CONSIDERED SIGNED AND SEALED AND THE SHA-1 100°� Construction Cost:
$
650,801.87
IL
AUTHENTICATION CODE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
j
Estimated 110% Bond Amount
$
2,770,555.23
N
NOTES:
to
1) This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only.
rn
tc
m
2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances,
and construction costs in
effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to
C
O
delete, decrease, or increase portions of this Opinion of Probable Cost.
m
3) All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time
r
C
d
due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor.
v
R
41 This cost estimate does not include the cost of any building construction.
David
Digitally signed by
Q
51 This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no -cost to the developer.
David J. Hurst, P. E.
J.
DN: cn=David J. Hurst, F
6) Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section.
H u rst
p E„o=Peninsula
Engineering, ou,
email=Dhurst@barronc
7) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit.
Ilier.com, c=US
E.
Date: 2017.03.27
14:48:43-04'00'
David J. Hurst, P.E.
FL Registration #60727
Peninsula Engineering
Certificate of Authorization #28275
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_PdroiigOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1 Rev
Packet Pg. 734
16.A.6. b
C.rof [Ter C;omvay
OW
Growth Management Division
Development Review
September 21, 2018
David Hurst, PE
Peninsula Engineering
2600 Golden Gate Parkway
Naples, FL 34105
RE: Performance Bond No. 106506987
Fronterra Phase 1— PL20150001982
Dear Mr. Hurst:
Please be advised that based on the work completed to date, the subject Performance
Bond may be reduced by $2,413,592.82 for Fronterra Phase 1, leaving an available
security of $356,962.41. The remaining security represents the 110% of the remaining
site infrastructure.
An original Bond Rider should be directed to this office, reducing the value of the
Bond, "all other terms and conditions of the original Performance Bond to remain in full o
force and effect'. N
If I can be of any further assistance to you in this regard, please let me know.
Sincerely,
Matt McLean, P.E.
Director, Development Review/Growth Management
Collier County, FL.
Growth Management Division/Development Review • 2800 North Horseshoe Drive • Naples, FL 34104 • 239-252-2400
Packet Pg. 735
16.A.6.b
Adw
TRAVELERS
RIDER
To be attached to and form part of Bond No. 106506927
Travelers Casualty and Surety Company of America
License No. N/A
Issued on behalf of CCC Fronterra, LLC as Principal, and in favor of
Collier County, Board of Collier County Commissioners as Obligee.
It is agreed that:
❑ 1. The Surety hereby gives its consent to change the Name:
fA
from: s
a
to:
L
L
d
❑ 2. The Surety hereby gives its consent to change the Address: c
L
from:
m
to: �
a
❑X 3. The Surety hereby gives its consent to change the Change the Bond amount
from: Two million seven hundred seventy thousand five hundred fifty five dollars and 23/100 ($2,770,555.23)
to: Three hundred fifty six thousand nine hundred sixty two dollars and 41/100-- ($356 962 41) E
IL
This rider shall become effective as of September 21, 2018 v
0
N
PROVIDED, however, that the liability of the Surety under the attached bond as changed by this rider shall not be
cumulative.
Signed, sealed and dated September 24, 2018
Accepted: Collier County, Board of Collier CounhI Commissioners
Obligee
I0
S-4111 (8/66)
T4Velers Casualtv and Surety Company of Americ-.
1
By:
drity A. Mosey
Attorney -in -Fact
Or CC Ave Maria, LLC
Princi al
By:
trio.,n Gppueti Vic.a.
Packet Pg. 736
16.A.6.b
Project:
Task:
Prepared By:
Checked By:
Fronterra Phase 1
Bond Reduction Calculation Worksheet
Date:
Date:
Calculate the amount of allowable bond reduction (and amount of bond to remain) based on current level of completion of the required subdivision and utility improvements.
1) Phase 1 subdivition improvements are completed, and Preliminary Acceptance granted.
2) Per the approved PPL, required street trees and sidewalks are being constructed by the homebuilder, on a lot -by -lot basis. Therefore the 100% bond
amount will be left in -place for street trees and sidewalks, until that work is completed.
Calculations:
Original Bond Summary
Engineer's OPC Amount - 100% Construction Bond: $ 2,518,686.57
En ineer's OPC Amount - 10% Maintenance Bond: $ 251,868.66
Tota Bon Amount: 2,770,555.23
100% Construction Bond
Completed Amount/Bond Reduction Evaluation
Construction Item
Bond Amount
Completed Amount
Reduced Bond Amount
Earthwork
937,805.51
937,805.51
5 -
Paving
$
348,408.59
$ 243,314.84
$ 105,093.75
Drainage
$
363,270.60
$ 363,270.60
$ -
Potable Water
$
192,544.59
$ 192,544.59
$
Sanitary Sewer
$
458,257.28
$ 458,257.28
$
Irrigation
$
116,550.00
$ 116,550.00
$
Lighting
$
52,500.00
$ 52,500.00
$
Landscape
$
49,350.00
$ 49,350.00
$
ota s
2,51 ,686. 7
2,413,59 .82
Summary
Original 100% Bond Amount $ 2,518,686.57
Reduction Amount $ 2,413,592.82
100% Construction Bond Amount Remaining 10 ,093.7
10%Maintenance Bond
Original Bond Amount $ 251,868.66
Reduction Amount $ -
10% Maintenance Bond Amount Remaining $ 251,868.66
Total Bond Summary
Original Total Bond Amount $ 2,770,555.23
Reduction Amount $ 2,413,592.82
New Total Bond Amount Remaining $ 356,962.41
Digitally signed by David J. Hurst,
P.E. 60727 State of Florida
David J
DN: cn=David J. Hurst, P.E. 60727
.
State of Florida, o=Printed copies
of the document are not
D
considered signed and sealed and
P.E.
Hurst, I . C,
all SHA-1 authentication code
must be verified on any electronic
State
coptu=Theitem has been
60727
electronironically signed and sealed
using a 1HA-1 authentication
`mail
of Florida
email=d h u rst@ba rroncol lier.com,
c=uS
Date: 2018.09.13 15:37:51-04'00'
Packet Pg. 737
16.A.6.b
Project:
PEN IN S U L A Task:
ENGINEERING` Prepared Checked By:
PHASE 1
Fronterra PPL - PH
Engineer's OPC for Subdivision Fee Calculation (Rev02)
LMB Date: 3/23/2017
DJH Date: 3/23/2017
CONTINGENCY
Calculation Summary SUB -TOTAL
PERCENT DOLLAR
TOTAL
EARTHWORK $ 893,148.10
5%
$ 44,657.41
$
937,805.51
PAVING $ 331,817.70
5%
$ 16,590.89
$
348,408.59
DRAINAGE $ 345,972.00
5%
$ 17,298.60
$
363,270.60
POTABLE WATER $ 183,375.80
5%
$ 9,168.79
$
192,544.59
SANITARY SEWER $ 436,435.50
5%
$ 21,821.78
$
458,257.28
IRRIGATION $ 111,000.00
5%
$ 5,550.00
$
116,550.00
a
LIGHTING $ 50,000.00
5%
$ 2,500.00
$
52,500.00
LANDSCAPING $ 47,000.00
5%
$ 2,350.00
$
49,350.00
Total Probable Construction Cost: $ 2,398,749.10
5%
$ 119,937.46
$
2,518,686.57
0
LL
Paving, Drainage and Site
d
c
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND
Construction Cost:
$
1,867,884.70CL
SEALED BY DAVID J HURST, P.E. ON 03/27/17 USING A
100%
SHA-1 AUTHENTICATION CODE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT
Water and Sewer
Q
CONSIDERED SIGNED AND SEALED AND THE SHA-1
100% Construction Cost:
$
650,801.87
m
AUTHENTICATION CODE MUST BE VERIFIED ON ANY
IL
ELECTRONIC COPIES.
