Backup Documents 06/08/2021 Item #11E ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP i 1 E
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. 'I he completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting. � ,,
**NEW** ROUTING SLIP ��` c op�'i 6/14_
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is ahiady complete with the
exception of the Chairman's signature,draw a line through routingilines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s)(List in routing order) Office Initials Date
1.
2. Risk-Management Risk-Management
3. County Attorney Office County Attorney Office 41 \ C -d '
4. BCC Office Board of County � ! a J
Commissioners A
` �✓tt
5. Minutes and Records Clerk of Courts Office
if 6 c-i 11A q:-12.4-441 CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff Joe Bellone/PUD Phone 239-252-2351
Contact/ Department
Agenda Date Item was 2921 Agenda Item Number 11 E 1yl Q , /
Approved by the BCC , Q Ia1O91 v
Type of Document Interlocal Agreement with Collier County Water- Number of Original 1
Attached Sewer District to provide potable water, Documents Attached
wastewater and irrigation water utility services to
the Longwater Village in the Big Cypress
PO number or account 408-210111-649030
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature?STAMP OK N/A
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman,with the exception of most letters,must be reviewed and signed p
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the \�
document or the final negotiated contract date whichever is applicable. cJ
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's (}�
signature and initials are required. �y
7. In most cases(some contracts are an exception),the original document and this routing slip N/A
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on May 021 and all changes made �/ is n
during the meeting have been incorporated in the ached document. The County - optiont
Attorney's Office has reviewed the changes,if applicable. . line.
9. Initials of attorney verifying that the attached document is the version approved by the A is not
BCC,all changes directed by the BCC have been made,and the document is ready forth: 'option for
Chairman's signature.
1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
1 lE
AGREEMENT TO PROVIDE
POTABLE WAIEH,WASPEWAIERAND IRRIGATION WAIERUTJLH Y SERVICES
THIS INTERLOCAL AGREEMENT ("Agreement") is made and entered into this 4341.1
day of %Su , , 2021 by and between the Board of County Commissioners of
Collier County, Florida, acting ex-officio as the Governing Board of the Collier County Water-
Sewer District (hereinafter referred to as the "CCWSD"), the Board of Supervisors of the Big
Cypress Stewardship District (hereinafter referred to as the "District"), CDC Land Investments,
LLC and Collier Land Holdings, Ltd. (hereinafter referred to as"Landowners").
RECITALS:
WHEREAS, Section 163.01(4), Florida Statutes, the Florida interlocal Cooperation Act
of 1969(the"Act"),authorizes the joint exercise of any power,privilege or authority that the public
agencies involved herein might exercise separately;and
WHEREAS, the CCWSD and the District are public agencies within the meaning of the
Act and desire to engage in the joint exercise of power that each might exercise separately; and
WHEREAS, the CCWSD provides water, wastewater and irrigation water service
(collectively known as"utility services"),in an economical and environmentally beneficial manner
to much of the unincorporated area of Collier County; and
WHEREAS,the District also has statutory authority to provide utility services within the
District, but intends to authorize the CCWSD to provide utility services within certain designated
areas of the District; and
WHEREAS,the CCWSD's service boundaries encompass the District; and
WHEREAS, the CCWSD shall incorporate certain designated lands and property within
the District into CCWSD's service area to exclusively provide retail potable water, wastewater
and irrigation water (including effluent irrigation water, when available) utility services in the
same manner and pursuant to the same ordinances and policies as CCWSD currently provides
service to all other customers located throughout the unincorporated service area of Collier
County, Florida; and
WHEREAS,the District acknowledges the CCWSD's right to offer utility services within
the District and further authorizes the CCWSD to exclusively provide utility services inside a
portion of the District's jurisdictional area known as Longwater Village; and
WHEREAS, this Agreement is intended to reduce to writing the terms and conditions
between the CCWSD, the District and the Landowners as to the exclusive provision of utility
services by the CCWSD within the Longwater Village area of the District.
