Agenda 09/28/2021 Item #16A13 (TDC Grant Applications)09/28/2021
EXECUTIVE SUMMARY
Recommendation to approve the Tourist Development Council Grant application requests from the
City of Naples, the City of Marco Island and Collier County for FY2021-2022 in the amount of
$8,362,600; budget these expenditures; authorize the Chairman to execute an Agreement with the
City of Naples; and make a finding that these expenditures promote tourism.
OBJECTIVE: To obtain approval of Tourist Development Fund 195 Grant application requests for
2021-2022 in the amount of $8,362,600.
CONSIDERATIONS: To review and approve the received TDC Grant Applications as follows:
FY2021/2022 Tourist Development Council Fund 195 Grant applications
STAFF
PROJECT/DESCRIPTION: REQUESTED RECOMMENDED
1. Beach Renourishment Projects
Naples Beach FY 2021 Beach Renourishment Program - 90068 $2,600,000 $2,600,000
Vanderbilt Beach FY 2021 Beach Renourishment Program - 90066 $2,600,000 $2,600,000
USACE Feasibility Study Technical Support - 80366 $ 500,000 $ 500,000
Local Government Funding Request (LGFR) - 90065 $ 25,000 $ 25,000
SUB-TOTAL $5,725,000 $5,725,000
2. Inlet Projects
Wiggins Pass Dredge - 80288 $ 150,000 $ 150,000
Clam Pass Monitoring - 88032 $ 20,000 $ 20,000
SUB-TOTAL $ 170,000 $ 170,000
3. Regulatory
Beach Tilling - Collier County - 80171 $ 30,000 $ 30,000
Biological Monitoring Nearshore Hardbottom - 90033 $ 185,000 $ 185,000
Shorebird Monitoring - 90297 $ 25,000 $ 25,000
Physical Beach and Pass Monitoring - (Vanderbilt, Clam Pass
Beach, Park Shore, Naples, and Marco South Beaches along with
Wiggins, Doctors, Collier Creek and Caxambas Pass) - 90536
$ 170,000 $ 170,000
Sea Turtle Protection Program - Collier County - 99999 $171,700 $171,700
SUB-TOTAL $581,700 $581,700
4. Beach Maintenance
Beach Maintenance - City of Naples - 90527 $ 203,000 $ 203,000
Beach Maintenance - Collier County/Marco Island - 90533 $ 268,100 $ 268,100
SUB-TOTAL $ 471,100 $ 471,100
5. Structures
Naples Pier Repair & Maintenance - 90096 (Category D) $200,000 $200,000
SUB-TOTAL $200,000 $200,000
6. Administration
16.A.13
Packet Pg. 703
09/28/2021
195 Admin Costs - 90020 $ 75,000 $ 75,000
185 Project Management and Administration - 99195 $ 883,700 $ 883,700
Tax Collector Fee’s (2.5%) - 99195 $ 256,100 $ 256,100
SUB-TOTAL $1,214,800 $1,214,800
TOTAL GRANTS $8,362,600 $8,362,600
1. Beach Renourishment Projects: Exceptional beach experience for our residents and visitors has
been at the heart of our success in the past. These projects are required to maintain that experience.
Approval is recommended.
2. Inlet Projects: Projects required to maintain the beaches, inlets, and the engineering and permitting
required to support construction. Approval is recommended.
3. Regulatory and Permit Compliance: All these items are required by the Florida Department of
Environmental Protection (FDEP) permit, required by law or required to maintain critical
programs between required permit activities. Approval is recommended.
4. Beach Maintenance: Beach maintenance is required along with beach renourishment to experience
an exceptional experience for our visitors and residents. Approval is recommended.
5. Structures: The City of Naples is requesting $200,000 in grant funding for the upkeep and safety
of the Naples pier. Approval is recommended
6. Administration: Administrative program and project management cost to manage the beach
program. Approval is recommended.
FISCAL IMPACT: The Fiscal Year 2021/2022 proposed Beach Renourishment Fund (195) budget
appropriates funding for these grant applications. The source of funds is the Tourist Development Tax.
GROWTH MANAGEMENT IMPACT: There is no impact to the growth management plan related
to this action.
ADVISORY COMMITTEE RECOMMENDATIONS: The Coastal Advisory Committee approved
this item on 06/10/2021 (9-0 vote). The Tourist Development Council approved this item on 6/28/2021
(7-0 vote).
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires
majority vote for approval - CMG
RECOMMENDATION: To approve the Tourist Development Council Grant application requests
from the City of Naples, the City of Marco Island and Collier County for FY2021 -2022 in the amount
of $8,362,600; budget these expenditures; authorize the Chairman to execute an Agreement with the
City of Naples; and make a finding that these expenditures promote tourism.
Prepared By: Andrew Miller, P.E., Coastal Zone Management, Capital Project Planning, Impact Fees
and Program Management Division
ATTACHMENT(S)
1. CZM Grant Applications FY21-22 (PDF)
2. TDC Grant Application - Turtle Monitoring (PDF)
3. TDC Grant Application Naples Pier Signed CM CoN (PDF)
16.A.13
Packet Pg. 704
09/28/2021
4. TDC 2022 Cat A Grant App Beach Maint Signed CM CoN (PDF)
5. 2021-2022 Category A City of Naples Agreement (PDF)
16.A.13
Packet Pg. 705
09/28/2021
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.13
Doc ID: 16232
Item Summary: Recommendation to approve the Tourist Development Council Grant application
requests from the City of Naples, the City of Marco Island and Collier County for FY2021-2022 in the
amount of $8,362,600; budget these expenditures; authorize the Chairman to execute an Agreement with
the City of Naples; and make a finding that these expenditures promote tourism.
