Agenda 05/11/2021 Item #16A 2 (Final Acceptance & Utility Conveyance Bradford Square)05/11/2021 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer facilities for Bradford Square, PL20150001521, accept the conveyance of a portion of the potable water and sewer facilities, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $34,922.18 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of the potable water and sewer facilities, accept the conveyance of a portion of the potable water and sewer facilities and appurtenant easements, and to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $34,922.18, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Bradford Square, has constructed the potable water and sewer facilities within dedicated easements to serve this private development (see attached location map). A portion of the potable water and sewer facilities was offered for conveyance to the County, as described in Official Records (O.R.) Book 5397, Page (PG) 813, together with appurtenant Deed of Utility Easement recorded in O.R. Book 5397, Page 818, and Access Easement recorded in O.R. Book 5397, Page 821, of the Public Records of Collier County, Florida. The remaining potable water and sewer facilities will be private. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on April 5, 2017. At that time, the value of these potable water and sewer utility facilities (assets) was $18,827.30 and $24,943.00, respectively. (See attached asset sheet). 3) Staff recorded all preliminary acceptance documents associated with the potable water and sewer facilities conveyed to the County in the public records of Collier County, which were re viewed and approved by the County Attorney’s office as to form and legality. The County was conveyed its interest in a portion of the potable water and sewer facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5397, at page 813 (“the Utilities Facilities Deed”), together with appurtenant Deed of Utility Easement recorded in O.R. Book 5397, Page 818, and Access Easement recorded in O.R. Book 5397, Page 821 (together the “Appurtenant Easements”) of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on March 23, 2021, in coordination with Public Utilities, and these facilities have been found to be satisfactory and acceptable. 6) The on-site potable water and sewer utilities, less the potable water and sewer utilities described in O.R. Book 5397, PG 813, are owned and maintained by the developer. 7) Staff recommends final acceptance of the subject utility facilities and release of the Utility Performance Security (UPS) and Final Obligation Bond in the total amount of $34,922.18. (See 16.A.2 Packet Pg. 263 05/11/2021 attached Exhibit A). Staff also recommends acceptance of the Utilities Facilities Deed and the facilities described therein and the Appurtenant Easements. 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 9) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water-Sewer District receiving title to a portion of the potable water and sewer utility facilities, which at the time of preliminary acceptance, had a total gross value of $43,770.30 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. -DDP RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for Bradford Square, PL20150001521, accept the conveyance of the Utilities Facilities Deed and the facilities described therein and the Appurtenant Easements, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $34,922.18 to the Project Engineer or the Developer’s designated agent. Prepared by: Valerie Kullick, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 4. Warranty Deed and Bill of Sale (PDF) 5. Deed of Utility Easement (PDF) 6. Access Easement (PDF) 16.A.2 Packet Pg. 264 05/11/2021 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.2 Doc ID: 15496 Item Summary: Recommendation to approve final acceptance of the potable water and sewer facilities for Bradford Square, PL20150001521, accept the conveyance of a portion of the potable water and sewer facilities, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $34,922.18 to the Project Engineer or the Developer’s designated agent. Meeting Date: 05/11/2021 Prepared by: Title: Technician – Growth Management Development Review Name: Valerie Kullick 04/06/2021 11:08 AM Submitted by: Title: Director – Growth Management Department Name: Matthew McLean 04/06/2021 11:08 AM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 04/06/2021 11:10 AM Water Steve Messner Additional Reviewer Completed 04/06/2021 1:24 PM Growth