Agenda 01/26/2021 Item #16E 6 (Change order/contractual modification report from Procurement Services)01/26/2021 EXECUTIVE SUMMARY Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. OBJECTIVE: To promote accountability and provide transpar ency to the public and gain the Board’s approval/ratification for various procurement -related transactions. CONSIDERATIONS: In accordance with the Board’s Procurement Ordinance 2017-08 and the Procurement Manual, the Procurement Services Division produces a regular administrative report which provides for Board approval of the following transactions: • Change Orders that do not exceed ten (10%) of the current Board approved aggregate amount, and/or require change in schedule (number of days); • Amendments to contracts; • After the fact memos from various County Divisions, as requested by the Clerk’s Finance staff for the timely process of invoices. • Other items as determined by the County Manager or designee that require Board approval. This administrative report includes the following: • Six (6) change orders that in aggregate modify contracts by $27,954 and add 112 calendar days to completion periods, see attached summary and backup for details; and • Zero (0) amendments this period with a fiscal impact of $0.00; and • One (1) after the fact memo with a fiscal impact of $0.00 for additional services FISCAL IMPACT: The net total for the seven (7) items is $27,954. LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: To ratify/approve change orders and/or contract amendments and other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08. Prepared By: Sara Schneeberger, Procurement Strategist, Procurement Services ATTACHMENT(S) 1. 0126 After the Fact Report - FY21 (PDF) 2. 0126 After the Fact Backup - FY21 (PDF) 3. 0126 Change Order Report - FY21 (PDF) 4. 0126 Change Order Backup - FY21 (PDF) 16.E.6 Packet Pg. 784 01/26/2021 COLLIER COUNTY Board of County Commissioners Item Number: 16.E.6 Doc ID: 14706 Item Summary: Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. Meeting Date: 01/26/2021 Prepared by: Title: Business Technology Analyst, Senior – Procurement Services Name: Sara Schneeberger 01/12/2021 8:56 AM Submitted by: Title: Manager - Procurement – Procurement Services Name: Sandra Herrera 01/12/2021 8:56 AM Approved By: Review: Procurement Services Catherine Bigelow Additional Reviewer Completed 01/12/2021 9:02 AM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 01/12/2021 9:33 AM Administrative Services Department Paula Brethauer Level 1 Division Reviewer Completed 01/12/2021 9:56 AM Procurement Services Sandra Herrera Additional Reviewer Completed 01/12/2021 9:57 AM Administrative Services Department Len Price Level 2 Division Administrator Review Completed 01/13/2021 3:03 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 01/13/2021 3:44 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 01/13/2021 4:05 PM Office of Management and Budget Laura Wells Additional Reviewer Completed 01/14/2021 8:54 AM County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 01/14/2021 3:46 PM Board of County Commissioners MaryJo Brock Meeting Pending 01/26/2021 9:00 AM 16.E.6 Packet Pg. 785 Item Page #Contract or Purchase OrderDate Description of Project Vendor Name Division ‐ DirectorFiscal Impact for Additional ServicesOutstanding InvoicesDescription1119-7646 450020277512/28/2020 Collier County 12 Bus Stop Waypoint Contracting, Inc. PTNE - Michelle Arnold $0.00 $4,148.00Division staff did not process a third change order to approve additional time prior to the expiration of the project term.Meeting DateTotal number of After the Fact MemosFiscal Impact for Additional ServicesOutstanding Invoices1/26/2021 1 $0.00 $4,148.0016.E.6.aPacket Pg. 786Attachment: 0126 After the Fact Report - FY21 (14706 : Procurement Services administrative reports) Instructions As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such “After the Fact Procurements” will be reported to the County Manager. Requester Name: Division: Division Director: Vendor Name: Amount: Contract #: Purchase Order: Why is this deemed a non-compliant purchase? Choose one. Contract Ordinance Manual P-Card Other Details of Purchase: Explain the circumstances behind this purchase. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring? The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by: Signature: Date: Division Director: Signature: Date: Collier County After the Fact Form Liz Soriano PTNE Michelle Arnold Waypoint Contracting, Inc. $4,148.00 19-7646/RFQ#2001-008 4500202775 ✔ The quote terms expired on 11/30/2020, as per change order #2. The change order processing was delayed as it had to be reviewed and approved by the grantor. Time expired prior to the concurrence of the grantor and work was completed in the amount of the change order #2, for $4,148.00 after 11/30/2020. The final invoice includes work thru 12/18/2020. Requesting for the final invoice to be approved for payment as it contains a portion of work that was completed passed the 11/30/20 completion date. The change order process will now include the grants coordinator at the beginning, to review and make sure that there is sufficient time for all parties involved to review and approve. Liz Soriano SorianoLiz Digitally signed by SorianoLiz Date: 2020.12.28 15:47:37 -05'00'12/28/2020 Omar De Leon for Michelle Arnold DeleonOmar Digitally signed by DeleonOmar Date: 2020.12.28 16:37:37 -05'00'12/28/20 1 116.E.6.b Packet Pg. 787 Attachment: 0126 After the Fact Backup - FY21 (14706 : Procurement Services administrative reports) 216.E.6.bPacket Pg. 788Attachment: 0126 After the Fact Backup - FY21 (14706 : Procurement Services administrative reports) 316.E.6.bPacket Pg. 789Attachment: 0126 After the Fact Backup - FY21 (14706 : Procurement Services administrative reports) 416.E.6.bPacket Pg. 790Attachment: 0126 After the Fact Backup - FY21 (14706 : Procurement Services administrative reports) 516.E.6.bPacket Pg. 791Attachment: 0126 After the Fact Backup - FY21 (14706 : Procurement Services administrative reports) Item page #Contract/ Grant