Loading...
Bayshore Beautification MSTU Agenda 10/06/2021 Bayshore CRA Offices: 3299 Tamiami Trail E, Unit 103, Naples, Florida 34112 Phone: 239-252-8844 Online: www.bayshorecra.com . Bayshore Beautification MSTU AGENDA October 6, 2021 - 5:00 PM Hybrid Virtual Zoom Advisory Committee Meeting 3299 Tamiami Trail E 3rd Floor BCC Chambers, Naples, Florida 34112 Chairman Maurice Gutierrez Robert Messmer, Sandra Arafet, George Douglas, James Bixler, Susan Crum, John Smith 1. Call to Order Roll Call 2. Pledge of Allegiance 3. Adoption of Agenda 4. Approval of Minutes a. July 14, 2021 (Attachment) 5. Landscape Maintenance Report – 6. Community / Business Presentations 7. Old Business a. Hamilton Ave Project Update – Barry Williams b. Access Management Plan Proposal update c. Del’s Corner Dedication – November 5 d. NBG Fair Share Contribution 8. New Business- a. 2022 Calendar (Attachment) (Action Item) 9. Staff Report a. CRA Directors Project Report (Attachment) b. Project Manager Report - Tami Scott (Attachment) c. Private Development Update (Attachment) d. Maintenance Report (Attachment) e. Financials - (Attachment) 10. Correspondence and Communication 11. Public Comments 12. Staff Comments 13. Advisory Committee Comments 14. Next Meeting Date a. November 3, 2021 @ 5pm 15. Adjournment 4.A.2 Packet Pg. 33 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Item 4a 1 July 14, 2021 Meeting Minutes BAYSHORE BEAUTIFICATION MSTU MINUTES OF THE JULY 14, 2021 MEETING The meeting of the Bayshore Beautification MSTU Advisory Committee was called to order by Maurice Gutierrez at 5:10 p.m. located on the 3rd floor of the Administration Building. I.Roll Call: Advisory Board Members Present: George Douglas, Maurice Gutierrez, John Smith, Susan Crum, Sandra Arafet and Jim Bixler attended in person. Excused Absence Bob Messmer MSTU Staff Present: Debrah Forester, CRA Director; Tami Scott, Project Manager; and Shirley Garcia, Operations Coordinator. II.Pledge of Allegiance: Led by Maurice Gutierrez. III.Adoption of Agenda: Ms. Forester added 7c. Sabal Shores street lighting survey and 7d. Flag Duty. She noted attachments that were provided at meeting regarding Christmas Decorations, Private Development Update and 10b. Donna Fiala Bayshore Article. George Douglas made a motion to accept the Agenda, second by Sandra Arafet. Motion passed unanimously. IV.Adoption of Minutes: Sandra Arafet made a motion to accept the previous meeting minutes as written, George Douglas seconded. Passed Unanimously. V.Landscape Report: a.Update on Landscaping—Aaron Gross, Ground Zero Landscaping— Aaron Gross presented his landscape report. The landscape crew have been out doing their weekly maintenance on Bayshore Drive they have been doing some pruning on South Bayshore Drive to Holly Ave. and herbicides and pesticide spraying due to the amount of rain. VI.Community / Business Presentations: VII.Old Business: a.Thomasson Drive Closeout- Tami Scott provide the update on closing out the project, some lingering items before they close it out completely. Sandra Arafet did have some concerns that the swales are holding too much water and maybe clogged. Ms. Scott wanted to clarify that the swale was intended to capture the water and she is monitoring it to ensure that the water is receding and that it is 4.A.2 Packet Pg. 34 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Item 4a 2 not clogged but that is the intention is to keep the water off the road and to not overflow onto properties. b.Landscape Contract- Ms. Scott provided the 3 bids received for the new contractor and A&M was the lowest bidder. The contract includes 7 areas including the new Thomasson Drive enhancements. Maurice Gutierrez asked if staff had any experience with A&M and Ms. Forester commented that the company has the current Immokalee MSTU landscaping contract. George Douglas made a motion to accept the bids as presented, second by Sandra Arafet. Passed unanimously. c.Sabal Shores Lighting Survey- Ms. Scott provided the update on the survey and that it will be out on August 1st until December 30th. d.Flag Duty at the Roundabout- Ms. Scott went over the request for volunteers to pick up flag duty and get an email to lower and raise the flag when the email notification comes in. Ms. Scott would like to give the key and flag crank to the primary person who is George Douglas and Sandra Arafet’s husband will be back up when Mr. Douglas is not available. VIII.New Business: a.Christmas Decorations- Ms. Scott provided the update on Christmas Decorations meeting that staff had with Jim Bixler. The staff will be going out to bid and the costs would be approved by the committee. Maurice Gutierrez made a motion not to exceed $30,000, Sandra Arafet second the motion. Approved unanimously. b.New Banners Discussion- Ms. Scott mentioned the two banners that were put up on the lightpoles at Thomasson roundabout as examples to get feedback from the Committee to which one they prefer. George Douglas asked if they could just put up temporarily around the roundabout and think about the rest later on. Ms. Scott agreed. George Douglas said a holiday decoration of some sort like a snowflake or something on the 8 poles for the holiday. Sandra Arafet suggested they wait as well. Maurice Gutierrez suggested we work with the Botanical Garden again and get some suggestions for their events too. c.Thomasson Drive Swales- Ms. Scott mentioned this item is a partnership with Botanical Garden to develop a bio-swale and it is a working stormwater swale. Ms. Forester asked if the committee likes the idea, and if they would support it the agreement would have to go to the board of county commissioners to be approved. Sandra Arafet shared some of her concerns about the illegal parking all over Hamilton Avenue down Thomasson Drive on the weekend and almost every weekend and especially holidays. Ms. Forester suggested staff working 4.A.2 Packet Pg. 35 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Item 4a 3 with Parks and Recs and put some signage for all cars