Meeting Date: 09/28/2021
Prepared by:
Title: – Capital Project Planning, Impact Fees, and Program Management
Name: Jessica Arencibia
08/03/2021 11:35 AM
Submitted by:
Title: Director – Capital Project Planning, Impact Fees, and Program Management
Name: Matthew McLean
08/03/2021 11:35 AM
Approved By:
Review:
Growth Management Department Lissett DeLaRosa Growth Management Department Completed 08/04/2021 2:21 PM
Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Completed 08/04/2021 2:37 PM
Capital Project Planning, Impact Fees, and Program Management Andrew Miller Additional Reviewer Completed 08/05/2021 11:49 AM
Procurement Services Sandra Herrera Additional Reviewer Completed 08/06/2021 12:37 PM
Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 08/10/2021 3:46 PM
Growth Management Operations Support Raquel Ovares Additional Reviewer Completed 08/16/2021 9:35 AM
Capital Project Planning, Impact Fees, and Program Management Farron Bevard Additional Reviewer Skipped 08/16/2021 1:57 PM
Capital Project Planning, Impact Fees, and Program Management Matthew McLean Additional Reviewer Completed 08/16/2021 4:03 PM
Growth Management Department Jessica Arencibia Growth Management Skipped 08/03/2021 1:42 PM
Growth Management Department Trinity Scott Transportation Completed 08/17/2021 7:16 PM
County Attorney's Office Colleen Greene Level 2 Attorney Review Completed 08/18/2021 9:31 AM
Grants Valerie Fleming Level 2 Grants Review Completed 08/18/2021 11:35 AM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 08/18/2021 11:40 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/18/2021 1:52 PM
Grants Therese Stanley Additional Reviewer Completed 09/01/2021 1:02 PM
Office of Management and Budget Susan Usher Additional Reviewer Completed 09/03/2021 3:33 PM
16.A.13
Packet Pg. 706
09/28/2021
County Manager's Office Sean Callahan Level 4 County Manager Review Completed 09/20/2021 9:56 AM
Board of County Commissioners Geoffrey Willig Meeting Pending 09/28/2021 9:00 AM
16.A.13
Packet Pg. 707
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Naples Beach FY21/22
Beach Renourishment Program
(No. 90068)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Truck haul beach renourishment
of the Beach R-60 to R-79.
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 8 Months
8. Total TDC Tax Funds Requested: $2,600,000
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 708 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Naples Beach FY21/22
Beach Renourishment Program
(No. 90068)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 2,600,000
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 2,600,000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Engineering, Permitting, Construction
and project certification
$ 2,600,000
$
$
$
$
TOTAL $ 2,600,000
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 709 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Vanderbilt Beach FY21/22
Beach Renourishment Program
(No. 90066)
1.Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2.Contact Person, Title and Phone Number:
Name: Andrew Miller
3.Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4.Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5.Details of Project- Description and Location: Truck haul beach renourishment
of the Beach R-22 to R-30.5.
6.Estimated project start date: October 1, 2021
7.Estimated project duration: 8 Months
8.Total TDC Tax Funds Requested: $2,600,000
9.If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 710 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Vanderbilt Beach FY21/22
Beach Renourishment Program
(No. 90066)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 2,600,000
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 2,600,000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Engineering, Permitting, Construction
and project certification
$ 2,600,000
$
$
$
$
TOTAL $ 2,600,000
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 711 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Local Government Funding Request for FDEP (90065)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Consultant support to develop
the FY 21/22 LGFR to FDEP for partial program funding.
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $25,000
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 712 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Local Government Funding Request for FDEP (90065)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 25,000
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $25,000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Consultant support FY 21/22 LGFR
$ 25,000
$
$
$
$
TOTAL $ 25,000
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 713 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
USACE Feasibility Study Technical Support (80366)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Engineering and technical
support for the USACE Feasibility Study
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $500,000
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
16.A.13.a
Packet Pg. 714 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
USACE Feasibility Study Technical Support (80366)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 500,000
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 500,000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Engineering and Technical Support $ 500,000
$
$
$
$
TOTAL $ 500,000
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 715 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Wiggins Pass Engineering and Monitoring - 80288
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Engineering and Monitoring of
Wiggins Pass
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $150,000
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 716 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Wiggins Pass Engineering and Monitoring - 80288
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 150,000
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 150,000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Consultant design and monitoring $ 150,000
$
$
$
$
TOTAL $ 150,000
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 717 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Clam Pass Dredging (Pelican Bay)
(No. 88032)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2800 N. Horseshoe Drive
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller, Principal Project Manager
Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP 34104
Phone: 252-2922
3. Organization’s Chief Official and Title:
Andy Solis, Chairman
Board of County Commissioners
4. Details of Project- Description and Location: Clam Pass Monitoring
5. Estimated project start date: October 1, 2021
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $20,000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
16.A.13.a
Packet Pg. 718 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Clam Pass Dredging (Pelican Bay)
(No. 88032)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 20,000.00
City/Taxing District Share $ ___________
State of Florida Share $ ___________
Federal Share $ ___________
TOTAL $ 20,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
__Contractual Services_______________ $ 20,000.00
__________________________________ $___________
__________________________________ $___________
__________________________________ $___________
__________________________________ $___________
TOTAL $ 20,000.00
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 719 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Beach Tilling – County Wide (80171)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2684 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Beach tilling is required by FDEP
permit and is performed directly prior to turtle nesting Season. Tilling is paid on
an acre basis for re-nourished beaches. Approval is recommended
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $30,000.00
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 720 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Beach Tilling (80171)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 30,000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ _30,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Contractual Services
$ 30,000.00
$
$
$
$
TOTAL $ 30,000.00
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 721 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Near Shore Hard Bottom Monitoring (No. 90033)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 S. Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Biological Monitoring is
required by FDEP permit to determine the health of the near shore
hardbottom as a result of the recent renourishment. Approval is
recommended.
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $185,000.00
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 722 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Near Shore Hard Bottom Monitoring
(No. 90033)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 185,000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 185,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Engineering Fees/Consultant
$_185,000.00
$
$
$
$
TOTAL $ 185,000.00
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 723 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Shorebird Monitoring (No. 90297)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: Shorebird Monitoring is
required for Vanderbilt, Park Shore, Naples and Marco South Beaches by
FDEP permit. Approval is recommended.
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $25,000
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 724 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Shorebird Monitoring (No. 90297)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 25,000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 25.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Contractual Services_
$_25,000.00
$
$
$
$
TOTAL $ 25,000.00
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 725 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
City/County Physical Beach and Pass Monitoring
(Vanderbilt, Clam Pass Beach, Park Shore, Naples, Marco South beaches along with
Wiggins, Doctors, Collier Creek and Caxambas Passes)
(No. 90536)
1. Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 South Horseshoe Drive
Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone Number:
Name: Andrew Miller
3. Address: Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location: This Physical Beach Monitoring
is required by FDEP permit and future renourishment. Beaches monitored
will be Vanderbilt, Clam Pass Beach, Park Shore, Naples, Marco South and
the southern portion of Barefoot Beach. Passes monitored will be Wiggins,
Doctors, Collier Creek and Caxambas. Approval is recommended.