No.Change #DateProject Name Vendor Name Division ‐ Project ManagerOriginal Contract AmountCurrent Contract Amount Current Change Order AmountRevised Contract Amount% Over Board Approved AmountContract LengthChange in length (Days)Updated contract length    Change in length       (%)1 1 19-7611 3 12/18/2020US 41 North Water Main Replacement Phase IIPWC, LLC PUEPMD - Diana Dueri $2,488,340.00 $2,488,340.00 $0.00 $2,488,340.00 0.00% 240 6 246 2.50%2 4 20-7682 3 12/18/2020Immokalee Rd at Woodcrest & Bellaire Bay DriveWright Construction GroupTransportation Engineering - John Conti$1,564,098.50 $1,564,098.50 $0.00 $1,564,098.50 0.00% 214 5 219 2.34%3 6 19-7615 2 12/17/2020Big Corkscrew Island Regional ParkAstra Construction ServicesFacilities Management - Dave Closas$45,065,454.00 $45,065,454.00 $0.00 $45,065,454.00 0.00% 608 0 608 0.00%4 14 17-7103 1 1/7/2021West Goodlette Frank Rd Joint Stormwater-Sewer ProjectQ. Grady Minor & AssociatesCapital Proj Planning, Impact Fees & Program Mgmt - Robert Wiley$695,591.00 $1,094,597.00 $27,954.00 $1,122,551.00 2.55% 1437 0 1437 0.00%5 21 18-7305 3 1/6/2021 Master Pump Station 306 PWC, LLC PUEPMD - Wayne Karlovich $10,719,008.00 $10,579,008.00 $0.00 $10,579,008.00 0.00%640 30 670 4.69%6 40 17-7198 1B.5 1/11/2021Collier County Sports Complex Phase 1BManhattan Construction Facilities Management - Margaret Bishop$19,665,469.00 $20,520,448.87 $0.00 $20,520,448.87 0.00% 379 71 450 18.73%Meeting Date Total number of Change OrdersTotal Dollar ChangeTotal Change in Days1/26/2021 6 $27,954.00 11216.E.6.cPacket Pg. 792Attachment: 0126 Change Order Report - FY21 (14706 : Procurement Services administrative reports) 1116.E.6.d Packet Pg. 793 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 12/18/2020 BullertBenjamin Digitally signed by BullertBenjamin DN: E=Benjamin.Bullert@colliercountyfl.gov, CN=BullertBenjamin, OU=General, OU=PPM User Accounts, OU=PUD Planning and Project Management, OU=PUD, OU=Divisions, DC=bcc, DC=colliergov, DC=net Date: 2020.12.18 09:59:46-05'00' ChmelikTom Digitally signed by ChmelikTom Date: 2020.12.18 11:38:14 -05'00' Joseph Bellone Digitally signed by Joseph Bellone Date: 2020.12.18 13:18:51 -05'00' SchneebergerSara Digitally signed by SchneebergerSara Date: 2020.12.23 12:25:42 -05'00' 2 16.E.6.d Packet Pg. 794 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PWC -Public Works Constructors 5256 Summerlin Commons Way Suite 203 Bldg. #2 Fort Myers, FL 33907 Phone: 239-270-5907 Fax: 239-270-5943 Collier County 3339 Tamiami Trail East Suite 303. Naples, FL 34112 Attn: Diana Dueri -Senior Project Mgr. November 24, 2020 Re: Time Extension Request-ETA Hurricane, and Added WM connections Ms. Dueri, PWC has installed or will install an additional 2 Water Main Connections plus restoration that will add another 3 days of work to our contract. The total contract quantity of Water Main Connections is 22 and the final quantity will be 24. In addition to this time PWC was unable to work for 3 days due to the Hurricane ETA. We are requesting that 6 days be added to the contract substantial and completion dates. Should you have any questions please feel free to contact me at your earliest convenience. Sincerely, Public Works Constructors LLC j311ttt � Brett Carner Florida Division Manager 3 16.E.6.d Packet Pg. 795 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) SchneebergerSara Digitally signed by SchneebergerSara Date: 2021.01.05 09:22:40 -05'00' 2416.E.6.d Packet Pg. 796 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 5 16.E.6.d Packet Pg. 797 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Contract Modification Work Order Modification Amendment Contract #: Change #: Purchase Order #: Project #: Contractor/Firm Name: Contract/Project: Project Manager Name: r: Division Name: Original Contract/Work Order Amount $ 45,065,454.00 10/8/19, 11.D Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 45,065,454.00 10/8/19, 11.D Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 45,065,454.00 7/12/2021 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 45,065,454.00 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date (Includes this change) # of Days Added Select Tasks Add new task(s) Delete task(s) Change task(s) Other (see below) Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Procurement Services Change Order Form 80039 Astra Construction Services LLC 4500201457 19-7615 2 Big Corkscrew Island Regional Park Facilities Management Dave P. Closas, PE, PMP 7/12/2021 7/12/2021 3/11/2021 *45 days North Phase 11/12/2019 1. To approve Astra Construction’s request for an extension of 45 days to the North Phase, making the substantial completion date January 11, 2021 with a final completion date of February 25, 2021. This change will not extend the total contract time, including the South Phase, leaving the final completion date July 12, 2021. 2. These changes were not included in the original contract due to following reasons: a. The North East Service Area (NESA) construction and project site overlap with the BCIRP project, water and sewer are now available from the NESA site to support the BCIRP site, which was not available at the time of the award of the contract. The water/sewer availability requires additional time (10 days) to tie into NESA’s water/sewer system and additional site work is needed. b. The county requested changes to the original scope and design of the artificial turfs at the 2 soccer fields/2 baseball fields in order to stay consistent with Collier County artificial turfs at the Collier County Sports Complex. The changes require additional time (30 days). c. Based on the original scope at award, a lake water irrigation system was required to irrigate the site. However, Collier County Public Utility Division will now be providing excess potable water to irrigate the BCIRP site that will require additional time (5 days) to tie into the system. 