Loading...
Agenda 03/23/2021 Item #11A (ITB #21-7823 w/D.N. Higgins, Inc.)03/23/2021 EXECUTIVE SUMMARY Recommendation to award Invitation to Bid (“ITB”) No. 21-7823, “108th and 109th Avenues Public Utilities Renewal" (Project Numbers 60139 and 70120), to Douglas N. Higgins, Inc., in the amount of $12,337,900, and authorize the Chair to sign the attached Agreement and authorize the necessary budget amendments. This is a companion to agenda items 11B and 11C. OBJECTIVE: Provide reliable, sustainable, and regulatory compliant services to the customers along 108th and 109th Avenue North in the Naples Park neighborhood by replacing the water, wastewater, and stormwater infrastructure in coordination with the Wastewater Basin 101 Program. CONSIDERATIONS: The proposed scope of work under Project Number 60139, “Naples Park Stormwater Improvements,” is consistent with the Stormwater Five-year Work Program of the 2020 Stormwater Management Annual Update Inventory Review (AUIR) / CIE approved by the Board on November 10, 2020, and with the goals, objectives and policies of the Conservation and Coa stal Management Element and the Stormwater Management Sub-Element of the Growth Management Plan. The proposed scope of work under Project Number 70120, “Naples Park Area Basin Optimization,” is consistent with the FY2021 Budget approved by the Board on September 17, 2020. The Wastewater Basin 101 Program represents substantially similar construction activities throughout the area located north of Vanderbilt Beach Road, west of U.S. 41, south of 111 th Street, and along Vanderbilt Drive from 111th Avenue north to Wiggins Pass Road. In areas of Basin 101 where water and stormwater projects were coincident with wastewater projects, the Public Utilities and Growth Management Departments sought to combine scopes into one construction project that will reduce c onstruction costs and avoid multiple disturbances in the neighborhood. Similar projects on 95th, 107th and 110th Avenues have already been successfully completed. Another project on 96 th Avenue North is scheduled to be complete in April 2021. The combined scope of the 108th and 109th Avenues Public Utility Renewal Project includes replacing and rehabilitating water, wastewater, and stormwater assets as follows: 1) Water infrastructure was installed in the late 1960s and has reached the end of its useful life. Improvements include removing and disposing of existing asbestos-cement water main and installing approximately 11,000 linear feet of new polyvinyl chloride (“PVC”) water main, along with new fire hydrants, gate valves, water services, water meters, and back flow preventers. 2) The wastewater infrastructure that replaced septic systems in the early 1970s and has reached the end of its useful life. Improvements include removing and disposing of approximately 10,000 linear feet of existing vitrified clay gravity sewer pipe, and concrete manholes, which will be replaced with PVC gravity sewer pipe and polymer concrete manholes. Existing sanitary sewer service laterals and cleanouts will also be replaced. 3) Stormwater infrastructure was installed in the 1960s and much of it has exceeded the end of its useful life. Improvements include removing and disposing of various sized aging corrugated metal culvert pipes and old drainage structures, such as mitered end sections, inlets and catch basins. These will be replaced with new perforated high-performance polypropylene and high- density polyethylene storm water pipe systems, along with new reinforced concrete culvert pipes, mitered end sections, inlets and catch basins with sumps to ensure proper drainage t hroughout the area and improve water quality. 11.A Packet Pg. 220 03/23/2021 The Contractor will be working simultaneously on 108th and 109th Avenues. Water mains along the two avenues will be replaced at the beginning of the project to avoid damaging fragile asbestos cement water mains throughout the course of the project. Wastewater and stormwater construction will follow, occurring one block at a time per avenue, which minimizes neighborhood disruption and accelerates restoration. This process was proven effective during the 95th and 96th Avenues construction. This project will benefit approximately 350 residences on 108th and 109th Avenues, a subsection of Basin 101. The condition of the stormwater, water and wastewater assets are defined as “Red” as reported to the Board at the October 1, 2013, Asset Assessment and Management Workshop. On October 20, 2020, the Procurement Services Division posted ITB No. 21-7823 for the construction of the 108th & 109th Avenues Public Utilities Renewal Project. The County sent 34,735 notices to contractors and one hundred twenty-nine (129) interested contractors viewed the bid package. On November 23, 2020 the County received four bids and one “No Bid” as summarized below. Bidders: Company Name City County S T Base Bid Responsiv e/Responsi ble Douglas N. Higgins, Inc. Naples Collier F L $12,337,900.00 Yes/Yes Mitchell & Stark Const. Co. Inc. Naples Collier F L $14,296,247.44 Yes/Yes Giannetti Contracting Corp Pompano Beach Broward F L $14,785,573.20 Yes/Yes Haskins, Inc. Bonita Springs Lee F L $15,166,092.95 Yes/Yes Keltour US, Inc. No Bid N/A Staff found four bidders responsive and responsible; while one bidder, Keltour US, Inc., entered a No-Bid stating “Not Applicable.” Douglas N. Higgins, Inc., a Collier County company, is the lowest responsive and responsible bidder. County staff and engineering consultant, Q. Grady Minor & Associates, P.A. (“Q. Grady”), determined the low bid fair and reasonable and recommends awarding the contract to Douglas N. Higgins, Inc. Q. Grady evaluated Higgins’ references, which was sufficient to determine its experience on work of a similar magnitude within the last five years prior, including assessing its experience, skill, business standing and ability to complete the work as required under the terms of the Agreement. Higgins’ bid is 14% below the Q. Grady’s $14,351,094.00 estimate of probable cost. The Procurement Services Division concluded the bidding was competitive and representative of market conditions. The bid tabulation, NORA, engineer’s letter of recommendation, and contract are attached. After this project is completed, six Naples Park streets will have been rehabilitated in this comprehensive manner: 107th, 110th, 95th, 96th, 108th, and 109th Avenues North. Prior to that, in 2013 and 2014, water mains were replaced on 91st, 92nd, 93rd and 94th Avenues North. The next four streets planned for water, wastewater and stormwater design are 98th, 99th, 105th, and 106th Avenues North. Attached is the Program Update and Map. FISCAL IMPACT: Funding is available in the water and wastewater user fee capital funds 412 and 414. A budget amendment, in the amount of $4,142,294.40, is required to transfer funding within Stormwater 11.A Packet Pg. 221 03/23/2021 Bond Fund (327) from Reserves to Project 60139 to cover a portion of construction ($3,701,370.00), engineer of record construction administration ($97,262.40), and Construction Engineering and Inspection (CEI) services ($343,662.00). Staff has analyzed current and future needs to be funded from the cited project numbers to assure that these budget amendments will not affect current and future financial commitments. The sources of funding are the Stormwater Bond Fund (327), Water User Fee Capital Fund (412) and Wastewater User Fee Capital Fund (414), allocated as shown below. FUNDING SOURCE BID AMOUNT BID % Stormwater Bond Fund (327) $3,701,370.00 30% Water Capital Fund (412) $3,207,854.00 26% Wastewater Capital Fund (414) $5,428,676.00 44% Total $12,337,900.00 100% Water and sewer operating costs will remain the same or decrease as these improvements are replacements. There will be no new maintenance costs associated with the stormwater improvements. While there will be additional closed drainage, the offset cost to clean and maintain should be no more than for the maintenance of the existing mixed open and closed system. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: To award ITB No. 21-7823, “108th & 109th Avenues Public Utilities Renewal" (Project Numbers 60139 and 70120), to Douglas N. Higgins, Inc., in the amount of $12,337,900.00, and authorize the Chair to sign the attached Agreement and authorize the necessary budget amendments. Prepared by: Diana C. Dueri, Senior Project Manager, Public Utilities Engineering and Project Management Division ATTACHMENT(S) 1. 21-7823 Bid Tabulation (PDF) 2. Bid Analysis No 21-7823 (PDF) 3. 21-7823 - NORA - Executed (flat) (PDF) 4. 21-7823 - DELORA 01042021 (PDF) 5. 21-7823 DouglasHiggins_Insurance_2-11-21 (PDF) 6. [Linked] 21-7823 DouglasHiggins_Contract_VendorSigned-withBonds (PDF) 7. Program Update and Map (PDF) 8. 108th and 109th Avenues Presentation (PDF) 11.A Packet Pg. 222 03/23/2021 COLLIER COUNTY Board of County Commissioners Item Number: 11.A Doc ID: 15127 Item Summary: Recommendation to award Invitation to Bid (“ITB”) No. 21-7823, “108th and 109th Avenues Public Utilities Renewal" (Project Numbers 60139 and 70120), to Douglas N. Higgins, Inc., in the amount of $12,337,900, and authorize the Chair to sign the attached Agreement and authorize the necessary budget amendments. This is a companion to agenda items 11B and 11C. (Tom Chmelik, Public Utilities Engineering and Project Management Division Director) Meeting Date: 03/23/2021 Prepared by: Title: Project Manager – Public Utilities Planning and Project Management Name: Diana Dueri 02/23/2021 11:43 AM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 02/23/2021 11:43 AM Approved By: Review: Wastewater Steve Nagy Additional Reviewer Completed 02/23/2021 4:49 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 02/24/2021 8:13 AM Procurement Services Sue Zimmerman Additional Reviewer Completed 02/24/2021 9:34 AM Procurement Services Cynthia McCanna Additional Reviewer Completed 02/24/2021 10:44 AM Water Pamela Libby Additional Reviewer Completed 02/24/2021 3:06 PM Wastewater Steve Messner Additional Reviewer Completed 02/24/2021 3:11 PM Public Utilities Planning and Project Management Benjamin Bullert Additional Reviewer Completed 02/25/2021 8:30 AM Public Utilities Planning and Project Management Daniel Roman Additional Reviewer Completed 02/25/2021 9:02 AM Public Utilities Operations Support Jennifer Morse Additional Reviewer Completed 02/25/2021 12:59 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 02/25/2021 2:58 PM Growth Management Department Lisa Taylor Additional Reviewer Completed 02/25/2021 3:47 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 02/26/2021 7:21 AM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 02/26/2021 12:03 PM Capital Project Planning, Impact Fees, and Program Management Liz Gosselin Additional Reviewer Completed 02/26/2021 4:02 PM Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 03/01/2021 1:50 PM 11.A Packet Pg. 223 03/23/2021 Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 03/01/2021 2:53 PM Procurement Services Sandra Herrera Additional Reviewer Completed 03/02/2021 1:44 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/03/2021 9:50 AM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/09/2021 3:45 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 03/10/2021 11:00 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/10/2021 11:31 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/10/2021 11:43 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 03/11/2021 3:17 PM Budget and Management Office Ed Finn Additional Reviewer Completed 03/11/2021 6:13 PM County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 03/12/2021 10:50 AM Board of County Commissioners MaryJo Brock Meeting Pending 03/23/2021 9:00 AM 11.A Packet Pg. 224 Project No:21-7823 Procurement Strategist:Cynthia McCanna Notices Issued:34735 Project Title:108th & 109th Avenues Public Utilities Renewal Project Project Manager:Diana Dueri Bid Pkgs Viewed:129 Bid Date:11/23/2020 Bids Received:4 No Bids 1 BID TABULATION BIDDER: ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 1.1a Mobilization/Demobilization (Max 5% of 108th Ave. N. Subtotal Bid, without Allowances)LS 1 $260,000.00 $260,000.00 $300,000.00 $300,000.00 $379,000.00 $379,000.00 $368,000.00 $368,000.00 $375,000.00 $375,000.00 1.2a Maintenance of Traffic LS 1 $530,000.00 $530,000.00 $50,000.00 $50,000.00 $450,000.00 $450,000.00 $190,000.00 $190,000.00 $190,000.00 $190,000.00 1.3a Project Sign EA 2 $6,000.00 $12,000.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $3,150.00 $6,300.00 $2,500.00 $5,000.00 1.4a Survey Layout & Record Drawings LS 1 $65,000.00 $65,000.00 $65,500.00 $65,500.00 $150,000.00 $150,000.00 $67,000.00 $67,000.00 $60,000.00 $60,000.00 1.5a Pre-Construction Video & Photographs LS 1 $20,000.00 $20,000.00 $17,920.00 $17,920.00 $7,500.00 $7,500.00 $10,900.00 $10,900.00 $25,000.00 $25,000.00 1.6a Post-Construction Video LS 1 $6,000.00 $6,000.00 $2,750.00 $2,750.00 $3,500.00 $3,500.00 $1,600.00 $1,600.00 $6,000.00 $6,000.00 1.7a Clearing & Grubbing LS 1 $420,000.00 $420,000.00 $25,000.00 $25,000.00 $78,000.00 $78,000.00 $16,500.00 $16,500.00 $37,500.00 $37,500.00 1.8a Vibratory Monitoring LS 1 $63,000.00 $63,000.00 $50,000.00 $50,000.00 $12,500.00 $12,500.00 $5,900.00 $5,900.00 $25,000.00 $25,000.00 1.9a Remove, Dispose, and Replace Mailboxes EA 184 $150.00 $27,600.00 $150.00 $27,600.00 $175.00 $32,200.00 $300.00 $55,200.00 $250.00 $46,000.00 1.10a Remove and Dispose Concrete, Asphalt, Gravel and Travertine Driveway SY 8,820 $3.00 $26,460.00 $6.12 $53,978.40 $14.00 $123,480.00 $20.00 $176,400.00 $20.00 $176,400.00 1.11a Remove and Store Brick Paver Driveway SY 1,418 $3.00 $4,254.00 $5.00 $7,090.00 $28.00 $39,704.00 $20.00 $28,360.00 $25.00 $35,450.00 1.12a Install Driveway i.Concrete SY 6,930 $39.00 $270,270.00 $41.15 $285,169.50 $48.00 $332,640.00 $45.00 $311,850.00 $45.00 $311,850.00 ii.Asphalt SY 1,363 $5.00 $6,815.00 $26.20 $35,710.60 $42.00 $57,246.00 $15.00 $20,445.00 $25.00 $34,075.00 iii.Brick Pavers SY 1,532 $40.00 $61,280.00 $47.00 $72,004.00 $79.00 $121,028.00 $28.00 $42,896.00 $45.00 $68,940.00 iv.Travertine SY 100 $50.00 $5,000.00 $125.00 $12,500.00 $175.00 $17,500.00 $65.00 $6,500.00 $100.00 $10,000.00 v.Pervious Paver SY 353 $140.00 $49,420.00 $80.00 $28,240.00 $90.00 $31,770.00 $60.00 $21,180.00 $100.00 $35,300.00 1.13a Driveway Coatings and Finishes i.Colored Concrete Coatings SY 465 $90.00 $41,850.00 $50.00 $23,250.00 $25.00 $11,625.00 $80.00 $37,200.00 $75.00 $34,875.00 ii.Decorative (Stamped) Concrete Coatings and Finishes SY 100 $120.00 $12,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $85.00 $8,500.00 $100.00 $10,000.00 iii.Color Additives SY 100 $50.00 $5,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $75.00 $7,500.00 $40.00 $4,000.00 1.14a Remove, Dispose, and Replace Sidewalk i. Asphalt SY 350 $10.00 $3,500.00 $34.10 $11,935.00 $34.00 $11,900.00 $50.00 $17,500.00 $40.00 $14,000.00 ii.Concrete SY 470 $140.00 $65,800.00 $6.12 $2,876.40 $63.00 $29,610.00 $75.00 $35,250.00 $60.00 $28,200.00 1.15a Detectable Warnings SY 120 $5.00 $600.00 $50.00 $6,000.00 $29.00 $3,480.00 $225.00 $27,000.00 $35.00 $4,200.00 1.16a Private Property Tree Removal EA 30 $50.00 $1,500.00 $500.00 $15,000.00 $374.00 $11,220.00 $350.00 $10,500.00 $200.00 $6,000.00 1.17a Vehicle Guard Post EA 16 $400.00 $6,400.00 $210.00 $3,360.00 $596.00 $9,536.00 $400.00 $6,400.00 $650.00 $10,400.00 1.18a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $2,103,749.00 $1,248,883.90 $2,063,239.00 $1,618,881.00 $1,693,190.00 ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 2.1a Water Main Pipelines i.8-inch C900 DR18 PVC LF 6,703 $17.00 $113,951.00 $78.04 $523,102.12 $40.00 $268,120.00 $65.00 $435,695.00 $58.00 $388,774.00 ii.12-inch C900 DR18 PVC LF 110 $80.00 $8,800.00 $106.13 $11,674.30 $96.00 $10,560.00 $86.00 $9,460.00 $76.00 $8,360.00 2.2a Gate Valves/Insert Valves/Line Stops i.6-inch Gate Valve EA 1 $200.00 $200.00 $1,400.00 $1,400.00 $1,971.00 $1,971.00 $1,855.00 $1,855.00 $1,300.00 $1,300.00 ii.8-inch Gate Valve EA 22 $1,200.00 $26,400.00 $1,850.00 $40,700.00 $2,567.00 $56,474.00 $2,350.00 $51,700.00 $1,800.00 $39,600.00 iii.12-inch Gate Valve EA 2 $5,200.00 $10,400.00 $2,960.00 $5,920.00 $4,067.00 $8,134.00 $4,070.00 $8,140.00 $2,900.00 $5,800.00 iv.6-inch Insert Valve EA 1 $400.00 $400.00 $19,450.00 $19,450.00 $14,944.00 $14,944.00 $13,250.00 $13,250.00 $6,500.00 $6,500.00 v.8-inch Line Stop EA 1 $600.00 $600.00 $10,860.00 $10,860.00 $11,694.00 $11,694.00 $13,000.00 $13,000.00 $7,500.00 $7,500.00 vi.12-inch Line Stop EA 2 $700.00 $1,400.00 $14,650.00 $29,300.00 $13,819.00 $27,638.00 $16,000.00 $32,000.00 $9,000.00 $18,000.00 2.3a Fire Hydrant Assemblies EA 13 $2,800.00 $36,400.00 $5,390.00 $70,070.00 $7,003.00 $91,039.00 $5,100.00 $66,300.00 $48,000.00 $624,000.00 2.4a Water Services i.Short Single Service EA 39 $300.00 $11,700.00 $990.00 $38,610.00 $1,478.00 $57,642.00 $1,150.00 $44,850.00 $1,100.00 $42,900.00 ii.Short Double Service EA 31 $500.00 $15,500.00 $1,250.00 $38,750.00 $1,873.00 $58,063.00 $1,500.00 $46,500.00 $1,400.00 $43,400.00 iii.Long Single Service EA 34 $450.00 $15,300.00 $1,990.00 $67,660.00 $2,009.00 $68,306.00 $1,525.00 $51,850.00 $1,600.00 $54,400.00 iv.Long Double Service EA 32 $500.00 $16,000.00 $2,220.00 $71,040.00 $2,435.00 $77,920.00 $1,900.00 $60,800.00 $1,900.00 $60,800.00 2.5a Water Meter, Meter Box, and Backflow Device i.New Meter Box (Relocated Existing Meter and Backflow)EA 10 $80.00 $800.00 $610.00 $6,100.00 $554.00 $5,540.00 $395.00 $3,950.00 $250.00 $2,500.00 ii.New Meter Box and New Backflow (Relocated Existing Meter)EA 154 $400.00 $61,600.00 $520.00 $80,080.00 $506.00 $77,924.00 $425.00 $65,450.00 $200.00 $30,800.00 2.6a Water Meter Box (vacant property)EA 10 $300.00 $3,000.00 $260.00 $2,600.00 $706.00 $7,060.00 $395.00 $3,950.00 $180.00 $1,800.00 2.7a Connection to Existing Water Main i.Vanderbilt Drive 8-inch PVC WM EA 1 $49,000.00 $49,000.00 $7,130.00 $7,130.00 $3,561.00 $3,561.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 ii.6th Street North 12-inch PVC WM EA 2 $45,000.00 $90,000.00 $10,830.00 $21,660.00 $3,652.00 $7,304.00 $5,870.00 $11,740.00 $12,000.00 $24,000.00 iii.7th Street North 8-inch PVC WM EA 2 $45,000.00 $90,000.00 $9,670.00 $19,340.00 $3,522.00 $7,044.00 $5,740.00 $11,480.00 $8,500.00 $17,000.00 iv.8th Court West 8" PVC WM EA 1 $42,000.00 $42,000.00 $9,590.00 $9,590.00 $3,414.00 $3,414.00 $5,630.00 $5,630.00 $8,000.00 $8,000.00 v.8th Court East 8" PVC WM EA 1 $42,000.00 $42,000.00 $10,830.00 $10,830.00 $3,701.00 $3,701.00 $6,000.00 $6,000.00 $8,000.00 $8,000.00 vi.US41 6-inch PVC WM EA 1 $42,000.00 $42,000.00 $7,135.00 $7,135.00 $6,845.00 $6,845.00 $7,000.00 $7,000.00 $6,200.00 $6,200.00 SECTION 1A: GENERAL (108TH AVENUE NORTH) SECTION 1A (GENERAL 108TH AVE. N.) SUBTOTAL: SECTION 2A: WATER SYSTEM (108TH AVENUE NORTH) ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp 11.A.1 Packet Pg. 225 Attachment: 21-7823 Bid Tabulation (15127 : 108th and 109th Avenues PUR - Construction) BIDDER:ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp 2.8a Bacteriological Sample Points i.Temporary Sample Point EA 10 $2,200.00 $22,000.00 $315.00 $3,150.00 $619.00 $6,190.00 $650.00 $6,500.00 $1,200.00 $12,000.00 ii.Permanent Sample Point EA 1 $4,200.00 $4,200.00 $1,970.00 $1,970.00 $2,217.00 $2,217.00 $2,300.00 $2,300.00 $3,000.00 $3,000.00 2.9a Air Release Valves EA 14 $400.00 $5,600.00 $2,310.00 $32,340.00 $3,135.00 $43,890.00 $1,875.00 $26,250.00 $2,000.00 $28,000.00 2.10a Conflict Avoidance (Deflection)EA 5 $500.00 $2,500.00 $4,480.00 $22,400.00 $2,722.00 $13,610.00 $6,560.00 $32,800.00 $3,200.00 $16,000.00 2.11a Temporary Connection to Existing Water Main EA 4 $1,000.00 $4,000.00 $4,330.00 $17,320.00 $3,563.00 $14,252.00 $5,000.00 $20,000.00 $3,500.00 $14,000.00 2.12a Removal and Disposal of Asbestos Concrete Water Main EA 5,829 $20.00 $116,580.00 $25.00 $145,725.00 $21.00 $122,409.00 $35.00 $204,015.00 $22.00 $128,238.00 2.13a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $932,331.00 $1,415,906.42 $1,177,466.00 $1,348,965.00 $1,708,872.00 ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 3.1a 8-inch PVC Gravity Sewer Pipe (Remove, Dispose, Replace)LF 5,929 $55.00 $326,095.00 $182.42 $1,081,568.18 $77.00 $456,533.00 $167.00 $990,143.00 $110.00 $652,190.00 3.2a Sanitary Sewer Service Lateral (Replace, Dispose, and Reconnect) i.Single Sanitary Sewer Service Lateral EA 199 $150.00 $29,850.00 $1,120.00 $222,880.00 $1,729.00 $344,071.00 $1,315.00 $261,685.00 $1,100.00 $218,900.00 ii.Double Sanitary Sewer Service Lateral EA 5 $50.00 $250.00 $1,310.00 $6,550.00 $2,236.00 $11,180.00 $1,650.00 $8,250.00 $1,200.00 $6,000.00 3.3a Private Property Sewer Service Lateral Replacement LF 200 $3.00 $600.00 $71.00 $14,200.00 $89.00 $17,800.00 $700.00 $140,000.00 $65.00 $13,000.00 3.4a Relocate Driveway Sanitary Service Lateral EA 38 $70.00 $2,660.00 $690.00 $26,220.00 $1,732.00 $65,816.00 $1,100.00 $41,800.00 $400.00 $15,200.00 3.5a Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA 16 $73,000.00 $1,168,000.00 $12,940.00 $207,040.00 $17,688.00 $283,008.00 $15,000.00 $240,000.00 $18,000.00 $288,000.00 3.6a Connect Existing Gravity Sewer to New Polymer Concrete Manhole EA 2 $30,000.00 $60,000.00 $1,630.00 $3,260.00 $6,533.00 $13,066.00 $12,000.00 $24,000.00 $5,000.00 $10,000.00 3.7a Connect New Gravity Sewer to Existing Manhole EA 2 $18,000.00 $36,000.00 $3,310.00 $6,620.00 $6,052.00 $12,104.00 $13,750.00 $27,500.00 $3,000.00 $6,000.00 3.8a Conflict Crossing Through Existing Box EA 1 $55,000.00 $55,000.00 $7,870.00 $7,870.00 $10,541.00 $10,541.00 $17,000.00 $17,000.00 $12,000.00 $12,000.00 3.9a Existing Sanitary Force Main Removal and Disposal LF 0 $2.00 $0.00 $35.00 $0.00 $0.00 $0.00 $45.00 $0.00 $8.00 $0.00 3.10a Road Restoration - Stabilized Subgrade SY 17,219 $0.50 $8,609.50 $6.00 $103,314.00 $3.70 $63,710.30 $6.00 $103,314.00 $5.00 $86,095.00 3.11a Road Restoration - Limerock Base (8-inch)SY 14,158 $4.00 $56,632.00 $13.00 $184,054.00 $18.00 $254,844.00 $16.00 $226,528.00 $12.00 $169,896.00 3.12a Road Restoration - 2-1/2" Asphalt (Two Lifts)SY 13,450 $10.00 $134,500.00 $17.42 $234,299.00 $24.00 $322,800.00 $16.25 $218,562.50 $16.00 $215,200.00 3.13a Final Paving Striping/Marking LS 1 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $21,774.00 $21,774.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 3.14a Remove, Dispose, and Replace Concrete Curb LF 150 $15.00 $2,250.00 $50.00 $7,500.00 $91.00 $13,650.00 $16.75 $2,512.50 $20.00 $3,000.00 3.15a Milling & Resurfacing SY 3,395 $5.00 $16,975.00 $20.53 $69,699.35 $17.00 $57,715.00 $28.65 $97,266.75 $35.00 $118,825.00 3.16a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $2,132,421.50 $2,395,074.53 $2,148,612.30 $2,612,561.75 $2,029,306.00 ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 4.1a 15" ADS Pipe LF 314 $20.00 $6,280.00 $74.77 $23,477.78 $86.00 $27,004.00 $56.00 $17,584.00 $60.00 $18,840.00 4.2a 18" ADS Pipe LF 3,707 $49.00 $181,643.00 $78.52 $291,073.64 $55.00 $203,885.00 $70.00 $259,490.00 $64.00 $237,248.00 4.3a 18" ADS Perforated Pipe in Water Quality Trench LF 6,348 $12.00 $76,176.00 $103.19 $655,050.12 $70.00 $444,360.00 $95.00 $603,060.00 $80.00 $507,840.00 4.4a 18" RCP LF 450 $12.00 $5,400.00 $95.09 $42,790.50 $97.00 $43,650.00 $75.50 $33,975.00 $100.00 $45,000.00 4.5a 24" ADS Pipe LF 2,792 $65.00 $181,480.00 $96.68 $269,930.56 $75.00 $209,400.00 $90.00 $251,280.00 $75.00 $209,400.00 4.6a 24" ADS Perforated Pipe in Water Quality Trench LF 2,639 $136.00 $358,904.00 $114.96 $303,379.44 $94.00 $248,066.00 $120.00 $316,680.00 $90.00 $237,510.00 4.7a 24" RCP LF 100 $250.00 $25,000.00 $108.09 $10,809.00 $153.00 $15,300.00 $95.00 $9,500.00 $125.00 $12,500.00 4.8a Catch Basin EA 41 $200.00 $8,200.00 $3,775.00 $154,775.00 $4,002.00 $164,082.00 $2,775.00 $113,775.00 $2,500.00 $102,500.00 4.9a Catch Basin w/Sedimentation Sump EA 16 $250.00 $4,000.00 $4,600.00 $73,600.00 $4,583.00 $73,328.00 $3,000.00 $48,000.00 $3,000.00 $48,000.00 4.10a Catch Basin w/Weir Plate EA 6 $20,000.00 $120,000.00 $5,240.00 $31,440.00 $5,907.00 $35,442.00 $4,150.00 $24,900.00 $5,500.00 $33,000.00 4.11a Yard Drain EA 157 $200.00 $31,400.00 $1,250.00 $196,250.00 $2,752.00 $432,064.00 $1,175.00 $184,475.00 $1,000.00 $157,000.00 4.12a Junction Box EA 2 $600.00 $1,200.00 $4,100.00 $8,200.00 $6,128.00 $12,256.00 $3,050.00 $6,100.00 $2,300.00 $4,600.00 4.13a Private Property Yard Drains EA 20 $100.00 $2,000.00 $820.00 $16,400.00 $1,653.00 $33,060.00 $565.00 $11,300.00 $500.00 $10,000.00 4.14a Connection to Existing Storm Structure EA 14 $500.00 $7,000.00 $1,000.00 $14,000.00 $2,998.00 $41,972.00 $1,995.00 $27,930.00 $3,000.00 $42,000.00 4.15a Modification of Existing Storm Storm Structure EA 4 $800.00 $3,200.00 $1,000.00 $4,000.00 $1,544.00 $6,176.00 $3,500.00 $14,000.00 $2,000.00 $8,000.00 4.16a Mitered End Section EA 18 $500.00 $9,000.00 $1,990.00 $35,820.00 $2,103.00 $37,854.00 $3,200.00 $57,600.00 $1,200.00 $21,600.00 4.17a Swale Grading (not associated with the above pay items)LF 522 $5.00 $2,610.00 $3.00 $1,566.00 $24.00 $12,528.00 $25.00 $13,050.00 $60.00 $31,320.00 4.18a Root Barrier LF 300 $12.00 $3,600.00 $25.00 $7,500.00 $26.00 $7,800.00 $78.00 $23,400.00 $250.00 $75,000.00 4.19a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1.0 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $1,177,093.00 $2,290,062.04 $2,198,227.00 $2,166,099.00 $1,951,358.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 1.1b Mobilization/Demobilization (Max 5% of 109th Ave. N. Subtotal Bid, without Allowances)LS 1 $260,000.00 $260,000.00 $300,000.00 $300,000.00 $357,000.00 $357,000.00 $340,000.00 $340,000.00 $375,000.00 $375,000.00 1.2b Maintenance of Traffic LS 1 $530,000.00 $530,000.00 $50,000.00 $50,000.00 $450,000.00 $450,000.00 $190,000.00 $190,000.00 $190,000.00 $190,000.00 1.3b Project Sign EA 2 $6,000.00 $12,000.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $3,150.00 $6,300.00 $2,500.00 $5,000.00 1.4b Survey Layout & Record Drawings LS 1 $65,000.00 $65,000.00 $65,500.00 $65,500.00 $140,000.00 $140,000.00 $67,000.00 $67,000.00 $60,000.00 $60,000.00 1.5b Pre-Construction Video & Photographs LS 1 $20,000.00 $20,000.00 $17,920.00 $17,920.00 $7,500.00 $7,500.00 $10,875.00 $10,875.00 $25,000.00 $25,000.00 1.6b Post-Construction Video LS 1 $6,000.00 $6,000.00 $2,750.00 $2,750.00 $3,500.00 $3,500.00 $3,025.00 $3,025.00 $6,000.00 $6,000.00 1.7b Clearing & Grubbing LS 1 $420,000.00 $420,000.00 $25,000.00 $25,000.00 $76,000.00 $76,000.00 $21,525.00 $21,525.00 $37,500.00 $37,500.00 1.8b Vibratory Monitoring LS 1 $63,000.00 $63,000.00 $50,000.00 $50,000.00 $12,600.00 $12,600.00 $5,900.00 $5,900.00 $25,000.00 $25,000.00 1.9b Remove, Dispose, and Replace Mailboxes EA 184 $150.00 $27,600.00 $150.00 $27,600.00 $175.00 $32,200.00 $300.00 $55,200.00 $250.00 $46,000.00 1.10b Remove and Dispose Concrete, Asphalt, Gravel and Travertine Driveway SY 7,411 $3.00 $22,233.00 $6.12 $45,355.32 $14.00 $103,754.00 $20.00 $148,220.00 $20.00 $148,220.00 1.11b Remove and Store Brick Paver Driveway SY 1,990 $3.00 $5,970.00 $5.00 $9,950.00 $28.00 $55,720.00 $20.00 $39,800.00 $25.00 $49,750.00 1.12b Install Driveway i.Concrete SY 6,048 $39.00 $235,872.00 $41.15 $248,875.20 $48.00 $290,304.00 $45.00 $272,160.00 $45.00 $272,160.00 ii.Asphalt SY 1,294 $5.00 $6,470.00 $26.20 $33,902.80 $42.00 $54,348.00 $15.00 $19,410.00 $25.00 $32,350.00 iii.Brick Pavers SY 1,945 $40.00 $77,800.00 $47.00 $91,415.00 $79.00 $153,655.00 $28.00 $54,460.00 $45.00 $87,525.00 iv.Travertine SY 100 $50.00 $5,000.00 $125.00 $12,500.00 $175.00 $17,500.00 $65.00 $6,500.00 $100.00 $10,000.00 v.Pervious Paver SY 0 $140.00 $0.00 $80.00 $0.00 $0.00 $0.00 $60.00 $0.00 $100.00 $0.00 1.13b Driveway Coatings and Finishes SECTION 2A (WATER SYSTEM 108TH AVE. N.) SUBTOTAL: SECTION 3A: WASTEWATER SYSTEM (108TH AVENUE NORTH) SECTION 3A (WASTEWATER SYSTEM 108TH AVE. N.) SUBTOTAL: SECTION 4A: STORMWATER SYSTEM (108TH AVENUE NORTH) SECTION 4A (STORMWATER SYSTEM 108TH AVE. N.) SUBTOTAL: SECTION 1B: GENERAL (109TH AVENUE NORTH) 11.A.1 Packet Pg. 226 Attachment: 21-7823 Bid Tabulation (15127 : 108th and 109th Avenues PUR - Construction) BIDDER:ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp i.Colored Concrete Coatings SY 820 $90.00 $73,800.00 $50.00 $41,000.00 $25.00 $20,500.00 $80.00 $65,600.00 $75.00 $61,500.00 ii.Decorative (Stamped) Concrete Coatings and Finishes SY 100 $120.00 $12,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $85.00 $8,500.00 $100.00 $10,000.00 iii.Color Additives SY 100 $50.00 $5,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $55.00 $5,500.00 $40.00 $4,000.00 1.14b Remove, Dispose, and Replace Sidewalk i. Asphalt SY 340 $10.00 $3,400.00 $34.10 $11,594.00 $34.00 $11,560.00 $35.00 $11,900.00 $40.00 $13,600.00 ii.Concrete SY 120 $140.00 $16,800.00 $6.12 $734.40 $63.00 $7,560.00 $60.00 $7,200.00 $60.00 $7,200.00 1.15b Detectable Warnings SY 120 $5.00 $600.00 $50.00 $6,000.00 $29.00 $3,480.00 $225.00 $27,000.00 $35.00 $4,200.00 1.16b Private Property Tree Removal EA 30 $50.00 $1,500.00 $500.00 $15,000.00 $374.00 $11,220.00 $350.00 $10,500.00 $200.00 $6,000.00 1.17b Vehicle Guard Post EA 16 $400.00 $6,400.00 $210.00 $3,360.00 $596.00 $9,536.00 $400.00 $6,400.00 $650.00 $10,400.00 1.18b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $2,016,445.00 $1,211,456.72 $1,967,737.00 $1,522,975.00 $1,626,405.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 2.1b Water Main Pipelines i.8-inch C900 DR18 PVC LF 6,167 $17.00 $104,839.00 $78.04 $481,272.68 $39.00 $240,513.00 $65.00 $400,855.00 $58.00 $357,686.00 ii.12-inch C900 DR18 PVC LF 120 $80.00 $9,600.00 $107.00 $12,840.00 $87.00 $10,440.00 $86.00 $10,320.00 $76.00 $9,120.00 2.2b Gate Valves/Insert Valves/Line Stops i.6-inch Gate Valve EA 1 $200.00 $200.00 $1,400.00 $1,400.00 $1,971.00 $1,971.00 $1,855.00 $1,855.00 $1,300.00 $1,300.00 ii.8-inch Gate Valve EA 20 $1,200.00 $24,000.00 $1,850.00 $37,000.00 $2,567.00 $51,340.00 $2,350.00 $47,000.00 $1,800.00 $36,000.00 iii.12-inch Gate Valve EA 2 $5,200.00 $10,400.00 $2,960.00 $5,920.00 $3,414.00 $6,828.00 $4,070.00 $8,140.00 $2,900.00 $5,800.00 iv.6-inch Insert Valve EA 1 $400.00 $400.00 $19,450.00 $19,450.00 $14,944.00 $14,944.00 $13,250.00 $13,250.00 $6,500.00 $6,500.00 v.8-inch Line Stop EA 1 $600.00 $600.00 $10,860.00 $10,860.00 $5,313.00 $5,313.00 $13,000.00 $13,000.00 $7,500.00 $7,500.00 vi.12-inch Line Stop EA 2 $700.00 $1,400.00 $14,650.00 $29,300.00 $7,438.00 $14,876.00 $16,000.00 $32,000.00 $9,000.00 $18,000.00 2.3b Fire Hydrant Assemblies EA 13 $2,800.00 $36,400.00 $5,390.00 $70,070.00 $7,003.00 $91,039.00 $5,100.00 $66,300.00 $48,000.00 $624,000.00 2.4b Water Services i.Short Single Service EA 29 $300.00 $8,700.00 $990.00 $28,710.00 $1,475.00 $42,775.00 $1,150.00 $33,350.00 $1,100.00 $31,900.00 ii.Short Double Service EA 35 $500.00 $17,500.00 $1,250.00 $43,750.00 $1,873.00 $65,555.00 $1,500.00 $52,500.00 $1,400.00 $49,000.00 iii.Long Single Service EA 29 $450.00 $13,050.00 $1,990.00 $57,710.00 $2,001.00 $58,029.00 $1,525.00 $44,225.00 $1,600.00 $46,400.00 iv.Long Double Service EA 33 $500.00 $16,500.00 $2,220.00 $73,260.00 $2,439.00 $80,487.00 $1,900.00 $62,700.00 $1,900.00 $62,700.00 2.5b Water Meter, Meter Box, and Backflow Device i.New Meter Box (Relocated Existing Meter and Backflow)EA 10 $80.00 $800.00 $610.00 $6,100.00 $554.00 $5,540.00 $395.00 $3,950.00 $250.00 $2,500.00 ii.New Meter Box and New Backflow (Relocated Existing Meter)EA 186 $400.00 $74,400.00 $520.00 $96,720.00 $506.00 $94,116.00 $425.00 $79,050.00 $200.00 $37,200.00 2.6b Water Meter Box (vacant property)EA 10 $300.00 $3,000.00 $260.00 $2,600.00 $706.00 $7,060.00 $395.00 $3,950.00 $180.00 $1,800.00 2.7b Connection to Existing Water Main i.Vanderbilt Drive 8-inch PVC WM EA 1 $49,000.00 $49,000.00 $7,130.00 $7,130.00 $3,561.00 $3,561.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 ii.6th Street North 12-inch PVC WM EA 2 $45,000.00 $90,000.00 $10,830.00 $21,660.00 $3,652.00 $7,304.00 $5,870.00 $11,740.00 $12,000.00 $24,000.00 iii.7th Street North 8-inch PVC WM EA 2 $45,000.00 $90,000.00 $9,670.00 $19,340.00 $3,522.00 $7,044.00 $5,740.00 $11,480.00 $8,500.00 $17,000.00 iv.8th Court West 8" PVC WM EA 0 $42,000.00 $0.00 $9,590.00 $0.00 $0.00 $0.00 $5,630.00 $0.00 $8,000.00 $0.00 v.8th Court East 8" PVC WM EA 0 $42,000.00 $0.00 $10,830.00 $0.00 $0.00 $0.00 $6,000.00 $0.00 $8,000.00 $0.00 vi.US41 6-inch PVC WM EA 1 $42,000.00 $42,000.00 $7,250.00 $7,250.00 $7,107.00 $7,107.00 $7,000.00 $7,000.00 $6,200.00 $6,200.00 2.8b Bacteriological Sample Points i.Temporary Sample Point EA 10 $2,200.00 $22,000.00 $320.00 $3,200.00 $619.00 $6,190.00 $650.00 $6,500.00 $1,200.00 $12,000.00 ii.Permanent Sample Point EA 1 $4,200.00 $4,200.00 $1,970.00 $1,970.00 $2,217.00 $2,217.00 $2,300.00 $2,300.00 $3,000.00 $3,000.00 2.9b Air Release Valves EA 12 $400.00 $4,800.00 $2,310.00 $27,720.00 $3,136.00 $37,632.00 $1,875.00 $22,500.00 $2,000.00 $24,000.00 2.10b Conflict Avoidance (Deflection)EA 5 $500.00 $2,500.00 $4,480.00 $22,400.00 $3,091.00 $15,455.00 $6,560.00 $32,800.00 $3,200.00 $16,000.00 2.11b Temporary Connection to Existing Water Main EA 4 $1,000.00 $4,000.00 $4,330.00 $17,320.00 $3,563.00 $14,252.00 $5,000.00 $20,000.00 $3,500.00 $14,000.00 2.12b Removal and Disposal of Asbestos Concrete Water Main EA 5,836 $20.00 $116,720.00 $25.00 $145,900.00 $21.00 $122,556.00 $35.00 $204,260.00 $22.00 $128,392.00 2.13b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $100,000.00 $100,000.00 $150,000.00 $150,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $847,009.00 $1,400,852.68 $1,114,144.00 $1,297,525.00 $1,649,998.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 3.1b 8-inch PVC Gravity Sewer Pipe (Remove, Dispose, Replace)LF 5,707 $55.00 $313,885.00 $182.42 $1,041,070.94 $77.00 $439,439.00 $167.00 $953,069.00 $110.00 $627,770.00 3.2b Sanitary Sewer Service Lateral (Replace, Dispose, and Reconnect) i.Single Sanitary Sewer Service Lateral EA 196 $150.00 $29,400.00 $1,120.00 $219,520.00 $1,729.00 $338,884.00 $1,315.00 $257,740.00 $1,100.00 $215,600.00 ii.Double Sanitary Sewer Service Lateral EA 5 $50.00 $250.00 $1,310.00 $6,550.00 $2,236.00 $11,180.00 $1,650.00 $8,250.00 $1,200.00 $6,000.00 3.3b Private Property Sewer Service Lateral Replacement LF 200 $3.00 $600.00 $71.00 $14,200.00 $95.00 $19,000.00 $700.00 $140,000.00 $65.00 $13,000.00 3.4b Relocate Driveway Sanitary Service Lateral EA 59 $70.00 $4,130.00 $690.00 $40,710.00 $1,732.00 $102,188.00 $1,100.00 $64,900.00 $400.00 $23,600.00 3.5b Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA 14 $73,000.00 $1,022,000.00 $12,940.00 $181,160.00 $17,688.00 $247,632.00 $15,000.00 $210,000.00 $18,000.00 $252,000.00 3.6b Connect Existing Gravity Sewer to New Polymer Concrete Manhole EA 2 $30,000.00 $60,000.00 $1,740.00 $3,480.00 $6,533.00 $13,066.00 $12,000.00 $24,000.00 $5,000.00 $10,000.00 3.7b Connect New Gravity Sewer to Existing Manhole EA 2 $18,000.00 $36,000.00 $3,740.00 $7,480.00 $6,052.00 $12,104.00 $13,750.00 $27,500.00 $3,000.00 $6,000.00 3.8b Conflict Crossing Through Existing Box EA 1 $55,000.00 $55,000.00 $8,080.00 $8,080.00 $10,541.00 $10,541.00 $17,000.00 $17,000.00 $12,000.00 $12,000.00 3.9b Existing Sanitary Force Main Removal and Disposal LF 4,668 $2.00 $9,336.00 $35.00 $163,380.00 $14.00 $65,352.00 $45.00 $210,060.00 $8.00 $37,344.00 3.10b Road Restoration - Stabilized Subgrade SY 16,177 $0.50 $8,088.50 $6.00 $97,062.00 $3.70 $59,854.90 $6.00 $97,062.00 $5.00 $80,885.00 3.11b Road Restoration - Limerock Base (8-inch)SY 13,277 $4.00 $53,108.00 $13.00 $172,601.00 $18.00 $238,986.00 $16.00 $212,432.00 $12.00 $159,324.00 3.12b Road Restoration - 2-1/2" Asphalt (Two Lifts)SY 12,606 $10.00 $126,060.00 $17.40 $219,344.40 $24.00 $302,544.00 $16.25 $204,847.50 $16.00 $201,696.00 3.13b Final Paving Striping/Marking LS 1.0 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $21,774.00 $21,774.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 3.14b Remove, Dispose, and Replace Concrete Curb LF 50 $15.00 $750.00 $50.00 $2,500.00 $91.00 $4,550.00 $16.75 $837.50 $20.00 $1,000.00 3.15b Milling & Resurfacing SY 3,128 $5.00 $15,640.00 $20.53 $64,217.84 $17.00 $53,176.00 $28.65 $89,617.20 $35.00 $109,480.00 3.16b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1.0 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $1,969,247.50 $2,461,356.18 $2,140,270.90 $2,731,315.20 $1,970,699.