Estimated 110% Bond Amount $ 2,770,555.23
0
NOTES:
1) This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only. N .y
cC
2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in m
effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to M
delete, decrease, or increase portions of this Opinion of Probable Cost. m0
3) All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time
due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor.
E
t
4) This cost estimate does not include the cost of any building construction. Digitally signed by
David J. David J. Hurst, P. E.
5) This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no -cost to the developer. DN: cn=David J. Hurst,
E., o=Peninsula
6) Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section. Hu1r S l} P. Engineering,
� email=Dhurst@barron(
7) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit. r Ilier.com, c=US
E.
Date: 2017.03.27
14:48:43-04'00'
David J. Hurst, P.E.
FL Registration #60727
Peninsula Engineering
Certificate of Authorization #28275
P:\Active_Projects\P-BCN 1-002\002_EastGateway_PPL\Design_P6roii80PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02.xlsx
Packet Pg. 738
16.A.6.b
Project: Fronterra PPL - PH1
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
EARTHWORK
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
EW-1
SILT FENCE
8,948
LF
$ 2.00
$ 17,896.00
EW-2
LAKE EXCAVATION NOT INCLUDED FOR FEE CALC.
68,521
CY
$ -
$ -
EW-3
EMBANKMENT - ON SITE
68,521
CY
$ 1.10
$ 75,373.10
EW-4
EMBANKMENT - IMPORT FILL
65,984
CY
$ 11.00
$ 725,824.00
EW-5
CLEARING
21.50
AC
$ 3,000.00
$ 64,500.00
EW-6
PRESERVE EXOTIC REMOVAL
6.37
AC
$ 1,500.00
$ 9,555.00
$
$
SUB -TOTAL EARTHWORK= $ 893,148.10
5%CONTINGENCY= $ 44,657.41
TOTAL EARTHWORK= $ 937,805.51
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Pgrg$t OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx
Packet Pg. 739
16.A.6. b
Project: Fronterra PPL - PH1
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
PAVING
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
PAV-1
3/4" ASPHALTIC CONCRETE TYPE S-III FIRST LIFT
8,182
SY
$ 4.95
$ 40,500.90
PAV-2
3/4" ASPHALTIC CONCRETE TYPE S-III SECOND LIF
8,182
SY
$ 4.95
$ 40,500.90
PAV-3
8" LIMEROCK BASE
9,721
SY
$ 6.50
$ 63,186.50
PAV-4
12" STABILIZED SUBGRADE
10,191
SY
$ 1.55
$ 15,796.05
PAV-4
IBRICK PAVERS
81
SY
$ 9.00
$ 729.00
PAV-5
2' VALLEY GUTTER
4,838
LF
$ 7.95
$ 38,462.10
PAV-6
TYPE "F" CURB
606
LF
$ 12.50
$ 7,575.00
PAV-7
TYPE "D" CURB
148
LF
$ 9.00
$ 1,332.00
PAV-8
TYPE "A" CURB
317
LF
$ 13.00
$ 4,121.00
PAV-9
3' VALLEY GUTTER CROSSING
209
LF
$ 19.50
$ 4,075.50
PAV-10
ADA CURB RAMP
6
EA
$ 300.00
$ 1,800.00
PAV-11
CONCRETE SIDEWALK
28,025
SF
$ 3.75
$ 105,093.75
PAV-12
STABILIZED LIMEROCK TURNAROUND
2
EA
$ 1,500.00
$ 3,000.00
PAV-13
BLUE -BLUE REFLECTORS
101
EA
$ 15.00
$ 150.00
PAV-14
WHEEL STOP
91
EA
$ 55.00
$ 495.00
PAV-15
SIGNING AND STRIPING
1
LS
$ 5,000.00
$ 5,000.00
Note: Offsite turn -lane improvement costs are not included
within this cost estimate, as those improvements are
reviewed and inspected by FDOT.
1) Includes littorals and preserve signs
SUB -TOTAL PAVING =
331817.7
5% CONTINGENCY =
16590.885
TOTAL PAVING =
348408.585
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Desig n_Pqrojt4p PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev
Packet Pg. 7470
16.A.6.b
Project: Fronterra PPL - PH1
Task: Engineer's OPC for Subdivision Fee Calculation (Rev(
Prepared B� LMB Date: 3/23/2017
Checked By DJH Date: 3/23/2017
DRAINAGE
ID
DESCRIPTION
QTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
DRA-1
8" PVC SECONDARY DRAINAGE LINES
919
LF
$ 15.50
$ 14,244.5(
DRA-2
10" PVC SECONDARY DRAINAGE LINES
1,150
LF
$ 19.00
$ 21,850.0(
DRA-3
12" PVC STORM PIPE
42
LF
$ 20.00
$ 840.0(
DRA-4
15" RCP STORM SEWER
1,055
LF
$ 22.20
$ 23,421.0(
DRA-5
18" RCP STORM SEWER
361
LF
$ 25.80
$ 9,313.8(
DRA-6
24" RCP STORM SEWER
353
LF
$ 38.10
$ 13,449.3(
DRA-7
30" RCP STORM SEWER
479
LF
$ 55.10
$ 26,392.9(
DRA-8
60" RCP STORM SEWER
307
LF
$ 200.00
$ 61,400.0(
DRA-9
YARD DRAIN
52
EA
$ 1,030.00
$ 53,560.0(
DRA-10
DITCH BOTTOM INLET (TYPE D)
5
EA
$ 2,750.00
$ 13,750.0(
DRA-11
CURB INLET
2
EA
$ 2,934.00
$ 5,868.0(
DRA-12
VALLEY GUTTER INLET (DOUBLE)
131
EA
$ 3,546.00
$ 46,098.0(
DRA-13
JUNCTION BOX
4
EA
$ 2,330.00
$ 9,320.0(
DRA-14
JUNCTION BOX (FOR 60" RCP)
3
EA
$ 7,500.00
$ 22,500.0(
DRA-15
TYPE "H" DITCH BOTTOM INLET (FOR 60" RCP)
1
EA
$ 4,000.00
$ 4,000.0(
DRA-16
ICONTROLSTRUCTURE
1
EA
$ 4,000.00
$ 4,000.0(
DRA-17
CONTROL STRUCTURE (TYPE H DITCH BOTTOM
INLET)
1
EA
$ 4,000.00
$ 4,000.0(
DRA-18
18" FLARED END
1
EA
$ 2,400.00
$ 2,400.0(
DRA-19
24" FLARED END
2
EA
$ 2,500.00
$ 5,000.0(
DRA 20
REMOVE EX. CONTROL STRUCTURE (AND RESTORE WITH DITCH BOTTOM INLET)
1
LS
$ 4,200.00
$ 4,200.01
DRA-21
RIP -RAP
162
SY
$ 2.25
$ 364.5(
SUB -TOTAL DRAINAGE = $
5% CONTINGENCY = $
TOTAL DRAINAGE = $
345, 972.0
17,298.6
363,270.6
m
m
t
a
w
c
O
L
LL
m
U
c
Q.