3. If this change order is not approved Astra will not have enough time to reach Substantial and Final Completion of the North Phase to have a complete and usable park. 6 316.E.6.d Packet Pg. 798 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Prepared by: ___________________________________________________________________________ Date: _____________ Senior Project Manager: Dave Closas, PE, PMP Facilities Management Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: ___________________________________________________________________________ Date: ________________ Principal Project Manager: Ayoub al-Bahou, PE, Facilities Management Approved by: ___________________________________________________________________________ Date: ________________ Division Director: Barry Williams, Parks & Recreation Approved by: ___________________________________________________________________________ Date: ________________ Engineer of Record: Mike Delate, Q Grady Minor Approved by: ___________________________________________________________________________ Date: ________________ Contractor: David Pabor, Astra Construction Services Accepted by: ___________________________________________________________________________ Date: ________________ Wood E&IS Approved by: ___________________________________________________________________________ Date: ________________ Division Director: Damon Grant, Facilities Management Approved by: ___________________________________________________________________________ Date: ________________ (Procurement Professional) Procurement Services Change Order Form Page 2 of 2 : Nestor Fernandez, CPM 12/17/20 12/17/2020 ClosasDave Digitally signed by ClosasDave Date: 2020.12.17 13:30:16 -05'00' Al-bahouAyoub Digitally signed by Al-bahouAyoub Date: 2020.12.22 16:10:05 -05'00' WilliamsBarry Digitally signed by WilliamsBarry Date: 2020.12.23 07:07:06 -05'00' This item has been electronically signed and sealed by Michael J. Delate, P.E. on the date adjacent to the seal using a SHA authentication code. Printed copies of this document are not considered signed and sealed and the SHA authentication code must be verified on any electronic copies. Digitally signed by Michael J. Delate, PE Date: 2020.12.17 15:54:53 -05'00' David E. Pabor Digitally signed by David E. Pabor DN: C=US, E=dpabor@astragroupinc.com, O=Astra Construction Services, OU=Operations, CN=David E. Pabor Date: 2020.12.17 16:01:31-05'00' nestor.fernandez Digitally signed by nestor.fernandez DN: cn=nestor.fernandez Date: 2020.12.17 15:45:22 -05'00' SchneebergerSara Digitally signed by SchneebergerSara Date: 2021.01.05 11:03:49 -05'00' 7 16.E.6.d Packet Pg. 799 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Astra Construction Services 300 Churchill Court · Woodstock, GA 30188 · Phone 770-992-9300 · Fax 678-494-6565 December 17, 2020 Dave Poblete Closas, P.E., PMP. Senior Project Manager Facilities Management Division 3335 Tamiami Trail East, Suite 101 Naples, Fl 34112-5356 RE: Big Corkscrew Island Regional Park (BCIRP) Contract No. 19-7615 Purchase Order No. 4500200288 11/06/19 Collier County Project No. 80039 Change Order Proposal – RCO 1 thru 7 Revision 5 Dear Mr. Closas, (The attached reflects changes to RCO 4 & 5 per CC Accountants requests.) (The following is modified as requested by Clerk’s office. Bond Costs have been removed. Sales Tax on Materials was moved below mark ups. Corrections were made to Cougar Contracting’s breakdown where formula had not included all costs shown.) On December 12, 2019, Astra submitted an order of magnitude for RCO 1 thru 7 which some detailed backup from subcontractors. Work Directive #1 for these changes was subsequently issued and received by Astra on January 16, 2020. In March, Astra received additional clarifications and some comments to respond to regarding the original RCO documents and the order of magnitude pricing. This document represents Astra’s formal change order request for RCO 1 thru 7 taking into account the clarifications and comments as follows. RCO No. Description Our Review 1 Generator This is no longer required and will be deleted. The cost of the generator has been deleted from the proposal. 2 Septic South Cost deduct appears to be reasonable 3 Septic North Cost deduct appears to be reasonable 4 South Grinder Pump Cost increase is not reasonable – see comments Revision to pricing is attached. 5 Wet Tap FM Cost increase appears to be reasonable 6 Change irrigation to reclaimed There should not be an increase in cost 8 16.E.6.d Packet Pg. 800 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Astra Construction Services 300 Churchill Court · Woodstock, GA 30188 · Phone 770-992-9300 · Fax 678-494-6565 These costs were deleted from the proposal. 7 Delete irrigation pump, etc. Cost placeholder appears to be reasonable The electrician made two mistakes in the order of magnitude pricing. No deduct was included for the rough in and wiring of the new irrigation pump station. The original proposal for FP&L was a deduct for the installation of ALL the conduit on the site. The order of magnitude included a cost for deducting the pump station and 12” main line based on a proposal received during the bidding phase. The actual deduct offered by the hired subcontractor was greater and reflected in this proposal. An additional 10 calendar days is requested to be added to North Phase duration and an additional 24 calendar days are requested to be added to the South Phase duration. These delays are a result of changing pre-cast boxes for sanitary and extending the procurement time for the structures. Please issue a change order for this work ASAP. Attached you will find detailed cost sheets for each RCO along with subcontractor backup as it applies. Should you have any questions, comments, or require any additional information please contact me at 813-293- 1871. Sincerely, David E. Pabor Senior Project Manager CC: Grant Beeson, Nestor Fernandez 9 16.E.6.d Packet Pg. 801 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Astra Construction Services 300 Churchill Court · Woodstock, GA 30188 · Phone 770-992-9300 · Fax 678-494-6565 November 11, 2020 Dave Poblete Closas, P.E., PMP Senior Project Manager Facilities Management Division 3335 Tamiami Trail East, Suite 101 Naples, Fl 34112-5356 