NOW,THEREFORE,the CCWSD,the District and the Landowners agree as follows:
INSTR 6077514 OR 5964 PG 1662 CAO
RECORDED 6/15/2021 8:32 AM PAGES 9
CLERK OF THE CIRCUIT COURT AND COMPTROLLER
COLLIER COUNTY FLORIDA
REC$78.00 INDX$1.00
1 iE
1. The foregoing recitals are true and correct and are incorporated herein by this reference.
2. The Landowners shall construct and pay for potable and irrigation quality water mains and
gravity sewers, force mains, wastewater pump stations and a community pump station
(collectively known as"wastewater facilities")within the Longwater Village development
and convey such facilities to the CCWSD in the manner provided in the applicable
CCWSD policies and County ordinances,including but not limited to Ordinance No.2004-
31,as amended,otherwise known as the Collier County Utilities Standards and Procedures
Ordinance (the "Utilities Standards Ordinance"), all of which as may be amended by the
Board of County Commissioners from time to time. Upon final acceptance of facilities,
CCWSD shall be responsible for maintenance and operations of such accepted facilities.
3. The District shall construct potable water transmission mains, wastewater force mains and
irrigation water transmission facilities at the Longwater Point of Connection(POC)between the
Rivergrass Village and Longwater Village which shall be available to serve Longwater
Village's demand in accordance with its development schedule as defined in Schedule A. The
POC shall be as defined on Schedule B.
4. The District agrees to reimburse the Landowners for the cost of upsizing certain
transmission mains identified in Schedule C within the Rivergrass Village so that sufficient
flows are available to service the Longwater Village.
5. Per the Rivergrass Interlocal Agreement, the CCWSD agreed to provide the necessary
potable/fire water design flows at a minimum pressure of 60 psi in the potable water system
at the Rivergrass Point of Connection. The developers, through their design(s), will size
their system(s) as required.
6. The CCWSD agrees to provide a wastewater system head value of 60 psi for the projected
wastewater flows at the Rivergrass Point of Connection by June 30,2022.
7. The CCWSD agrees to provide the necessary irrigation water design flows at a minimum
pressure of 60 psi in the IQ water system at the Rivergrass Point of Connection by June 30,
2022.
8. The Landowners, successors and assigns shall construct potable water mains and
wastewater force mains designed to Collier County standards within the Longwater Village
of sufficient size up to and including 16" needed by the District to serve the Bellmar
village. These mains will be located within the Longwater spine road or within other routes
acceptable to the District and the wastewater force main will terminate at the intersection
of the spine road and the future Big Cypress Parkway, while the 16" potable water main
will terminate at the utility site and further agree to provide the IQ water distribution system
basis of design for review and approval by the CCWSD.
9. The Landowners will require all developers in Longwater to install an internal residential
IQ system to serve residential areas and the Village Center in accordance with the LDC to
the Point of Connection.
2 -�
O��
11€
10. The CCWSD will install IQ meters and manage and bill residents based on their IQ water
consumption at the CCWSD Board approved IQ rates for the IQ service provided
regardless of the CCWSD's water source(s).
11. The Landowners shall convey a minimum 5-acre utility site in the vicinity of the general
services area suitable for the construction and operation of the facilities necessary to
provide sufficient utility services. All lands shall be conveyed to the Collier County Water-
Sewer District. The value of these lands shall be determined by two accredited Real Estate
Appraisers, each party will secure their own accredited Real Estate Appraiser. The
purchase price shall be based on the gross acreage market value of the land,to include any
entitlements based upon an agreed date of value. The aforementioned date must be before
SRA action, increased density or any other up zoning entitlements to the property. The
final price per acre shall be equal to the average of the two independent appraisal reports.
Section 11 of the Rivergrass Agreement, OR 5746, Pages 3307-3314, shall be deleted in
its entirety.