will be towed and utilizing Dels’ property for any overflow parking and charging a fee. IX. Staff Reports: a. CRA Directors Report- Ms. Forester provided the report and highlighted some of the projects. Del’s is working on getting the demo completed, Ms. Scott had some suggestions on putting the Del’s corner sign to hang under the banner poles. The public art plan was approved at the Board meeting and the next step is working on a sub-committee and the mural ordinance. The land code regulations are moving forward. The BCC did approve the bonus density pool amendment and it was transmitted to the State for review. The land regulations had some changes as recommended by staff and is moving forward. The current versions are posed on the BGTCRA website. b. Project Manager Report- Tami Scott highlighted a couple of projects: • Fire Suppression III the final completion will be on 7/30/21. • CRA Parking lot has a final completion date of 8/19/21. • Moorehead Manor is moving forward, the wall is going in and all new landscaping. c. Maintenance Report: Ms. Forester provided the current maintenance report, if anyone had any questions. d. Financials: The financial reports were presented and noted the FY22 budget starting in October. X. Correspondence and Communications: a. Resident Correspondence for Thomasson Drive Project - Ms. Forester provided the correspondence from a resident on the successful. This correspondence went to all the Commissioners and recognized the hard work by staff. b. Bayshore Article from Donna Fiala – Attached the article Ms. Fiala wrote about all the wonderful things happening on Bayshore Drive. XI. Public Comments: Al Schantzen just wanted to mention the barricades blocking the sidewalk and bike lane and if they could remove it before the weekend in front of the CRA parking lot. Cathy Shaw from 1781 Danford Street attended to express her concerns for the Danford Street improvements and feels there has not been any correspondence lately. Her desire to slow the traffic on Danford was the purpose of their involvement in this Hamilton Avenue Improvement and all of the property owners are asking the committee for help in getting a meeting set up with Parks and Recreation as soon as possible with all the property owners. Maurice Gutierrez asked about how the traffic calming on Solana Road has 5 speed bumps but will not put any speed bumps on Danford Street and he would like to ask that question as well. There was a question on zoom about if Danford 4.A.2 Packet Pg. 36 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Item 4a 4 will be included in the Hamilton Avenue project. Ms. Forester answered that the Danford St is still moving forward and will continue to work with the Danford Street property owners. Hamilton Avenue will move forward as a separate project. There were several other properties owners that had the same comments about the lack of communication and their concerns about the traffic issues going on with no resolution. XII.Staff Comments – Ms. Forester mentioned the Bayshore Wine Venue July 16th groundbreaking and invited everyone to attend. XIII.Advisory Committee Comments: Maurice Gutierrez asked to have Transportation staff attend to discuss the amount of turn lanes on Bayshore Drive and no other areas similar seems to have to comply. He would like to see what their answers are. Ms. Forester recommended to complete the access management plan to get some of the answers they are asking, and she will invite transportation to discuss as well. XIV.Next Meeting Date: a. October 6, 2021 @ 5pm XV.Adjournment: 7:00 pm ______________________________________ Chairman Maurice Gutierrez 4.A.2 Packet Pg. 37 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Bayshore Beautification MSTU Advisory Committee Meeting Calendar 2022 Meetings are held on the first Wednesday of each month at 5:00 PM unless otherwise notified •January 12, 2022 –2nd Wednesday due to New Year’s Day •February 2, 2022 •March 8, 2022 Joint CRA/BBMSTU Meeting •April 5, 2022 Joint CRA/MSTU/BCC Annual workshop TBD •April 6, 2022 •May 4, 2022 •June 1, 2022 •July 13, 2022 –2nd Wednesday due to Independence Day •August 1, 2022- Summer Break (TBD) •September 14, 2022- Summer Break (TBD) •October 5, 2022 •November 2, 2022 •December 7, 2022 BCC Holiday Schedule 2022 The Board of County Commissioners recognizes the following holidays in 2022, observed on the dates listed below: •New Year’s Day Monday, January 3, 2022 •Martin Luther King, Jr. Day Monday, January 17, 2022 •President’s Day Monday, February 21, 2022 •Memorial Day Monday, May 30, 2022 •Independence Day Monday, July 4, 2022 •Labor Day Monday, September 6, 2022 •Veteran’s Day Friday, November 11, 2022 •Thanksgiving Day Thursday, November 24, 2022 •Day After Thanksgiving Friday, November 25, 2022 •Christmas Eve Friday, December 23, 2022 •Christmas Day Monday, December 26, 2022 Offices: 3299 Tamiami Trail E, Unit 103, Naples, Florida 34112 Phone: 239-252-8844 Online: www.bayshorecra.com Item 8a 4.A.2 Packet Pg. 38 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Item 9a CRA and County PROJECT UPDATES – October 2021 1.DEL’S PROPERTY ACQUISITION - Closed on November 20, 2020. Survey of property identified some issues. ROW easement to County will be initiated by Real Estate Services and anticipate approval by BCC in December. Following survey, demolition of the warehouse and retail store will begin. Scope of services for demolition being finalized. Demolition late January/February with completion by early summer. Following demolition, highest and best use analysis to be conducted. Dedication for Del’s Corner scheduled for November 5, 2021. 2.PUBLIC ART PLAN – Public Art Committee ordinance scheduled for adoption at October 12 meeting. Mural ordinance is being revised and will start public hearing process. Staff is reviewing revisions to the mural code. Anticipate public hearing process to start First quarter 2022. County reposted position for Arts and Cultural Manager (application period closes 10/14/21). 