Loading...
Backup Documents 11/09/2021 Item #16A18 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 A 1 b TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office II I 1 al 4. BCC Office Board of County b%N Commissioners Jd f 5 ( 5. Minutes and Records Clerk of Court's Office YUk t r.1 202( ?-'ti PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Andrew Miller—GMD—Capital Project Contact/ Department Planning, Impact Fees and Program Management Agenda Date Item was 1 1/09/21 Agenda Item Number 16.A.18 Approved by the BCC Type of Document Work Order— 18-7432-CZ—Taylor Engineering Number of Original 1 Attached — 2022 Dune Planting and Exotic Vegetation Documents Attached Removal-$32,444.00 PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature STAMP OK FEB 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be FEB signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 06/08/2021 and all changes made during FEB N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the L•w I/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the Tt� n option for Chairman's signature. ` this line. 1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16A18 MEMORANDUM Date: November 18, 2021 To: Andrew Miller, Manager Coastal Management Program From: Martha Vergara, Deputy Clerk Minutes and Records Department Re: Work Order #18-7432 CZ - Dune Planting & Exotic Vegetation Removal Taylor Engineering, Inc. Attached is a scanned copy of the document referenced above, (Item #16A18) approved by the Board of County Commissioners on Tuesday, November 9, 2021. The original has been held in the Minutes and Records Department for the Board's Official Record. If you have any questions, please contact me at 252-7240. Thank you. Attachment 16A18 WORK ORDER/PURCHASE ORDER Contract 18-7432-CZ"Professional Services Library—Coastal Engineering Category" Contract Expiration Date: March 9, 2025/ This Work Order is for professional Engineering Services for work known as: Project Name: Dune Vegetation Restoration Project—Grant Funded Project No: 50154.1 , The work is specified in the proposal dated October 7, 2021/which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to: Taylor Engineering. Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I Drawings and Technical Specifications * Task 11 Bid Administration Assistance Schedule of Work: Complete work within 225 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement# l 8-7432-CZ will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above. the County will compensate the Firm in accordance with followinj method(s): (Negotiated Lump Sum (NLS) (Lump Sum Plus Reimbursable Costs (LS+RC) Time & Material (T&M) (established hourly rate— Schedule A) n Cost Plus Fixed Fee(CPFF), as provided in the attached proposal. Task I $24,460.00 Task II $ 7,984.00/ TOTAL FEE $32,444.00 / Digitally signed by MillerAndrew PREPARED BY: MI n er rew Date:2021.10.0810:25:21-04'00' Andrew Miller, Manager Date Swann.w�or�..wew McLeanMatthewa.. � ��� � APPROVED BY: .a��. �a� Matthew McLean, Division Director Date Digitally signedby ScottTrinityScottTrinit Date:2021.10.14 12:06:16 APPROVED BY: -04'00' Trinity Scott, Department Head Date Page 1 of 3 16A18 By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Taylor Engineering, Inc. Jenna Phillips Digitally signed by Jenna Phillips Date:21021.10.11 10:07:12-04'00' Jenna Phillips, M.S., Sr. Project Engineer Date (Remainder of page intentionally left blank) Page 2 of 3 16A18 IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOAR OF COUNTY COMMISSIONERS Ci t 1 Kir1zei,:Cie k of Courts COL E UNTY, FLO By: By. 0144/9 , Chairman Dated: oJewt4x.._ • Attest affi` tlit % Taylor Engineering, Inc. Digitally signed by Robert Neal parts 2 221.10.11 Dae:DitaN2021y gned.10.11y Jenna 1008.:5phillips By: Jenna Phillips -�,DD, 11:57:02-04'00' First Witness Signature Jenna Phillips, M.S., Sr. Project Engineer TType/print signature and titleT TType/print witnesgsita�aymg a by - ki_ i7/)l �Kenneth Craig Date:2021.10.11 Second Witness 14:D8:3'l UA'W" TType/print witness nameT A rov as to Form and Legaliitty�: ( ; WI Assistant County Atto ey (pUe1ev' M M . &1661-& Print Name Page 3 of 3 16A18 ctober 7, 2021 (Proposal valid for 90-days) Mr.Andrew Miller, P.E. Principal Project Manager Collier County Coastal Zone Management 2685 South Horseshoe Drive, Unit 103 Naples, Florida 34104 RE: Vanderbilt, Naples,and Park Shore Beaches Dune Planting Plans,Specifications,and Bid Package Preparation;Collier County, Florida Mr. Miller: Per your request, Taylor Engineering is pleased to submit the enclosed scope of work and fee proposal (Exhibit A)for design,technical specifications and bid administration for the Vanderbilt, Naples, and Park Shore Beach Dune Planting Projects. Primary tasks include design, development of contract documents and bid assistance services. Taylor Engineering will perform these services on a time and materials basis,for a total cost not-to-exceed fee of$32,444.00. Please contact me at(941) 702-5871 or jphillips@taylorengineering.com with any