Management Development Review Marcus Berman Additional Reviewer Completed 04/06/2021 2:07 PM Wastewater Steve Nagy Additional Reviewer Completed 04/06/2021 2:17 PM Wastewater Steve Messner Additional Reviewer Completed 04/06/2021 2:42 PM Growth Management Operations & Regulatory Management Kenneth Kovensky Additional Reviewer Completed 04/06/2021 4:51 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 04/07/2021 10:31 AM Growth Management Department Lissett DeLaRosa Level 1 Reviewer Completed 04/07/2021 2:52 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 04/16/2021 1:11 PM Growth Management Department Matthew McLean Additional Reviewer Completed 04/16/2021 5:14 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 04/19/2021 11:52 AM County Attorney's Office Derek D. Perry Level 2 Attorney Review Completed 04/22/2021 9:49 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 04/22/2021 10:19 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/23/2021 2:18 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 04/29/2021 6:30 PM 16.A.2 Packet Pg. 265 05/11/2021 County Manager's Office Sean Callahan Level 4 County Manager Review Completed 05/02/2021 1:28 PM Board of County Commissioners Geoffrey Willig Meeting Pending 05/11/2021 9:00 AM 16.A.2 Packet Pg. 266 BRADFORD SQUARE LOCATION MAP 16.A.2.a Packet Pg. 267 Attachment: Location Map (15496 : Final Acceptance of Utilities - Bradford Square) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond $30,922.18 2017392194 Final Obligation Bond $4,000 2017392194 Total Amount $34,922.18 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.2.b Packet Pg. 268 Attachment: Exhibit A (15496 : Final Acceptance of Utilities - Bradford Square) VERIFICATION OF FINAL COST - WATER PROJECT NAME: BRADFORD SQUARE RETIREMENT COMMUNITY LOCATION: 14258 Livingston Road, Naples, Florida NAME AND ADDRESS OF OWNER: Bradford Square Retirement Community, LLC 8040 Eiger Drive Lincoln, NE 68516 TYPE OF UTILITY SYSTEM: Potable Water and Fire Main ITEM SIZE QUANT. UNIT COST TOTAL Tapping Sleeve Tapping Sleeve Tapping Valve Tapping Valve PVC DR-18 Water Main PVC DR-14 Water Main PVC DR-14 Fire Main PVC DR-14 Fire Main PVC DR-14 Fire Main Hydrant Assembly w/ Valve Fire Department Connection Gate Valve Check Valve Post lndicator Valve Water Service Potable Meter & BFP Fire Detector Check 5 2,42o.oo S 4,370.00 S gzs.oo S 1,170.00 S 4,s01.60 $ 2,67s.2s S :zr.oo S 1,128.40 S so,8s2.10 S 22,s4o.oo s 1,130.00 S 69s.oo S gss.oo 5 2,2s0.00 S 1,638.00 s 1s,260.00 s 1s,475.00 16" x 4" L6" x8" 8" 4" 6" 8" 6" 4" 4" 4" 3" 8" 5 2,42O.OO S 4,370.00 S 92s.oo S 1,170.00 s 13.60 S rs.+s 5 zt.qo 5 zt.to S 2s.3s S 3,220.00 s 1,130.00 s 69s.00 S ges.oo s 2,2so.oo s 7.80 s 1s,260.00 s 1s,475.00 7 1 7 L EA EA EA EA LF LF LF LF LF EA EA EA EA EA LF EA EA 331 745 15 52 2,006 zto T L 7 7 L L 1 16.A.2.b Packet Pg. 269 Attachment: Exhibit A (15496 : Final Acceptance of Utilities - Bradford Square) Fire Riser EA s1,430.00s 1,430.00 Fire Riser EA s3,740.00s z,qso.oo TOTAL COST s 137,2s6.35 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: Ot*z /1e<trnrtz OF: BLUEWATER OF SOUTH FLORIDA STATE OF FLORIDA COUNTY OF COLLIER The tn nstrument was signed and a efore me this 23'd day of June, 2015 by who is p me and who did not take an oath. Nam 8" l- 2 I ona MC00i,la"DLPATBICIA 2J12nFFCOMMSSIONMY EXPIBES:201914, 16.A.2.b Packet Pg. 270 Attachment: Exhibit A (15496 : Final Acceptance of Utilities - Bradford Square) VERIFICATION OF FINAL COST - SEWER PROJECT NAME: BRADFORD SQUARE RETIREMENT COMMUNlTY LOCATION: 14258 Livingston Road, Naples, Florida NAME AND ADDRESS OF OWNER: Bradford Square Retirement Community, LLC 8040 Eiger Drive Lincoln, NE 58516 WPE OF UTILIW SYSTEM: Sanitary Sewer ITEM SIZE QUANT. UNIT COST TOTAL Reverse Hot Tap Force Main PVC DR-18 Force Main PVC DR-14 Sanitary Main SDR 26 Sanitary Manhole Cleanout Check Valve Air Release Valve HDPE Directional Drill Lift Station L6" X4" 4" 4" 4' 4' L 270 335 EA EA EA LF EA EA EA EA EA EA EA s 4,120.00 s 18.40 s 21.20 s 40.70 s 3,760.00 s 27o.oo S 1,875.00 S 5,110.00 S 17,9oo.oo s106,5oo.oo S 7,230.00 TOTAL COST S +,t2o.oo s 3,864.00 S z,toz.oo 5 3,744.40 S 3,760.00 s s40.00 S t,8zs.oo s 15,330.00 S 17,9oo.oo S too,soo.oo S 7,230.00 S t7L,96s.4o 92g" 6" L 2 1 3 1 1 L N/A g" x4" 6' 1250 Gallon Grease Trap N/A I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: / OF 9u.lu 16.A.2.b Packet Pg. 271 Attachment: Exhibit A (15496 : Final Acceptance of Utilities - Bradford Square) STATE OF FLORIDA couNTY oF coLLtER) The foregoing instrument was signed and zors av (?14 d- /hc/(/ lt ( rbl=wno is before me this 20th day of August, know to me and who did not take an Name $.ullisDtifR*o l(Jrlqi ruu P'prJo8 oroz'lrYeq-GI&s sSuux: erz!