Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 04/27/2021 Item #16A 2 (Final acceptance Winding Cypress Phase 3B)
16.A.2 04/27/2021 EXECUTIVE SUMMARY Recommendation to approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for Winding Cypress Phase 3B, PL20190002096 and authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance and accept the conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Winding Cypress Phase 3B, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). The potable water and sewer facilities were offered for conveyance to the County, as described in OR Book 5716, Page 2114, and are located within County utility easements dedicated by the plat of Winding Cypress Phase 3 recorded in Plat Book 65, Page 23, of the Public Records of Collier County, Florida. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on January 7, 2020. At that time, the value of these potable water and sewer utility facilities (assets) was $91,593.77 and $78,046.55, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. The County acquired its interest in the potable water and sewer facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5716, at Page 2114 ("the Utilities Facilities Deed") of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on March 19, 2021, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount of $4,000. Staff also recommends acceptance of the Utilities Facilities Deed and the facilities described therein. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water -Sewer District receiving title to the utility facilities, which at the time of preliminary acceptance, had a total Packet Pg. 464 16.A.2 04/27/2021 gross value of $169,640.32 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. -DDP RECOMMENDATION: To approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for Winding Cypress Phase 3B, PL20190002096, accept the conveyance of the Utilities Facilities Deed and the facilities described therein, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. Prepared by: Valerie Kullick, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 4. Warranty Deed and Bill of Sale (PDF) 5. PB 65 PG 23 (PDF) Packet Pg. 465 16.A.2 04/27/2021 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.2 Doc ID: 15356 Item Summary: Recommendation to approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for Winding Cypress Phase 3B, PL20190002096 and authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 04/27/2021 Prepared by: Title: Technician — Growth Management Development Review Name: Valerie Kullick 03/19/2021 3:18 PM Submitted by: Title: Director — Growth Management Department Name: Matthew McLean 03/19/2021 3:18 PM Approved By: Review: Water Pamela Libby Additional Reviewer Wastewater Steve Nagy Additional Reviewer Growth Management Operations & Regulatory Management Kenneth Kovensky Wastewater Beth Johnssen Additional Reviewer Water Beth Johnssen Additional Reviewer Growth Management Department Jeanne Marcella Level 1 Reviewer Growth Management Development Review Marcus Berman Public Utilities Planning and Project Management Tom Chmelik Engineering & Natural Resources Jack McKenna Additional Reviewer Growth Management Department Matthew McLean Additional Reviewer County Attorney's Office Derek D. Perry Level 2 Attorney Review Growth Management Department Jeanne Marcella Department Head Review Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Office of Management and Budget Laura Zautcke Additional Reviewer County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 03/19/2021 3:24 PM Completed 03/19/2021 4:39 PM Additional Reviewer Completed Completed 03/21/2021 8:09 AM Completed 03/21/2021 8:09 AM Completed 03/22/2021 8:26 AM Additional