Agenda 12/14/2021 Item #16A 6 (Resolution - Final Acceptance for Fronterra Phase 1 PL20150001982 )16.A.6 12/14/2021 EXECUTIVE SUMMARY Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements for the final plat of Fronterra Phase 1, Application Number PL20150001982, and authorize the release of the maintenance security. OBJECTIVE: To have the Board of County Commissioners (Board) grant final acceptance of the infrastructure improvements associated with the subdivision, and release the maintenance security. CONSIDERATIONS: 1) On October 3, 2018, the Growth Management Department granted preliminary acceptance of the roadway and drainage improvements in Fronterra Phase 1. 2) The roadway and drainage improvements will be maintained by the Fronterra Community Development District, CCC Fronterra, LLC, BC Naples Investments, LLP, and Fronterra Property Owners Association, Inc. 3) The required improvements have been constructed in accordance with the Land Development Code. The Growth Management Department has inspected the improvements on September 30, 2021 and is recommending final acceptance of the improvements. 4) A resolution for final acceptance has been prepared by staff and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C of the Land Development Code. A copy of the document is attached. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the Fronterra Community Development District, CCC Fronterra, LLC, BC Naples Investments, LLP, and Fronterra Property Owners Association, Inc. The existing security in the amount of $356,962.41 will be released upon Board approval. The original security in the amount of $2,770,555.23 has been reduced to the current amount of $356,962.41 based on the previous work performed and completed pursuant to the terms of the Construction and Maintenance Agreement dated August 17, 2017. GROWTH MANAGEMENT IMPACT: There is no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - DDP RECOMMENDATION: To grant final acceptance of the roadway and drainage improvements in Fronterra Phase 1, Application Number PL20150001982, and authorize: 1. The Chairman to execute the attached resolution authorizing final acceptance of the improvements. 2. The Clerk of Courts to release the maintenance security. Prepared By: Lucia S. Martin, Associate Project Manager, Development Review ATTACHMENT(S) 1. Location Map (PDF) 2. Bond Basis (PDF) 3. Resolution (PDF) 4. Plat Map (PDF) Packet Pg. 722 16.A.6 12/14/2021 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.6 Doe ID: 20421 Item Summary: Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements for the final plat of Fronterra Phase 1, Application Number PL20150001982, and authorize the release of the maintenance security. Meeting Date: 12/14/2021 Prepared by: Title: Technician — Growth Management Development Review Name: Lucia Martin 10/18/2021 1:36 PM Submitted by: Title: Environmental Specialist — Growth Management Department Name: Jaime Cook 10/18/2021 1:36 PM Approved By: Review: Growth Management Department Growth Management Department Growth Management Department Growth Management Department County Attorney's Office Office of Management and Budget County Attorney's Office Office of Management and Budget County Manager's Office Board of County Commissioners Lissett DeLaRosa Growth Management Department Jaime Cook Additional Reviewer Trinity Scott Transportation James C French Growth Management Derek D. Perry Level 2 Attorney Review Debra Windsor Level 3 OMB Gatekeeper Review Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Laura Zautcke Additional Reviewer Geoffrey Willig Level 4 County Manager Review Geoffrey Willig Meeting Pending Completed 10/21/2021 12:51 PM Completed 11/09/2021 2:23 PM Skipped 10/20/2021 2:41 PM Completed 11/10/2021 12:47 AM Completed 11/29/2021 10:29 AM Completed 11/29/2021 10:45 AM Completed 11/29/2021 2:14 PM Completed 11/30/2021 9:24 AM Completed 12/02/2021 9:51 AM 12/14/2021 9:00 AM Packet Pg. 723 16.A.6.a FRONTERRA PHASE 1 LOCATION MAP Packet Pg. 724 16.A.6. b CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this 1-1— day of AUGUST / / 20 17 between Cc-c ftron-Vurr, "hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board. RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of certain plat of a subdivision to be known as: FRONTERRA PHASE 1 B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post appropriate guarantees for the construction of the improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: Developer will cause to be constructed: Roadway, Drainage, water & sewer improvements within I A months from the date of approval said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and by reference made a part hereof) in the amount of $ 2, 770,55523 - which amount represents 10% of a the total contract cost to complete the construction plus 100% of the estimated cost of to complete the required improvements at the date of this Agreement. i7L 3. In the event of default by the Developer or failure of the Developer to complete such improvements c within the time required by the Land Development Code, Collier may call upon the subdivision performance security to insure satisfactory completion of the required improvements. ,n 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or his designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manager or his designee. After the one year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or his designee to inspect the required improvements. The County Manager or his designee shall inspect the improvements and, if found to be still in compliance with the Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. Packet Pg. 725 16.A.6. b 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or his designee to reduce the dollar amount of the subdivision performance security on the basis of work complete, Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or his designee. The County Manager or his designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or his designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant to public advertisement and receipt and acceptance of bids, the improvements required herein. The Developer, as principal under the subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent costs, together with any damages, either direct or consequential, which the Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this Agreement. 