RE: Big Corkscrew Island Regional Park (BCIRP) Contract No. 19-7615 Purchase Order No. 4500200288 11/06/19 Collier County Project No. 80039 Change Order Proposal – Add Booster Pump and Electrical Service for Irrigation (HOOVER PUMPS) Dear Mr. Closas, (This proposal has been revised to remove bond cost) At your request, we are providing detailed itemized pricing for labor and material to add a Booster Pump and Electrical Service as detailed in the proposal and its attachments. Attached you will find detailed cost sheets for this change along with subcontractor backup as it applies. The total amount is an increase of 101,798.47. Astra requests an additional $101,798.47 and 5 calendar days be added to the North contract for this change. Should you have any questions, comments, or require any additional information please contact me at 813-293- 1871. Sincerely, David E. Pabor Senior Project Manager CC: Grant Beeson, Nestor Fernandez 10 16.E.6.d Packet Pg. 802 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Project Name:Date: Change Event No.: Owner Tracking No.: DESCRIPTION: Labor Breakdown Qty Crew Description Qty Man Hrs Rate Cost 1 MH @ -$ @ -$ Labor Total -$ Material Breakdown Cost @ /Unit @ /Unit -$ Sales Tax 7%$0.00 $0.00 Material Total $0.00 Subcontractor Costs (See Attached Proposals)Cost Down to Earth Booster Pump - Hoover 1 LS @ 75,638.92$ /Unit 75,638.92$ Down to Earth Directional Bore Main 1 LS @ 2,000.00$ /Unit 2,000.00$ Nuson's Electric Electrical Service for Pump 1 LS @ 19,312.00$ /Unit 19,312.00$ 1 LS @ -$ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ Subcontractor Total 96,950.92$ Overhead & Profit Breakdown Mark-Up on Labor 10% -$ Mark-Up on Material 10% -$ Mark-Up on Subcontractors 5%4,847.55$ Mark-Up Total 4,847.55$ TOTAL ADDITIONAL COSTS 101,798.47$ Additional Calendar Days Required 5 Additional days requested Clarifications: Add Booster Pump and Electrical Service. Hoover Pumps Big Corkscrew Island Regional Park 7/27/2020 22 Add Booster Pump and Electrical Service 11 16.E.6.d Packet Pg. 803 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Astra Construction Services 300 Churchill Court · Woodstock, GA 30188 · Phone 770-992-9300 · Fax 678-494-6565 November 11, 2020 Dave Poblete Closas, P.E., PMP Senior Project Manager Facilities Management Division 3335 Tamiami Trail East, Suite 101 Naples, Fl 34112-5356 RE: Big Corkscrew Island Regional Park (BCIRP) Contract No. 19-7615 Purchase Order No. 4500200288 11/06/19 Collier County Project No. 80039 Request for Work Directive Synthetic Sports Field Changes – Delegated Engineering & Piping Changes Dear Mr. Morton, We request you revise Work Directive 03 dated 081820 as follows. 1. Delegated engineering, material, and labor to construct the revise underdrainage at a Not to Exceed cost of $66,284.46. 2. Because the sub grade (dirt) elevation was already set for ½ inch pad when it was directed to be removed; Increase the thickness of the Base Material for the both fields 1/2” (17mm) Field Pad by adding an additional 560CY stone base at a Not to Exceed cost of ADD $38,726.93. 3. Eliminate any other cost items shown. Should you have any questions, comments, or require any additional information please contact me at 813-293- 1871. Sincerely, David E. Pabor Senior Project Manager CC: Grant Beeson 12 16.E.6.d Packet Pg. 804 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Project Name:Date: Change Event No.: Owner Tracking No.: DESCRIPTION: Labor Breakdown Qty Crew Description Qty Man Hrs Rate Cost 1 MH @ -$ @ -$ Labor Total -$ Material Breakdown Cost 1 EA @ /Unit -$ @ /Unit -$ Sales Tax 7%$0.00 $0.00 Material Total $0.00 Subcontractor Costs (See Attached Proposals)Cost Turf Solutions 1 LS @ 63,128.06$ /Unit 63,128.06$ 0 LS @ -$ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ @ /Unit -$ Subcontractor Total 63,128.06$ Overhead & Profit Breakdown Mark-Up on Labor 10% -$ Mark-Up on Material 10% -$ Mark-Up on Subcontractors 5%3,156.40$ Mark-Up Total 3,156.40$ TOTAL ADDITIONAL COSTS 66,284.46$ Additional Calendar Days Required 30 Additional days requested Clarifications: RFI 58 Synthetic Turf Fields Drainage System Change Round Pipe to Flat Pipe Layout - This revision is requested based on coordination between the Engineer of Record and the Delegated Engineer during the Design Process for the Big Corkscrew Island Regional Park 11/11/2020 RFI 58 - REVISION to Work Directive No. 03 Item 01. Unsolicited Proposal 13 16.E.6.d Packet Pg. 805 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Contract Modification Work Order Modification Amendment Contract #: Change #: Purchase Order #: Project #: Contractor/Firm Name: Contract/Project: Project Manager Name: r: Division Name: Original Contract/Work Order Amount $ 695,591.00 7/11/17 16A17 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 1,094,597.00 5/26/20 16A7 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 1,094,597.00 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 27,954.00 61.38% Total Change from Original Amount Revised Contract/Work Order Total $ 1,122,551.00 2.55% Change from Current BCC Approved Amount Cumulative Changes $ 426,960.00 2.55% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date (Includes this change) # of Days Added Select Tasks Add new task(s) Delete task(s) Change task(s) Other (see below) Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Prepared by: ___________________________________________________________________________ Date: __1-7-21_________ Robert Wiley, Principal Project Manager Capital Project Planning, Impact Fees and Program Management Division Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: ___________________________________________________________________________ Date: ________________ Justin Frederiksen, P.E., Vice President Q. Grady Minor and Associates, P.A. Approved by: __N/A______________________________________________________________________ Date: ________________ (Design Professional and Name of Firm, if project applicable) Approved by: ___________________________________________________________________________ Date: ________________ (Procurement Professional) Procurement Services Change Order Form 60142.2 Q. Grady Minor and Associates, P.A. 4500179447 17-7103 1 West Goodlette Frank Road Joint Stormwater- Sewer Project Capital Project Planning, Impact Fees and Program Management Robert Wiley 7/3/21 7/26/20 7/27/17 1. Change Order #1 will continue to fund Task 7 – Construction Administration of the original contract in the amount of $27,954.00 for necessary construction administration services by the design engineer of record (EOR). This additional funding is necessary to pay the EOR for construction under contract while the contractor completes construction of the project. The contractor has experienced construction delays (e.g. weather, unforeseen utilities conflicts, COVID, etc.) that have extended the life of the project. 