Reviewer Completed Additional Reviewer Completed Completed 03/29/2021 9:19 AM Completed 03/29/2021 9:42 AM Completed 03/29/2021 9:47 AM Completed 03/29/2021 11:40 AM Completed 03/29/2021 11:57 AM Completed 03/30/2021 9:11 AM Completed 04/15/2021 4:22 PM Completed 04/15/2021 4:51 PM Packet Pg. 466 16.A.2 04/27/2021 Board of County Commissioners MaryJo Brock Meeting Pending 04/27/2021 9:00 AM Packet Pg. 467 16.A.2.a WINDING CYPRESS PHASE 3B Maples Manor Lely Resore P�C_EvT LOCkTiC C, d-71 LOCATION MAP r a Packet Pg. 468 16.A.2.b Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond W/Plat Final Obligation Bond $4,000 2019659345 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment r a Packet Pg. 469 16.A.2.b VERIFICATION OF FINAL COST PROJECT NAME: Winding Cypress Phase 3 LOCATION: Part of Sections 2 &3, Township 51, Range 26 NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Dr., Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIAL AND SERVICES) ITEM SIZE QUAN. UNIT COST TOTAL PVC Water Main (C-900, DR 18, PC150) 6" 867 LF $22.85 $19,810.95 PVC Water Main (C-900, DR 18, PC150) 8" 1848 LF $26.52 $49,008.96 PVC Water Main (C-900, DR 14, PC150) 8" 297 LF $28.65 $8,509.05 Gate Valve w/Box 6" 3 EA $1,396.24 $4,188.72 Gate Valve w/Box 8" 4 EA $1,735.73 $6,942.92 Fire Hydrant Assembly w/Valve, Lead, Tee & Bends 8 EA $4.554.67 $36,437.36 Permanent Sample Point 1 EA $2,046.77 $2,046.77 Water Services (Double) 31 EA $993.75 $30,806.25 Water Services (Single) 33 EA $801.56 $26,451.48 Connect to Existing Watermain 2 EA $2,010.42 $4,020.84 Temporary Gap Configuration 2 EA $2,000.00 $4,000.00 Automatic Flushing Device 2 EA $5,945.07 $11,890.14 Automatic Flushing Device Remove & Relocate 1 EA $850.00 $850.00 TOTAL COST $204, 963.44 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as -installed cost of the system. OF: Haleakala Construction, Inc. 5758 Taylor Rd Naples, FL 34109 STATE OF Florida COUNTY OF Collier r a Packet Pg. 470 16.A.2.b The foregoing instrument was signed and acknowledged before me this 15th day of August, 2019 by Jayson Oreschnick who is personally known to me X OR who produced identification Type of Identification Produced Not ry Public ILIA #::S,�fic fi®� Seal: rZvp �• �I��1ws� 1D-��,,, ? �; "ip t r a Packet Pg. 471 16.A.2.b VERIFICATION OF FINAL COST PROJECT NAME: Winding Cypress Phase 3 LOCATION: Part of Sections 2 &3, Township 51, Range 26 NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Dr., Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIAL AND SERVICES) ITEM SIZE QUAN. UNIT COST TOTAL PVC Sanitary Sewer 8" 2,743 LF $69.16 $189,705.88 Diameter Manhole (0'-6' Depth) 4' 2 EA $5,977.57 $11,955.14 Diameter Manhole (6'-8 Depth') 4' 2 EA $7,040.43 $14,080.86 Diameter Manhole (8'-10' Depth) 4' 2 EA $8,255.74 $16,511.43 Diameter Manhole (12'-14' Depth) 4' 3 EA $10,805.29 $32,415.87 Sewer Lateral (Double) 4' 46 EA $957.62 $44,050.52 Sewer Lateral (Single) 4' 4 EA $894.91 $3,579.64 TOTAL COST I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as -installed cost of the system. OF: Haleakala Construction, Inc. 5758 Taylor Rd Naples. FL 34109 STATE OF Florida COUNTY OF Collier $312,299.39 The foregoing instrument was signed and acknowledged before me this 15th day of August, 2019 by Jayson Oreschnick who is personally known to me X OR who produced identification Type of Identification Produced „—_ Seal: :C t� Notary Public _ t Z : f4M 166717 _ a�9 45�Uo f d ST a Packet Pg. 472 Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Description Utility Performance Refundable Bond Cashier Name: Batch Number: Entered By: Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT 2019659345 2019-082619 09/10/2019 $4,000.00 Payment Method Check $4,000.00 $0.00 