9. All of the terms, covenants and conditions herein contained are and shall be binding upon the Developer and the respective successors and assigns of the Developer. IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by their duly authorized representatives this �-1 day of AUGUST / / 2017 SIGNED IN THE PRESENCE OF: (Name of Entity) CC FRONTERRA, LLC ' - V, 11-� 0— By: 1 1 rinted Name S (�� vj -e V-� J / e/p C MI'v"14r-r�, Printed Name/Title V�c� (President, VP, or CEO) (Provide Proper Evidence of Authority) Printed Name ATTEST: DWIGHT E.BROCK, CLERIK BOARD O OL Y COMMISSION S OF COL OUNTY, FLORIDA By: Deputy Cl%i6ll, 16 al By: C PENNY TAYLOR, CHAIRM Approved 0 0 ality: Scott A. Stone, Assistant County Attorney N O N Packet Pg. 726 16.A.6. b 2017 FLORIDA LIMITED LIABILITY COMPANY ANNUAL REPORT DOCUMENT# L16000045776 Entity Name: CCC FRONTERRA, LLC Current Principal Place of Business: 2020 SALZEDO STREET, SUITE 200 CORAL GABLES. FL 33134 Current Mailing Address: 2020 SALZEDO STREET, SUITE 200 CORAL GABLES, FL 33134 US FEI Number: APPLIED FOR Name and Address of Current Registered Agent: EISENACHER, HAROLD 2020 SALZEDO STREET, SUITE 200 CORAL GABLES, FL 33134 US FILED Apr 11, 2017 Secretary of State CC9582731197 Certificate of Status Desired: No The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Authorized Person(s) Detail Title PRESIDENT Name CARR,JAMES Address 2020 SALZEDO STREET, SUITE 200 City -State -Zip: CORAL GABLES FL 33134 Title VP, TREASURER, ASST. SECRETARY Name EISENACHER, HAROLD Address 2020 SALZEDO STREET, SUITE 200 City -State -Zip: CORAL GABLES FL 33134 Date Title VP Name IBARRIA, DIANA Address 2020 SALZEDO STREET, SUITE 200 City -State -Zip: CORAL GABLES FL 33134 Title VP, SECRETARY, ASST. TREASURER Name MIYARES, ANDRES Address 2020 SALZEDO STREET, SUITE 200 City -State -Zip: CORAL GABLES FL 33134 I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath, that I am a managing member or manager of the limited liability company or the receiver or trustee empowered to execute this report as required by Chapter 605, Florida Statutes, and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: HAROLD EISENACHER VP 04/11/2017 Electronic Signature of Signing Authorized Person(s) Detail Date Packet Pg. 727 16.A.6. b PERFORMANCE BOND No. 106506927 KNOW ALL PERSONS BY THESE PRESENTS: that CCC Fronterra, LLC 135 San Lorenzo Avenue, Suite 750 Coral Gables, Florida 33146 (hereinafter referred to as "Owner") and Travelers Casualty and Surety Company of America One Tower Square, 3B Hartford, CT 06813 (800)873-1477 (hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter referred to as "County") in the total aggregate sum of Two million seven hundred seventy thousand five hundred fiftv-five and 23 cents Dollars ($2,770,555.23) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context requires. THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by c the Board a certain subdivision plat named Fronterra Phase 1 and that certain subdivision shall include specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed c and shall continue until the date of final acceptance by the Board of County Commissioners of the specific improvements described in the Land Development Regulations (hereinafter the "Guaranty Period") NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in accordance with the Land Development Regulations during the guaranty period established by the County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save harmless the County from and against all costs and damages which it may suffer by reason of Owner's failure to do so, and shall reimburse and repay the County all outlay and expense which the County may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no change, extension of time, alteration, addition or deletion to the proposed specific improvements shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, addition or deletion to the proposed specific improvements. PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner and the Surety to the full and faithful performance in accordance with the Land Development Regulations. The term "Amendment," wherever used in this Bond, and whether referring to this Bond, or other documents shall include any alteration, addition or modification of any character whatsoever. IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed this 1711 day of August, 2017. Packet Pg. 728 7SES : Printed Name �I �J Vj f `',/, Printed Name Alli'64S f ei�rz WITNESSES: Printed Name=--r^'uali E (4s�ltl. 1111i,C,,y , Printed Name 0'iA CCC Fronterra, LLC By:A,—LA AY�6 — �z Printed Name/Title (Provide Proper Evidence of Authority) BC Naples Investment, LLP By: Barron Management, LLC By: ✓Jll' —^"-- Brian Goguen, iefOperating Officer Printed Name/Title (Provide Proper Evidence of Authority) ACKNOWLEDGEMENT STATE OF IF L COUNTY OF INA Q nj THE FOREGOING PERFORMANCE BgND WAS ACKNOWLEDGED BEEWE ME THIS (i41bAY OF AUGUST 2017, BY f-_tOe, �Y AS �V OF CCC FRONTERRA, LLC WHO IS PERSONALLY KNOWN l O ME, OR HAS PRODUCED AS IDENTIFICATION - Public - State of Florida LISSETTEVIERA (SEAL) �((�SL, ti•.... s „ MY COMMISSION # GG 072508 �tSJV�G =yam, pg= EXPIRES: June 12 2021 Printed Name .E°d: `.`•'• Banded Thru No1My Pubic Undewrilers11 N 0 Packet Pg. 729 16.A.6. b WITNESSES: Printed Name Printed Name WITNESSES: Printed Name Cata f- OXS%LL t Printed Name Mkkc,�7.�'� fin. STATE OF _ COUNTY OF THE FOREGOING AUGUST FRONTERRA, L IDENTIFICATION. CCC Fronterra, LLC By:_ Printed Name/Title {,Provide Proper Evidence of Authority) BC Naples Investment, LLP By: Barron Collier Management, LLC By: ✓V-- Brian Goguen, C�iefOperating Officer Printed Name/Title (Provide Proper Evidence of Authority) ACKNOWLEDGEMENT PEbfFORMANCE BOND WAS ACKNOWLEDGED 2017, BY AS WHO IS PERSONALLY KNOWN TO ME, OR - Notary Puj2ric - State of Florida Printed Name BEF¢RE ME THIS I`��AY OF OF CCC PRODUCED AS (SEAL) Packet Pg. 730 16.A.6. b STATE OF FLORIDA COUNTY OF COLLIER THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS ! 7I AY OF ,tune kii64— 2017, BY Brian Goquen AS Chief Operating Officer OF BC Naples Investment LLP WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS IDENTIFICATION. Notary Public - State of Florida Printed Name 44 -VIII-N , l/�U,Spr, WIT ESSES: Robin Griffin i yam' v` 0 Lorraine Jones -Murray STATE OF Florida COUNTY OF Collier �" •'i •. KIM D. DAVIDSON MY COMMISSION # FF 070690 SEAL) a EXPIRES: February 19, 2018 Bonded Thru Notary Public Underwriters Trav rs Casualty and Surety Company of America F By: I 4 (/i Charity A. Moser, Attorney -In -Fact ACKNOWLEDGEMENT THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 171t DAY OF _August 2017, BY _Charity A. Moser AS Attorney -In -Fact OF _Travelers Casualty and Surety Company of America WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS 41DENTIATION. is - State Flor (SEAL) je Printed Name r"+kg UWANA.BODOR .: MY COMMISSION # FF 941634 'a= EXPIRES: April 6, 202o Bond* Thru Notary Public Underwriters N O N Packet Pg. 731 16.A.6. b WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT' HE RED rORDER POWER OF ATTORNEY TRAVELERSFarmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 229466 Certificate No, 0 0 7 ®®,") 3 3 1 KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Huntley A. Hornbeck II, Kristin M. Neiert, Marc E. Williams, Stephen J. Benza, Charity A. Moser, and Dawn Y. Colecchio of the City of Naples , State of Florida , their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this day of October 2016 5th T_ Farmington Casualty Company St. Paul Mercury Insurance Company tV Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company N Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company N St. Paul Guardian Insurance Company G�SUq�y TM� yY FIFE 6-4 Ok�K.�KSG �.•Pt' � gU 9.k JP�1Y AHO �A06Why rG�ii1.� n' : O � •b P f�,p•FONAj i Q ' ° � y � ° 1977 r+cronooa4tto �, _ �, t•:,ml jW;�t'eoanr�';�: � ttwrro z HOC y 19J�t �.SEALiof�`:.SSAL'a`° 1896 ry • *�' J � S�Rnnct� v.........y:+air o..... -d 'r gar Fill State of Connecticut City of Hartford ss. By: cf Robert L. Raney, Senior Vice President On this the 5th day of October 2016 , before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such. being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. i G.Tt'T In Witness Whereof, I hereunto set my hand and official seal. %UP(i�iV V My Commission expires the 30th day of June, 2021. 91%G * Marie C. Tetreault, Notary Public 58440-5-16 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RE �: . _- _. -_.:._ .,..._�. - Packet Pg. 732 16.A.6. b WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and b" - the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company. Fidelity 4 and Guaranty Insurance Company, Fidelity a id Guaranty Insurance underwriters, Inc.. St. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance j Company. St. Paul Mercury Insurance Comp my, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and united States Fidelity and Guaranty Company, which resolu'ion; are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the Presidc;tt, any Vice Chairman, any Executive Vice President. any Senior Vice President. any Vice President, any Second Vice President. the Treasurer. any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointer such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances. contra, is of indemnity, and other writings obligatory in the nature of a bond. recognizance, or conditional undertaking, and any of said officers or the Board of Directors at Lxy time may remove any such appointee and revoke the power given him or her: and it is FURTHER RESOLVED, that the Chairma i the President, any Vice Chairman, any Executive Vice President, anv Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, prodded that each such delegation is in writing acid a copy thereof is filed in the office of the Secretary: and it is FURTHER RESOLVED, that any bond, recognizance. contract of indemnity, or writing obligatory in the nature of a bond, recognizance. or conditional undertaking shall be valid and binding upon the Company .hen (a) signed by the President. any Vice Chairman. any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President. the Tre isurer, any Assistant Treasurer. the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant �e_retary: or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their Lertificates of authority or by one or more Company officers pursuant to a written delegation of authority: and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, t ny Assistant Secretary, and the seal of the Company may he affixed by facsimile to any Power of Attorney or to ally certificate relating thereto appointing Resideu Vice Presidents. Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligator; in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Compam- and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. 1, Kevin E. Hughes. the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine it surance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Aw rney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have here.utto set my hand and affixed the seals of said Companies this I I day of � , ,p' - Kevin E. Hughes. Assistant Sec tart' �GASUq� b < yF\RE 6 ; Q�t`M.. :M'rG9 Jp��.Aaµ. �Jp�Tv gryQS �swn`G, F�rgM V TED - Z j tJa P�p��F'�m � Q�: �ORP O k4/,.yni 1' "Osae.4S8AL,'D �.. "w„^m:,w. IS . A� �4��"'. ' 1�' ' 61 F�+ f ' � "'• Attt`. To verify the authenticity of this Power of Attorney, call 1-800 421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number. the above -named individuals and the details of ta( bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE 90RDF' Packet Pg. 733 16.A.6. b f � � � � � � � � � Project: Fronterra PPL - PH 1 r Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) ENGINEERING *` Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 PHASE 1 CONTINGENCY Calculation Summary SUB -TOTAL PERCENT DOLLAR TOTAL EARTHWORK $ 893,148.10 5% $ 44,657.41 $ 937,805.51 PAVING $ 331,817.70 5% $ 16,590.89 $ 348,408.59 DRAINAGE $ 345,972.00 5% $ 17,298.60 $ 363,270.60 POTABLE WATER $ 183, 375.80 5% $ 9,168.79 $ 192, 544.59 � SANITARY SEWER $ 436,435.50 5% $ 21,821.78 $ 458,257.28 d IRRIGATION $ 111,000.00 5% $ 5,550.00 $ 116,550.00 LIGHTING $ 50,000.00 5% $ 2,500.00 $ 52,500.00 LANDSCAPING $ 47,000.00 5% $ 2,350.00 $ 49,350.00 0 L Total Probable Construction Cost: $ 2,398,749.10 5% $ 119,937.46 $ 2,518,686.57 w c to Paving, Drainage and Site a THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND m SEALED BY DAVID J HURST, P.E. ON 03/27/17 USING A 100% Construction Cost: $ 1,857,884.70 SHA-1 AUTHENTICATION CODE. Q PRINTED COPIES OF THIS DOCUMENT ARE NOT Water and Sewer CONSIDERED SIGNED AND SEALED AND THE SHA-1 100°� Construction Cost: $ 650,801.87 IL AUTHENTICATION CODE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. j Estimated 110% Bond Amount $ 2,770,555.23 N NOTES: to 1) This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only. rn tc m 2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to C O delete, decrease, or increase portions of this Opinion of Probable Cost. m 3) All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time r C d due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. v R 41 This cost estimate does not include the cost of any building construction. David Digitally signed by Q 51 This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no -cost to the developer. David J. Hurst, P. E. J. DN: cn=David J. Hurst, F 6) Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section. H u rst p E„o=Peninsula Engineering, ou, email=Dhurst@barronc 7) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit. Ilier.com, c=US E. Date: 2017.03.27 14:48:43-04'00' David J. Hurst, P.E. FL Registration #60727 Peninsula Engineering Certificate of Authorization #28275 P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_PdroiigOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1 Rev Packet Pg. 734 16.A.6. b C.rof [Ter C;omvay OW Growth Management Division Development Review September 21, 2018 David Hurst, PE Peninsula Engineering 2600 Golden Gate Parkway Naples, FL 34105 RE: Performance Bond No. 106506987 Fronterra Phase 1— PL20150001982 Dear Mr. Hurst: Please be advised that based on the work completed to date, the subject Performance Bond may be reduced by $2,413,592.82 for Fronterra Phase 1, leaving an available security of $356,962.41. The remaining security represents the 110% of the remaining site infrastructure. An original Bond Rider should be directed to this office, reducing the value of the Bond, "all other terms and conditions of the original Performance Bond to remain in full o force and effect'. N If I can be of any further assistance to you in this regard, please let me know. Sincerely, Matt McLean, P.E. Director, Development Review/Growth Management Collier County, FL. Growth Management Division/Development Review • 2800 North Horseshoe Drive • Naples, FL 34104 • 239-252-2400 Packet Pg. 735 16.A.6.b Adw TRAVELERS RIDER To be attached to and form part of Bond No. 106506927 Travelers Casualty and Surety Company of America License No. N/A Issued on behalf of CCC Fronterra, LLC as Principal, and in favor of Collier County, Board of Collier County Commissioners as Obligee. It is agreed that: ❑ 1. The Surety hereby gives its consent to change the Name: fA from: s a to: L L d ❑ 2. The Surety hereby gives its consent to change the Address: c L from: m to: � a ❑X 3. The Surety hereby gives its consent to change the Change the Bond amount from: Two million seven hundred seventy thousand five hundred fifty five dollars and 23/100 ($2,770,555.23) to: Three hundred fifty six thousand nine hundred sixty two dollars and 41/100-- ($356 962 41) E IL This rider shall become effective as of September 21, 2018 v 0 N PROVIDED, however, that the liability of the Surety under the attached bond as changed by this rider shall not be cumulative. Signed, sealed and dated September 24, 2018 Accepted: Collier County, Board of Collier CounhI Commissioners Obligee I0 S-4111 (8/66) T4Velers Casualtv and Surety Company of Americ-. 