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $170,000.00
9. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.a
Packet Pg. 726 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
City/County Physical Beach and Pass Monitoring
(Vanderbilt, Clam Pass Beach, Park Shore, Naples, Marco South beaches along with
Wiggins, Doctors, Collier Creek and Caxambas Passes)
(No. 90536)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 170,000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 170,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Engineering Fees
$_170,000.00
$
$
$
$
TOTAL $ 170,000.00
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 727 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Beach Cleaning/Maintenace
Collier County/Marco Island (No. 90533)
1. Name and Address of Project Sponsor Organization:
Coastal Zone
Management Collier
County Government
2685 South Horseshoe
Drive Unit 103
Naples, Florida 34104
2. Contact Person, Title and Phone
Number: Name: Andrew Miller
3. Address:
Collier County Government
2685 S. Horseshoe Drive
City Naples ST FL ZIP
34104 Phone: 252-5342
4. Organization’s Chief Official and
Title:
Penny Taylor - BCC Chairman
Board of County Commissioners
5. Details of Project- Description and Location:
This item is required to maintain the beaches and is recommended
for approval.
6. Estimated project start date: October 1, 2021
7. Estimated project duration: 12 Months
8. Total TDC Tax Funds Requested: $268,100
9. If the full amount requested cannot be awarded, can the
program/project be restructured to accommodate a smaller
award?
Yes (X) No ( )
16.A.13.a
Packet Pg. 728 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Beach Cleaning/Maintenance
Collier County/Marco Island (No. 90533)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 268,100
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 268,100
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc.)
Operating Expenses
$ 268,100
$
$
$
$
TOTAL $ 268,100
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 729 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Beach Renourishment and Pass Maintenance
Fund 185 Administration
1.Name and Address of Project Sponsor Organization:
Coastal Zone Management
Collier County Government
2685 S. Horseshoe Drive
Unit 103
Naples, Florida 34104
2.Contact Person, Title and Phone Number:
Name: Andrew Miller
3.Address: Collier County Government
2685 S. Horseshoe Drive City Naples
ST FL ZIP 34104 Phone: 252-5342
4.Organization’s Chief Official and Title:
Penny Taylor - BCC Chairman Board
of County Commissioners
2.Details of Project- Description and Location: This item funds County staff to
manage the projects, maintain the beaches, administer the program and is
broken down as follows: Staff includes the CZM Manager; Operations
Analyst; a Project Manager; a Field Supervisor; 2 equipment operators to
clean and maintain the County and Marco Beaches. Indirect Administrative
Costs required for administrative functions like purchasing, information
technology, motor pool and human resources; Current rent; Division Fiscal
Support; and charges for the Tax Collector are also included. Approval is
recommended.
3.Estimated project start date: October 1, 2021
4.Estimated project duration: 12 Months
5.Total TDC Tax Funds Requested: $1,214,800
If the full amount requested cannot be awarded, can the program/project be
restructured to accommodate a smaller award?
Yes (X) No ( )
16.A.13.a
Packet Pg. 730 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application Page 2
Fund 185 Administration
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 1,214,800
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 1,214,800
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Administration Cost $ 75,000
185 Project Management & Administration $ 883,700
Tax Collector Fee’s (2.5%) $ 256,100
TOTAL $1,214,800
I have read the Tourist Development Category “A” Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization’s Chief Official Date
16.A.13.a
Packet Pg. 731 Attachment: CZM Grant Applications FY21-22 (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A'' GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Collier County Sea Turtle Protection Program/Environmental Compliance
1. Name and Address of Project Sponsor Organization:
Collier County Parks and Recreation Department
North Collier Regional Park
15000 Livingston Road
Naples, FL 34109
2. Contact Person, Title and Phone Number:
Name: Barry Williams, Director
Address: 15000 Livingston Road
City: Naples, FL,34109
Phone: 239-252-4035 FAX: 239 -514-8657
Other: 239-280-7035
3. Organization's Chief Official and Title:
Barry Williams, Director
Collier County Parks and Recreation Division
4. Details of Project- Description and Location:
The following activities require coastal construction permits from the State of Florida and
thus a sea turtle monitoring program.
L Beach nourishment;
2. Construction, excavation or maintenance of coastal inlet and related shoals;
3. Beach cleaning and grooming activities landward of the mean high-water line.
4. Beach cleaning following a red tide or storm event.
The following excerpts from current regulations (Chapter 168-41 Rules and Procedures
for Application for Coastal Construction Permits, Florida Administrative Code), provides
for the scope of the permitting process and protection of marine turtles as it relates to the
aforementioned activities.
168-41.001 Scope
This chapter provides the requirements and procedures for the issuance, denial, transfer,
renewal, modification, suspension and revocation of coastal construction permits. In this
Chapter Coastal Construction is defined as "any work or activity on or encroaching upon
16.A.13.b
Packet Pg. 732 Attachment: TDC Grant Application - Turtle Monitoring (16232 : Tourist Development Council Grant Application Requests)
sovereignty lands of Florida, below the mean high-water line of any tidal water of the
state, which is likely to have a material physical effect on existing coastal conditions or
natural shore and inlet processes."
l6B-41.0055 Protection of Marine Turtles (Florida Administrative Code)
(1) In keeping with the Departments Authority to protect marine turlles pursuant to
Section 370.12, Florida Statutes, any application for a permit under this Chapter for
coastal construction that affects marine turtles shall be subject to the conditions and
requirements for marine turtle protection as part of the permitting process.
(2) The Department shall require appropriate measures to protect marine turtles and
their habitat, such as: nest surveys, nest relocation, nest marking, modification of coastal
construction, measures to reduce sand compaction, and short and long term monitoring to
assess the impacts of the permitted coastal construction on marine turtles and their
habitat.
The Parks and Recreation Department, marine turtle permit holders for Collier County,
monitor the following beaches for sea turtle activities as State and federal permit
requirements for beach renourishment, beach raking, allowance for the use of vehicles
on the beach for surveys, beach cleanup following a red tide or storm event and special
events .
Barefoot Beach: construction. excavation or maintenance of Wiggins Pass (only that
area included within the area of influence of Wiggins Pass; 1 mile north of Pass south to
Wiggins Pass); pass material disposal location (renourishment): beach cleaning following
a storm event and red tide
Vanderbilt Beach: beach nourishment: construction. excavation or maintenance of a
coastal inlet and related shoals (Wiggins Pass and Clam Pass): beach cleaning and
grooming activities landward of the mean high-water line.