m
U
U
Q
c
ii
N
v
0
N
y
y
m
m
c
O
m
c
a�
E
t
U
fC
Q
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-
FeeCalc_Ph1_Rev02.xlsx 4 of 9
Packet Pg. 741
16.A.6.b
Project: Fronterra PPL - PH
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
POTABLE WATER
ID
DESCRIPTION
QTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
WAT-1
4" GATE VALVE
1
EA
$ 950.00
$ 950.00
WAT-2
4" PVC WATER SERVICE C900, DR-14
55
LF
$ 12.00
$ 660.00
WAT-3
6" PVC WATER MAIN C900, DR-14
271
LF
$ 15.00
$ 4,065.00
WAT-4
6" PVC WATER MAIN C900, DR-1 8)
503
LF
$ 13.00
$ 6,539.00
WAT-5
6" GATE VALVE
3
EA
$ 1,000.00
$ 3,000.00
WAT-6
8" PVC WATER MAIN C900, DR-14
304
LF
$ 18.00
$ 5,472.00
WAT-7
8" PVC WATER MAIN C900, DR-1 8)
1,936
LF
$ 15.80
$ 30,588.80
WAT-8
8" GATE VALVE
10
EA
$ 1,286.00
$ 12,860.00
WAT-9
DIRECTIONAL DRILL 6" PVC DR14 WITH CASING
132
LF
$ 130.00
$ 17,160.00
WAT-10
FIRE HYDRANT ASSEMBLY COMPLETE'
10
EA
$ 3,500.00
$ 35,000.00
WAT-11
1" SINGLE SERVICE SHORT SIDE COMPLETE
6
EA
$ 575.00
$ 3,450.00
WAT-12
1" SINGLE SERVICE LONG SIDE COMPLETE
3
EA
$ 799.00
$ 2,397.00
WAT-13
1-1/2" DOUBLE SERVICE SHORT SIDE COMPLETE
13
EA
$ 969.00
$ 12,597.00
WAT-14
1-1/2" DOUBLE SERVICE LONG SIDE COMPLETE
20
EA
$ 1,250.00
$ 25,000.00
WAT-15
AIR RELEASE VALVE
4
EA
$ 1,674.00
$ 6,696.00
WAT-16
AUTOMATIC FLUSHING DEVICE
1
EA
$ 2,500.00
$ 2,500.00
WAT-17
TEMPORARY BLOW -OFF
4
EA
$ 3,000.00
$ 12,000.00
WAT-18
TEMPORARY BACTERIAL SAMPLE POINT
3
EA
$ 175.00
$ 525.00
WAT-19
IPERMANENT BACTERIAL SAMPLE POINT
1
EA
$ 1,916.00
$ 1,916.00
* Fire Hydrant Assembly (Complete) includes gate valve at hydrant.
SUB -TOTAL POTABLE WATER = $
5%CONTINGENCY= $
TOTAL POTABLE WATER = $
183,375.80
9,168.79
192,544.59
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PiUot40PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02. xlsx
Packet Pg. 742
16.A.6. b
Project: Fronterra PPL - PH1
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
SANITARY SEWER
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
SAN-2
8" PVC GRAVITY SEWER MAIN 6'-8' CUT
370
LF
$ 35.00
$ 12,950.00
SAN-3
8" PVC GRAVITY SEWER MAIN 8'-10' CUT
503
LF
$ 40.00
$ 20,120.00
SAN-4
8" PVC GRAVITY SEWER MAIN 10'-12' CUT
459
LF
$ 45.00
$ 20,655.00
SAN-5
8" PVC GRAVITY SEWER MAIN 12'-14' CUT
917
LF
$ 50.00
$ 45,850.00
SAN-6
8" PVC GRAVITY SEWER MAIN 14'-16' CUT
123
LF
$ 83.00
$ 10,209.00
SAN-7
4' SANITARY SEWER MANHOLE 0'-8' CUT
1
EA
$ 4,300.00
$ 4,300.00
SAN-8
4' SANITARY SEWER MANHOLE 8'-10' CUT
1
EA
$ 5,500.00
$ 5.500.00
SAN-9
4' SANITARY SEWER MANHOLE 10'-12' CUT
2
EA
$ 7,050.00
$ 14,100.00
SAN-10
4' SANITARY SEWER MANHOLE 12'-14' CUT
4
EA
$ 9,000.00
$ 36,000.00
SAN-11
4' SANITARY SEWER MANHOLE 14'-16' CUT
2
EA
$ 11,110.00
$ 22,220.00
SAN-12
6" SERVICE LATERAL SINGLE
13
EA
$ 824.00
$ 10,712.00
SAN-13
6" SERVICE LATERAL DOUBLE
31
EA
$ 908.00
$ 28,148.00
SAN-14
TELEVISION INSPECTION
2,372
LF
$ 2.50
$ 5,930.00
SAN-15
4" PVC FORCE MAIN C900 DR14
63
LF
$ 22.50
$ 1,417.50
SAN-16
4" PVC FORCE MAIN C900-DR18
787
LF
$ 15.00
$ 11,805.00
SAN-17
4" PLUG VALVE
1
EA
$ 838.00
$ 838.00
SAN-18
AIR RELEASE VALVE
3
EA
$ 2,727.00
$ 8,181.00
SAN-19
CONNECT TO EXISTING FORCE MAIN
1
EA
$ 1,000.00
$ 1,000.00
SAN-20
TESTING
1
LS
$ 1,500.00
$ 1,500.00
SAN-21
JPUMP STATION
1
EA
$ 175,000.00
$ 175,000.00
SUB -TOTAL SANITARY SEWER = $
5% CONTINGENCY = $
TOTAL SANITARYSEWER = $
436,435.50
21,821.78
458,257.28
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P@yByttOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02.xlsx
Packet Pg. 743
16.A.6. b
Project: Fronterra PPL - PH1
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
IRRIGATION
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
IRR-1
IRRIGATION WELL & PUMP ALLOWANCE
1
EA
$ 63,000.00
$ 63,000.00
IRR-2
IRRIGATION PRIMARY ALLOWANCE
1
EA
$ 30,000.00
$ 30,000.00
IRR-3
IRRIGATION SECONDARY ALLOWANCE
1
EA
$ 18,000.00
$ 18,000.00
5 -
SUB -TOTAL IRRIGATION $ 111,000.00
5%CONTINGENCY= $ 5,550.00
TOTAL IRRIGATION= $ 116,550.00
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P®rW$t§OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02.xlsx
Packet Pg. 744
16.A.6. b
Project: Fronterra PPL - PH1
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
LIGHTING
ID
DESCRIPTION
QTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
ILL-1
SITE LIGHTING ALLOWANCE
1
LS
$ 50,000.00
$ 50,000.00
SUB -TOTAL LIGHTING = $ 50,000.00
5%CONTINGENCY= $ 2,500.00
TOTAL LIGHTING= $ 52,500.00
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P(got�OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev
Packet Pg. 745
16.A.6. b
Project:
Task:
Prepared By:
Checked By:
LANDSCAPING
Fronterra PPL - PH
Engineer's OPC for Subdivision Fee Calculation (Rev02)
LIMB Date: 3/23/2017
DJH Date: 3/23/2017
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
LA-1
LANDSCAPING ALLOWANCE
1
LS
$ 47,000.00
$ 47,000.00
$
$
SUB-TOTALLANDSCAPING= $ 47,000.00
5%CONTINGENCY= $ 2,350.00
TOTAL LANDSCAPING = $ 49,350.00
N
O
N
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_P@Trdyt�OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1_Rev02.xlsx
Packet Pg. 746
16.A.6. b
P E N I N S U L A Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
ENGINEERING �+ Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