2.Change Order #1 is necessary due to the contractor not completing the project construction within the original contract time frame. These additional services by the EOR were not included in the original contract because of the unforeseen conditions encountered during the construction period along with the onset of COVID quarantine impacts. 3.If this modification is not approved the EOR will not be available to provide the necessary services to ensure proper constru ction and certification of the construction project. Final completion and certification of the construction project would be delay ed for several months while a new solicitation for engineering services and contract administration to select a new EOR was undertaken. wiley_r Digitally signed by wiley_r DN: E=Robert.Wiley@colliercountyfl.gov, CN=wiley_r, OU=LDS User Accounts, OU=GMD PR Land Development Svcs, OU=Planning and Regulation, OU=GMD, OU=Divisions, DC=bcc, DC=colliergov, DC=net Date: 2021.01.07 15:42:30-05'00' Justin Frederiksen, PE Digitally signed by Justin Frederiksen, PE Date: 2021.01.07 16:20:37 -05'00' SchneebergerSara Digitally signed by SchneebergerSara Date: 2021.01.08 10:05:14 -05'00' 41416.E.6.d Packet Pg. 806 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) November 13, 2020 Mr. Robert Wiley, P.E. Collier County Stormwater Management Division 3339 East Tamiami Trail Naples, FL 32399-2500 RE: Proposal for Professional Services – Construction Administration West Goodlette Frank Road Joint Stormwater-Sewer Improvements Year 3 Dear Mr. Wiley: Q. Grady Minor & Associates, P.A. (GradyMinor) is pleased to provide Collier County (County) this proposal for the construction administration services for water, wastewater, stormwater, and roadway system improvements associated with the extension of the construction contract beyond the second year of the West Goodlette Frank Road Joint Stormwater-Sewer (West G-F Road) Improvements project. The West G-F Road project area is generally bounded by Goodlette‐Frank Road to the east, US‐41 to the west, Cypress Woods Drive to the north, and Creech Road to the south. GradyMinor provided the preliminary engineering, engineering, permitting, and bidding services for the expansion of the City of Naples’ (City) wastewater system; the replacement of the City’s water system, and the replacement of the County’s stormwater system. The contract construction schedule will be extended 76 days and as a result, GradyMinor’s construction administration contract will need to be extended and additional funds added to cover the additional work. We propose the following Scope of Services for the extension of the construction contract beyond the second year of construction for the project: Task No. A. - Construction Contract Administration Services: • Property owner correspondence/log. • Coordination with the County, City, and Inspectors. • Attend construction meetings, prepare agendas, and meeting minutes. Total of 6 meetings. • Provide periodic observations during construction and at critical times, to certify the project complete. • Provide clarification of plans and construction documents or make minor changes due to field conditions. • Respond to requests for additional information from the Contractor. • Maintain open communication with County and City inspectors and project managers. • Review City and County’s inspection reports and provide support as necessary. 15 16.E.6.d Packet Pg. 807 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) • Monitor the project phone line. Monitoring shall include answering the phone calls or in the event a phone call cannot be immediately answered, retrieve the voice main within two hour during normal business hours. Incoming phone call information and resolution of the phone call will be documented (in a phone log in) and maintained by GradyMinor. Basic questions will be answered by GradyMinor with more complex questions forwarded to the City’s/County’s project manager, Contractor, or CEI as appropriate. Phone calls after normal business hours will be reviewed prior to 10:00AM the following business day. • Monitor the project email address. Monitoring shall include answering emails within two hour during normal business hours. Email information and resolution of the email will be documented (in an email log) and maintained by GradyMinor. Basic questions will be answered by GradyMinor with more complex questions forwarded to the City’s/County’s project manager, Contractor, or CEI as appropriate. Emails after normal business hours will be reviewed prior to 10:00AM the following business day. • Review and approve Contractor pay requests. Quantities will be verified by the City’s/County’s inspectors. • Provide assistance to resolve unforeseen conflicts. • Provide public relation services as requested by the County and the City. These may include additional neighborhood meetings; presentation document preparation; meetings with residents and key stakeholders, County/City, etc. • One-on-one meetings with property owners. • Provide progress updates and status the phases of the project and provide weekly, brief, project stats updates to the Commissioner’s office. • Incorporate County and City direction/decisions made into the Contract Documents as applicable. County/City