Park Shore: beach nourishment; construction, excavation or maintenance of a coastal
inlet and related shoals (Clam Pass and Doctors Pass). Upland sand temperature studies
as required by the State.
City of Naples: beach nourishment; construction, excavation or maintenance of a coastal
inlet and related shoals (Doctors Pass and Gordon Pass)
City of Marco Island: construction, excavation or maintenance of a coastal inlet and
related shoals (Big Marco Pass and Caxambas Pass); Beach nourishment; Hideaway
Beach T-Groin; beach cleaning and grooming activities landward of the mean high-water
line.
The duties and associated costs of the program are as follows:
I . Administrative/permitting
2. Reconnaissance and beach zoning including installation and maintenance of DNR
location reference monuments for CZM and Sheriff department 500 feet increments
along 26 miles of beach
3. Daily monitoring (7 days/wk./beach -April 01-May 01 depending on
renourishment schedules through Oct.3 1)
4. Evaluation, mapping and data entry
16.A.13.b
Packet Pg. 733 Attachment: TDC Grant Application - Turtle Monitoring (16232 : Tourist Development Council Grant Application Requests)
5. Responding to sea tuftle disorientations (associated with renourishment and beach
profile, as required by the State)
8. Repo(s (Sea Turtle Protection Plan- Annual Report; special reports per each beach
nourishment and T-groin units, Index Nesting Beach Reports (Vanderbilt); State
Productivity Reports, Beach Compaction Reports)
9. Mobilization/demobili zatron-
10. Vehicle maintenance- ATV's, penetrometers, data loggers
I 1. Supplies- acquisition, maintenance, inventory
12. Sand studies including beach compaction, sand temperature and ground/surface
water studies and associated reporting requirements
13. Dune vegetation monitoring and exotic removal
14. Nest relocation in construction areas
15. Monitoring and reporting of escarpments
16. Additional studies required as required State/Federal permits (Florida Statute Chapter
161-053 F.A.C. Chapter 62b-33)
17. Stranding reports and removal of injured, sick and dead seaturtles from all County
beaches (average 50- I 00/yr).
18 Public awareness- news media and public speaking upon request.
19. State mandated beach lighting compliance inspections and follow-up
21. Assist with maintaining rope and posting along the dunes
22. Other duties as requested by CZM Department
23. Provide technical assistance and respond to data requests from coastal engineering
consultants upon request.
The purpose of this application is to obtain funds to perlorm the requirements of a sea
turtle protection program in the specified locations.
5. Estimated project start date: October 1,2021
6. Estimated project duration: One (1) year
7, Total TDC Tax Funds Requested: $ 171.700
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes( ) No(x)
16.A.13.b
Packet Pg. 734 Attachment: TDC Grant Application - Turtle Monitoring (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Collier County Sea Turtle Protection Program/Environmental Compliance
I'RO,[.C',t Itt l)(;1._ I'
PROGRAM ELEMENT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
TOTAL
Personnel and Operating
Capital -Replacement ATV
TOTAL
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
AMOUNT
$ r71,700.00
$
$
$
$ 171,700.00
s 166,500s 5,200
$ 171,700
I hal'e read the Tourist Development Category "A" Beach Funding Policl- covering
beach renourishment and pass maintenance and agree that m1' organization will
compll rr ith all guideline s and criteria.
Signature f Sponsor Organization's Chief Official
16.A.13.b
Packet Pg. 735 Attachment: TDC Grant Application - Turtle Monitoring (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
2022 Beach Renourishment and Pass Maintenance
_____ Naples Pier Annualized Repair and Maintenance_____
(Project Title)
1. Name and Address of Project Sponsor Organization:
City of Naples
735 Eighth Street South
Naples, Florida 34102
2. Contact Person, Title and Phone Number:
Name: Nick Roberts, Community Services Director
Address: 280 Riverside Circle
City: Naples State: FL ZIP: 34102
Phone: 239/213-7120 FAX: 239/213-7130 Email: nroberts@naplesgov.com
3. Organization’s Chief Elected Official and Title:
Hon. Teresa Heitmann, Mayor
4. Details of Project- Description and Location:
Description: This annual TDC funded project includes labor, material, supplies and equipment for
the upkeep and safety of the pier. The Naples Pier is a public access beach facility and a tourist
attraction and destination. The pier structure has a shoreline erosion control and beach preservation
effect. The public safety through the continued maintenance of the Naples Pier is of paramount
importance. Repair and maintenance issues include the Naples Pier structure, wooden deck, railings,
restrooms, concession building, shade structures, storage facilities, light fixture replacement,
painting, staining, fish cleaning tables, as well as water and electrical systems and other areas
related to the Naples Pier.
The Pier, a historically significant structure originally constructed in 1887, serves as a public access
beach facility, as a major tourist attraction and vacation destination. The Naples Pier captures out-
of-county and local visitors as well as tourist populations from through-out the region and world.
Location: The project location is at the 12th Avenue South terminus beach end. Please refer to Project
Location Map found in Exhibit A below.
5. Estimated project start date: October 1, 2021
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $200,000
Collier County Tourist Development Council
16.A.13.c
Packet Pg. 736 Attachment: TDC Grant Application Naples Pier Signed CM CoN (16232 : Tourist Development Council Grant Application Requests)
Category "A" Grant Application - Page 2
Na les Pier AnnuaUzed Re air and Maintenance
(Project Title)
8. If the fuU amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ()No (X)
PROJECT BUDGET
PROGRAM ELEMENT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
AMOUNT
$ 200 000
$
$
$
TOTAL $ 200 000
PROJECT EXPENSES:
(Engineermg, Mobilization, Contractor, Monitoring etc)
Labor Re au- Maintenance Su Ues Materials $200000
$
$
TOTAL $ 200 000
I have read the Tourist Development Category "A" Beach Funding Policy covering beach
renourishment and pass maintenance and agree that my organization wUl comply with aU
gui e *nes and cr ^~a. -
AM
Dana A. Souza, Int im City Manager
5 1^1 ^-^ 2^
Date
16.A.13.c
Packet Pg. 737 Attachment: TDC Grant Application Naples Pier Signed CM CoN (16232 : Tourist Development Council Grant Application Requests)
EXHIBIT A
ADDITIONAL INFORMATION
ELIGIBILITY: The pier structure is no more than one-half mile from a public beach facility,
public access point, and hotel or motel facilities and is on a beach area classified as eligible.