3.17 AC - BOARDWALK – JUNE 22 2021 CRA Board approved negotiating with Stantec to develop scope of work. Staff reviewing the scope and budget. Target Board approval in November. 4.BRANDING - Paradise Advertising and Marketing, Inc. – Scope of work being finalized Phase 1 will begin in FY22. Scope of work anticipated for review in November. 5.BAYSHORE ACCESS MANAGEMENT PLAN – Draft scope of work is being reviewed by staff. Bring to advisory board in November for review and approval. 6.COASTERS/SHUTTLE SERVICE – New option being reviewed. Bring to community in November. 7.LAND USE REGULATIONS/BONUS DENSITY AMENDMENT – Updated adoption schedule – late January. Consultant contract extended to March 31, 2021. 8.Conservation Collier Cycle 10 Properties - Bayshore parcels consideration for purchase at Conservation Collier Land Acquisition Advisory Committee (CCLAAC) meeting on October 11, 2021. End of South Bayshore. Approximately 71 aces (see attached map). 9.Linwood Sidewalk – Safe Routes to School Project – PE – 2022/2023 and Construction 2024/2025 10.Peters Avenue – five-foot sidewalk from Collee Court to US41. $389,000 CDBG grant awarded and managed by Transportation Planning department. Project will begin following the US 41 FDOT project is completed. The sidewalk will be placed on the 4.A.2 Packet Pg. 39 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Item 9a residential side of the street. Laurie Beard (GMD) is project manager 11.Pine Street – FDOT Funded Becca to US41 – PE 2022/2023. Construction 2024/2025. Will coordinate with stormwater study. 12.Commercial Drive Stormwater Improvements – Design Services with Blot Engineering underway. Design anticipated to take 120 days and total project completed in 450 days. The engineer of record is Ed Blot with Blot Engineering. The project will replace a 15-inch diameter drainage pipe across Commercial Drive with a 30-inch drainage pipe to improve stormwater conveyance to the Gateway Triangle stormwater management pond. The project will install a 30-inch connection pipe in the alley just west of commercial Drive to improve stormwater management connections which will help reduce flooding in this alley. Construction will begin after design is completed. Project Manager – Rick Orth 13.April 13, 2021 BCC approved construction contract for the East Naples Community Park Welcome Center,” to Curran Young Construction, LLC, in the amount of $2,965,622.28. 4.A.2 Packet Pg. 40 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) PROJECT UPDATES Bayshorc Gatcwuy Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU Tami Scott October 5, 2021 Item 9b Thomasson Drive: Project Completed - approximate balance on contract will be $200,000.00 staff is working on the final pay application. Roundabout Flag -Half Mast: Half-mast process is in place and working well. Del's Parle Staff is working on additional planting and dedication plaques for November 5, 2021. Fire Suppression System- Phase 3: Project Completed - Staff is working with other County department regarding storm water and paving. CRA Parking Lot: Project Completed - Staff is working with additional items planting, gates, benches. MSTU Landscape Contract: New landscape contract has been approved A & M Property Maintenance, LLC 4396 Owens Way Ave Maria, Fl 34142. Armando is schedule to start on October 8· 2021 and will attend the MSTU meetings starting in November 2021. Moorhead Manor: Old fence and landscaping removed; new concrete wall installed. Looks great! Storm water: CRA staff is working with Collier County GMD Capital Project Planning, Impact Fees, & Program Management, Stormwater Management Section on the new project titled CRA Bayshore Gateway Triangle Area 4 and Pine, Becca, and Weeks. The Fees from Blot Engineering, Inc of Cape Coral, FL 33904 is higher than anticipated and CRA staff is working to possible break the two projects up. South Bayshore renovation: Isles of Collier is working on an entrance plan off of Bayshore., staff has seen a preliminary plan that show a roundabout at the end of south Bay shore. As soon as the information is public staff will be providing a copy or discussion. Sabal Shores street lighting: Survey has been set up for the last 3 plus weeks, most folks who have taken the survey would like to see additional streetlights. Staff will bring forward the information at a later meeting. Linwood Way: PO has been opened; staff is working with the City of Naples and vender to get the project completed. 4825 Bayshore Drive: General cleanup of the building has been completed. FDOT Project: US41 FDOT Safety Improvement Project – Construction is anticipated to begin in October 2021 and there are 300 calendar days of contract time. Tentative completion July 2022. 7 existing light decorative poles are called out be removed as well as the “porkchop” at the corner of Bayshore and US41 4.A.2 Packet Pg. 41 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 1 of 10 September 2021 Private Development Update Please Note: Projects with *and highlight have been updated since the last report Zoning Petitions Mini-Triangle MPUD (PUDA): PL20210001100 Location: 1991 and 1911 Tamiami Trail; 2000 and 2054 Davis Blvd. Owner: Metropolitan Naples LLC Status: Pre-application meeting held 6/9/2021 Amend Mini Triangle Mixed Use Subdistrict [companion item Mini-Triangle Small Scale GMPA (PL-20210001101)] to allow for the conversion of hotel units to multifamily residential units (not to exceed 491 dwelling units) and to amend the min./max. retail and office square footage for a combined minimum of 25,000 SF office/retail and a maximum of 130,000 SF of office/retail. Mini-Triangle MPUD (Small Scape GMPA): PL20210001101 Location: 1991 and 1911 Tamiami Trail; 2000 and 2054 Davis Blvd. Owner: Metropolitan Naples LLC Status: Pre-application meeting held 6/9/2021 Amend the Mini-Triangle MPUD-GTMUD-MXD (Ordinance 2018-025) and companion item Mini-Triangle Mixed Use Subdistrict to allow for the conversion of hotel units to multifamily residential units (not to exceed 491 dwelling