Inspectors shall provide GradyMinor with written inspection reports and photographs on a daily basis. We propose to complete these tasks in accordance with the following fee schedule: TASK DESCRIPTION BUDGET FEE & TYPE A. Construction Contract Admin Services $27,954.00 Time & Material TOTAL $27,954.00 This Proposal only includes those items specifically identified above and does not include environmental assessments, geotechnical investigations, as-built surveying services, or full time construction inspection. This Proposal is subject to the Standard Provisions of the Collier County Professional Services Agreement #17-7103 “West Goodlette Frank Road Joint Stormwater-Sewer Project”. Services requested beyond the scope of this Proposal will be performed for a fee negotiated when the scope of additional services is known or at the approved Collier County Professional Services Agreement #17- 7103 hourly rate schedule. Invoices will be issued monthly, payable per the applicable Collier County Purchasing Policy. Government imposed sales taxes or fees shall be added to our fees for services under this Proposal. 16 16.E.6.d Packet Pg. 808 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Very truly yours, Justin Frederiksen, P.E. Vice President 17 16.E.6.d Packet Pg. 809 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) GradyMinor Proposal for Professional Engineering Services West Goodlette Frank Road Joint Stormwater-Sewer Project Construction Administration Services - Year 3 Refer to Q. Grady Minor and Associates, P.A. proposal and scope of services dated: Project Senior Manager Engineer Designer Inspector Clerical Total TOTAL Task Activity Description $147 $123 $94 $96 $62 Hours COST TASK A Construction Contract Administration Services 1 Contractor RFI and responses 12 8 6 4 4 34 $3,944 2 Property Owner Coorespondance/Log 4 2 8 14 $1,330 3 Coordination with the Contractor, City, County, Proerty/Business Owners, and Inspectors 20 6 8 4 38 $4,694 4 Project Phone Line and Email Monitoring 2 4 6 $1,158 5 Construction Status meetings (6 Meetings)24 12 10 46 $5,624 6 Periodic Site Observation during Construction 20 20 40 $4,860 7 Miscellaneous Public Relations and One-on-One Property Owner Meetings 10 6 8 2 26 $3,100 8 Progress Status and general coordination 12 8 8 28 $3,244 Subtotal Task A:$27,954 Total Tasks A - Time and Expense Budget:$27,954 Notes: 1 This proposal excludes as-built and stake out survey services. 2 This proposal excludes full time CEI 3 This proposal assumed creation of RECORD Drawings off of Contractor provided redlines and survey information as well as City/County inspector redlines. November 13, 2020 1816.E.6.dPacket Pg. 810Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) TASK DESCRIPTION BUDGET 1.0 Construction Contract Administration Services #REF! 2.0 #REF!#REF! 3.0 #REF!27,954.00$ 4.0 #REF!#REF! TOTAL 27,954.00$ 19 16.E.6.d Packet Pg. 811 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) FEE & TYPE Time & Material Time & Material Time & Material Time & Material 20 16.E.6.d Packet Pg. 812 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 52116.E.6.d Packet Pg. 813 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 22 16.E.6.d Packet Pg. 814 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 23 16.E.6.d Packet Pg. 815 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 01/05/2021 01/06/2021 KarlovichWayne Digitally signed by KarlovichWayne Date: 2021.01.06 09:12:40 -05'00' SchneebergerSara Digitally signed by SchneebergerSara Date: 2021.01.08 11:00:35 -05'00' 24 16.E.6.d Packet Pg. 816 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PajerCraig Digitally signed by PajerCraig Date: 2021.01.06 09:56:08 -05'00' ChmelikTom Digitally signed by ChmelikTom Date: 2021.01.06 11:04:50 -05'00' Beth Johnssen Digitally signed by Beth Johnssen Date: 2021.01.06 11:19:21 -05'00' Joseph Bellone Digitally signed by Joseph Bellone Date: 2021.01.06 11:24:37 -05'00' 25 16.E.6.d Packet Pg. 817 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment $0.00 H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$0.00 J General Contractor's Mark-up $0.00 K Total PWC Direct Costs + Mark-up (Line I + J)$0.00 L Total Subcontractor Direct Costs -$756.63 M General Contractor's Mark-up on Subcontractor Direct Costs -$37.83 N Subtotal -$794.46 Subcontractor Mark Up -$75.66 Tax -$26.82 O Total PWC Change Request (Line K + L + M + N)-$896.94 i To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Shunt Trip Deletion WD #3 PWC Joint Venture 15% markup 5% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 8.31.2020. PWC JOB NO. CONTRACT 11/02/2020 26 16.E.6.d Packet Pg. 818 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 8.31.2020 27 16.E.6.d Packet Pg. 819 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment -$19,500.00 D Subtotal of Additive Cost -$19,500.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)-$19,500.00 J General Contractor's Mark-up K Total PWC Direct Costs + Mark-up (Line I + J)-$19,500.00 L Total Subcontractor Direct Costs M General Contractor's Mark-up on Subcontractor Direct Costs -$1,950.00 N Subtotal -$1,950.00 Tax $0.00 O Total PWC Change Request (Line K + L + M + N)-$21,450.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. 