€? ll I Nolsslrl,loc ll! 6lvll00cll 1 Ylcluvd 16.A.2.b Packet Pg. 272 Attachment: Exhibit A (15496 : Final Acceptance of Utilities - Bradford Square) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2017392194 Transaction Number:2017-015670 Date Paid:03/14/2017 Amount Due:$34,922.18 Payment Details:Payment Method Amount Paid Check Number Check $30,922.18 27334 Check $4,000.00 27333 Amount Paid:$34,922.18 Change / Overage:$0.00 Contact:Cameron General Contractors Inc. 8040 Eiger Drive Lincoln, NE 68516 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Utility Performance Refundable Bond PL20150001521 $4,000.00 $4,000.00 670-000000-220113 Refundable Bonds PL20150001521 $30,922.18 $30,922.18 670-000000-220113 Cashier Name:AlinaHarris Batch Number:6182 Entered By: melissaalvarez 16.A.2.b Packet Pg. 273 Attachment: Exhibit A (15496 : Final Acceptance of Utilities - Bradford Square) Certification of Contributory Assets -Potable Water PROJECT NAME: BRADFORD SQUARE RETIREMENT COMMUNITY LOCATION: 14258 Livingston Road, Naples, Florida NAME AND ADDRESS OF OWNER: Bradford Square Retirement Community, LL 8040 Eiger Drive Lincoln, NE 68516 TYPE OF UTILITY SYSTEM: Potable Water ITEM SIZE QUANT. UNIT COST TOTAL TappingSleeve L6" x4" 1 EA S 1,110.00 S f,tfO.OO Tapping Sleeve L6" x8" 1 EA S 1,530.00 S f,S:O.OO Tapping Valve 1 EA S 91O.OO S SfO.OO Tapping Valve 1 EA S 1,240.00 S \,Z4O.OO PVC DR-18 Water Main 91 LF S e.fO S SSS.fO PVC DR-14 Fire Main 92 tF S rz.as S Ltez.zo Potable Meter & BFP 1 EA S 12,3OO.OO S 12,300.00 TOTAL COST S 18,827.30 I do hereby certify that the quantities of material described above are a true and accurate representation of the material cost of the system as installed. CERTIFYING: % OF: STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this 13th day of August, 2015 PAIBICIAL IU)ONTLO MY COMMTSSIO{ I FF 41273 EXPIRES: S€Plembol 14, 2019 8o,!(5 Tiru &)!tY Pubrc Ud.r-ileE Nam Chad M Kim who is personally know to me and who did not take an oath. \ 16.A.2.c Packet Pg. 274 Attachment: Assets Sheet (15496 : Final Acceptance of Utilities - Bradford Square) Certification of Contributory Assets -Sanitary Sewe PROJECT NAME: BRADFORD SQUARE RETIREMENT COMMUNITY LOCATION: 14258 Livingston Road, Naples, Florida NAMEANDADDRESSOFOWNER:BradfordSquareRetirementCommunity'LLC 8040 Eiger Drive Lincoln, NE 68516 TYPE OF UTILITY SYSTEM: Sanitary Sewer ru TOTALQUANT.SIZEITEM UNIT COST Reverse Hot Tap Force Main PVC DR-18 Air Release Valve HDPE Directional Drill 8t k- 76" X4"EA s1,920.00 s1,920.00 10 8.3s 83.50 N/A 5,110.00 5,110.00 8" x4"169 105.50 L7,829.50 CERTIFYING: OF: s s s s s s EA EA LF 7 -./€ 9-l'< The foregoing instrument was signed and acknowledged before me this 20th day of August, 2015byChadMcKimmwhoispersonallyknowtomeandwhodidnottakeanoath. Nam 1 TOTALCOST s 24,943.00 I do hereby certify that the quantities of material described above are a true and accurate representation of the material cost of the system as installed' STATE OF FLORIDA COUNTY OF COLLIER 16.A.2.c Packet Pg. 275 Attachment: Assets Sheet (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.d Packet Pg. 276 Attachment: Warranty Deed and Bill of Sale (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.d Packet Pg. 277 Attachment: Warranty Deed and Bill of Sale (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.d Packet Pg. 278 Attachment: Warranty Deed and Bill of Sale (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.d Packet Pg. 279 Attachment: Warranty Deed and Bill of Sale (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.d Packet Pg. 280 Attachment: Warranty Deed and Bill of Sale (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.e Packet Pg. 281 Attachment: Deed of Utility Easement (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.e Packet Pg. 282 Attachment: Deed of Utility Easement (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.e Packet Pg. 283 Attachment: Deed of Utility Easement (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.f Packet Pg. 284 Attachment: Access Easement (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.f Packet Pg. 285 Attachment: Access Easement (15496 : Final Acceptance of Utilities - Bradford Square) 16.A.2.f Packet Pg. 286 Attachment: Access Easement (15496 : Final Acceptance of Utilities - Bradford Square)