Loading...
Agenda 07/13/2021 Item #16C 3 (Certification of Financial Responsibilty)07/13/2021 EXECUTIVE SUMMARY Recommendation to approve a Certification of Financial Responsibility required by the Florida Department of Environmental Protection in connection with the renewal of an existing permit to Operate a Non-Hazardous Class 1 Injection Well System at Collier County's South County Regional Water Treatment Plant (“SCRWTP”) Facility on City Gate Drive. OBJECTIVE: To certify, unconditionally, to the Florida Department of Environmental Protection (“FDEP”) the county’s obligation to close, plug, and abandon its SCRWTP Deep Injection Well (DIW) and related dual zone monitoring well as required by Chapter 62-528, Florida Administrative Code. CONSIDERATIONS: The permit renewal application requires the county to complete and execute a Certification of Financial Responsibility form. This form certifies that the county will be unconditionally obligated to have the financial resources necessary to close, plug, and abandon the Class I injection well and related monitoring well. The initial Certification of Financial Responsibility for the SCRWTP DIW and its dual zone monitoring well was included in the county's Application to Construct DEP Form No.62-528.900(1) submitted on August 26, 2005. At the time of the initial application, the estimate to plug and abandon the wells was $333,000.00 At the time of the most recent renewal of operating permits (FDEP Permit No. 173528 -009- UO/I I & 173528-0 I 0-UO/I I) the estimated cost was $731,578.00. The current estimated cost to plug and abandon is $621,240.00. FISCAL IMPACT: The actual expenditure of funds is not anticipated and would only be required if the county abandoned the injection wells. Funds to cover these costs, if needed, are maintained in the Reserves for Contingency line item in Fund (408), which is funded through user fees. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with executing this document. LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. - SRT RECOMMENDATION: To approve and authorize the Chair to sign the attached Certification of Financial Responsibility form. Prepared by: Steve Messner, Director, Water Division ATTACHMENT(S) 1. Cert of Finan Respon 061521 (PDF) 2. Plugging and Abandonment SCRWTP Cost Estimate (PDF) 3. Resolution no 2001-294 (PDF) 16.C.3 Packet Pg. 1208 07/13/2021 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.3 Doc ID: 16254 Item Summary: Recommendation to approve a Certification of Financial Responsibility required by the Florida Department of Environmental Protection in connection with the renewal of an existing permit to Operate a Non-Hazardous Class 1 Injection Well System at Collier County's South County Regional Water Treatment Plant (SCRWTP) Facility on City Gate Drive. Meeting Date: 07/13/2021 Prepared by: Title: – Public Utilities Department Name: Drew Cody 06/11/2021 11:58 AM Submitted by: Title: Division Director - Water – Water Name: Steve Messner 06/11/2021 11:58 AM Approved By: Review: Water Drew Cody Additional Reviewer Skipped 06/11/2021 11:59 AM Water Steve Messner Additional Reviewer Completed 06/11/2021 12:04 PM Wastewater Steve Messner Additional Reviewer Completed 06/11/2021 12:05 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 06/11/2021 3:41 PM Water Randy Lewis Additional Reviewer Completed 06/14/2021 3:06 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 06/14/2021 3:10 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 06/15/2021 2:56 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 06/15/2021 