PHASE 2
CONTINGENCY
Calculation Summary SUB -TOTAL
PERCENT DOLLAR
TOTAL
EARTHWORK $ 1,022,009.00
5% $ 51,100.45
$ 1,073,109.45
PAVING $ 174,076.70
5% $ 8,703.84
$ 182,780.54
DRAINAGE $ 131,412.30
5% $ 6,570.62
$ 137,982.92
POTABLE WATER $ 92,967.00
5% $ 4,648.35
$ 97,615.35
SANITARY SEWER $ 161,867.50
5% $ 8,093.38
$ 169,960.88
IRRIGATION $ 48,000.00
5% $ 2,400.00
$ 50,400.00
a
LIGHTING $ 50,000.00
5% $ 2,500.00
$ 52,500.00
L
LANDSCAPING $ 20,500.00
5% $ 1,025.00
$ 21,525.00
Total Probable Construction Cost: $ 1,700,832.50
5% $ 85,041.63
$ 1,785,874.14
Paving, Drainage and Site
d
c
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND
to
SEALED BY DAVID J HURST, P.E. ON 03/27/17
100% Construction Cost:
$ 1,518,297.91
a
USING A SHA-1 AUTHENTICATION CODE.
d
v
PRINTED COPIES OF THIS DOCUMENT ARE NOT
Water and Sewer
Q
CONSIDERED SIGNED AND SEALED AND THE SHA-1
100% Construction Cost:
$ 267,576.23
=
AUTHENTICATION CODE MUST BE VERIFIED ON
li
ANY ELECTRONIC COPIES
Estimated 110% Bond Amount
$ 1,964,461.55
C
NOTES:
0
N
1) This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes
Only.
N
(n
O
2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances,
and construction costs in
ib
effect on the date of this document. Interpretations of these construction
costs may affect this Opinion of Probable Cost, and may require
adjustments to
=
delete, decrease, or increase portions of this Opinion of Probable Cost.
O
M
3) All costs provided in this OPC are based on recent contract prices, or the Engineers'
latest known unit costs. These costs cannot be guaranteed at this time
=
due to unpredictable and uncontrollable increases in the cost of concrete,
petroleum, or the availability of materials and labor.
d
E
s
4) This cost estimate does not include the cost of any building construction.
O
r
Q
5) This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no -cost to the developer.
6) Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section.
7) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit.
David J. Hurst, P.E.
FL Registration H60727
Peninsula Engineering
Certificate of Authorization #28275
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PdrofigOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx
Packet Pg. 747
16.A.6.b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
EARTHWORK
ID
DESCRIPTION
OTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
EW-1
CLEARING
9.50
AC
$ 3,000.00
$ 28,500.00
EW-2
EMBANKMENT - IMPORT FILL
90,319
CY
$ 11.00
$ 993,509.00
EW-3
SILT FENCE ACCOUNTED FOR IN PHASE 1
0
LF
$ 2.00
$ -
$ -
5 -
SUB-TOTALEARTHWORK= $ 1,022,009.00
5%CONTINGENCY= $ 51,100.45
TOTAL EARTHWORK = $ 1,073,109.45
N
It
O
N
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PgraWPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx
Packet Pg. 748
16.A.6.b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
PAVING
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
PAV-1
3/4" ASPHALTIC CONCRETE TYPE S-III FIRST LIFT
4,004
SY
$ 4.95
$ 19,819.80
PAV-2
3/4" ASPHALTIC CONCRETE TYPE S-III SECOND LIFT
4,004
SY
$ 4.95
$ 19,819.80
PAV-3
8" LIMEROCK BASE
4,971
SY
$ 6.50
$ 32,311.50
PAV-4
12" STABILIZED SUBGRADE
5,164
SY
$ 1.55
$ 8,004.20
PAV-5
2' VALLEY GUTTER
3,517
LF
$ 7.95
$ 27,960.15
PAV-6
CONCRETE SIDEWALK
17,067
SF
$ 3.75
$ 64,001.25
PAV-7
BLUE -BLUE REFLECTORS
4
EA
$ 15.00
$ 60.00
PAV-8
SIGNING AND STRIPING
1
LS
$ 1,500.00
$ 1,500.00
PAV-9
ADA CURB RAMP
21
EA
$ 300.00
$ 600.00
SUB -TOTAL PAVING= $ 174,076.70
5%CONTINGENCY= $ 8,703.84
TOTAL PAVING= $ 182,780.54
P:\Active_Projects\P-BCNI-002\002—EastGateway—PPL\Design_P(Vi5MPCs\2017-03-14-RevO2\Fronterra-FeeCalc Ph2_Revqz,xlsx
Packet Pg. 749
16.A.6. b
Project:
Task:
Prepared By
Checked By:
DRAINAGE
Fronterra PPL - PH2
Enqineer's OPC for Subdivision Fee Calculation (Rev02
LIMB
DJH
Date: 3/23/2017
Date: 3/23/2017
ID
DESCRIPTION
QTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
DRA-1
10" PVC SECONDARY DRAINAGE LINES
1,242
LF
$ 19.00
$ 23,598.0(
DRA-2
15" RCP STORM SEWER
264
LF
$ 22.20
$ 5,860.8(
DRA-3
24" RCP STORM SEWER
327
LF
$ 38.10
$ 12,458.7(
DRA-4
30" RCP STORM SEWER
108
LF
$ 55.10
$ 5,950.8(
DRA-5
36" RCP STORM SEWER
194
LF
$ 82.00
$ 15,908.0(
DRA-6
YARD DRAIN
32
EA
$ 1,030.00
$ 32,960.0(
DRA-7
DITCH BOTTOM INLET TYPED
2
EA
$ 2,750.00
$ 5,500.0(
DRA-8
VALLEY GUTTER INLET (DOUBLE)
6
EA
$ 3,546.00
$ 21,276.0(
DRA-9
24" FLARED END
2
EA
$ 2,500.00
$ 5,000.0(
DRA-10
36" FLARED END
1
EA
$ 2,900.00
$ 2,900.0(
SUB -TOTAL DRAINAGE = $
5%CONTINGENCY= $
TOTAL DRAINAGE = $
131, 412.31
6, 570. 6,
137, 982.9,
T
a�
ca
m
a
cU
L
L
c
0
L
LL
d
c
is
w
a
a)
V
V
a
CU
LL
N
O
N
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_Perm it\OPCs\2017-03-14-Rev02\Fronterra-
FeeCaic_Ph2_Rev02.xlsx 4 of 9
Packet Pg. 750
16.A.6. b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
POTABLE WATER
ID
DESCRIPTION
QTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
WAT-1
6" PVC WATER MAIN (C900, DR-18)
1,602
LF
$ 13.00
$ 20,826.00
WAT-2
6" GATE VALVE
5
EA
$ 1,000.00
$ 5,000.00
WAT-3
8" PVC WATER MAIN (C900, DR-14)
54
LF
$ 18.00
$ 972.00
WAT-4
8" PVC WATER MAIN (C900, DR-18)
230
LF
$ 15.80
$ 3,634.00
WAT-5
8" GATE VALVE
1
EA
$ 1,286.00
$ 1,286.00
WAT-6
