Loading...
Backup Documents 02/09/2021 Item # 9A Immokalee Rd at Woodcrest Signal Warrant Analysis Signal Warrant Analysis Report Immokalee Road (C.R. 846) at Woodcrest Drive/Quarry Drive Intersection Collier County, FL 02/01/2018 Prepared for: Prepared by: Davidson Engineering, Inc. 4365 Radio Road, Suite 201 Naples, FL 34104 Phone: 239.434.6060 Trebilcock Consulting Solutions, PA 1205 Piper Boulevard, Suite 202 Naples, FL 34110 Phone: 239.566.9551 Email: ntrebilcock@trebilcock.biz Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 2 Statement of Certification I certify that this Signal Warrant Analysis Report has been prepared by me or under my immediate supervision, and that I have experience and training in the field of Traffic and Transportation Engineering. Norman J. Trebilcock, AICP, P.E. FL Registration No. 47116 Trebilcock Consulting Solutions, PA 1205 Piper Boulevard, Suite 202 Naples, FL 34110 Company Cert. of Auth. No. 27796 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 3 Table of Contents Project Description ......................................................................................................................... 4 Existing Developments – North Side ........................................................................................... 4 Existing Developments – South Side ........................................................................................... 6 Trip Generation and Turning Movements Distribution .................................................................. 7 Estimated Volumes – North Side ................................................................................................ 8 Estimated Volumes – South Side ................................................................................................ 9 Immokalee Road & Woodcrest Drive/Quarry Drive Intersection ................................................ 10 Recommendations ........................................................................................................................ 13 Appendices Appendix A: Heritage Bay DRI – Commercial Master Site Plan ................................................... 14 Appendix B: Existing Project Developments ................................................................................ 16 Appendix C: Heritage Bay DRI – Commercial Turning Movement Exhibit .................................. 18 Appendix D: TIS Excerpts ............................................................................................................. 20 Appendix E: Collier County Count Station 593 – 2016 FDOT PSCF Report .................................. 43 Appendix F: Green Tree Plaza – Traffic Counts, July 2014........................................................... 46 Appendix G: Traffic Signal Warrant Summary ............................................................................. 57 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 4 Project Description The analyzed intersection is located on Immokalee Road (CR 846) and Woodcrest Drive/Quarry Drive in northern Collier County. This intersection provides access to the Heritage Bay DRI on the north side via Quarry Drive and several residential developments on the south side via Woodcrest Drive. Refer to Fig. 1 – Overall Project Location Map below. The Heritage Bay DRI project traffic analysis anticipated this location as a signalized intersection. Fig. 1 – Overall Project Location Map Existing Developments – North Side Heritage Bay DRI on the north side of Immokalee Road at Quarry Drive, includes residential and commercial development. The Commercial Activity Center within Heritage Bay DRI, which can be accessed by the Heritage Bay residents through internal vehicular and pedestrian connections, is more oriented to the surrounding area and the travelling public. It is connected to Quarry Drive via Limestone Trail as shown in Fig. 1 – Overall Project Location Map. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 5 The Heritage Bay residential and commercial areas are building out at a rapid rate. The Commercial Activity Center has a combination of land uses as shown in Table 1A – Existing Development – Heritage Bay DRI, Appendix A: Heritage Bay DRI – Commercial Master Site Plan, and Appendix B: Existing Project Developments provide more detailed information on each parcel within the project limits. The existing development illustrated in Table 1A - Existing Development – Heritage Bay DRI below, shows land uses based on the Institute of Transportation Engineers, 9th Edition land use descriptions. Table 1A Existing Development – Heritage Bay DRI No. Development Description Name Land Use ITE Land Use Code Total Size 1N Heritage Bay Heritage Bay Residential Residential 210 230 1,950 du 2N Cameron Commons Unit 1, Tract 1 NCH Medical-Dental Building 720 42,996 sf 3N Unit 1, Tract 2 CVS Pharmacy with drive 881 12,900 sf 4N Unit 1, Tract 3 Chase Bank Drive-in Bank 912 4,572 sf 5N Unit 1, Tract 4 Shopping Center Shopping Center 820 31,415 sf 6N Unit 1, Tract 5 Commercial Coffee/Donut & Furniture Store 937 890 6,100 sf 7N Heritage Commons Tract D, Lot 1 Medical-Dental Office Building General Office Building 710 8,390 sf 8N Tract D, Lot 2 Taco Bell Restaurant 934 1,892 sf 8N Tract D, Lot 2 Culvers Restaurant 934 4,190 sf 9N Tract D, Lot 3 Car Wash Automated Car Wash 948 3,022 sf 10N Tract D, Lot 4 Racetrac Convenience Market w/Gasoline pumps * 853 * 5,500sf convenience market 11N Tract D, Lot 5 & Lot 6 Goodwill Shopping Center 820 16,713 sf 12N Tract D, Lot 7 Commercial Mini-Warehouse 151 8,500 13N Tract D, Lot 8 & Tract W-1 The Warehouse Cuisine Quality Restaurant 931 5,513 sf 14N Heritage Vistas Tract F Watercrest Assisted Living 254 128 Beds Note(s): *includes 16 pumps. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 6 As shown on Appendix B: Existing Project Developments, for the purposes of this report, accesses to Heritage Bay DRI are provided as follows: 1. Entrance Collier Boulevard extension – Existing full access – future right-in/right-out connection located approximately 660 feet north of the Immokalee Road intersection; existing full access at Weathered Stone Drive/Broken Back Road located approximately 1,320 feet north of the Immokalee Road intersection. 2. Four access points off of Immokalee Road (CR 846): Existing right-in/right-out/directional left-in at Goodland Bay Drive approximately 1,320 feet east of the Collier Boulevard intersection; existing full access at Bellaire Bay Drive located at approximately 0.5 mile east of the Collier Boulevard intersection; existing right-in/right-out/directional left-in at Woodcrest Drive/Quarry Drive intersection located 1.0 miles east of the Collier Boulevard intersection; existing full median opening at Heritage Bay Boulevard located at approximately 1,320 feet east of the Ridge Road intersection or 2.0 miles east of the Collier Boulevard intersection. 3. The internal site circulation system for Commercial Activity Center accommodates interconnections between various land uses to minimize side friction with Bellaire Bay Drive and Goodland Bay Drive. Existing Developments – South Side Several residential developments along Woodcrest Drive on the south side of Immokalee Road include Bent Creek Preserve, Richmond Park (formerly known as Abaco Club), Legacy Lakes (formerly known as Habitat-Woodcrest RPUD), Lamorada (formerly known as Indian Hills Estates) and Mockingbird Crossing. Refer to Fig. 1 – Overall Project Location Map on page 4. Some developments along Woodcrest Drive are already under construction and others are also approaching build out condition, as shown in Table 1B on next page and Appendix B: Existing Project Developments. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 7 Table 1B Existing Development – Woodcrest Drive corridor No. Development Description Land Use ITE Land Use Code Total Size 1S Bent Creek S26, T48S, R26E Residential 210 230 449 du 2S Richmond Park S26, T48S, R26E Residential 230 104 du 3S Legacy Lakes/ Habitat S26, T48S, R26E Residential 210 55 du 4S Lamorada S25, T48S, R26E Residential 210 230 260+128 du 5S Mockingbird Crossing S36, T48S, R26E Residential 210 110 du Trip Generation and Turning Movements Distribution The project’s site trip generation was extracted from approved traffic engineering studies prepared for each property, as applicable. They are based on traffic impact studies (TIS) performed by different consultants for each of the various developments within the project area. These studies were performed based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, with the current edition available at the time of the TIS preparation for each property. Estimated traffic volumes are shown in Table 2A – Project Trip Generation Average Weekday – North Side and Table 2B – Project Trip Generation Average Weekday – South Side. Projected trips were calculated using the