4:40 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 06/15/2021 4:43 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/16/2021 11:19 AM Budget and Management Office Ed Finn Additional Reviewer Completed 06/22/2021 2:51 PM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 06/28/2021 4:37 PM Board of County Commissioners Geoffrey Willig Meeting Pending 07/13/2021 9:00 AM 16.C.3 Packet Pg. 1209 16.C.3.aPacket Pg. 1210Attachment: Cert of Finan Respon 061521 (16254 : Cert of Financial Responsibility SCRWTP DIW) 16.C.3.aPacket Pg. 1211Attachment: Cert of Finan Respon 061521 (16254 : Cert of Financial Responsibility SCRWTP DIW) '''I > May 3, 2021 Steve Messner Director, Water Division Collier County Public Utilities Department 3339 Tamiami Trail East, Suite 30 I Naples, FL 3441 12 Subject: Collier County Public Utilities Department SCRWTP fW-1 and IW-2 Plugging and Abandonment Cost Estimate FDEP Permit No. 173528-009-UO/I I & 173528-0 I 0-UO/I I Dear Mr. Messner: As requested, WSP has prepared this cost estimate for the plugging and abandonment of the injection wells at the South County Regional Water Treatment Plant (SCRWTP). Collier County owns and operates two Class I deep injection wells at the SCRWTP. The injection well system consists of two deep injection wells (IW-1 and IW-2) and one dual-zone monitor well (DZMW- 1 ). Each of the three wells would need to be filled with cement to land surface to complete the abandonment process. The open hole sections of the injection wells would be filled with gravel prior to grouting the injection well casings. The estimate provided is based on a previous cost estimate for plugging and abandonment of the injection well system prepared during 2016 and review of recent bids for injection well work in South Florida. Please feel free to call me if you have any questions or if you require additional information. Yours sincerely, Scott Manahan, P.E. Senior Engineering Manager WSP USA Inc. 1567 Hayley Lane Suite 202 Fort Myers, FL 33907 (239)481-6494 WSP.com 16.C.3.b Packet Pg. 1212 Attachment: Plugging and Abandonment SCRWTP Cost Estimate (16254 : Cert of Financial Responsibility SCRWTP DIW) \\\lt Procedures and costs for the plugging and abandonment of injection wells IW-l and fW-2 and dual-zone monitoring well DZMW-I Collier South County Regional Water Treatment Plant Plans for the plugging and abandonment of injection wells lW- l and lW-2 and dual-zone monitor well DZMW-l are provided in Figure C-1. For the purpose of preparing a cost estimate, it is assumed that dual-zone monitoring well DZMW- l would be abandoned. However, the possibility exists that well DZMW-l might be retained outside of the Florida Department of Environmental Protection (FDEP) Underground Injection Control (UIC) program as a regional monitor well. Injection wells IW-l and IW-2 would be abandoned by first "killing" the flow of the well and then removing the wellhead. The open hole in each well would then be filled with gravel to l0 feet below the base ofthe 14.48-inch inner diameter fiberglass reinforced plastic (FRP) injection tubing. The remaining open hole and FRP tubings would be cemented to land surface. The dual-zone monitoring well would be abandoned by filling both the 6 5/8-inch and 12.75-inch outer diameter casings with Portland cement to land surface. Neat Portland cement would be used unless permission is granted by the Florida Department ofEnvironmental Protection (FDEP) to use extenders. The abandonment plans for the well includes 6 major bid items: Bid ltem #l includes all work associated with mobilization