10.22.2020 Contractor Signature Date Diesel Pump Credits PWC Joint Venture 15% markup 10% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 10.22.2020 PWC JOB NO. CONTRACT 28 16.E.6.d Packet Pg. 820 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment $0.00 H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$0.00 J General Contractor's Mark-up $0.00 K Total PWC Direct Costs + Mark-up (Line I + J)$0.00 L Total Subcontractor Direct Costs $974.74 M General Contractor's Mark-up on Subcontractor Direct Costs $48.74 N Subtotal $1,023.48 Subcontractor Mark Up $97.48 Tax $29.70 O Total PWC Change Request (Line K + L + M + N)$1,150.66 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 8/31/2020 PWC JOB NO. CONTRACT MPS 306 WD#9 Corrective Electrical Items PWC Joint Venture 15% markup 5% Markup 08.31.2020 29 16.E.6.d Packet Pg. 821 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment $0.00 H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$0.00 J General Contractor's Mark-up $0.00 K Total PWC Direct Costs + Mark-up (Line I + J)$0.00 L Total Subcontractor Direct Costs $8,890.00 M General Contractor's Mark-up on Subcontractor Direct Costs $444.50 N Subtotal $9,334.50 Tax O Total PWC Change Request (Line K + L + M + N)$9,334.50 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Concrete Slab Addition PWC Joint Venture 15% markup 5% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 10.10.19 PWC JOB NO. CONTRACT 11.04.2019 30 16.E.6.d Packet Pg. 822 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment $0.00 H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$0.00 J General Contractor's Mark-up $0.00 K Total PWC Direct Costs + Mark-up (Line I + J)$0.00 L Total Subcontractor Direct Costs -$4,300.00 M General Contractor's Mark-up on Subcontractor Direct Costs -$430.00 N Subtotal -$4,730.00 Tax -$283.80 O Total PWC Change Request (Line K + L + M + N)-$5,013.80 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 3/24/2020 PWC JOB NO. CONTRACT Traffic Coating V.E. Credit PWC Joint Venture 15% markup 10% Markup Revised 03.24.2020 31 16.E.6.d Packet Pg. 823 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $2,500.00 B Material $3,282.75 C Equipment $950.00 D Subtotal of Additive Cost $6,732.75 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$6,732.75 J General Contractor's Mark-up $673.28 K Total PWC Direct Costs + Mark-up (Line I + J)$7,406.03 L Total Subcontractor Direct Costs $9,220.00 M General Contractor's Mark-up on Subcontractor Direct Costs $461.00 N Subtotal $9,681.00 Tax $229.79 O Total PWC Change Request (Line K + L + M + N)$17,316.82 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 12.15.2020 PWC JOB NO. CONTRACT MPS 306 WD#12 Water Service PWC Joint Venture 10% markup 5% Markup 32 16.E.6.d Packet Pg. 824 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) 06/10/20 12:20 PM PUBLIC UTILITIES WORK DIRECTIVE CHANGE #13 PROJECT NAME: Master Pump Station 306 DATE OF ISSUANCE: June 10, 2020 EFFECTIVE DATE: June 10, 2020 OWNER: The Board of County Commissioners of Collier County, Florida PROJECT#: 18-7305 CONTRACTOR: PWC Joint Venture LLC ENGINEER: AECOM You are directed to proceed promptly with the following change(s): Description:Provide clear anodized finish for louvers, registers and window frames in lieu of the specified paint finish. Provide $2000 credit for approved finish change. Purpose of Work Directive Change: Clear anodized finish approved with cost savings in lieu of specified paint finish. Attachments: Submittal 08 91 19.01 If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: Unit Prices Contractor’s records Lump Sum Engineer’s record Other: T&M Proposal Other No additional Time Estimated increase (decrease) in Contract Price Estimated change in Contract Time: $2,000 Increase or decrease by 0 calendar days. RECOMMENDED: AUTHORIZED: By: By: Engineer Owner’s Representative RRRRRRRRRIZIZIIIZIIZIZIZEDEEEEEEEE: Owner’’’’’’’’’ssssssssss Representative 33 16.E.6.d Packet Pg. 825 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) SHOP DRAWING REVIEW COMMENTS Page 1 of 1 PROJECT:MPS 306 Construction Phase Services SUBMITTAL NO:08 91 19.01 SUBJECT:Louvers –Color Samples (Hard copy)DRAWING NUMBER or SPECIFICATION NUMBER:08 91 19 AECOM NO:60334966 DATE RETURNED:04/13/2020 REVIEWER:Douglas McKenzie, P.E.REVIEW CODE:2 Code Definition: 1 - No Exceptions Taken 2 - Make Corrections Noted 3 - Amend & Resubmit 4 - Rejected-See Comments 5 - For Information Only 6 - Not Required for Review AECOM’s review is for general conformance with the design concept and contract documents. Markings or comments shall not be construed as relieving the Contractor from compliance with the project plans and specifications nor departure therefrom. The Contractor remains responsible for details and accuracy, for confirming and correlating all quantities and dimensions, for selecting fabrication processes, for techniques of assembly, and for performing work in a safe manner. COMMENT NUMBER REFERENCE COMMENT(S) 1 Approved as Noted Please provide clear anodized finishes for both the louvers and window frames along with a combined $2,000 credit to the project as approved by the Owner. ATTACHMENT TO WD#13 34 16.E.6.d Packet Pg. 826 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Collier County Solicitation 18-7305 SHOP DRAWING SUBMITTAL NO. AECOM 4415 Metro Parkway, Suite 404 Fort Myers, FLORIDA 33916 ATTN: ATTN: PROJECT AECOM OWNER CONTRACTOR PROJECT NO. PROJECT NO. PROJECT NO. ITEM NO. COPIES DESCRIPTION PREVIOUS SUBMITTAL NO. SPEC. SECTION NO. PLAN SHEET NO. SUBMITTED BY: _ CONTRACTOR DATE COPY: RETURNED BY: _ ENGINEER DATE REV. 04/09/18 Subrnittals Section No. 01 33 00-4 5/2/2018 2:43 PM p.130 SUBMITTAL RETURN (TO BE COMPLETED BY ENGINEER) ITEM NO. COPIES RESUBMIT COMMENTS YES NO &ROOLHU&RXQW\3XPS6WDWLRQ 3:&OOF&ROOLHU&RXQW\  'XVWLQ&KLVXP 'H$QJHOR+HQGHUVRQ    /RXYHUV&RORU6DPSOHV 35 16.E.6.d Packet Pg. 827 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR: DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $1,950.00 C Equipment $0.00 D Subtotal of Additive Cost $1,950.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$1,950.00 J General Contractor's Mark-up $195.00 K Total PWC Direct Costs + Mark-up (Line I + J)$2,145.00 L Total Subcontractor Direct Costs $7,410.00 M General Contractor's Mark-up on Subcontractor Direct Costs $370.50 N Subtotal $7,780.50 Tax $126.75 O Total PWC Change Request (Line K + L + M + N)$10,052.25 No Reinforcing Steel To the best of my knowledge and belief, I certify that all costs listed above are correct. 