Pulte Group 3350 PEACHTREE ROAD NE ATLANTA , GA 30326 Reference Number PL20190002096 AlinaHarris 8571 LuciaMartin Amount Paid Check Number $4,000.00 0090233335 Oriainal Amount GL Account Fee Paid $4,000.00 $4,000.00 670-000000-220113 r a Packet Pg. 473 16.A.2.c CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: Winding Cypress Phase 3 LOCATION: Part of Sections 2 &3, Township 51, Range 26 NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Dr., Suite 300 Bonita Sprinus, FL 34134 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM SIZE QUAN. UNfT COST TOTAL PVC Water Main (C-900, DR 181 PC150) 6" 867 LF $4.93 $4,274.31 PVC Water Main (C-900, DR 18, PC150) 81 1848 LF $8.53 $15,763.44 PVC Water Main (C-900, DR 14, PC150) 8" 297 LF $10.62 $3,154.14 Gate Valve w/Box 6" 3 EA $668.86 $2:006.58 Gate Valvew/Box 8" 4 EA $1,001.70 $4,006.80 Fire Hydrant Assembly wNalve, Lead, Tee & Bends 8 EA $2,815.36 $22,522.88 Permanent Sample Point 1 EA $1,106.64 $1,106.64 Water Services (Double) 31 EA $499.26 $15,477.06 Water Services (Single) 33 EA $385,84 $12,732.72 Connect to Existing Watermain 2 EA $371.00 $742,00 Temporary Gap Configuration 2 EA $250.00 $500.00 Automatic Flushing Device 2 EA $4,478.50 $8,957.00 Automatic Flushing Device Remove & Relocate 1 EA $350.20 $350.20 TOTAL COST $91, 593.77 I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities. NG: on Qreschnick, Vice OFF: Haleakala Construction, Inc. 5758 Taylor Rd Naples, FL 34109 STATE OF Florida COUNTY OF Collier The foregoing instrument was signed and acknowledged before me this 15th day of August, 2019 by Jayson Oreschnick who is personally known to me X OR who produced identification Type of Identification Produced,F=.r:,s;^ dJ �4�it i t,Sn Xx . 0'Do,, . zo�SegI��G ��� Notary Public a . �rpa�1��E1: �l�t�y\t''c• sY G.Q CK .N �dd���p�1SaG9i3i4 �6� Packet Pg. 474 16.A.2.c CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: LOCATION: NAME & ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: Winding Cypress Phase 3 Part of Sections 2 &3, Township 51, Range 26 Divosta Homes, L.P. 24311 Walden Center Dr., Suite 300 Bonita Springs, FL 34134 SANITARY SEWER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL PVC Sanitary Sewer 8" 2,743 LF $5.07 $13,907.01 Diameter Manhole (0'-6' Depth) 4' 2 EA $3,610.36 $7,220.72 Diameter Manhole (6-8 Depth') 4' 2 EA $4,052.38 $8,104.76 Diameter Manhole (8'-10' Depth) 4' 2 EA $4,643.86 $9,287,72 Diameter Manhole (12'-14' Depth) 4' 3 EA $5,943.42 $17,830.26 Sewer Lateral (Double) 4' 46 EA $438.84 $20,186.64 Sewer Lateral (Single) 4' 4 EA $377.36 $1,609.44 TOTAL COST $78,046.55 I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities. OF: Haleakala Construction, Inc. 5758 Taylor Rd Naples, FL 34109 STATE OF Florida COUNTY OF Collier The foregoing instrument was signed and acknowledged before me this 15th day of August, 2019 by Jayson Oreschnick who is personally known to me X OR who produced identification Type of Identification Produced � sy(is9v�e41: i��3119`g� �1���\a A��al'�e �ol�/�'rr'ar✓ ' � � mat. (i •.' n\h15�i0iv_a � Y�r �';�. Seal: Notary Public `o t t--G lHh717 .`-�''� ° NfP✓; Frei' °';:^" 4v`M Packet Pg. 475 INSTR 5815040 OR 5716 PG 2114 RECORDED 1/14/2020 11:01 AM PAGES 6 CLERK OF THE CIRCUIT COURT AND COMPTROLLER, COLLIER COUNTY FLORIDA DOC@.70 $0.70 REC $52.50 CONS $10.00 16.A.2. d (Winding Cypress Phase 3B) This instrument was prepared by and after recording return to: Steven M. Falk, Esq. Falk Law Firm, P.A. 7400 Tamiami Trail North, Suite 103 Naples, Florida 34108 (239)596-8400 (Space above this line for recording data) UTILITY FACILITIES WARRANTY DEED AND BILL OF SALE THIS INDENTURE, made effecliv,(" © c) O xid,.year set forth below, between DIVOSTA