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 4.1b 15" ADS Pipe LF 216 $20.00 $4,320.00 $66.77 $14,422.32 $86.00 $18,576.00 $56.00 $12,096.00 $60.00 $12,960.00 SECTION 2B (WATER SYSTEM 109TH AVE. N.) SUBTOTAL: SECTION 1B (GENERAL 109TH AVE. N.) SUBTOTAL: SECTION 2B: WATER SYSTEM (109TH AVENUE NORTH) SECTION 3B: WASTEWATER SYSTEM (109TH AVENUE NORTH) SECTION 3B (WASTEWATER SYSTEM 109TH AVE. N.) SUBTOTAL: SECTION 4B: STORMWATER SYSTEM (109TH AVENUE NORTH) 11.A.1 Packet Pg. 227 Attachment: 21-7823 Bid Tabulation (15127 : 108th and 109th Avenues PUR - Construction) BIDDER:ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp 4.2b 18" ADS Pipe LF 3,934 $49.00 $192,766.00 $70.52 $277,425.68 $55.00 $216,370.00 $70.00 $275,380.00 $64.00 $251,776.00 4.3b 18" ADS Perforated Pipe in Water Quality Trench LF 3,371 $12.00 $40,452.00 $95.19 $320,885.49 $70.00 $235,970.00 $95.00 $320,245.00 $80.00 $269,680.00 4.4b 18" RCP LF 550 $12.00 $6,600.00 $87.09 $47,899.50 $95.00 $52,250.00 $75.50 $41,525.00 $100.00 $55,000.00 4.5b 24" ADS Pipe LF 2,796 $65.00 $181,740.00 $88.68 $247,949.28 $75.00 $209,700.00 $90.00 $251,640.00 $75.00 $209,700.00 4.6b 24" ADS Perforated Pipe in Water Quality Trench LF 2,636 $136.00 $358,496.00 $106.96 $281,946.56 $94.00 $247,784.00 $120.00 $316,320.00 $90.00 $237,240.00 4.7b 24" RCP LF 146 $250.00 $36,500.00 $100.09 $14,613.14 $153.00 $22,338.00 $95.00 $13,870.00 $125.00 $18,250.00 4.8b Catch Basin EA 39 $200.00 $7,800.00 $3,775.00 $147,225.00 $4,002.00 $156,078.00 $2,700.00 $105,300.00 $2,500.00 $97,500.00 4.9b Catch Basin w/Sedimentation Sump EA 13 $250.00 $3,250.00 $4,600.00 $59,800.00 $4,583.00 $59,579.00 $2,850.00 $37,050.00 $3,000.00 $39,000.00 4.10b Catch Basin w/Weir Plate EA 6 $20,000.00 $120,000.00 $6,525.00 $39,150.00 $5,907.00 $35,442.00 $3,950.00 $23,700.00 $5,500.00 $33,000.00 4.11b Yard Drain EA 155 $200.00 $31,000.00 $1,250.00 $193,750.00 $2,752.00 $426,560.00 $1,175.00 $182,125.00 $1,000.00 $155,000.00 4.12b Junction Box EA 2 $600.00 $1,200.00 $4,100.00 $8,200.00 $6,063.00 $12,126.00 $3,050.00 $6,100.00 $2,300.00 $4,600.00 4.13b Private Property Yard Drains EA 20 $100.00 $2,000.00 $820.00 $16,400.00 $1,653.00 $33,060.00 $565.00 $11,300.00 $500.00 $10,000.00 4.14b Connection to Existing Storm Structure EA 16 $500.00 $8,000.00 $1,000.00 $16,000.00 $2,998.00 $47,968.00 $1,995.00 $31,920.00 $3,000.00 $48,000.00 4.15b Modification of Existing Storm Storm Structure EA 4 $800.00 $3,200.00 $1,000.00 $4,000.00 $1,544.00 $6,176.00 $3,500.00 $14,000.00 $2,000.00 $8,000.00 4.16b Mitered End Section EA 12 $500.00 $6,000.00 $1,990.00 $23,880.00 $2,103.00 $25,236.00 $3,200.00 $38,400.00 $1,200.00 $14,400.00 4.17b Swale Grading (not associated with the above pay items)LF 536 $5.00 $2,680.00 $3.00 $1,608.00 $24.00 $12,864.00 $25.00 $13,400.00 $60.00 $32,160.00 4.18b Root Barrier LF 300 $12.00 $3,600.00 $25.00 $7,500.00 $26.00 $7,800.00 $78.00 $23,400.00 $250.00 $75,000.00 4.19b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1.0 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $1,159,604.00 $1,872,654.97 $1,975,877.00 $1,867,771.00 $1,721,266.00 $2,103,749.00 $1,248,883.90 $2,063,239.00 $1,618,881.00 $1,693,190.00 $932,331.00 $1,415,906.42 $1,177,466.00 $1,348,965.00 $1,708,872.00 $2,132,421.50 $2,395,074.53 $2,148,612.30 $2,612,561.75 $2,029,306.00 $1,177,093.00 $2,290,062.04 $2,198,227.00 $2,166,099.00 $1,951,358.00 $6,345,594.50 $7,349,926.89 $7,587,544.30 $7,746,506.75 $7,382,726.00 $2,016,445.00 $1,211,456.72 $1,967,737.00 $1,522,975.00 $1,626,405.00 $847,009.00 $1,400,852.68 $1,114,144.00 $1,297,525.00 $1,649,998.00 $1,969,247.50 $2,461,356.18 $2,140,270.90 $2,731,315.20 $1,970,699.00 $1,159,604.00 $1,872,654.97 $1,975,877.00 $1,867,771.00 $1,721,266.00 $5,992,305.50 $6,946,320.55 $7,198,028.90 $7,419,586.20 $6,968,368.00 $4,120,194.00 $2,460,340.62 $4,030,976.00 $3,141,856.00 $3,319,595.00 $1,779,340.00 $2,816,759.10 $2,291,610.00 $2,646,490.00 $3,358,870.00 $4,101,669.00 $4,856,430.71 $4,288,883.20 $5,343,876.95 $4,000,005.00 $2,336,697.00 $4,162,717.01 $4,174,104.00 $4,033,870.00 $3,672,624.00 $12,337,900.00 $14,296,247.44 $14,785,573.20 $15,166,092.95 $14,351,094.00 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Local Business Tax Receipt (Colloer County Yes Yes N/A N/A Yes No *Verified on Line Yes Yes Yes Yes Yes Yes Naples Naples Pompano Beach Bonita Springs Collier Collier Broward Lee Opened By: Cynthia McCanna * Minor irregularity Witnessed by:Jim Flanagan SUBTOTAL A (108th Avenue North): Mitchell & Stark Const. Co. Inc. NOTE: (No additional payment shall be made for rock excavation, replacement of fill material or dewatering). * (Owners Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.” GRAND TOTAL 108TH & 109TH AVENUES NORTH: Section 3B: Wastewater System (109th Avenue North) Section 4B: Stormwater System (109th Avenue North) SUBTOTAL B (109th Avenue North): GRAND TOTAL SUMMARY A & B - 108TH & 109TH AVENUES NORTH Section 1A & 1B: General County: Place of Business Bidders Checklist (Form 12) Addendums (3) SUMMARY B - 109TH AVENUE NORTH Douglas N. Higgins, Inc. SunBiz E-Verify Contractors Key Personnel Assigned to Project - (Form 2) Trench Safety Act Acknowledgement (Form 6) Bid Bond (Form 7) Statement of Experience of Bidder (Form 5) Completed Bid Forms: Insurance and Bonding Requirements (Form 8) Conflict of Interest Affidavit (Form 9) Vendor Declaration Statement (Form 10) Immigration Affidavit Certification (Form 11) Bid Schedule Material Manufacturers (Form 3) Bid Response Form (Form 1) List of Major Subcontractors (Form 4) SECTION 4B (STORMWATER SYSTEM 109TH AVE. N.) SUBTOTAL: SUMMARY A - 108TH AVENUE NORTH Section 1A: General (108th Avenue North) Section 2A: Water System (108th Avenue North) Haskins, Inc. Giannetti Contracting Corp Section 3A: Wastewater System (108th Avenue North) Section 4A: Stormwater System (108th Avenue North) Section 1B: General (109th Avenue North) Section 2B: Water System (109th Avenue North) Section 2A & 2B: Water System Section 3A & 3B: Wastewater System Section 4A & 4B: Stormwater System 11.A.1 Packet Pg. 228 Attachment: 21-7823 Bid Tabulation (15127 : 108th and 109th Avenues PUR - Construction) $0 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 $16,000,000 $18,000,000 Eng Est Douglas N. Higgins Mitchell & Stark Giannetti Contracting Haskins Bid Results for 21-7823 "108th and 109th Avenues Public Utilities Renewal" Project KEY: Dashed Green- AVERAGE BID Dashed black- +/-1 std dev of avg bid 11.A.2 Packet Pg. 229 Attachment: Bid Analysis No 21-7823 (15127 : 108th and 109th Avenues PUR - Construction) Solicitation No.:21-7823 Title:108th & 109th Avenues Public Utilities Renewal Project Bid Due Date and Time:November 23, 2020 3:00 PM On October 20, 2020 the Procurement Services Division issued ITB No.21-7823,108th & 109th Avenues Public Utilities Renewal project to 34,735 vendors. Interested contractors viewed one hundred twenty-nine (129) bid packages and the County received four (4) bids by the November 23, 2020 deadline. The County received and one (1) “No Bid”, as summarized above. Staff reviewed the bids received. Four bids were found to be responsive and responsible. Mitchell & Stark Const. Co. Inc. had one minor irregularity. Keltour US, Inc. entered a No-Bid stating “Not Applicable”. Staff determined that Douglas N. Higgins, Inc. is the lowest responsive and responsible bidder. Staff therefore recommends that the contract be awarded to Douglas N. Higgins, Inc., the lowest responsive and responsible bidder, for a total contract amount of $12,337,900.00. Project Manager: Procurement Strategist: Date:January 8, 2020 Notice of Recommended Award RESPONDENTS: Company Name City County ST Base Bid Responsive/Responsible Douglas N. Higgins, Inc.Naples Collier FL $12,337,900.00 Yes/Yes Mitchell & Stark Const. Co. Inc.Naples Collier FL $14,296,247.44 Yes/Yes Giannetti Contracting Corp Pompano Beach Broward FL $14,785,573.20 Yes/Yes Haskins, Inc.Bonita Springs Lee FL $15,166, 092.95 Yes/Yes Keltour US, Inc.No Bid N/A Utilized Local Vendor Preference: Yes No N/A Required Signatures Procurement Services Director: Sandra Herrera 11.A.3 Packet Pg. 230 Attachment: 21-7823 - NORA - Executed (flat) (15127 : 108th and 109th Avenues PUR - Construction) Civil Engineers  Land Surveyors  Planners  Landscape Architects Q. Grady Minor & Associates, P.A. Ph. 239-947-1144  Fax. 239-947-0375 3800 Via Del Rey EB 0005151  LB 0005151  LC 26000266 Bonita Springs, FL 34134 www.gradyminor.com January 4, 2021 Ms. Cynthia McCanna Procurement Strategist Collier County Procurement Services Division 3295 Tamiami Trail East Naples, FL 34112-5361 RE: Award Recommendation 20-7823 - 108th & 109th Avenue North Public Utilities Renewal Project Dear Ms. McCanna: Q. Grady Minor & Associates, P.A. (GradyMinor) has completed our review of the bid documents provided by the Collier County Procurement Services Division for the above referenced project and we are pleased to provide the following award recommendation. The scope of the 108th & 109th Avenue North Public Utilities Renewal Project (Project) includes the replacement of aging potable water, wastewater, and stormwater infrastructure along 108th Avenue North and 109th Avenue North in Naples Park from Vanderbilt Drive to Tamiami Trail/US 41 and the complete rebuilding of affected roadways. Based on the bid tabulation (attached), Douglas N. Higgins, Inc. (DNH) is the low bidder with a bid amount of $12,337,900.00, which is approximately 14% less than the project’s Opinion of Probable Construction Cost (OPCC) amount of $14,351,094.00. GradyMinor reviewed DNH’s bid documents, provided by the Collier County Procurement Services Division, and did not find any irregularities of concern. It should be noted that some of DNH’s bid unit prices were significantly different from the other four bids received for the Project. GradyMinor reviewed the bid items that were significantly different, including re-checking the Project quantities, and we are not concerned by the differences as DNH has significant recent experience within the Naples Park neighborhood, on nearly identical projects. Additionally, the DNH’s completed Minimum Qualifications of Bidders table (Section XIV of the bid documents) indicates that DNH has successfully completed similar projects in scope and size to the 108th & 109th Avenue North Public Utilities Renewal Project in Collier County, including nearly identical projects within the same neighborhood to this Project. DNH is a local general contractor with utility construction experience throughout southwest Florida and Collier County for the last 30 years. Additionally, DNH is in Collier County’s library of approved underground utility contractors and has been for many years. The projects provided by DNH as references are underground utility focused, all within Collier County. GradyMinor contacted six (6) of the provided references and completed the Collier County Procurement Services Division Vender Reference Check Log (attached). All the references that were contacted provided positive feedback and a summary of the Vender Reference Check Logs is provided on the following page: 11.A.4 Packet Pg. 231 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Ms. Cynthia McCanna 108th & 109th Avenue North Public Utilities Renewal Project Award Recommendation January 4, 2021 Page 2 \\qgm.local\files\Engineering\PROJ-ENG\C\CCU272\08CDocs\01Bidding-Addenda-COs-Corr\Award Recommendation\108 and 109th PUR Recommendations for Reward DNH.docx Project: Project completed timely & within budget? Submittal/review process performed satisfactorily? Construction process performed satisfactorily? Did the process run smoothly? Were there any changes? Contract closeout process performed satisfactorily? Warranty issues since closeout? 95th Ave. N. Public Utilities Renewal Yes Yes Yes Yes No Yes No 107th Ave. N. Public Utilities Renewal Yes Yes Yes Yes Yes, but not b/c of DNH Yes No 110th Ave. N. Public Utilities Renewal Yes Yes Yes Yes Yes, but not b/c of DNH Yes No Royal Harbor Water System Improvements Yes Yes Yes Yes Yes, but not b/c of DNH Yes Possibly on asphalt but was satisfactorily corrected by DNH Oil Well Road Force Main Improvements Yes Yes Yes Yes Yes, but not b/c of DNH Yes No Everglades City Water System Upgrade Phase II Multiple attempts were conducted to contact Mr. Sammy Hamilton. Unfortunately, Mr. Hamilton passed away in 2019. Several voicemails were also left for the Everglades City Clerk Dottie Joiner. Unfortunately, no response was provided. Therefore, the questionnaire could not be answered for the Everglades City Water System Upgrade – Phase II. Based on the above information, GradyMinor recommends Douglas N. Higgins, Inc. be awarded the 108th & 109th Avenue North Public Utilities Renewal Project in the amount of $12,337,900.00. Please feel free to call me with any questions. Very truly yours, Justin Frederiksen, P.E. Project Manager 11.A.4 Packet Pg. 232 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Project No:21-7823 Procurement Strategist:Cynthia McCanna Notices Issued:34735 Project Title:108th & 109th Avenues Public Utilities Renewal Project Project Manager:Diana Dueri Bid Pkgs Viewed:129 Bid Date:11/23/2020 Bids Received:4 No Bids 1 BID TABULATION BIDDER: ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 1.1a Mobilization/Demobilization (Max 5% of 108th Ave. N. Subtotal Bid, without Allowances)LS 1 $260,000.00 $260,000.00 $300,000.00 $300,000.00 $379,000.00 $379,000.00 $368,000.00 $368,000.00 $375,000.00 $375,000.00 1.2a Maintenance of Traffic LS 1 $530,000.00 $530,000.00 $50,000.00 $50,000.00 $450,000.00 $450,000.00 $190,000.00 $190,000.00 $190,000.00 $190,000.00 1.3a Project Sign EA 2 $6,000.00 $12,000.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $3,150.00 $6,300.00 $2,500.00 $5,000.00 1.4a Survey Layout & Record Drawings LS 1 $65,000.00 $65,000.00 $65,500.00 $65,500.00 $150,000.00 $150,000.00 $67,000.00 $67,000.00 $60,000.00 $60,000.00 1.5a Pre-Construction Video & Photographs LS 1 $20,000.00 $20,000.00 $17,920.00 $17,920.00 $7,500.00 $7,500.00 $10,900.00 $10,900.00 $25,000.00 $25,000.00 1.6a Post-Construction Video LS 1 $6,000.00 $6,000.00 $2,750.00 $2,750.00 $3,500.00 $3,500.00 $1,600.00 $1,600.00 $6,000.00 $6,000.00 1.7a Clearing & Grubbing LS 1 $420,000.00 $420,000.00 $25,000.00 $25,000.00 $78,000.00 $78,000.00 $16,500.00 $16,500.00 $37,500.00 $37,500.00 1.8a Vibratory Monitoring LS 1 $63,000.00 $63,000.00 $50,000.00 $50,000.00 $12,500.00 $12,500.00 $5,900.00 $5,900.00 $25,000.00 $25,000.00 1.9a Remove, Dispose, and Replace Mailboxes EA 184 $150.00 $27,600.00 $150.00 $27,600.00 $175.00 $32,200.00 $300.00 $55,200.00 $250.00 $46,000.00 1.10a Remove and Dispose Concrete, Asphalt, Gravel and Travertine Driveway SY 8,820 $3.00 $26,460.00 $6.12 $53,978.40 $14.00 $123,480.00 $20.00 $176,400.00 $20.00 $176,400.00 1.11a Remove and Store Brick Paver Driveway SY 1,418 $3.00 $4,254.00 $5.00 $7,090.00 $28.00 $39,704.00 $20.00 $28,360.00 $25.00 $35,450.00 1.12a Install Driveway i.Concrete SY 6,930 $39.00 $270,270.00 $41.15 $285,169.50 $48.00 $332,640.00 $45.00 $311,850.00 $45.00 $311,850.00 ii.Asphalt SY 1,363 $5.00 $6,815.00 $26.20 $35,710.60 $42.00 $57,246.00 $15.00 $20,445.00 $25.00 $34,075.00 iii.Brick Pavers SY 1,532 $40.00 $61,280.00 $47.00 $72,004.00 $79.00 $121,028.00 $28.00 $42,896.00 $45.00 $68,940.00 iv.Travertine SY 100 $50.00 $5,000.00 $125.00 $12,500.00 $175.00 $17,500.00 $65.00 $6,500.00 $100.00 $10,000.00 v.Pervious Paver SY 353 $140.00 $49,420.00 $80.00 $28,240.00 $90.00 $31,770.00 $60.00 $21,180.00 $100.00 $35,300.00 1.13a Driveway Coatings and Finishes i.Colored Concrete Coatings SY 465 $90.00 $41,850.00 $50.00 $23,250.00 $25.00 $11,625.00 $80.00 $37,200.00 $75.00 $34,875.00 ii.Decorative (Stamped) Concrete Coatings and Finishes SY 100 $120.00 $12,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $85.00 $8,500.00 $100.00 $10,000.00 iii.Color Additives SY 100 $50.00 $5,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $75.00 $7,500.00 $40.00 $4,000.00 1.14a Remove, Dispose, and Replace Sidewalk i. Asphalt SY 350 $10.00 $3,500.00 $34.10 $11,935.00 $34.00 $11,900.00 $50.00 $17,500.00 $40.00 $14,000.00 ii.Concrete SY 470 $140.00 $65,800.00 $6.12 $2,876.40 $63.00 $29,610.00 $75.00 $35,250.00 $60.00 $28,200.00 1.15a Detectable Warnings SY 120 $5.00 $600.00 $50.00 $6,000.00 $29.00 $3,480.00 $225.00 $27,000.00 $35.00 $4,200.00 1.16a Private Property Tree Removal EA 30 $50.00 $1,500.00 $500.00 $15,000.00 $374.00 $11,220.00 $350.00 $10,500.00 $200.00 $6,000.00 1.17a Vehicle Guard Post EA 16 $400.00 $6,400.00 $210.00 $3,360.00 $596.00 $9,536.00 $400.00 $6,400.00 $650.00 $10,400.00 1.18a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $2,103,749.00 $1,248,883.90 $2,063,239.00 $1,618,881.00 $1,693,190.00 ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 2.1a Water Main Pipelines i.8-inch C900 DR18 PVC LF 6,703 $17.00 $113,951.00 $78.04 $523,102.12 $40.00 $268,120.00 $65.00 $435,695.00 $58.00 $388,774.00 ii.12-inch C900 DR18 PVC LF 110 $80.00 $8,800.00 $106.13 $11,674.30 $96.00 $10,560.00 $86.00 $9,460.00 $76.00 $8,360.00 2.2a Gate Valves/Insert Valves/Line Stops i.6-inch Gate Valve EA 1 $200.00 $200.00 $1,400.00 $1,400.00 $1,971.00 $1,971.00 $1,855.00 $1,855.00 $1,300.00 $1,300.00 ii.8-inch Gate Valve EA 22 $1,200.00 $26,400.00 $1,850.00 $40,700.00 $2,567.00 $56,474.00 $2,350.00 $51,700.00 $1,800.00 $39,600.00 iii.12-inch Gate Valve EA 2 $5,200.00 $10,400.00 $2,960.00 $5,920.00 $4,067.00 $8,134.00 $4,070.00 $8,140.00 $2,900.00 $5,800.00 iv.6-inch Insert Valve EA 1 $400.00 $400.00 $19,450.00 $19,450.00 $14,944.00 $14,944.00 $13,250.00 $13,250.00 $6,500.00 $6,500.00 v.8-inch Line Stop EA 1 $600.00 $600.00 $10,860.00 $10,860.00 $11,694.00 $11,694.00 $13,000.00 $13,000.00 $7,500.00 $7,500.00 vi.12-inch Line Stop EA 2 $700.00 $1,400.00 $14,650.00 $29,300.00 $13,819.00 $27,638.00 $16,000.00 $32,000.00 $9,000.00 $18,000.00 2.3a Fire Hydrant Assemblies EA 13 $2,800.00 $36,400.00 $5,390.00 $70,070.00 $7,003.00 $91,039.00 $5,100.00 $66,300.00 $48,000.00 $624,000.00 2.4a Water Services i.Short Single Service EA 39 $300.00 $11,700.00 $990.00 $38,610.00 $1,478.00 $57,642.00 $1,150.00 $44,850.00 $1,100.00 $42,900.00 ii.Short Double Service EA 31 $500.00 $15,500.00 $1,250.00 $38,750.00 $1,873.00 $58,063.00 $1,500.00 $46,500.00 $1,400.00 $43,400.00 iii.Long Single Service EA 34 $450.00 $15,300.00 $1,990.00 $67,660.00 $2,009.00 $68,306.00 $1,525.00 $51,850.00 $1,600.00 $54,400.00 iv.Long Double Service EA 32 $500.00 $16,000.00 $2,220.00 $71,040.00 $2,435.00 $77,920.00 $1,900.00 $60,800.00 $1,900.00 $60,800.00 2.5a Water Meter, Meter Box, and Backflow Device i.New Meter Box (Relocated Existing Meter and Backflow)EA 10 $80.00 $800.00 $610.00 $6,100.00 $554.00 $5,540.00 $395.00 $3,950.00 $250.00 $2,500.00 ii.New Meter Box and New Backflow (Relocated Existing Meter)EA 154 $400.00 $61,600.00 $520.00 $80,080.00 $506.00 $77,924.00 $425.00 $65,450.00 $200.00 $30,800.00 2.6a Water Meter Box (vacant property)EA 10 $300.00 $3,000.00 $260.00 $2,600.00 $706.00 $7,060.00 $395.00 $3,950.00 $180.00 $1,800.00 2.7a Connection to Existing Water Main i.Vanderbilt Drive 8-inch PVC WM EA 1 $49,000.00 $49,000.00 $7,130.00 $7,130.00 $3,561.00 $3,561.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 ii.6th Street North 12-inch PVC WM EA 2 $45,000.00 $90,000.00 $10,830.00 $21,660.00 $3,652.00 $7,304.00 $5,870.00 $11,740.00 $12,000.00 $24,000.00 iii.7th Street North 8-inch PVC WM EA 2 $45,000.00 $90,000.00 $9,670.00 $19,340.00 $3,522.00 $7,044.00 $5,740.00 $11,480.00 $8,500.00 $17,000.00 iv.8th Court West 8" PVC WM EA 1 $42,000.00 $42,000.00 $9,590.00 $9,590.00 $3,414.00 $3,414.00 $5,630.00 $5,630.00 $8,000.00 $8,000.00 v.8th Court East 8" PVC WM EA 1 $42,000.00 $42,000.00 $10,830.00 $10,830.00 $3,701.00 $3,701.00 $6,000.00 $6,000.00 $8,000.00 $8,000.00 vi.US41 6-inch PVC WM EA 1 $42,000.00 $42,000.00 $7,135.00 $7,135.00 $6,845.00 $6,845.00 $7,000.00 $7,000.00 $6,200.00 $6,200.00 SECTION 1A: GENERAL (108TH AVENUE NORTH) SECTION 1A (GENERAL 108TH AVE. N.) SUBTOTAL: SECTION 2A: WATER SYSTEM (108TH AVENUE NORTH) ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp 11.A.4 Packet Pg. 233 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) BIDDER:ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp 2.8a Bacteriological Sample Points i.Temporary Sample Point EA 10 $2,200.00 $22,000.00 $315.00 $3,150.00 $619.00 $6,190.00 $650.00 $6,500.00 $1,200.00 $12,000.00 ii.Permanent Sample Point EA 1 $4,200.00 $4,200.00 $1,970.00 $1,970.00 $2,217.00 $2,217.00 $2,300.00 $2,300.00 $3,000.00 $3,000.00 2.9a Air Release Valves EA 14 $400.00 $5,600.00 $2,310.00 $32,340.00 $3,135.00 $43,890.00 $1,875.00 $26,250.00 $2,000.00 $28,000.00 2.10a Conflict Avoidance (Deflection)EA 5 $500.00 $2,500.00 $4,480.00 $22,400.00 $2,722.00 $13,610.00 $6,560.00 $32,800.00 $3,200.00 $16,000.00 2.11a Temporary Connection to Existing Water Main EA 4 $1,000.00 $4,000.00 $4,330.00 $17,320.00 $3,563.00 $14,252.00 $5,000.00 $20,000.00 $3,500.00 $14,000.00 2.12a Removal and Disposal of Asbestos Concrete Water Main EA 5,829 $20.00 $116,580.00 $25.00 $145,725.00 $21.00 $122,409.00 $35.00 $204,015.00 $22.00 $128,238.00 2.13a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $932,331.00 $1,415,906.42 $1,177,466.00 $1,348,965.00 $1,708,872.00 ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 3.1a 8-inch PVC Gravity Sewer Pipe (Remove, Dispose, Replace)LF 5,929 $55.00 $326,095.00 $182.42 $1,081,568.18 $77.00 $456,533.00 $167.00 $990,143.00 $110.00 $652,190.00 3.2a Sanitary Sewer Service Lateral (Replace, Dispose, and Reconnect) i.Single Sanitary Sewer Service Lateral EA 199 $150.00 $29,850.00 $1,120.00 $222,880.00 $1,729.00 $344,071.00 $1,315.00 $261,685.00 $1,100.00 $218,900.00 ii.Double Sanitary Sewer Service Lateral EA 5 $50.00 $250.00 $1,310.00 $6,550.00 $2,236.00 $11,180.00 $1,650.00 $8,250.00 $1,200.00 $6,000.00 3.3a Private Property Sewer Service Lateral Replacement LF 200 $3.00 $600.00 $71.00 $14,200.00 $89.00 $17,800.00 $700.00 $140,000.00 $65.00 $13,000.00 3.4a Relocate Driveway Sanitary Service Lateral EA 38 $70.00 $2,660.00 $690.00 $26,220.00 $1,732.00 $65,816.00 $1,100.00 $41,800.00 $400.00 $15,200.00 3.5a Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA 16 $73,000.00 $1,168,000.00 $12,940.00 $207,040.00 $17,688.00 $283,008.00 $15,000.00 $240,000.00 $18,000.00 $288,000.00 3.6a Connect Existing Gravity Sewer to New Polymer Concrete Manhole EA 2 $30,000.00 $60,000.00 $1,630.00 $3,260.00 $6,533.00 $13,066.00 $12,000.00 $24,000.00 $5,000.00 $10,000.00 3.7a Connect New Gravity Sewer to Existing Manhole EA 2 $18,000.00 $36,000.00 $3,310.00 $6,620.00 $6,052.00 $12,104.00 $13,750.00 $27,500.00 $3,000.00 $6,000.00 3.8a Conflict Crossing Through Existing Box EA 1 $55,000.00 $55,000.00 $7,870.00 $7,870.00 $10,541.00 $10,541.00 $17,000.00 $17,000.00 $12,000.00 $12,000.00 3.9a Existing Sanitary Force Main Removal and Disposal LF 0 $2.00 $0.00 $35.00 $0.00 $0.00 $0.00 $45.00 $0.00 $8.00 $0.00 3.10a Road Restoration - Stabilized Subgrade SY 17,219 $0.50 $8,609.50 $6.00 $103,314.00 $3.70 $63,710.30 $6.00 $103,314.00 $5.00 $86,095.00 3.11a Road Restoration - Limerock Base (8-inch)SY 14,158 $4.00 $56,632.00 $13.00 $184,054.00 $18.00 $254,844.00 $16.00 $226,528.00 $12.00 $169,896.00 3.12a Road Restoration - 2-1/2" Asphalt (Two Lifts)SY 13,450 $10.00 $134,500.00 $17.42 $234,299.00 $24.00 $322,800.00 $16.25 $218,562.50 $16.00 $215,200.00 3.13a Final Paving Striping/Marking LS 1 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $21,774.00 $21,774.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 3.14a Remove, Dispose, and Replace Concrete Curb LF 150 $15.00 $2,250.00 $50.00 $7,500.00 $91.00 $13,650.00 $16.75 $2,512.50 $20.00 $3,000.00 3.15a Milling & Resurfacing SY 3,395 $5.00 $16,975.00 $20.53 $69,699.35 $17.00 $57,715.00 $28.65 $97,266.75 $35.00 $118,825.00 3.16a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $2,132,421.50 $2,395,074.53 $2,148,612.30 $2,612,561.75 $2,029,306.00 ITEM NO.DESCRIPTION (108TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 4.1a 15" ADS Pipe LF 314 $20.00 $6,280.00 $74.77 $23,477.78 $86.00 $27,004.00 $56.00 $17,584.00 $60.00 $18,840.00 4.2a 18" ADS Pipe LF 3,707 $49.00 $181,643.00 $78.52 $291,073.64 $55.00 $203,885.00 $70.00 $259,490.00 $64.00 $237,248.00 4.3a 18" ADS Perforated Pipe in Water Quality Trench LF 6,348 $12.00 $76,176.00 $103.19 $655,050.12 $70.00 $444,360.00 $95.00 $603,060.00 $80.00 $507,840.00 4.4a 18" RCP LF 450 $12.00 $5,400.00 $95.09 $42,790.50 $97.00 $43,650.00 $75.50 $33,975.00 $100.00 $45,000.00 4.5a 24" ADS Pipe LF 2,792 $65.00 $181,480.00 $96.68 $269,930.56 $75.00 $209,400.00 $90.00 $251,280.00 $75.00 $209,400.00 4.6a 24" ADS Perforated Pipe in Water Quality Trench LF 2,639 $136.00 $358,904.00 $114.96 $303,379.44 $94.00 $248,066.00 $120.00 $316,680.00 $90.00 $237,510.00 4.7a 24" RCP LF 100 $250.00 $25,000.00 $108.09 $10,809.00 $153.00 $15,300.00 $95.00 $9,500.00 $125.00 $12,500.00 4.8a Catch Basin EA 41 $200.00 $8,200.00 $3,775.00 $154,775.00 $4,002.00 $164,082.00 $2,775.00 $113,775.00 $2,500.00 $102,500.00 4.9a Catch Basin w/Sedimentation Sump EA 16 $250.00 $4,000.00 $4,600.00 $73,600.00 $4,583.00 $73,328.00 $3,000.00 $48,000.00 $3,000.00 $48,000.00 4.10a Catch Basin w/Weir Plate EA 6 $20,000.00 $120,000.00 $5,240.00 $31,440.00 $5,907.00 $35,442.00 $4,150.00 $24,900.00 $5,500.00 $33,000.00 4.11a Yard Drain EA 157 $200.00 $31,400.00 $1,250.00 $196,250.00 $2,752.00 $432,064.00 $1,175.00 $184,475.00 $1,000.00 $157,000.00 4.12a Junction Box EA 2 $600.00 $1,200.00 $4,100.00 $8,200.00 $6,128.00 $12,256.00 $3,050.00 $6,100.00 $2,300.00 $4,600.00 4.13a Private Property Yard Drains EA 20 $100.00 $2,000.00 $820.00 $16,400.00 $1,653.00 $33,060.00 $565.00 $11,300.00 $500.00 $10,000.00 4.14a Connection to Existing Storm Structure EA 14 $500.00 $7,000.00 $1,000.00 $14,000.00 $2,998.00 $41,972.00 $1,995.00 $27,930.00 $3,000.00 $42,000.00 4.15a Modification of Existing Storm Storm Structure EA 4 $800.00 $3,200.00 $1,000.00 $4,000.00 $1,544.00 $6,176.00 $3,500.00 $14,000.00 $2,000.00 $8,000.00 4.16a Mitered End Section EA 18 $500.00 $9,000.00 $1,990.00 $35,820.00 $2,103.00 $37,854.00 $3,200.00 $57,600.00 $1,200.00 $21,600.00 4.17a Swale Grading (not associated with the above pay items)LF 522 $5.00 $2,610.00 $3.00 $1,566.00 $24.00 $12,528.00 $25.00 $13,050.00 $60.00 $31,320.00 4.18a Root Barrier LF 300 $12.00 $3,600.00 $25.00 $7,500.00 $26.00 $7,800.00 $78.00 $23,400.00 $250.00 $75,000.00 4.19a Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1.0 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $1,177,093.00 $2,290,062.04 $2,198,227.00 $2,166,099.00 $1,951,358.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY. UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 1.1b Mobilization/Demobilization (Max 5% of 109th Ave. N. Subtotal Bid, without Allowances)LS 1 $260,000.00 $260,000.00 $300,000.00 $300,000.00 $357,000.00 $357,000.00 $340,000.00 $340,000.00 $375,000.00 $375,000.00 1.2b Maintenance of Traffic LS 1 $530,000.00 $530,000.00 $50,000.00 $50,000.00 $450,000.00 $450,000.00 $190,000.00 $190,000.00 $190,000.00 $190,000.00 1.3b Project Sign EA 2 $6,000.00 $12,000.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $3,150.00 $6,300.00 $2,500.00 $5,000.00 1.4b Survey Layout & Record Drawings LS 1 $65,000.00 $65,000.00 $65,500.00 $65,500.00 $140,000.00 $140,000.00 $67,000.00 $67,000.00 $60,000.00 $60,000.00 1.5b Pre-Construction Video & Photographs LS 1 $20,000.00 $20,000.00 $17,920.00 $17,920.00 $7,500.00 $7,500.00 $10,875.00 $10,875.00 $25,000.00 $25,000.00 1.6b Post-Construction Video LS 1 $6,000.00 $6,000.00 $2,750.00 $2,750.00 $3,500.00 $3,500.00 $3,025.00 $3,025.00 $6,000.00 $6,000.00 1.7b Clearing & Grubbing LS 1 $420,000.00 $420,000.00 $25,000.00 $25,000.00 $76,000.00 $76,000.00 $21,525.00 $21,525.00 $37,500.00 $37,500.00 1.8b Vibratory Monitoring LS 1 $63,000.00 $63,000.00 $50,000.00 $50,000.00 $12,600.00 $12,600.00 $5,900.00 $5,900.00 $25,000.00 $25,000.00 1.9b Remove, Dispose, and Replace Mailboxes EA 184 $150.00 $27,600.00 $150.00 $27,600.00 $175.00 $32,200.00 $300.00 $55,200.00 $250.00 $46,000.00 1.10b Remove and Dispose Concrete, Asphalt, Gravel and Travertine Driveway SY 7,411 $3.00 $22,233.00 $6.12 $45,355.32 $14.00 $103,754.00 $20.00 $148,220.00 $20.00 $148,220.00 1.11b Remove and Store Brick Paver Driveway SY 1,990 $3.00 $5,970.00 $5.00 $9,950.00 $28.00 $55,720.00 $20.00 $39,800.00 $25.00 $49,750.00 1.12b Install Driveway i.Concrete SY 6,048 $39.00 $235,872.00 $41.15 $248,875.20 $48.00 $290,304.00 $45.00 $272,160.00 $45.00 $272,160.00 ii.Asphalt SY 1,294 $5.00 $6,470.00 $26.20 $33,902.80 $42.00 $54,348.00 $15.00 $19,410.00 $25.00 $32,350.00 iii.Brick Pavers SY 1,945 $40.00 $77,800.00 $47.00 $91,415.00 $79.00 $153,655.00 $28.00 $54,460.00 $45.00 $87,525.00 iv.Travertine SY 100 $50.00 $5,000.00 $125.00 $12,500.00 $175.00 $17,500.00 $65.00 $6,500.00 $100.00 $10,000.00 v.Pervious Paver SY 0 $140.00 $0.00 $80.00 $0.00 $0.00 $0.00 $60.00 $0.00 $100.00 $0.00 1.13b Driveway Coatings and Finishes SECTION 2A (WATER SYSTEM 108TH AVE. N.) SUBTOTAL: SECTION 3A: WASTEWATER SYSTEM (108TH AVENUE NORTH) SECTION 3A (WASTEWATER SYSTEM 108TH AVE. N.) SUBTOTAL: SECTION 4A: STORMWATER SYSTEM (108TH AVENUE NORTH) SECTION 4A (STORMWATER SYSTEM 108TH AVE. N.) SUBTOTAL: SECTION 1B: GENERAL (109TH AVENUE NORTH) 11.A.4 Packet Pg. 234 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) BIDDER:ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp i.Colored Concrete Coatings SY 820 $90.00 $73,800.00 $50.00 $41,000.00 $25.00 $20,500.00 $80.00 $65,600.00 $75.00 $61,500.00 ii.Decorative (Stamped) Concrete Coatings and Finishes SY 100 $120.00 $12,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $85.00 $8,500.00 $100.00 $10,000.00 iii.Color Additives SY 100 $50.00 $5,000.00 $50.00 $5,000.00 $34.00 $3,400.00 $55.00 $5,500.00 $40.00 $4,000.00 1.14b Remove, Dispose, and Replace Sidewalk i. Asphalt SY 340 $10.00 $3,400.00 $34.10 $11,594.00 $34.00 $11,560.00 $35.00 $11,900.00 $40.00 $13,600.00 ii.Concrete SY 120 $140.00 $16,800.00 $6.12 $734.40 $63.00 $7,560.00 $60.00 $7,200.00 $60.00 $7,200.00 1.15b Detectable Warnings SY 120 $5.00 $600.00 $50.00 $6,000.00 $29.00 $3,480.00 $225.00 $27,000.00 $35.00 $4,200.00 1.16b Private Property Tree Removal EA 30 $50.00 $1,500.00 $500.00 $15,000.00 $374.00 $11,220.00 $350.00 $10,500.00 $200.00 $6,000.00 1.17b Vehicle Guard Post EA 16 $400.00 $6,400.00 $210.00 $3,360.00 $596.00 $9,536.00 $400.00 $6,400.00 $650.00 $10,400.00 1.18b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $2,016,445.00 $1,211,456.72 $1,967,737.00 $1,522,975.00 $1,626,405.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 2.1b Water Main Pipelines i.8-inch C900 DR18 PVC LF 6,167 $17.00 $104,839.00 $78.04 $481,272.68 $39.00 $240,513.00 $65.00 $400,855.00 $58.00 $357,686.00 ii.12-inch C900 DR18 PVC LF 120 $80.00 $9,600.00 $107.00 $12,840.00 $87.00 $10,440.00 $86.00 $10,320.00 $76.00 $9,120.00 2.2b Gate Valves/Insert Valves/Line Stops i.6-inch Gate Valve EA 1 $200.00 $200.00 $1,400.00 $1,400.00 $1,971.00 $1,971.00 $1,855.00 $1,855.00 $1,300.00 $1,300.00 ii.8-inch Gate Valve EA 20 $1,200.00 $24,000.00 $1,850.00 $37,000.00 $2,567.00 $51,340.00 $2,350.00 $47,000.00 $1,800.00 $36,000.00 iii.12-inch Gate Valve EA 2 $5,200.00 $10,400.00 $2,960.00 $5,920.00 $3,414.00 $6,828.00 $4,070.00 $8,140.00 $2,900.00 $5,800.00 iv.6-inch Insert Valve EA 1 $400.00 $400.00 $19,450.00 $19,450.00 $14,944.00 $14,944.00 $13,250.00 $13,250.00 $6,500.00 $6,500.00 v.8-inch Line Stop EA 1 $600.00 $600.00 $10,860.00 $10,860.00 $5,313.00 $5,313.00 $13,000.00 $13,000.00 $7,500.00 $7,500.00 vi.12-inch Line Stop EA 2 $700.00 $1,400.00 $14,650.00 $29,300.00 $7,438.00 $14,876.00 $16,000.00 $32,000.00 $9,000.00 $18,000.00 2.3b Fire Hydrant Assemblies EA 13 $2,800.00 $36,400.00 $5,390.00 $70,070.00 $7,003.00 $91,039.00 $5,100.00 $66,300.00 $48,000.00 $624,000.00 2.4b Water Services i.Short Single Service EA 29 $300.00 $8,700.00 $990.00 $28,710.00 $1,475.00 $42,775.00 $1,150.00 $33,350.00 $1,100.00 $31,900.00 ii.Short Double Service EA 35 $500.00 $17,500.00 $1,250.00 $43,750.00 $1,873.00 $65,555.00 $1,500.00 $52,500.00 $1,400.00 $49,000.00 iii.Long Single Service EA 29 $450.00 $13,050.00 $1,990.00 $57,710.00 $2,001.00 $58,029.00 $1,525.00 $44,225.00 $1,600.00 $46,400.00 iv.Long Double Service EA 33 $500.00 $16,500.00 $2,220.00 $73,260.00 $2,439.00 $80,487.00 $1,900.00 $62,700.00 $1,900.00 $62,700.00 2.5b Water Meter, Meter Box, and Backflow Device i.New Meter Box (Relocated Existing Meter and Backflow)EA 10 $80.00 $800.00 $610.00 $6,100.00 $554.00 $5,540.00 $395.00 $3,950.00 $250.00 $2,500.00 ii.New Meter Box and New Backflow (Relocated Existing Meter)EA 186 $400.00 $74,400.00 $520.00 $96,720.00 $506.00 $94,116.00 $425.00 $79,050.00 $200.00 $37,200.00 2.6b Water Meter Box (vacant property)EA 10 $300.00 $3,000.00 $260.00 $2,600.00 $706.00 $7,060.00 $395.00 $3,950.00 $180.00 $1,800.00 2.7b Connection to Existing Water Main i.Vanderbilt Drive 8-inch PVC WM EA 1 $49,000.00 $49,000.00 $7,130.00 $7,130.00 $3,561.00 $3,561.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 ii.6th Street North 12-inch PVC WM EA 2 $45,000.00 $90,000.00 $10,830.00 $21,660.00 $3,652.00 $7,304.00 $5,870.00 $11,740.00 $12,000.00 $24,000.00 iii.7th Street North 8-inch PVC WM EA 2 $45,000.00 $90,000.00 $9,670.00 $19,340.00 $3,522.00 $7,044.00 $5,740.00 $11,480.00 $8,500.00 $17,000.00 iv.8th Court West 8" PVC WM EA 0 $42,000.00 $0.00 $9,590.00 $0.00 $0.00 $0.00 $5,630.00 $0.00 $8,000.00 $0.00 v.8th Court East 8" PVC WM EA 0 $42,000.00 $0.00 $10,830.00 $0.00 $0.00 $0.00 $6,000.00 $0.00 $8,000.00 $0.00 vi.US41 6-inch PVC WM EA 1 $42,000.00 $42,000.00 $7,250.00 $7,250.00 $7,107.00 $7,107.00 $7,000.00 $7,000.00 $6,200.00 $6,200.00 2.8b Bacteriological Sample Points i.Temporary Sample Point EA 10 $2,200.00 $22,000.00 $320.00 $3,200.00 $619.00 $6,190.00 $650.00 $6,500.00 $1,200.00 $12,000.00 ii.Permanent Sample Point EA 1 $4,200.00 $4,200.00 $1,970.00 $1,970.00 $2,217.00 $2,217.00 $2,300.00 $2,300.00 $3,000.00 $3,000.00 2.9b Air Release Valves EA 12 $400.00 $4,800.00 $2,310.00 $27,720.00 $3,136.00 $37,632.00 $1,875.00 $22,500.00 $2,000.00 $24,000.00 2.10b Conflict Avoidance (Deflection)EA 5 $500.00 $2,500.00 $4,480.00 $22,400.00 $3,091.00 $15,455.00 $6,560.00 $32,800.00 $3,200.00 $16,000.00 2.11b Temporary Connection to Existing Water Main EA 4 $1,000.00 $4,000.00 $4,330.00 $17,320.00 $3,563.00 $14,252.00 $5,000.00 $20,000.00 $3,500.00 $14,000.00 2.12b Removal and Disposal of Asbestos Concrete Water Main EA 5,836 $20.00 $116,720.00 $25.00 $145,900.00 $21.00 $122,556.00 $35.00 $204,260.00 $22.00 $128,392.00 2.13b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1 $100,000.00 $100,000.00 $150,000.00 $150,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $847,009.00 $1,400,852.68 $1,114,144.00 $1,297,525.00 $1,649,998.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 3.1b 8-inch PVC Gravity Sewer Pipe (Remove, Dispose, Replace)LF 5,707 $55.00 $313,885.00 $182.42 $1,041,070.94 $77.00 $439,439.00 $167.00 $953,069.00 $110.00 $627,770.00 3.2b Sanitary Sewer Service Lateral (Replace, Dispose, and Reconnect) i.Single Sanitary Sewer Service Lateral EA 196 $150.00 $29,400.00 $1,120.00 $219,520.00 $1,729.00 $338,884.00 $1,315.00 $257,740.00 $1,100.00 $215,600.00 ii.Double Sanitary Sewer Service Lateral EA 5 $50.00 $250.00 $1,310.00 $6,550.00 $2,236.00 $11,180.00 $1,650.00 $8,250.00 $1,200.00 $6,000.00 3.3b Private Property Sewer Service Lateral Replacement LF 200 $3.00 $600.00 $71.00 $14,200.00 $95.00 $19,000.00 $700.00 $140,000.00 $65.00 $13,000.00 3.4b Relocate Driveway Sanitary Service Lateral EA 59 $70.00 $4,130.00 $690.00 $40,710.00 $1,732.00 $102,188.00 $1,100.00 $64,900.00 $400.00 $23,600.00 3.5b Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA 14 $73,000.00 $1,022,000.00 $12,940.00 $181,160.00 $17,688.00 $247,632.00 $15,000.00 $210,000.00 $18,000.00 $252,000.00 3.6b Connect Existing Gravity Sewer to New Polymer Concrete Manhole EA 2 $30,000.00 $60,000.00 $1,740.00 $3,480.00 $6,533.00 $13,066.00 $12,000.00 $24,000.00 $5,000.00 $10,000.00 3.7b Connect New Gravity Sewer to Existing Manhole EA 2 $18,000.00 $36,000.00 $3,740.00 $7,480.00 $6,052.00 $12,104.00 $13,750.00 $27,500.00 $3,000.00 $6,000.00 3.8b Conflict Crossing Through Existing Box EA 1 $55,000.00 $55,000.00 $8,080.00 $8,080.00 $10,541.00 $10,541.00 $17,000.00 $17,000.00 $12,000.00 $12,000.00 3.9b Existing Sanitary Force Main Removal and Disposal LF 4,668 $2.00 $9,336.00 $35.00 $163,380.00 $14.00 $65,352.00 $45.00 $210,060.00 $8.00 $37,344.00 3.10b Road Restoration - Stabilized Subgrade SY 16,177 $0.50 $8,088.50 $6.00 $97,062.00 $3.70 $59,854.90 $6.00 $97,062.00 $5.00 $80,885.00 3.11b Road Restoration - Limerock Base (8-inch)SY 13,277 $4.00 $53,108.00 $13.00 $172,601.00 $18.00 $238,986.00 $16.00 $212,432.00 $12.00 $159,324.00 3.12b Road Restoration - 2-1/2" Asphalt (Two Lifts)SY 12,606 $10.00 $126,060.00 $17.40 $219,344.40 $24.00 $302,544.00 $16.25 $204,847.50 $16.00 $201,696.00 3.13b Final Paving Striping/Marking LS 1.0 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $21,774.00 $21,774.