FIRE HYDRANT ASSEMBLY (COMPLETE)*
4
EA
$ 3,500.00
$ 14,000.00
WAT-7
1" SINGLE SERVICE (SHORT SIDE) (COMPLETE)
7
EA
$ 575.00
$ 4,025.00
WAT-8
1" SINGLE SERVICE (LONG SIDE) (COMPLETE)
2
EA
$ 799.00
$ 1,598.00
WAT-9
1-1/2" DOUBLE SERVICE (SHORT SIDE) (COMPLETE)
15
EA
$ 969.00
$ 14,535.00
1-1/2" DOUBLE SERVICE (LONG SIDE) (COMPLETE)
20
EA
$ 1,250.00
$ 25,000.00
LWAT-0
1
TEMPORARY BACTERIAL SAMPLE POINT
1
EA
$ 175.00
$ 175.00
2
PERMANENT BACTERIAL SAMPLE POINT
1
EA
$ 1,916.00
$ 1,916.00
* Fire Hydrant Assembly (Complete) includes gate valve at hydrant.
SUB -TOTAL POTABLE WATER = $
5%CONTINGENCY= $
TOTAL POTABLE WATER = $
92, 967.00
4,648.35
97, 615.35
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P fUByttOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02. xlsx
Packet Pg. 751
16.A.6. b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
SANITARY SEWER
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
SAN-1
8" PVC GRAVITY SEWER MAIN 6'-8' CUT
313
LF
$ 35.00
$ 10,955.00
SAN-2
8" PVC GRAVITY SEWER MAIN 8'-10' CUT
680
LF
$ 40.00
$ 27,200.00
SAN-3
8" PVC GRAVITY SEWER MAIN 10'-12' CUT
313
LF
$ 45.00
$ 14,085.00
SAN-4
8" PVC GRAVITY SEWER MAIN 12'-14' CUT
353
LF
$ 50.00
$ 17,650.00
SAN-5
4' SANITARY SEWER MANHOLE 8'-10' CUT
4
EA
$ 5,500.00
$ 22,000.00
SAN-6
4' SANITARY SEWER MANHOLE 10'-12' CUT
1
EA
$ 7,050.00
$ 7,050.00
SAN-7
4' SANITARY SEWER MANHOLE 12'-14' CUT
2
EA
$ 9,000.00
$ 18,000.00
SAN-8
6" SERVICE LATERAL SINGLE
8
EA
$ 824.00
$ 6,592.00
SAN-9
6" SERVICE LATERAL DOUBLE
36
EA
$ 908.00
$ 32,688.00
SAN-10
TELEVISION INSPECTION
1,659
LF
$ 2.50
1
$ 4,147.50
SAN-11
TESTING
1
LS
$ 1,500.00
$ 1,500.00
SUB -TOTAL SANITARY SEWER = $ 161,867.50
5%CONTINGENCY $ 8,093.38
TOTAL SANITARY SEWER = $ 169, 960.88
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PWi5$t§OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx
Packet Pg. 752
16.A.6.b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
IRRIGATION
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
IRR-1
IRRIGATION PRIMARY ALLOWANCE
1
EA
$ 30,000.00
$ 30,000.00
IRR-2
IRRIGATION SECONDARY ALLOWANCE
1
EA
$ 18,000.00
$ 18,000.00
5 -
5%CONTINGENCY= $
TOTAL IRRIGATION = $
48, 000.00
2,400.00
50,400.00
N
O
N
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PgrijVPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Re
Packet Pg. 753
16.A.6. b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02
Prepared By: LIMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
LIGHTING
ID
DESCRIPTION
OTY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
LL-1
SITE LIGHTING ALLOWANCE
1
LS
$ 50,000.00
$ 50,000.00
S
$
$
SUB -TOTAL LIGHTING = $ 50,000.00
5%CONTINGENCY= $ Z,500.00
TOTAL LIGHTING = $ 52,500.00
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_Peot�DPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx
Packet Pg. 754
16.A.6. b
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
LANDSCAPING
ID
DESCRIPTION
CITY
UNIT TYPE
UNIT PRICE
TOTAL PRICE
LA-1
LANDSCAPING ALLOWANCE
1
LS
$ 20,500.00
$ 20,500.00
SUB -TOTAL LANDSCAPING = $ 20,500.00
S%CONTINGENCY= $ 1,025.00
TOTAL LANDSCAPING= $ 21,525.00
N
O
N
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_P(gMVPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Re I
Packet Pg. 755
16.A.6. b
PERFORMANCE BOND
No.106506927
KNOW ALL PERSONS BY THESE PRESENTS: that
CCC Fronterra, LLC
135 San Lorenzo Avenue, Suite 750
Coral Gables, Florida 33146
(hereinafter referred to as "Owner") and
Travelers Casualty and Surety Company of America
One Tower Square, 3B
Hartford, CT 06813
(800)873-1477
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter
referred to as "County") in the total aggregate sum of Two million seven hundred seventy thousand five
hundred fifty-five and 23 cents Dollars ($2,770 555.23) in lawful money of the United States, for the payment
of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or
plural, as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
@
the Board a certain subdivision plat named Fronterra Phase 1 and that certain subdivision shall include
S
specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter "Land
Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed
N
and shall continue until the date of final acceptance by the Board of County Commissioners of the specific
c
improvements described in the Land Development Regulations (hereinafter the "Guaranty Period")
NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in
accordance with the Land Development Regulations during the guaranty period established by the County,
and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save harmless
the County from and against all costs and damages which it may suffer by reason of Owner's failure to do
so, and shall reimburse and repay the County all outlay and expense which the County may incur in making
good any default, then this obligation shall be void, otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no
change, extension of time, alteration, addition or deletion to the proposed specific improvements shall in
any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension
of time, alteration, addition or deletion to the proposed specific improvements.
PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner
and the Surety to the full and faithful performance in accordance with the Land Development Regulations.
The term "Amendment," wherever used in this Bond, and whether referring to this Bond, or other documents
shall include any alteration, addition or modification of any character whatsoever.
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed
this 17t^ day of August, 2017.
Packet Pg. 756
16.A.6. b
WITH SES-
17�
VAJ,",�
Printed IName u) J
ff�k
Printed dame P II'6AYS k;�C`
WIT NESSES:
Printed Name
t
Primed
STATE OF r
COUNTY OF (\AfQ M
CCC Fronterra, LLC
By: 0$ ih�
Printed Name/'Title
(Prov;de Proper Evidence of Authority)
BC 'Maples Investment, L LP
By: Barron Coliier Management, LLC
Brian GoJuen, Chief' Operating Officer
Printed flame/Title
(Provide Proper Evidence of Authority)
AC'K.NM LEDC.rENIF y I
rI
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BE E ME THIS I`%�tbAY OF
AUGUST , 2017, BY AS OF CCC
FRONTERRA. LLC WHO IS PERSONALLY KNOWN TO 1aE. OR HAS PRODUCED AS
IDE;IiTiFICATION.
Notat9, Public - State of Florida
Printed Name L\tSc: ,V i-e-�
.M..�.n.M.a.w.rwr.r ...
USSETTE VIERA
MY COMMISSION # GG 0725W
y` EXPIRES: June 12, 2021
Bonded Tbw Notary Pubk Underwriters
(SEAL)
N
0
N
Packet Pg. 757
16.A.6. b
WITNESSES:
Printed Name
Printed Name
WITNESSES:
Printed Name Cxz-�f- f4 Uku—
Printed Name/l;��� J.C•. f�ir�r
STATE OF _
COUNTY OF
CCC Fronterra, LLC
By:
Printed Name/Title
(Provide Proper Evidence of Authority)
BC Naples Investment, LLP
By: Barron Collier Management, LLC
By:�'✓---
Brian Goguen, 4
ef perating Officer
Printed Name/Title
(Provide Proper Evidence of Authority)
ACKNOWLEDGEMENT
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS (i-146AY OF
AUGUST , 2017, BY AS OF CCC
FRONTERRA, LLC WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS
IDENTIFICATION.
Notary Public - State of Florida
Printed Name
(SEAL)
a
Packet Pg. 758
16.A.6.b
STATE OF FLORIDA
COUNTY OF COLLIER
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 7�DAY OF
4ufte Aiy64- , 2017, BY Brian Goguen AS Chief Operating Officer OF BC Naples Investment. LLP
WHO IS PERSONALLY KNOWN TO ME. OR HAS PRODUCED AS IDENTIFICATION.
Notary Public - State of Florida
Printed Name _1<,'l�
WIT ESSES: —
Robin Griffin
'4..,,),')
v
Lorraine Jones-Murra
STATE OF Florida
COUNTY OF Collier
..........
'e. W" KIM D. DAVIDSON SEAL
MY COMMISSION r FF OM690 )
a EXPIRES February 19, 2018
f„Rf ry°° Banded Thro Notary P.bl c Unc eOw en
Trav rs Casualty and.$urety Company of America
By:
Charity A. Moser, Attorney -In -Fact
ACKNOWLEDGEMENT
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 171h DAY OF
_August 2017, BY _Charity A. Moser AS Attorney -In -Fact OF _Travelers Casualty and Surety Company
of America WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS
IDENTI (CATION.
No is - State Flo (SEAL)
ZrW
Printed Name
ADWA"h UWAN A BODOR
MY COMMISSION Ii FF 941634
EXPIRES: April 6, 2020
"•RI t` Bonded Thru Notary Public Underwriters
Packet Pg. 759
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
POWER OF ATTORNEY
TRAVELERS Farmington Casualty Company St. Paul Mercury Insurance Company
dj Fidelity and Guaranty Insurance Company 'Il-ayclers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of Americr.
i St. Paul Fire and Marine Insurance Company United Stales Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 229466
Certificate No. 007003331
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casually Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company. Travelers Casualty and Surety Company of America. and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Huntley A. Hornbeck II, Kristin M. Neiert, Marc E. Williams, Stephen J. Benza, Charity A. Moser, and Dawn Y. Colecchio
of the City of Naples , State of Florida , their true and lawful Attorney(s)-in-Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this
day of October . 2016
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
5th
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
c3 �i n � 9 � aCpiPORiIED _,y` ?fox vo.oic�ms �`'��A.tf?n a HARTFen�`9: �^+�n`RbAQ� �4� 19t12 o tt
s1y�Cn'+r r � 1951 a y �tlSC•.AL "" D W CONN. n r��tgrt � �n t� i
i a �. oslSBJCLit WOo Q o
State of Connecticut
City of Hanford ss.
r
Bv:
Robert L. Rancy, Senior Vice President
On this the 5th day of October 2016 , before me personally appeared Robert L. Raney, who acknowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
0.T!7
In Witness Whereof, I hereunto set my hand and official seal. ,,tiTAR
My Commission expires the 30th day of June, 2021. sir A(/sL%"- it
C'r � �S
58440-5-16 Printed in U.S.A.
Marie C. Ten•eault. Notary Public
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
Packet Pg. 760
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 16.A.6.b
This ower of Attorney is granted under and by the authority of the following resolutions adopted by the Hoards of Directors of Farmington Casualty Company, Fidelity
and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters. Inc.. St. Paul Fire and Marine Insurance Company, St. Paul Guardian insurance
Company, S:. PJuN Mgrcury Insurance Company. Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America. and United States
Fidelity and Guaranty Company, which resolutions are now in full force and effect. reading as follows:
RESOLVED, that the Chairman, the President. any Vice Chairman, any Executive Vice President. any Senior Vice President. any Vice President, any Second Vice
President, the Treasurer -my Assistant Treasurer. the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescrihe to sign with the Company's name and seal with the
Company's seal bonds. recognizances. contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTFIER RESOLVED. that the Chairman. the President. any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority Io one or more officers or employees of this Company, provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity. or writing obligatory in the nature ref a bond, recognizance, or conditional undertaking
Shall be valid and binding upon the Contparty when (a) signcd by the President, any Vice Chairman, arty Executive Vice President. any Senior Vice President or anv Vice
President. any Second Vice President. the 'I reasurer, any A,si.srnt Treasurer. the Corporate Sceretat\ or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary: or (h) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power
prescrihed in his or her certificate or their certificates of authority or by one or more Company officers pursuant u) it written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the folldxving officers: President, arr; Executive Vice President. any Senior Vice President. any Vice President,
anv Assistant Vice President, anv Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power ul Attorney or to any
certificate relating thereto appointing Resident Vice Presidents. Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate hearing such facsimile signature or facsimile seal
Shall he valid and hinding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond ar understanding to which it is attached.