ORGANIZATIONAL CAPACITY: The City of Naples will be the primary recipient and
lead agency for controlling and completing all aspects and activities proposed in this grant
application. The City will remain the lead agency for the duration of funding and will be the
sole point of contact for all matters related to this proposal. The City has the managerial and
financial capability to ensure proper planning, management, and completion of the project
described in this application.
BUDGET ASSURANCES: Dual Compensation: If a City project staff member or consultant
is involved simultaneously in two or more projects, the staff will not be compensated for more
than 100% of their time for any such dual involvement.
PROJECT LOCATION MAP:
16.A.13.c
Packet Pg. 738 Attachment: TDC Grant Application Naples Pier Signed CM CoN (16232 : Tourist Development Council Grant Application Requests)
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY “A” GRANT APPLICATION
2022 Beach Renourishment and Pass Maintenance
_____ Naples Beach Maintenance_____
(Project Title)
1.Name and Address of Project Sponsor Organization:
City of Naples
735 Eighth Street South
Naples, Florida 34102
2.Contact Person, Title and Phone Number:
Name: Mike Leslie, Community Services Interim Director
Address: 280 Riverside Circle
City: Naples State: FL ZIP: 34102
Phone: 239/213-7120 FAX: 239/213-7130 Email: mleslie@naplesgov.com
3.Organization’s Chief Elected Official and Title:
Hon. Teresa Heitmann, Mayor
4.Details of Project- Description and Location:
Description: This is an annual TDC funded project essential for support of maintenance on local
beaches. The City is responsible for the upkeep and grooming of TDC eligible beaches within the
City limits. Under this project, the City removes litter, accumulation of algae and rocks along public
access beach portions of the Gulf within the City’s jurisdictional limits. Funding is a benefit to both
residents and tourist populations, and to the preservation of the beach, shoreline and its overall
appearance and investment. This year’s request includes the partial reimbursement for
beach maintenance equipment operator, landscape tech’s and service workers salaries. FY21 total
costs for beach maintenance personnel is $350,781 for salaries only, plus benefits. Requested
amount of $203,000 is an increase from last year’s approved amount of $197,000 to cover the
annual salary increases for the beach maintenance staff.
Location: Signification coordination of effort continues between the City and Collier County
concerning beach maintenance. The project boundary location is from southernmost State-permitted
beach cleaning area within the City’s jurisdictional boundary northward to Clam Pass in Collier
County.
5.Estimated project start date:
6.Estimated project duration:
7.Total TDC Tax Funds Requested:
October 1, 2021
12 Months
$203,000
8.If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ( ) No (X)
16.A.13.d
Packet Pg. 739 Attachment: TDC 2022 Cat A Grant App Beach Maint Signed CM CoN (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Council
Category “A” Grant Application - Page 2
_____ Naples Beach Maintenance_____
(Project Title)
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
TOTAL
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Beach Maintenance Staff Salaries
_________________________________
__________________________________________
TOTAL
$ 203,000__ __
$ ___________
$ ___________
$ ___________
$ 203,000____
$ 203,000 ___
$ _____ __
$ _ ________
$ 203,000___
I have read the Tourist Development Category “A” Beach Funding Policy covering beach
renourishment and pass maintenance and agree that my organization will comply with all
guidelines and criteria.
______________________________ ________2-10-2021_____
Charles T. Chapman IV, City Manager Date
16.A.13.d
Packet Pg. 740 Attachment: TDC 2022 Cat A Grant App Beach Maint Signed CM CoN (16232 : Tourist Development Council Grant Application Requests)
EXHIBIT A
ADDITIONAL INFORMATION
ELIGIBILITY: Beach Maintenance activities will take place on beach area that are least 80%
classified as eligible under the TDC guidelines. The project boundary location is from
southernmost State-permitted beach cleaning area within the City’s jurisdictional boundary to Clam
Pass in Collier County.
ORGANIZATIONAL CAPACITY: The City of Naples will be the primary recipient and lead
agency for controlling and completing all aspects and activities proposed in this grant application.
The City will remain the lead agency for the duration of funding and will be the sole point of
contact for all matters related to this proposal. The City has the managerial and financial capability
to ensure proper planning, management, and completion of the project described in this application.
BUDGET ASSURANCES: Dual Compensation: If a City project staff member or consultant is
involved simultaneously in two or more projects, the staff will not be compensated for more than
100% of their time for any such dual involvement.
PROJECT LOCATION MAP:
16.A.13.d
Packet Pg. 741 Attachment: TDC 2022 Cat A Grant App Beach Maint Signed CM CoN (16232 : Tourist Development Council Grant Application Requests)
2021-2022 TOURIST DEVELOPMENT TAX
GRANT AGREEMENT BETWEEN
COLLIER COUNTY AND TEEE CITV OF NAPLES
CATEGORY "A" CITY OF NAPLES' PROJECTS
THIS AGREEMENT is made and entered into this/fr day of.(z2)/?-4f^?^ . 2021,
by and between the City of Naples, ("GRANTEE") and Collier County, apolitical subdivision of
the State of Florida, ("COUNTy").
RECITALS;
WHEREAS, CITY has submitted two grant applications for Tourist Development Tax
Funds in the aggregate amount of Pour Hundred and Three Thousand Dollars ($403,000) for the
City of Naples' Beach Cleaning and Maintenance Staff Salaries ($203,000.00) and for Naples
Pier Repair and Maintenance ($200,000.00) for fiscal year 2021-2022 as described in Exhibit
"A," Grant Applications, to this Agreement (the "Projects"), and
WHEREAS, the Coastal Advisoiy Committee and the Tourist Development Council
have reviewed the Grant Applications and made recommendations to approve funding these
expenditures and have also made recommended findings that these expenditures promote
tourism; and
WHEREAS, the Board of County Conunissioners desires to fund the Projects with
Tourist Development Tax and finds that these expenditures promote tourism.