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 3.14b Remove, Dispose, and Replace Concrete Curb LF 50 $15.00 $750.00 $50.00 $2,500.00 $91.00 $4,550.00 $16.75 $837.50 $20.00 $1,000.00 3.15b Milling & Resurfacing SY 3,128 $5.00 $15,640.00 $20.53 $64,217.84 $17.00 $53,176.00 $28.65 $89,617.20 $35.00 $109,480.00 3.16b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1.0 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $1,969,247.50 $2,461,356.18 $2,140,270.90 $2,731,315.20 $1,970,699.00 ITEM NO.DESCRIPTION (109TH AVENUE NORTH)UNIT EST. QTY.UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($)UNIT PRICE AMOUNT ($) 4.1b 15" ADS Pipe LF 216 $20.00 $4,320.00 $66.77 $14,422.32 $86.00 $18,576.00 $56.00 $12,096.00 $60.00 $12,960.00 SECTION 2B (WATER SYSTEM 109TH AVE. N.) SUBTOTAL: SECTION 1B (GENERAL 109TH AVE. N.) SUBTOTAL: SECTION 2B: WATER SYSTEM (109TH AVENUE NORTH) SECTION 3B: WASTEWATER SYSTEM (109TH AVENUE NORTH) SECTION 3B (WASTEWATER SYSTEM 109TH AVE. N.) SUBTOTAL: SECTION 4B: STORMWATER SYSTEM (109TH AVENUE NORTH) 11.A.4 Packet Pg. 235 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) BIDDER:ENGINEER'S ESTIMATEDouglas N. Higgins, Inc.Haskins, Inc. Mitchell & Stark Const. Co. Inc.Giannetti Contracting Corp 4.2b 18" ADS Pipe LF 3,934 $49.00 $192,766.00 $70.52 $277,425.68 $55.00 $216,370.00 $70.00 $275,380.00 $64.00 $251,776.00 4.3b 18" ADS Perforated Pipe in Water Quality Trench LF 3,371 $12.00 $40,452.00 $95.19 $320,885.49 $70.00 $235,970.00 $95.00 $320,245.00 $80.00 $269,680.00 4.4b 18" RCP LF 550 $12.00 $6,600.00 $87.09 $47,899.50 $95.00 $52,250.00 $75.50 $41,525.00 $100.00 $55,000.00 4.5b 24" ADS Pipe LF 2,796 $65.00 $181,740.00 $88.68 $247,949.28 $75.00 $209,700.00 $90.00 $251,640.00 $75.00 $209,700.00 4.6b 24" ADS Perforated Pipe in Water Quality Trench LF 2,636 $136.00 $358,496.00 $106.96 $281,946.56 $94.00 $247,784.00 $120.00 $316,320.00 $90.00 $237,240.00 4.7b 24" RCP LF 146 $250.00 $36,500.00 $100.09 $14,613.14 $153.00 $22,338.00 $95.00 $13,870.00 $125.00 $18,250.00 4.8b Catch Basin EA 39 $200.00 $7,800.00 $3,775.00 $147,225.00 $4,002.00 $156,078.00 $2,700.00 $105,300.00 $2,500.00 $97,500.00 4.9b Catch Basin w/Sedimentation Sump EA 13 $250.00 $3,250.00 $4,600.00 $59,800.00 $4,583.00 $59,579.00 $2,850.00 $37,050.00 $3,000.00 $39,000.00 4.10b Catch Basin w/Weir Plate EA 6 $20,000.00 $120,000.00 $6,525.00 $39,150.00 $5,907.00 $35,442.00 $3,950.00 $23,700.00 $5,500.00 $33,000.00 4.11b Yard Drain EA 155 $200.00 $31,000.00 $1,250.00 $193,750.00 $2,752.00 $426,560.00 $1,175.00 $182,125.00 $1,000.00 $155,000.00 4.12b Junction Box EA 2 $600.00 $1,200.00 $4,100.00 $8,200.00 $6,063.00 $12,126.00 $3,050.00 $6,100.00 $2,300.00 $4,600.00 4.13b Private Property Yard Drains EA 20 $100.00 $2,000.00 $820.00 $16,400.00 $1,653.00 $33,060.00 $565.00 $11,300.00 $500.00 $10,000.00 4.14b Connection to Existing Storm Structure EA 16 $500.00 $8,000.00 $1,000.00 $16,000.00 $2,998.00 $47,968.00 $1,995.00 $31,920.00 $3,000.00 $48,000.00 4.15b Modification of Existing Storm Storm Structure EA 4 $800.00 $3,200.00 $1,000.00 $4,000.00 $1,544.00 $6,176.00 $3,500.00 $14,000.00 $2,000.00 $8,000.00 4.16b Mitered End Section EA 12 $500.00 $6,000.00 $1,990.00 $23,880.00 $2,103.00 $25,236.00 $3,200.00 $38,400.00 $1,200.00 $14,400.00 4.17b Swale Grading (not associated with the above pay items)LF 536 $5.00 $2,680.00 $3.00 $1,608.00 $24.00 $12,864.00 $25.00 $13,400.00 $60.00 $32,160.00 4.18b Root Barrier LF 300 $12.00 $3,600.00 $25.00 $7,500.00 $26.00 $7,800.00 $78.00 $23,400.00 $250.00 $75,000.00 4.19b Allowance at the direction and approval by Collier County Utilities Project Manager.TBD 1.0 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $1,159,604.00 $1,872,654.97 $1,975,877.00 $1,867,771.00 $1,721,266.00 $2,103,749.00 $1,248,883.90 $2,063,239.00 $1,618,881.00 $1,693,190.00 $932,331.00 $1,415,906.42 $1,177,466.00 $1,348,965.00 $1,708,872.00 $2,132,421.50 $2,395,074.53 $2,148,612.30 $2,612,561.75 $2,029,306.00 $1,177,093.00 $2,290,062.04 $2,198,227.00 $2,166,099.00 $1,951,358.00 $6,345,594.50 $7,349,926.89 $7,587,544.30 $7,746,506.75 $7,382,726.00 $2,016,445.00 $1,211,456.72 $1,967,737.00 $1,522,975.00 $1,626,405.00 $847,009.00 $1,400,852.68 $1,114,144.00 $1,297,525.00 $1,649,998.00 $1,969,247.50 $2,461,356.18 $2,140,270.90 $2,731,315.20 $1,970,699.00 $1,159,604.00 $1,872,654.97 $1,975,877.00 $1,867,771.00 $1,721,266.00 $5,992,305.50 $6,946,320.55 $7,198,028.90 $7,419,586.20 $6,968,368.00 $4,120,194.00 $2,460,340.62 $4,030,976.00 $3,141,856.00 $3,319,595.00 $1,779,340.00 $2,816,759.10 $2,291,610.00 $2,646,490.00 $3,358,870.00 $4,101,669.00 $4,856,430.71 $4,288,883.20 $5,343,876.95 $4,000,005.00 $2,336,697.00 $4,162,717.01 $4,174,104.00 $4,033,870.00 $3,672,624.00 $12,337,900.00 $14,296,247.44 $14,785,573.20 $15,166,092.95 $14,351,094.00 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Local Business Tax Receipt (Colloer County Yes Yes N/A N/A Yes No *Verified on Line Yes Yes Yes Yes Yes Yes Naples Naples Pompano Beach Bonita Springs Collier Collier Broward Lee Opened By: Cynthia McCanna * Minor irregularity Witnessed by:Jim Flanagan SUBTOTAL A (108th Avenue North): Mitchell & Stark Const. Co. Inc. NOTE: (No additional payment shall be made for rock excavation, replacement of fill material or dewatering). * (Owners Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.” GRAND TOTAL 108TH & 109TH AVENUES NORTH: Section 3B: Wastewater System (109th Avenue North) Section 4B: Stormwater System (109th Avenue North) SUBTOTAL B (109th Avenue North): GRAND TOTAL SUMMARY A & B - 108TH & 109TH AVENUES NORTH Section 1A & 1B: General County: Place of Business Bidders Checklist (Form 12) Addendums (3) SUMMARY B - 109TH AVENUE NORTH Douglas N. Higgins, Inc. SunBiz E-Verify Contractors Key Personnel Assigned to Project - (Form 2) Trench Safety Act Acknowledgement (Form 6) Bid Bond (Form 7) Statement of Experience of Bidder (Form 5) Completed Bid Forms: Insurance and Bonding Requirements (Form 8) Conflict of Interest Affidavit (Form 9) Vendor Declaration Statement (Form 10) Immigration Affidavit Certification (Form 11) Bid Schedule Material Manufacturers (Form 3) Bid Response Form (Form 1) List of Major Subcontractors (Form 4) SECTION 4B (STORMWATER SYSTEM 109TH AVE. N.) SUBTOTAL: SUMMARY A - 108TH AVENUE NORTH Section 1A: General (108th Avenue North) Section 2A: Water System (108th Avenue North) Haskins, Inc. Giannetti Contracting Corp Section 3A: Wastewater System (108th Avenue North) Section 4A: Stormwater System (108th Avenue North) Section 1B: General (109th Avenue North) Section 2B: Water System (109th Avenue North) Section 2A & 2B: Water System Section 3A & 3B: Wastewater System Section 4A & 4B: Stormwater System 11.A.4 Packet Pg. 236 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Appendix H2 – Template - DELORA Vendor Reference Check Log VENDOR REFERENCE CHECK LOG Solicitation No.: 21-7823 Reference Check by: Julien Devisse Solicitation Title: 108th and 109th Avenues Public Utilities Renewal Project Date: 12/15/2020 Bidder’s Name: Douglas N. Higgins, Inc. Phone: 239-947-1144 Design Entity: Q. Grady Minor & Associates, P.A. REFERENCED PROJECT: Project Name: 95th Ave. N. Public Utilities Renewal Project Location: 95th Ave. N. Project Description: Remove and install new water services, sewer pipe and stormwater infrastructure Completion Date: January 10, 2020 Contract Value: $5,443,920 Project Owner/Title: Collier County Public Utilities Owner’s Address: 3339 Tamiami Trail E. Ste. 301, Naples, FL 34112 Phone: 239-252-4233 Owner’s Contact Person: Corinne Trtan E-Mail:Corinne.Trtan@colliercountyfl.gov 1.Was project completed timely and within budget? (If not, provide detail) Yes. 2.Was the submittal/review process performed satisfactorily? (If not, provide detail) Yes. 3.Was the construction process performed satisfactorily? (If not, provide detail) Yes. 4.Did the process run smoothly? Were there any changes? Describe below. Yes, no changes due to the contractor. 5.Was the contract closeout process performed satisfactorily? (If not, provide detail) Yes. 6.Any warranty issues since closeout? Were they responded to and performed satisfactorily? No. 7.Additional comments: None. 11.A.4 Packet Pg. 237 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Appendix H2 – Template - DELORA Vendor Reference Check Log VENDOR REFERENCE CHECK LOG Solicitation No.: 21-7823 Reference Check by: Julien Devisse Solicitation Title: 108th and 109th Avenues Public Utilities Renewal Project Date: 12/29/2020 Bidder’s Name: Douglas N. Higgins, Inc. Phone: 239-947-1144 Design Entity: Q.Grady Minor & Associates, P.A. REFERENCED PROJECT: Project Name: 107th Ave. N. Public Utilities Renewal Project Location: 107th Ave. N. Project Description: Remove and install new water services, sewer pipe and stormwater infrastructure Completion Date: April 20, 2018 Contract Value: $3,279,116.35 Project Owner/Title: Collier County Public Utilities Owner’s Address: 3339 Tamiami Trail E. Ste. 301, Naples, FL 34112 Phone: 239-252-3989 Owner’s Contact Person: Diana Dueri E-Mail:Diana.Dueri@colliercountyfl.gov 1.Was project completed timely and within budget? (If not, provide detail) Yes. 2.Was the submittal/review process performed satisfactorily? (If not, provide detail) Yes. 3.Was the construction process performed satisfactorily? (If not, provide detail) Yes. 4.Did the process run smoothly? Were there any changes? Describe below. Yes, no changes due to the contractor. 5.Was the contract closeout process performed satisfactorily? (If not, provide detail) Yes. 6.Any warranty issues since closeout? Were they responded to and performed satisfactorily? No. 7.Additional comments: None. 11.A.4 Packet Pg. 238 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Appendix H2 – Template - DELORA Vendor Reference Check Log VENDOR REFERENCE CHECK LOG Solicitation No.: 21-7823 Reference Check by: Julien Devisse Solicitation Title: 108th and 109th Avenues Public Utilities Renewal Project Date: 12/29/2020 Bidder’s Name: Douglas N. Higgins, Inc. Phone: 239-947-1144 Design Entity: Q.Grady Minor & Associates, P.A. REFERENCED PROJECT: Project Name: 110th Ave. N. Public Utilities Renewal Project Location: 110th Ave. N. Project Description: Remove and install new water services, sewer pipe and stormwater infrastructure Completion Date: April 20, 2018 Contract Value: $4,746,981.89 Project Owner/Title: Collier County Public Utilities Owner’s Address: 3339 Tamiami Trail E. Ste. 301, Naples, FL 34112 Phone: 239-252-3989 Owner’s Contact Person: Diana Dueri E-Mail:Diana.Dueri@colliercountyfl.gov 1.Was project completed timely and within budget? (If not, provide detail) Yes. 2.Was the submittal/review process performed satisfactorily? (If not, provide detail) Yes. 3.Was the construction process performed satisfactorily? (If not, provide detail) Yes. 4.Did the process run smoothly? Were there any changes? Describe below. Yes, no changes due to the contractor. 5.Was the contract closeout process performed satisfactorily? (If not, provide detail) Yes. 6.Any warranty issues since closeout? Were they responded to and performed satisfactorily? No. 7.Additional comments: None. 11.A.4 Packet Pg. 239 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Appendix H2 – Template - DELORA Vendor Reference Check Log VENDOR REFERENCE CHECK LOG Solicitation No.: 21-7823 Reference Check by: Julien Devisse Solicitation Title: 108th and 109th Avenues Public Utilities Renewal Project Date: 1/4/2021 Bidder’s Name: Douglas N. Higgins, Inc. Phone: 239-947-1144 Design Entity: Q. Grady Minor & Associates, P.A. REFERENCED PROJECT: Project Name: Royal Harbor Water System Improvements Project Location: City of Naples Project Description: Replace 14,700 LF of water mains, (2) 10 inch direction drills, 950 LF of 4 inch PVC FM, and 290 LF of PVC storm drain piping. Completion Date: March 27, 2015 Contract Value: $2,072,961.00 Project Owner/Title: City of Naples Utilities Department Owner’s Address: 380 Riverside Circle, Naples Phone: 239-213-4714 Owner’s Contact Person: Bob Middleton E-Mail: rmiddleton@naplesgov.com 1. Was project completed timely and within budget? (If not, provide detail) Yes 2. Was the submittal/review process performed satisfactorily? (If not, provide detail) Yes 3. Was the construction process performed satisfactorily? (If not, provide detail) Yes 4. Did the process run smoothly? Were there any changes? Describe below. Yes. Yes there were changes but not due to D.N. Higgins. 5. Was the contract closeout process performed satisfactorily? (If not, provide detail) Yes 6. Any warranty issues since closeout? Were they responded to and performed satisfactorily? May have had one on asphalt, but was corrected by the D.N. Higgins. 7. Additional comments: None. 11.A.4 Packet Pg. 240 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Appendix H2 – Template - DELORA Vendor Reference Check Log VENDOR REFERENCE CHECK LOG Solicitation No.: 21-7823 Reference Check by: Julien Devisse Solicitation Title: 108th and 109th Avenues Public Utilities Renewal Project Date: 12/15/2020 Bidder’s Name: Douglas N. Higgins, Inc. Phone: 239-947-1144 Design Entity: Q. Grady Minor & Associates, P.A. REFERENCED PROJECT: Project Name: Oil Well Road Force Main Improvements Project Location: Oil Well Road Project Description: Installed 8-inch, 10-inch and 12-inch wastewater force main Completion Date: September 7, 2019 Contract Value: $452,667.36 Project Owner/Title: Collier County Public Utilities Owner’s Address: 3339 Tamiami Trail E. Ste. 301, Naples, FL 34112 Phone: 239-252-5372 Owner’s Contact Person: Wayne Karlovich E-Mail:Wayne.Karlovich@colliercountyfl.gov 1.Was project completed timely and within budget? (If not, provide detail) Yes. 2.Was the submittal/review process performed satisfactorily? (If not, provide detail) Yes. 3.Was the construction process performed satisfactorily? (If not, provide detail) Yes. 4.Did the process run smoothly? Were there any changes? Describe below. Yes. There were changes but due to unforeseen conditions, not due to the contractor. 5.Was the contract closeout process performed satisfactorily? (If not, provide detail) Yes. 6.Any warranty issues since closeout? Were they responded to and performed satisfactorily? No. 7.Additional comments: They did a great job performing the work and managing any changes throughout construction. 11.A.4 Packet Pg. 241 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) Appendix H2 – Template - DELORA Vendor Reference Check Log VENDOR REFERENCE CHECK LOG Solicitation No.: 21-7823 Reference Check by: Julien Devisse Solicitation Title: 108th and 109th Avenues Public Utilities Renewal Project Date: 1/4/2021 Bidder’s Name: Douglas N. Higgins, Inc. Phone: 239-947-1144 Design Entity: Q. Grady Minor & Associates, P.A. REFERENCED PROJECT: Project Name: Everglades City Water System Upgrade Phase II Project Location: Everglades City Project Description: Installation of new membrane filtration system, new FM to lift station, updated water pumps Completion Date: January 14, 2015 Contract Value: $2,534,189.05 Project Owner/Title: Everglades City Owner’s Address: 102 Copeland Ave, Everglades City Phone: 239-695-3781 Owner’s Contact Person: Sammy Hamilton/Dottie Joiner E-Mail: rmiddleton@naplesgov.com 1. Multiple attempts were conducted to contact Mr. Sammy Hamilton. Unfortunately, Mr. Hamilton passed away in 2019. Several voicemails were also left for the Everglades City Clerk Dottie Joiner. Unfortunately, no response was provided. Therefore, the questions below could not be answered for the Everglades City Water System Upgrade – Phase II. Was project completed timely and within budget? (If not, provide detail) 2. Was the submittal/review process performed satisfactorily? (If not, provide detail) 3. Was the construction process performed satisfactorily? (If not, provide detail) 4. Did the process run smoothly? Were there any changes? Describe below. 5. Was the contract closeout process performed satisfactorily? (If not, provide detail) 6. Any warranty issues since closeout? Were they responded to and performed satisfactorily? 7. Additional comments: 11.A.4 Packet Pg. 242 Attachment: 21-7823 - DELORA 01042021 (15127 : 108th and 109th Avenues PUR - Construction) 11.A.5Packet Pg. 243Attachment: 21-7823 DouglasHiggins_Insurance_2-11-21 (15127 : 108th and 109th Avenues PUR - Construction) CONSTRUCTION AGREEMENT THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ("Owner") hereby contracts with Douglas N. Higgins Inc. ("Contractor") of 3390 Travis Pointe Rd., Suite A, Ann Arbor, MI 48108, a Foreign Profit Corporation, authorized to do business in the State of Florida, to perform all work ("Work") in connection with 108t' and 109t' Avenues Public Utilities Renewal Project, Invitation to Bid No. 21-7823 ("Project"), as said Work is set forth in the Plans and Specifications prepared by Q. Grady Minor & Associates, P.A., the Engineer and/or Architect of Record ("Design Professional') and other Contract Documents hereafter specified. Owner and Contractor, for the consideration herein set forth, agree as follows: Section 1. Contract Documents. A. The Contract Documents consist of this Agreement, the Exhibits described in Section 6 hereof, the Legal Advertisement, the Bidding Documents and any duly executed and issued addenda, Change Orders, Work Directive Changes, Field Orders and amendments relating thereto. All of the foregoing Contract Documents are incorporated by reference and made a part of this Agreement (all of said documents including the Agreement sometimes being referred to herein as the "Contract Documents" and sometimes as the "Agreement" and sometimes as the "Contract"). A copy of the Contract Documents shall be maintained by Contractor at the Project site at all times during the performance of the Work. B. Owner shall furnish to the Contractor one reproducible set of the Contract Documents and the appropriate number of sets of the Construction Documents, signed and sealed by the Design Professional, as are reasonably necessary for permitting. Section 2. Scope of Work. Contractor agrees to furnish and pay for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely, and fully perform and complete in a good and workmanlike manner the Work required by the Contract Documents. Section 3. Contract Amount. In consideration of the faithful performance by Contractor of the covenants in this Agreement to the full satisfaction and acceptance of Owner, Owner agrees to pay, or cause to be paid, to Contractor the following amount (herein "Contract Amount"), in accordance with the terms of this Agreement: Twelve Million Three Hundred Thirty -Seven Thousand Nine Hundred Dollars ($12,337,900.00). Section 4. Bonds. A. If applicable, the Contractor shall provide Performance and Payment Bonds, in the form prescribed in Exhibit B-1 and B-2, in the amount of 100% of the Contract Amount, the costs of which are to be paid by Contractor. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall meet the requirements of the Department of the Treasury Fiscal Service, "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsurance Companies" circular. This circular may be accessed via the web at www.fms.treas.gov/c570/c570.html#certi Should the Contract Amount be less 1 Construction Services Agreement: Revised 12-28-20 (v8) than $500,000, the requirements of Section 287.0935, F,S, shall govern the rating and classification of the surety. B. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute at its cost and expense another bond and surety, both of which shall be subject to the Owner's approval. Section 5. Contract Time and Liquidated ❑amages. A. Time of Performance. Time is of the essence in the performance of the Work under this Agreement. The "Commencement Date" shall be established in the written Notice to Proceed to be issued by the Project Manager, as hereinafter defined. Contractor shall commence the Work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Contractor shall achieve Substantial Completion within four hundred and twenty (420) calendar days from the Commencement date (herein "Contract Time"). The date of Substantial Completion of the Work (or designated portions thereof] is the date certified by the Design Professional when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. Contractor shall achieve Final Completion within thirty (30) calendar days after the date of Substantial Completion. Final Completion shall occur when the Agreement is completed in its entirety, is accepted by the Owner as complete and is so stated by the Owner as completed. As used herein and throughout the Contract Documents, the phrase "Project Manager" refers to the Owner's duly authorized representative and shall mean the Division Administrator or Department Director, as applicable, acting directly or through duly authorized representatives. B. Liquidated Damages in General. Owner and Contractor recognize that, since time is of the essence for this Agreement, Owner will suffer financial loss if Contractor fails to achieve Substantial Completion within the time specified above, as said time may be adjusted as provided for herein. In such event, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, Four Thousand Three Hundred Forty -Four Dollars ($4,344.00) for each calendar day thereafter until Substantial Completion is achieved. Further, in the event Substantial Completion is reached, but the Contractor fails to reach Final Completion within the required time period, Owner shall also be entitled to assess and Contractor shall be liable for all actual damages incurred by Owner as a result of Contractor failing to timely achieve Final Completion, The Project shall be deemed to be substantially completed on the date the Project Manager (or at his/her direction, the Design Professional) issues a Certificate of Substantial Completion pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to Substantially or Finally Complete the Work within the required time periods. C. Computation of Time Periods. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday 2 G� Conslructlon Services Agreement' Revised 12-23-20 (v8) or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. D, Determination of Number of Days of Default. For all contracts, regardless of whether the Contract Time is stipulated in calendar days or working days, the Owner will count default days in calendar days. E. Right of Collection. The Owner has the right to apply any amounts due Contractor under this Agreement or any other agreement between Owner and Contractor, as payment on such liquidated damages due under this Agreement in Owner's sole discretion. Notwithstanding anything herein to the contrary, Owner retains its right to liquidated damages due under this Agreement even if Contractor, at Owner's election and in its sole discretion, is allowed to continue and to finish the Work, or any part of it, after the expiration of the Contract Time including granted time extensions. F. Completion of Work by Owner. In the event Contractor defaults on any of its obligations under the Agreement and Owner elects to complete the Work, in whole or in part, through another contractor or its own forces, the Contractor and its surety shall continue to be liable for the liquidated damages under the Agreement until Owner achieves Substantial and Final Completion of the Work. Owner will not charge liquidated damages for any delay in achieving Substantial or Final Completion as a result of any unreasonable action or delay on the part of the Owner. G. Final Acceptance by Owner. The Owner shall consider the Agreement complete when the Contractor has completed in its entirety all of the Work and the Owner has accepted all of the Work and notified the Contractor in writing that the Work is complete. Once the Owner has approved and accepted the Work, Contractor shall be entitled to final payment in accordance with the terms of the Contract Documents. H. Recovery of Damages Suffered by Third Parties. Contractor shall be liable to Owner to the extent Owner incurs damages from a third party as a result of Contractor's failure to fulfill all of its obligations under the Contract Documents. Owner's recovery of any delay related damages under this Agreement through the liquidated damages does not preclude Owner from recovering from Contractor any other non -delay related damages that may be owed to it arising out of or relating to this Agreement. Section 6. Exhibits Incorporated. Exhibits Incorporated: The following documents are expressly agreed upon, attached hereto and made a part of this Agreement for Solicitation ITB #21-7823 "108rh and 109" Avenues Public Utilities Renewal Project". Exhibit A-1; Contractor's Bid Schedule Exhibit A-2' Contractor's Bid Submittal Forms and Addendums Exhibit A-3: Contractor's List of Key Personnel Exhibit B-1: Payment Bond Forms ❑ Not Applicable Exhibit B-2: Performance Bond Forms ❑ Not Applicable Exhibit 134 Insurance Requirements Exhibit C: Release and Affidavit Form Exhibit D: Contractor Application for Payment Form 3 Construction Services Agreemenjl Revised 12-28-20 (A) Exhibit E: Change Order Form Exhibit F: Certificate of Substantial Completion Form Exhibit G: Final Payment Checklist Exhibit H: General Terms and Conditions Exhibit I: Supplemental Terms and Conditions ❑ Applicable ® Not Applicable The following documents are expressly agreed to be incorporated by reference and made a part of this Agreement for Solicitation #21-7823 "1t)8th and 109th Avenues Public Utilities Renewal Project". The complete contract documents, including Addendum with attachments, are available on the County's on-line bidding system: https://www.bidsync comlbidsync-cast, which the parties agree comprise the final integrated agreement executed by the parties. Sections corresponding to any checked box ( ® ) expressly apply to the terms of this Agreement and are available through the County's on-line bidding. Exhibit J: Technical Specifications ❑Exhibit K: Permits ❑Exhibit L: Standard Details ❑Exhibit M: Plans and Specifications prepared by Q. Grady Minor & Associates, P.A. Exhibit N: Environmental Health and Safety Requirements for Construction Projects Section 7. Notices A. All notices required or made pursuant to this Agreement by the Contractor to the Owner shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Collier County Board of County Commissioners, FL c/o Public Utilities Engineering & Project Management Division 2885 Horseshoe Drive S. Naples, FL 34104 Attn: Diana Dueri, Senior Project Manager Phone' (239) 252-4218 Email: Diana. Dueri@colliercountvfl.aov B. All notices required or made pursuant to this Agreement by Owner to Contractor shall be made in writing and shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Douglas N. Higgins, Inc. 3390 Travis Pointe Rd., Ste. A Ann Arbor, MI 48108 Attn: Kelly A. Wilkie, VP Phone: (239) 774-3130 Email: Kwilkie2000 dnhi ins,com C. Either party may change its above noted address by giving written notice to the other party in accordance with the requirements of this Section. 4 construction 5ervlces Agreement' Revised 12-28-20 (A) Section 8. PUBLIC ENTITY CRIMES. 8.1 By its execution of this Contract, Construction Contractor acknowledges that it has been informed by Owner of the terms of Section 287,133(2)(a) of the Florida Statutes which read as follows: "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity in excess of the threshold amount provided in s. 287-017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." Section 9. Modification. No modification or change to the Agreement shall be valid or binding upon the parties unless in writing and executed by the party or parties intended to be bound by it. Section 10. Successors and Assigns. Subject to other provisions hereof, the Agreement shall be binding upon and shall inure to the benefit of the successors and assigns of the parties to the Agreement. Section 11. Governing Law. The Agreement shall be interpreted under and its performance governed by the laws of the State of Florida. Section 12. No Waiver. The failure of the Owner to enforce at any time or for any period of time any ❑ne or more of the provisions of the Agreement shall not be construed to be and shall not be a walver of any such provision or provisions or of its right thereafter to enforce each and every such provision. Section 13. Entire Agreement. Each of the parties hereto agrees and represents that the Agreement comprises the full and entire agreement between the parties affecting the Work contemplated, and no other agreement or understanding of any nature concerning the same has been entered into or will be recognized, and that all negotiations, acts, work performed, or payments made prior to the execution hereof shall be deemed merged in, integrated and superseded by the Agreement. Section 14. Severability. Should any provision of the Agreement be determined by a court to be unenforceable, such a determination shall not affect the validity or enforceability of any other section or part thereof. 5 0 COnStn doll SeNlces Agreement: Revleed 12-28-20 (A) Section 1v. Change Order Authorization. The Project Manager shall have the authority on behalf of the Owner to execute all Change Orders and Work Directive Changes to the Agreement to the extent provided for under the Owner's procurement ordinance and policies and accompanying administrative procedures. Section 16. Construction. Any doubtful or ambiguous language contained in this Agreement shall not be construed against the party who physically prepared this Agreement. The rule sometimes referred to as "fortius contra proferentum" (pursuant to which ambiguities in a contractual term which appears on its face to have been inserted for the benefit of one of the parties shall be construed against the benefited party) shall not be applied to the construction of this Agreement. Section 17. Order of Precedence In the event of any conflict between or among the terms of any of the Contract Documents, the terms of the Construction Agreement and the General Terms and Conditions shall take precedence over the terms of all other Contract Documents, except the terms ❑f any Supplemental Conditions shall take precedence over the Construction Agreement and the General Terms and Conditions. To the extent any conflict in the terms of the Contract Documents including the Owner's Board approved Executive Summary cannot be resolved by application of the Supplemental Conditions, if any, ❑r the Construction Agreement and the General Terms and Conditions, the conflict shall be resolved by imposing the more strict or costly obligation under the Contract Documents upon the Contractor at Owner's discretion, xwww 6 (91 ConstriMlan Services Agreement: RWsed 12.26-21) M) IN WITNESS WHEREOF, the parties have executed this Agreement on the dates) indicated below. TWO WITN Daniel N. Higgins, Vice -President Print Name SECON WITNESS David J. Wilkie, Vice -President Print Name Date: February 8, 2021 ATTEST: Crystal K. Kinzel, Clerl< of Courts &Comptroller BY: Approved as to Form and Legality: Assistant County Attorney Print Name CONTRACTOR: Douglas N. Higgins, Inc. By: Q,1.(.0 Kelly A. Wilkie, ce-President 02/08/2021 Print Name and Title Date OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY FLORIDA BY: Chairman ConsWction Services Agreement: Rev(sed 12-28-20 tv8) y�� EXHIBIT A-1: CONTRACTOR'S BID SCHEDULE (FOLLOWING THIS PAGE) 8 Construction Services Agreement: Revised 12-28-20 (v8) 9 110SrumULE COL LI1R COUNTY 149tilAVENUE arn7091hAVINUENChtil EITb UC UTILITY RFNI WA4 I++i.11 rlryli 21-74:11 ".fllshaticn lGuillk Itrhi, Ami P01- r Rid 0ua 0■ Ifu vamarr 19, Ea10 f9 3'.all YAl DID SCI IEDLILE blObiR: dtlMlAS 11. 1116GIN4, Ir11. lT$MNO. PRSCRIPII�N lOBjNAVONUENORTH UNIT uNITPki; EST.QIY, I AMOUNT $1 SECTION JAI GENERAL {101111AVENUENORTHI T NlpmU..11e Demo,_ ion(Max5%o1P16thAV*.N.Subtotal Bid, LS $260'e0.90 1 $160,000.00 Ll1 1.21 MainlenanaoofTfaffir l5 $5s0,000.00 L 5950,000,00 19a pro aot SI n BA 46,00000 1 l7 600.00 i.4a Svr-uV Lk oiAl & Record Drowln a L9 6$ a40.00 1 $65,400.04 1,50 Pr4.Cani1rucNOhVfdaa&Photo ra ha L5 $20,00,00 i 1 004A0 I,Ba Post•ConstructionVideo LS 000.00 1 S Doa.DD 1.7a OWN &Gruilhlo LS 420 .00 1 d20000A0 !&a Vibratory Mordtedn Ls 1 .OD 1 $ 0DDA0 LL9a Remove Dispose, and flaialm MAllaosec M 150.00 Jim R7 man 1,1Qa Ran misinJ01spGHCartCfeLe, Asp IleIt. GraY41aAdTffyerlIle0rPmw§V SY 0.00 0.82Q $15,4611^ L31e Rnmvv0 and 51era Rdtk Plyor OriviwA SY $3.90 Sila t4254.00 1,32a Inita lurivewe Ce"we 5Y "3Leo 8930 270 2a0A0 I. As lull Y 5.0P 6.51 111.1 B ■ears SMOO 1,512 $61,2wpo Tjat.FLlAa SY _ 50.00 100 5 900.00 v. pawtovs P 4 SY L4p.00 153 4g 410,44 1,18. lim"way n3atlRpsendF411shof 1. CotoradConcralaCalUn s sY 90.00 465 1090A0 II. E.mraNu+ sum ad [oncnlaCo■tln sandFlnlahn 5Y $II0,00 SO0 517000,00 I", celer Addalyss _ SY $W,04 11 $5,040.00 Ramwa Ols at+ nndRo 11caSldawalk i.Ida f. Ai hdl SY $W.00 850 $9594A4 11, Canvate SY $140,00 474 65 BDOM 1.S5a 0alactaWo Warntn a SY $5,00 120 56130,00 1,161 PdvatePreiare TfeiRamovaT EA SOAQ 34 SISt10.00 l.11. Vehicle Guard Patt FA _ $A00,o0 15 408.OQ AllawaoC4atthedliectlonand ap0001hytetllorCounty U011ficS T6R 5140,004,00 1 $1401040.00 110a pro4eS Mona ". 5ECILONSA aENERAl106LHAVE,N. SUBIOVA1t 11437a900 AMOUNTIP ITEM NO. OESCNPiION{109THAVFNUBNORTHI UNIT UNIT MCP W,uTY. =110N 2A1 W_ATTFt$y$l M J108M AVENUE NORTH 25+ WaLef Mbtn Pl 4I10ps 1,1 9.InrhC900DR18PVC LF $17.001 4703 $119451.M II. 12-InehMCI DR78PVC LF �$80.00 170 6600,00 2,20 Lift II V.lvaf ln.+rl VaLVe lne Stapp 1. 5-1n h6ato Volvo FA 700.00 1 $200.00 II. E-imhGot* Volvo EA smom 22 12f,400,00 III. 12. hch Gbf. VAUD 9A $5,200,00 7 10 a0Ao N. S.Inchlne.d Valva EA $400.00 1 4 • v, 8-I11ehtflmMa EA fi94.P4 1 00005 vl. 12•Inclt Llna Soo FA $740.DO 2 1400.00 2.11 Pro H drankAsl4o14Bos EA 2 e00.00-7 =7±= pmoo.o0 Loa Wokf $+view I. Short Sln laSmkn [a 3Q0.00 39 $11700.00 tl. _ Short Danbl.$.rvlre EA 5500.091 91 15500,00 III. Lo $In servlco EA d50M 14 15900.00 Iv. ion 0. I S1rvf11 EA SOO.4P 3x Sld 00.40 2.5a WalorMotor M4tetBo)r andBackRawDaYls4 I. Now M.t&ll" kOocaltdEElttkl motor andRu:kllaw EA 80.btl 10 SBDa•4o II, N41v Matar Knot and Naw TSefuilmv Re]xatid EA *Vti Me1ot EA 400A0 i54 6] 000.00 2,6i water motor Bail manl re ell TA $300.0D 10 3 040.00 L7a Coanactlontofulstln 1h1terMoln 1. Vendathlll Drive winch PYC WnA EA 549,900.40 1 4911�,� I4 Elh5Lrw1l4arihlR•Lnr11PVCWM EA W00a.00 2 f}0004,40 III. 71hStrootNa s•nchPVC WM FA S45,000.0 2 $90,G00.00 N. alb courtwul0"PY£WM EA 54200Q.001 7 $42,000.00 v. 91h Court Else 3, PVCWM EA 42000.00 1 $4zX00,00 y1. u5a15•inrhrVCWM FA $42,000.00 1 142,000.00 2.81 05mriolo fol wainlePaints ==:7=- 1,1 Tamporery Sample Polnt EA $2,200.00 10 1 $21,000.00 JOaTLI AVENUE NORTH and 1957H *Vl NUE NORTH 1 SeLden ld•1 PU6LIt VIcULY RENEWAL Co�ticT• Cocltaty BID SCHEDULE COLLIER COUNTY 308th AVENUE and 109th AVENUE NORTH PUBLIC UTILITY RENEWAL if. Permanent Sam le Point EA $4,200.00 1 $4,200,00 2.9a Air Release Valves EA $400.00 34 _ $5,600.00 2.10a 2.11a Conflict Avoidance lCleflectfonL_ Temporary Connection to Wsting Water Main EA EA $500.001 $1,000,00 5 4 $2,500.00 $4,000.00 2.12o Removaland Disposal of Asbestos Concrete Water Main EA $20.00 5829 $116,580.00 2.13a Allowance at the direction and approval by Collier County Utilities Pro ect Manager. TBD $100,000.00 1 $100,000.00 SEGTIQN2A(t1dATERSYSTEM'108THAVE,N.)SUBTOTAL; $932 3i,00 ITEM NO, DESCRIPTION AVENUE NORTH) UNIT UNIT PRICE EST. QTY. AMOUNT($) SECTION $A: WASTEWATER SYSTEM (108TH AVENUE NORTH) 3,1a ravity Sewer Pipe Remove, Dispose, Replacel LF $55.Ool 5,929 $326,095.00 ?,2a Sanitar Sewer Service Lateral (Replace, Dispose, and Reconnect I. S(n Ie Sanitary Sewer Service Lateral EA $150.00 199 $29,850,00 Double Sanitary Sewer Service Lateral EA _ $50.00 5 $250.00 33a 1PrIvate Pro ert Sewer Service Lateral Replacement LF $3.00 200 $600.00 3Aa Relocate Driveway SanitaryService Lateral EA $70.00 38 $2,660.00 Precast Polymer Concrete Manholes (Remove, Dispose, Replace) EA $73,000.00 16 $1,168,000.00 H3.Sa 3.6a Connect Extsling Gravity Sewer to New Polymer Concrete Manhole EA $30,000.00 2 $60,000,00 3,7a Connect New Gravity Sewer to Existing Manhole EA $18,000,00 2 _ __ $36,000.00 3.8a Conflict Crossin Throu h Existing Box EA $55,000.00 1 $55,000,00 3.9a Extsling Sanitary Force Main Removal and Dis osal IF $2.00 0 $0.00 3.10a Road Restoration - Stabilized Subgrad Sy $0.50 17219 $8,609.50 3.lia Road Restoration - Limerock Base J8,lnchl Sy $4,00 14158 $56,632.00 3.12a Road Restoration -2-1/2"Asphalt Two Lifts Sy $10.00 13,450 $134,500.00 3.13a Final Paying Striping/Markin LS $35,000.00 1.0 $35,000.00 3.14a Remove, Dispose, and Replace Concrete Curb LF $1S.00 150 $2,250.00 3.I5a Milling &�th Sy $5.00 3,395 $16,975.00 3.16a Allowanction and approval byCollier County Utilities Project TBD$200,000.00 1.0 $200,000.00 SECTION 3A(WASTEWA1- SYSTEM 308TH AVE. N.) SUBTOTAL: $2,132,421.50 ITEM No. DESCRiPTION(108THAVENUE NORTH) UNIT UNITPRICE EST,QTY. AMOUNT($)' SEGf10N.AA; $TORMWATER $YSTEM (108TH AVENUE NORTH)i 4.1a 15"AOS Pf a LF $20.00 314 $6,280.00 4.2a 18"ADS Pipe LF $49.00 3,707 $181,643.00 4.3a 18" ADS Perforated Pip a in Water Quality Trench IF $12.00 6,348 $76,176.00 4Aa 18"RCP IF $12.00 450 $5400,00 4,Sa 24" ADS PI p a LF $65.00 2792 $181,480.00 4,6a 24" ADS Perforated Pipe In Water Quality Trench LF $136,00 2,639 $358,904.00 4.7a 24" RCP LF $250,00 100 $25,000.00 4.8a Catch Basin EA $200,00 41 $8,200.00 4.9a 4.10a 4.lia Catch Basin w/Sedimentation Sump Catch Basin w/Weir Plate Yard Draln EA EA EA $250.00 $20,000,00 $200.00 16 6 _ 157 $4,000.00 $120,000.00 $31,400.00 4.12a Junction Box EA $600.00 2 $1,200.00 4.13a Private Pro ert Yard Drains EA $100.00 20 $2,000.00 4.14a Connection to Existing Storm Structure EA $500.00 14 $7,000.00 108TH AVENUE NORTH and 109TH AVENUE NORTH 2 Section 111-2 PUBLIC UTILITY RENEWAL - r=� ,nCo'�13evcCnTtnty 010 SCHEDULE COLLIER COUNTY Login AVENUE and 1091h AVENUE NORTH PUBLIC UTILITY RENEWAL 4.15a Storm Storm Structure Modification of Existing0 EA $800.0 4 $3,200,00 4.16a Mitered End Section EA $500.00 18 $9,000,00 4.17a Swale Grading (not associated with the above pay Items) LF $5.00 522 $2,610,00 4.18a Root Barrier LF $12,00 300 $3,600.DO 4,19a ra-apgruva TBD $150,000.00 1,0 $150,000.00 _ 'SECTION 4AISTORMWATERSYSTEM 108TOAVE. NjSUBTOTAL; - $1177,093.00 ITEM NO-1 DESCRIPTION )109THAVENUE NORTH) UNIT UN)7PRICE ESX.QTY.. AMOUNT($) SECTION 18: GENERAL (109TH AVENUE NORTH) '. 