Backup Documents 02/23/2021 Item #11I Triangle BlvdRecommendation to award an agreement pertaining to invitation to bid (“ITB”) no. 20-7820, “Triangle Blvd Transportation Operational Improvements,” to Cougar Contracting, LLC, in the
amount of $3,395,000 and authorize the Chair to sign the agreement (project number 60215).
BCC February 23, 2021
Jay Ahmad, P.E.
Transportation Engineering, Director
Triangle Blvd Transportation Operational
Improvements
1
Project Location
2
Roundabout Celeste Dr. & Triangle Blvd.
3
Triangle Blvd. and Price Str
4
Triangle Boulevard
5
Sidewalks on both sides of the roadways along Triangle Blvd and Price Str;
median modifications at US 41 and Triangle Blvd, as well as at Price Str and US 41 and all along the Triangle Blvd corridor.
A roundabout will be constructed at Triangle Blvd and Celeste Dr.
Construction start: shortly after contract approval
Construction duration: approximately one year
Project Details/ Schedule
Triangle Blvd Transportation Operational
Improvements
6
Received 8 Bids:
Triangle Blvd Transportation Operational
Improvements
*The bid is 18% lower than the Engineer’s opinion of cost which was $4,154,203.81.
7
BCC February 23, 2021
Recommendation to award an agreement pertaining to invitation to bid (“ITB”) no. 20-7820, “Triangle Blvd Transportation Operational Improvements,” to Cougar Contracting, LLC, in the
amount of $3,395,000 and authorize the Chair to sign the agreement (project number 60215).
Triangle Blvd Transportation Operational
Improvements
8