NOW, THEREFORE, BASED UPON THE MUTUAL COVENANTS AND
PREMISES PROVIDED HEREIN AND OTHER VALUABLE CONSIDERATION, IT IS
MUTUALLY AGREED AS FOLLOWS:
1. SCOPE OF WORK. GRANTEE prepared detailed applications outlining the Prqj ects to
be accomplished, along with a project budgets, as part of the grant application process, attached
as Exhibits "A." GRANTEE shall provide the project activities outlined in the Grant Application
16.A.13.e
Packet Pg. 742 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
within the budgeted amounts provided in the Grant Application. GRANTEE shall not be
reimbursed for any expenditures not included in the Grant Application nor be reimbursed for
amounts in excess of those provided in tiie Grant Application unless an amendment to this
Agreement is entered into by GRANTEE and COUNTY.
2. PAYMENT AND REIMBURSEMENT. The aggregate maximum reimbursement under
this Agreement shall be Four Hundred and Three Tliousand DoUais ($403,000.00). GRANTEE
shaU be paid in accordance with the fiscal procedures of COUNTY upon submittal of an invoice
and upon verification that the services described in the invoice are completed or that goods have
been received.
2.1 GRANTEE shall detennine that the goods and services have been properly provided
and shall submit invoices to the County Manager or his designee. The County Manager, or his
designee, shall determine that the invoice payments are authorized and the goods or sa-vices
covered by such invoice have been provided or performed in accordance with such authorization.
The budget for each project, attached as Exhibit "B," shall constitute authorization of the
expenditure described in the invoices provided that such expenditure is made in accordance with
this Agreement,
2.2 Each invoice submitted by GRANTEE shall be itemized in sufficient detail for audit
thereof and shall be supported by copies of corresponding vendor invoices and proof of receipt
of goods or perfbmiance of the services invoiced. GRANTEE shall certify in writing that all
subcontractors and vendors have been paid for work and materials from previous payments
iweived prior to receipt of any further payments, COUNTV shall not pay GRANTEE until the
Clerk to the Board of County Commissioners pre-audits payment invoices in accordance with the
law
[19-CZM-002M/1634518/1 ]
16.A.13.e
Packet Pg. 743 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
2.3 GRANTEE shall be paid for its actual cost not to exceed the maximum amount
budgeted pursuant to the attached Exhibit "B,"
3, ELIGIBLE EXPENDITURES, Only eligible expenditures described in Proposals will
be paid by COUNFy. Any expenditures paid by COUNTy which are later deemed to be
ineligible expenditures shall be repaid to COUNTY within thirty (30) days of COUNTY'S
written request to repay said funds. COUNTY may request repayment of funds for a period of
.up to one (1) year after tennination of this Agreement or any extension or renewal thereof.
4. PAYMENT REQUESTS. Payment requests for interim draws and final payment must
be submitted to the County in the form of the Request for Funds form attached to tiiis Agreement
as Exhibit "C." All payments are on a reimbursement basis only after proof of paid invoices are
presented to the County. County may withhold any interim draw for failure to provide the
interun status report, and County shall withhold final payment until receipt of the final status
report or other final report acceptable to County. All invoices and requests for payment
including the fmal payment must be received within ninety (90) days of termination of this
Agreement. Any invoices and requests for payment not received in this time frame shall be
returned to the Grantee and rejected for payment.
5. FNSURANCE. GRANTEE is required to submit a Certificate of Insurance naming
Collier County, and its Board of County Commissioners and the Touiist Development Council as
additionally insured. The insurance coverages identified in the Certificate of InsurMice shall be
ttiaintained without interruption fiom the date of commencement of the Projects until the date of
completion of all Projects required hereunder or as specified in this Agreement, whichever is
longer. The Certificate of Insurance shall be issued by a company licensed in the State of
[19-CZM<0264/1634518/1]
16.A.13.e
Packet Pg. 744 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
Florida, with a current A.M. Best Financial rating of "Class VI" or higher, and provide General
Liability Insurance for no less than the following amount:
Bodily lajury Liability - $300,000 each claim per person
Property Damage Liability - $300,000 each claim per person
Personal Injury Liability - $300,000 each claim per person
Worker's Compensation and Employer's Liability - Statutory
The Certificate of Insurance must be delivered to the County Manager, or his designee, within
ten (10) days of execution of this Agi-ecment by COUNTY. GRANTEE shall not commence
activities which are to be funded pursuant to this Agreement until COUNTY has received the
Certificate of Insurance.
6. CHOICE OF VENDORS AND FAIR DBALING. GRANTEE may select vendors or
subcontractors to provide services as described in Proposal. COUNTY shall not be responsible
for paying vendors and shall not be involved in the selection of subcontractoTs or vendors.
GRANTEE agrees to disclose any relationship between GRANTEE and subconfa-actors and/or
vendors, including, but not limited to, similar or related employees, agents, officers, directors
and/or shareholders. COUNTY may, in its discretion, object to the reasonableness of the
expenditures and require repayment if invoices have been paid under this Agreement for
unreasonable expenditures. The reasoiiableaess of the expenditures shall be based on industry
standards.
7. INDEMNIFICATION, To Ae extent peimitted by law, GRANTEE shall hold harmless
and defend COUNTV, and its agents and employees, torn any and all suits and actions including
attorney's fees and all costs of litigation and judgments of any name and description arising out
of or incidental to the performance of tiiis Agreement or work performed thereunder. This
provision shall also pertain to any claims brought against tiie COUNTY by any employee of the
(1&-CZM-00264/1634S18/1] 4
16.A.13.e
Packet Pg. 745 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
named GRANTEE, any subcontractor, or anyone directly or indu^ctly employed or authorized to
perform work by any of them.
8. NOTICES. All notices from COUNTY to GRANTEE shall be in writing and deemed
duly served if mailed by registered or certified mail to GRANTEE at the foJlowing address:
Nick Roberts, MR CPRP Director
Communfty Services Depaitaient.City of Naples
280 Riveiside Circle
Naples, Florida 34102
nroberts@naplesgov.com
All notices from GRANTEE to COUNTf shall be in writing and deemed duly served if mailed
by registered or certified mail to COUNTY at the following address:
Andrew Miller, Manager
Coastal Zone Management
Collier County Government
2685 S, Horseshoe Drive
Naples, Florida 34104
Andrew.Miller@colliercountyfl.gov
GRANTEE and COUNTY may change their above mailing address at any time upon giving the
other party written notification pursuant to this section.