units) and to amend the min./max. retail and office square footage for a combined minimum of 25,000 SF office/retail and a maximum of 130,000 SF of office/retail. St. Matthew’s House PUD to PUD Rezoning (PUDR): PL20210000176* Location: 2001 Airport Rd S. Status: Third resubmittal from applicant on 9/20/2021. NIM held 8/11/2021 The applicant is proposing to amend the existing Devoe Pontiac CPUD to expand the PUD boundary to the north and south and change the name of the PUD to St. Matthew’s House Commercial Planned Unit Development (CPUD). The rezone proposes to increase the number of homeless shelter beds from 104 to 150, and request 130,000 square feet of general commercial, office, social service, and warehouse uses. Brookside Marina Rezone: PL20190001540* Location: 2015 and 2025 Davis Blvd. Status: Second resubmittal from applicant on 9/12/21. Rezone of the submerged lands only from RSF-4 to C-4. Notwithstanding the Item 9c 4.A.2 Packet Pg. 42 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 2 of 10 straight C-4 zoning and to ensure GMP consistency, the permitted uses for the submerged lands will be limited to water-related or water-dependent uses associated with a marina. Uses include wet boat slips (with or without lifts/davits), boat lift canopies, boat ramps (one ramp exists already), small recreational boat rentals, operation of charter or party fishing boats, canoe/kayak/rowboat rentals, houseboat rentals, and tourist guide boat operations. Jet ski rentals are excluded, but requesting ability to rent a wet slip to a private jet ski owner. Live-aboard vessels also excluded. Brookside Marina Conditional Use: PL20210001318* Location: 2015 and 2025 Davis Blvd. Status: Pre-application meeting waived. First submittal from applicant on 9/21/21. Companion item to PL20190001540. Seeking conditional use approval for small, recreational boat rental operations at a marina. Promenade at the Boat Yard Rezone: PL20210000021* Location:2707 Bayview Drive Status: Second applicant submittal on 7/29/2021. Staff comment letter issued on 9/7/2021. This property is currently zoned RSF-4-BMUD-R4 and is proposed to be rezoned to RSF-4-BMUD-W in order to create the necessary space for an outdoor boating storage rack, as part of the boatyard. Promenade at the Boat Yard Rezone: PL20210000020* Location: 2736, 2754, and 2772 Bayview Drive Status: Status: Second applicant submittal on 7/29/2021. Staff comment letter issued on 8/27/2021. NIM held May 11, 2021 The subject properties are currently zoned RSF-4-BMUD-R4 and are proposed to be rezoned to RSF-4-BMUD-NC (neighborhood commercial) to construct a 2-story building with ground level parking, second floor of retail, and a third floor for residential. Naples Boat Yard Variance: PL20200000007* Location: 2775 Bayview Drive Status: Review comment letter issued on 8/23/2021; Originally a PUD Rezone, applicants have changed the request to a Variance; Pre-Application Meeting held on 1-22-2020. NIM meeting held May 11, 2021. The applicant is proposing a complete site renovation to construct a boat storage facility along the north side of Bayview Dr. This petition requests a variance from the 20-foot rear yard waterfront setback to allow for a building to be 10 feet from the Item 9c 4.A.2 Packet Pg. 43 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 3 of 10 waterfront, and for a small office on the NE corner of the site to be setback back 0 feet from the waterfront. 2831 Becca Ave Parking Exemption (PE): PL20210000596* Location: 2831 Becca Ave Status: Agent resubmittal on 7/21/2021; NIM held 7/27/2021; Hearing Examiner date 9/23/2021 (continued to 10/14/2021) The Request is to amend the parking exemption granted for the parking lot that supports Celebration Park (food truck park) to allow parking use on Mondays. Isles of Collier Preserve Phase 16 (Parcel T) (PPL): PL20210000695* Location: 8530 Bayshore Drive (between Bayshore Dr and Hamilton Ave) Status: Agent resubmittal on 8/24/2021. Staff issued comments on 9/16/2021. The Request is to divide the property into 61 single family units designated as lots and 9 tracts (including private right-of-way, easements and open space), approximately 47 acres. Artist Village (CU): PL20210001916* Location: 3061 Lunar Street Status: Pre-application meeting held on 8/17/2021. In follow up to the meeting, applicant indicated they will pursue a different route. Item 9c 4.A.2 Packet Pg. 44 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 4 of 10 The request was to allow a village consisting of 2 rows of 5 units (one row on each lot). None of the units will have cooking facilities. They will each have a bathroom and some counter space including a sink, a microwave and a small fridge. There will be loft space above this section for sleeping. In front of these 2 rows of rooms will be a communal room for gathering, gallery space, a full kitchen, a half bath and a laundry room. In the middle will be a community garden. 1652 Avondale (ZLTR): PL20210002335* Location: 1651 Avondale St Status: First submittal on 9/16/2021. The request is for zoning verification letter to build a metal powder coating shop in the existing structure. Development Review Petitions Naples Boat Yard Site Improvement Plan (SIP): PL20210000148* Location:2775 Bayview Dr. Status: First GMD Review Letter sent out on 4/13/2021. Applicant resubmittal on 9/08/2021. The Naples Boat Yard is proposing to renovate the concrete dock to accommodate their traveling boat lift. Gateway of Naples SDPA: PL20210000839 Location: Corner of Davis Blvd and US41 (Folio 00386880009 and 00386840007) Status: Requested minor changes to approved SDPA (PL20200000536) on 4/6/2021. Pre-application meeting waived and waiting on applicant submittal. This site has a previously approved Site Development Plan. The applicant is requesting a reconfigured entrance, reduced lane width, regrading, removal of SR84 turn lane per FDOT, added sewer service connection, removal of drainage chambers, and revised control structure. This project includes 24 condo