1,1h r naA a LS $260,000.00 1 $260,000.00 1,2b .,. �..., Maintenance of Traffic LS $530,000.00 1 $530,000.00 1.3b Project Sin EA $6,000.00 2 $12000.00 1.4b Survey Layout & Record Drawings t5 $65,000,00 1 $65,000.00 S,Sb Pre -Construction Video & Photographs LS $20,000.00 1 $20,000.00 1,6b _ Post -Construction Video LS $6,000.00 1 $6,000.00 1.7b Clearin & Grubbing LS $420,000.00 1 $420,000.00 1.8b Vibratory Monitoring LS $63,000.00 1 $63,000.00 1.913 Remove Dls ose and Replace Mailboxes EA $150.00 184 _ $27,600.00 1.10b Remove and Dispose Concrete, Asphalt, Gravel and Travertine Driveway SY $3.00 7,411 $22,233.00 1,11b Remove and Store Brick Paver Driveway SY $3.001 1,990 1 $5,970.00 1,12b Install Driveway 1. Concrete SY $39.00 6,048 $235,872.00 it, Asphalt SY 5.00 1294 $6470.00 III . Brick Pavers SY 540.00 1945 $77,800,00 fv.1 Travertine SY $50.00 100 $5000,00 Pervious Paver SY $140,00 0$0.00Drivewa Coatin sand Finishes Colored Concrete Coatin s SY $90.00 820 $73,800.00 Decorative Stamped Concrete Coatings and Finishes SY $120.00 100 $12,000.00 K ColorAdditives SY $50,00 100 $5,000.00 Remove, Dis ose, and Re lace Sidewalk As halt SY $10.00 340 $3,400.00 Concrete SY $140.00 120 $16,800.00 1.15b Delectable Warnings SY $5,00 120 $600.00 1.16b Private Pro ert Tree Removal EA $50,60 30 $1,500.00 i,l7b Vehicle Guard Post EA $400.00 16 $6,400.00 1 18b Allowance at the direction and approval by Collier County Utilities Pro ect Manager. TBD $140,000,00 1 $140,000.00 -'. SECTION 18 (GENERAL 109TH AVE. N.j SUBTOTALt D$SCRIQTION-)ig9T1AVENUENPRTH) . -, : tlN1T i1NlTPRICE;Si SECTION 213:WATERSY$TEM 109TMAVEN(1EN)RTH) 2,11b Water Main Pipelines 1. 8-Inch C900 DR18 PVC LF $17,00 6 167 $104,839.00 If. 124nch C900 DR18 PVC LF $80.00 120 $9,600.00 2,2b Gate Valves Insert Valves/Line Stops 1, 6-Inch Gate Valve EA $200.01) 1 $200.00 Ii. 8-Inch Gate Valve EA $1,200.00 20 $24,000.00 lit. 12-inch Gate Valve EA $5,200.00 2 $10,400.00 Iv. 6-inch Insert Valve EA $400.00 1 $400.00 v, 8-Inch Line Stop EA $600.00 1 $600.00 vi, 12-Inch Line Stop EA $700.00 2 $1,400.00 2.3b Fire Hydrant Assemblies EA $2,800,00 13 $36,400.00 2.4b Water Services i. Short Single Service EA $300.00 29 $8,700.00 IL Short Double Service EA $500.00 35 $17,500.00 lit. Lon $ln le Service EA 450.001 29 513 050.00 Iv. Long Double Service EA $500,00 33 $16,500.00 2.5b Water Meter, Meter Box, and Backflow Device I. Now Meter Box Relocated Existing Meter and Backflow) EA $80.00 10 800.00 H. New Meter Box and New Backflow Relocated Existing Meter),EA 1 $400,00 186 $74,400.00 2,6b Water Meter Box vacant propertyl EA $300.00 10 $3,000.00 2J10 Connection to Existing Water Main - L Vanderbilt Drive 8-Inch PVC WM EA $49,000.00 1 $49,000.00 H. Bib Street North 12-Inch PVC WM EA $45,000.00 2 $90,000.00 Ili, 7th Street North 8-Inch PVC WM EA $45,000.00 2 $90,000.00 iv. 8th Caurt West 8" PVC WM EA $42,000,00 0 So.00 v. _ 8th Court East 8" PVC WM EA $42,000.00 0 $0.00 vi, US416-Inch PVC WN, EA $42,OODAO 1 $42,000.00 2.8b Bacteriological Sample Points ,_._ lOBTH AVENUE NORTH and 1091H AVENUE NORTH Section Illd PUBLIC UTILITY RENEWAL 3 ��� �r c4hL1. County BID SCHEDULE COLLIER COUNTY 108th AVENUE and 1091h AVENUE NORTH PUBLIC UTILITY RENEWAL r. Temporary Sample Point EA $2,200.00 10 $22,000.00 II. Permanent Sample Point EA $4,200.00 1 $4,200.00 2,9b Air Release Valves EA $400.00 12 1 $4,800.00 2.10b Conflict Avoidance Deffectlon EA $500.00 5 $2,500.00 2.11b TemporaryConnection to Existing Water Main EA $1,000.00 4 $4,000.00 2.12b Removal and Disposal of Asbestos Concrete Water Main EA $20.00 5,836 $116,720.00 2.13b Allowance at the direction and approval by Collier County Utilities Project Manager. TBD $100,000.00 1 $100,000.00 $EC-nON2fl{WA7Ef3SYSfEM109TF1 AVE. N,lSUaTOTAIs $847 9.00 ITEM NO. DESCRIPTION(109TH AVENUE NORTH) UNIT UNIT PRICE EST, QTY, AMOUNT($) SECTION3B: WASTEWATER SYSTEM 1109TH AVENUE NORTH): 3,11a 8-Inch PVC Gra Ity Sewer Pie Remove, Dispose, Replace) LF 1 $55.001 5,707 $313,885.00 3,2b Sanity Sewer Serv(ce Lateral Re lace Dis ose, and Reconnect 1. Single Sanitary Sewer Service Lateral $150.00 196 $29,400.00 ii, Double Sanity Sewer Service Lateral $50.00 5 $250*00 3.3b Private Pro err Sewer Service Lateral Replacement $3.00 200 $600.00 3,4b Relocate Drivewa Sanitar Service Lateral f $70.00 59 $4,130.00 3.5b Precast Polymer Concrete Manholes (Remove, Dispose, Replace) $73,000.00 14 $1,022,000.00 3,6b Connect Existing Gravity Sewer to New Polymer Concrete Manho $30,000.00 2 $60,000.00 3.7b Connect New Gravity Sewer to Existing Manhole EA $18,000.00 2 $36,000.00 3.8b Conflict Crossing Throu h Existing Box EA $55,000.00 1 $55,000.00 3.9b Existing Sanitary Force Main Removal and Disposal LF 1 $ZOO 4,668 $9,336.00 3.10b Road Restoration - Stabilized Subgrade Sy $0,50 16,177 $8, 888.50 3.11b Road Restoration - Limerock Base 8-Inch Sy $4.00 13,277 $53,108.00 3.12b Road Restoration-2-112" Asphalt Two Lifts _ SY $10,00 12,606 $126,060,OD 3136 Final Pavin Striping/Marking LS $35,000.00 1.0 $35,000.00 3,14b I Remove Dispose and Replace Concrete Curb LF $15.00 50 $750.00 3.156 I N1111ing & Resurfacing Sy $5.00 3128 $15,640.00 3.16b Allowance at the direction and approval by Collier County Utilities Pro ect Manager. TBD $200,000.00 LO $200,000.00 'iSECTION 3B (WASTEWATER $YSTEM109TH AVE, N:) SUBTOTAL: :$1,969247,50 (TEMNO, DESCRIPTION (109T14AVENUENORTH) UNIT UNITPIRCB EST, CITY. AMOUNT{$) SECTION.4Br $TORMWATER SYSTEM (109TH AVENUE NORTH), 4.1b 15" ADS Pie LF $20.00 216 $4,320.00 4.2b 18"ADS Pipe LF $49.00 3934 $192,766.00 4.3b 18" ADS Perforated Pipe in Water Qualil Trench LF $12.00 3,371 $40,452.00 4Ab 18" RCP LF $12.00 550 $6,600.00 4.5b 24" ADS Pipe LF $65.00 2,796 $181740.00 4,6b 24" ADS Perforated Pipe in Water Quall Trench LF $136.00 2,636 $358,496.00 4.7b 24" RCP LF $250.00 146 $36,500A0 4.8b Catch Basin EA $200.00 39 $7,800.00 4.94 Catch Basin wJSedimentalion Sump EA $250.00 13 $3,250.00 Catch Basin iv Wefr Plate EA $20,000.00 6 $120,000.00 Yard Drain EA $200.00 155 $31,000.00 !unction Box EA $600.00 2 $1,200.00 Private Pro err Yard Drains EA $100.00 20 $2,000.00 F Connection to Existin Storm Structure EA $500.00 16 $8,000.00 Modification of Existing Storm Storm Structure EA $800.00 4 $3,200.00 Mitered End Section EA $500.00 12 $6,000.00 Swale Grading not associated with the above pay Items LF $5.00 536 $2,680.00 4,186 I Root Barrier LF $12.00 300 $3600.00 4.19b Allowance at the direction and approval by Collier County Utilities Pro ect Manager. TBD $150,000.00 1.0 $150,000.00 $tCTION48(STORMWATER SYSTEM 109THAVE, Nil .SUBTQTALE $i,iS9,604,00 SUMMARY A -108TH AVENUE NQRTH Section 1A: General (108th Avenue North) $2,103,749.00 " Sacflon 2A;> hater$'$tern-108th Avan(18 North'- $932,331.00 Section 3A: Wastewater System (108th Avenue North) $2,132,421.50 $action 4A: Stormwater Sstern 108th Avenue North $1,177,093.00 SUBTOTAL A (108th Avenue North): $6,345,594.50 SUMMARY B- 109TH AVENUE NORTH Section 1B: General (109th Avenue North) $2,016,445.00 Section 28: Wa#er S, ani-(10$th Avenue North) $647,009.00 Section 36: Wastewater system {100th Avenue North $1,969,247.60 Section 4B: Stormwater System (109th Avenue North) $1,1s9,6o4.00 SUBTOTAL B (309th Avenue North): $5,992,305.50 LOBTH AVENUE NORTH and 109TH AVENUE NORTH 4 5edion 1114 PUBLIC UTILITY RENEWAL PIICISCHmULE CCLLI(A COVtiTY LOAIh MAU& pad 101h AVENUE NOhTH PUNIC UTILITY NINE WAL GRAND TOTAL MOMARY A A 8 -108TH A 109TH AVeNUES Nu►t7H Sectlon 1A & 19. General 54,124,294.40 Section ZA & 281 Water S AGM $1,779,140M Sectton 3A & 38; Was#ewa#er 5 stem $4,1II1,669m Section 4A & Aez Stormwater System $2,336,597.00 GRAND TOTAL 108TH & 149TH AVENUES NORTH: $72,337,9UO,OO • {pwno-n Adawanl+- for nwnsn Uto- r'i ofapctsd, ihll nhew+n�+will LI acid oaly+f Ilia 13wn4r'41111Irllan ie nctunWhill Walk doe Io Hnforr Plea canrhlNn++�nJler+F dlrscir,d by Lhl Uwrllr.IncPOIFdn of the Alfawmn IT pp*l al 1bA 01IwI Firl;e II I.pl Iha CAnnetterwlA he pAld any po-ldnln of1Ne feN+el+ani at the Allki anm E.pcaWU,ral of Dwn014 Allowinco- will bo- (reds 1hialtib (Il6npgprd4r+rPlh prdpAr daeeminW3on of Thua aed Pd1IAHAIL Leµflm t1AA lilt III hIAP " Nrlm 445 addhiwul p+ymew 00 6r made Iilr lack @K v vAlien, cepflrsmlhi III IIII metsrllt ar dau'uirrin[t. LdHtH AvENLI( N4hIN and L09TH AVENUE NOUN PUBLIC UTILITY RENEWAL 9 SuVoa IIt4 EXHIBIT A-2: CONTRACTOR'S BI❑ SUBMITTAL FORMS AND ADDENDUM {FOLLOWING THIS PAGE] 0 Construction Services Agreement: Revised 12-28-20 (0) CA U �7eG-r�.VF� Email: Cynthia.McCanna@colliercountyfl.gov Ad-nihistraflveSeNces Division Telephone: 239.252.8992 Procurement Services ADDENDUM #1 Date: November 3, 2020 From: Cynthia McCanna, Procurement Strategist To: Interested Bidders Subject: Addenda # I - 21-7823 10811' & 109"' Avenues Public Utilities Renewal Project This Addenda has been issued for the following items identifying clarifications, changes, deletions, and/or additions to the scope of work, solicitation documents and/or bid schedule for the above referenced solicitation: ADDITION: The Minutes and Sign -In sheet from the November 3, 2020 Pre -Bid Meeting has been posted to BidSync: 21-7823 Pre -Bid Meeting Minutes 21-7823 Pre -Bid Meeting Sing -In Sheets If you require additional information please post a question on our Bid Sync (www.bidsyne,com) bidding platform under the solicitation for this project. Please sign below and return a copy of this Addendum with your submittal for the above referenced solicitation. c (Signature) Date (Name of Wrin) O L7et� County Administrative SeNces Wslon Procurement Services hale: November 12, 2020 Email: Cynthia.mccattna[a,)colliercowilyfl.gov Telephone: (239) 252-8992 Addendum #2 Fr-arn. Cynthia McCanna, Procurement Strategist To: Interested Bidders subject; Addendum # 2 Solicitation #21-7823 - 108111 & 1091" Avenue North Public U ilitics Renewal Project The following clarifications are issued as an addendum: 1. S1~ WMD Master Dewatering Permit 11-03912-W; 10811' & 109"' Avenue North at Naples Park 2, SFWMD Water Use Individual Permit 11-03812-W 3, Bid Schedule Revised has been uploaded 4. Measurement and Payment Section IV Revised has been uploaded 5. 1081 & 1001 Avenue North Project Plans Revised has been uploaded 6. Road/driveway dewatering ratnps clarification: If road/driveway dewatering ramps are utilized at roadways/driveways, the contractor shall provide barricades on either side of thee ramps to protect/warn vehicles from driving over manifolds/connection sections on either side of ail ramps. 7, Private property yard drain clarification: Private property yard drains shall be NDS 12" Square Catch Basins (Items 1200, 1212, 1206, and 1266) or approved equal. h s://www,rids ra /PDFs/BrocliurQs 2 0NOB-Nuxt- gneration-Cat - asin-Brochui,e. df 8, SFWM.D dewatering comi-nenceinent notification olariflcation: The Contractor shall notify the SFWMD a minimum of 5 days prior to contrnenGing dewatering activities. 1f you require additional information, please post a question on our Bid Sync (www.bi sync.com) bidding platform under the solicitation for this project. Please sign below and return a copy of this Addendum With your suhniiltal for the atrove referenced solicitatibri: (Signature) (Name Wirm) Ill Date 9 ®8.97eY C01414ty Email: Cynthia.McCannaacolliercountyfl.gov Administr�ativeServicesWsion Telephone: (239) 252 - 8992 Procurement Services Addendum 3 Date: 11/18/2020 From: Cynthia McCanna, Procurement Strategist To: Interested Bidders Subject: Addendum 3 The following clarifications are issued as an addendum identifying the following clarification to the scope of work, changes, deletions, or additions to the original solicitation document for the referenced solicitation: Chancre 1. Bid Opening Date SUKeRk1y-& &d6led to 618S6 9t1—N8v 10 2020 3: O-P-NI-E-SX Updated Bid Opening Nov 23, 2020 3:00:00 PM EST If you require additional information, please post a question on our Bid Sync (www.bidsync.com) bidding platform under the solicitation for this project. Please sign below and return a copy of this Addendum with your submittal for the above referenced solicitation. --2 1 L-Ywm-i (Signature) Date (Name of Fam) { rOAR-I I - III RRSPONSE FORM BOARD OiP COUNTY COMMiSSiONERS COLLIER COUNTY, FLORIDA 108th mid 109th Avenues Public Utilities Retteivai! Project BID NO. 21-7023 lull Nanle of Bidder Douglas N. HiReans, Inc fvlain Business Aciclress t' I14 Place of Business 4485 Later rise Ave. Naples, FL 34104 TOeph❑ne No. ��Q-Z74-31 D Fnx Na. 239-774- 266 _ Stile CoMractot's License #(;GC060189 Stale of Florida Certilicate of A ilhority Doctunent Number 830666 federal Tax ldentificntioo Number 38-1897765 MINS H 01-772-2183_ ccKm Cage Code OVD82 To: BOARD OF COUNTY Ct`)ivllvllSSMNERS OF COLLIER COUNTY, FLORIDA (hereinafter called the Owner) The undolsigncd, as Bidder declares Ihnt the Only person Or parties interested ill this t3id as principals arc those nnmed herein, flint this Bid Is submitted withnul collusion with ally other persOn, firm ❑r cOrpOratiolt; that it has carefully essunined the location of the proposed Work, the proposed loan of Agreement and all other Contract Doctntlonts and Bonds, mid the Contract Drawings and Specifications. Bidder proposes, and ntgreas if this Bid is at:celitetl. Bidder Will execute [lie Agreement included in the Bidding Documents, to provide all necessary machinery, tools, apparatus and other means of c❑nslruction, including utility and transportati❑n services necessary to do all the Work, and furnish all the Illaterinls and equipment specified or refarrod to in the Contmet Documents tit the manner and time herein prescribed and according to the requirements of the Owner as therein sal fot'111, furnish the Conlroctor's Bonds and Insurance specified in (lie Glnel'ai Conditions of the Contract, nod to do all other things reguircd Of the Contractor by the Contract Documents, and Ittat II will !nice full payment the sums set forth in %lie followinh, Bit] Schedule: Unit prices sliall be provided ill no snore than two decimal points, luul in the cstse where further decimal points are inadvertently provided, rounding to two decimal paints will be conducted by Proem'ement Services Divisi011 staff, 0110a nolitictttion that its Bid has been awarded, the Successful Bidder will exeoutc the Agreement form attached to the l:3idding Documents within lea (10) calendar slays attcl deliver the Surety Bond or Bonds and il1s1r1'atice Certificates as required by the Contract Documents. The bill security attached is to became the property of1110 Owner in the event the Agreement. 111st11'alice Certificates and Donds are not executed and delivered to Owner within the time above set f❑rlh, us liquidated damages, fO1' 1110 delay and additional expense to [lie Owner, it being recognized that, since time is of the essence, Owner will suffer titimaial loss if the Successful Bidder fails to execute and deliver to Owner the required A81=111ent, Jnstlranae C,er01ontes and Cronus ivilhin the required time period, in the event of such fmitu'e, the tO1al alllaun[ Of Owner's damages, will be difficull, if not Inipossiblo, to definitely ascertain and quantify. It Is hereby ugreed timl it is appropriate and fait' that Owner receive ligrtidated damages fr0111 the 5ut<cessful Bidder in the event it fails to execute and deliver the Agreement, insurance Certificates, and Bonds ns required hereunder. The 0or18lructiort Soircifstfori Doc rev 02-21-20 CAtI Sm-cussrul Bidder hereby enpressly 14aives and relinquishes way fight WHO it May Itteve to seek to cluu'aoteAW the above noted licluidnied damages tis n penalty, which the parties ngme represents a Fail- and retiscimble evilltnte of Owner's rl011101 clatlinges at Ille time of bidding if lire. 4uccessrul Bicicfef fails to e\eeute and deliver the rlgreeti7e11t, InStlfallCC CelIitlealea, and Bonds in a timely mminei% Upon receipt ol'thc signed and Approved agreement and i'ureltase Orclef, the Undersigned proposes to =1omence work at the site witltfn Five (5) calendar days fmin the commencement dale stipulated in the tiwrillen Notice to Proceed miless the Project Manager, ill writing, subscclnontly notifies the Colltrautor of modlFied (later) commenoemenf date, The undersigned further rtgt-ees to substwitidly CpnlplCle all work covered by dtis Bid within four hundred lrvt_+uly (5420) Consecutive calendar clays, cotnptlied by excluding, the commewoment date and including Ilse last day ol'such period, mud to be hilly completed to the point oFfittal acceptance by the Owner Nvithiir thirty (30) consecutive calendar chtys alter substantinl Completion, c000puted by excluding commencement date and including the Inst clay orsucll period, Acceptance and {acknowledged by on authorize Agent Signatttl'e: ""` `"r • Title:_ Vice Presidcn Date: l i 19 2Q Ccnsfruclfon Solicrfalion Doc rev 02-21-20 C'A F0101 2 - CONTRACTOR'S KEY PERSONNEL ASSIGNED TO,rfI E PROJECT 108th and 109th Avenues Public Utilities Renewal Project Name Ken Fritz Michael Lobello Construction Solicitation Doc rev 02-21-20 Bid No. 21-7823 Personnel Catewn, Construction Superintendent Project Managej, FORAM 3 - MATERIAL MANUFACTURE RS THIS FORM MUST BE COMPLETED OR 1311) SHALL BE DEEMED NON-ItESPONSIN'E All Bidders shall confirm by signature that they will provide the manufacturers and materials outlined in this Bid specifications, including compliance with Florida Statute 255.20 to provide lumber, timber and other forest products produced and manufactured in the State of Florida as long as the price, fitness and quality are equal. Exceptions (when equals are acceptable) may be requested by completing the Material Manufacturer Exception List below. It' an exception for a manufacturer and/or material is proposed and listed below and is not approved by Engineer/Project Manager, Bidder shall furnish the manufacturer named in the specification. Acceptance of this form does not constitute acceptance of material proposed on this list. Complete and sign section A OR B. Section A (Acceptance of all nrmufictures and materials in Bid specifications) On behalf of my firm, I confirm that �Ve will use all manufacturers and materials as specifically outlined in the Bid specifications. Company:— Douglas N. Hig ins,-InC. Signature: Gl : 1� 'L - Date:11/19/2 Section B (Exception requested to Bid specifications manufacturers and materials) EXCEPTION MATERIAL EXCEPTION lVIANUFACTURER 2. 3. 4. 5. Please insert additional pages as necessary. Company: Signatu Construction Solicitation Doc rev 02-21-20 Date IBC}RM 4 - LIST Or MAJORSUBCONTRACTORS "PHIS LIST MUST BC COMPLETED Olt DID MAY BE DEEMED NON-RESPOINSIVE The Luldel'signed states thAl the Endowing is a list of 111e Pl'Ol)csed subcontractors for the major cateprios outlined In [lie requirements of 111C aid specificnlinns. The undersigned acknowledges its responsibility I'Or ensuring that the Subcontractors rot. the molar Categories listed Ilercill are "qunlificd" (as deP1llCd in Ordinance 2017-08 and Section 15 of Instructions to Bidders) and meet ell legal regniromcnts applicable to and necessitated by the C ontrnt Documents, inoltiding, but n01 limited to Proper licrclscs, certifications, rel;isn'ations and insurance coverrlge. The Owner resmes the right to disqunlify nny Biddor ullo iticludes non-c:anl;11inlll or non-gtlnlified Subconlractots in ils bid offer. Further, the Owilc:r 1119Y direct the Successful $idler In removelreplue any Subcolllt'act❑r, at tlu fulditional cost 10 Oamer,,,Yhich Is found to be non-complimil Nvith this requirement either before Or klfter tile. iSSllaneL of the Awe1'd of C;11nont by Owner. (Attach addiliollal clleetS as ocedmi). Further, the undersigltod aelcno,Vlcclges and aglees that prolllptly After [lie Awnrd of Contract, and in accordance with the r0quirenlents ofthc: C uillrecl Doetllnelds, the Successful Bidder shall identify all Subconll'actors it itllellds to ilse oil the Project. The trllcieesigned further agrees that till SUI)COIAMClays suhsequenlly identified for tiny portion of work on this Project nitlsl be qualified as noted above. Nlajol• Clllegory Of Wark 1. Electrical V I r 2. Mechanical 3, Plumbin 4. Site Work[ 5, Identify other subcontractors that represent more thnn 10% of price 01' lhel affect the critical oath of the schedule Subcontractor and Address Conlpany: _D_asX_HiggUis, IiI Signature: '! . _ bate: 1 I/t9/20 Construction 50ficltatforl Doc rev 02-21-20 �ti Lrcrr� 7i Yt�ltatt�.- �-t. rflyl� N�ubr!rl y �i".1�l�rvg I , rL L`. Gt r�`-K— 0 FORNI5 - STATEMENTOF EXPERIENCE OF BIDDER The Bidder is requjred to state below what work of similar magnitude completed within the last five (5) years is a judge of its experience, skill and business standing and of its ability to conduct the work as completely and as rapidly as required under the terms of the Agreement. I. See Attnched 2. a (project name) (project owner) (project location) (Owner's address) (project description) (Owner's contact person) (project start/completion dates) (contract value) (phone) (email) (Project name) (project owner) (project location) (Owner's address) (project description) (Owner's contact person) $ (project start/completion dates) ('contract value) (phone) (email) (project name) (project owner) (project location) (Owner's address) (project description) (Owner's contact person) (project start/completion dates) (contract value) (phone) (email) Construction Solicitation Doc rev 02-21-20 (title) (title) (title) ■ FORMS - c0'ATERIE +IT OIL EXPERIENCE OF BIDDER 4. 5. (project name) (paajcct awncr) (projec( location) (OW1lee's address) (project descrip(ion) (Owl ar',s Conittct persoll) (title) (project Completion (late) (conttatct value) (phone) (email) (project linme) (pro•lect owner) (projed locatiall) (Owner's address) (p1,7jec[ descriptian) — - (C7wner's ContaCl parst7n) (project contplelion elate) (contract Value) (pharle) (email) G, (JrRjecl name) (project ownel') (prajecl location) (Owner's address) (project description) (project completion dale) (Owner's contact person) (title) (contract vallue) (pholle) Company- D s las N. Hi gins, Inc. Construction Solicitation Doc rev 02-21-20 (Clunil) Dote; I ] Lgao 0 EXPERIENCE STATEMENT, SOUTHWEST DIVISION Royal Harbor Water Syslani Improvclnanto • Fthase I Job No. 400. 4 wnar AddrBss - PLjaG Wal2pgg }Ileitis: Coy of Naples - utpltioa ciapt. 300 Riverside Cir- Nalsles, FL 34102 ANyson Holland, Deputy 134reclor (239) 213-4713 AMFlallondfnaulrreev, was Taira Tech, Inc. 101100 Chevrolet Way, Ste. 300 Estero, FL 33929 13rell Messner, P.E. (239) 3OU-1 407 t nntraot Date: May 21. 2014 Final Canlratil Amount: $2,0?2,991.00 Comolel)ori March 27, 2015 dues 14.700 LF of asuaolos cemem water mains Will A Ines and a i PVC water Mi ln, (2) 10 indi I IDP5 dlrectionnl drills undarnoa(h Inlorcoastol canal to "loop" the syclam, Insloli4on of 980 LF of 4 1 PVC force plain to replacedelerlurating alaaharga farce inain Irani Cilys Lift Slatton and approx. 2W LF of 12 Inch corrugated PVC Livingston Road IC WalarASR System Well Below the U80W - Phase 2 Job No. 1000.13 Collier Courtly Publir LIb11116S Mao 7erniaml Troll E., Sae, 303 Napted, FL 34112 Zeman RaiTaro, PM (230)252.9279 CDM 50111 2180 W. FUst St„ Ste, 4011 Fl. Myers, FL33901 Jason S0indra, F.E. (239) 938•ge00 Dia• December 11, 2013 Iract Amounl: $2,561.180.45 ), pglp, January 3D, 2015 Prclecl Mama' Everglades City Water Systanl Upgreda Phasn It Job No. 029-13 QUner-Addmue-Preloct M—Aa g r• (phone: City of Lver9lades City 102 Copeland Ave. Evarglsdea City, FL 341311 Mayer Sammy Hamilton, Jr. (239) NS-3781 American Englneeflnp ConsullWits 573 991d Eagle Dr. Marco island, FL 34145 Rnny Joel, P,F. (299)304.1697 ]ale' May 38, 2013 lracl Amount: $2,534,109.05 in Dote: January 14. 2015 Inslallallon of a noW morn brone nitralidli system housed Inn new 5truclure, upgradod Iransfer pumps, 0anitcal systems, standby generator and assoclated Inslfumenlatioil and electrical supply, Installed a now force main to the Copeleiul Lilt Station; upgraded The Camostewn 8 Copelerid Lan SrellOAa: upgraded wrlar mimnt P. ranlaC-ad FIX1 ln0 PS roof el booster Stalt0n. 4VTP FlandiGuerdr it Replacement Jab No. 730-14 City at Naples - U11hi 300 Rivnreldo Mr. Nap%&, FL 341D2 David Graff, PM 230-213.471e drrolr2111aW eraem Cl1y or Naples • U11111103 00111 300 Riverside Cir, Naples, Ft. 3h102 David Graff, PM 239.213-4716 Cglitracl DeleDale: October 29, 2014 Final C{tptrA I112UL $04.729,00 Ccniplollon DEL% Fobfusry 4, 2015 ❑pining L testing Of now Clwm V Group Three ASR fri)eailen w2G syelani, Removal or sub -standard IlandrGuardrall Syslema In Area arena designated A$R-2- Conslructlan of ASR Pipeline, Inslallallon or atwve Removal Water Treatment Plant wllh now Alumhlum HandlGuardfall ground mechanical piping and valves, electrical equipmonl and canlot Systems meeting OSHA Standards equipmura removed to provide space for ilia required well drill dquip. Perform all assectated MIN, worst, fa$toratlon and cleanup, Hitching Posl Forte Main Improvements Job Nc-1426.15 Collier County Public Ulllllles 3339 Tannaml Trall E., Sulle 303 Naples, FL 34112 Gary Butler, SPM gt� h�l q� a bill �!rt 9y t n R 1 (239)252.5377 Johnson Sngineorlrig, lnc, 2122 . uhnson St., P.O. Box 1630 Fort Myors, FL 331102 Michael Plckay, P.F- mrdIMlehnren•nr.eOm (23e) +81.2455 C66keel_DAVU March 31, 2015 i;lnal Can1ra(1 Ain4uf1t: 5174,913-00 Complellon Dare: July 1, 2015 u mch Westevvaier Forcornaia Pipelines, Valves, Aar Raloase a and connoct to exiettng system, lack and bare crossings, hackgll, ig, noWablo m1, pavement and reslorollon, Ilushlnp 8 pressure 1. Countyuuppuedmatedat. E�21g 4; Vandorblll Beach Rd. 8 Sduthbay Or, Water Morn Rolocallan Job No, 980-15 Collier Courtly Public UtillOes 3339 Tamlaml Tfdll I=., Suite $03 Naples, FL 34112 Diana Duarl, PMP d itaduerlgcnalrrxer.nrr (239) 252.3980 Agnnil, Bather and Brundage, Inc. 7400 Tamlaml Trail N.. Ste, 200 Naples. Fl- 34108 ❑ominioil Aniiae, P.F- 111111,20110ftw= (239) 597-31 11 Canlrecl Dale: Aprff 3% 201U 1=1na1CgfdrsctAmOuld: $120.267.00 Cur0a10110nB' Augusl7, 2010 Prolonl OasctlD.Il4n; Inslellaltall of epproximateiy 050 LF of now le" walar mein. Inctuding 0106, pilings, meter bagoa, Ora hydrants, MOT, dewatering, removal and disposal or saUeatos concrete water main, hack 1111tng, (wrnpatilln, sad, landscaping, pavement. C�`1Flerttlanmy�tSraphux iDNH111Neolet allies a? X 2"Iss EXPERIENCE STATEMENT - SOUTHWEST DIVISION MPS 306 Force Nlain - Phase III/Naples Manor Water klain - Phase 2 Job No.742.15 Owner - Address - Protect Manager - Phone: Collier County Public Utilities 3339 Tamiami Trail E., Ste. 303 Naples, FL 34112 Wayne Karlovlch, P.E. (239)252-5372 Wa neXerlovichCdcolliergov.net Engineer- Address- Phone: AECOM Technical Services, Inc. 4415 Metro Pkvry., Ste.404 Ft. Myers, FL 33916 Dustin Chisum, P.E. (239)278.7996 dustin.c Mau m(aaeco m.co m Contract Dale: July 7, 2015 Final Contract Amount: $1,524,244.52 Completion Date: January 9, 2017 Installation of 8" water mains; removal of existing AC Water mains; installation of new valves, hydrants, temporary and permanent bacterial sample valves and other appurtenances, Installation of new water services and backflow devices, relocation of existing water meters to Individual water meter boxes; removal of abandoned fire hydrants, water valves & valve boxes, blowoffs, etc. Installation of a new 24" force main, 42" steel casing under US 41 by Jack & bore, connect to existing force mains; installation of new valves, air release valves and appurtenances. Restore sidewalks, roadway, driveway and landscaping. Pump Station 309. Job No. 1510-i6 Collier County Public Utilities 3339 Tamiami Trail E., Ste. 303 Naples, FL 34112 John Eick, P.E. (239) 252-5345 J oh n EI c k@coll lergov. net Hole Monies, Inc, 950 Encore Way Naples, FL 34110 David Schmitt, P.E. (239) 254-2000 David Sc h mi tt@ hme n ¢.con r Contract Date: June 9, 2016 Final Contract Amounl: $492,889.47 Completion Date: May 31, 2017 Construction of a new wastewater pump station to replace an existing pump station. Included construction of a new sub- mersible wastewater pump station, mist, piping, electrical, electrical service extension, wastewater service connection, grouting of existing gravity sewer, modification of manholes, abandonment of an existing wastewater pump station and mist. site work. 'roiect Name: LASIP - Wingsoulh Slormwater Improvements Job No.702-15 Owner - Address - Proiect Manager - Phone: Collier County Transporalion Engineering Project Name: scwttr to Uvernow u Job No. 1520.16 Owner - Address - Protect Manager - Pilor Collier County Public Utilities 2885 S. Horseshoe Dr. 3339 Tamiami Trail E., Ste. 303 Naples, FL 34104 Naples, FL 34112 (239)253.2885 (239)252-5372 James Zuver, PM Wayne Karlovich, P.E. Iamesmverocolllergov.net W avnexarlovich@colliereov net Engineer - Address - Phone: Engineer- Address - Phone: Agnoli, Barber and Brundage Hole Monies 7400 Tamiami Trail N., Ste, 200 950 Encore Way Naples, FL 34108 Naples, FL 34110 (239)597-3111 (239) 254-2000 Edward Tryka III, P.E. David Schmitt, P.E. David Sch mitt@ hmen e.com Contract Date: December 8, 2015 Contract Dale: June 6, 2016 Final ContractAmounL $3.288,436.85 Final Contract Amount: $207,635A9 Completion Dale: May 24, 2017 Comf_rlelion Date: May 31, 2017 Wingsoulh was the culmination of the L.A.S.LP. project. This was in part a drainage improvement project for the Parkers Hammock neighborhood and a clearing out of vegetation; shifting and reshaping of the stormwaler drainage swales surrounding the Wingsoulh Airpark. Additionally, 3 control structures were constructed In order to help control water storage levels, Replacement Installation of temporary bulkhead, pumping equipment & bypass of flows to allow replacement of the overflow weir gates. Remove and replace the existing channel covers and supports. Demolition of existing overflow weir gales. Repaired concrete and installed new overflow weir gates flow with actuators. Electrical and SCADA work. New motorized actuator was compatible with the existing electrical and SCADA. Restoration and cleanup. N C:\Users\tammy\Drophox (DNHII\Naples Office Managers\Experience Statement 07 31 20.xisx EXPERIENU STATEMENT - SOUTHW E5T DIVISION NCWRF Awat;on EqulpinelA Roplacaiaaul Job No. 170-16 Collier Counly Public Wilifies 3no,romtaml Troll E„ Sle- 303 Naples, FL 34112 (239) 252 :s372 Wayne narlovu3l, Senldr Prue! ivlgr. Waynr.ksi jgvrsli&Icnlliorsounlvn,Dov - AddFf M1S�rlionn, NIA October S, 2016 $415,892.00 February 26, 2018 Aorabdn Equiphi0nt was r9m004 and replaced for Oxldolon Pitch N 1 knd selective aerolion ayulpnrard Was removed slid replaced for Dxldallan Dbch P2, Cd11{er Blvd. $ oily Bake Dr. WM Job No,14i8-17 Ownoa , Address • Protect Manerrer- Ph.nno: Collier County Water 0Imibbllcn 4370 Mercantile Ave. Naples, FL 31104 t239) 252.6245 Parnala Llbby, Water Ulsiribullon Mor. MA Cunlradt Dale: November, 2017 Final contract Amount: $41%, 136.157 QeMRki in ISare- November 13, 2017 Prelect 0—fipucnr 40"Price arcmera Illpe Repair SCRW7P Sludge Th7c,kener Reruibiuhing Jub No, 1270-16 Collier County Public UIIIIIss 3339 Tarnrand Trail E., Ste. 303 Napies, FL 14112 (239) 252-5344 Alicia Abbott, Project Mgr, r< i 'I I(W Consulting Enalnears, Inc, 5021 Bonner Dr. Fail Myers, I=L 33912 -230 D9u91es ECknWili, P.E. p awel a �,r ckm:nni4l4.wo n tinvipaf �Orltracl Date: Novambar 1, 2016 Final CanlracLAm9u1A; 53g2,709.96 Gmmpiellod Date: Noyambar 17, 2017 PFOIBCt ❑e506e110a: ReTurblshed the kme sludge Ildckenar machalikim. Clearing �lia gfaugy thickening basin, dispose of all materials, remove support budge, the Inlet well, drive and lift assembly, torque tube, Ngid arms, Trencpoli ilia drive and lift assemblies to and from Dyivo authorized rebuild cantor in Tampa, FL. Arrange the factory aulhorized rafurblihing. Romovd Falling & decking, sandblusi, repair and replace carrodod steel, and racoal die Qupporl bridge- Relnntall graiing & guardrail, I461811 refurbished drive and lift machanisrns, and Install new fahricnled compononls. Run now vdre anri rorrdult for elnclrlcol work -roach up ddeting namn9ad during loslallalian. Protect Name: lo7ln Ave. N. Peblio 1,1111igns Renewal dap No, IGOO-17 Collier County Public Ullllllee 3339Tamiamt Trail P., Sie, 301 Naples, FL 34 f 12 (239)252.2589 Micheal Slovans, Senior Project Mgr. r lEtd+sL51! LA iv�AUW 99woAtw in�a F-Address •Phone: 0. Grady Minor & AsgorJ9ler 3800 Via bet key Donna Springs, I'L 34194 (219) 047.1144 Justin Fradedksen,P-E- r oar 'r'w>lsat�.��u=s4� �nnlracl Dale: February28, 2017 Plnnl Conlrnct Amnuni• 53,278,116,35 COmp19119r1l7nle: April20, 2018 Remove and Insiali approx, 4250 LF or rioyi o" Walar main piping and appurferiancos, now No 1lydr rots, vatvo8. Water 90NIcas, rnetero and backgaw prdvdnlam, Remove and install apprdx, 4400 LF o1 new 9" PVC gedvity adwar plpo, man119les, and replace existing sanitary sower sdrVlce laterals. Remove and Install approx. 5100 LF of IS' and 24" HOPE parforaies atormwator piping, Install apprdx, 32.50 LF pf is" and 241 kDn and RCP slormwalar plping, catch basins, sediment catch basins, Jundllon basins, Inhis yard drains and mitered and gecllons. Restore driveways, rel3ull01ng the roadway, subgrade, base, and asphall. �L:rt41' CWsarAlornmyWropbox Orfieo Mu,Ehlis%EYponouca UiluironliV 31 20,wim (XPERIENCL STATEMENT-St7UTHWEST DIVISION waled Name 1101i Ave, N, rArhlic UhUae 1lesiawal Job No. 1600.17 3wner - Addrosa.- Pr4iiN'J•bgnnner • Pltona: Cnlllnr Counly PLB+liC UIIb1i56 7119 1 emlemi l rail E . $Itr. 301 Naples, FL 34112 (229) 262-2660 Michael Stevens, Senlor Proleot Mor. M chn ulAU.m(RdII4S{rL4lrlivJl-APv D. Grady Minor s AvUdales 3goe Via Del Roy Bonita Springs, FL 34134 (239) W 7- i 14d Ju51II1Frededk6B11, P.E. the e+l 04 jua11Y.Tk0r.ram Conlract pate: Pebmary 28, 2017 rinal Contract Amount: ;4,748.0611A9 Camarallon Dale: April 24, 2018 Remove and Install appro%. 5460 LF of new 8 Mid a'wnlar main piping and appurlonancos, now Ore hydranla, Volves, weler saratces, meiors and hockllow piavanters. Remove and insiall approx. 51001-F or now ar PVC gravity sewer pipe, manholes, and replace existing sanilary sower service Islarals, hrslall approx. 4020 LF of M" HDPE sewer forge main pipe. Remove and Install approlt, 6030 LF of 14 end 24" HOPE pertoreled slormwaior piping. Install appfax 4340 LF of 1 B end 24" HOPE and RCP slormwaler piping, catch buslns, t;adlm0111 catch hpalna, Judcllon basins, Inline yard drains and mitered end saegarsa. lieslofe drWipways, fdbulld roadway, auhgrnda, base and saphail Liay 4olony APpunenanc$s Jab No. 1545.111 Gwner —Address • I'MIMalhha(L�eT. P Collier Counly Pubne U11111lles 333E Tamleml Trail E., 510. 383 Naples, FL 34112 (239)252,4218 DlimB DUBFJ. PM nlona.overl�sollf�raountyf Japrly Johnson Engineerfng 212T. Jahnslen St. FI. Myala, FL 33902.1550 (239) 3344046 Mlcheel dickey, P-F MWEN0as,9Atp UM Conlroct Dalo: July 24, 2016 Final Canlracl MOM; $353,100.00 Comolellon Date: September 21, 2018 pfoloot poscdat$10: Repine Backnow & 9ypbss AmemNles; replace compound surVloo niolois; Install4" QUY valves on 4" Bypass; Install double Ilea stop Willi llypase assembly; Install Gate ValVeS; inslaK 0" inaoflion Valves; Install fire liydranl aaaambly, Raeloralion 'rnlecl Neme; Monnlen Rd. Bansier PLahp 91811M b l'lp)ng I{erlaeamahl .lab No. 1442.18 Ownor AddrQaa - Pruleot.Mn1m@r._• Plano; Colllef C,eLlnly Public 1,111111109 333D Talnlnmi TrPH 1=„ 51e, 303 Neplak I=L 34112 (239) 252-4236 Sion Fandrlch, P.C. 9fioo.fan4rlch@ vj1 Ojj;ok]MYAM Tatra Tech 10000 Chevrolet Wrly, Ste, 300 E51ero, FL W02a (239) 390.1407 Danny Nelson, P.E. d i h I7 y� i el t p�3 a I r n I nc h. t a m aW July30,2D1t1 FinalFiftal CenlreAAmounL $98.750,00 Cgmplalion.Ratly' (kiaber20,20111 Pralpcl Deacnnllon: koplace 3 existing pulnpu wl(h now pumps arrd piping Improvomeols. Job No, 142B-iB Collier Gowlty Pbbllc L11illlios 3139 Tamismi Trap E , SIB- 303 Ngpiea, FL 34112 g39)252-5343 PeterSchnll, PMP �4ll�rcovnhll.[aM Elm Inear - Addrasb - Ptlepp; WA ConlrarA QAd April 10, 2010 Ulm, ConlAcl A01WL11! $94,350,10 C.Cmalellon Dole; Augu9t 13, 2010 485 of Aquagonlr& solar pond 8arallcn sy54ema on ponds G Clusan�InrmnVlor4puo7 InNal)' Naphfi 0I11ce lance 91alwm,0 a7 IL 20.x151 EXPERIENCE STATEMENT - SOUTHWEST DIVISION .lab No. 1370-18 Colter County Public Utilities 3&19 Tamlarnl Troll E.. SIC, 303 Naples, FL 34112 Paul Abbolt, PM FDldJS46otufleolllrrreunMf oov Address - Phano Wood. Plc 201 Ailpurl Rd- S. Naples, FL 34104 (230) 643-4747 Angel kodrl4uox, CFM FMP Ykngef,rvdrfiva7LmYW kdplr,Yam 39e- March 25, 2019 Ireci Amount: $192,400,27 t0 Onle Aunm 2, 2019 AERATION BASIN Inal8lied MOW 24 V overhead cable lifeline Idp peoleumn 6yalome AERATED SLUDGE HOLDING TANK Inclell Iwo 140' CverAoad apbio iifoliao rail prolecllon systems, rhrea 130' overhead opble lifeline Tall prolaollun eyerehl6, ten eompresstoll braces, toil Iillllne trolleys Jab No,1340.10 Collier County Public Willlles 3339 Tamleml Trail E., Ste, 303 Naples, EL 34112 (239)282-5372 Wayne Orlevicii. PC - Johnson Engineodng 2122 Johnson Sl. Ft. Myers, FL 33001 (239)334-0046 Mike Dlakcy, P.E. MBIE12 nrohpp�cam Contract Vale! AI1gUM 27, 2018 Final2mlracl Arnouni: E152,000,15 Q2gjgI5llan Dale: September 26. 