10/15/2020 Contractor Signature Date •This proposal includes only the items specifically referenced in this proposal, any and all unforeseen conditions and encumbrances are excluded and are subject to additional compensation. Sidewalk Addition WD #15 PWC Joint Venture 10% markup 5% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 10.15.2020 PWC JOB NO. CONTRACT 36 16.E.6.d Packet Pg. 828 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$0.00 J General Contractor's Mark-up K Total PWC Direct Costs + Mark-up (Line I + J)$0.00 L Total Subcontractor Direct Costs $3,277.00 M General Contractor's Mark-up on Subcontractor Direct Costs $163.85 N Subtotal $3,440.85 Tax $0.00 O Total PWC Change Request (Line K + L + M + N)$3,440.85 To the best of my knowledge and belief, I certify that all costs listed above are correct. 10.14.2020 Contractor Signature Date Change proposal to add an alternate power source to the day tanks. PWC Joint Venture 15% markup 5% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 10/14/2020 PWC JOB NO. CONTRACT 37 16.E.6.d Packet Pg. 829 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment $0.00 H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$0.00 J General Contractor's Mark-up $0.00 K Total PWC Direct Costs + Mark-up (Line I + J)$0.00 L Total Subcontractor Direct Costs $4,050.00 M General Contractor's Mark-up on Subcontractor Direct Costs $202.50 N Subtotal $4,252.50 Subcontractor Mark Up $405.00 Tax O Total PWC Change Request (Line K + L + M + N)$4,657.50 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Cost to Lower Footers per RFI 018 PWC Joint Venture 15% markup 5% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 8/31/2020 PWC JOB NO. CONTRACT 08.31.2020 38 16.E.6.d Packet Pg. 830 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR:DATE: DESCRIPTION OF CHANGE: PWC Direct Costs Additive Costs A Labor $1,324.00 B Material $0.00 C Equipment $400.00 D Subtotal of Additive Cost $1,724.00 Deductive Costs (use minus sign to denote negative figures) E Labor F Material G Equipment $0.00 H Subtotal of Deductive Cost $0.00 I Contractor's Total Direct Cost (D+H)$1,724.00 J General Contractor's Mark-up $172.40 K Total PWC Direct Costs + Mark-up (Line I + J)$1,896.40 L Total Subcontractor Direct Costs $61,591.00 Credit for Line Stops -$14,500.00 M General Contractor's Mark-up on Subcontractor Direct Costs $2,354.55 N Subtotal $49,445.55 Tax O Total PWC Change Request (Line K + L + M + N)$51,341.95 To the best of my knowledge and belief, I certify that all costs listed above are correct. 12/15/2020 Contractor Signature Date Change Order Request for Insertion Valve Service on 16" & 14" Lines PWC Joint Venture 10% markup 5% Markup CONTRACTOR CHANGE ORDER REQUEST SUMMARY Y18-7305 2018.05 Master Pump station 306 Y18-7305 12/15/2020 PWC JOB NO. CONTRACT 39 16.E.6.d Packet Pg. 831 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) this exhibit is not applicable EXHIBIT F CHANGE ORDER Contract Modification Work Order Modification Contract #: Change #: Purchase Order #: Project #: Contractor/Firm Name: Project Name: Project Manager Name: r: Department: Original Contract/Work Order Amount $ 19,665,469.00 12/10/19, 11.D Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 20,520,448.87 11/10/20,16.E.6 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 20,520,448.87 1/19/2021 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 4.35% Total Change from Original Amount Revised Contract/Work Order Total $ 20,520,448.87 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 854,979.87 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date (Includes this change) # of Days Added Select Tasks Add new task(s) Delete task(s) Change task(s) Other (see below) Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. “The above costs are all related to the Collier County Sports Complex project. All cost break downs, fee break outs, and detailed back up are included with the AR documents within this change order package. Notwithstanding anything to the contrary above, Construction Manager does not release and expressly reserves the right to pursue claims for time extensions and additional compensation that arise out of or result from the COVID-19 outbreak and the responses to this outbreak including implementation of any instructions, restrictions, and/or requirements by any federal, state, or local governmental or public health entity resulting from this outbreak and which claims may include, but are not limited to, additional time and costs due to labor or material shortages, quarantines, and implantation of other safety and health protocols.” 1) This change order is requesting a time extension for 71 days due to design changes and material delivery delays. Substantial completion will be March 1, 2021 and final completion will be met 30 days later on March 31, 2021. 2) These changes were not included in the original contract because design changes with the HVAC system in the Stadium and material delivery schedule delays have extended the substantial completion date. 3) If this change order is not processed the most efficient HVAC system will not be installed at the Stadium and substantial completion will not be met. Prepared by: ________________________________________________________________________ Date: ________________ (Margaret A. Bishop, PE, Facilities Management Division) Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this accepta nce. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: ________________________________________________________________________ Date: ________________ (Manhattan Construction Florida, Inc.) Approved by: _________________________________________________________________________ Date: ________________ (Josh Fruth, Davidson Engineering) 50156 17-7198 1B.5 4500185615 Manhattan Construction Florida Inc. Phase 1B Collier County Sports Complex Facilites Management Margaret Bishop 1-6-2020 71 1-5-2021 1-19-2021 3-31-2021              64016.E.6.d Packet Pg. 832 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports) Approved by: _________________________________________________________________________ Date: ________________ (Damon Grant, Division Director) Approved by: _________________________________________________________________________ Date: ________________ (Procurement Professional)             41 16.E.6.d Packet Pg. 833 Attachment: 0126 Change Order Backup - FY21 (14706 : Procurement Services administrative reports)