12. The Landowners within Longwater Village agree to pre-pay water and wastewater impact
fees to the CCWSD without expiration (the "prepayment"). Landowners shall reserve
water capacity equivalent to 350 ERC's and wastewater capacity equivalent to 350 ERC's
in advance.
13. The prepayment shall be due no later than thirty (30) days after Landowners' receipt and
acceptance of:
a. An approved and non-appealable SRA for the Longwater Village development.
b. All required and non-appealable permits from the South Florida Water
Management District or any federal or state regulatory authorities.
c. The prepayment shall be at the then current CCWSD Board approved rates for
water and wastewater impact fees: The credit for water and wastewater impact fees
identified herein shall be reduced by 50% of the prepayment per ERC for each
residential unit on a building permit issued thereon until the development is either
completed or the credits are exhausted or have been assigned as provided for in the
Collier County Impact Fee Ordinance. The developer shall be responsible for any
difference between the prepayment amount per ERC and the rate in effect at the
time of building permit application submittal.
d. The CCWSD agrees to reimburse the District for the cost of the POC as identified
in item 3 and upsizing the transmission mains as identified in item 4 in an amount
not to exceed $2,700,000 identified by Schedule C as signed and sealed by the
District's Engineer of Record.
e. The CCWSD shall reimburse the District in the amount identified in item 13(d)
within 30 days of receipt of the Longwater Village's prepayment.
14. This Agreement shall remain in effect until terminated by the CCWSD,the District or the
Landowners. Any party may terminate this Agreement, with or without cause, by
providing written notice to the other parties prior to the date that either the CCWSD, the
3 /
I lE
District or the Landowners commit any affirmative act to construct or provide potable
water, wastewater or irrigation water utility service within the District, including but not
limited to entering into an agreement hiring a contractor or a consultant to provide utility
construction-related services in furtherance of this Agreement. Any attempt to terminate
the Agreement once any party has incurred any expense in furtherance of fulfilling its
duties under the Agreement, without the express written consent of the other parties, shall
be considered a nullity. Termination shall be effective one hundred eighty(180)days after
receipt of said written notice.This Agreement may be amended from time to time upon the
written consent of all parties. Any amendment to the Agreement must be in writing and
must be executed with the same formalities as this original Agreement.
15. NOTICES. All notices required under this Agreement shall be directed to the following
offices:For the County: Office of the County Manager,3335 East Tamiami Trail Suite 101
Naples, Florida 34112. For the District/Landowners: Patrick Utter, Collier Enterprises,
Vice President of Real Estate and Club Operations,999 Vanderbilt Beach Road, Suite 507,
Naples,FL 34108.
16. INDEMNIFICATION. To the extent allowed by law, each party agrees to indemnify,
defend and hold harmless the other, its officers,board members, council members, agents
and employees from and against any and all fines, suits, claims, demands, penalties,
liabilities, costs or expenses, losses, settlements, judgments and awards and actions of
whatever kind or nature, including attorney's fees and costs(and costs and fees on appeal)
and damages (including,but not limited to,actual and consequential damages)arising from
any negligent, willful or wrongful misconduct, knowing misrepresentation or material
breach of this Agreement by such party, its officers, board members, council members,
agents or employees. The foregoing indemnification shall not constitute a waiver of the
CCWSD or the District's sovereign immunity beyond the limits set forth in Florida
Statutes, Section 768.28, nor shall the same be construed to constitute agreement by any
party to indemnify another party for such other party's negligent,willful or intentional acts
or omissions.
17. COUNTERPARTS.This Agreement may be executed in any number of counterparts,each
of which shall be deemed to be an original as against any party who signature appears
thereon and all of which shall together constitute one and the same instrument.
18. Recording.This Agreement shall be recorded in the Public Records of Collier County. The
County shall be responsible for recording the same.
IN WITNESS WHEREOF,the parties hereto have set their hands and seals the day and
year first written above.