2019 Jecl 0esclhrllan. Installed approximately 1220 LF of 1fldnch wastowaler (RrGa main, Joh No. 1320, W Collier Courtly Public Whites 3334 Tamlan9 Trail E., SIR. 303 Naples, FL 34112 (239)252.5372 Woyue Karlavlcll, PE Johnaon Engineering 2122 Johnson 81. Fr. Myers, FL 3301 (239) 234-0046 Mike Dickey, P.E- m+dLelohnsononY,�om Pecernher 3, 2018 1racLAmo;mk; gd52,667,36 In Dalai Scplemher 7, 20L9 In9lnllefj npproYlmatelo :1700 LF of 8-Inch, 10-inrJl and 124nch wnslewarer farce me In. tWl Aft N i'umio Ulpalgx I'm Job No. 1500-18 +Jtiri rnr • nuu,uen - nwuur tnen+.srv1 - ri1v,�a. m Co111er Ccunly Pub1k , Uolldea =9 Tamlaml Trag E„ Ste, 303 Naples, FL 34112 (239)252-4233 Corinna TriaR r,&lA n u. T rt 0 n Q c o! I h m o un ml l.aoy FnOinaar-Adflrass_ Phone; p- Brady Minor & Aaoaclotes 3600 Via ON Rey Bonlia Springs, FL 34134 (239) 647.1144 Justin rroderiksen, P.E. {rrednrl kitlh�YrM!'rldMLrNrI Conl[�ct Pare: ,tune 26. 2018 �J mLG4nlruo Amount $5,443,020.00 Camatvlkan Da{ar Jonupry 10, 2020 Proloot basarJn lm Rewoya 8025 LP bf a -Inca asboslas concrete water main piping; Install0325 LF Of rtat78-inch water rrialrl piping, now fire hydrants, gale valves and water aerylcas, Inslafl al now water services and rglocetlort of water metgm and backnow prevoiRafs. Remove 560D LF of sewer pipe, concrete mewhcles and aervico Ialerals; Inalallatlan of 5000 LF of now 8-Inch newer pips, precasl steel reinforced polymer concrete arorllloleo. Repla0a sllnitery sewer lalafalo. Remove and Install new HIIPE and RGP alorrrtwatar piping, catch basins, Inilne yard dralna and 04ered end eaclleoe. Real❑re driveways and rebuild the roadway and asphall 4,iUran�lamm4lPrep6oY(pNlUlir'rK4YF9HIS0Menyer+ perleneY51J10m9nto731ie.4W Go &Z' County Section XIV Minimum Qualifications of Bidders 108th 109th Avenue North Public Utility Renewal 1 dWm a ROW 1 mile (min) 1 mite (min) 1 mile (mip)'S5 1 male (mm) , 1 mile {thin) Proj2 Name Owner and.Owtier Contact , Year Contract {fUitflin a buittout 60 vAdeor potablewater potable crater Maki and Storm1+"or, roadway (name, phone, email) Completed ' Arnoimt Neighborhood? tess? ; 6" or targer3 6" or targer? taterats2 larger?' rebuilding3 MPS 306 Force Main - Phase III Collier County Public Naples Manor Water Main - Utilities 2017 S1,524,244.52 Yes Yes Phase 2 Wayne Karlovich, P.E. 239-252-5372 Wa e.Karlovich@colliercoun ov 107th Ave. N. Public Utilities Collier County Public Utilities Renewal Michael Stevens, SPM 7018 $3,279,116.35 Yes Yes Yes Yes Yes Yes Yeti 239-252-2589 MichaeLStevens@colliercountyfl.g v 110th Ave. N. Public Utilities Collier County Public Utilities Renewal Michael Stevens, SPM 2018 S4,746,931.89 Yes Yes Yes Yes Yes Yes Yes 239-252-2589 Michael.Stevens@colliercountyfl.go r 95th Ave. N. Public Utilities Collier County Public Utilities I Renewal Corinne Trtan 2020 $5,443,920.00 Yes Yes Yes Yes Yes Yes Yes 239-252-4233 Corinne.T rtan@colliercountyfl.go Royal Harbor4 Water System City of Naples - Utilities Dept. Improvements - Phase 1 Allyson Holland, Deputy Director 2015 $2,072,961.00 Yes Yes Yes Yes 239-213-4713 AMHoUand@naplesgov.com 108TH AVENUE NORTH and 109TH AVENUE NORTH PUBLIC UTILITY RENEWAL .�-FORM ti-TRGNCIJ SAFEW ACT Bidder aclatowledgcs Ilia[ iiscludad in the varlDus iletns of the bid and in the Total ail Prio(: ore costs For Complying with the Florida Trench Safety Act (90-96, Laws of Florida) t0cctive Oc{oher 1, 1990. Tlie Balder Further idenli Fes the cost to be summarized below: Trench Safaly Units of Unit Unit Extended Cos Measure Measure naliflt ( Description) L[ EM—) � . al 1'P61y1� t7U�L �- 2. 3. 4. 5. goo TOTAL $ )?U, coo Failure to complete the flbove may result in the Bid being declared null -responsive. Company: Sigtlalul'e: Date; 11119124 Conshudio» Solici[ation Doc rev 0 -21-20 CAU IrC#1;M 7-BID DON1) KNOW AL.I, MEN BY THESE" PRCSUN•I'S. tint the .1)Q1qg1ws IV,.I3i�l,lli�,.111+..... ....... -.— III) V1. Galled the PrlIle ipai) and _I�.il.Llf }3Si 9G5�11 1)1_�JJLS� mu31,YS:n. (Ilercill ctl3u l the Sorely), a col poI'llAll chartered alld + •' Willl Its pi'ilicipal 01,11ces Ili lilt Clly t51'• ;lllj .l,• j�_.,__.._......_.._. exlslint; lilltlei' 111E hliSs Qf t174 StatC` Uf—_�._1�.....,...,. _ and aulhorind to do busille�s Ill ill, State of J']., _ _ vre Mehl lid firmly bdll1141 t,nto Ilse llicr CSni4,-11gArdsr[Cs1U.111.y c:otlimiSM011Cr5:__(hereina[tet c:t111cc1111cO>,vncrl, ill lllt: full rind just Alll11 ❑f l'?I_ce�(�f the .xtlFul7t`tl_ lei dollars (s 544, ) good and lativful money of (lie Llniled Stales ol'Awerica, to bt: IMid upon (101M)d of 111e O{vlter, to which 1111ymeltl Well alld II -Illy to btu 11111dc, the Principal alto) the Surety Wild Iliellmlves, (heir heirs, and execiltors, w1minislmlors, And tlssigns, jointly and severally wid ftrinly by these preseltls. wllerens. The Principiil is Abolll to snbmil. or I1M SMOI titled in the 0WIl r, A 13id AW fuI'll ishtng all Islbor, materials, egtupmenl and incideolais necessnr31 10 furnish, in5l.111, nlltl fully complete the Work on lice Prclivel known as Bid No. 21.7823 108th wid 1091h Mcatles P11h11c Utilities Retlewili PI -flied. NOW, THEREFORE. ORE. If tic QWtler shall #ccepl the Bid of the PRINCIPAL and Ilse PRINC IPAI, s11111 enter into Ille required Agreelllent Willi 111e O,vnerslild ►vithio ten days after (lie dote of a wvrilten Noticc of Award in llccordamv with the terms of siscll 13id, and give such bond or bonds in Fm Funount of 10VA Ilse loInI Coniracl Amoum as specified ill flic F3id(hlig I)(l,II1F11211B, 01' ('01111aGt Uortlments ivilli,good ant{ suff icient sus•tly for the raidiful performance of Ilse Agicemen ( and For the prompt pa} mcllt of Jabpr, nmterints raid supplies furuishetl ill the pluscclllioll thereat al., in the evelll of tllc failure ol'the PRINCIPAL to enter into such Agreement or to Clive Such bolltl or bonds. tool deliver to Owner the requiml cerlilicmes of insuralice, if the PRINCIPAL shall psly to the OBLIGEE me ri c i sum orsib. or at I acht, notcd above os liquidated dallinges, and not 115 a penalty. as provided in the Bidtl!jig I7ocliments, ihen this obligalion 8111111 be III[ II anal vain, olllel'lvise to remain ill full force :Iliac afR.,ct, IN n2.STIiNIONY Thereof, (lie Principal and Surety Have caused the-,e presrrlts it) be duly signed and %tided this _ .gj11_ (hty of__M)_uj-abg, 2020 B'Y 62 C't7(111ierSlgtle(I Principal (Seal) Solely (Seal) Appoinled PraCluciog Agesll for I Ivlal� ul2. 2d Box 541, Stlitc JAIOU, Ault Arbor, MI 98106 i)rrr�cl frfrlul►'ftl;afCfrrlrus rti: TI II:: HART f ORD BOND, 1,12 hrrifard flaxPOWF'111-Z, 01'A"] 1Y-.1 10R �''X lrltard, CannrclCut 015156 f;nntl.t,ll,ilrl�ff!I�g�ar lurcl.rrfnt rnrr� 4[fe•;lii[i�;19h1+ nrlrix: Ofip•7.r7.5ti35 KNOW AI_I. PERSOM6 BY I IIt-SE 12RESGf'1•I'S'l'HA'1': Affallr-y Naha: IM ANT GROLIP J N('fALM 111i[+OR A enn Catiu: 35-350E151 life tfard I'll a 111smance Coinpinly, 11 s urlu,rnlit�u duly gipmiml miller the taus of the $Lill. of C'(11muctirUl I-lorllold Casually insurmice GumpFuly, a 031110rilliru tluly nrgrmvjx tl LLncler 11111101'K of II1c SIRIC 01711101111111 I'Iarllortl Accident alid IndelnnlRy ColTipally, a corporrllioli tiuly 0rgiI1117r:111111410L Il1C IILsYS 01 11 he SiMO (11'C'01111cutiCLIL Hartford Undorwrltel's IhsuYtsncc: Company. 11 Corpnluliou thlly orginliued 1111dCr 111ta law., of II1C Slow III'( U11FICV14,111 -fVII)l Cliy FII'ra li)GLA-811Cti Colripfllly, ll OW110TA6011 (lily rl1'I:i1111zGtl tlll(ICr Ills' luµ'K of Ihr' 51111t: 01'10uliuuli 111 irtford hisuranr:e Company of 111111016. a curl,oraliurn duly orkinlixed undrr ills` 1113,•s til'tku M111v ul' Milloir finr[lord 1110tilot)m! Company of the MldwOsi, a corporalinn duly orba1i7vd unticr' Ihr' Iuwx ol'aht dale ol`Indiallri I lartiurtl Insul'alice compally et the gotitheast, a C011141latkill tlllly orgrulirad 111](10 the ItM9 01'111e 51111r Df 1'4aridu having their hnme olflro in Hnrtlorrl. Conncclivut. (herainafler colleGlively mfeitod to Fir Itle "Companies") do hereby mako, con0ttde �lntl appoint, 111) 10 Me amourif of Una iIld Led Susan E. Nllyd, Vicki S, Dinlcan, Terri Mahakian, Monica 14. MiIIs, ]ty-ist.io A. lstidvan, Joel E, Specicmail, I;Jsr M. Wilmot of ANN Ai?13012, Mi-chigan Moir true wid lawful All ornoy(t;)-In-Fact, each In their saparate cnp.Xily if MOM [lion rmo is namUd WOW, io Slflrl If.; name as suiety(Itts) gnly afi delineated above by .rl, and to oNcoule, seal and acknewledge any and all t]Cnds, undertakings, rontrncls and othoi writLon Inslrunients in the nature Ihorool, on boh:ill of the Companies In their hLlElnasa al guaranleeing ilia lidrallty of persons, guarantoatrig tho performance of contracls and mccoling or fivaranlooing hands and undeilakings miulied pr patmitlod in any actions or proceedings allowed by law. in Witness Whurcol, anti as aulharized by a lleadlutloh or tim Board (it Direnlorr, of lhe cornpanI s an Way 6, 2018 the Companies have ciAusad those presents to be signacl by Its Senior Vice President and its cnrporato seals to be herulo alflxed, duly Wlesled by its ASslslanl Secretary. Furlhcr, pursuant to Resolution of Me Roord or Directors of the Companies, [he comfaailies har'eoy unambiguously mf lirm that they are and will be bound by any mechanically applied signatures oppliad to this Power oI Mornay. + r<A,rwS � y�w„i w rr,er,,r�,� +orilwr � � tyT4 itp79 1 t4 r yT r,�l 9S S.� • Ij�•y ..4�1+ ��tlli9.4� 4e1i1�• .. //;.,- yi John Cray, Asslstanl Sarielery STATE OF CONNECTICUT ss. Martlord COUNTY OF HARTFORIJ M, Ross Fisher, Son€or Ylce Presidenl On this 5111 day of January, 2018. betore me personally mime K Noss Fisher, to me known, who being by Imo duly sworn, slid drpose and say: Ihni ho molder in the Counly of Ha rdord, stwo of coriner:lioul; 111211 110 fs Ihr senlor vice PrgGidoid of the Cornpanivs, We corporalions descrlbed in and which executed the ahnvn Inslrumr+ni: thal he knows the seals of the said cerporaliorls, lhat the seals alllxed to the said In:llrunnefil aro such eorllorale etiafs, first they warn so eiflixed by aulhorhy of lho 13mirdq ui Dhonlors of said mitpur mfl(os and that ho ilgried his 1lrinle Ihuru to by Ilke aulhorily- I, the llnderslgned, Assislanl Vice Piasidenl of Ilia copy ul the Power of A1lnrney exectled by said Companies, Signed and sealed al (he City of I-latllord. ���Y r{� � erg a+ #f p ��}IRrAlty � y y 1 h ,r�i4�1 �fy 1i fCeff�,��LA.0. :f4r.Q2 ISlllldecll'I', it IIIy11:1T,1 r<Illllt}' I1511,IIC CERTIFICATE n+, t„„11:1 S;h1,11;xpiY4'K�u1y i1. �u�1 Companies, DO HEREBY CERTIFY that If a above and foregoing Is a true and sorted which is still in lull iorcer etfecllve as of y fy f,r lh `, rT �. f�.c,.,,�uri; ►¢#t �i ,� yP++$ape C �auu1.,,`� � r,wMMl ��r���$•n�� � �+a1Ail► Cr ^.i f97� ,� � �D7Q tgh4 r Itevin hlr+c11mr1n, Asslsliml VIS:ri I"i' miduht -1P% --,1, 0 ------------------------------- -- FORM 8 - INSURANCE AND BONDING REQUiR> i19CNTS The Vendor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in FORM 8 of this solicitation. The Vendor shall procure and maintain property insurance Upon the entire project, if required, to the full insurable value of the scope of work. The County and the Vendor waive against each other and the County's separate Vendors, Contractors, Design Consultant, Subcontractors, agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to (lie proceeds of such insurance. 'file Vendor and County shall, where appropriate, require similar waivers of subrogation from the County's separate Vendors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County", or, the specific solicitation number and title. The General Liability Policy provided by Vendor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Vendor under this solicitation and shall contain a severability of interests provisions. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioner's in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. The amounts and types of insurance coverage shall conform to the minimum requirements set forth in FORM 8 with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents, if Vendor has any self - insured retentions or deductibles under any of the below listed minimum required coverage, Vendor must identify on the Certificate of hisurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self -insured retentions or deductibles will be Vendor's sole responsibility. Coverages shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer. The Vendor and/or its insurance carrier shall provide thirty (30) days written notice to the County of policy cancellation or non -renewal on the part of the insurance carrier or the Vendor. Tile Vendor shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non - renewal or material change in coverage or limits received by Vendor from its insurer and nothing contained herein shall relieve Vendor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Vendor heremider, Vendor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such Policy. Should at any time the Vendor not maintain the insurance coverageW required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverages and charge the Vendor for such coverage[sl purchased. if Vendor fails to reimburse (he County for such costs within thirty (30) days after demand, the Cotmty has the right to offset these costs from any amount due Vendor under this Agreement or any other agreement between (he County and Vendor. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverageW purchased or (Ile insurance company or companies used. The decision of the County to purchase such insurance coverages) shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of insurance expires prior to the completion of the scope of work, the Vendor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Vendor to provide the County with such renewal certificate(s) shall be considered justification for the County to terminate any and all contracts. Colliler Caunl,y rloridn bmu- ice mid i3pt dirlig Regttirernenty Insurnncc 1 Dand Type Required 1. nlirs 1. E Worker's compellsalion Statutory Limits of I-Im idu Stalules, Chapter 4,10 and all Federal Goyernment Statutory Limits and Requirernelrts Evidence of WorKel'S' Co11 pensatiotl coverage or a Certificate of Gwelnplion issued by [lie Slate of Fla riclo is required. Entities HIM ure Formed as Sole Proprietorships shall not be required to provide a proorofexemplioa. An application for exemption Cain In ubtnhled ohllint: Hi f t�I,OS:J h is d g.cOhnJhnc-exo lllU .3, ® Employer's Liability $_I,000,000 single limit per Occurrence 3, Commercial General Bodily Injury and Property Damage. Liability (Occurrence Form) patlerned after the .1 1,000,001) single limit per occurrence, $2,000,000 aggregalti For nudity current ISO form lnjury Liability and Property Damage Liability. "Phis sha11 iticlude Premises arld Operations; lndependonl Contmolors; Products and Completed Operalions and Contrsacwpl .Li ability, 4, 1Z lncleuuiificalion To the maximum extent permitted by lalorid►t law, the ConlraclorlVendor shall defend, indeninify and hold harmless Callicr County, its officers anal employees from any and all liabilities, damages, losses anal casts, including, but not limited ta, reasonable atturneys' fees an([ paralegals' Pecs, to the extent oaused by the negligence, recklessness, or intentionally wroligrul conduct of the Contractor/ Vendor or allyone employed or utilized by [lie ContractorlVendor in the pul'bimance of this Agreement. 5, { Automobile Liability $_1,000,000 Each Occurrence; Bodily Injury & Property Damage. Owned/Non-owned/Hired; Automobile Illclucle[l G. ® Other inuurance 415 ❑ Watelvatt $ Per Occurlvncc noted: ❑ United Stides Longshoremen's and Harbonvarke s Act cayerage. shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jaltes Act) shall be w2iinralned wltere applicable to the completion orttic 1Vork. $ Per Occurrence ❑ Aircrall Liability coverage shall be carrie[t iil limits orlhat less than $5,000,000 eaoh occurrence If Applicable to the completlolt ofthe Services wider this Agreement. 5 Per occurrence Pollution $ 1,000,000 Per Occtlrrehlee ❑ Professional Liability $ Per claim & in the aggregate ❑ Project Professional Liability Pal' Occurrence ❑ Valuable PaPCIS Ie1SW'erlce $� Pei- Occurrence ❑ Cyber Liability $ Per Oce►rrrence ❑ Technology Errors & Ontissious $ Per Occurrence 7. X Bid bond Shall be submitted with proposal response in the form of certified Hinds, cashiers' check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. S. M Performance and For projects in excess of $200,000, bonds shall be submitted with the executed Payment Bonds contract by Proposers receiving award, and written for 100% of the Contract award annoant, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to (to business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as "A-" or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders' surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Ina, of 75 Fulton Street, New York, New York 10038. X Vendor shall ensure that all subcontractors comply with the same instn•ance requirements that he is required to meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions. 10. 0 Collier County must be named as "ADDITIONAL INSURED" on the hnsurance Certificate for Commercial General Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Vendor's policy shall be endorsed accordingly. 11. ® The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates Of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County, 12. N On all certificates, the Certificate Holder nnnst read: Collier County Board of Commissioners, 3295 Tamiami Trail East, Naples, FL 34112 13. M Thirty (30) Days Cancellation Notice required. 14. Collier County shall procure and maintain Builders Risk Insurance on all construction projects where it is deemed necessary. Such coverage shall be endorsed to cover the interests of Collier County as well as the Contractor. Premiums shall be billed to the project and the Contractor shall not include Builders Risk premiums in its project proposal or project billings. All questions regarding Builder's Risk Insurance will be addressed by the Collier County Risk Management Division. 10/15/20 - CC Vendor's Insurance Acceptance By submission of the bid Vendor accepts and understands the insurance requirennents of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. The insurance submitted must provide coverage for a minimum of six (6) months from the (late of award. A�Irnnni;;trative Seivi�fas Delyaiinnent P10(mrP tOrd Serhx Dmsml FORM 9 - CONFLICT' OF INTEREs'r AFFIDAViT The Vendor certifies that, to the best of its knowledge and belief, the past and current work on any Collier County project affiliated with this solicitation does not pose an organizational conflict as described by one of the three categories below: Biased ground rules — The firm has not set the "ground rules" for affiliated past or current Collier County project identified above (e.g., writing a procurement's statement of ivok, specifications, or pert'orming systems engineering and technical direction for the procurement) which appears to skew the competition in favor of lily firm. Impaired objectivity —The firm has not performed work on an affiliated past or current Collier County project identified above to evaluate proposals / past performance of itself or a competitor, which calls into question the contractor's ability to render impartial advice to the government. Lluegaal access to information —The frill has not had access to nonpublic information as part of its performance of a Collier County project identified above which may have provided the contractor (or an affiliate) with an Unfair competitive advantage in current or fixture solicitations and contracts. Ili addition to this signed affidavit, the contractor / vendor must provide the following: i . All documents produced as a result of the wort: completed in the past or currently being worked on for the above - mentioned project; and, 2, indicate if the information produced was obtained as a matter of public record (in the "sunshine") or through non- public (not in the "sunshine") conversation (s), meeting(s), docunlenl(s) and/or other means. Failure to disclose all material or having an organizational conflict in one or more of the three categories above be identified, may result in the disqualification for future solicitations affiliated with the above referenced project(s). By the signature below, the firm (employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the project identified above has been fully disclosed and does not pose all organizational conflict. Douglas N. Higgins Inc { Company (Name �' t �r�l_� �1,�L-c, Signature Kelly A. Wilkie, VP Print Name and Title State of Michigan County of_ Wnchtenaw The foregoing instrument was acknowledged before me by means of 1XI hysical presence oE tarization, this 19th_ clay of November (nnonth), 2020 (year), by Teel ice(name of person acknowledging). (/ �n nature i otary ort a- Nichigaii Personally Known OR Produced identification Personall Known _ Type of Identification Produced David J. Wilkie (Print, 'f'ype, or Stamp Commissioned frame of Notary Public) DAVID J. WILKIE Notary Public, Michigan County of Washtenaw My Comm, Expires 05/20/2024 >~ '01h 3r cr otlr;R�,y A4min1s1mlivc.;8w4m:q NO. ilmont pros❑rQ11100 5ulvl06 olvW011 FORM lo-vL:Ni)oi( 13f Cl,�lll,1'I'14�NS7'A'I'L�11LlV'i' BOARD OF COUNTY COMMISSIONERS Collier County Government Complex Naples, f-lorida 34112 Deny C.'ommissionem The undersigned, as Vendor declnres that dtis response is made willicul connection or nrrangcmcitt Will, any Other person and this proposal is in evoly respect Fair and made in good fttitit, without collusion or fraud. The Vend❑r hereby (luclares the instructions, purchase order terms and conditio,ts, requirements, and specitieationslscope of work of lhis solicitation have been fully examined and accepted. The Vendor (igrees, if this solicitation submittal is ncCel)WI, to execute a Collier County document for the i)urpose of establishing, a formal contractual rcleti❑nship between the flrttt and Collier County, For llic performance of all requirements to which Ilse solicilmlon perlains. The Vendor states that the subntittt:tl is based upon the dUellnlenlS lisled by the above referenced Solicitation. Further, Ilse vendor agrees that If awarded a contrnet far these goods aut]!ol' services, the vetulor will not be eligible to eOwpete, suhu►it a pt'ol)Otinl, ba nwarClcd, or perform as a sub- ❑entlor fol' any fuhn•e associateii with work Nint is a result of this awnrcletl Contract. 1N WiT'h'ESS WHEREOF, WE leave hereunto subscribed Our names ot) this _19jb day of�loacetribet�, 202Diu Ilte County Or--wnShl�ena►y , in the state of Miellinni�� Firm's Legal Douglas N. Miggim. Inc, Nansc: Address 4485 Enterprise Ave. City, State, Zip NaRles, FL 34104 Code; Florida B30666 Certificate of Authority Documem Number Fetierstl Tax 38-1 Idolltillution dumber OVD82 '"CCR 0 or CAGE Code *Only iFGrant Funded Telepholm 2�4-,+UU -- _ Email. 1cwillcie20000dnl'tiuins,eom Signature by; ,f (Typed soul written) Title IZelly A. Wilkie, Vice President _ �'cM 1 Addition111 Contact 111ftlrmulioll ;end payluellls 1Oo Doty las N-1-lig i u II1C (requirod if ell fFerear CoI1 p1my nallic 114C[I as payee from abovk,) COAMCt n1u11e. Daniel Hi y iiis Title; Vies PresidenL Address: 3390 Travis Pointe Rd., -Ste. A ___-- city, state, ZIP Ann Arbor MI 48108 Telephone; 734-996-9500 En111i1: Danes dnhi ins.com 01'flre Servicing collier 4485 Enterprise Ave. Naples, FL 34104 Cs01111ty to lri:lee Order's (required if(lil'lerent from above) Contact nr11t1e: Mike Lobello Title: Regional lV pna er Address: Enterprise Ave. City, State, ZIP 74485 JVaRles, FL 34104 Telephone: 239-774-3130 Email: Mi1ceL n dnhiyzi4A&. Qjn. Secondary colltaet for Kett Pritz D erations Mana gcr this salicilation: Email: KenFndnhi ins.corn P1101m: 239-253-3522 0 AdwJi*-Jratfvo Seivices Dgmrtmen( Pivauemeni eivicssDiaison FORR'1 I I - BIMICRATION ArTlnAviT CEICHFICATION This Affidavit is required and should be signed, notarized by in authorized principal of the firm and submitted with formal solicitation submittals. Further, Vendors are required to be enrolled in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Vendor's bid. Acceptable evidence consists of a copy ofthe properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company which will be produced at the time of the submission of the Vendor's bid or within five (5) day of the Comity's Notice of Recommend Award. FAILURE TO EXECUTE THiS AFFIDAVIT CERTIFICATION AND SUBMIT WITH VENDOR'S PROPOSAUBID MAY DEEM'THE VENDOR NON -RESPONSIVE, Collier County will not intentionally award County conh•acts to any Vendor who knowingly employs unauthorized alien workers, constitUting a violation of the employment provision contained in S U.S.C. Section 1324 a(e) Section 274A(e) of the Immigration and Nationality Act ("INA"). Collier County may consider the employment by any Vendor of unauthorized aliens a violation of Section 274A (e) of the iNA. Such Violation by the recipient of the Employment Provisions contained in Section 274A (e) of the INA shall be grounds for unilateral termination of the contract by Collier County. Vendor attests that they are fully compliant with all applicable immigration laws (specifically to the 1956 Lnmigration Act and subsequent Amendment(s)) and agrees to comply with the provisions of the lvlemorandunt of Understanding with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E-Verify), operated by the Department of I-lomeland Security in partnership with the Social Security Adminish*ation at the time of submission of the Vendor's bid, Douglas N. Higgins, Inc. Company Name a lit,Uvu- - % Signature Kellv A. Wilkie, Vice President Print Name and Title State of Michigan County of WaShletj;&yy The foi-egoing instrument was acknowledged before me by means of C%physical presence or O online notarization, this I9t11 day of November (month), ?,((year), by Kelly A. Wilkie (name of person acknowledging). ( I nature Notary Public- State of>=lerida)Michigan nod j.,_Willr;P (Print, Type, or Stamp Commissioned Name of Notary Public) Personally Known OR Produced Identification PersonAv Known Type of identification Produced DAVID J. WILKIE Notary Public, Michigan County of Washtonaw My Comm, Expires 05/2012024 �— FORM 42 - BIDDER; C'HE(:AWST IMPORTANT: No bid shall he considered unless it is made on unaltered Bid forms which are included in the Bidding Documents. Please read carefully, sign in the spaces indicated and return with your Bid. Bidder Should check off each of the following items as the necessary action is completed: 1. The Bid has been signed. 2, The Bid prices offered have been reviewed. 3. The price extensions and totals have been checked. 4. Bid Schedule has been completed and attached. .5. Any required drawings, descriptive literature, etc. have been included. 6. .Any delivery information required is included. 7. The following on-line standard documents have been reviewed and accepted in BidSync: a. Construction bid instructions form b. Construction services agreement C. Purchase order terms and conditions 8. All of the following bid forms have been completed and signed: a. Bid Form (Form 1) b. Contractors Key Personnel (Form 2) c. Material Manufacturers (Form 3) d. List of Major Subcontractors (Form 4) e. Statement of Experience (Form 5) f. Trench Safety Act (Form 6) g. Bid Bond Form (Form 7) h. Insurance and Bonding Requirements (Form 8) f. Conflict of Interest Affidavit (Form 9) j. Vendor Declaration Statement (Form 10) k. Inmigration Law Affidavit Certification (Form 1 I) MUST be signed and attached with your submittal or you MAY be DEEMED NON -RESPONSIVE 1. Signed Grant Provisions and Assurances package in its entirety, if applicable, are executed and should be included with your submittal. All forms mast be executed, or you MAY be DEEMED NON -RESPONSIVE. 9. Copies of required information have been attached a. Business tax Receipt (Collier County Businesses Only) b. Company's E-Verify profile page or memorandum of understanding c. Certificate of Authority to Conduct Business in State of Florida (sunbiz.org) d. Any required professional licenses — valid and current (myfloridalicense.com) (ie: General Contractors license, Underground Utility and Excavation, Builders, Trade Contractors, etc., as applicable, requested and/or required.) 10. If required, the amount of Bid bond has been checked, and the Bid bond or cashier's check has been submitted. 11. Any addenda have been signed and acknowledgement form attached and included, or you MAY be DEEMED NON -RESPONSIVE. 12. The Bid will be uploaded in time to be received no later than the specified opening date and time, otherwise the Bid cannot be considered. 13. Completed 21-7823 Mininunn Qualifications of Bidders Matrix form and upload with bid, as based on the 21-7823 Mininntm Qualifications of Bidders requirements. Company ID Number: 364382 To be accepted as a participant In E-Verify, you should only sign the Employer's Section of the signature page. If you have any questions, contact E-Verlfy at US-464.421 B. Page 12 ❑[ 13 I F Verify MOU for Employer I Revlslon Cato 0NO= www.dhs.goVlE-Vorify l 1CG�� I Company ID Number: 364882 North American Industry Classification Systems Code: 237 Administrator: Number of Errs la ees; 20 to 99 Number of Sites VVerifled for: Are you verifying for more than 1 site? If yes, please provide the number of sites verified for ill each State: • MiCMAN Site(S) PLORIDA 3 sitc(s) Information relating to the Program Administrator(s) for your' Company Oil policy questions or operational problems; Namv Kelly A Wilkie Telephone Number: (734) 996 - 9500 Fax Number: (734) 996 - 8480 E-mail Address: lnvilitie2DD0®yahoo.com Name: R Suzanne Hawker Telepbmie Numbcn (734) 996 - 9500 Fox Number: (734) 996 - 8480 E-mail Address: rsha►vlcer@YOlme.¢em Page 13 of 131 E-Vadfy MOU for Employer I Ravlsion We Dp1611t}9 vvvvvu.dlls.UovJr--Verify Detail by Entity Name Page 1 of 3 Florida De��ry ier_t of Siate OEpartg e q of Sstc / pivison of Coroorations / Search Re,�or4 / 9,,- 4U _6v Frti y Name / V, -d' http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 1/22/2021 Detail by Entity Name Page 2 of 3 Title PD HIGGINS, DOUGLAS N 3390 TRAVIS POINTE RD., SUITE A ANN ARBOR, MI 48108 Title VP, Executive Secretary, Treasurer WILKIE, KELLY A 3390 TRAVIS POINTE RD SUITE #A ANN ARBOR, MI 48108 Title VP HIGGINS, DANIEL N 3390 TRAVIS POINTE RD. SUITE A ANN ARBOR, MI 48108 Title VP, Secretary Wilkie, David J 3390 TRAVIS POINTE RD. SUITE A ANN ARBOR, MI 48108 Title Vice -President DeLuca, Matthew T 5355 McIntosh Road Suite E Sarasota, FL 34233 Annual Reports Report Year Filed Date 2019 01/07/2019 2020 01/06/2020 2021 01/09/2021 DOCUment Images 01109i2021 -- ANNUAt. REPORT View image in PDI= format g11Q61202_0 -•- nNNUAL REPORT View 1111e0e in PDI= format 01/0772019 -- ANNUAL REPORT View image in PDF format 04/23r2018 -- AMENDED ANNUAL REPORT Vie•,a image in PDF format 011080.018 -- ANNUAL REPORT View image in PDF format 2A1017 -_APnt-LADED ANNUAI..REPOF 1 View image in PDF format D1l �l21i -- ANNUAL REPORT View image in PDF format 011071201.6 -- ANNUAL REPORT Vida imago in PDF format 1 01/07/2015 --ANNUAL REPORT View image in PDF format 011071201A --ANNUAL REPORT Vic:e� image in PDF format 07/01/2013 _AMENDED ANNUAL REPORT View image in PDF forniat http://search.sunbiz.oi,glInquirylCorporationSearchISearchResu ltDetail?inquirytype=Entity... 1 /22/2021 Detail by Entity Name Page 3 of 3 0rlft' t3••ANNUALREPURT 041upl2 •• ANNUAL REPq$-,[ 61f64r2010 •- hNNUAL REPORT Gif2fi1E999 — ANNVAf RIPQRI ANNUAL F' T 911171; 007 -- ANNLIAI, Fjt.VQC 0111712M, •• ANNIJAL REPORT 0111912f)05 -- AMU16LjU MRl r A ••ANNU4L BEfORT Q5f27(' W$ •• Rea. kieiltChltrltrif g111712003 -- ANNUALIT.Et3RT F F Il f11122C.lI8)) -.ANNUAL fiEPOFiT Q1125W..01)(I—ANNUAL REPORT 47�f2.�13.pRo..,,::.f�.�N1,df5>T.i�EL'{IPr 021M R� r;;a11 �ee_„�,.�alvrruh4.� 1 R RT 0112ftH:7fff3 •• ANNVAL REY 011251I 05 —ANNUAL RL POE&I View image in PDF format View imopa in YPf• fvnnnl Vlow imepv m PUF forittal View image lit P[7 (' (gnr117t Vow 1111age In RDF farrn9l View imago in POF formal View imago in PDF formrrL v%w urlaga In Pf]r farmet Nhn Wy finRMOF-Ml at SIAlry i Mpm 7O cm mal— http://sesrch.sunbiz.org/InquirylCorporationSearch/Searchl esultDetail?inquirytype=Entity... I/22/2021 Ron DeSantis, Governor Halsey Beshe2rs, Secretary Florida d. STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION STRY", CONSTRUCTION,,I,N,•DU-- ,.-.:�LICENSING BOARD F THE GENERAL CO�N'TR-A'CT-C�R-:'H�E-.RIEI�'-N':--I-*S-'C�ERT-� ED'UNDER THE PROVISIONS OF 'C--"H-A--PTE.R 4-8:9-,=,-FC0 -,—R,'1QA,-:S.T--,ATUTES -7 ILA 10E'N-'S.E'11NWB,E'R!'1-CG 0189 EXPIRATION DATE: AUGUST 31, 2022 Always verify licenses online at MyFloridaLicense.com Do not alter this document in any form. This is your license. It is unlawful for anyone other than the licensee to use this document. I III COCKIER COUNTY BUSINESS TAX BUSINESS TAX NUMBER: 000464 COLLIER COUNTY TAX COLLECTOR - 2800 N. HORSESHOE DRIVE - NAPLES FLORIDA 34104 - (239) 252.2477 VISIT OUR WEBSITE AT: www,collieitax,com THIS RECEIPT EXPIRES SEPTEMBER 30, 2021 LOCATION: 4485 ENTERPRISE AVE ZONED: INDUSTRIAL LIC 1541 BUSINESS PHONE: 774-3130 STATE OR COUNTY LIC 4: CG C060189 'I-10 EMPLOYEES CLASSIFICATION: 05-GENERAL CONTRACTOR CLASSIFICATION CODE: 05100101 y t LEGAL FORM Corporation I" 1g A r u , l This document is a business tax only. This is not certification that licehiseai' It does not permit the licensee to violate any existing regulatory zoning laws nor does It exempt the licensee from any other taxes or permits that may be DISPLAY AT PLACE OF BUSINESS FOR PUBLIC INSPECTION. FAILURE TO DO SO IS CONTRARY TO LOCAL LAWS, DOUGLAS N. HIGGINS, INC GGINS, DANIEL N i85 ENTERPRISE AVE %PLES,FL 34104 -THIS TAX IS NON -REFUNDABLE - DATE 08/05/2020 AMOUNT 18.00 RECEIPT 50121-00081008 (C State , Florida r -7) </ S I certify from the records of this office that DOUGLAS N. HIGGINS INC. is a Michigan corporation authorized to transact business in the State of Florida, qualified on August 1, 1973. The document number of this corporation is 830666. I further certify that said corporation has paid all fees due this office through December 31, 2020, that its most recent annual report/uniform business report was filed on January 6, 2020, and that its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Givers under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Sixth day of January, 2020 Seaetar;v of State Tracking Number: 6660225520CC To authenticate this certificate,visit the following site,euter this number, and then follow the instructions displayed. https://seivices.suitbiz.org/Ti[iugs/Cei-tificateOfStotus/CertiriicateAutlienticatiou Florida Department of Transportation RON DESANTIS 605 Suwannee Sheet ICE\+IN J. TMAULT, P.F., GO VE, R1NOR Tallahassee, FL 32399-0450 SECRI TART August 19, 2020 DOUGLAS N. HIGGINS, INC. 3390 TRAVIS POINTE ROAD ANN ARBOR, MICHIGAN 48108 RE: CERTIFICATE OF QUALIFICATION Dear Sir/Madam: The Department of Transportation has qualified your company for the type of work indicated below. Unless your company is notified otherwise, this Certificate of Qualification will expire 9/30/2.021. However, the new application is due 7/31/2021. In accordance with S.337.14 (1) F.S. your next application must he filed within (4) months of the ending date of the applicant's audited annual financial statements. If your company's maximum capacity has been revised, you can access it by logging into the Contractor Prequalification Application System via the following link: HTTPS://fdotvipl.dot.state.fl.us/ContractorPreQualification/ Once logged in, select "View" for the most recently approved application, and then click the "Manage" and "Application Summary" tabs. FDOT APPROVED WORK CLASSES: DRAINAGE, GRADING, MINOR BRIDGES, R&R MINOR BRIDGES, UNDERGROUND UTILITIES, WATER MAINS, FORCE MAINS, PUMP STATIONS. You may apply for a Revised Certificate of Qualification at any time prior to the expiration date of this certificate according to Section 14-22.0041(3), Florida Administrative Code (F.A.C.), by accessing your most recently approved application as shown above and choosing "Update" instead of "View." If certification in additional. classes of work is desired, documentation is needed to show that your company has done such work with your own forces and equipment or that experience was gained with another contractor and that you have the necessary equipment for each additional class of work requested. All prequalified contractors are required by Section 14-22.006(3), F.A.C., to certify their work underway monthly in order to adjust maximum bidding capacity to available bidding capacity. You can find the link to this report at the website shown above. AA:cg Sincerely, ,cQ z�it,, for Alan Autry, Manager Contracts Administration Office www.fdot.gov EXHIBIT A-3: CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT Name Ken Fritz Personnel CateooN Construction Superintendent Michael Lobello Project Manager 14 Construction Services Agreement: Revised 12-28-20 (0) CA() EXHIBIT B-1: PUBLIC PAYMENT BOND ITB# 21=7823 Bond No. 356CSAQ4398 Contract No. ITB# 21-7823 KNOW ALL MEN BY THESE PRESENTS: That Douglas N Higgins Inc as Principal, and Hartford Accident and Indemnity Company as Surety, located at One Hartford Plaza Hartford CT 0 1rri (Business Address) are held and firmly bound to a oar o oun omm as oners as Obligee in the SUM Of Twelve million' Hundred Thirty Sevan Thousand Nine Hundred Dollars ($ 12 337,900,00 ) for the paymenf whereo we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered Into a contract dated as of the day of 20 with Obligee for 1108th and 109th Avenues Pu is t tides Renewal In Collier County, Florida accordance wl h drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to herein as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.05(2), In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. 