units, 120 hotel units, restaurant space, 204 parking spaces, and 9 stories in height. Metropolitan Naples - Lot 1 SDP: PL20200002428* Location: Mini Triangle, 2000 & 2054 Davis Blvd. Status: First staff comment letter issued on 06/02/2021. Applicant resubmittal on 9/22/2021. This SDP proposes to develop a 9-story residential tower over a 6-story podium that will contain 270 multi-family units, parking and approximately 7,600sf of commercial uses within Lot 1. All access, drainage, and utility connections for the 1.57ac Lot 1 were previously designed and approved under the Metropolitan Naples PL20200001193. This SDP details the driveway, sidewalk, utility service, Item 9c 4.A.2 Packet Pg. 45 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 5 of 10 downspout, and yard drain connections from the building to the ROW. Metropolitan Naples PPL: PL20200001193 Location: Mini-triangle parcels 2054 Davis Blvd. Status: Pending resubmittal, comment letter issued on 05/20/2021. This project proposes to create 3 separate parcels with the intent to have separate SDP’s for each parcel. The applicant proposes to construct the infrastructure required to provide services and ingress/egress to the three individual development tracts within the project boundary. The intent is to subdivide the project into three separate development tracts consistent with the current zoning approval and allow each tract to be developed as the market supports the land use for each individual tract. Our goal is to develop the infrastructure now that the zoning has been approved and proceed with the vertical improvements for each tract as market conditions support each land use. Naples Botanical Garden Horticultural Campus SDPA: PL20190002586* Location: 4820 Bayshore Drive At 90% drawings and will go out to bid in June/July. Pre-application meeting held on 12-18-2019. Per Christine Willoughby no plans have been submitted as of 7/28/2021. Per NBG, design efforts are ongoing. The purpose of this application is to modify and expand the previously permitted grow house and recycle center to include the new horticultural center. The horticultural center will include several new various grow/green houses, office building and maintenance shop. 3467 Bayshore Drive SDP: PL20210001360 Location: 3467 Bayshore Drive Status: Pre-application meeting held on 6/16/2021. 12,203 – 16,271 SF, 3-story building on ±0.47 acres of property at 3467 Bayshore Drive. The proposed building is mixed-use with commercial, destination resort, distillery, and restaurant uses on the first floor and lodging on the second and third floors. The proposed vehicular access to the site will be provided from Areca Avenue. Alcohol Distance Waiver required if sale of alcoholic beverage for on-site consumption. The Home Depot #6348 SDPI: PL20210001541* Location: 1651 Airport Road S Status: Incomplete submittal on 8/25/2021. Home Depot is requesting to re-stripe existing parking to ten (10) angled parking stalls to display HD Rental Equipment that can be rented through the TRC. The proposed Site Plan includes six (6) parking stalls to be designated for Rental Truck parking only. Item 9c 4.A.2 Packet Pg. 46 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 6 of 10 Pine Street Storage Warehouse SDPA: PL20210001598 Location: 2447 Pine Street Status: Staff comment letter issued on 7/26/2021, pending resubmittal by applicant. Replace previously approved doggy daycare building with one storage building of 7,187 sf, parking and drainage facilities. 3015 Tamiami Trail East SDPA: PL20210001656* Location: 3015 Tamiami Trail East Status: Pre-application meeting held on 8/5/2021. The request is to renovate the existing commercial structure. Potential buyer wishes to use the existing building as a restaurant with outdoor seating. Alteration of the existing parking layout will be required to provide room for outdoor dining. There appear to be some nonconformities with the existing building and site including front setback and landscape buffers. Potential buyer is interested in a rooftop seating area. Windstar of Naples Bay Clubhouse SDPA: PL20210001972* Location: 1700 Windstar Blvd Status: Pre-application on 9/14/2021. The request is for clubhouse expansion, demolition of the existing cart barn, new cart barn with second story fitness center, possible additional vehicular parking, and supporting utility and storm drain modifications. Windstar of Naples Bay Clubhouse Expansion APR: PL20210002095* Location: 1700 Windstar Blvd Status: First submittal on 8/24/2021. Staff comment letter issued 9/09/2021. Administrative Parking Reduction request for proposed improvements which require 291 parking spaces, per LDC 4.05.04. An APR is requested to allow use of the existing 203 parking spaces, in conjunction with 20 private golf cart spaces, and 48 bicycle parking spaces; a reduction of 88 vehicular parking spaces. This is an additional reduction of 43 spaces from the previously approved APR. Rehabilitation Plans for Pump Station 308.09 SDPI: PL20210002186* Location: 2759 Wild Pines Ln Status: First submittal on 8/31/2021. The request is for rehabilitation of Collier County Duplex Station 308.09 including removal of the existing valve vault, wet well rehab, new pumps, new wet well top, new discharge piping, new control panel and new antenna. Item 9c 4.A.2 Packet Pg. 47 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 7 of 10 Francis Shadowlawn Properties, LLC PPL: PL20210002023* Location: 1948 Shadowlawn Dr Status: Pre-application meeting on 9/7/2021. The request is for a minor sub-division plat to put up a shed with no electric and no plumbing. Gulfview and Bayshore Mixed Use Development PPL: PL20210002029* Location: Parcel 61841080008 (east of Bayshore Drive and north of Van Buren Ave) Status: Pre-application meeting on 9/2/2021. The request is for a 10 acre Mixed Use Development located along Bayshore Drive on Lot 113. Applicant went from multifamily to platted single family lot with two commercial parcels application type change form SDP to PPL. Approved