ATTEST: • BOARD O COUNTY COMMISSIONERS
Crystal Kinzel,Clerk" COLLIE TY,FLO
BY:
�erk Penny Taylo , Chair
Attest as to Glaii
signature only. �) 4
1 1E
Approved ;s to i rm ;nd
legal suffi,�ie y:1, 4
,„„fif
■,..._idi A
Jeffrey A. 1atzk ; ounty Attorney
ij
I
5
FAO
iI
1 lE
ATTEST: BIG CYPRESS STEWARDSHIP DISTRICT
BY: • rr.
4
vb. q,�;,E (>, Patrick L. tter, President
ATTEST: CDC LAND INVESTMENTS,LLC
/C31 BY: J- Uttl
Patrick,Q*
, Vice President
ATTEST: COLLIER LAND HOLDINGS,Ltd.
BY: AV. U`
Patrick L. Utter,Vice President
6
1 IE
Toino1 j0 oCO
~ I 1
0 IA IA 0
-t, ., 111
1.13 N N tp W
CO O n
N N
0 O LA 0 in IA
T 0
IA N N IA In CO
O O N
N N0 LA CD LA
p
LA
O IA In N O p0 CO CO
al .-I N O A let lW N M
O O N N N 1-
N N
O O 0 0 0 O Vl in O
0 in CD
T N N N 0 0 CD T .4 O U:i LID 0 011
O t+1 O N N N IO
N pp N N
In IOA O LA0O 0 IALID .M-I COT CO
N N N 0 N 0 N N N N AL N
O O IU O N N .-i ID
N M N
0 0 0 0 0 0ill IA
V1 0 LA IA O V1 O- tO M OAil
-I N 0 N 0 N 0 N .-I 0 co IA T
01 O ) ID Otl V IA O N .-I .i VI
Al N
0 0 0 0 0 0 0 0 In V) O
V1 0 V) 0 IA 0 ✓1 CO .-I m CO
O N O N O tV 0 h 0 h h N h
O tp vl O 0/ o .-I .i .-I e{
L_ N .Z N
'I,
0' lil O LA O ILA uul E o� e m AI
m 01 Al O Al O N h 7 T V) O O O
AI 6 Cr; v o .: ri ri CF.
N a N
gtD LAOTtoilW IIDD mNONN N m N N h N C. Lri O
Li
N
LA
O IA M ul
N LA
N Ca
11 l0 IA
T ,I
h Al Al N h h O 01 V1 LA h in
Al;CL
CCN N N .hi h'I O
O
V1 I
CO
Q WIIO/1 O O IOD .;;;I LA O
;.;;;I � 000
CL lO N N N h. IO h h in I, lD 8O Ln
Q N N7; CD IN Al ~ dNll tAl o, ~
WZ 0 0 0 O O ✓t 0 in
O0 0 .~i IIA IA I~A V N CO Vll In O LA
J N N .'.I NO A. O h
O O N .i .i
CV A4 N .1 1
0 0 0 0 in CO _
0 N O .0; M N In N IA 0 in
Al A4
O CDNI h S I,:N N ci •-1
T N
0 IA ut 0 In IA 0
'i ID N N CO N.
M .-I .i T .-I - M 0 V1 In
0 IAm ti
0
Al N „) _M
c °' c
r
N 0 NmO
ID2 ` N 2 N W .'I
M 01 M Oi I9
.+ o CO LAm in C N II CN m COi M. r-I 1-1 N
C U .. U N H N
N n
ai n ti N Io Lu F....6
~
p
c 0 c 0 = N u " ;cu."' Wp O °NNC
MIm o I°C, m 3 3
N
u
To it) io m ' ill CL
la u ` _ u
c ` c w cn y c a c 01 c 01 c al 8
v E v E o E . E E a E E c
0) O 0) O W O W O O! O W O 0) O ''p
to u to u ¢ u tr u ¢ LI ¢ u CC IJ
rti y `a a`
�° E w E 660
m
J w o ? o v o 0
¢ CO m 1
lE
Schedule B—Point of Connection (POC)
Rivergrass
POC
• n
Longwater Connector
41'Ave. Transmission Mains
Transmission
Mains17
• r l3.