questions. Sincerely, Jenna Phillips, M.S. Regional Office Lead Attachments(1) 16A18 TAYLOR ENGINEERING , I N C . Delivering Leading-Edge Solutions VANDERBILT, NAPLES and PARK SHORE BEACHES DUNE PLANTING PLAN,SPECIFICATION,AND BID PACKAGE PREPARATION SERVICES COLLIER COUNTY, FLORIDA EXHIBIT A-SCOPE OF WORK Introduction Collier County (County) intends to complete a dune planting and exotic vegetation removal project at Vanderbilt, Park Shore, and Naples Beaches. The Vanderbilt Beach project area extends from Collier County Florida Department of Environmental Protection (FDEP) Reference Monument (R-monument) R- 22.3 south to R-32. Naples Beach extends from R-60 to R-74.3. Park Shore Beach extends from R-42 to R- 54+400. The existing dunes in this area are densely vegetated but contain exotic species that are to be removed; the newly nourished dune requires new plantings with native species to facilitate the establishment of a self-sustaining dune ecosystem. Additionally, beach access improvements will be incorporated to include signages, rope and posts to keep people off the dunes/dune plantings. Under this scope, Taylor Engineering will produce the necessary plans, specifications, and bid package documents to support planting and exotic vegetation removal efforts at Vanderbilt, Park Shore, and Naples Beaches.The County's intent for this project is to vegetate the nourished dune with native species and remove exotic vegetation species that have invaded the existing dune.This scope of work is to provide a dune planting plan in compliance with FDEP Permit No 0331817-004-1M and other information which may be required to support the bid administration efforts. Assumptions Taylor Engineering made several assumptions in developing this scope of work and associated fees for the project. The assumptions listed below, and throughout this scope of work, affect the proposed level of effort and associated costs. If any of the assumptions prove incorrect, Taylor Engineering will submit a proposal to modify our scope of work and fees accordingly. Taylor Engineering developed this scope of work under the following assumptions and background information: The project area extends from R-22.3 to R-32, R-42 to R-54+400,and R-60 to R-74.3 in Collier County. The newly established dune will be constructed as depicted in the 2021 Beach Renourishments: Naples, Vanderbilt, & Pelican Bay Construction Plans produced by Coastal Planning& Engineering, Inc. and dated 7/30/2021. The County has secured the necessary permits for this work. Taylor Engineering is not responsible for permit acquisition. The County will advertise the project. The County will conduct inspections during planting operations and produce necessary project completion documents for submittal to FDEP. The County is responsible for complying with necessary precautions for shorebirds and sea turtles as outlined in the FDEP permit. Taylor Engineering not responsible for permit compliance and/or production of permit compliance documentation. 10199 SOUTHSIDE BLVD, SUITE 310 JACKSONVILLE, FL 32256 TEL 904.731 .7040 WWW.TAYLORENGINEERING.COM 16A18 Collier County October 7,2021 Page 2 of 6 The County will be responsible for post-planting activities as required by FDEP permit (i.e. subsequent watering and sand fence removal), construction observation, and project certification Client Responsibility Client shall provide Taylor Engineering with the following information and documents related to the project site, if available: Permit and design documents associated with the beach and dune fill project Natural resource surveys including physical and biological monitoring, and documentation of other resources of concern to regulatory agencies; Survey data, including but not limited to, boundary (property and riparian rights lines), topography/bathymetry, existing nearshore structures (seawalls, nearshore boardwalks, boat ramp, piers, etc.), mean high water line(s); County field estimates for exotic vegetation removal areas for each project site. Copies of existing regulatory authorizations associated with the project site, including temporary use agreements where applicable. Taylor Engineering shall have the right to reasonably rely on the accuracy and validity of such documentation and data. Collier County will provide existing conditions survey to Taylor Engineering for the purposes of this project. The following tasks comprise this scope of work. Scope of Work 1.0 DRAWINGS AND TECHNICAL SPECIFICATIONS Taylor Engineering staff will prepare drawings and technical specifications for a dune flora restoration. We anticipate the project design will include the following components: • Native plant species consisting of 70%dune grasses and 30%other native dune species o predominantly sea oats(Uniola paniculata),dune panic grass(Panicum amarum),railroad vine(Ipomea pes-caprae), and/or dune sunflower(Helianthus debilis) o 4"container plants or less placed a minimum of 6"deep c> Placement in staggered rows at a maximum distance of 18" apart c, Fertilize and water-in the planting units