8th IN WITNESS WHEREOF, the above parties have executed this instrument this day of February 2021 , the name of each party being affixed and these presents duly signed by its under,,signed representative, pursuant to authority of its governing body. 11 Construction Services Agreement: Revised 12-28-20 (va) CAO Signed, se d and delivered in the pres a of: PRINCIPAL Douglas N. Higgins, Inc. BY: l l�lk Cu Witn� as to Principal NAME: Kel A. it cie ITS: Vice -President STATE OF Michigan COUNTY OF Washtenaw The foregoing Instrument was acknowledged before me by means of � physical presence or ❑ online notarization, this 8th day of February 2021 by Kelly A. Wilkie as Vice -President of uouglas N. Higgins, Inc. a Michigan corporation, on behalf of the corporation. He/she is personally known to me OR has produced personally known �� as identification and did (did not) take an My Commission Expires:05/20/2024 DAVID J. W ILKIG Notary Public, Michigan County of Washtenaw My Comm. Expires 0512012024 (AFFIX OFFICIAL SEAL) ATTEST: Notary Public) NAME: David J. Wilkie (Legibly Printed) Notary Public, State of Michigan Commission No.: N/%+ SURETY: Hartford Accident and Indemnity Company (Printed Name) One Hartford Plaza Hartford, CT 06115 (Business Address (Authorized Signature) Witnesses to Surety (Printed Name) 1z Construction Services Agreement: Revised 12-28-20 (v8) CAU m A._ . APr.�11te As Attorney in Fact (Attach Power of Attorney) Kristie A Pudvan Attorney -in -Fact (Printed Name) FL Non -Resident License No. W523460 Ty 24 Frank Lloyd Wright Dr.. Suite J4100 A n Arbor- r AHIU5 (Business Address) 734-662-1154 (Telephone Number) STATE OF MicJ)jgan COUNTY OF O kla� nd acting in Washtenaw The foregoing Instrument was acknowledged before me by means of (� physical presence or ❑ online notarization, this 8th day of B brunrg 20 21 , by Kri¢tie A Pudvan as Attorney -in -Fact of Hartford Accident and indemn;t; Con , a Connecticut corporation, on behalf of the corporation. He/she Is personally known to me OR has produced personally known as identification and did (did not take an oath. , My Commission Expires: 5/22/2021 (Sign lure of f N Notary Public) (AFFIX OFFICIAL SEAL) LISA M WILMOT Notary Public • Michigan Oakland County My Commission Expires May 2 22 , 021 , i Acting in the County of Name: Lisa M Wilmot (Legibly Printed) Notary Public, State of: Michigan , Commission No.: N/A 13 Conslrucflon Services Agreement: Revised 12-28-20 (v8) CAO EXHIBIT B-2: PUBLIC PERFORMANCE BOND ITB# 21-7823 KNOW ALL MEN BY THESE PRESENTS: That as Principal, and as Bond No. 35BCSAQ4398 Contract No. 21-7823 Douglas N. Higgins, Inc. a or Accident anindemnity Company Surety, located at The Board of County Commissioners of Collier County Florida Twelve Million Three Hundred Thirty Seven Thousand Nine Hundred Dollars a ($ 12.33zsoo.00 _) for the payment whereof we bond ourselves, our heirs, executors, personal representatives, successors and assigns, Jointly and severally. WHEREAS, Principal has entered Into a contract dated as of the day of 20 1 with Obligee for 108th and 109th Avenues Public Utilities Renewal Project ITB No. 21-7823 In accordance with drawings and specifications, which contract is Incorporated by reference and made a part hereof, and is referred to herein as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract; and 2. Pays Obligee any and all losses, damages, costs and attorneys' fees that Obligee sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, Incurred by Obligee; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise It remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contractor other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alterations or additions to the terms of the Contract or to work or to the specifications. This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Obligee for more than the penal sum of this Performance Bond regardless of the number of suits that may be filed by Obligee. IN WITNESS WHEREOF, the above parties have executed this instrument this ath day of February 2021 , the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. 14 Constmclion Services Agreement: Revised 12-28-20 (v8) G\ Signed, seale and delivered in the nceBFin of: Witnesses as to Principal STATE OF Michigan COUNTY OF Washtenaw PRINCIPAL Douglas N. Higgins, Inc. BY: hei a NAME: Kelly A. Wilkie ITS: Vice -President The foregoing Instrument was acknowledged before me by means of ®physical presence or ❑ online notarization, this ath day of February 20 21 by Kelly A. Wilkie , as Vice -President of Douglas N. Higgins, Inc. a Michigan corporation, on behalf of the corporation. He/she is personally known to me OR has produced personally known as identification and did (did not) take an oath. My Commission Expires: os/zo/zoza bAVID J. WILKIE Notary Public, Michigan County of Washtenaw My Comm. Expires 05/20/2024 (AFFIX OFFICIAL SEAL) Name: David J. Wilkie (Legibly Printed) Notary Public, State of: Michigan Commission No.: N/A 16 Canstrucllon Services Agreement: Revised 12-28-20 (v8) r,�,1 Witnesses as to Sureiy SURETY: Hartford Accident and Indemnity Company (Printed Name) One Hartford Plaza Hartford CT 06115 (Business Address) (Authorized Signature) (Printed Name) As Att rney in Fact (Attach Power of Attorney) i 1WItnesses (Printed Name) r 60 o100 Ann Arbor M1 4141n'; Address) 734-662-1154 (Telephone Number) STATE OF Michigan COUNTY OF Oakland amino in Mirhi.,an The foregoing instrument was acknowledged before me by means of t�physical presence or ❑ online notarization, this day of February 6 ?1 , by Krictir A Pndw n , as Attorney -in -Fact A Hartford Accidea Connecticut corporation, on behalf of the corporation- He/she is personally known to me OR has produced personaUy known as identification and did (did not) take an oath, My Commission Expires: 5/22/2021 qj net re of Notary Public) Lisa M. Wilmot (Legibly Printed) 'FIX OFFICIAL SEAL) Notary Public, State of: Michiean Commission No.: N/A LISA M WILMOT Notary Public - Michigan Oakland County 1s My Commission Expire; y1a 2 2021 Construction Services Agreement: Revised 12-28-20 (v8) fCA 1 Acting In the County OILS- Direct Inquiries/Claims to: THE HARTFORD BOND, TA2 �OWER OF ATTORNEY HartfOne ord, ConnecPlaza ticut 06165 Dond.Cleima®thahertford.com ca0:888.2663988 orlex:860.757.5835 KNOW ALL PERSONS By THESE PRESENTS THAT: Agency Name: HYLANT GROUP INC/ANN ARBOR Agency Code: 35-350851 Hertford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut Hartford Casually Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, uplotheamountof Unlimited : Susan E. Hurd, Vicki S. Duncan, Terri Mahakian, Monica M. Mills, Kristie A. Pudvan, Joel E. Speckman, Lisa M. Wilmot of ANN ARBOR, Michigan their true and lawful Attorneys) -in -Fact, each in their separate capaclly If more than one is named above, to sign Its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written Instruments In the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted In any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and Its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by aan�y' mechanically applied signatures applied to this Power of Attorney. p V John Gray, Assistant Secretary M. Ross Fisher, Senior Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he Is the Senior Vice President of the Companies, the corporations described In and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. �Ila1laa t�a:,rltRna a-T }Vla.�-nan.tk R Kathlccn T.Maynard NotaryPublic CERTIFICATE My Conn ssion Expires July 31, 2021 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which Is still In full force effective as of Signed and sealed at the City of Hartford. ntya ywwr, , ,virsq� ou O mo : � �`� a e:.e tioer rwq t,; ca.w 197°�8s �'t�a T✓°fSjr z 79T9 Keviin Heckman, Assistant Vice President ronxote Hartford Accident and Indemnity Company 5445 Corporate Drive Suite 300 Troy, MI 48098 February 9, 2021 Collier County Procurement Services Division 3295 Tamiami Trail East Building C2 Naples, FL 34112 RE: Douglas N. Higgins, Inc. Project: 108'h and 1090' Avenues Public Utilities Renewal Project ITB #21-7823 Bond 435BCSAQ4398 Hartford Accident and Indemnity Company approves the request for the Owner Collier County to date the Payment Bond and Performance Bond forms for the captioned on the same date as the contract approval date. Please contact me at (248) 822-6451 or mark.mulville�u,thehartford.com if you have any questions. Sincerely, Mark J. Mulville, CPCU Executive Underwriter Hartford Accident and Indemnity Company EXHIBIT B-3: INSURANCE REQUIREMENTS The Contractor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in EXHIBIT B of this solicitation. The Contractor shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Contractor waive against each other and the County's separate Contractors, Design Consultant, Subcontractors, agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Contractor and County shall, where appropriate, require similar waivers of subrogation from the County's separate Contractors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County", or, the specific solicitation number/contract number and title. The General Liability Policy provided by Contractor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Contractor under this solicitation and shall contain a severability of interests provisions. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. The amounts and types of insurance coverage shall conform to the minimum requirements set forth in EXHIBIT B with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Contractor has any self -insured retentions or deductibles under any of the below listed minimum required coverage, Contractor must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self -insured retentions or deductibles will be Contractor's sole responsibility. Coverage(s) shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer. The Contractor and/or its insurance carrier shall provide thirty (30) days written notice to the County of policy cancellation or non -renewal on the part of the insurance carrier or the Contractor. The Contractor shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non -renewal or material change in coverage or limits received by Contractor from its insurer and nothing contained herein shall relieve Contractor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Contractor hereunder, Contractor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. Should at any time the Contractor not maintain the insurance coverage(s) required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage(s) and charge the Contractor for such coverage(s) purchased. If Contractor fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due 17 Construction Services Agreement: Revised 12-28-20 (v8) ,cX € Contractor under this Agreement or any other agreement between the County and Contractor. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverage(s) purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverage(s) shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Contractor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Contractor to provide the County with such renewal certificate(s) shall be considered justification for the County to terminate any and all contracts. 18 Construction Services Agreement: Revised 12-28-20 (v8) Collier County Florida Insurance and Bonding Requirements Insurance / Bond Type Required Limits 1. ❑ Worker's Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and Requirements Evidence of Workers' Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption. An application for exemption can be obtained online at https://apps.fldfs.com/bocexempt/ 2. ❑ Employer's Liability $ single limit per occurrence 3. ❑ Commercial General Bodily Injury and Property Damage Liability (Occurrence Form) patterned after the current $ single limit per occurrence, $2,000,000 aggregate for Bodily Injury ISO form Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. 4. ❑ Indemnification To the maximum extent permitted by Florida law, the ContractorNendor/Consultant shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the ContractorNendor/Consultant or anyone employed or utilized by the ContractorNendor/Consultant in the performance of this Agreement. 5. ❑ Automobile Liability $ " Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included 6. ❑ Other insurance as ❑ Watercraft $ Per Occurrence noted: ❑ United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. $ _ Per Occurrence ❑ Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ Per Occurrence ❑ Pollution $ Per Occurrence ❑ Professional Liability $ Per claim & in the aggregate • $1,000,000 per claim and in the aggregate • $2,000,000 per claim and in the aggregate ❑ Project Professional Liability $ Per Occurrence ❑ Valuable Papers Insurance $ Per Occurrence 19 Construction Services Agreement: Revised 12-28-20 (v8) ip. ' .k.. J ❑ Cyber Liability $ Per Occurrence ❑ Technology Errors & Omissions $ Per Occurrence 7. ❑ Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers' check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 8. ❑ Performance and For projects in excess of $200,000, bonds shall be submitted with the executed Payment Bonds contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as "A-" or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders' surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New York 10038. 9. ❑ Consultant shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Consultant shall provide County with certificates of insurance meeting the required insurance provisions. 10. ❑ Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Contractor's policy shall be endorsed accordingly. 11. ❑ The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. 12. ❑ Thirty (30) Days Cancellation Notice required. Contractor/Consultant's Insurance Statement We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. Name of Firm Signature Print Name Insurance Agency Agent Name Date Telephone Number 20 Construction Services Agreement: Revised 12-28-20 (v8) ,CAS EXHIBIT C: RELEASE AND AFFIDAVIT FORM COUNTY OF (COLLIER) STATE OF (FLORIDA) Before me, the undersigned authority, personally appeared being duly sworn, deposes and says: after (1) In accordance with the Contract Documents and in consideration of $ to be received, ("Contractor") releases and waives for itself and it's subcontractors, material - men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated 120 for the period from to . This partial waiver and release is conditioned upon payment of the consideration described above. It is not effective until said payment is received in paid funds. (2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, shall be fully satisfied and paid upon Owner's payment to Contractor. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No. Witness Witness STATE OF COUNTY OF CONTRACTOR BY: ITS: DATE: President [Corporate Seal] The foregoing instrument was acknowledged before me by means of ❑ physical presence or ❑ online notarization, this day of 1 20 by I as on behalf of the My Commission Expires: (AFFIX OFFICIAL SEAL) of corporation , a corporation, He/she is personally known to me OR has produced as identification and did (did not) take an oath. (Signature of Notary Public) NAME: (Legibly Printed) Notary Public, State of Commissioner No.: Construction Services Agreement: Revised 12-28-20 (v8) Cry O EXHIBIT D FORM OF CONTRACT APPLICATION FOR PAYMENT Collier County Board of County Commissioners the OWNER or Collier County Water -Sewer Owner's Project Manager's Name: Bid No. Project No. Count 's Division Name Purchase Order No. Submitted by Contractor Representative: Name Application Date: Contractor's Name & Address: Payment Application No. Original Contract Time: Original Contract Price: $ Revised Contract Time: Total Change Orders to Date: $ Revised Contract Amount: $ Total Value of Work Completed & Stored to Date: $ Retainage @5% through Insert Date $ Retainage @ 5% through [Insert date $ Retainage @ % after Insert date $ Less Retainage $ Total Earned Less Retainage $ Less previous payment(s Percent Work Completed to Date: % AMOUNT DUE THIS APPLICATION: $ Percent Contract Time Com leted to Date: % Liquidated Damages to Be Accrued $ Remaining Contract Balance $ ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; and (4) CONTRACTOR has only included amounts in this Application for Payment properly due and owing and CONTRACTOR has not included within the above referenced amount any claims for unauthorized or changed Work that has not been properly approved by Owner in writing and in advance of such Work. Contractor's Name Contractor's Si nature: Date: Type Title: Shall be signed by an authorized representative of the Contractor. Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by:._ Design Professional's Name: i nature: Date: Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by: Owner's Project Manager Name: Signature: I I Date: 22 Construction Services Agreement: Revised 12-28-20 (v8) i %�— EXHIBIT D (Continued) SCHEDULE OF VALUES Project Name: Project Numhar; Date: Parlod To; ITEM Numam DESCRIPTION SCHEDULED VALLAP WORK COMPLETED STORM MATERIALS TOTAL COMP &STORED TO DATE PERCENT COMPLETE BALANCE TOPINISH 0% RITNNAM _9h RETAINAGE TOTAL RETAINAGE WITHHELD PREvIouSAPPLICATIONS THIS PERIOD THRUDATE I SINCEDATE TOTALS * Explanation for the two columns under Previous Appllcatlons: The Thru Rate N where yatl will place all Informatlon until the contract Is complete unless a release or reduction of retalnage Issue comes Into play. If this happens, all Information up to the date of the %change In retalnage is placed in the Thru Rate column. Information after that date Is placed In the Since Datecojumn. This states what has happened since the change in retalnage. 23 Construalon Servlcas Agreement: Revised 12-28-20 (v8) 0 Exhibit D (Continued) Stored Materials Record Formula: A+B-C-D=E A B C D E Balance Invoice Previously Received Previously Installed To Date Description Supplier Number Received This Period Installed This Period Install 24 Construction Services Agreement: Revised 12-28-20 (v8) A, EXHIBIT E: CHANGE ORDER An electronic data entry form may be found at: http://bccspO1 /SiteDirectory/ASD/Purchasing/Forms 1 /Forms/DefauIt.aspx Change Order Form Contract#: Change Purchase Order#: I I Project#:�� Contractoffimt Name: Project Manager Name — Project Name: �— —� Department: F— —� Original Cc, ntr 9cVvV ark. a..dar Amount Crigiral BCC Ap¢rcval Date; Agenda Item Current BCC ARCrov>=d Anxunt Last BCC Approval Daie; Agenda Item* CurrentCentrsct,'Oi ork Order Amcunt SAP Contract Expiration Date_(hisste_r) Dollar Amcuntoithis Change I ADMVI Tots IChangefromOrigineIAmcunt RevisedCcritrsct'War':Order Totsl 1 5 0.0o atlJ?7! ChsngeframCurrent BCC Appfc ed Amount Cumula6o-CIts n _s $ 0.0011 ODIWOI I Ch ang sfrcmCtarentAmcunt Completion Date, Description of the Tasks) Change, and Rationale for the Change Notice to Proc" Original Last Approved Revised Date Date Completion Dat Date li+ slxacnanga, #of Days Added L J 5electTasks ❑, Add newtask(s) 0 Deletetask(s) ❑',Changetask(s) ❑', Other Ise--r Provide a response to the following:1.) detailed and specific explanationfrationale of the requested change(s) to the task(s) and f or the additional day s added tif requestedl; 2.) why this change was not included in the original co ntra'r-t; and, 3.) describe the impact if this channe is not processed, ftta h adaitToral informaton iron the bes€a,n FYois't rai araYor C�rtractarrf rt. Prepared by: Date: (FYoje:4 }�1ara=;=_r Name and DeF=arimer:,t) _ Ac epianceof this Charge Order shall conailt0aamonif atr+rtocortract workoro:ridartdrsiatovear,jvrill terLbjz.3toalithesame term sard'condrlUnsasaontaired3n1hsa>ontrcl,L.orkOJL_rSn�Yat at✓SYe,ass fulfyssdth-samedere513le!€rthis acceplar"')e,The a €i"e5tnl ni.i sny, to S lip Contract 0511conElimts a fill and final settlernarl of any and all Claims oft he Contraclaf#VS0,0 fConsUharV Design Professional arisingoutoforre-lat_stothechangesetforlhh rein,ir.FlUdinYaclaimsiorimp'-lar, d=_tayCosis. Accepted by: Dale: (Conlractor B Vsr�for i Corsuhant ! Das 4gn Processional a mi Nam_ cd Firm, ii prejectapplicab1s) Approved by: Data: {DesTgr` Prefes=_Tanalan=d Nsme of Firm, d proj=r„1 applicatri=_; Approved by: Date: (F`rovuremant Proiessk�t�! 25 Construction Services Agreement; Revised 12-28-20 (v8) 'CArf OWNER'S Project No. PROJECT: CONTRACTOR: Contract For Contract Date EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION Design Professional's Project No. This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To OWNER And To Substantial Completion is the state in the progress of the Work when the Work (or designated portion) is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN PROFESSIONAL, and that Work is hereby declared to be substantially complete in accordance with the requirements of the Contract Documents on: DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within days of the above date of Substantial Completion. The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties shall be as follows: 26 Construction Services Agreement: Revised 12-28-20 (v8�{� RESPONSIMLITIE& CONTRACTOR The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the Contract Documents. Exeouted by Design Professional on By: Design Professional Type Name and Title 20 CONTRACTOR accepts this Certificate of Substantial Completion on , 20 By: CONTRACTOR Type Name and Title OWNER accepts this Certificate of Substantial Completion on 120 By: OWNER Type Name and Title 27 Construction Services Agreement: Revised 12-28.2 EXHIBIT G: FINAL PAYMENT CHECKLIST Bid No.: Project No.: -- PO No.: Date: Contractor: The following items have been secured by the for the Project known as and have been reviewed and found to comply with the requirements of the Contract Documents. Original Contract Amount: Final Contract Amount: Commencement Date: Substantial Completion Time as set forth in the Agreement:Calendar Days, Actual Date of Substantial Completion: Final Completion Time as set forth in the Agreement: Calendar Days. Actual Final Completion Date: YES NO 1. All Punch List items completed on 2. Warranties and Guarantees assigned to Owner (attach to this form). 3. Effective date of General one-year warranty from Contractor is: 4. 2 copies of Operation and Maintenance manuals for equipment and system submitted (list manuals in attachment to this form), 5. As -Built drawings obtained and dated, 6. Owner personnel trained on system and equipment operation. 7. Certificate of occupancy No.: issued on (attach to this form)- 8. Certificate of Substantial Completion issued on 9. Final Payment Application and Affidavits received from Contractor on: 10. Consent of Surety received on _ 11. Operating Department personnel notified Project is in operating phase, 12. All Spare Farts or Special Tools provided to Owner. 13. Finished Floor Elevation Certificate provided to Owner: 14, Other: If any of the above is not applicable, indicate by NIA. Acknowledgments: By Contractor: By Design Professional By owner: NO is checked for any of the above, attach explanation. mpany Name) (Signature) (Typed Name & Title) (Firm Name) (Signature) (Typed Name & Title) (Department Name) (Signature) (Name & Title) 28 Construction Servims Agreement• Reuised 12-28.20 CAO EXHIBIT H. GENERAL TERMS AND CONDITIONS 1. INTENT OF CONTRACT DOCUMENTS. 1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein. 1.2 If before or during the performance of the Work Contractor discovers a conflict, error or discrepancy in the Contract Documents, Contractor immediately shall report same to the Project Manager in writing and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification from the Project Manager; said interpretation or clarification from the Project Manager may require Contractor to consult directly with Design Professional or some other third party, as directed by Project Manager. Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing any portion of the Work. 1.3 Drawings are intended to show general arrangements, design and extent of Work and are not intended to serve as shop drawings. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the drawings, specifications or other Contract Document provisions, Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon the Contractor, as determined by the Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the Contract Documents. 2. INVESTIGATION AND UTILITIES. 2A Subject to Section 2.3 below, Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work and the general and local conditions, and particularly, but without limitation, with respect to the following: those affecting transportation, access, disposal, handling and storage of materials; availability and quality of labor; water and electric power; availability and condition of roads; work area; living facilities; climatic conditions and seasons; physical conditions at the work -site and the project area as a whole; topography and ground surface conditions; nature and quantity of the surface materials to be encountered; subsurface conditions; equipment and facilities needed preliminary to and during performance of the Work; and all other costs associated with such performance. the failure of Contractor to acquaint itself with any applicable conditions shall not relieve Contractor from any of its responsibilities to perform under the Contract Documents, nor shall it be considered the basis for any claim for additional time or compensation. 2s Constructlon Services Agreement: Revised 12-28-20 (0) CAU 2.2 Contractor shall locate all existing roadways, railways, drainage facilities and utility services above, upon, or under the Project site, said roadways, railways, drainage facilities and utilities being referred to in this Sub -Section 2.2 as the "Utilities". Contractor shall contact the owners of all Utilities to determine the necessity for relocating or temporarily interrupting any Utilities during the construction of the Project. Contractor shall schedule and coordinate its Work around any such relocation or temporary service interruption. Contractor shall be responsible for properly shoring, supporting and protecting all Utilities at all times during the course of the Work. The Contractor is responsible for coordinating all other utility work so as to not interfere with the prosecution of the Work (except those utilities to be coordinated by the Owner as may be expressly described elsewhere in the Contract Documents). 23 Notwithstanding anything in the Contract Documents to the contrary, if conditions are encountered at the Project site which are (i) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (ii) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, and which reasonably should not have been discovered by Contractor as part of its scope of site investigative services required pursuant to the terms of the Contract Documents, then Contractor shall provide Owner with prompt written notice thereof before conditions are disturbed and in no event later than three (3) calendar days after first observance of such conditions. Owner and Design Professional shall promptly investigate such conditions and, if they differ materially and cause an increase or decrease in Contractor's cost of, or time required for, performance of any part of the Work, Owner will acknowledge and agree to an equitable adjustment to Contractor's compensation or time for performance, or both, for such Work. If Owner determines that the conditions at the site are not materially different from those indicated in the Contract Documents or not of an unusual nature or should have been discovered by Contractor as part of its investigative services, and that no change in the terms of the Agreement is justified, Owner shall so notify Contractor in writing, stating its reasons. Claims by Contractor in opposition to such determination by Owner must be made within seven (7) calendar days after Contractor's receipt of Owner's written determination notice. If Owner and Contractor cannot agree on an adjustment to Contractor's cost or time of performance, the dispute resolution procedure set forth in the Contract Documents shall be complied with by the parties. 3. SCHEDULE. 3,1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award, shall prepare and submit to Project Manager, for their review and approval, a progress schedule for the Project (herein "Progress Schedule"). The Progress Schedule shall relate to all Work required by the Contract Documents, and shall utilize the Critical Path method of scheduling and shall provide for expeditious and practicable execution of the Work within the Contract Time. The Progress Schedule shall indicate the dates for starting and completing the various stages of the Work. 3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly updates to the Progress Schedule shall be subject to the Project Manager's review and approval. Contractor shall submit the updates to the Progress Schedule with its monthly Applications for Payment noted below. The Project Manager's review and approval of the submitted Progress Schedule updates shall be a condition precedent to the Owner's obligation to pay Contractor. 3.3 All work under this Agreement shall be performed in accordance with the requirements of all Collier County Noise Ordinances then in effect. Unless otherwise specified, work will generally be 30 Constructlon ServiCps Agreemenl Revised 12-28-20 (4) 1r limited to the hours of 7 a.m. to 7 p.m., Monday through Saturday. No work shall be performed outside the specified hours without the prior approval of the Project Manager, 4. PROGRESS PAYMENTS. 4.1 prior to submitting its first monthly Application for Payment, Contractor shall submit to Project Manager, for their review and approval, a schedule of values based upon the Contract Price, listing the major elements of the Work and the dollar value for each element. After its approval by the Project Manager, this schedule of values shall be used as the basis for the Contractor's monthly Applications for Payment. This schedule shall be updated and submitted each month along with a completed copy of the Application for Payment form signed by the Contractor's authorized representative and attached to the Agreement as Exhibit-Q. 4.2 Prior to submitting its first monthly Application for Payment, Contractor shall provide to the Project Manager the list of its Subcontractors and materialmen submitted with its Bid showing the work and materials involved and the dollar amount of each subcontract and purchase order. Contractor acknowledges and agrees that any modifications to the list of Subcontractors submitted with Contractor's Bid and any subsequently identified Subcontractors are subject to Owner's prior written approval. The first Application for Payment shall be submitted no earlier than thirty (30) days after the Commencement pate. Notwithstanding anything herein to the contrary, if approved by Owner in its sole discretion, Contractor may submit its invoice for any required Payment and Performance Bonds prior to the first Application of Payment provided that Contractor has furnished Owner certified copies of the receipts evidencing the premium paid by Contractor for the bonds. 4.3 Unless expressly approved by Owner in advance and in writing, said approval at Owner's sole discretion, Owner is not required to make any payment for materials or equipment that have not been incorporated into the Project. If payment is requested on the basis of materials and equipment not incorporated into the Project, but delivered and suitably stored at the site or at another location, and such payment and storage have been agreed to by Owner in writing, the Application for Payment also shall be accompanied by a bill of sale, invoice or other documentation warranting that the Owner has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, together with evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect Owner's interest therein, all of which shall be subject to the Owner's satisfaction. Thereafter, with each Application for Payment, Contractor also shall complete and submit to Owner as part of its Application for Payment, the Stored Materials Record attached hereto and made a part hereof as Exhibit D. 4.4 Contractor shall submit its monthly Application for Payment to the Project Manager or his or her designee, as directed by Owner (which designee may include the Design Professional). After the date of each Application for Payment is stamped as received and within the timeframes set forth in Section 218.735 F.S., the Project Manager, or Design Professional, shall either: (1) Indicate its approval of the requested payment; (2) indicate its approval of only a portion of the requested payment, stating in writing its reasons therefore; or (3) return the Application for Payment to the Contractor indicating, in writing, the reason for refusing to approve payment. Payments of proper invoices in the amounts approved shall be processed and paid in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Procurement Services Division and the Clerk of Court's Finance Department respectively. 4,5 In the event of a total denial by Owner and return of the Application for Payment by the Project Manager, the Contractor may make the necessary corrections and re -submit the Application for Payment. The Owner shall, within ten (10) business days after the Application for Payment is 31 Constructlon Services Agreement: Revlsed 12-28-20 (0) fi:1 stamped and received and after Project Manager approval of an Application for Payment, pay the Contractor the amounts so approved_ 4.6 Owner shall withhold retainage on the gross amount of each monthly progress payment in the amount of five percent (5%), as permitted by Section 255.078, Florida Statutes. The foregoing does not prohibit Owner from withholding retainage at a rate less than five percent (5%) of each monthly progress payment as otherwise allowable under Section 255,078, Florida Statutes. Any reduction in retainage below the m6ximum amount set forth in Section 255.078, Florida Statutes, shall be at the sole discretion of the Owner. Such retainage shall be accumulated and not released to Contractor until final payment is due unless otherwise agreed to by the Owner in accordance with Florida Statute 255.078. Any interest earned on retainage shall accrue to the benefit of the Owner. 4.7 Monthly payments to Contractor shall in no way imply approval or acceptance of Contractor's Work. 4.8 Each Application for Payment, subsequent to the first pay application, shall be accompanied by a Release and Affidavit, in the form attached as Exhibit C. acknowledging Contractor's receipt of payment in full for all materials, labor, equipment and other bills that are then due and payable by Owner with respect to the current Application for Payment. Further, to the extent directed by Owner and in Owner's sole discretion, Contractor shall also submit a Release and Affidavit from each Subcontractor, sub -subcontractor, or supplier in the form attached as Exhibit C acknowledging that each Subcontractor, sub -subcontractor or supplier has been paid in full through the previous month's Application for Payment. The Owner shall not be required to make payment until and unless these affidavits are furnished by Contractor. 4.9 Contractor agrees and understands that funding limitations exist and that the expenditure of funds must be spread over the duration of the Project at regular intervals based on the Contract Amount and Progress Schedule. Accordingly, prior to submitting its first monthly Application for Payment, Contractor shall prepare and submit for Project Manager's review and approval, a detailed Project Funding Schedule, which shall be updated as necessary and approved by Owner to reflect approved adjustments to the Contract Amount and Contract Time. No voluntary acceleration or early completion of the Work shall modify the time of payments to Contractor as set forth in the approved Project Funding Schedule. 4.10 Notwithstanding anything in the Contract Documents to the contrary, Contractor acknowledges and agrees that in the event of a dispute concerning payments for Work performed under this Agreement, Contractor shall continue to perform the Work required of it under this Agreement pending resolution of the dispute provided that Owner continues to pay Contractor all amounts that Owner does not dispute are due and payable. 4.11 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non- payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement_ 4.12 The County may, at its discretion, use VISA/MASTER card credit network as a payment vehicle for goods and/or services purchased as a part of this contract, The County may not accept any additional surcharges (credit card transaction fees) as a result of using the County's credit card for transactions relating to this solicitation 32 Constructlon Services Agreemer)L Revised 12-28-20 (0) 5. PAYMENTS WITHHELD. 