9. NO PARTNERSHIP. Nothing herein contained shall be construed as creating a
partnership between COUNTY and GRANTEE, or its vendor or subcontractor, or to constitute
GRANTEE, or its vendor or subcontractor, as an agent or employee ofCOUNTV
10. TERMINATION. COUNTY or GRANTEE may cancel this Agreement with or without
cause by giving thirty (30) days advance written notice of such tennination pursuant to Section 8
and specifying the effective date of termination. If COUNTY tenninates this Agreement,
COUNTY will pay GRANTEE for all expenditures incurred, or conb-actual obligations incurred
with subcontractors and vendors, by GRANTEE up to the effective date of the tennmation so
long as such expenses are eligible.
[19-CZM-00264/I634518/1]
to
16.A.13.e
Packet Pg. 746 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
11. GENERAL ACCOUNTma GRANTEE is required to maintain complete and accwate
accounting records and keep tourism tourist development tax funds in a separate checking
account. All revenue related to the Agreement should be recorded, and all expenditures must be
incun-ed within the tenns of this Agreement,
12. AVAILABILITY OF RECORDS. GRANTEE shall maintain records, books, documents,
papers and financial information pei-taining to work performed under this Agreement.
GRANTEE agrees that COUNTY, or any of its duly authorized representatives, shall, until the
expiration of three (3) years after final payment under this Agreement, have access to, and the
right to examine and photocopy any pertinent books, documents, papera, and records of
GRANTEE involving transactions related to this Agreement.
13. AVAILABILITY OF FUNDS: This Agreement is subject to the availability of Tourist
Development Tax revenues. If for any reason tourist tax funds are not available to fund all or
part of this Agreement, the COUNTY may upon \vritten notice, at any time during the terms of
this Agreement, and at its sole discretion, reduce or eliminate funding under this Agreement.
14. PROHIBITION OF ASSIGNMENT. GRANTEE shall not assign, convey, or transfer in
whole or in pai-t its interest in this Agreement without the prior written consent of COUNTY.
15. TERM. This Agreement shall become eflfective on October 1, 2021 and shaU remain
effective until sixty (60) days after completion of the Project described in Exhibit "A", but no
later than November 30, 2022.
16. AMENDMENTS. This Agreement may only be amended in writing by mutual agreement
of the parties and after recommendation by the Tourist Development Council if appropriate, i.e.
pertaining to the expenditure of Tourist Development Tax.
ll9-CZM-W2W\W5\W]
16.A.13.e
Packet Pg. 747 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
17. REQUEST FOR EXTENSION. Any request for additional time to complete the Projects
described herein, or any request for additional Tourist Development Tax funds must be made in
writing and received by the County Manager or designee at least thirty (30) days prior to the end
date of this Agreement as provided in Section 15, TERM.
IN WITNESS WHEREOF, GRANTEE and COUNTy have each respectively, by an authorized
person or agent, hereunder set their hands and seals on the date and year first above written.
DATED:
ATTEST:
CRYSTAL Kinzel. Clerk
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
, Deputy Clerk
By;
Penny Taylor, Chairman
Approved as to form and
legality:
Ileen M. Greene
Managing Assistant County Attorney
ATTEST:
...."./. \y -A-A-iSr ''<-A'^-A-'^
-r'E^Y
^ -|^^/^?SK^City Clerk
'.Q\i^f^y
ApprovfedE.tStcK^rm ajid
legal suff 's^ip^
(corporate seal)
CITY OF NAPLES
Teresa Heitmann, Mayor
Nan y Stupa ch, City ttomey
[19^:ZM<0264/1634$18/1]
^
16.A.13.e
Packet Pg. 748 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
EXHIBIT "A"
COLLIER COUNTY TOUMST DEVELOPMENT COUNCIL
CATEGORY <(AM GRANT APPLICATION
2022 Beach Renourishment and Pass Maintenance
Na les Beach Maintenance
(Project Title)
1. Name and Address of Project Sponsor Organization:
City of Naples
735 Eighth Street South
Naples, norida 34102
2.Contact Person, Tftle and Phone Number:
Name: Mike Leslie, Community Services Interim Director
Address: 280 Riverside Circle
City: Naples State: PL ZIP: 34102
Phone: 239/213-7120 FAX: 239/213-7130 EmaU: mlesUe a<na les ov.com
3.Organization's Chief Elected Official and Title:
Hon. Teresa Heitmann, Mayor
4. DetaUs of Project- Description and Location:
Description: This is an annual TDC funded project essential for support of maintenance on local
beaches. The City is responsible for the upkeq) and grooming ofTDC eligible beaches within the
City limits. Under this project, the City removes litter, accumulation of algae and rocks along public
access beach portions of the Gulf within the City's jurisdictional limits. Funding is a beaefiit to both
residents and tourist populations, and to the preservation of the beach, shoreline and its overall
appearance and investment. This year's request includes fhe partial reimbursement for
beach mamtenance equipment operator, landscape tech's and service workers salaries. FV21 total
costs for beach maintenance personnel is $350,781 for salaries only, plus benefits. Requested
amount of $203,000 is an increase fi-om last year's approved amount of $197,000 to cover the
annual salary increases for the beach maintenance staff.
Location: Signification coordination of effort continues between the City and Collier County
concemmg beach maintenance. The project boundary location is from southernmost State-pennitted
beach cleaning area within the City's jurisdictional boundary northward to Clam Pass in Collier
County.
5. Estimated project start date:
6. Estimated project duration:
7. Total TDC Tax Funds Requested:
October 1,2021
12 Months
$203 000
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a snnaller award?
Yes()NoC?Q
16.A.13.e
Packet Pg. 749 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
Collier County Tourist Development Counal
Category aA" Grant Application - Page 2
Na les Beach Maintenance
(Project Tide)
PROJECT BUDGET
PROGRAM ELEMENT
TDC Funds Requested
Qty/Taxing District Share
State of Florida Share
Federal Share
AMOUNT
$203000
$.
$
$
TOTAL $203000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Beach Maintenance Staff Salaries $ 203000
$
$
TOTAL $203000
I have read the Tourist Development Category "AM Beach Funding Policy covering beach
renourishment and pass maintenance and agree that my oi^anfczation wUI comply with aU
guidelines and criteria.
Charles T. Chapman IV, City Manager
2-10-2021
Date
16.A.13.e
Packet Pg. 750 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
EXMBITA
ADDFHONAL INFORMATION
ELIGIBILFTY: Beach Maintenance activities will take place on beach area tfaat are least 80%
classified as eligible under the TDC guidelines. The project boundary location is from
southernmost State-permitted beach cleaning area within the City's jurisdictional boundary to Clam
Pass in Collier County.