during installation • Signage, rope and bollard barriers, or sand fence placed to protect the new vegetation and dune feature according to FDEP guidelines The project will include vegetation planting along the newly constructed and existing dune system within the limits of the Vanderbilt Beach nourishment area (R-22.3 to R-32), Park Shore Beach area (R-42 to R- 54+400) and the partial limits of the Naples Beach nourishment area (R-60 to R-74.3). Portions of the project area have an established dune and vegetation, in those areas, the proposed project will supplement the existing vegetation with the installation of several native dune species and the removal of exotic species. This will help promote a healthy, diverse dune ecosystem. TA Y L O R ENGINEERING , INC . 1 6A18 Collier County October 7,2021 Page 3 of 6 On behalf of Collier County,Taylor Engineering will prepare draft construction drawings and specifications for the proposed dune planting, exotic species removal in areas as identified by County, sand fence, and dune signage installation as required for regulatory review. The draft construction drawings will include the limits of the proposed vegetation planting including planting zones (dune face, dune crest, upland, etc),and educational signage, post and rope locations.The drawings will also include typical cross section views, preliminary planting details for each zone, existing and proposed grade contours (from existing survey data), Collier County property lines and the Coastal Construction Control Line (CCCL). The vegetation limits will be determined based on the most recent aerial photographs, topographic survey data, and beach nourishment plans provided by the County. A Taylor Engineering staff member will visit the project site to verify the proposed planting area/zones, beach access,and educational signage areas. We will submit draft construction drawings and specifications to Collier County and FDEP for review and approval. We will schedule a teleconference with FDEP to discuss the draft construction drawings and supporting information and will coordinate with FDEP and the County to address FDEP questions and review comments.While we anticipate submittal of a complete and concise drawing package,the nature of the project may generate review comments and agency requests for additional information (RAls) during the review process. Should coordination and requests for additional information require more time than the amount budgeted for this task,we will contact Collier County and discuss a modification of the contract to account for the additional level of effort. Taylor Engineering will prepare final technical specifications and construction drawings to support bidding and construction of the project.The drawings will consist of plan and cross section views of the nourished beach conditions and dune vegetation community restoration, sand fencing, beach access post and rope enhancements, and educational signage. The final construction drawings will also include specific details for the proposed vegetation areas.As part of this task,we will estimate the project construction quantities for inclusion in the bid package.We will update the technical specifications to be consistent with the FDEP permit and the construction drawings. Additionally, we assume Collier County will prepare and provide its standard"front-end"contract documents for project bidding;we will review these documents and the contract plans and specifications for consistency. We will provide the final construction-ready specifications and drawings in reproducible hardcopy and digital format. 2.0 BID ADMINISTRATION ASSISTANCE Taylor Engineering will provide the final construction bid package(Contract Documents)to Collier County and support the County during the solicitation/award phase of the project. Bid administration assistance services shall include the following activities: • Compile the Contract Documents to include the County's standard front-end contracting and purchasing documents, construction plans, technical specifications, and other pertinent documents. • Develop an Opinion of Probable Cost for construction, if required. • Assist Collier County with the distribution of construction Contract Documents to prospective contractors, if required. • Attend and provide technical support for a pre-bid conference if the county organizes such a meeting for this project. • Assist with the development of contract document addenda in response to technical questions from potential bidders. • Attend the bid opening meeting. • Review bids,check contractor's technical references, and prepare a written recommendation for contractor selection. TA Y L O R ENGINEERING , I N C . 