1 By: drity A. Mosey Attorney -in -Fact Or CC Ave Maria, LLC Princi al By: trio.,n Gppueti Vic.a. Packet Pg. 736 16.A.6.b Project: Task: Prepared By: Checked By: Fronterra Phase 1 Bond Reduction Calculation Worksheet Date: Date: Calculate the amount of allowable bond reduction (and amount of bond to remain) based on current level of completion of the required subdivision and utility improvements. 1) Phase 1 subdivition improvements are completed, and Preliminary Acceptance granted. 2) Per the approved PPL, required street trees and sidewalks are being constructed by the homebuilder, on a lot -by -lot basis. Therefore the 100% bond amount will be left in -place for street trees and sidewalks, until that work is completed. Calculations: Original Bond Summary Engineer's OPC Amount - 100% Construction Bond: $ 2,518,686.57 En ineer's OPC Amount - 10% Maintenance Bond: $ 251,868.66 Tota Bon Amount: 2,770,555.23 100% Construction Bond Completed Amount/Bond Reduction Evaluation Construction Item Bond Amount Completed Amount Reduced Bond Amount Earthwork 937,805.51 937,805.51 5 - Paving $ 348,408.59 $ 243,314.84 $ 105,093.75 Drainage $ 363,270.60 $ 363,270.60 $ - Potable Water $ 192,544.59 $ 192,544.59 $ Sanitary Sewer $ 458,257.28 $ 458,257.28 $ Irrigation $ 116,550.00 $ 116,550.00 $ Lighting $ 52,500.00 $ 52,500.00 $ Landscape $ 49,350.00 $ 49,350.00 $ ota s 2,51 ,686. 7 2,413,59 .82 Summary Original 100% Bond Amount $ 2,518,686.57 Reduction Amount $ 2,413,592.82 100% Construction Bond Amount Remaining 10 ,093.7 10%Maintenance Bond Original Bond Amount $ 251,868.66 Reduction Amount $ - 10% Maintenance Bond Amount Remaining $ 251,868.66 Total Bond Summary Original Total Bond Amount $ 2,770,555.23 Reduction Amount $ 2,413,592.82 New Total Bond Amount Remaining $ 356,962.41 Digitally signed by David J. Hurst, P.E. 60727 State of Florida David J DN: cn=David J. Hurst, P.E. 60727 . State of Florida, o=Printed copies of the document are not D considered signed and sealed and P.E. Hurst, I . C, all SHA-1 authentication code must be verified on any electronic State coptu=Theitem has been 60727 electronironically signed and sealed using a 1HA-1 authentication `mail of Florida email=d h u rst@ba rroncol lier.com, c=uS Date: 2018.09.13 15:37:51-04'00' Packet Pg. 737 16.A.6.b Project: PEN IN S U L A Task: ENGINEERING` Prepared Checked By: PHASE 1 Fronterra PPL - PH Engineer's OPC for Subdivision Fee Calculation (Rev02) LMB Date: 3/23/2017 DJH Date: 3/23/2017 CONTINGENCY Calculation Summary SUB -TOTAL PERCENT DOLLAR TOTAL EARTHWORK $ 893,148.10 5% $ 44,657.41 $ 937,805.51 PAVING $ 331,817.70 5% $ 16,590.89 $ 348,408.59 DRAINAGE $ 345,972.00 5% $ 17,298.60 $ 363,270.60 POTABLE WATER $ 183,375.80 5% $ 9,168.79 $ 192,544.59 SANITARY SEWER $ 436,435.50 5% $ 21,821.78 $ 458,257.28 IRRIGATION $ 111,000.00 5% $ 5,550.00 $ 116,550.00 a LIGHTING $ 50,000.00 5% $ 2,500.00 $ 52,500.00 LANDSCAPING $ 47,000.00 5% $ 2,350.00 $ 49,350.00 Total Probable Construction Cost: $ 2,398,749.10 5% $ 119,937.46 $ 2,518,686.57 0 LL Paving, Drainage and Site d c THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND Construction Cost: $ 1,867,884.70CL SEALED BY DAVID J HURST, P.E. ON 03/27/17 USING A 100% SHA-1 AUTHENTICATION CODE. PRINTED COPIES OF THIS DOCUMENT ARE NOT Water and Sewer Q CONSIDERED SIGNED AND SEALED AND THE SHA-1 100% Construction Cost: $ 650,801.87 m AUTHENTICATION CODE MUST BE VERIFIED ON ANY IL ELECTRONIC COPIES. Estimated 110% Bond Amount $ 2,770,555.23 0 NOTES: 1) This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only. N .y cC 2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in m effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to M delete, decrease, or increase portions of this Opinion of Probable Cost. m0 3) All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. E t 4) This cost estimate does not include the cost of any building construction. Digitally signed by David J. David J. Hurst, P. E. 5) This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no -cost to the developer. DN: cn=David J. Hurst, E., o=Peninsula 6) Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section. Hu1r S l} P. Engineering, � email=Dhurst@barron( 7) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit. r Ilier.com, c=US E. Date: 2017.03.27 14:48:43-04'00' David J. Hurst, P.E. FL Registration #60727 Peninsula Engineering Certificate of Authorization #28275 P:\Active_Projects\P-BCN 1-002\002_EastGateway_PPL\Design_P6roii80PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02.xlsx Packet Pg. 738 16.A.6.b Project: Fronterra PPL - PH1 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 EARTHWORK ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 SILT FENCE 8,948 LF $ 2.00 $ 17,896.00 EW-2 LAKE EXCAVATION NOT INCLUDED FOR FEE CALC. 68,521 CY $ - $ - EW-3 EMBANKMENT - ON SITE 68,521 CY $ 1.10 $ 75,373.10 EW-4 EMBANKMENT - IMPORT FILL 65,984 CY $ 11.00 $ 725,824.00 EW-5 CLEARING 21.50 AC $ 3,000.00 $ 64,500.00 EW-6 PRESERVE EXOTIC REMOVAL 6.37 AC $ 1,500.00 $ 9,555.00 $ $ SUB -TOTAL EARTHWORK= $ 893,148.10 5%CONTINGENCY= $ 44,657.41 TOTAL EARTHWORK= $ 937,805.51 P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Pgrg$t OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx Packet Pg. 739 16.A.6. b Project: Fronterra PPL - PH1 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 PAVING ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III FIRST LIFT 8,182 SY $ 4.95 $ 40,500.90 PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III SECOND LIF 8,182 SY $ 4.95 $ 40,500.90 PAV-3 8" LIMEROCK BASE 9,721 SY $ 6.50 $ 63,186.50 PAV-4 12" STABILIZED SUBGRADE 10,191 SY $ 1.55 $ 15,796.05 PAV-4 IBRICK PAVERS 81 SY $ 9.00 $ 729.00 PAV-5 2' VALLEY GUTTER 4,838 LF $ 7.95 $ 38,462.10 PAV-6 TYPE "F" CURB 606 LF $ 12.50 $ 7,575.00 PAV-7 TYPE "D" CURB 148 LF $ 9.00 $ 1,332.00 PAV-8 TYPE "A" CURB 317 LF $ 13.00 $ 4,121.00 PAV-9 3' VALLEY GUTTER CROSSING 209 LF $ 19.50 $ 4,075.50 PAV-10 ADA CURB RAMP 6 EA $ 300.00 $ 1,800.00 PAV-11 CONCRETE SIDEWALK 28,025 SF $ 3.75 $ 105,093.75 PAV-12 STABILIZED LIMEROCK TURNAROUND 2 EA $ 1,500.00 $ 3,000.00 PAV-13 BLUE -BLUE REFLECTORS 101 EA $ 15.00 $ 150.00 PAV-14 WHEEL STOP 91 EA $ 55.00 $ 495.00 PAV-15 SIGNING AND STRIPING 1 LS $ 5,000.00 $ 5,000.00 Note: Offsite turn -lane improvement costs are not included within this cost estimate, as those improvements are reviewed and inspected by FDOT. 1) Includes littorals and preserve signs SUB -TOTAL PAVING = 331817.7 5% CONTINGENCY = 16590.885 TOTAL PAVING = 348408.585 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Desig n_Pqrojt4p PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev Packet Pg. 7470 16.A.6.b Project: Fronterra PPL - PH1 Task: Engineer's OPC for Subdivision Fee Calculation (Rev( Prepared B� LMB Date: 3/23/2017 Checked By DJH Date: 3/23/2017 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 8" PVC SECONDARY DRAINAGE LINES 919 LF $ 15.50 $ 14,244.5( DRA-2 10" PVC SECONDARY DRAINAGE LINES 1,150 LF $ 19.00 $ 21,850.0( DRA-3 12" PVC STORM PIPE 42 LF $ 20.00 $ 840.0( DRA-4 15" RCP STORM SEWER 1,055 LF $ 22.20 $ 23,421.0( DRA-5 18" RCP STORM SEWER 361 LF $ 25.80 $ 9,313.8( DRA-6 24" RCP STORM SEWER 353 LF $ 38.10 $ 13,449.3( DRA-7 30" RCP STORM SEWER 479 LF $ 55.10 $ 26,392.9( DRA-8 60" RCP STORM SEWER 307 LF $ 200.00 $ 61,400.0( DRA-9 YARD DRAIN 52 EA $ 1,030.00 $ 53,560.0( DRA-10 DITCH BOTTOM INLET (TYPE D) 5 EA $ 2,750.00 $ 13,750.0( DRA-11 CURB INLET 2 EA $ 2,934.00 $ 5,868.0( DRA-12 VALLEY GUTTER INLET (DOUBLE) 131 EA $ 3,546.00 $ 46,098.0( DRA-13 JUNCTION BOX 4 EA $ 2,330.00 $ 9,320.0( DRA-14 JUNCTION BOX (FOR 60" RCP) 3 EA $ 7,500.00 $ 22,500.0( DRA-15 TYPE "H" DITCH BOTTOM INLET (FOR 60" RCP) 1 EA $ 4,000.00 $ 4,000.0( DRA-16 ICONTROLSTRUCTURE 1 EA $ 4,000.00 $ 4,000.0( DRA-17 CONTROL STRUCTURE (TYPE H DITCH BOTTOM INLET) 1 EA $ 4,000.00 $ 4,000.0( DRA-18 18" FLARED END 1 EA $ 2,400.00 $ 2,400.0( DRA-19 24" FLARED END 2 EA $ 2,500.00 $ 5,000.0( DRA 20 REMOVE EX. CONTROL STRUCTURE (AND RESTORE WITH DITCH BOTTOM INLET) 1 LS $ 4,200.00 $ 4,200.01 DRA-21 RIP -RAP 162 SY $ 2.25 $ 364.5( SUB -TOTAL DRAINAGE = $ 5% CONTINGENCY = $ TOTAL DRAINAGE = $ 345, 972.0 17,298.6 363,270.6 m m t a w c O L LL m U c Q. m U U Q c ii N v 0 N y y m m c O m c a� E t U fC Q P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra- FeeCalc_Ph1_Rev02.xlsx 4 of 9 Packet Pg. 741 16.A.6.b Project: Fronterra PPL - PH Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE WAT-1 4" GATE VALVE 1 EA $ 950.00 $ 950.00 WAT-2 4" PVC WATER SERVICE C900, DR-14 55 LF $ 12.00 $ 660.00 WAT-3 6" PVC WATER MAIN C900, DR-14 271 LF $ 15.00 $ 4,065.00 WAT-4 6" PVC WATER MAIN C900, DR-1 8) 503 LF $ 13.00 $ 6,539.00 WAT-5 6" GATE VALVE 3 EA $ 1,000.00 $ 3,000.00 WAT-6 8" PVC WATER MAIN C900, DR-14 304 LF $ 18.00 $ 5,472.00 WAT-7 8" PVC WATER MAIN C900, DR-1 8) 1,936 LF $ 15.80 $ 30,588.80 WAT-8 8" GATE VALVE 10 EA $ 1,286.00 $ 12,860.00 WAT-9 DIRECTIONAL DRILL 6" PVC DR14 WITH CASING 132 LF $ 130.00 $ 17,160.00 WAT-10 FIRE HYDRANT ASSEMBLY COMPLETE' 10 EA $ 3,500.00 $ 35,000.00 WAT-11 1" SINGLE SERVICE SHORT SIDE COMPLETE 6 EA $ 575.00 $ 3,450.00 WAT-12 1" SINGLE SERVICE LONG SIDE COMPLETE 3 EA $ 799.00 $ 2,397.00 WAT-13 1-1/2" DOUBLE SERVICE SHORT SIDE COMPLETE 13 EA $ 969.00 $ 12,597.00 WAT-14 1-1/2" DOUBLE SERVICE LONG SIDE COMPLETE 20 EA $ 1,250.00 $ 25,000.00 WAT-15 AIR RELEASE VALVE 4 EA $ 1,674.00 $ 6,696.00 WAT-16 AUTOMATIC FLUSHING DEVICE 1 EA $ 2,500.00 $ 2,500.00 WAT-17 TEMPORARY BLOW -OFF 4 EA $ 3,000.00 $ 12,000.00 WAT-18 TEMPORARY BACTERIAL SAMPLE POINT 3 EA $ 175.00 $ 525.00 WAT-19 IPERMANENT BACTERIAL SAMPLE POINT 1 EA $ 1,916.00 $ 1,916.00 * Fire Hydrant Assembly (Complete) includes gate valve at hydrant. SUB -TOTAL POTABLE WATER = $ 5%CONTINGENCY= $ TOTAL POTABLE WATER = $ 183,375.80 9,168.79 192,544.59 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PiUot40PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02. xlsx Packet Pg. 742 16.A.6. b Project: Fronterra PPL - PH1 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 SANITARY SEWER ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE SAN-2 8" PVC GRAVITY SEWER MAIN 6'-8' CUT 370 LF $ 35.00 $ 12,950.00 SAN-3 8" PVC GRAVITY SEWER MAIN 8'-10' CUT 503 LF $ 40.00 $ 20,120.00 SAN-4 8" PVC GRAVITY SEWER MAIN 10'-12' CUT 459 LF $ 45.00 $ 20,655.00 SAN-5 8" PVC GRAVITY SEWER MAIN 12'-14' CUT 917 LF $ 50.00 $ 45,850.00 SAN-6 8" PVC GRAVITY SEWER MAIN 14'-16' CUT 123 LF $ 83.00 $ 10,209.00 SAN-7 4' SANITARY SEWER MANHOLE 0'-8' CUT 1 EA $ 4,300.00 $ 4,300.00 SAN-8 4' SANITARY SEWER MANHOLE 8'-10' CUT 1 EA $ 5,500.00 $ 5.500.00 SAN-9 4' SANITARY SEWER MANHOLE 10'-12' CUT 2 EA $ 7,050.00 $ 14,100.00 SAN-10 4' SANITARY SEWER MANHOLE 12'-14' CUT 4 EA $ 9,000.00 $ 36,000.00 SAN-11 4' SANITARY SEWER MANHOLE 14'-16' CUT 2 EA $ 11,110.00 $ 22,220.00 SAN-12 6" SERVICE LATERAL SINGLE 13 EA $ 824.00 $ 10,712.00 SAN-13 6" SERVICE LATERAL DOUBLE 31 EA $ 908.00 $ 28,148.00 SAN-14 TELEVISION INSPECTION 2,372 LF $ 2.50 $ 5,930.00 SAN-15 4" PVC FORCE MAIN C900 DR14 63 LF $ 22.50 $ 1,417.50 SAN-16 4" PVC FORCE MAIN C900-DR18 787 LF $ 15.00 $ 11,805.00 SAN-17 4" PLUG VALVE 1 EA $ 838.00 $ 838.00 SAN-18 AIR RELEASE VALVE 3 EA $ 2,727.00 $ 8,181.00 SAN-19 CONNECT TO EXISTING FORCE MAIN 1 EA $ 1,000.00 $ 1,000.00 SAN-20 TESTING 1 LS $ 1,500.00 $ 1,500.00 SAN-21 JPUMP STATION 1 EA $ 175,000.00 $ 175,000.00 SUB -TOTAL SANITARY SEWER = $ 5% CONTINGENCY = $ TOTAL SANITARYSEWER = $ 436,435.50 21,821.78 458,257.28 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P@yByttOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02.xlsx Packet Pg. 743 16.A.6. b Project: Fronterra PPL - PH1 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 IRRIGATION ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE IRR-1 IRRIGATION WELL & PUMP ALLOWANCE 1 EA $ 63,000.00 $ 63,000.00 IRR-2 IRRIGATION PRIMARY ALLOWANCE 1 EA $ 30,000.00 $ 30,000.00 IRR-3 IRRIGATION SECONDARY ALLOWANCE 1 EA $ 18,000.00 $ 18,000.00 5 - SUB -TOTAL IRRIGATION $ 111,000.00 5%CONTINGENCY= $ 5,550.00 TOTAL IRRIGATION= $ 116,550.00 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P®rW$t§OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev02.xlsx Packet Pg. 744 16.A.6. b Project: Fronterra PPL - PH1 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 LIGHTING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE ILL-1 SITE LIGHTING ALLOWANCE 1 LS $ 50,000.00 $ 50,000.00 SUB -TOTAL LIGHTING = $ 50,000.00 5%CONTINGENCY= $ 2,500.00 TOTAL LIGHTING= $ 52,500.00 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P(got�OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1 _Rev Packet Pg. 745 16.A.6. b Project: Task: Prepared By: Checked By: LANDSCAPING Fronterra PPL - PH Engineer's OPC for Subdivision Fee Calculation (Rev02) LIMB Date: 3/23/2017 DJH Date: 3/23/2017 ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE LA-1 LANDSCAPING ALLOWANCE 1 LS $ 47,000.00 $ 47,000.00 $ $ SUB-TOTALLANDSCAPING= $ 47,000.00 5%CONTINGENCY= $ 2,350.00 TOTAL LANDSCAPING = $ 49,350.00 N O N P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_P@Trdyt�OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph 1_Rev02.xlsx Packet Pg. 746 16.A.6. b P E N I N S U L A Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) ENGINEERING �+ Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 PHASE 2 CONTINGENCY Calculation Summary SUB -TOTAL PERCENT DOLLAR TOTAL EARTHWORK $ 1,022,009.00 5% $ 51,100.45 $ 1,073,109.45 PAVING $ 174,076.70 5% $ 8,703.84 $ 182,780.54 DRAINAGE $ 131,412.30 5% $ 6,570.62 $ 137,982.92 POTABLE WATER $ 92,967.00 5% $ 4,648.35 $ 97,615.35 SANITARY SEWER $ 161,867.50 5% $ 8,093.38 $ 169,960.88 IRRIGATION $ 48,000.00 5% $ 2,400.00 $ 50,400.00 a LIGHTING $ 50,000.00 5% $ 2,500.00 $ 52,500.00 L LANDSCAPING $ 20,500.00 5% $ 1,025.00 $ 21,525.00 Total Probable Construction Cost: $ 1,700,832.50 5% $ 85,041.63 $ 1,785,874.14 Paving, Drainage and Site d c THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND to SEALED BY DAVID J HURST, P.E. ON 03/27/17 100% Construction Cost: $ 1,518,297.91 a USING A SHA-1 AUTHENTICATION CODE. d v PRINTED COPIES OF THIS DOCUMENT ARE NOT Water and Sewer Q CONSIDERED SIGNED AND SEALED AND THE SHA-1 100% Construction Cost: $ 267,576.23 = AUTHENTICATION CODE MUST BE VERIFIED ON li ANY ELECTRONIC COPIES Estimated 110% Bond Amount $ 1,964,461.55 C NOTES: 0 N 1) This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only. N (n O 2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in ib effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to = delete, decrease, or increase portions of this Opinion of Probable Cost. O M 3) All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time = due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. d E s 4) This cost estimate does not include the cost of any building construction. O r Q 5) This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no -cost to the developer. 6) Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section. 7) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit. David J. Hurst, P.E. FL Registration H60727 Peninsula Engineering Certificate of Authorization #28275 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PdrofigOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx Packet Pg. 747 16.A.6.b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 EARTHWORK ID DESCRIPTION OTY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 CLEARING 9.50 AC $ 3,000.00 $ 28,500.00 EW-2 EMBANKMENT - IMPORT FILL 90,319 CY $ 11.00 $ 993,509.00 EW-3 SILT FENCE ACCOUNTED FOR IN PHASE 1 0 LF $ 2.00 $ - $ - 5 - SUB-TOTALEARTHWORK= $ 1,022,009.00 5%CONTINGENCY= $ 51,100.45 TOTAL EARTHWORK = $ 1,073,109.45 N It O N P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PgraWPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx Packet Pg. 748 16.A.6.b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 PAVING ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III FIRST LIFT 4,004 SY $ 4.95 $ 19,819.80 PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III SECOND LIFT 4,004 SY $ 4.95 $ 19,819.80 PAV-3 8" LIMEROCK BASE 4,971 SY $ 6.50 $ 32,311.50 PAV-4 12" STABILIZED SUBGRADE 5,164 SY $ 1.55 $ 8,004.20 PAV-5 2' VALLEY GUTTER 3,517 LF $ 7.95 $ 27,960.15 PAV-6 CONCRETE SIDEWALK 17,067 SF $ 3.75 $ 64,001.25 PAV-7 BLUE -BLUE REFLECTORS 4 EA $ 15.00 $ 60.00 PAV-8 SIGNING AND STRIPING 1 LS $ 1,500.00 $ 1,500.00 PAV-9 ADA CURB RAMP 21 EA $ 300.00 $ 600.00 SUB -TOTAL PAVING= $ 174,076.70 5%CONTINGENCY= $ 8,703.84 TOTAL PAVING= $ 182,780.54 P:\Active_Projects\P-BCNI-002\002—EastGateway—PPL\Design_P(Vi5MPCs\2017-03-14-RevO2\Fronterra-FeeCalc Ph2_Revqz,xlsx Packet Pg. 749 16.A.6. b Project: Task: Prepared By Checked By: DRAINAGE Fronterra PPL - PH2 Enqineer's OPC for Subdivision Fee Calculation (Rev02 LIMB DJH Date: 3/23/2017 Date: 3/23/2017 ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 10" PVC SECONDARY DRAINAGE LINES 1,242 LF $ 19.00 $ 23,598.0( DRA-2 15" RCP STORM SEWER 264 LF $ 22.20 $ 5,860.8( DRA-3 24" RCP STORM SEWER 327 LF $ 38.10 $ 12,458.7( DRA-4 30" RCP STORM SEWER 108 LF $ 55.10 $ 5,950.8( DRA-5 36" RCP STORM SEWER 194 LF $ 82.00 $ 15,908.0( DRA-6 YARD DRAIN 32 EA $ 1,030.00 $ 32,960.0( DRA-7 DITCH BOTTOM INLET TYPED 2 EA $ 2,750.00 $ 5,500.0( DRA-8 VALLEY GUTTER INLET (DOUBLE) 6 EA $ 3,546.00 $ 21,276.0( DRA-9 24" FLARED END 2 EA $ 2,500.00 $ 5,000.0( DRA-10 36" FLARED END 1 EA $ 2,900.00 $ 2,900.0( SUB -TOTAL DRAINAGE = $ 5%CONTINGENCY= $ TOTAL DRAINAGE = $ 131, 412.31 6, 570. 6, 137, 982.9, T a� ca m a cU L L c 0 L LL d c is w a a) V V a CU LL N O N P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_Perm it\OPCs\2017-03-14-Rev02\Fronterra- FeeCaic_Ph2_Rev02.xlsx 4 of 9 Packet Pg. 750 16.A.6. b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE WAT-1 6" PVC WATER MAIN (C900, DR-18) 1,602 LF $ 13.00 $ 20,826.00 WAT-2 6" GATE VALVE 5 EA $ 1,000.00 $ 5,000.00 WAT-3 8" PVC WATER MAIN (C900, DR-14) 54 LF $ 18.00 $ 972.00 WAT-4 8" PVC WATER MAIN (C900, DR-18) 230 LF $ 15.80 $ 3,634.00 WAT-5 8" GATE VALVE 1 EA $ 1,286.00 $ 1,286.00 WAT-6 FIRE HYDRANT ASSEMBLY (COMPLETE)* 4 EA $ 3,500.00 $ 14,000.00 WAT-7 1" SINGLE SERVICE (SHORT SIDE) (COMPLETE) 7 EA $ 575.00 $ 4,025.00 WAT-8 1" SINGLE SERVICE (LONG SIDE) (COMPLETE) 2 EA $ 799.00 $ 1,598.00 WAT-9 1-1/2" DOUBLE SERVICE (SHORT SIDE) (COMPLETE) 15 EA $ 969.00 $ 14,535.00 1-1/2" DOUBLE SERVICE (LONG SIDE) (COMPLETE) 20 EA $ 1,250.00 $ 25,000.00 LWAT-0 1 TEMPORARY BACTERIAL SAMPLE POINT 1 EA $ 175.00 $ 175.00 2 PERMANENT BACTERIAL SAMPLE POINT 1 EA $ 1,916.00 $ 1,916.00 * Fire Hydrant Assembly (Complete) includes gate valve at hydrant. SUB -TOTAL POTABLE WATER = $ 5%CONTINGENCY= $ TOTAL POTABLE WATER = $ 92, 967.00 4,648.35 97, 615.35 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P fUByttOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02. xlsx Packet Pg. 751 16.A.6. b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 SANITARY SEWER ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE SAN-1 8" PVC GRAVITY SEWER MAIN 6'-8' CUT 313 LF $ 35.00 $ 10,955.00 SAN-2 8" PVC GRAVITY SEWER MAIN 8'-10' CUT 680 LF $ 40.00 $ 27,200.00 SAN-3 8" PVC GRAVITY SEWER MAIN 10'-12' CUT 313 LF $ 45.00 $ 14,085.00 SAN-4 8" PVC GRAVITY SEWER MAIN 12'-14' CUT 353 LF $ 50.00 $ 17,650.00 SAN-5 4' SANITARY SEWER MANHOLE 8'-10' CUT 4 EA $ 5,500.00 $ 22,000.00 SAN-6 4' SANITARY SEWER MANHOLE 10'-12' CUT 1 EA $ 7,050.00 $ 7,050.00 SAN-7 4' SANITARY SEWER MANHOLE 12'-14' CUT 2 EA $ 9,000.00 $ 18,000.00 SAN-8 6" SERVICE LATERAL SINGLE 8 EA $ 824.00 $ 6,592.00 SAN-9 6" SERVICE LATERAL DOUBLE 36 EA $ 908.00 $ 32,688.00 SAN-10 TELEVISION INSPECTION 1,659 LF $ 2.50 1 $ 4,147.50 SAN-11 TESTING 1 LS $ 1,500.00 $ 1,500.00 SUB -TOTAL SANITARY SEWER = $ 161,867.50 5%CONTINGENCY $ 8,093.38 TOTAL SANITARY SEWER = $ 169, 960.88 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PWi5$t§OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx Packet Pg. 752 16.A.6.b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 IRRIGATION ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE IRR-1 IRRIGATION PRIMARY ALLOWANCE 1 EA $ 30,000.00 $ 30,000.00 IRR-2 IRRIGATION SECONDARY ALLOWANCE 1 EA $ 18,000.00 $ 18,000.00 5 - 5%CONTINGENCY= $ TOTAL IRRIGATION = $ 48, 000.00 2,400.00 50,400.00 N O N P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PgrijVPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Re Packet Pg. 753 16.A.6. b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02 Prepared By: LIMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 LIGHTING ID DESCRIPTION OTY UNIT TYPE UNIT PRICE TOTAL PRICE LL-1 SITE LIGHTING ALLOWANCE 1 LS $ 50,000.00 $ 50,000.00 S $ $ SUB -TOTAL LIGHTING = $ 50,000.00 5%CONTINGENCY= $ Z,500.00 TOTAL LIGHTING = $ 52,500.00 P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_Peot�DPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx Packet Pg. 754 16.A.6. b Project: Fronterra PPL - PH2 Task: Engineer's OPC for Subdivision Fee Calculation (Rev02) Prepared By: LMB Date: 3/23/2017 Checked By: DJH Date: 3/23/2017 LANDSCAPING ID DESCRIPTION CITY UNIT TYPE UNIT PRICE TOTAL PRICE LA-1 LANDSCAPING ALLOWANCE 1 LS $ 20,500.00 $ 20,500.00 SUB -TOTAL LANDSCAPING = $ 20,500.00 S%CONTINGENCY= $ 1,025.00 TOTAL LANDSCAPING= $ 21,525.00 N O N P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_P(gMVPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Re I Packet Pg. 755 16.A.6. b PERFORMANCE BOND No.106506927 KNOW ALL PERSONS BY THESE PRESENTS: that CCC Fronterra, LLC 135 San Lorenzo Avenue, Suite 750 Coral Gables, Florida 33146 (hereinafter referred to as "Owner") and Travelers Casualty and Surety Company of America One Tower Square, 3B Hartford, CT 06813 (800)873-1477 (hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter referred to as "County") in the total aggregate sum of Two million seven hundred seventy thousand five hundred fifty-five and 23 cents Dollars ($2,770 555.23) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context requires. THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by @ the Board a certain subdivision plat named Fronterra Phase 1 and that certain subdivision shall include S specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed N and shall continue until the date of final acceptance by the Board of County Commissioners of the specific c improvements described in the Land Development Regulations (hereinafter the "Guaranty Period") NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in accordance with the Land Development Regulations during the guaranty period