5.1 The Project Manager may decline to approve any Application for Payment, or portions thereof, because of subsequently discovered evidence or subsequent inspections that reveal non- compliance with the Contract Documents, The Project Manager may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) Defective Work not remedied; (b) third party claims filed or reasonable evidence indicating probable filing of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents by Contractor, 5.2 If any conditions described in 5.1. are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Provided however, in the event of an emergency, Owner shall not be required to provide Contractor any written notice prior to rectifying the situation at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or non -liquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 5.3 In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off -set the amount owed to the County by applying the amount owed to the vendor or contractor for services performed of for materials delivered in association with a contract. 6.1 Owner shall make final payment to Contractor in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Procurement Services Division and the Clerk of Court's Finance Department after the Work is finally inspected and accepted by Project Manager as set forth with Section 20.1 herein, provided that Contractor first, and as an explicit condition precedent to the accrual of Contractor's right to final payment, shall have furnished Owner with a properly executed and notarized copy of the Release and Affidavit attached as Exhibit C, as well as, a duly executed copy of the Surety's consent to final payment and such other documentation that may be required by the Contract Documents and the Owner. Prior to release of final payment and final retainage, the Contractor's Representative and the Project Manager shall jointly complete the Final Payment Checklist, a representative copy of which is attached to this Agreement as Exhibit G. 6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and all claims by Contractor against Owner arising out of this Agreement or otherwise relating to the Project, except those previously made in writing in accordance with the requirements of the Contract Documents and identified by Contractor as unsettled in its final Application for Payment. Neither the acceptance of the Work nor payment by Owner shall be deemed to be a waiver of Owner's right to enforce any obligations of Contractor hereunder or to the recovery of damages for defective Work not discovered by the Design Professional or Project Manager at the time of final inspection. 33 Construction Services Agreement: Revised 12-28-20 (0) 7. SUBMITTALS AND SUBSTITUTIONS. 7.1 Contractor shall carefully examine the Contract Documents for all requirements for approval of materials to be submitted such as shop drawings, data, test results, schedules and samples. Contractor shall submit all such materials at its own expense and in such form as required by the Contract Documents in sufficient time to prevent any delay in the delivery of such materials and the installation thereof. 7.2 Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier, the naming of the item is intended to establish the type, function and quality required, Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other suppliers may be accepted by Owner if sufficient information is submitted by Contractor to allow the Owner to determine that the material or equipment proposed is equivalent or equal to that named. Requests for review of substitute items of material and equipment will not be accepted by Owner from anyone other than Contractor and all such requests must be submitted by Contractor to Project Manager within thirty (30) calendar days after Notice of Award is received by Contractor, unless otherwise mutually agreed in writing by Owner and Contractor, 7.3 If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor shall make application to the Project Manager for acceptance thereof, certifying that the proposed substitute shall adequately perform the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that specified. The application shall state that the evaluation and acceptance of the proposed substitute will not prejudice Contractor's achievement of substantial completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with Owner for the Project) to adapt the design to the proposed substitute and whether or not incorporation or use by the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service shall be indicated. The application also shall contain an itemized estimate of all costs that will result directly or indirectly from acceptance of such substitute, including costs for redesign and claims of other contractors affected by the resulting change, all of which shall be considered by the Project Manager in evaluating the proposed substitute. The Project Manager may require Contractor to furnish at Contractor's expense additional data about the proposed substitute, 7.4 If a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, sequence, technique or procedure of construction acceptable to the Project Manager, if Contractor submits sufficient information to allow the Project Manager to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents. The procedures for submission to and review by the Project Manager shall be the same as those provided herein for substitute materials and equipment. 7.5 The Project Manager shall be allowed a reasonable time within which to evaluate each proposed substitute and, if need be, to consult with the Design Professional. No substitute will be ordered, installed or utilized without the Project Manager's prior written acceptance which shall be evidenced by a Change Order, a Work Directive Change, a Field Order or an approved Shop Drawing. The Owner may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute, The Project Manager will 34 Construction Services Agreement: Revised 12-28.20 (0) r` record time required by the Project Manager and the Project Manager's consultants in evaluating substitutions proposed) by Contractor and making changes in the Contract Documents occasioned thereby. Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse Owner for the charges of the Design Professional and the Design Professional's consultants for evaluating each proposed substitute. a. DAILY REPORTS, SIGNE❑ AND SEALED AS-BUILTS AND MEETINGS. 8.1 Unless waived in writing by Owner, Contractor shall complete and submit to Project Manager on a weekly basis a daily log of the Contractor's work for the preceding week in a format approved by the Project Manager. The daily log shall document all activities of Contractor at the Project site including, but not limited to, the following, 8.1.1 Weather conditions showing the high and low temperatures during work hours, the amount of precipitation received on the Project site, and any other weather conditions which adversely affect the Work; 8.1.2 Soil conditions which adversely affect the Work; 8.1.3 The hours of operation by Contractor's and Sub -Contractor's personnel; 8.1.4 The number of Contractor's and Sub -Contractor's personnel present and working at the Project site, by subcontract and trade; 8.1.5 All equipment present at the Project site, description of equipment use and designation of time equipment was used (specifically indicating any down time); 8.1.6 Description of Work being performed at the Project site; 8.1.7 Any unusual or special occurrences at the Project site; 8.1.8 Materials received at the Project site; 8.1.9 A list of all visitors to the Project 8.1.10 Any problems that might impact either the cost or quality of the Work or the time of performance. The daily log shall not constitute nor take the place of any notice required to be given by Contractor to Owner pursuant to the Contract Documents. 8.2 Contractor shall maintain in a safe place at the Project site one record copy of the Contract Documents, including, but not limited to, all drawings, specifications, addenda, amendments, Change Orders, Work Directive Changes and Field Orders, as well as all written interpretations and clarifications issued by the Design Professional, in good order and annotated to show all changes made during construction. The annotated drawings shall be continuously updated by the Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Work directive Changes and Field Orders, and all concealed and buried installations of piping, conduit and utility services. All buried and concealed items, both inside and outside the Project site, shall be accurately located on the annotated drawings as to depth and in relationship to not less than two (2) permanent features 35 Constructlon services Agreement; Revised 12-28.20 (0) [ (e.g. interior or exterior wall faces). The annotated drawings shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in a contrasting color. The "As -Built" record documents, together with all approved samples and a counterpart of all approved shop drawings shall be available to the Project Manager or Design Professional for reference. Upon completion of the Work and as a condition precedent to Contractor's entitlement to final payment, these "As -Built" record documents, samples and shop drawings shall be delivered to Project Manager by Contractor for Owner, 8.3 Contractor shall keep all records and supporting documentation, which concern or relate to the Work hereunder for a minimum of five (5) years from the date of termination of this Agreement or the date the Project is completed or such longer period as may be required by law, whichever is later, pursuant to Florida Public Records Law Chapter 119 and comply with specifically those contractual requirements in 119.0701(2)(a)-(b) as follows: IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: Communication and Customer Relations Division 3299 Tamiami Trail East, Suite 102 Naples, Fl_ 34112-5746 Telephone: (239) 252.8999 Email: PublicRecordRe nest colliercount fi. ov The Contractor must specifically comply with the Florida Public Records Law to: 1. Keep and maintain public records required by the public agency to perform the service, 2. Upon request from the public agency's custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the public agency. 4. Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the Contractor or keep and maintain public records required by the public agency to perform the service. If the Contractor transfers all public records to the public agency upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency's custodian of public records, in a format that is compatible with the information technology systems of the public agency. 36 Constructlan Services Agreement: Revised 12-28.20 (v8) �t 9. CONTRACT TIME AND TIME EXTENSIONS. 9.1 Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and material -men, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures, as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's suppliers and contractors as set forth in Paragraph 12.2. herein. 9.2 Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. 9.3 No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of its duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage For Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 9.4 In no event shall any approval by Owner authorizing Contractor to continue performing Work under this Agreement or any payment issued by Owner to Contractor be deemed a waiver of any right or claim Owner may have against Contractor for delay damages hereunder, 10, CHANGES IN THE WORK. 10.1 Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any alleged changes must be approved by Owner in writing prior to starting such items. Owner will not be responsible for the costs of any changes commenced without Owner's express prior written approval. Failure to obtain such prior written approval for any changes will be deemed: (i) a waiver of any claim by Contractor for such items and (h) an admission by Contractor that such items are in fact not a change but rather are part of the Work required of Contractor hereunder. 10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the requested changes. Contractor shall promptly perform changes authorized by duly executed Change 37 Construction Services Agreement: Revised 12-28-20 (0) C�117 Orders, The Contract Amount and Contract Time shall be adjusted in the Change Order in the manner as Owner and Contractor shall mutually agree. 10.3 If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive, In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 11 of these General Conditions or else be deemed to have waived any claim on this matter it might otherwise have had. 10.4 In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10%) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all Subcontractors' and sub -subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5%) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15%). All compensation due Contractor and any Subcontractor or sub -subcontractor for field and home office overhead is included in the markups noted above. No markup shall be placed on sales tax, shipping or subcontractor markup. 10.5 Owner shall have the right to conduct an audit of Contractor's books and records to verify the accuracy of the Contractor's claim with respect to Contractor's costs associated with any Change Order or Work Directive Change. 10.6 The Project Manager shall have authority to order minor changes in the Work not involving an adjustment to the Contract Amount or an extension to the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes may be effected by Field Order or by other written order. Such changes shall be binding on the Contractor. 10.7 Any modifications to this Contract shall be in compliance with the County procurement ordinance and policies and Administrative Procedures in effect at the time such modifications are authorized. 11. CLAIMS AND DISPUTES. 11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time or other relief with respect to the terms of the Contract Documents. The term "Claim" also includes other disputes and matters in question between Owner and Contractor arising out of or relating to the Contract Documents. The responsibility to substantiate a Claim shall rest with the party making the Claim. 11.2 Claims by the Contractor shall be made in writing to the Project Manager within forty-eight (48) hours from when the Contractor knew or should have known of the event giving rise to such Claim or else the Contractor shall be deemed to have waived the Claim. Written supporting data shall be submitted to the Project Manager within fifteen (15) calendar days after the occurrence of the event, unless the Owner grants additional time in writing, or else the Contractor shall be deemed to have waived the Claim. All Claims shall be priced in accordance with the provisions of Subsection 10.4. Cons4ruction ServicesAgreomenl; Revised 12-26-20 (v8) 11.3 The Contractor shall proceed diligently with its performance as directed by the Owner, regardless of any pending Claim, action, suit or administrative proceeding, unless otherwise agreed to by the Owner in writing. Owner shall continue to make payments in accordance with the Contract Documents during the pendency of any Claim. 12.1 Owner may perform other work related to the Project at the site by Owner's own forces, have other work performed by utility owners or let other direct contracts. If the fact that such other work is to be performed is not noted in the Contract Documents, written notice thereof will be given to Contractor prior to starting any such other work. If Contractor believes that such performance will involve additional expense to Contractor or require additional time, Contractor shall send written notice of that fact to Owner and Design Professional within forty-eight (48) hours of being notified of the other work. If the Contractor fails to send the above required forty-eight (48) hour notice, the Contractor will be deemed to have waived any rights it otherwise may have had to seek an extension to the Contract Time or adjustment to the Contract Amount. 12.2 Contractor shall afford each utility owner and other contractor who is a party to such a direct contract (or Owner, if Owner is performing the additional work with Owner's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work and shall properly connect and coordinate its Work with theirs. Contractor shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of the Project Manager and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other Contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.3 If any part of Contractor's Work depends for proper execution or results upon the work of any other contractor or utility owner (or Owner), Contractor shall inspect and promptly report to Project Manager in writing any delays, defects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. Contractor's failure to report will constitute an acceptance of the other work as fit and proper for integration with Contractor's Work. 13. INDEMNIFICATION AND INSURANCE. 13.1 To the maximum extent permitted by Florida law, the Contractor shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement, 13.2 The duty to defend under this Article 13 is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, Owner and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to Contractor. Contractor's obligation to indemnify and defend under this Article 13 will survive the expiration or earlier termination of this ,agreement until it is determined by final judgment that an action against the Owner or an indemnified 39 Construction Services Agreement: Revised 12-28-20 (0) CA� party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 13.3 Contractor shall obtain and carry, at all times during its performance under the Contract Documents, Insurance of the types and in the amounts set forth in the Insurance and Bonding Requirements form Exhibit B-$ to the Agreement. Further, the Contractor shall at all times comply with all of the terms, conditions, requirements and obligations set forth under Exhibit B-3. 14. COMPLIANCE WITH LAWS. 14.1 Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, worker's compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Project Manager in writing. To the extent any law, rule, regulation, code, statute, or ordinance requires the inclusion of certain terms in this Agreement in order for this Agreement to be enforceable, such terms shall be deemed included in this Agreement. Notwithstanding anything in the Contract Documents to the contrary, it is understood and agreed that in the event of a change in any applicable laws, ordinances, rules or regulations subsequent to the date this Agreement was executed that increases the Contractor's time or cost of performance of the Work, Contractor is entitled to a Change Order for such increases, except to the extent Contractor knew or should have known of such changes prior to the date of this Agreement. 14.2 By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U,S.C. 1324, et seg. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 14.3 Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States, including the requirements set forth in Florida Statute, §448.095, The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland Security (DH5) in partnership with the Social Security Administration (SSA), provides an Internet - based means of verifying employment eligibility of workers in the United States, it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: Commodity based procurement where no services are provided. + Where the requirement for the affidavit is waived by the Board of County Commissioners Contractors I Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Contractor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Contractors are also required to provide the Collier County Procurement Services Division an executed affidavit certifying 40 Construction Services Agreement Revised 12-26.20 (v8) � � they shall comply with the E,Verify Program_ The affidavit is attached to the solicitation documents. If the Bidder/Contractor does not comply with providing both the acceptable E-Verif evidence and the executed affidavit the bidder's ! Contractor's Proposal may be deemed non- responsive. Additionally, Contractors shall require all subcontracted Contractors to use the E-Verify system for all purchases not covered under the "Exceptions to the program" clause above. For additional information regarding the Employment Eligibility Verification System (E-Verify) program visit the following website; http://www.dhs.poy/E-Verify. It shall be the Contractor's responsibility to familiarize themselves with all rules and regulations governing this program, Contractor acknowledges, and without exception or stipulation, any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq.. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. 15. CLEANUP AND PROTECTIONS. 15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner_ 15.2 Any existing surface or subsurface improvements, including, but not limited to, pavements, curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery, not indicated in the Contract Documents to be removed or altered, shall be protected by Contractor from damage during the prosecution of the Work. Subject to the Section 2.3 above, any such improvements so damaged shall be restored by Contractor to the condition equal to that existing at the time of Contractor's commencement of the Work. 16. ASSIGNMENT. 16.1 Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. Any attempt to assign or otherwise transfer this Agreement, or any part herein, without the Owner's consent, shall be void. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 17. PERMITS, LICENSES AND TAXES. 17.1 Pursuant to Section 218.80, F.S., Owner will pay for all Collier County permits and fees, including license fees, permit fees, impact fees or inspection fees applicable to the Work through an internal budget transfer(s), Contractor is not responsible for paying for permits issued by Collier County, but Contractor is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier County agencies when the 41 Construction Servlws Agreement: Revised 12-28-20 (v8) Contractor is acquiring permits. Owner will not be obligated to pay for any permits obtained by Subcontractors. 17.2 All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. 17.3 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 18. TERMINATION FOR DEFAULT. 18.1 Contractor shall be considered in material default of the Agreement and such default shall be considered cause for Owner to terminate the Agreement, in whole or in part, as further set forth in this Section, if Contractor: (1) fails to begin the Work under the Contract Documents within the time specified herein; or (2) fails to properly and timely perform the Work as directed by the Project Manager or as provided for in the approved Progress Schedule; or (3) performs the Work unsuitably or neglects or refuses to remove materials or to correct or replace such Work as may be rejected as unacceptable or unsuitable; ❑r (4) discontinues the prosecution of the Work; or (5) fails to resume Work which has been suspended within a reasonable time after being notified to do so; or (6) becomes insolvent or is declared bankrupt, or commits any act of bankruptcy: or (7) allows any final judgment to stand against it unsatisfied for more than ten (10) days; or (8) makes an assignment for the benefit of creditors; or (9) fails to obey any applicable codes, laws, ordinances, rules or regulations with respect to the Work; or (10) materially breaches any other provision of the Contract Documents. 18.2 Owner shall notify Contractor in writing of Contractor's default(s). If Owner determines that Contractor has not remedied and cured the default(s) within seven (7) calendar days following receipt by Contractor of said written notice or such longer period of time as may be consented to by Owner in writing and in its sole discretion, then Owner, at its option, without releasing or waiving its rights and remedies against the Contractors sureties and without prejudice to any other right or remedy it may be entitled to hereunder or by law, may terminate Contractor's right to proceed under the Agreement, in whole or in part, and take possession of all or any portion of the Work and any materials, tools, equipment, and appliances of Contractor, take assignments of any of Contractor's subcontracts and purchase orders, and complete all or any portion of Contractor's Work by whatever means, method or agency which Owner, in its sole discretion, may choose. 18.3 If Owner deems any of the foregoing remedies necessary, Contractor agrees that it shall not be entitled to receive any further payments hereunder until after the Project is completed. All moneys expended and all of the costs, losses, damages and extra expenses, including all management, administrative and other overhead and other direct and indirect expenses (including Design Professional and attorneys' fees) or damages incurred by Owner incident to such completion, shall be deducted from the Contract Amount, and if such expenditures exceed the unpaid balance of the Contract Amount, Contractor agrees to pay promptly to Owner on demand the full amount of such excess, including costs of collection, attorneys' fees (including appeals) and interest thereon at the maximum legal rate of interest until paid. If the unpaid balance of the Contract Amount exceeds all such costs, expenditures and damages incurred by the Owner to complete the Work, such excess shall be paid to the Contractor. The amount to be paid to the Contractor or Owner, as the case may be, shall be approved by the Project Manager, upon application, and this obligation for payment shall survive termination of the Agreement. 42 Construction Services Agreement', Revised 12-28-20 (v8) 18.4 The liability of Contractor hereunder shall extend to and include the full amount of any and all sums paid, expenses and losses incurred, damages sustained, and obligations assumed by Owner in good faith under the belief that such payments or assumptions were necessary or required, in completing the Work and providing labor, materials, equipment, supplies, and other items therefore or re -letting the Work, and in settlement, discharge or compromise of any claims, demands, suits, and judgments pertaining to or arising out of the Work hereunder. 18.5 If, after notice of termination of Contractor's right to proceed pursuant to this Section, it is determined for any reason that Contractor was not in default, or that its default was excusable, or that Owner is not entitled to the remedies against Contractor provided herein, then the termination will be deemed a termination for convenience and Contractor's remedies against Owner shall be the same as and limited to those afforded Contractor under Section 19 below. 18.6 In the event (i) Owner fails to make any undisputed payment to Contractor within thirty (30) days after such payment is due or Owner otherwise persistently fails to fulfill some material obligation owed by Owner to Contractor under this Agreement, and (ii) Owner has failed to cure such default within fourteen (14) days of receiving written notice of same from Contractor, then Contractor may stop its performance under this Agreement until such default is cured, after giving Owner a second fourteen (14) days written notice of Contractor's intention to stop performance under the Agreement. If the Work is so stopped for a period of one hundred and twenty (120) consecutive days through no act or fault of the Contractor or its Subcontractors or their agents or employees or any other persons performing portions of the Work under contract with the Contractor or any Subcontractor, the Contractor may terminate this Agreement by giving written notice to Owner of Contractor's intent to terminate this Agreement. If Owner does not cure its default within fourteen (14) days after receipt of Contractor's written notice, Contractor may, upon fourteen (14) additional days' written notice to the Owner, terminate the Agreement and recover from the Owner payment for Work performed through the termination date, but in no event shall Contractor be entitled to payment for Work not performed or any other damages from Owner. 19. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION. 19.1 Owner shall have the right to terminate this Agreement without cause upon seven (7) calendar days written notice to Contractor. In the event of such termination for convenience, Contractor's recovery against Owner shall be limited to that portion of the Contract Amount earned through the date of termination, together with any retainage withheld and reasonable termination expenses incurred, but Contractor shall not be entitled to any other or further recovery against Owner, including, but not limited to, damages or any anticipated profit on portions of the Work not performed. 19.2 Owner shall have the right to suspend all or any portions of the Work upon giving Contractor not less than two (2) calendar days' prior written notice of such suspension. If all or any portion of the Work is so suspended, Contractor's sole and exclusive remedy shall be to seek an extension of time to its schedule in accordance with the procedures set forth in the Contract Documents. In no event shall the Contractor be entitled to any additional compensation or damages. Provided, however, if the ordered suspension exceeds six (6) months, the Contractor shall have the right to terminate the Agreement with respect to that portion of the Work which is subject to the ordered suspension. 20. COMPLETION. 43 Construction Services Agreement: Revised 12-28-20 (v8) cJk0 20.1 When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Project Manager in writing that the entire Work (or such designated portion) is substantially complete. Within a reasonable time thereafter, Owner, Contractor and Design Professional shall make an inspection of the Work (or designated portion thereof) to determine the status of completion, if Owner, after conferring with the Design Professional, does not consider the Work (or designated portion) substantially complete, Project Manager shall notify Contractor in writing giving the reasons therefore. If Owner, after conferring with the Design Professional, considers the Work (or designated portion) substantially complete, Project Manager shall prepare and deliver to Contractor a Certificate of Substantial Completion which shall fix the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punch -list of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portion thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punch -list. The Project Manager, shall coordinate with the Contractor the return of any surplus assets, including materials, supplies, and equipment. 20.2 Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Project Manager and Design Professional will make such inspection and, if they find the Work acceptable and fully performed under the Contract Documents shall promptly approve payment, recommending that, on the basis of their observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Neither the final payment nor the retainage shall become due and payable until Contractor submits: (1) Receipt of Contractor's Final Application for Payment, (2) The Release and Affidavit in the form attached as Exhibit C. (3) Consent of surety to final payment. (4) Receipt of the final payment check list. (5) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipts, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the Work's acceptability, even though the Design professional may have issued its recommendations. Unless and until the Owner is completely satisfied, neither the final payment nor the retainage shall become due and payable. 21. WARRANTY. 21,1 Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any subcontractor or material men supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after Substantial Completion, any Work is found to be defective or not in conformance with the Contract Documents, 44 Construction services Agresmeni: Revised 12-28-20 (VB) CCA Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. Further, in the event of an emergency, Owner may commence to correct any defective Work, without prior notice to Contractor, at Contractor's expense. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 21.2 No later than 30 days prior to expiration of the warranty, the Project Manager, or another representative of the Owner, shall conduct an inspection of the warranted work to verify compliance with the requirements of the Agreement. The Contractor's Representative shall be present at the time of inspection and shall take remedial actions to correct any deficiencies noted in the inspection. Failure of the Contractor to correct the cited deficiencies shall be grounds for the Owner to disqualify the Contractor from future bid opportunities with the Owner, in addition to any other rights and remedies available to Owner. 22. TESTS AND INSPECTIONS. 22.1 Owner, Design Professional, their respective representatives, agents and employees, and governmental agencies with jurisdiction over the Project shall have access at all times to the Work, whether the Work is being performed on or off of the Project site, for their observation, inspection and testing. Contractor shall provide proper, safe conditions for such access. Contractor shall provide Project Manager with timely notice of readiness of the Work for all required inspections, tests or approvals. 22,2 If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish Project Manager the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Project Manager, 22.3 Contractor is responsible, without reimbursement from Owner, for re -inspection fees and costs; to the extent such re -inspections are due to the fault or neglect of Contractor. 22A If any Work that is to be inspected, tested or approved is covered without written concurrence from the Project Manager, such worm must, if requested by Project Manager, be uncovered for observation, Such uncovering shall be at Contractor's expense unless Contractor has given Project Manager timely notice of Contractor's intention to cover the same and Project Manager has not acted with reasonable promptness to respond to such notice. If any Work is covered contrary to written directions from Project Manager, such Work must, if requested by Project Manager, be uncovered for Project Manager's observation and be replaced at Contractor's sole expense. 22.5 The Owner shall charge to Contractor and may deduct from any payments due Contractor all engineering and inspection expenses incurred by Owner in connection with any overtime work. Such overtime work consisting of any work during the construction period beyond the regular eight (8) hour day and for any work performed on Saturday, Sunday or holidays. 22.6 Neither observations nor other actions by the Project Manager or Design Professional nor inspections, tests or approvals by others shall relieve Contractor from Contractor's obligations to perform the Work in accordance with the Contract Documents. 45 Construction Services Agreement: Revised 12-28-20 (W3)x---., C.V.)) 23. DEFECTIVE WORK. 23.1 Work not conforming to the requirements of the Contract Documents or any warranties made or assigned by Contractor to Owner shall be deemed defective Work, If required by Project Manager, Contractor shall as directed, either correct all defective Work, whether or not fabricated, installed or completed, or if the defective Work has been rejected by Project Manager, remove it from the site and replace It with non -defective Work. Contractor shall bear all direct, indirect and consequential costs of such correction or removal (including, but not limited to fees and charges of engineers, architects, attorneys and other professionals) made necessary thereby, and shall hold Owner harmless for same. 23.2 If the Project Manager considers it necessary or advisable that covered Work be observed by Design Professional or inspected or tested by others and such Work is not otherwise required to be inspected or tested, Contractor, at Project Manager's request, shall uncover, expose or otherwise make available for observation, inspection or tests as Project Manager may require, that portion of the Work in question, furnishing all necessary labor, material and equipment, If it is found that such Work is defective, Contractor shall bear all direct, indirect and consequential costs of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction (including, but not limited to, fees and charges of engineers, architects, attorneys and other professionals), and Owner shall be entitled to an appropriate decrease in the Contract Amount. If, however, such Work is not found to be defective, Contractor shall be allowed an increase in the Contract Amount andlor an extension to the Contract Time, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction. 