and demobilization ofthe drilling rig and supporting equipment required for the task. This bid item also includes the work required to retrofit the drilling pad with new pad walls to ensure that injected or formation fluids are not accidentally spilled on the ground. Total (lump sum): $ 185,000 Bid Item #2 consists ofmechanical integrity tests Contractor costs (2 wells @ $50,000): $100,000 Bid Item #3 includes the materials and work required to "kill" the flow ofthe injection wells Lump sum (2 wells): $25,000 Bid Item ll4 includes all work required to fill the injection wells with gravel to approximately l0 feet below the bottom ofthe 14.48-inch fiberglass tubing (estimated 3,615 ft3 at 4.50/ft3): Estimated cost (2 wells): $25,000 Bid ltem #5 includes all materials and work required to fill the remaining open holes and nominal 14.48-inch I.D. injection tubings of injection wells andthe DZMW-l casings and open hole with neat cement to land surface (estimated 5,400 ft3 at $16.00/ft3) plus rig time (3 wells): $ 132,700 Bid Item li6 includes cleanup ofthe site and disposal of materials: $50,000 TOTALCONTRACTORCOSTS: $517.700 CONTINGENCY (20%): $103,540 TOTAL CONTRACTOR COSTS & CONTINCENCY: $621 .240 16.C.3.b Packet Pg. 1213 Attachment: Plugging and Abandonment SCRWTP Cost Estimate (16254 : Cert of Financial Responsibility SCRWTP DIW) 1■抑 … 2∞α :NJECT!( (AS‐BU:L IN」ECT10N WELL″1∥Wl (AS‐BU:LT WELL PROFILE) ヨlD 「 υ7嗣 :響 忍疑習E 「 t雪 器 計 □G瑞 』醐ぎ □ N¨RIANO CEME嗜 )N WELL滋 ∥W21 T WELL PROF:LE)(AS‐BUILT WELL PROF:LE) ```じ l〕 $tdi.ksfu19ll*rh,SUFdIFaffiSh:{2!}{r4ffidl@rillaa-t46 Colid Courty Pubac Uihi.s Ocpalfut C‐f16.C.3.b Packet Pg. 1214 Attachment: Plugging and Abandonment SCRWTP Cost Estimate (16254 : Cert of Financial Responsibility SCRWTP DIW) RESOLUT:ONN0 2∞1‐294 16B8'1 A RESOLUT10N APPOINTINC AND AUrHORIZING THE COMMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES, EMERCENCY SERViCES, PUBLIC SERVICES,PUBLIC UT:LIT:ES, SuPPoRT SERV:CES ANつ TRANSPORTAT:ON ADMINISTRATORS AND ANY DEPARTMENT DIREC■ORS THEV ttY APPO:NT AND ALIHORIZL TO EXECUTE CRANT APPLICATIONS,PERMIT APPLICAT10NS Aヽ D OTHER DOCUMENTS PERTAINIヽ C TOTHE CONSTRCCT10N OF CA PITAL IMPROVEMENT PROJE∝SWHEREAS thc Board of County COmmissloncrs oF Conicr cOunty Fl。■da has a need for eapital proleci des18n and construclon act,vitics thiou3hout thC COunty which may rcquirc appl,cation for Fants and pcrmits through 10cュ l state and Fedc:`l agcneicsi and W HEREAS, it is thc intention or said Bodrd !。 makc app!icallons to local, statc and Fcdcral agcnctes;.lnd WHEREAS.in ordc「to cxPcd tC proccssing it is neccsary to offlciBlly aPPOint and havc Or record county ofrcials Outho■zed tO cxccute grmi 3ppl c●tiOns,pcmit`pp cutiOns IInd othe「 documents pe・ taining`o the conslnlction of capital impr●vemcnt prolects On bch31F O,thc Board to va●ous●gcncics including but nOtllmited to thc following: Federal Avi310n AdministratiOn Fttral Environmental Protcction Agencン Flo●da Depanment of EnvirOnmcnta Pmtcc10n Flo●da Depanment of TranspOnation Flolda nsh and wild∥rc Conservalon Commission South Flo●d●Watcr Man.lgcncnt Disl●ci O S Amy Corps or En3incers O S CoastCu●rd NOW, THEREFORE. BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF CO[iIER COUNTY.FLOR:DA.that:L漁 榊醐鮒爾鶯I鷺 W猫 2 RcsOlu:lo■No 2000‐18ワ is hereby supersedcd by thi6 RcbolutiOn THIS RESOLUT【ON ADOPTED AFrER MOT:ON SECOND AND MAJORITY VOTE FAVORING ADOPTЮN Appr●v“ `,1。口 m andI・ “ ]ヽ uf“にncメ BOARD OF COUNTY COMMISS10NERS 16.C.3.c Packet Pg. 1215 Attachment: Resolution no 2001-294 (16254 : Cert of Financial Responsibility SCRWTP DIW)