established by the County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save harmless the County from and against all costs and damages which it may suffer by reason of Owner's failure to do so, and shall reimburse and repay the County all outlay and expense which the County may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no change, extension of time, alteration, addition or deletion to the proposed specific improvements shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, addition or deletion to the proposed specific improvements. PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner and the Surety to the full and faithful performance in accordance with the Land Development Regulations. The term "Amendment," wherever used in this Bond, and whether referring to this Bond, or other documents shall include any alteration, addition or modification of any character whatsoever. IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed this 17t^ day of August, 2017. Packet Pg. 756 16.A.6. b WITH SES- 17� VAJ,",� Printed IName u) J ff�k Printed dame P II'6AYS k;�C` WIT NESSES: Printed Name t Primed STATE OF r COUNTY OF (\AfQ M CCC Fronterra, LLC By: 0$ ih� Printed Name/'Title (Prov;de Proper Evidence of Authority) BC 'Maples Investment, L LP By: Barron Coliier Management, LLC Brian GoJuen, Chief' Operating Officer Printed flame/Title (Provide Proper Evidence of Authority) AC'K.NM LEDC.rENIF y I rI THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BE E ME THIS I`%�tbAY OF AUGUST , 2017, BY AS OF CCC FRONTERRA. LLC WHO IS PERSONALLY KNOWN TO 1aE. OR HAS PRODUCED AS IDE;IiTiFICATION. Notat9, Public - State of Florida Printed Name L\tSc: ,V i-e-� .M..�.n.M.a.w.rwr.r ... USSETTE VIERA MY COMMISSION # GG 0725W y` EXPIRES: June 12, 2021 Bonded Tbw Notary Pubk Underwriters (SEAL) N 0 N Packet Pg. 757 16.A.6. b WITNESSES: Printed Name Printed Name WITNESSES: Printed Name Cxz-�f- f4 Uku— Printed Name/l;��� J.C•. f�ir�r STATE OF _ COUNTY OF CCC Fronterra, LLC By: Printed Name/Title (Provide Proper Evidence of Authority) BC Naples Investment, LLP By: Barron Collier Management, LLC By:�'✓--- Brian Goguen, 4 ef perating Officer Printed Name/Title (Provide Proper Evidence of Authority) ACKNOWLEDGEMENT THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS (i-146AY OF AUGUST , 2017, BY AS OF CCC FRONTERRA, LLC WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS IDENTIFICATION. Notary Public - State of Florida Printed Name (SEAL) a Packet Pg. 758 16.A.6.b STATE OF FLORIDA COUNTY OF COLLIER THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 7�DAY OF 4ufte Aiy64- , 2017, BY Brian Goguen AS Chief Operating Officer OF BC Naples Investment. LLP WHO IS PERSONALLY KNOWN TO ME. OR HAS PRODUCED AS IDENTIFICATION. Notary Public - State of Florida Printed Name _1<,'l� WIT ESSES: — Robin Griffin '4..,,),') v Lorraine Jones-Murra STATE OF Florida COUNTY OF Collier .......... 'e. W" KIM D. DAVIDSON SEAL MY COMMISSION r FF OM690 ) a EXPIRES February 19, 2018 f„Rf ry°° Banded Thro Notary P.bl c Unc eOw en Trav rs Casualty and.$urety Company of America By: Charity A. Moser, Attorney -In -Fact ACKNOWLEDGEMENT THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 171h DAY OF _August 2017, BY _Charity A. Moser AS Attorney -In -Fact OF _Travelers Casualty and Surety Company of America WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS IDENTI (CATION. No is - State Flo (SEAL) ZrW Printed Name ADWA"h UWAN A BODOR MY COMMISSION Ii FF 941634 EXPIRES: April 6, 2020 "•RI t` Bonded Thru Notary Public Underwriters Packet Pg. 759 WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER POWER OF ATTORNEY TRAVELERS Farmington Casualty Company St. Paul Mercury Insurance Company dj Fidelity and Guaranty Insurance Company 'Il-ayclers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of Americr. i St. Paul Fire and Marine Insurance Company United Stales Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 229466 Certificate No. 007003331 KNOW ALL MEN BY THESE PRESENTS: That Farmington Casually Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company. Travelers Casualty and Surety Company of America. and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Huntley A. Hornbeck II, Kristin M. Neiert, Marc E. Williams, Stephen J. Benza, Charity A. Moser, and Dawn Y. Colecchio of the City of Naples , State of Florida , their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this day of October . 2016 Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company 5th St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company c3 �i n � 9 � aCpiPORiIED _,y` ?fox vo.oic�ms �`'��A.tf?n a HARTFen�`9: �^+�n`RbAQ� �4� 19t12 o tt s1y�Cn'+r r � 1951 a y �tlSC•.AL "" D W CONN. n r��tgrt � �n t� i i a �. oslSBJCLit WOo Q o State of Connecticut City of Hanford ss. r Bv: Robert L. Rancy, Senior Vice President On this the 5th day of October 2016 , before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. 0.T!7 In Witness Whereof, I hereunto set my hand and official seal. ,,tiTAR My Commission expires the 30th day of June, 2021. sir A(/sL%"- it C'r � �S 58440-5-16 Printed in U.S.A. Marie C. Ten•eault. Notary Public WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER Packet Pg. 760 WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 16.A.6.b This ower of Attorney is granted under and by the authority of the following resolutions adopted by the Hoards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters. Inc.. St. Paul Fire and Marine Insurance Company, St. Paul Guardian insurance Company, S:. PJuN Mgrcury Insurance Company. Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America. and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect. reading as follows: RESOLVED, that the Chairman, the President. any Vice Chairman, any Executive Vice President. any Senior Vice President. any Vice President, any Second Vice President, the Treasurer -my Assistant Treasurer. the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescrihe to sign with the Company's name and seal with the Company's seal bonds. recognizances. contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTFIER RESOLVED. that the Chairman. the President. any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority Io one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity. or writing obligatory in the nature ref a bond, recognizance, or conditional undertaking Shall be valid and binding upon the Contparty when (a) signcd by the President, any Vice Chairman, arty Executive Vice President. any Senior Vice President or anv Vice President. any Second Vice President. the 'I reasurer, any A,si.srnt Treasurer. the Corporate Sceretat\ or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary: or (h) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescrihed in his or her certificate or their certificates of authority or by one or more Company officers pursuant u) it written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the folldxving officers: President, arr; Executive Vice President. any Senior Vice President. any Vice President, anv Assistant Vice President, anv Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power ul Attorney or to any certificate relating thereto appointing Resident Vice Presidents. Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate hearing such facsimile signature or facsimile seal Shall he valid and hinding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond ar understanding to which it is attached. I, Kevin F. Hughes. the undersigned. Assistant Secretary. of Farmington Casualty Company. fidclity and Guar:utt Insur:ute•e Company. fidelity and Guaranty Insurance Underwriters, Inc., tit. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance Company. St. Paul NIcrcury Insurance Company, Travelers Casualty and Surety Cony7any.'l ray clers CasualtySurety and SureCompany of America, and United States Fidelit and Guaranty Company do hereby certify that the shove and foregoing is a Iruc and corrcci copy of the Power of Attorney executed by said Companies, which is in full horde and effect and has not been revoked. IN TESTIMONY WHEREOF. I have hereunto set my hand and grazed the seals of said Companies this 1 —11."efay of ' .20 s . ill� (15�_ /�/� Kevin E. Hughes. Assistant Sc,: Lary to .y m ���u'�d•$Q,ptQY ^.,_��x!` `�N•ing` .•p Hsgw, +,�tr.�NeP J+o'i�,°svw'�vy,t/� 0 �Opv6NArfhn�l a Nunaoao, ? ttvarraj ro Yb'�'�'tc a 1977 �i Jet i'..r f C Ai q SI::AL v ry sN d •� , die....µ a:` + b , .. c:.;.uf" ,.ur N f �•..�, ;,,/� df �N wdM '•// Ittr�� Qi s to To verily the authenticity of this Power of Attorney. call 1-800-421-3880 or contact us at www.h-avelersbond.cotn. Please refer to the Attorney -In -Fact number, the above -named individuals and the details of the bond to which the power is attached. Q Packet Pg. 761 16.A.6.c RESOLUTION NO.21- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN FRONTERRA PHASE 1, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 63, PAGES 13 THROUGH 15, AND RELEASE OF THE MAINTENANCE SECURITY. WHEREAS, the Board of County Commissioners of Collier County, Florida, on June 13, 2017, approved the plat of Fronterra Phase 1 for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of the maintenance security; and WHEREAS, the Development Review Division has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Fronterra Phase 1, pursuant to the plat thereof recorded in Plat Book 63, pages 13 through 15, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage improvements within Fronterra Phase 1 will be maintained privately in the future and will not be the responsibility of Collier County. This Resolution adopted after motion, second and majority vote favoring same, this 14th day of December, 2021. DATE: BOARD OF COUNTY COMMISSIONERS ATTEST: COLLIER COUNTY, FLORIDA CRYSTAL K. KINZEL, CLERK Deputy Clerk Approved as to form and legality: Derek D. Perry Assistant County Attorney 1)0\� Penny Taylor, Chairman [21-EIS-04568/1675131/11 Page 1 of 1 Packet Pg. 762 {� 1 gg = LJ Q D- s� �w� arc O �pS YMg m xo "p msog o s- LLI WQh;6=�gogo m S od "w zao w& cwia HE �g c SOWo oNo w Z.=-oaS • u • co F y Z �E�o QME zi 1^i UD al �o W co �zC\2 O Z PLI E O �7 cn W a x z C) E� Saw Z sgooe§6 zoH € U oof =;=oa��•� �� g� p 0z��w�nzJ�'�� Ld o w agWo�w mow_ �� w LL <Hm<iwii iz H 8. J r rrc �o< ow $� <ww�o Nx �zzs zkz€o3 n Moz-fig om=<G i8 ;z y<<= pads= <w� z< �3 o s� 4 ee+•�ya•uewwi e•�umMe••v i•„i:�zwzl a•ra �eia :wewyuv 22 mass 23 a�a= a$ a p§wo w Ada Z �w3 apy�a - W 3E� O goo =s pg o awl (n g"oo 6po as ,a_JI= 'off W � end-, "a � o Oo- o 0evl!\ =o (n boo U a"U c � fig£ ag xp"_ a ? g=o zo mwo w^ 0 xLL �p OU �o Co L� �o"ppp out U) R z �o h �16 ooz�� i o$ z � o I W N s�mI'I o QWw -Oo goo o<oI �<'a�o - "�awQz. W w Cm p a �� pp Pa ia3l '6 � w swam 1jFa `gip o�pod oo� op €LLz. -$o$�o _gip obi x�ax=w aw MN- -1saw iz io z ' Eo H, -os _ = gip gw�=p z „IB w �.�o w 'w6�gg �<BmopQs�p= w �n�s 1= z ��w_-wpNzps m Y6oawsog==w o s�s= 6w <�� -mow oho = owpp . ..p x a<s" p po_LLw�<pz€wwo w _ Q= g,w=amomQ�m _SU��wa J�j +�po did womQ3ogap-dg� p a�s6N= 3 pswx L o 'W o=�=='. - l_ pow ow_ �a AiUn o CD o �z- s ww iz < _s-o F�mo Ao m< oa z Q 0 8s oU go'�s W<u,� ffi �gv m�V p8n -i =~`5 m Ana ogn,e RH"�.� 3rc'� 1. a iU 3w Apo p�a'� w�a l-29 ggm � o g 3 -,_"w, �_= a .G7 - `pp Ba`=o pf o�wFg� ' ffi b cgz g pip 1Ez< o P ='oiEoa -�_ z a� �p`ds" opt z 5awwpo IRo=o sm o=� sF asp= kl<gsp�Pw3 mkpao � =�W M-8 _ - �•'" '� _erg.. §� - 8< off" 2� <s �o w - -H� -z H zwa z- ���m .V �o=� uuJJ BGz�Sp3�:3 �oiS=. � wkrc�'=--' o�ui iul coi��"' WmB�N�W�Eov=i g=aop 6p ao << NaNz z. „a3' _ -<go o o� LL 3 HgA _ g- aw�w spa===o �<_ a Wza mp98 a - - Co- 1�a a�a�=�w wpE HELM- ��e _wRb o �VMOVo o � p�86a moow c o o d w z< ay »1-- aw s� x� �z LL 8�o = p - 3m '2 oa o �p <� '3 =Q o y m<m !------ Ir--------I II � ' CV I 0 II I I Q ! 40 M II �N ao all I I I 'I O m =11 m w Qw J S O d (n m tt i 11 m ! m II I o I I I II AwA v, O I I in L23 L .r L21 L19 .r S 1� of $ a !G al O L23 m �1 Im L19 "i �I O of o N o L21 � Li9 In !Y' 00 � ro la o L �}L IF, ! rol nl L23 m t l.'.l L� CI-i-' nl L21 L19 F-1 a n1 m !w el m 8L23 � O L21 L19 n .i!m V H " r� L21 L19 U N Q W FI-I J Qi z a E- nl L21 �n L19 In ^o a' L23 N Wcf) W a- 1O! mj zs' D.E. moo, L zs• L C) O W � I o yi Io j b e ! o! ml nl L23 ro A� f 1 ifl E- L21 L,8 Ilo o L21 L19 n ai m O L23 N �ryr�, O I^I � I L21 L19 I al .y U- a t13 102.00 I$ ! MI Sr15' D.E. i� -_L1 -I� 8 i1 5 5 I I BY33'S4'E 1 1 304.00 (TOTAL) r w. °iI of EE SHEET 3 OF 3 Il IW e III I I IIZ � Il�m QiUa Q Q FIi w p � li I F w �I II w U W II I 8 II o I 'I tt W II m Z J I O „IIU o ? II �II tll IL of q o gl m: I NI I ml o f Q F i I Ld > w d I I I I F II nl- d O w o F M Q $moo �3 U i�o j � E6 1.o F LKI I w �b� 5 C) �o I Uri C7 I " W I F a � r w d I I I I F II nl- d O w o F M Q $moo �3 U i�o j � E6 1.o F LKI I w �b� 5 C) �o I Uri C7 I " W I F a � r � _ c g � Z " I U L43 L44 � l 'O n V e r_ o Iz T 1 = mN „ as 1 FI< N \ \ I G m \ zz Aw 6w v, a rc E-'----------------- �F �I I V66.70 r L.B.E R o n Z. „ 9 a'�j �$ s ` U== o Bow€m ;N mS w�;"'��m� ao omo n-JE m! go yj6��G �4 a I 1. I I � I rc oa j Pik wmw� ooz� 2s• LB.E. W {4y8j36 d -.-._.-.-._._. --- ._._._._._L_ J II t 25L.B.E. NORTH RIGHT-OF-WAY SR-84 -DAVIS BOULEVARD STATE ROAD 84 H Q I W U Q M I W I 90 I Y li 0 r) 0 ffi m� ALL W �W I E- a_ (n i E. g O Q J Iw I= a m Id � �- O i� I M O O � '- I Fo "o< E- M z o N a W W t I a t2s.so � a 99'33'S4'W FL \ N I O O � o ryl3 of o � Ls NR Y w o b W of al to N to O gl � Lt I H� W N L3 L1 le 1� �I L3 le J I M w ° gil f].s' �L1--L4- D.E. _ Ig J T`1 ].s' D.E � to r- rl IL'. 71J � ml ' N L1 I to N loi �O V 1 0� nl n O IR N In Z � I Lt w W ry nl � m L1 In E-, a V1 Z E5 v o 8i Lt n o of nl ' I L3 I � to � to L1 n m m o li a I o o o De � � II II II I I ' II I II I I w I O I � F U�o E z FS � Nlno \I N a w s U CJ C12 I < a` E- L) \3 J Ew w F 0 w�w�w Z m nbbb, trnim o 25' PRESERVE p FPRINCIPLE SETBACK LINE o W 9ETI-K 10.2' 10' D.E. IS D.E. UNE 10.2' 10' D.E. (� J n n a 99'33'54" 959.83 Q _47.00 _ 42_00 42.00 42Do 39.00 46.83 38.00 _420_0 _38.00 3-. - 20.0 I 41 nt oo J d m m, w o m oPF v W co uo muo co uD e>uo cow � I �m up uo co uo Lto i a ee,cam� in it 0.6) O o00 000noo o u n c a89'33'54"W U Z: rclouw�urvrvnNry + 9 I I � ou Z �10 42.00P 42.00--4220Om <3.Op 61.83 38.00P 42.00 Is..6] _Llj N J m to N 89'33'S4"E 346.00 40 -N 99'33'54'E 46.130,67-1 Is MADRID CIRCLE N W33.54"E 300 TRACT "R" P.0zo ° ; -----------D.E------------ w' hoq� .E.. A.E., C.U.E.. & .) = J J J J J J J J J J 16 10' P U E �n S 89'33'54' 346.D0 ' ' r� 4 y° I w 6].00 29.00 4].00 44.s0 4].00 4- 8].00 N f � --o ---f -tom--- it L23 Les � e L,a �I $'n mm nm MM°;� " it ro ' 0I I ZmmbmO1mmmzi 29.0 42.00 49.50 42.00 J 49.50 J n m L25 N 89'33'14"E 212.00 .I-� I � I L23 I � I L23 d' IZ I � I o s' D.E. L I ].5' D.E. I � II m L23 N L2 �L- I � I eN LL7 I� L2 I I O L23 O L2 I ol- u I 13 � L2 I � I L23 � L2 z I � I m I L23 O Z I I W L2f 3"aL..� N � I I� I .-I I O I I m I I � I� I � I O I � I m Z I I I I m 5 MATCH LINE SEE SHEET 2 OF 3 Fx I F =� I I �1