ORGANIZATIONAL CAPACITV: The City of Naples wiU be the primary recipient and lead
agency for controlling and completing all aspects and activities proposed in this grant application.
The City will remain the lead agency for tfae duration of funding and will be the sole point of
contact for all matters related to this proposal. The City has the managerial and financial capability
to ensure proper planning, management, and completion of the project described m this application.
BUDGET ASSURANCES: Dual Compensation: If a City project staff member or consultant is
involved simultaneously in two or more projects, the staff will not be compensated for more than
100% of their time for any such dual involvement.
PROJECT LOCATION MAP:
twCsssyfwsiftwMi! Na^B
16.A.13.e
Packet Pg. 751 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
3.
JLf-nj-XJLUi. A /1.
COLLIER COUNTy TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
2022 Beach Renourishment and Pass Maintenance
Na les Pier Annualized Re air and Maintenance
(Project Title)
Name and Address of Project Sponsor Organization:
City of Naples
735 Eighth Street South
Naples, Florida 34102
Contact Person, Tifle and Phone Number:
Name: Nick Roberts, Community Services Director
Address: 280 Riverside Circle
City: Naples State: FL ZIP: 34102
Phone: 239/213-7120 FAX: 239/213-7130 EmaU: nrobertsana les ov.com
Organization's Chief Elected Official and Tide:
Hon. Teresa Heitmann, Mayor
4. Details of Project- Description and Location:
Description: This annual TDC funded project includes labor, material, supplies and equipment for
the upkeep and safety of the pier. The Naples Pier is a public access beach facility and a tourist
atfracti^ and destination. The pier structure has a shoreline erosion control and beach preservation
effect. The public safety through the continued maintenance of the Naples Pier is of paramount
importance. Repair and maintenance issues include the Naples Pier structure, wooden deck, railings,
restrooms, concession building, shade stmctures, storage facilities, light fixture replacement,
painting, staining, fish cleaning tables, as well as water and electrical systems and other areas
related to the Nq)les Pier.
The Pier, a historically significant structure originally constructed ia 1887, serves as a public access
beach facility, as a major tourist attraction and vacation destination. The Naples Pier captures out-
of-county and local visitors as well as tourist populations from through-out the region and world.
Location: The project location is at fhe 12th Avenue South terminus beach end. Please refer to Project
Location Map found in Exhibit A below.
5. Estimated project start date:
6. Estimated project duration:
7. Total TDC Tax Funds Requested:
October 1,2021
12 Months
$200 000
Collier County Tourist Development Council
16.A.13.e
Packet Pg. 752 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
Category "A» Grant AffpKcation - Page 2
Na lesPierAnnualizedRe air and Maintenance
(Project Titte)
8. If tiie full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes ()No (X)
PROJECT BUDGET
PROGRAM ELEMENT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal
AMOUNT
$200000
$
$
s
TOTAL $200000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Labor Re air Maintenance Su Ues. Materials $ 200 000
$
$-
TOTAL $200.000
L have read the Tourist Devdopment Category "A" Beach Funding PoU<y covering beach
renourishment and pass maintenance and agree that my organization wili comply with all
gui^mes and criteija.
f I,.^IA
Dana A. Souza, Interim City Manager
5 ^(z^2-/
Date
16.A.13.e
Packet Pg. 753 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
EXHIBFTA
ADDITIONAL INFORMATION
ELIGIBU.ITY: The pier stmcture is no more than one-halfmile from a public beach facility,
public access point, and hotel or motel facilities and is on a beach area classified as eligible.
ORGANIZATIONAL CAPACITY: The City ofNaples will be the primary recipient and
lead agency for controlling and completing all aspects and activities proposed in this grant
application. The City will remain the lead agency for the duration of funding and will be the
sole point of contact for all matters related to this proposal. The City has the managerial and
fmancial capability to ensure proper planning, management, and completion of the project
described in this application.
BUDGET ASSURANCES: Dual Compensation: If a City project staff member or consultant
is involved simultaneously in two or more projects, the staff will not be compensated for more
than 100% of their time for any such dual involvement.
16.A.13.e
Packet Pg. 754 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
EXHIBIT "B"
BUDGET - CITy OF NAPLES
Naples Pier Repair and Maintenance
Beach Cleaning and Maintenance
Staff Salaries
$200,000.00
$203,000.00
AGGREGATE TOTAL $403,000.00
(19-CZM-002e4/ie34618/1]
16.A.13.e
Packet Pg. 755 Attachment: 2021-2022 Category A City of Naples Agreement (16232 : Tourist Development Council Grant Application Requests)
EXHIBIT "Cn
REQUEST FOR FUNDS
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
EVENT NAME
ORGANIZATION
ADDRESS
CONTACT PERSON
REQUEST PERIOD FROM
REQUEST#
( ) INTERIM REPORT
TOTAL CONTRACT AMOUNT $
EXPENSE BUDGET
TELEPHONE ( )
TO
( )NNAL REPORT
REIMBURSEMENT RE UESTED
TOTALS
NOTE: Reimbursement of fands must stay wtthin the confines of the Project Expenses outlined in your
application. Copies of paid invoices, canceUed checks, tear sheets, printed samples or other backup Information
to substantiate payment jasst accompany request for funds. The followiiig will not be accepted for payments;
statements in place of invoices; checks or invoices not dated; tear sheets without date, company or organizations
name. A tear sheet Is required for each ad for each day or monfli of publication. A proof of an ad'wiB not be
accepted.
Each additional request for payment subsequent to the first request, Grantee is required to submit verification in
writing that an subtuntractora and vendors have been paid for work and niaterials previously performed or
receh'ed prior to receipt of any ftirther payments.
If project budget has specific categories with set dollar limits, the Grantee is required to include a spreadsheet to
show which tategory each Invoice Is being paid from and total of category before payment can be made to
Grantee. Organizations receiving funding should take Into consideration iliat it will take a niaximum of 45 days
for the County to process a check.
Furnisliing false information may constitute a vtotation ofappHcable State and Federal laws.
CERTIFICATION OF FINANCIAL OFFICER: I certify that the above information Is correct based on our
official accounting system and records, consistently applied and maintained and that the cost shown have been
made for the purpose of and in accordance with, tlic terms of the contract. The funds requested are for
reimbursement of actual cost made during this time period.
SIGNATURE
[19-C2M.00264/ie34518/1l
TITLE
^
16.A.13.e