16A18 Collier County October 7,2021 Page 4 of 6 Our review and recommendations will be limited to engineering and technical issues. Collier County will be responsible for review and evaluation of contractors' financial condition, business licenses or authorizations, bonding, contractual requirements, and any other non-engineering or non-technical information. We will review the bid recommendations with the County and assist it in verifying that all the necessary bid components are in order. Schedule Scope of work to be completed within 225 days from receipt of the Notice to Proceed (NTP). Fees Taylor Engineering will perform the work on the basis of Time and Materials, Not to Exceed $32,444.00, to be invoiced monthly. TAYLOR ENGINEERING, INC. COST SUMMARY BY TASK P2021-133: VANDERBILT, PARK SHORE& NAPLES BEACH DUNE PLANTING TASK 1: Drawings and Technical Specifications Labor Hours Rates Cost Task Totals Principal 4.0 231.0/ 924.00' Senior Engineer 32.0 177.0/ 5,664.00 Engineer 40.0 130.0/ 5,200.00/ Senior Environmental Specialist 40.0 167.0/ 6,680.00/ CADD Technician 56.0 107.01 5,992.00/ Total Man-Hours 172.0 Labor Cost 24,460.00 Total Non-Labor Cost - Total Task 1 24,460.00 TAYLOR ENGINEERING , I N C . 1 6A18 Collier County October 7,2021 Page 5 of 6 TASK 2: Bid Administration Assistance Labor Hours Cost Task Totals Principal 2.0 231.0� 462.00 Senior Engineer 24.0 177.0 4,248.00 Engineer 8.0 130.0" 1,040.00 Senior Environmental Specialist 12.0 167.0,x 2,004.00/ Scientist/Geologist 2.0 115.0 230.00 Total Man-Hours 48.0 Labor Cost 7,984.00 Total Task 2 7,984.00 Total $ 32,444.00" TAYLOR ENGINEERING , I N C . 1 6 411J Collier County October 7,2021 Page 6 of 6 Collier County Contracted Rate Schedule SCHEDULE B-ATTACHMENT 1 RATE SCHEDULE Principal j $231 Senior Prvlect Manager , S203 Project Manager $160 Senior Engineer S177 Engineer S130 Senior Inspecttx__�_� _.. $126 Intmctor _ S93 Senior Planner $150 -.�...... .._-.__._,_.___..� Planner _._ _.-___.._ S12C, Senior Dcsiitcr _.$140 .._. Designer $103 Pnvinxvrteatal Specialist S120 — Senior Environmental Specialist S147 Scientist icolo st SI15 Senior Scientist/Geologist $153 Marine Biologist ltdregeologist $120 Senior Marine Biolo�ist.itdrugeologist S145 _._ _ Senior GIS Specialist $155 GIS Specialist - $115 ClericaVAdministrative ST3 Senior Technician $103 Technician SW Surveyor and ha S123 I CADD Technician $107 Survey Crew_2 titan $145 j Survey Crew-3 man SIN $i Surveil•Crew-4 man SUS i Senior Architect S160 _1 Architect $125 1 The above hourly rates are applicable to Time and Materials task(s)only The above list may not be al' inclusive Hourly rates for additional categories required to provide particular project services shalt be mutually agreed upon by the County and firn in writing.on a protect by project basis.as needed,arid will be set forth in the Work Order agreed upon by the paries TA Y L O R ENGINEERING , I N C . 16A18 From: ticraeaeLosnat Tu: Zzaaltepra utalMtiMarti seNate Rom•on•nr.+rl':9.2412-C2 Dam: Prosy.snxerber Is.20212'M.Ir Pl1 Albamm•Y: ) ,tea amO01.aal Hi Parton, The next firm in rotation for 18.7432-Q is TAYLOR ENGINEERING INC. Please be sure to attach this email to the requisition. Respectfully, Cynthia McCanna Procurement Strategist CO per County Procurement Services Division 3295 Tamiami Trail East,Bldg.C2!Naples.FL 34112 Office(239)252-8992 gmthia mrcannaecoliercounfvrl pay 'HOW ARE WE DOtNGT'jrl<.1SC T AU Our Sure We appreciate your feedback! BidSj'nc(non'A?town as Periscope SOURCE)is Collier County's hid platform,and registration is free. Register today at Worn'havoc rvre, For registration assistance please contact Ridl me customer service at 800-990-9339 or cilia:supper hid yne iyRt From:BevardFarron cFarron.Bevard@colliercountyfl.goon Sent:Friday,September 10,2021 2:31 PM To:McCannaCynthia cCynthia.McCann@colliercountyfl gov> Cc:MillerAndrew cAndrew.Miiler@cohiercountyfl.gor> Subject:Rotation Request:18-7432-a Hey Cynthia At your earliest mnvenicnce,can you please let us know who is next in rotation in relation to 18-7432-CZ: PSL-COASTAL ENGINEERING CATEGORY 11.7432-a 4600005020 APTI4 ENVIRONMENTAL&I8RASIRUCURE (reA-C8&1 ENVIRONMENTAL&7111R„ 124970 03/10/2020 03109/2025 PSL-COASTAL EMG81EEIU4G CATEGORY 4600003021 Mm1STON&MOORE ENGBIEERS PA 101492 03/10/2020 03/09/2023 PSL-COASTAL ENG'RIEEIUW CATEGORY 460000077 TAYLOR ENGINEERNG RIC 10292a 03/10/2020 03/09/2023 • Specific Category Name for 18.7432-C2.Coastal Engineering • Project Name:Dune Vegetation Project(2022) • Brief Description:Design and bid package for 2022 dune vegetation project • 2021 dune project is currently in the works from Lowdermilk Park to Doctors Pass • We art hoping to have this out to bid by December 2021(after construction is complete with the 2021-2022 Collier Beach Renourishment project) Please let us know if you have any further questions or concerns. As always,thank you! Respectfully, Farron Bevard Operations.Analyst Co r County We are committed to your success' Growth Management Department Capital Project Planning,Impact Fees&Program Management Division Coastal Zone Management Section 2685 South Horseshoe Drive!'nit lift Septa,Fa.,14104 Office:'LO n52 786! • Under Florida Law.e-mall addresses are pubes records.If you do nal want your e-mail address released in response to a public records request,on not send electronic mad to this entity.Instead. contact this office by telephone arm writing.