Projects Oakes Farms Parking Lot SDP: PL20170004242* Location:1420 Brookside Dr. Status: Complete - Final acceptance issued by County on 6/8/2021. This SDP is for a 96-parking space, 39,000 square foot parking lot with associated stormwater, landscaping and irrigation. Courthouse Shadows SDPA: PL20200000554 Location: 3290 Tamiami Trail East, Folio 28750000028 Status: Utility Relocation at inspection stage. Courthouse Shadows SDPA: PL20190002368 Location: 3290 and 3420 Tamiami Trail East, Folio 28750000028; 28750000523; 28750000769 Status: Approved on 3-9-2021; Construction underway. This SDPA is for proposed development of 300 units of a multi-family residential community. There will be 5 residential buildings, a clubhouse, detached garages, trash compactor building, maintenance building, a pool amenity area, and an outdoor covered lounge. Fifth Third Bank SDPA: PL20190001097 Location: 2898 Tamiami Trail East Status: Approved on 12-22-2020; Construction underway Item 9c 4.A.2 Packet Pg. 48 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 8 of 10 New Fifth Third Bank at the corner of Tamiami Trail and Bayshore Drive. Sunbelt Rentals SDP: PL20200000188 Location: 2560 Davis Blvd. Status: Approved and construction has commenced Sunbelt Rentals is currently leasing three properties along Davis Boulevard. They are looking to construct a new building on the far east parcel, leave the existing business operational, receive a temporary CO on the new building and complete the site by demolishing the existing building and constructing a new parking and storage area. Bayshore Food Wine Venue Alcohol Beverage Distance Waiver: PL20200001934* Location: NE Area of Bayshore Drive and Becca (Folio 71580240005, and 71580220009) Status: Approved by HEX Decision 2021-12 dated 2/25/21 - with conditions: 1.All other applicable state or federal permits must be obtained before commencement of the development. 2. Outdoor amplified music shall be limited to the hours of 11 :00 a.m. to 10:00 p.m. on Friday and Saturday, and 11 :00 a.m. to 9:00 p.m. on Sunday through Thursday. 3.Fully ensure pedestrian safety crossing Bayshore Drive to the greatest extent feasible. 4.Take protective steps to prevent music amplification intrusion into the abutting residential neighborhood. This request is for a waiver of the 500-foot separation between establishments whose primary function is the sale of alcoholic beverages for consumption on-site, to allow for a 100.3-foot separation between the Celebration Food Truck park and the Bayshore Wine and Food Venue. Bayshore Food Wine Venue SDP: PL20190002611 Location: NE Area of Bayshore Drive and Becca (Folio 71580240005, and 71580220009) Status: SDP Approved on 6/10/21; Pre-construction meeting held on 7/12/2021; Construction underway Proposed 9,350 sq. ft. retail/office/restaurant/warehouse on vacant land. Includes conditions for right-of-way reservation at three corners of Bayshore Dr and Becca Ave for future roundabout improvements as part of CRA Bayshore Beautification project. Rehabilitation Plans for Pump Station 308.04 (SDPI): PL20210001043 Location: 2308 Andrew Dr (Folio 61842800009) Status: Approved 6/04/2021 Item 9c 4.A.2 Packet Pg. 49 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 9 of 10 The proposed project involves the rehabilitation of Collier County Duplex Pump Station 308.04. The rehabilitation will include the removal of the existing valve vault, wet well rehab, new pumps, new wet well top, new discharge piping, new control panel and new antenna. Also included in the project will be improvements to the pump station site including a new fence, earth berm and gravel ground cover. Swamp Axe Worldwide, LLC Alcohol Beverage Waiver– ABW PL20200002617 Location: 2487 Linwood Avenue Status: Hearing Examiner approved on June 11, 2021 Attended CRA Advisory Board meeting on 05.05.21 Requested action: minimum distance waiver to sell alcohol less than 500 feet from a childcare facility. Trail Professional Center SDP: PL20200001177 Location: 3080 Tamiami Trail East Status: Under construction. Pre-construction meeting on 7/16/2021. Demolish the existing structure and replace with a new 3-story office building. Sabal Bay – Jersey Mikes SDPI: PL20210001732* Location: 5040 Tamiami Trail E, Unit #200 Status: Approved on 7/19/2021. Request to update new parking calculations from 2200 sf to 1400 sf. Move grease trap to middle unit. Compass Place SDPI: PL20210001900* Location: 3030 Thomasson Dr Status: First submittal on 8/9/2021. Approved on 8/16/2021 The request is to revise east entrance per Thomasson Drive improvements; remove drainage pipe & replace with conveyance swale; and revise sidewalk configuration along front of (2) buildings. East Trail Office (SDPA): PL20200000222 Location: 2059 Tamiami Trail Status: Final site acceptance issued by County on 5/26/2021. The request is for improvements including interior remodel with additional second story floor area being added, closure of the existing ingress (southern) access on Tamiami Trail East, small amount of parking reconfiguration, vehicular interconnection to the west and fencing off/closure of a portion of the northern parking lot. The existing egress access will become ingress only. The existing Item 9c 4.A.2 Packet Pg. 50 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Page 10 of 10 shared two-way access on Commercial Drive will remain as is. The proposed land use is “general office” at 8,437 sf. Courthouse Shadows Utility Relocation CPP: PL20210001734* Location: 3290 Tamiami Trail E Status: First submittal on 7/15/2021. Staff approved 9/14/2021. This project is scheduled to complete the clubhouse and first building in November 2022. The buildings will be delivered in phases and the project is scheduled to be complete by April 2023. This Construction Phasing Plan request is to relocate of existing utilities from the previously existing shopping center property to be located under the reverse frontage road. The site improvements (including but not limited to asphalt