HOMES, L.P., a Delaware limited p (Iieremfte fe � ed to as "Grantor"), whose post office address is 24311 Walden Center,,' s. fie, Suite 300, Bonita rgs;� FL 34134, and the BOARD OF COUNTY COMMISSIONERS NCOLLIER COUNTY, . LODA, AS THE GOVERNING BODY OF COLLIER COUNTY ,AN5 E=OFFI THE\GOVVERNING BOARD OF THE COLLIER COUNTY WATER - whole post office\address is 3299 Tamiami Trail East, Naples, Florida 34112, it$ suc ret' fter r fd redtto as "Grantee"). S`TH 3 l That said Grantor, for kit 'in consideration of th rum of TF Y AND NO/100THS DOLLARS ($10.00) and other good and valu'alnsideration to said Gint i'lad paid by said Grantee, the receipt of which is hereby acknowledge "gas°ranted, bargained acid Ql kc the said Grantee, and Grantee's successors and assigns forever, all dta le- water and wa$e�v tlrtility system(s) or portion(s) thereof ("Utility Facilities") lying within the fo'iwiicrnc; ether with appurtenant easement rights for the installation, operation, relocation, repaif- enance of said facilities, situate, lying and being in Collier County, Florida, to wit: SEE EXHIBIT "A" ATTACHED HERETO AND INCORPORATED BY REFERENCE HEREIN WHICH CONTAINS THE LEGAL DESCRIPTION. EXHIBIT "B" ATTACHED HERETO IS A SKETCH OF OTHER GRAPHIC REPRESENTATION THAT DEPICTS THE PHYSICAL LOCATION OF THE UTILITY SYSTEMS BEING CONVEYED. and said Grantor does hereby fully warrant the title to said Utility Facilities, and/or system(s) or portion(s) thereof, be they realty, personalty, or mixed, and will defend the same against the lawful claims of all persons whomsoever. For the purposes of this conveyance, the Utility Facilities conveyed herein shall not be deemed to convey any of the lands described in Exhibit "A" or Exhibit "B". Grantor and Grantee are used for singular or plural, as the context allows. To have and to hold the same unto the Grantee, and its successors and assigns, together with the right to enter upon said land, excavate, relocate and/or take or introduce materials for the purpose of constructing, relocating, operating, repairing and/or otherwise maintaining utility systems thereon. Grantor and Grantee are used for singular or plural, as the context requires. 4832-8252-9954, v. 1 Packet Pg. 476 OR 5716 PG 2115 16.A.2. d IN WITNESS WHEREOF, Grantor has executed this Utilities Facilities Warranty Deed and Bill of Sale the date and year set forth below in the presence of: Witnesses: �'�D Witness Name: ST+c Vc s! (20S1 Witness N STATE OF FLORIDA COUNTY OF LEE The foregoing instrument was Hueniken, Vice President -Lai DiVosta Homes Holdings, I partnership, on behalf of said me. DIVOSTA HOMES, L.P., a Delaware limited partnership By: DIVOSTA HOMES HOLDINGS, LLC, a Delaware limited liability company, its general partner By:_,`Z� Michael Hueniken Its, Vice President -Land Planning and Development .� aStlest Florida Division ling and Developm general partner of, a ility company and I ItIM",PATRICK BUTLER State of Florida -Notary Public Commission a GG 218611 My Commission Expires June 18, 2022 4832-8252-9954, v. 1 IK-r , 2019, by Michael da Division, on behalf of L.P., a Delaware limited He is personally known to NOTARY PUBLIC Name: PA7,ucc & rune (type or print) My Commission Expires: 6�$/6- Packet Pg. 477 OR 5716 PG 2116 16.A.2.d EXHIBIT "A" Tract "R" and the 15' County Utility Easement (C.U.E.) lying within Tract "L3", Winding Cypress Phase 3, according to the plat thereof recorded in Plat Book 65, Page 23, Public Records of Collier County, Florida. 