I, Kevin F. Hughes. the undersigned. Assistant Secretary. of Farmington Casualty Company. fidclity and Guar:utt Insur:ute•e Company. fidelity and Guaranty Insurance
Underwriters, Inc., tit. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance Company. St. Paul NIcrcury Insurance Company, Travelers Casualty and
Surety Cony7any.'l ray clers CasualtySurety and SureCompany of America, and United States Fidelit and Guaranty Company do hereby certify that the shove and foregoing
is a Iruc and corrcci copy of the Power of Attorney executed by said Companies, which is in full horde and effect and has not been revoked.
IN TESTIMONY WHEREOF. I have hereunto set my hand and grazed the seals of said Companies this 1 —11."efay of ' .20
s
. ill� (15�_ /�/�
Kevin E. Hughes. Assistant Sc,: Lary
to
.y
m
���u'�d•$Q,ptQY ^.,_��x!` `�N•ing` .•p Hsgw, +,�tr.�NeP J+o'i�,°svw'�vy,t/� 0
�Opv6NArfhn�l
a Nunaoao, ? ttvarraj ro
Yb'�'�'tc a 1977 �i Jet i'..r f C Ai q
SI::AL v
ry sN d •� , die....µ a:` + b
, .. c:.;.uf" ,.ur N f �•..�, ;,,/� df �N wdM '•// Ittr�� Qi
s
to
To verily the authenticity of this Power of Attorney. call 1-800-421-3880 or contact us at www.h-avelersbond.cotn. Please refer to the Attorney -In -Fact number, the
above -named individuals and the details of the bond to which the power is attached. Q
Packet Pg. 761
16.A.6.c
RESOLUTION NO.21-
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE
OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN
FRONTERRA PHASE 1, ACCORDING TO THE PLAT THEREOF
RECORDED IN PLAT BOOK 63, PAGES 13 THROUGH 15, AND
RELEASE OF THE MAINTENANCE SECURITY.
WHEREAS, the Board of County Commissioners of Collier County, Florida, on June 13,
2017, approved the plat of Fronterra Phase 1 for recording; and
WHEREAS, the Developer has constructed and maintained the roadway and drainage
improvements in accordance with the approved plans and specifications as required by the Land
Development Code (Collier County Ordinance No. 04-41, as amended); and
WHEREAS, the Developer is requesting final acceptance of the roadway and drainage
improvements and release of the maintenance security; and
WHEREAS, the Development Review Division has inspected the roadway and drainage
improvements, and is recommending acceptance of said facilities.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby
granted for those roadway and drainage improvements in Fronterra Phase 1, pursuant to the plat
thereof recorded in Plat Book 63, pages 13 through 15, and the Clerk is hereby authorized to
release the maintenance security.
BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage
improvements within Fronterra Phase 1 will be maintained privately in the future and will not be
the responsibility of Collier County.
This Resolution adopted after motion, second and majority vote favoring same,
this 14th day of December, 2021.
DATE: BOARD OF COUNTY COMMISSIONERS
ATTEST: COLLIER COUNTY, FLORIDA
CRYSTAL K. KINZEL, CLERK
Deputy Clerk
Approved as to form and legality:
Derek D. Perry
Assistant County Attorney 1)0\�
Penny Taylor, Chairman
[21-EIS-04568/1675131/11
Page 1 of 1
Packet Pg. 762
{� 1 gg =
LJ
Q
D-
s�
�w� arc
O �pS
YMg m xo "p
msog o s-
LLI
WQh;6=�gogo m
S od "w
zao w& cwia HE �g
c SOWo oNo
w Z.=-oaS
•
u
•
co F y
Z
�E�o
QME zi
1^i UD
al
�o W
co
�zC\2
O Z
PLI E
O
�7 cn
W a
x
z
C)
E�
Saw
Z sgooe§6 zoH €
U oof =;=oa��•� ��
g�
p 0z��w�nzJ�'��
Ld o w agWo�w mow_ ��
w LL <Hm<iwii iz H 8.
J r rrc
�o<
ow
$� <ww�o
Nx �zzs zkz€o3
n Moz-fig om=<G i8
;z
y<<= pads=
<w� z<
�3
o
s�
4 ee+•�ya•uewwi e•�umMe••v i•„i:�zwzl a•ra �eia :wewyuv
22
mass 23
a�a= a$
a p§wo w Ada
Z �w3 apy�a - W 3E� O goo =s pg o awl
(n g"oo 6po as
,a_JI= 'off W �
end-, "a � o
Oo- o 0evl!\ =o (n boo
U a"U c � fig£ ag xp"_
a ? g=o zo mwo w^
0 xLL �p
OU �o Co L� �o"ppp out U)
R z
�o
h
�16
ooz��
i o$
z � o I
W N s�mI'I
o QWw -Oo
goo o<oI
�<'a�o -
"�awQz.
W w Cm
p a �� pp Pa ia3l '6
�
w swam 1jFa `gip o�pod
oo� op €LLz.
-$o$�o _gip obi
x�ax=w aw MN- -1saw iz io
z ' Eo H, -os _ = gip
gw�=p z „IB
w �.�o w 'w6�gg �<BmopQs�p= w �n�s 1=
z ��w_-wpNzps m Y6oawsog==w o s�s= 6w
<�� -mow oho = owpp . ..p x
a<s" p po_LLw�<pz€wwo w _
Q= g,w=amomQ�m _SU��wa J�j +�po did
womQ3ogap-dg� p a�s6N= 3 pswx
L o 'W o=�=='. - l_ pow ow_ �a AiUn o
CD o
�z-
s ww iz < _s-o F�mo Ao m< oa
z Q 0 8s oU go'�s W<u,� ffi �gv
m�V p8n
-i =~`5 m Ana ogn,e RH"�.� 3rc'� 1.
a iU
3w Apo p�a'� w�a l-29 ggm �
o g 3 -,_"w, �_= a
.G7 - `pp Ba`=o pf o�wFg� ' ffi
b cgz g pip 1Ez< o P ='oiEoa -�_ z a�
�p`ds" opt
z 5awwpo IRo=o sm o=� sF
asp= kl<gsp�Pw3 mkpao � =�W M-8
_ - �•'" '� _erg..
§� -
8<
off"
2� <s
�o
w -
-H�
-z H zwa z-
���m .V �o=� uuJJ BGz�Sp3�:3 �oiS=.
� wkrc�'=--' o�ui iul coi��"' WmB�N�W�Eov=i
g=aop 6p ao <<
NaNz
z.