paving, concrete sidewalk, signage/striping, lighting, landscape, and drainage) will be accepted per the Construction Phasing Plan enclosed with this request. Law Office (Zoning Certificate – Non Residential): PL20210000785* Location: 2671 Airport Road S. Unit 301 (Folio 28681500244) Status: Staff approval on 8/03/2021 The request is for a non-residential land use zoning certificate. Applicant intends to relocate an existing business (Law Offices of Lisa C Mead P.A.) to a 1,800 sf office/professional/business center with 40 parking spaces. Item 9c 4.A.2 Packet Pg. 51 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Bayshore/Gateway TriangleRedevelopment Area 07-21-21 20203067-017 AS SHOWN 1 WINDSTAR NAPLES BOTANICAL GARDENS MATTAMY HOMES COLLIER COUNTY GOV'T COMPLEX HAMILTON HARBOR BOTANICAL PLACE CRICKET LAKE CIRRUS POINTE SOUTHPOINTE YACHT CLUB PINEBROOK LAKE CULTURAL ARTS VILLAGE AT BAYSHORE DEVOE PONTIAC KELLER ENTRY LEVEL COURTHOUSE SHADOWS/COLLIER MINI-TRIANGLE MPUD MILLER SQUARE Tam i a m i T R L E Davis BLVD Bayshore DRAirport RD SPine STWindstar BLVD Thomasson DR Barrett AVE Ya c h t H a r b o r DRShadowlawn DRAndrew DRBecca AVE Lunar STRiver DRLinda DR Karen DR Holly AVE Lakeview DR Danford ST Storter AVE Weeks AVEPineland AVEBreakwater WAYAndrews AVE Wa s h i n g t o n A V E Woodside AVEArbutus STCoco AVE Cottage Grove AVE Terrace AVE Liberty LNSabal CT Pine STSABAL BAY MPUD Bayshore/Gateway TriangleRedevelopment AreaCollier County, FL DATE PROJECT NO.FILE NO.SCALE SHEET JOHNSON ENGINEERING, INC.2122 JOHNSON STREETP.O. BOX 1550FORT MYERS, FLORIDA 33902-1550PHONE (239) 334-0046FAX (239) 334-3661E.B. #642 & L.B. #642W:\2014\20149700-241\ArcGIS\PDF\Boundary Check\07-21-21 CRA Boundary Comparison 11x17.mxdLegend CRA Boundary City of Naples FLU: Bayshore/Gateway Triangle Redevelopment Overlay Planned Unit Development (PUD) Bayshore Mixed Use District (BMUD) Gateway Triangle Mixed Use District (GTMUD) 0 1,000 2,000500ft City of Naples SABAL BAY MPUD SABAL BAY MPUD Notes:1. CRA boundary provided by Collier County GMD, January 2020.2. City of Naples, Zoning Overlays, Future Land Use Overlay, andPUD data from Collier County GIS Hub by Collier County GMD,February 2021. Item 9c - Map 4.A.2 Packet Pg. 52 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-October 6, 2021) Locations Activity Description/Issues Date Results Status completion date Light Pole #35 due to accident Tami got the insurance and driver information Completely knocked down pole need to use replacements from Thomasson Drive project 4/12/2021 Filed claim Contractor replaced light pole week of june 12th, waiting for reimburement from insurance Fence under Haldeman Creek Bridge needs repair John Johnson working with Road Maintenance with CRA parnership Homeless continuing to cut fence 5/1/2021 Road Maintenance removed all homeless trash and debris fence repair still in process CRA Director working with Road Maintenance on costs of repair Light Pole #50 due to accident reported from Traffic Ops Pole knocked down the light pole was destroyed Traffic Ops removed all debris 9/3/2021 New light installed by Southern Signal 9/23 Waiting for reimbursement Bayshore Drive Plantation to US 41 Quarterly Paver Safety check issues from tree roots and construction projects 8/16/2021 Paver Contractor out doing repairs Next Safety Check mid December 9/16/2021 CRA purchased 2732 Francis Ave Need to add to CRA property maintenance bid out Mowing, hedging, after vacant house demo'd 9/23/2021 Bids will be due after demo is completed 09/30/2021 Maintenance Report Item 9d 4.A.2 Packet Pg. 53 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee- Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 163 BAYSHORE/AVALON MST 47,956.35 19,173.14-28,783.21- ** REVENUE Sub Total 1,347,700.00-1,347,700.00-1,347,700.00-1,245,447.03-102,252.97- * REVENUE - OPERATING Su 1,295,300.00-1,295,300.00-1,295,300.00-1,245,447.03-49,852.97- 311100 CUR AD VALORE 1,285,300.00-1,285,300.00-1,285,300.00-1,218,430.26-66,869.74- 311200 DEL AD VALORE 24,274.09-24,274.09 361170 OVERNIGHT INT 547.38-547.38 361180 INVESTMENT IN 10,000.00-10,000.00-10,000.00-2,051.69-7,948.31- 361320 INTEREST TAX 143.61-143.61 * CONTRIBUTION AND TRANS 52,400.00-52,400.00-52,400.00-52,400.00- 486600 TRANS FROM PR 486700 TRANS FROM TA 489200 CARRY FORWARD 117,200.00-117,200.00-117,200.00-117,200.00- 489900 NEG 5% EST RE 64,800.00 64,800.00 64,800.00 64,800.00 ** EXPENSE Sub Total 1,342,700.00 1,347,700.00 1,347,700.00 47,956.35 1,226,142.28 71,072.26 * OPERATING EXPENSE 325,100.00 330,100.00 330,100.00 47,956.35 273,115.65 6,498.89 631400 ENG FEES 37,974.00 37,974.00- 634970 INDIRECT COST 5,200.00 5,200.00 5,200.00 5,200.00 634980 INTERDEPT PAYMENT 500.00 500.00- 634990 LANDSCAPE INC 102,000.00 102,000.00 102,000.00 2,761.73 12,764.76 86,473.51 634999 OTHER CONTRAC 102,000.00 102,000.00 102,000.00 13,813.75 56,268.92 31,917.33 643100 ELECTRICITY 25,000.00 25,000.00 25,000.00 11,143.85 15,690.16 1,834.01- 643400 WATER AND SEWER 82.96 3,388.04 3,471.00- 645100 INSURANCE GEN 900.00 900.00 900.00 900.00 645260 AUTO INSURANC 900.00 900.00 900.00 900.00 646311 SPRINKLER SYS 10,000.00 10,000.00 10,000.00 180.57-10,180.57 646318 MULCH 15,000.00 15,000.00 15,000.00 829.70 7,670.30 6,500.00 646360 MAINT OF GROU 20,000.00 20,000.00 20,000.00 20,000.00 646430 FLEET MAINT I 5,000.00 5,000.00 5,000.00 4,576.00 424.00 646440 FLEET MAINT P 2,200.00 2,200.00 2,200.00 127.38 2,072.62 646445 FLEET NON MAI 300.00 300.00 300.00 148.13 151.87 646451 LIGHTING MAIN 35,000.00 35,000.00 35,000.00 17,705.97 110,933.49 93,639.46- Fund 163 Bayshore MSTU Item 9e 4.A.2 Packet Pg. 54 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee- 648170 MARKETING & PROMO 1,800.00 1800.00- 649030 CLERKS RECORDING 52.50 52.50- 649100 LEGAL ADVERTI 1,200.00 1,200.00 1,200.00 1,500.00 300.00- Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available 652310 FERT HERB CHEM $5,000.00 $5,000.00 118.39 131.61 4750.00 652490 FUEL AND LUB 400.00 400.00 400.00 116.47 283.53 652990 OTHER OPERATI 14,286.07 