ITE equations and average rates for the various land uses, as applicable. Project traffic turning movements generated by the developments are assigned to the adjacent roadways using the knowledge of the area. For the purposes of this report, the project was divided into two areas (north and south sides) to better illustrate projected movements. For details see Appendix C: Heritage Bay DRI – Commercial Turning Movements Exhibit. The internal capture that accounts for a reduction in external traffic because of the interaction between the multiple land uses in a site were included in each TIS, as applicable. They are also based on the information contained in Collier County TIS Guidelines and Procedures, the internal capture rates for the project are limited to a maximum of 20% of the total project trips. The pass-by trips account for traffic that is already on the external roadway network and stops at the project on the way to a primary trip destination. It should be noted that the driveway volumes are not reduced as a result of the pass-by reduction, only the traffic added to the Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 8 surrounding streets and intersections. Pass-by trips are not deducted in this analysis since this is an operational analysis (all external trips are accounted for). Estimated Volumes – North Side The PM peak-hour project trip generation for the north side of the Project property was extracted from the referenced TIS’s. The project compiled trip generation is summarized in Table 2A-1 Project Trip Generation, Average Weekday – North Side Heritage Bay DRI - Commercial and Table 2A-2 Project Trip Generation, Average Weekday – North Side Heritage Bay DRI – Residential below and in Appendix D: TIS Excerpts. Table 2A-1 Project Trip Generation, Average Weekday – North Side Heritage Bay DRI – Commercial PM PEAK HOUR (VPH) No. Land Use ITE Land Use Code Size ADT Enter Exit Total 2N Medical-Dental Building 720 42,996 sf 1,554 38 98 136 3N Pharmacy with drive 881 12,900 sf 624 31 34 65 4N Walk-in Bank 911 4,572 sf 527 23 23 46 5N Shopping Center 820 31,415 sf 3,152 138 149 287 6N Coffee/Donut & Furniture Store 937. 890 6,100 sf 1,738 46 46 92 7N Commercial 720, 820, 932 8,390 sf 528 23 22 45 8N Restaurant 934 1,892 sf 939 32 30 62 8N Restaurant 934 4,190 sf 2,079 71 66 137 9N Automated Car Wash 948 3,022 sf 510 22 21 43 10N Convenience Market w/Gasoline pumps 945 5,500 sf conv. market - 16 pumps 4,650 140 140 280 11N Shopping Center 820 16,713 sf 643 27 29 56 12N Commercial 151 8,500 sf 339 12 11 23 13N Quality Restaurant 931 5,513 sf 446 24 13 37 14N Assisted Living 254 128 Beds 340 12 16 28 Total External Commercial 18,069 639 698 1,337 Note(s): 2N - TIS prepared by Trebilcock Consulting Solutions on 11/13/2014. 3N - TIS prepared by Vanesse Daylor on 11/4/2008. 4N - Estimate prepared by TCS on 9/27/2017. 5N - TIS prepared by Davidson Engineering on 10/16/2008. 6N - TIS prepared by Davidson Engineering on 6/26/2015. 7N - TIS prepared by Interplan on 3/28/2017. 8N - TIS prepared by JMB Engineering on 7/18/2017. 8N - TIS prepared by Turgut Dervish on 8/25/17. 9N - Estimate prepared by TCS on 8/26/2014. 10N - TIS prepared by TR Transportation on 11/27/2016. 11N - TIS prepared by Davison Engineering on 3/23/2016. 12N - TIS prepared by TCS on 8/26/2014. 13N - TIS prepared by Davison Engineering on 7/13/2016. 14N - TIS prepared by Quattrone & Assoc. on 4/23/2017. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 9 Table 2A-2 Project Trip Generation, Average Weekday – North Side Heritage Bay DRI - Residential PM PEAK HOUR (VPH) No. Land Use ITE Land Use Code Size ADT Enter Exit Total 1N Heritage Bay Residential 210, 230 2,320 du 7,734 467 274 741 Total External Residential) 7,734 467 274 741 Note(s): 1N - DRI, Question 21, prepared by David Plummer & Assoc. on 6/11/2002. A 35% of the commercial part of the Heritage Bay DRI is considered for the left turning movements at the Quarry Drive and Immokalee Road intersection, a PM Peak-Hour exit volume of 244vph (Refer to Table 2A-1). The residential component of the Heritage Bay DRI is based on the information contained within Appendix D: TIS Excerpts, excerpt 1N (Heritage Bay DRI, Question 21, prepared by David Plummer & Assoc. on June 11, 2002. The southbound PM peak-hour left turn volume of 31vph. The total southbound PM peak-hour left turn lane volume on Quarry Drive at Immokalee Road of 275 vph is to be used for the signal warrant analysis. Estimated Volumes – South Side The PM peak-hour project trip generation for the south side of the Project property was extracted from the referenced TIS’s. The project compiled trip generation is summarized in Table 2B Project Trip Generation, Average Weekday – South Side, below and in Appendix D: TIS Excerpts. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 10 Table 2B Project Trip Generation, Average Weekday – South Side PM PEAK HOUR (VPH) No. Land Use ITE Land Use Code Size ADT Enter Exit Total 1S Bent Creek 210 230 449 du 3,889 240 136 376 2S Richmond Park 230 104 du 666 42 20 62 3S Legacy Lakes/Habitat 210 55 du 606 39 22 61 4S Lamorada 210 230 388 du 3,327 205 117 322 5S Mockingbird Crossing 210 110 du 1,135 74 43 117 Total External - - 9,623 600 338 938 Note(s): 1S - TIS prepared by. Trebilcock Consulting Solutions on September 7, 2017 (25% left north to Immokalee Road). 2S - TIS prepared by JMB Transportation on April 7, 2016 2017 (43% left north to Immokalee Road). 3S - TIS prepared by TR Transportation on December 8, 2014 2017 (100% left north to Immokalee Road). 4S - TIS prepared by Johnson Engineering on April 1, 2014 2017 (88% right north to Immokalee Road ). 5S - TIS prepared by Vanesse & Daylor on December 3, 2005 2017 (45% right north to Immokalee Road). Consistent with traffic data presented in the approved TIS’s for projects along Woodcrest Drive, the total external volumes for the developments along Woodcrest Drive are considered for the PM Peak-Hour left turning movements at the Woodcrest Drive and Immokalee Road intersection. The northbound PM peak-hour left turn volume at the intersection is estimated at 55%, or 186vph. The following is a summary of the estimated volumes on both sides of Immokalee Road at the Woodcrest Drive/Quarry Drive intersection: - North side: 275 vph - South side: 186 vph Immokalee Road & Woodcrest Drive/Quarry Drive Intersection 1. Existing Conditions. A traffic Signal Warrant Analysis is conducted for the intersection of Immokalee Road and Woodcrest Drive/Quarry Drive. This is a dual directional median opening located approximately 1.0 mile east of the Collier Boulevard intersection. The intersection is currently stop controlled on the south and north approaches. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 11 Major Street – Immokalee Road (CR 846) is a principal arterial roadway under Collier County jurisdiction, and it is primarily a west-east six-lane divided roadway with dedicated bicycle lanes, curb and gutter, and a closed drainage system. It has a posted legal speed limit of 50 mph in the vicinity of the intersection.  East Approach – Three through lanes, one left-turn lane and one right-turn lane.  West Approach – Three through lanes, one left-turn lane and one right-turn lane. Minor Street, northbound approach – Woodcrest Drive is a local roadway under Collier County jurisdiction, and it is primarily a north-south two-lane undivided roadway with a sidewalk on the west side, curb and gutter, and a closed drainage system. It has a posted legal speed limit of 30 mph in the vicinity of intersection.  South Approach – One shared left-turn/through and one right-turn lane. Minor Street, southbound approach – Quarry Drive is one of the main entrances to Heritage Bay development. This is a four-lane undivided local roadway with a sidewalk on the west side, curb and gutter, and a closed drainage system. It has a posted legal speed limit of 30 mph in the vicinity of intersection.  North Approach – One shared left-turn/through and one right-turn lane. 2. Traffic Volumes. Twenty-four-hour traffic counts were provided by Collier County Transportation staff for Immokalee Road (CR 846) east of Collier Boulevard (CR 951), as collected by Collier County Count Station 593. Traffic counts provided were conducted on March 14, 2017. The traffic volumes were adjusted with the FDOT peak season conversion factor (PSCF) – 0.97 – refer to Appendix E: Collier County Count Station 593 – 2016 FDOT PSCF Report. Quarry Drive at Immokalee Road intersection – southbound approach traffic volumes are determined based on provided residential and commercial trip generation (ref. Appendix D: TIS Excerpts). The most intense traffic impacts occur during the PM peak-hour. Therefore, estimated traffic PM peak-hour is utilized for the purpose of this report. Daily hourly variation is calculated using traffic counts conducted on a similar type plaza – Green Tree Plaza located in the southwest quadrant of the Immokalee Road and Airport Road intersection. Turning movement counts were collected July 21 - 27, 2014. Traffic count details are attached in Appendix F: Green Tree Plaza – Traffic Counts, July 2014. From the information shown in this appendix, hourly variation is calculated as shown in Table 3 Hourly Variation – Weekday. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 12 Table 3 Hourly Variation – Weekday* Hour Begin Hourly Variation Percentages Hour Begin Hourly Variation Percentages 11:00 0.88 15:00 0.71 12:00 1.00 16:00 0.81 13:00 0.88 17:00 0.88 14:00 0.85 18:00 0.71 Note(s): *Based on data shown in Appendix F As shown in Appendix C: Heritage Bay DRI – Commercial Turning Movements Exhibit, southbound approach volumes on Quarry Drive at Immokalee Road average 35% of the commercial development outbound volume, or 244 vph. The Heritage Bay Residential area has a southbound approach volume of 31 vph. The combined volume is 275 vph as shown before. The highest eight hours of the highest approach minor street volumes where the major street meets the volume warrant are shown in Table 4, Summary of 8-hour approach counts, below. Table 4 Summary of 8-hour highest approach counts* Traffic Counts – Peak Season Hour Begin Immokalee Road EB Immokalee Road WB Immokalee Road Weekday Total PSCF Peak Season Total Quarry Drive SB - LT 11:00 980 1,230 2,210 0.97 2,144 242 12:00 1,055 1,162 2,217 0.97 2,150 275 13:00 1,052 1,123 2,175 0.97 2,110 242 14:00 1,235 1,039 2,274 0.97 2,206 234 15:00 1,499 1,272 2,771 0.97 2,688 195 16:00 1,715 1,170 2,885 0.97 2,798 223 17:00 1,975 1,156 3,131 0.97 3,037 242 18:00 1,559 976 2,535 0.97 2,459 195 Note(s): *Immokalee Road EB and WB volumes extracted from Appendix E; **North Side Developments exiting volume peak hour is 257 vph, as shown in Table 2A. The hourly variation calculated for the Southbound Left movement was obtained using Table 3. 3. Signal Warrant Analysis. The signal warrant analysis was performed in accordance with the procedures and guidelines outlined in the Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition, with Revision numbers 1 and 2 incorporated, dated May 2012. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 13 For the purposes of this report, Immokalee Road (CR 846) is considered the major street, and Woodcrest Drive/Quarry Drive are the minor streets. For the Heritage Bay residential area, the southbound approach has an exclusive right-turn lane with outbound right-turning volume averaging 92% of the southbound total volume. Due to minimal conflict expected with the major street while entering westbound Immokalee Road (CR 846), the southbound approach (31vph or 8% of the total volume) has been evaluated as a one-lane approach and the southbound right-turn traffic is not considered for warrant analysis. For the Heritage Bay commercial activity area, the southbound approach with a shared thru/left-turn lane of 35% of the total volume generated (or 244vph). The total volume used for the traffic signal warrant analysis is 257vph. The results of the traffic signal warrant analysis during the study hours are provided in Table 5, below and Appendix G: Traffic Signal Warrant Summary. Table 5 Summary of Signal Warrant Analysis Warrant Applicable Satisfied Comments 1 Eight-Hour Vehicular Volume Yes Yes The traffic volumes meet the requirements of this warrant. 1A Minimum Vehicular Volume Yes Yes The traffic volumes meet the requirements of this warrant. 1B Interruption of Continuous Traffic Yes Yes The side street traffic volumes meet the requirements of this warrant. 2 Four-Hour Vehicular Volume Yes Yes The traffic volumes meet the requirements of this warrant. 3 Peak-Hour Vehicular Volume No Yes The warrant is not applicable as the side street does not provide service to any facilities that attract or generate large number of vehicles over a short period. However, this warrant is satisfied by the traffic volumes. The Immokalee Road (CR 846) and Woodcrest Drive/Quarry Drive intersection meets Signal Warrants 1, 2 and 3. Recommendations Based on engineering judgment, knowledge of adjacent roadway network and results of this signal warrant analysis, it is our recommendation that a traffic signal is warranted and should be installed at the intersection of Immokalee Road and Woodcrest Drive/Quarry Drive based on planning needs. The intersection configuration is recommended to be reconstructed as a full median opening on Immokalee Road at Woodcrest Drive/Quarry Drive. Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 14 Appendix A: Heritage Bay DRI – Commercial Master Site Plan (1 Sheet) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 15 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 16 Appendix B: Existing Project Developments (1 Sheet) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 17 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 18 Appendix C: Heritage Bay DRI – Commercial Turning Movement Exhibit (1 Sheet) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 19 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 20 Appendix D: TIS Excerpts (20 Sheets) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 21 1N - DRI, Question 21, prepared by David Plummer & Assoc. on June 11, 2002 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 22 2N - TIS prepared by Trebilcock Consulting Solutions on November 13, 2014 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 23 3N - TIS prepared by Vanesse Daylor on November 4, 2008 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 24 4N - Estimate prepared by TCS on September 27, 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 25 5N - TIS prepared by Davison Engineering on October 16, 2008 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 26 6N - TIS prepared by Davison Engineering on June 26, 2015 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 27 7N - TIS prepared by Interplan on March 28, 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 28 8N - TIS prepared by JMB Engineering on July 18, 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 29 8N - TIS prepared by Turgut Dervish on August 25, 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 30 9N - Estimate prepared by TCS on August 26, 2014 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 31 10N - TIS prepared by TR Transportation on September 27, 2016 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 32 11N - TIS prepared by Davison Engineering on March 23, 2016 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 33 12N - TIS prepared by TCS on August 26, 2014 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 34 13N - TIS prepared by Davison Engineering on July 13, 2016 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 35 14N - TIS prepared by Quattrone & Assoc. on April 23, 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 36 1S - TIS prepared by. Trebilcock Consulting Solutions on September 7, 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 37 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 38 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 39 2S - TIS prepared by JMB Transportation on April 7, 2016 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 40 3S - TIS prepared by TR Transportation on December 8, 2014 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 41 4S - TIS prepared by Johnson Engineering on April 1, 2014 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 42 5S - TIS prepared by Vanesse & Daylor on December 3, 2005 2017 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 43 Appendix E: Collier County Count Station 593 – 2016 FDOT PSCF Report (2 Sheets) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 44 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 45 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 46 Appendix F: Green Tree Plaza – Traffic Counts, July 2014 (10 Sheets) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 47 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 48 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 49 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 50 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 51 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 52 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 53 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 54 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 55 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 56 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 57 Appendix G: Traffic Signal Warrant Summary (4 Sheets) Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 58 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 59 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 60 Immokalee Rd at Woodcrest Dr/Quarry Dr – Signal Warrant Analysis Report – February 2018 Trebilcock Consulting Solutions, PA P a g e | 61