„a3' _ -<go
o
o�
LL 3
HgA _ g-
aw�w spa===o �<_
a Wza
mp98
a - -
Co-
1�a a�a�=�w wpE
HELM-
��e
_wRb
o �VMOVo
o
� p�86a moow c o
o
d
w
z<
ay
»1--
aw
s�
x�
�z
LL
8�o
= p
-
3m
'2
oa
o �p <�
'3
=Q
o
y m<m
!------
Ir--------I
II �
'
CV
I
0
II
I
I
Q
!
40
M
II
�N ao
all I
I
I
'I
O
m
=11 m
w
Qw
J S O
d (n m
tt
i 11
m
!
m
II I
o
I
I I
II
AwA v,
O I
I in
L23 L
.r
L21 L19
.r
S
1�
of
$
a
!G
al O
L23 m
�1
Im
L19 "i
�I
O
of o N
o L21 � Li9 In
!Y'
00 �
ro
la
o
L
�}L
IF,
!
rol
nl L23 m t
l.'.l L�
CI-i-'
nl L21 L19
F-1 a
n1 m
!w
el m
8L23
�
O
L21 L19 n
.i!m
V H "
r�
L21 L19
U N Q
W FI-I J Qi z a
E-
nl L21 �n L19 In
^o
a' L23 N
Wcf) W a-
1O!
mj zs' D.E. moo,
L zs• L
C) O
W
�
I o yi Io
j b e
!
o!
ml
nl L23 ro
A�
f 1 ifl E-
L21 L,8 Ilo
o
L21 L19 n
ai
m O
L23
N
�ryr�, O
I^I
� I L21 L19 I
al .y
U-
a t13
102.00 I$
!
MI Sr15' D.E. i�
-_L1
-I� 8
i1
5
5
I
I
BY33'S4'E 1 1
304.00 (TOTAL)
r w.
°iI of
EE SHEET 3 OF 3
Il
IW
e III
I
I
IIZ �
Il�m
QiUa Q
Q
FIi
w
p
�
li I F
w
�I
II w U
W II
I
8 II o
I
'I tt
W II
m Z
J I O
„IIU
o
? II
�II
tll
IL
of q
o gl m:
I
NI
I
ml
o f Q F i
I
Ld
>
w d
I
I
I
I
F II
nl- d O
w o
F
M
Q $moo
�3
U i�o
j �
E6 1.o
F LKI I
w �b�
5 C)
�o
I Uri C7
I " W
I F a �
r
w d
I
I
I
I
F II
nl- d O
w o
F
M
Q $moo
�3
U i�o
j �
E6 1.o
F LKI I
w �b�
5 C)
�o
I Uri C7
I " W
I F a �
r
�
_
c
g �
Z
" I U
L43 L44 �
l
'O
n V
e
r_
o
Iz
T
1 =
mN „
as 1
FI<
N
\ \ I G m \
zz
Aw
6w
v,
a
rc
E-'-----------------
�F
�I
I
V66.70
r
L.B.E
R
o
n
Z.
„
9
a'�j
�$ s
`
U==
o
Bow€m
;N mS
w�;"'��m�
ao
omo
n-JE
m!
go
yj6��G
�4
a
I 1.
I I
� I
rc oa
j
Pik wmw� ooz�
2s• LB.E. W {4y8j36 d
-.-._.-.-._._. --- ._._._._._L_ J II t 25L.B.E.
NORTH RIGHT-OF-WAY SR-84
-DAVIS BOULEVARD STATE ROAD 84
H
Q
I
W
U
Q M
I
W
I
90
I
Y
li
0 r)
0
ffi
m�
ALL
W
�W
I
E-
a_ (n
i
E. g
O
Q
J
Iw
I=
a
m
Id
�
�- O
i�
I
M
O
O �
'-
I
Fo
"o<
E- M
z o
N a
W W
t
I a t2s.so
� a 99'33'S4'W
FL
\
N
I O
O �
o
ryl3
of o
� Ls NR Y
w o b
W
of
al
to
N to
O
gl
� Lt
I
H� W
N L3
L1 le
1�
�I L3
le
J
I
M
w
° gil f].s'
�L1--L4-
D.E. _ Ig
J
T`1 ].s' D.E � to
r- rl
IL'. 71J �
ml '
N L1 I
to
N loi
�O
V 1
0�
nl
n
O IR
N In
Z
�
I
Lt
w
W
ry
nl
�
m
L1 In
E-,
a
V1
Z
E5
v
o 8i
Lt n
o
of
nl
' I L3
I
� to
� to
L1 n
m
m
o
li a
I
o
o
o
De
�
�
II II
II
I I
'
II
I
II
I
I
w I
O
I
�
F
U�o
E z
FS
� Nlno \I N a w
s U
CJ
C12
I <
a`
E-
L) \3 J
Ew w
F
0 w�w�w
Z m nbbb, trnim o
25' PRESERVE p
FPRINCIPLE SETBACK LINE o W
9ETI-K 10.2' 10' D.E. IS D.E. UNE 10.2' 10' D.E. (� J n n
a 99'33'54" 959.83 Q
_47.00 _ 42_00 42.00 42Do 39.00 46.83 38.00 _420_0 _38.00 3-. - 20.0 I 41
nt oo J d m m, w o m oPF v W
co uo muo co uD e>uo cow � I �m up uo co uo
Lto
i a ee,cam�
in it 0.6) O o00 000noo
o u n c a89'33'54"W U Z: rclouw�urvrvnNry
+ 9 I I � ou
Z
�10 42.00P 42.00--4220Om <3.Op 61.83 38.00P 42.00 Is..6] _Llj N J m
to N 89'33'S4"E 346.00 40 -N 99'33'54'E 46.130,67-1
Is MADRID CIRCLE N W33.54"E 300 TRACT "R"
P.0zo ° ;
-----------D.E------------ w' hoq�
.E.. A.E., C.U.E.. & .) = J J J J J J J J J J
16 10' P U E
�n S 89'33'54' 346.D0 ' ' r� 4 y° I w
6].00 29.00 4].00 44.s0 4].00 4- 8].00 N
f � --o ---f -tom---
it L23 Les � e L,a
�I $'n mm
nm MM°;� "
it ro ' 0I I ZmmbmO1mmmzi
29.0 42.00 49.50 42.00 J 49.50 J n m
L25 N 89'33'14"E 212.00
.I-�
I �
I L23
I �
I L23 d'
IZ
I �
I o
s' D.E.
L
I ].5' D.E.
I �
II m
L23 N
L2
�L-
I �
I eN
LL7
I� L2
I
I O
L23 O L2
I ol-
u
I 13 � L2
I �
I L23 � L2
z
I �
I m
I L23 O
Z
I
I W
L2f 3"aL..�
N �
I
I�
I .-I
I O
I
I m
I
I �
I�
I �
I O
I �
I m
Z
I
I
I
I m
5
MATCH LINE SEE SHEET 2 OF 3
Fx
I
F =�
I
I
�1