Loading...
Backup Documents 01/12/2021 Item #11A CEI Veterans Memorial Blvd Extension_1-12-21 BCC Agenda Item 11A: Recommendation to award Agreement No. 20-7728, Construction Engineering and Inspection (“CEI”) Services for Veterans Memorial Boulevard Extension – (From Old 41 Road to the intersection with Livingston Road); to Hardesty & Hanover Construction Services, LLC, for Phase I ($1,177,236), and Phase II ($937,213.35) for an overall total cost of $2,131,949.35 (County Project Number 60198). Jay Ahmad, P.E. Transportation Engineering, Director BCC Meeting - January 12, 2021 1 Veterans Memorial Boulevard Extension BCC – 01/12/21 2 2 Construction Engineering and Inspection (CEI) BCC – 01/12/21 3 Five (5) Proposals received for the CEI Solicitation Shortlisted 4 Proposals Final Ranking: Hardesty and Hanover BCC Approved Final Ranking: 9/08/20 Agenda Item 16A27 Negotiated Contract for Phase I ($1,177,236), and Phase II ($937,213.35) for an overall total cost of $2,131,949.35 3 Construction inspection, materials sampling & testing, and administrative activities to determine compliance of the Design-Build Contract Observe and determine work progress and quality; Identify and report significant changes, substitutions, defects, and deficiencies Direct corrective actions to the significant changes, substitutions, defects, and deficiencies Consult with County on issues which exceed delegated authority Construction Engineering and Inspection (CEI) BCC – 01/12/21 4 5 Typical Roadway Section BCC – 01/12/21 Roadway classification: 4-lane divided urban arterial Roadway features: asphalt pavement, traffic signals, sidewalks, on-street bike lanes and stormwater ponds. 5 Project Details BCC – 01/12/21 6 Project included in the 5-Year Work Program Phase 1 (Design-Build): East entrance of “GGG” High School to intersection of Livingston Rd and Veterans Memorial Blvd. Two new signals (Elementary and at New High School) Wet and Dry Detention Ponds Public utilities (water and wastewater) New Collier County GGG High School (by others) 6 Project Details BCC – 01/12/21 7 Phase 2 – (Design-Bid-Build): Old 41 Rd to east entrance of “GGG” High School Railway Road crossing Environmental impacts Noise Walls Pond sites R/W acquisition Phase 2A: US 41 to Old 41 Rd – FDOT PD&E Study Not Part of this CEI Contract. Will require a Change Order if Phase 2A is added to the current Phase 2 work 7 Phase 1 BCC Approved DB Contract: Oct. 27, 2020 NTP Issued For DB Contract: Nov. 20, 2020 Temporary School Access: June 2021 Substantial Completion: April 2023 Final Completion: June 2023 School Opening: August 2023 Anticipated Schedule BCC – 01/12/21 8 Phase 2 Procurement (Design): Spring 2021 NTP (Design): late 2021 Procurement (Construction): early 2023 NTP (Construction): late 2023 Construction Duration: 18 months Phase 2A Current Under FDOT PD&E Study Anticipated Schedule BCC – 01/12/21 9