23.3 If any portion of the Work is defective, or if Contractor fails to supply sufficient skilled workers, suitable materials or equipment or fails to finish or perform the Work in such a way that the completed Work will conform to the Contract Documents, Project Manager may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated. The right of Project Manager to stop the Work shall be exercised, if at all, solely for Owner's benefit and nothing herein shall be construed as obligating the Project Manager to exercise this right for the benefit of Design Engineer, Contractor, or any other person. 214 Should the Owner determine, at its sole opinion, it is in the Owner's best interest to accept defective Work, the Owner may do so. Contractor shall bear all direct, indirect and consequential costs attributable to the Owner's evaluation of and determination to accept defective Work. If such determination is rendered prior to final payment, a Change Order shall be executed evidencing such acceptance of such defective Work, incorporating the necessary revisions in the Contract Documents and reflecting an appropriate decrease in the Contract Amount. If the Owner accepts such defective Work after final payment, Contractor shall promptly pay Owner an appropriate amount to adequately compensate Owner for its acceptance of the defective Work. 23,5 If Contractor fails, within a reasonable time after the written notice from Project Manager, to correct defective Work or to remove and replace rejected defective Work as required by Project Manager or Owner, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any of the provisions of the Contract Documents, Owner may, after seven (7) days written notice to Contractor, correct and remedy any such deficiency. Provided, however, Owner shall not be required to give notice to Contractor in the event of an emergency. To the extent necessary to complete corrective and remedial action, Owner may exclude Contractor from any or all of the Project site, take possession of all or any part of the Work, and suspend Contractor's services related thereto, take possession of Contractor's tools, appliances, construction equipment and machinery at the Project site and incorporate in the Work all materials 46 Construction Services Agreement: Revised 12-28-20 (A) ,1-At and equipment stored at the Project site or for which Owner has paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Design Professional and their respective representatives, agents, and employees such access to the project site as may be necessary to enable Owner to exercise the rights and remedies under this paragraph. All direct, indirect and consequential costs of Owner in exercising such rights and remedies shall be charged against Contractor, and a Change Order shall be issued, incorporating the necessary revisions to the Contract Documents, including an appropriate decrease to the Contract Amount. Such direct, indirect and consequential costs shall include, but not be limited to, fees and charges of engineers, architects, attorneys and other professionals, all court costs and all costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of Contractor's defective Work. Contractor shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by Owner of Owner's rights and remedies hereunder. 24. SUPERVISION AND SUPERINTENDENTS. 24.1 Contractor shall plan, organize, supervise, schedule, monitor, direct and control the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents, Contractor shall be responsible to see that the finished Work complies accurately with the Contract Documents. Contractor shall keep on the Work at all times during its progress a competent resident superintendent, who shall be subject to Owner's approval and not be replaced without prior written notice to Project Manager except under extraordinary circumstances. The superintendent shall be employed by the Contractor and be the Contractor's representative at the Project site and shall have authority to act on behalf of Contractor. All communications given to the superintendent shall be as binding as if given to the Contractor. Owner shall have the right to direct Contractor to remove and replace its Project superintendent, with or without cause. Attached to the Agreement as Exhibit A-1 is a list identifying Contractor's Project Superintendent and all of Contractor's key personnel who are assigned to the Project; such identified personnel shall not be removed without Owner's prior written approval, and if so removed must be immediately replaced with a person acceptable to Owner. 24.2 Contractor shall have a competent superintendent on the project at all times whenever contractor's work crews, or work crews of other parties authorized by the Project Manager are engaged in any activity whatsoever associated with the Project, Should the Contractor fail to comply with the above condition, the Project Manager shall, at his discretion, deduct from the Contractor's monthly pay estimate, sufficient moneys to account for the Owner's loss of adequate project supervision, not as a penalty, but as liquidated damages, separate from the liquidated damages described in Section 5.8, for services not rendered. 25. PROTECTION OF WORK. 25.1 Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. if Contractor or any one for whom Contractor is lega4ly liable for is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any moneys necessary to replace such loss or damage shall be deducted from any amounts due Contractor. 25.2 Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 47 Construction Services Agreement: Revised 12-28-20 (0) DIV 25.3 Contractor shall not disturb any benchmark established by the Owner or design Professional with respect to the Project, If Contractor, or its subcontractors, agents or anyone for whom Contractor is legally liable, disturbs the Owner or Design Professional's benchmarks, Contractor shall immediately notify Project Manager and Design Professional. The Owner or Design Professional shall re-establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 26. EMERGENCIES. 26.1 In the event of an emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner or Design Professional is obligated to act to prevent threatened damage, Injury or loss. Contractor shall give Project Manager written notice within forty-eight (48) hours after Contractor knew or should have known of the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Project Manager determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty-eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 27. USE OF PREMISES. 27.1 Contractor shall maintain all construction equipment, the storage of materials and equipment and the operations of workers to the Project site and land and areas identified in and permitted by the Contract Documents and other lands and areas permitted by law, rights of way, permits and easements, and small not unreasonably encumber the Project site with construction equipment or other material or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or any land or areas contiguous thereto, resulting from the performance of the Work. 28. SAFETY. 28.1 Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 28.1.1 All employees on or about the project site and other persons and/or organizations who may be affected thereby; 28.1.2 Ali the Work and materials and equipment to be incorporated therein, whether in storage on or off the Project site; and 28.1.3 Other property on Project site or adjacent thereto, including trees, shrubs, walks, pavements, roadways, structures, utilities and any underground structures or improvements not designated for removal, relocation or replacement in the Contract Documents. 28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and regulations of any public body having jurisdiction for the safety of persons or property or to protect them from 48 Construction Services Agreement: Revised 12-28-20 (A) G-A damage, injury or loss. Contractor shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of underground structures and improvements and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation or replacement of their property. Contractor's duties and responsibilities for the safety and protection of the Work shall continue until such time as the Work is completed and final acceptance of same by Owner has occurred. All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 28.3. Contractor shall designate a responsible representative located on a full time basis at the Project site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to Owner. 28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner property. All employees of Contractor, as well as those of all subcontractors and those of any other person or entity for whom Contractor is legally liable (collectively referred to herein as "Employees"), shall not possess or be under the influence of any such substances while on any Owner property. Further, Employees shall not bring on to any Owner property any gun, rifle or other firearm, or explosives of any kind. 28.5 Contractor acknowledges that the Work may be progressing on a Project site which is located upon or adjacent to an existing Owner facility, In such event, Contractor shall comply with the following: 28.5.1 All Owner facilities are smoke free. Smoking is strictly prohibited; 28.5.2 All Employees shall be provided an identification badge by Contractor. Such identification badge must be prominently displayed on the outside of the Employees' clothing at all times. All Employees working at the Project site must log in and out with the Contractor each day; 28.5.3 Contractor shall strictly limit its operations to the designated work areas and shall not permit any Employees to enter any other portions of Owner's property without Owner's expressed prior written consent; 28.5.4 All Employees are prohibited from distributing any papers or other materials upon Owner's property, and are strictly prohibited from using any of Owner's telephones or other office equipment; 28.5.5 All Employees shall at all times comply with the OSHA regulations with respect to dress and conduct at the Project site. Further, all Employees shall comply with the dress, conduct and facility regulations issued by Owner's officials onsite, as said regulations may be changed from time to time; 28.5.6 All Employees shall enter and leave Owner's facilities only through the ingress and egress points identified in the site utilization plan approved by Owner or as otherwise designated, from time to time, by Owner in writing; 49 Construction Services Agreement: Revised 12-28-20 (YG) � 28.5.7 When requested, Contractor shall cooperate with any ongoing Owner investigation involving personal injury, economic loss or damage to Owner's facilities or personal property therein; 28.5.8 The Employees may not solicit, distribute or sell products while on Owner's property. Friends, family members or other visitors of the Employees are not permitted on Owner's property; and 28.5.9 At all times, Contractor shall adhere to Owner's safety and security regulations, and shall comply with all security requirements at Owner's facilities, as said regulations and requirements may be modified or changed by Owner from time to time, 29. PROJECT MEETINGS. Prior to the commencement of Work, the Contractor shall attend a pre -construction conference with the Project Manager, Design Professional and others as appropriate to discuss the Progress Schedule, procedures for handling shop drawings and other submittals, and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. During the prosecution of the Work, the Contractor shall attend any and all meetings convened by the Project Manager with respect to the Project, when directed to do so by Project Manager or Design Professional, The Contractor shall have its subcontractors and suppliers attend all such meetings (including the pre -construction conference) as may be directed by the Project Manager- 30, VENDOR PERFORMANCE EVALUATION. Owner has implemented a Vendor Performance Evaluation System for all contracts awarded in excess of $25,000. To this end, vendors will be evaluated on their performance upon completion/termination of this Agreement. 31, MAINTENANCE OF TRAFFIC POLICY. For all projects that are conducted within a Collier County Right -of -Way, the Contractor shall provide and erect Traffic Control Devices as prescribed in the current edition of the Manual On Uniform Traffic Control Devices (MUTCD), where applicable on local roadways and as prescribed in the Florida Department of Transportation's Design Standards (DS), where applicable on state roadways. These projects shall also comply with Collier County's Maintenance of Traffic Policy, #5807, incorporated herein by reference. Copies are available through Risk Management and/or Procurement Services division, and is available on-line at coiliergov,net/purchasing. The Contractor will be responsible for obtaining copies of all required manuals, MUTCD, FDOT Roadway & Traffic Design Standards Indexes, or other related documents, so to become familiar with their requirements. Strict adherence to the requirements of the Maintenance of Traffic ("MOT") policy will be enforced under this Contract. All costs associated with the Maintenance of Traffic shall be included on the line item on the bid page. If MOT is required, MOT is to be provided within ten (10) days of receipt of Notice of Award. 32. SALES TAX SAVINGS AND DIRECT PURCHASE. 32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work, No markup shall 50 Construction Services Agreement: Revised 12,28-20 (v$) 1�.1r be applied to sales tax. Additionally, as directed by Owner and at no additional cost to Owner, Contractor shall comply with and fully implement the sales tax savings program with respect to the Work, as set forth in section 32.2 below: 32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from sales tax and may wish to generate sales tax savings for the Project, Owner reserves the right to make direct purchases of various construction materials and equipment included in the Work ("Direct Purchase"). Contractor shall prepare purchase orders to vendors selected by Contractor, for execution by Owner, on forms provided by Owner. Contractor shall allow two weeks for execution of all such purchase orders by Owner. Contractor represents and warrants that it will use its best efforts to cooperate with Owner in implementing this sales tax savings program in order to maximize cost savings for the Project. Adjustments to the Contract Amount will be made by appropriate Change Orders for the amounts of each Owner Direct Purchase, plus the saved sales taxes. A Change Order shall be processed promptly after each Direct Purchase, or group of similar or related Direct Purchases, unless otherwise mutually agreed upon between Owner and Contractor. With respect to all Direct Purchases by Owner, Contractor shall remain responsible for coordinating, ordering, inspecting, accepting delivery, storing, handling, installing, warranting and quality control for all Direct Purchases. Notwithstanding anything herein to the contrary, Contractor expressly acknowledges and agrees that all Direct Purchases shall be included within and covered by Contractor's warranty to Owner to the same extent as all other warranties provided by Contractor pursuant to the terms of the Contract Documents. In the event Owner makes a demand against Contractor with respect to any Direct Purchase and Contractor wishes to make claim against the manufacturer or supplier of such Direct Purchase, upon request from Contractor Owner shall assign to Contractor any and all warranties and Contract rights Owner may have from any manufacturer or supplier of any such Direct Purchase by Owner. 32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for sale tax under Chapter 212, Florida Statutes, and for its responsibilities for Federal excise taxes. 33. SUBCONTRACTS. 33.1 Contractor shall review the design and shall determine how it desires to divide the sequence of construction activities. Contractor will determine the breakdown and composition of bid packages for award of subcontracts, based on the current Project Milestone Schedule, and shall supply a copy of that breakdown and composition to Owner and Design Professional for their review and approval prior to submitting its first Application for Payment. Contractor shall take into consideration such factors as natural and practical lines of severability, sequencing effectiveness, access and availability constraints, total time for completion, construction market conditions, availability of labor and materials, community relations and any other factors pertinent to saving time and costs. 33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying or providing any portion of the Work pursuant to a contract with Contractor. Contractor shall be solely responsible for and have control over the Subcontractors. Contractor shall negotiate all Change Orders, Work Directive Changes, Field Orders and Requests for Proposal, with all affected Subcontractors and shall review the costs of those proposals and advise Owner and Design Professional of their validity and reasonableness, acting in Owner's best interest, prior to requesting approval of any Change Order from Owner. All Subcontractors performing any portion of the Work on this Project must be "qualified" as defined in Collier County Ordinance 2013-69, meaning a person or entity that has the capability in all respects to perform fully the Agreement requirements with respect to its portion of the Work and has the integrity and reliability to assure good faith performance. 51 Construction Services Agreement: Revised 12-28-20 (v8) 0 333 In addition to those Subcontractors identified in Contractor's bid that were approved by Owner, Contractor also shall identify any other Subcontractors, including their addresses, licensing information and phone numbers, it intends to utilize for the Project prior to entering into any subcontract or purchase order and prior to the Subcontractor commencing any work on the Project. The list identifying each Subcontractor cannot be modified, changed, or amended) without prior written approval from Owner, Any and all Subcontractor work to be self -performed by Contractor must be approved in writing by Owner in its sole discretion prior to commencement of such work. Contractor shall continuously update that Subcontractor list, so that it remains current and accurate throughout the entire performance of the Work. 33.4 Contractor shall not enter into a subcontract or purchase order with any Subcontractor, if Owner reasonably objects to that Subcontractor. Contractor shall not be required to contract with anyone it reasonably objects to. Contractor shall keep on file a copy of the license for every Subcontractor and sub -subcontractor performing any portion of the Work, as well as maintain a log of all such licenses. All subcontracts and purchase orders between Contractor and its Subcontractors shall be in writing and are subject to Owner's approval. Further, unless expressly waived in writing by Owner, all subcontracts and purchase orders shall (1) require each Subcontractor to be bound to Contractor to the same extent Contractor is bound to Owner by the terms of the Contract Documents, as those terms may apply to the portion of the Work to be performed by the Subcontractor, (2) provide for the assignment of the subcontract or purchase order from Contractor to Owner at the election of Owner upon termination of Contractor, (3) provide that Owner will be an additional indemnified party of the subcontract or purchase order, (4) provide that Owner, Collier County Government, will be an additional insured on all liability insurance policies required to be provided by the Subcontractor except workman's compensation and business automobile policies, (5) assign all warranties directly to Owner, and (6) identify Owner as an intended third -party beneficiary of the subcontract or purchase order. Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract, copies of the Contract Documents to which the Subcontractor will be bound. Each Subcontractor shall similarly make copies of such documents available to its sub - subcontractors. 33.5 Each Subcontractor performing work at the Project Site must agree to provide field (on -site) supervision through a named superintendent for each trade (e.g., general concrete forming and placement, masonry, mechanical, plumbing, electrical and roofing) included in its subcontract or purchase order. In addition, the Subcontractor shall assign and name a qualified employee for scheduling direction for its portion of the Work. The supervisory employees of the Subcontractor (including field superintendent, foreman and schedulers at all levels) must have been employed in a supervisory (leadership) capacity of substantially equivalent level on a similar project for at least two years within the last five years. The Subcontractor shall include a resume of experience for each employee identified by it to supervise and schedule its work. 33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and purchase orders shall provide, 33.6.1 That the Subcontractor's exclusive remedy for delays in the performance of the subcontract or purchase order caused by events beyond its control, including delays claimed to be caused by Owner or Design Professional or attributable to Owner or Design Professional and including claims based on breach of contract or negligence, shall be an extension of its contract time. 33.6.2 1n the event of a change in the work, the Subcontractor's claim for adjustments in the contract sum are limited exclusively to its actual costs for such changes plus no more than 10% for overhead and profit. 52 Canstructlan Services Agreement Revised 12-28-20 (0) CAQ 33.6.3 The subcontract or purchase order, as applicable, shall require the Subcontractor to expressly agree that the foregoing constitute its sole and exclusive remedies for delays and changes in the Work and thus eliminate any other remedies for claim for increase in the contract price, damages, losses or additional compensation. Further, Contractor shall require all Subcontractors to similarly incorporate the terms of this Section 33.6 into their sub -subcontracts and purchase orders. 33.6.4 Each subcontract and purchase order shall require that any claims by Subcontractor for delay or additional cost must be submitted to Contractor within the time and in the manner in which Contractor must submit such claims to Owner, and that failure to comply with such conditions for giving notice and submitting claims shall result in the waiver of such claims. 34. CONSTRUCTION SERVICES. 34.1 Contractor shall maintain at the Project site, originals or copies of, on a current basis, all Project files and records, including, but not limited to, the following administrative records: 34.1.1 Subcontracts and Purchase Orders 34.1.2 Subcontractor Licenses 34.1.3 Shop Drawing Submittal/Approval Logs 34.1.4 Equipment Purchase/Delivery Logs 34.1.5 Contract Drawings and Specifications with Addenda 34.1.6 Warranties and Guarantees 34.1.7 Cost Accounting Records 34.1.8 Labor Costs 34.1.9 Material Costs 34.1.10 Equipment Costs 34.1.11 Cost Proposal Request 34.1.12 Payment Request Records 34.1.13 Meeting Minutes 34.1.14 Cost -Estimates 34.1.15 Bulletin Quotations 34.1.16 Lab Test Reports 34.1.17 Insurance Certificates and Bonds 34.1.18 Contract Changes 34.1.19 Permits 34.1.20 Material Purchase Delivery Logs 34.1.21 Technical Standards 34.1.22 Design Handbooks 34.1.23 "As -Built" Marked Prints 34.1.24 Operating & Maintenance Instruction 34.1.25 Daily Progress Reports 34.1.26 Monthly Progress Reports 34.1.27 Correspondence Files 34.1.28 Transmittal Records 34.1.29 Inspection Reports 34.1.30 Punch Lists 34.1.31 PMIS Schedule and Updates 34.1.32 Suspense (Tickler) Files of Outstanding Requirements 53 Construction Services Agreement: Revised 12-28-20 (v8) The Project files and records shall be available at all times to Owner and Design Professional or their designees for reference, review or copying. 34.2 Contractor Presentations At the discretion of the County, the Contractor may be required to provide a brief update on the Project to the Collier County Board of County Commissioners, "Board", up to two (2) times per contract term. Presentations shall be made in a properly advertised Public Meeting on a schedule to be determined by the County Manager or his designee. Prior to the scheduled presentation date, the Contractor shall meet with appropriate County staff to discuss the presentation requirements and format. Presentations may include, but not be limited to, the following information: Original contract amount, project schedule, project completion date and any changes to the aforementioned since Notice to Proceed was issued. 35. SECURITY. The Contractor is required to comply with County Ordinance 2004-52, as amended. Background checks are valid for five (5) years and the Contractor shall be responsible for all associated costs. If required, Contractor shall be responsible for the costs of providing background checks by the Collier County Facilities Management Division for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four (4) years. All of Contractor's employees and subcontractors must wear Collier County Government Identification badges at all times while performing services on County facilities and properties. Contractor ID badges are valid for one (1) year from the date of issuance and can be renewed each year at no cost to the Contractor during the time period in which their background check is valid, as discussed below. All technicians shall have on their shirts the name of the contractor's business. The Contractor shall immediately notify the Collier County Facilities Management Division via e-mail (DL-FMOPS(cr�colliergov.net) whenever an employee assigned to Collier County separates from their employment. This notification is critical to ensure the continued security of Collier County facilities and systems. Failure to notify within four (4) hours of separation may result in a deduction of $500 per incident. CCSO requires separate fingerprinting prior to work being performed in any of their locations. This will be coordinated upon award of the contract. If there are additional fees for this process, the Contractor is responsible for all costs. 36. VENUE. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 37. VALUE ENGINEERING. All projects with an estimated cost of $10 million or more shall be reviewed for consideration of a Value Engineering (VE) study conducted during project development. A "project" shall be defined as the collective contracts, which may include but not be limited to: design, construction, and 54 Construction Services Agreement: Revised 12-28-20 (v8) ,��c3 construction, engineering and inspection (CEI) services. Additionally, any project with an estimated construction value of $2 million or more may be reviewed for VE at the discretion of the County. 38. ABOVEGROUND/UNDERGROUND TANKS. 38.1 The contractor shall ensure compliance with all NFPA regulations: specifically 110 & 30/30A; FDEP chapter 62 regulations: specifically 761, 762, 777, and 780; 376 & 403 Florida Statutes; and STI, UL, PEI, ASME, NACE, NLPA, NIST & API referenced standards pertaining to the storage of hazardous materials and petroleum products. 38.2 The contractor shall notify the Solid & Hazardous Waste Management Department (SHWMD) prior to the installation, removal, or maintenance of any storage tank, including day tanks for generators, storing / will be storing petroleum products or hazardous materials. The contractor shall provide a 10 day and 48-hour notice to SHWMD 239-252-2508 prior to commencement. The contractor shall provide the plans pertaining to the storage tank systems containing hazardous materials / petroleum products to the SHWMD prior to plans submittal to a permitting entity and then SHWMD must approve the plans prior to contractor's submittal for permitting. 39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on Owner's projects who are neat, clean, well-groomed and courteous. Subject to the Americans with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The Owner may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Owner's projects is not in the best interest of the County. 40. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision - making authority and by Owner's staff person who would make the presentation of any settlement reached during negotiations to Owner for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision -making authority and by Owner's staff person or designee who would make the presentation of any settlement reached at mediation to Owner's Board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under Section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 55 Construction Services Agreement: Revised 12-28-20 (v8) EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS " N!A" 56 Construction Services Agreement: Revised 12-2$-20 (0) 0 February 1, 2021 Naples Park Infrastructure Optimization Progress Update In 2013, the Public Utilities Department started a multi-year program to replace potable water and wastewater pipes that have reached the end of their useful lives. In 2017, the Growth Management Department combined efforts to form the Public Utility Renewal (PUR) program which included stormwater improvements. The Collier County Board of County Commissioners has approved the following projects to date: • 91st and 92nd Avenues North: Water main replacement completed 11/14/14. • 93rd and 94th Avenues North: Water main replacement completed 1/23/15. • 97th Avenue North (700 Block): Water and sewer main replacement completed 2/22/15. • 107th Avenue North Public Utility Renewal (PUR): Water and sewer replacement and wastewater force main installation, combined with stormwater improvements from Vanderbilt Drive to 8th Street. Completed 5/16/2018 • 110th Avenue North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Completed 5/16/2018 • 95th Avenue North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Completed 1/13/2020 • 96th Avenue North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Scheduled to be completed 4/2021 The following project is pending Board approval: • 108th and 109th Avenues North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Scheduled to be completed July 2022. The following streets are scheduled to be designed in 2021 under the PUR program with construction planned in 2022-23 depending on infrastructure condition and available funding: • 98th and 99th Avenues North • 105th and 106th Avenues North As funding is available, similar improvements are planned to continue throughout the Naples Park Area; however, a more detailed sequence has not yet been defined or approved. 11.A.7 Packet Pg. 244 Attachment: Program Update and Map (15127 : 108th and 109th Avenues PUR - Construction) February 1, 2021 NAPLES PARK MAP VB Dr. 6th St. 7th St. 8th St. U.S. 41 110th Ave. N. (PUR Complete) 109th Ave. N. (PUR Pending) 108th Ave. N. (PUR Pending) 107th Ave. N. (PUR Complete) 106th Ave. N. (Next PUR Design) 105th Ave. N. (Next PUR Design) 104th Ave. N. 103rd Ave. N. 102nd Ave. N. 101st Ave. N. 100th Ave. N. 99th Ave. N. (Next PUR Design) 98th Ave. N. (Next PUR Design) 97th Ave. N. (Water/Sewer Comp.) 96th Ave. N. (PUR Complete) 95th Ave. N. (PUR Complete) 94th Ave. N. (Water Complete) 93rd Ave. N. (Water Complete) 92nd Ave. N. (Water Complete) 91st Ave. N. (Water Complete) 11.A.7 Packet Pg. 245 Attachment: Program Update and Map (15127 : 108th and 109th Avenues PUR - Construction) 108th and 109th Avenues Public Utilities Renewal Public Utilities Department Growth Management Department March 9, 2021 Regular Agenda Collier County | Florida 11.A.9 Packet Pg. 246 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Companion Items Three companion executive summaries for the 108th and 109th Avenues Public Utilities Renewal Project are seeking Board approval: 1.Construction of the water, wastewater and stormwater infrastructure. The contractor is Douglas N. Higgins, Inc. with extensive experience in similar projects, specifically in Naples Park. 2.Construction, Engineering and Inspection (CEI) Services for Stantec Consulting Services, Inc., previously Board-approved for the Naples Park area. 3.Construction Administration Services (CA) for Q. Grady Minor & Associates P.A., the firm responsible for the design and certification of the project. Public Utilities Department Engineering and Project Management Division 2 11.A.9 Packet Pg. 247 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Objective •Provide reliable, sustainable, and regulatory compliant services to the customers along 108th and 109th Avenues North in the Naples Park neighborhood by replacing the water, wastewater and stormwater infrastructure. Public Utilities Department Engineering and Project Management Division 3 11.A.9 Packet Pg. 248 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Project Location Public Utilities Department Engineering and Project Management Division 4 Vanderbilt Drive US 41 109th Ave North 108th Ave North 11.A.9 Packet Pg. 249 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Considerations -Water Water infrastructure •Installed in the late 1960s. •Removes and disposes of existing asbestos- cement water main. •Installs approximately 11,000 linear feet of new polyvinyl chloride (PVC) water main. •Installs new fire hydrants, gate valves, water services, water meters, and back flow preventers. Public Utilities Department Engineering and Project Management Division 5 11.A.9 Packet Pg. 250 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Considerations -Wastewater Public Utilities Department Engineering and Project Management Division 6 Wastewater infrastructure •Installed in the early 1970s. •Removes and replaces approximately 10,000 linear feet of existing vitrified clay gravity sewer pipe, laterals and cleanouts with PVC pipe. •Replaces concrete manholes with polymer concrete manholes which require less maintenance. 11.A.9 Packet Pg. 251 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Considerations -Stormwater Public Utilities Department Engineering and Project Management Division 7 Stormwater infrastructure •Installed in 1960s. •Removes and replaces approximately 10,000 linear feet of aging corrugated metal culvert pipes with new perforated high-performance pipe. •Replaces old drainage structures with catch basins and sumps to ensure proper drainage. 11.A.9 Packet Pg. 252 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Considerations Public Utilities Department Engineering and Project Management Division 8 Based on lessons-learned •Replace water main simultaneously on 108th and 109th Avenues to avoid damaging fragile asbestos cement water mains throughout the remainder of the project. •Wastewater and stormwater construction and restoration will follow, occurring one block at a time also simultaneously on both avenues. •Minimizes neighborhood disruption and accelerates restoration. •This process was proven effective during construction of 95th and 96th Avenues. 11.A.9 Packet Pg. 253 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Naples Park Summary 91st and 92nd Avenues North: Water main replacement completed 11/14/14. 93rd and 94th Avenues North: Water main replacement completed 1/23/15. 97th Avenue North (700 Block): Water and sewer main replacement completed 2/22/15. 107th Avenue North Public Utility Renewal (PUR): Water and sewer replacement and wastewater force main installation, combined with stormwater improvements from Vanderbilt Drive to 8th Street. Completed 5/16/2018. 110th Avenue North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Completed 5/16/2018. 95th Avenue North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Completed 1/13/2020. 96th Avenue North PUR: Water and sewer replacement combined with stormwater improvements from Vanderbilt Drive to U.S. 41. Scheduled to be completed 4/2021.9 11.A.9 Packet Pg. 254 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Naples Park Summary Map 10 11.A.9 Packet Pg. 255 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Neighborhood Coordination Public Utilities Department Engineering and Project Management Division 11 •Detail information letter with Right of Entry form will be sent in April 2021 to all homeowners on 108th and 109th Avenues. •Project phone line:239-269-1890 •Project e-mail: NaplesParkPUR@CollierCountyFL.gov •Project updates and notices: www.CollierPUR.com •Public information services provided by Stantec, the CEI consultant. 11.A.9 Packet Pg. 256 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th Recommendation To award ITB No. 21-7823, “108th & 109th Avenues Public Utilities Renewal" to Douglas N. Higgins, Inc., in the amount of $12,337,900.00, and authorize the Chair to sign the attached Agreement and authorize the necessary budget amendments. That the Board of County Commissioners approves a $1,145,540.00 Purchase Order to Stantec Consulting Services, Inc. That the Board of County Commissioners approves a work order to Q. Grady Minor & Associates, P.A., for Construction Administration Services in the amount of $324,208.00. Public Utilities Department Engineering and Project Management Division 12 11.A.9 Packet Pg. 257 Attachment: 108th and 109th Avenues Presentation [Revision 1] (15127 : 108th and 109th