14,286.07- * TRANSFERS 917,100.00 917,100.00 917,100.00 917,100.00 911600 TRANS TO 160 791,600.00 791,600.00 791,600.00 791,600.00 911870 TRANS TO 187 125,500.00 125,500.00 125,500.00 125,500.00 * TRANSFER CONST 41,300.00 41,300.00 41,300.00 35,926.63 5,373.37 930600 PA BUDGET TR 12,300.00 12,300.00 12,300.00 9,892.34 2,407.66 930700 TC BUDGET TR 29,000.00 29,000.00 29,000.00 26,034.29 2,965.71 * RESERVES 59,200.00 59,200.00 59,200.00 59,200.00 993000 RESV FOR CAPI 59,200.00 59,200.00 59,200.00 59,200.00 Fund 160 Project 50171 Hamilton Ave Parking Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50171 BAYSHORE/AVALON PR 599,500.00 599,500.00 599,500.00 599,500.00 ** REVENUE Sub Total 700,500.00-700,500.00-700,500.00-700,500.00- *CONTRIBUTION AND TRANS 700,500.00-700,500.00-700,500.00-700,500.00- 482187 ADV/REPAY FRM 700,500.00-700,500.00-700,500.00-700,500.00- **** XPENSE Sub Total 1,300,000.00 1,300,000.00 1,300,000.00 1,300,000.00 *CAPITAL OUTLAY 1,300,000.00 1,300,000.00 1,300,000.00 1,300,000.00 763100 IMPROVEMENTS 1,300,000.00 1,300,000.00 1,300,000.00 1,300,000.00 Item 9e 4.A.2 Packet Pg. 55 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee- 648170 MARKETING & PROMO 1,800.00 1800.00- 649030 CLERKS RECORDING 52.50 52.50- 649100 LEGAL ADVERTI 1,200.00 1,200.00 1,200.00 1,500.00 300.00- Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available 652310 FERT HERB CHEM $5,000.00 $5,000.00 118.39 131.61 4750.00 652490 FUEL AND LUB 400.00 400.00 400.00 116.47 283.53 652990 OTHER OPERATI 14,286.07 14,286.07- * TRANSFERS 917,100.00 917,100.00 917,100.00 917,100.00 911600 TRANS TO 160 791,600.00 791,600.00 791,600.00 791,600.00 911870 TRANS TO 187 125,500.00 125,500.00 125,500.00 125,500.00 * TRANSFER CONST 41,300.00 41,300.00 41,300.00 35,926.63 5,373.37 930600 PA BUDGET TR 12,300.00 12,300.00 12,300.00 9,892.34 2,407.66 930700 TC BUDGET TR 29,000.00 29,000.00 29,000.00 26,034.29 2,965.71 * RESERVES 59,200.00 59,200.00 59,200.00 59,200.00 993000 RESV FOR CAPI 59,200.00 59,200.00 59,200.00 59,200.00 Fund 160 Project 50171 Hamilton Ave Parking Fund / Comm Item BCC Adopt Budget Tot Adopt Budget Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50171 BAYSHORE/AVALON PR 599,500.00 599,500.00 599,500.00 599,500.00 ** REVENUE Sub Total 700,500.00-700,500.00-700,500.00-700,500.00- *CONTRIBUTION AND TRANS 700,500.00-700,500.00-700,500.00-700,500.00- 482187 ADV/REPAY FRM 700,500.00-700,500.00-700,500.00-700,500.00- **** XPENSE Sub Total 1,300,000.00 1,300,000.00 1,300,000.00 1,300,000.00 *CAPITAL OUTLAY 1,300,000.00 1,300,000.00 1,300,000.00 1,300,000.00 763100 IMPROVEMENTS 1,300,000.00 1,300,000.00 1,300,000.00 1,300,000.00 Item 9e 4.A.2 Packet Pg. 56 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee- Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 160 BAYSHORE/AVALON PR 570,570.53 3,686,248.80 4,256,819.33- ** REVENUE Sub Total 1,575,000.00-1,575,000.00-5,637,295.80-7,212,295.80-813,304.15-6,398,991.65- * REVENUE - OPERATING Su 21,704.15-21,704.15 361170 OVERNIGHT INT 4,435.26-4,435.26 361180 INVESTMENT IN 17,268.89-17,268.89 * CONTRIBUTION AND TRANS 1,575,000.00-1,575,000.00-5,637,295.80-7,212,295.80-791,600.00-6,420,695.80- 481163 TRANS FRM 163 791,600.00-791,600.00-791,600.00-791,600.00- 482187 ADV/REPAY FRM 700,500.00-700,500.00-700,500.00-700,500.00- 489200 CARRY FORWARD 82,900.00-82,900.00-82,900.00-82,900.00- 489201 CARRY FORWARD 5,637,295.80-5,637,295.80-5,637,295.80- ** EXPENSE Sub Total 1,575,000.00 1,575,000.00 5,637,295.80 7,212,459.80 570,570.53 4,499,552.95 2,142,172.32 * OPERATING EXPENSE 202,017.26 85,836.00 287,853.26 614,519.05 326,665.79- 631400 ENG FEES 287,853.26 287,853.26 614,519.05 326,665.79- 646451 LIGHTING MAIN 85,836.00-85,836.00 * CAPITAL OUTLAY 1,550,000.00 1,550,000.00 5,435,278.54 85,836.00-6,899,442.54 570,570.53 3,885,033.90 2,443,674.11 763100 IMPROVEMENTS 1,550,000.00 1,550,000.00 5,435,278.54 85,836.00-6,899,442.54 570,570.53 3,885,033.90 2,443,674.11 * RESERVES 25,000.00 25,000.00 25,164.00 25,164.00 993000 RESV FOR CAPI 25,000.00 25,000.00 25,164.00 25,164.00 Fund / Comm Item BCC Adopt Budget Tot Adopt Budget CarryF Amendme Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50174 BAYSHORE/AVALON PR 250,000.00 250,000.00 90,416.00 340,416.00 90,416.00 250,000.00 ** EXPENSE Sub Total 250,000.00 250,000.00 90,416.00 340,416.00 90,416.00 250,000.00 * CAPITAL OUTLAY 250,000.00 250,000.00 90,416.00 340,416.00 90,416.00 250,000.00 763100 IMPROVEMENTS 250,000.00 250,000.00 90,416.00 340,416.00 90,416.00 250,000.00 Fund 160 Bayshore Capital Projects Fund 160 Project 50174 North Bayshore Item 9e 4.A.2 Packet Pg. 57 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee- Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50173 BAYSHORE/AVALON PR 11,635.00 11,635.00 11,635.00 ** EXPENSE Sub Total 11,635.00 11,635.00 11,635.00 * OPERATING EXPENSE 11,635.00 11,635.00 11,635.00 631400 ENG FEES 11,635.00 11,635.00 11,635.00 Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50154 FEMA BAYSHORE/AV 164.00 164.00 ** EXPENSE Sub Total 164.00 164.00 * OPERATING EXPENSE 85,836.00-85,836.00 646451 LIGHTING MAIN 85,836.00-85,836.00 * CAPITAL OUTLAY 86,000.00 85,836.00-164.00 763100 IMPROVEMENTS 86,000.00 85,836.00-164.00 Fund / Comm Item BCC Adopt Budget CarryF Amendme Amendments Tot Amend Budget Commitment Actual Available **** Grand Total-Fund/ CI *** 50172 BAYSHORE/AVALON PR 5,535,080.80 5,535,080.80 480,154.53 4,499,552.95 555,373.32 ** EXPENSE Sub Total 5,535,080.80 5,535,080.80 480,154.53 4,499,552.95 555,373.32 * OPERATING EXPENSE 276,218.26 276,218.26 614,519.05 338,300.79- 631400 ENG FEES 276,218.26 276,218.26 614,519.05 338,300.79- * CAPITAL OUTLAY 5,258,862.54 5,258,862.54 480,154.53 3,885,033.90 893,674.11 763100 IMPROVEMENTS 5,258,862.54 5,258,862.54 480,154.53 3,885,033.90 893,674.11 Fund 160 Project 50172 Thomasson Drive Fund 160 Project 50173 South Bayshore Fund 160 Project 50154 FEMA Item 9e 4.A.2 Packet Pg. 58 Attachment: MSTU Agenda Packet-10-6-21 (20389 : Bayshore Beautification MSTU Advisory Committee-