Longwater
POC
is
I F
rtit
1-4:!;‘•;t,"
Upsized to support other villages
•
Connector transmission mains
■ ■ ■ ■ ■ ■ ■ ■
CCWSD Transmission mains
9/3/20 ((274
�. w
1 iE
Schedule C
.GNOLI 9/22/2020
L' ;BARBER&
" BRUNDAGE,wc.
Professional Engineers,Planners,Surveyors
A.Landscape Architects
RIVERGRASS & LONGWATER
Engineer's Opinion of Probable Construction Cost
Pipe Upsizing and New Pipe Under Connector Road
RIVERGRASS changes when LONGWATER goes online
Potable Water Wastewater Irrigation
Length Length Length
Upsizing Pipe Cost Upsizing Pipe Cost Upsizing Pipe Cost
Valve Cost Valve Cost Valve Cost
5,077 ft 1,946 ft 6,959 ft
8"to 12" ($74,124) 6"to 12" ($38,609) 4"to 6" ($18,441)
($8,400) ($3,120) ($3,000)
3,427 ft 4,117 ft 2,176 ft
8"to 16" ($126,285) 10"to 16" ($127,956) 4"to 16" ($97,354)
($33,960) ($8,300) ($27,320)
8,273 ft 6,319 ft 9,436 ft
12"to 16" ($184,074) 12"to 16" ($140,598) 6"to 16" ($397,161)
($59,930) ($30,330) ($97,950)
5,623 ft
8"to 16" ($207,208)
($50,940)
7,961 ft
12"to 16" ($177,132)
($64,540)
TOTAL COST
Potable Water Wastewater Irrigation
$486,773 $348,913 $1,141,047
Subtotal $1,976,733
NEW PIPE ON CONNECTOR ROAD
Potable Water Wastewater Irrigation
Length Length Length
Size Pipe Cost Size Pipe Cost Size Pipe Cost
Valve Cost Valve Cost Valve Cost
3,316 ft 4,850 ft 3,316 ft
16" ($221,907) 12" ($202,100) 16" ($221,907)
($29,320) ($20,900) ($29,320)
TOTAL COST
Potable Water Wastewater Irrigation
$251,227 $223,000 $251,227
Subtotal I $725,453
Grand Total
$2,702,186
This Opinion of Probable Construction Cost(OPC)has been prepared by Agnoli,Barber,&Brundage,Inc.(ABB)at the request of
owner or as a requirement of a governmental agency. ABB has based the unit costs of this OPC on previous work history with
similar projects or on values provided by reputable contractors we have worked with. In accordance with F.A.C.61G-1518.011,
this is not a guarantee or warranty expressed or Implied as to the construction cost that may be obtained by owner using
competitive bidding. If such a guarantee is needed,it is recommended that owner procure the services of a professional cost
estimator or obtain a binding bid from a contractor. 400,37
ems etlP11,,ww
Biology signed by N J.AMIO 'cW
IMminlok J. �G�;.......... 0✓'P
Amino,Jr. ,'LENS •: Thb nem has been eleeronioally signed and seoled by Dominick 1.Antics,Jr.,PE.
ON: p: on 09/22/2020.
CN,Oominld J. o; No.39382 to
Ocolnle,J.anom..r.Mnlpo, •*
O.Oominkd Printed copies of this document are not considered signed and sealed. '•1 E tC,
Amlco,L=Naples, . : STATE OF �;
S=Florida,CeUS �O'•'`ZORIO?;:'•
O.I.:2020.0922 FS...N ````c
15:09:01•d'OP '�HAL inn II M`C�
NSMO