4832-8252-9954, v. 1 Packet Pg. 478 OR 5716 PG 2117 co x LU Co L) 9 o to �V. Cf) E-- Cn Lo z Cf) E. > El z C\2 PQ u in CDO 2- Cg o A4 49 t6 z , gj�jv i MIM I Packet Pg. 479 1 OR 5716 PG 2118 16.A.2.d CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: Winding Cypress Phase 3 LOCATION: Part of Sections 2 &3, Township 51, Range 26 NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Dr., Suite 300 Bonita Sprinqs, FL 34134 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL PVC Water Main (C-900, DR 18, PC150) 6" 867 LF $4.93 $4,274.31 PVC Water Main (C-900, DR 18, PC150) 8" 1848 LF $8.53 $15,763.44 PVC Water Main (C-900, DR 14, PC150) 8" 297 LF $10.62 $3,154.14 Gate Valve w/Box 3 EA $668.86 $2,006.58 Gate Valve w/Box 8y �• 4 EA $1,001.70 $4,006.80 Fire Hydrant Assembly w/Valve, Lead, Tee & Bes -� 8 EA $2,815.36 $22,522.88 ntf Permanent Sample Point `1 EA $1,106.64 $1,106.64 Water Services (Double) 3 EA $499.26 $15,477.06 Water Services (Single) 33 EA $385.84 $12,732.72 � Connect to Existing Watermain 2 EA $371.00 $742.00 Temporary Gap Configuration EA $250.00 $500.00 Automatic Flushing Device ,r EA $4,478.50 $8,957.00 Automatic Flushing Device Remove & eloc e : t 1 EA $350.20 $350.20 TQTAIOST $91,593.77 4 I do hereby certify that the quantities of 6 described above are a, ar�1 a, representation of the system being contributed to Collier County Utilities. �' }$ Ja on reschnick, Vice Pr sident O Haleakala Construction, Inc. 5758 Taylor Rd Naples, FL 34109 STATE OF Florida COUNTY OF Collier The foregoing instrument was signed and acknowledged before me this 15th day of August, 2019 by Jayson Oreschnick who is personally known to me X OR who produced identification Type of Identification Produced Ma®0a°+�c�C�SdA l 4&I" ��rrrr ER1pXn,��i�''° Notary Public #GG166717 iO] aj °Onded L �o�\�%o Qom' -'•". h a` drfrrr/����89i8itlt9\ O�'a��,� Packet Pg. 480 *** OR 5716 PG 2119 *** 16.A.2. d CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: LOCATION: NAME & ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: Winding Cypress Phase 3 Part of Sections 2 &3, Township 51, Range 26 Divosta Homes, L.P. 24311 Walden Center Dr., Suite 300 Bonita Springs, FL 34134 SANITARY SEWER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL PVC Sanitary Sewer 8" 2,743 LF $5.07 $13,907.01 Diameter Manhole (0'-6' Depth) 4' 2 EA $3,610.36 $7,220.72 Diameter Manhole (6-8 Depth') 4'--2..., m EA $4,052.38 $8,104.76 Diameter Manhole (8'-10' Depth) 41� �L'� �A $4,643.86 $9,287.72 AV Diameter Manhole (12'-14' Depth) - $5,943.42 $17,830.26 Sewer Lateral (Double) 46 $438.84 $20,186.64 Sewer Lateral (Single) , 4 E$377.36 $1,509.44 T I do hereby certify that the quantities of material the system being contributed to Colliert Coty C RTIFYIN Jay I on Ireschnick, Vice esident OF: Haleakala Construction, Inc. 5758 Taylor Rd Naples, FL 34109 STATE OF Florida COUNTY OF Collier $78,046.55 representation of The foregoing instrument was signed and acknowledged before me this 15th day of August, 2019 by Jayson Oreschnick who is personally known to me X OR who produced identification Type of Identification Produced Seal: _ ; `;, ER ry , a s Notary Public y 2 •. #tG '166717 r�9s���, aaSl�6B08 4iCo��@�`e Packet Pg. 481 r� Q � U - � o w, x o m� x 04 0 ^ i 3: �. t za k C � 886 rc�p� 0- z g J .� A �m zo k rc�� oY z w w mU zap x� a� za rc Z z 8 Ya Y 0 CG m RQ c�i.o 8 ID m�mn" d Ld �n 1 O �308 O cr Ld ggo o mom- Iro8. maa�eow� O$8 ? •` mW�op > ��__ :JTotBW11 vOi <z € €wgww o po =pz� ' =oz- A a v€ = wW w3 w b i z r C -W� Via$ prc = -zcmi w < O z- 6 w" mg� m h'8 ggm om w 91, agpw� N H z !u rcm o�w �3pzn Wow p$ V� u � n m3o�z � 54�--�= N05 W W oS aanz„w _� wowp�m �wz 9g9 $sy I Z ¢ i N m zh 53 o`So�wdmm?�oi3zL'i'o `�•ITI ~o nn nm � Cl)J a's a'u - - zi 1F W o ? wnm �e w ¢ w W z we orc�� ■ Ooo W s8 �o eQe m3e m o m`ma mLL znnnnooa� 3: ngo�N (n J O- a "wwm �m O ne mm a aarn " Me -ws) OH I11,3 m f 0� m d5 —mJ eu is z 'Ed a m V �g �$ as s ga a ,or z - H 3zs o m 3 5 i I