Loading...
Agenda 01/26/2021 Item #16A 7 (Final Plat for National Golf & Country Club at Ave Maria, Phase 2)01/26/2021 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of National Golf and Country Club at Ave Maria, Phase 2, (Application Number PL20200001505) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of National Golf and Country Club at Ave Maria, Phase 2, a subdivision of lands located in Section 9, Township 48 South, Range 29 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of National Golf and Country Club at Ave Maria, Phase 2. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Ave Maria SRA. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of National Golf and Country Club at Ave Maria, Phase 2 be approved for recording. FISCAL IMPACT: The project cost is $1,224,872.79 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $561,762.30 b) Drainage, Paving, Grading $663,110.49 The Security amount, equal to 110% of the project cost, is $1,347,360.07 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $21,018.32 16.A.7 Packet Pg. 433 01/26/2021 The Fees are based on a construction estimate of $663,110.49 (does not include Ave Maria Utilities) and were paid in October, 2020. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,125.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) n/a c) Drainage, Paving, Grading (.75% const. est.) $4,973.33 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) n/a e) Drainage, Paving, Grading (2.25% const. est.) $14,919.99 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee’s recommendation and shall take evidence and testimony in regard to the final subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it shall state reasons for such denial or conditions. In accordance with the LDC, the applicant is required to submit the final subdivision plat to the County Manager or designee for recording within 18 months of the date of approval of the final subdivision plat by the Board. However, following approval by the Board, but prior to recordation, the County Manager or designee may approve minor insubstantial changes to the subdivision plat, and the Board may approve any changes that are not minor and insubstantial. This item has been approved as to form and legality, and requires a majority vote for Board approval - - DDP RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of National Golf and Country Club at Ave Maria, Phase 2 (Application Number PL20200001505) for recording with the following stipulations: 1. Approve the amount of $1,347,360.07 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney’s office and the Board of County Commissioners or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Associate Project Manager, Development Review Division 16.A.7 Packet Pg. 434 01/26/2021 ATTACHMENT(S) 1. Location Map (PDF) 2. Opinion of Probable Cost - AMUC (PDF) 3. Opinion of Probable Cost - County (PDF) 4. Plat Map (PDF) 16.A.7 Packet Pg. 435 01/26/2021 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.7 Doc ID: 14546 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of National Golf and Country Club at Ave Maria, Phase 2, (Application Number PL20200001505) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 01/26/2021 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 12/17/2020 1:43 PM Submitted by: Title: Director – Growth Management Department Name: Matthew McLean 12/17/2020 1:43 PM Approved By: Review: Growth Management Department Jeanne Marcella Level 1 Reviewer Completed 12/22/2020 8:00 AM Public Services Department James C French Deputy Department Head Review Completed 12/22/2020 10:55 AM County Attorney's Office Derek D. Perry Level 2 Attorney Review Completed 12/29/2020 11:05 AM Growth Management Department Jeanne Marcella Department Head Review Completed 12/30/2020 8:10 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 12/30/2020 8:23 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 12/30/2020 11:13 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 01/06/2021 9:26 AM County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 01/07/2021 6:17 PM Board of County Commissioners MaryJo Brock Meeting Pending 01/26/2021 9:00 AM 16.A.7 Packet Pg. 436 NATIONAL GOLF AND COUNTRY CLUB AT AVE MARIA, PHASE 2 LOCATION MAP 16.A.7.a Packet Pg. 437 Attachment: Location Map (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 1 of 4 Project: Task: Prepared By:AJS Date:9/28/2020 Checked By:DJH (Revised)Date:11/10/2020 PERCENT DOLLAR POTABLE WATER 218,859.70$ -$ SANITARY SEWER 264,532.80$ -$ IRRIGATION 78,369.80$ -$ TOTAL 561,762.30$ 0% -$ POTABLE WATER, SANITARY SEWER, IRRIGATION: TOTAL O.P.C. = NOTES: 1) 2) David Hurst, P.E. FL Registration #60727 Peninsula Engineering Certificate of Authorization #28275 561,762.30$ All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. This Opinion of Probable Cost shall be used for Review Fee Calculation Purposes Only. National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) Calculation Summary 264,532.80$ 78,369.80$ 218,859.70$ SUB-TOTAL CONTINGENCY 561,762.30$ TOTAL P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-AMUC_Rev01 David J Hurst Digitally signed by David J Hurst DN: c=US, o=PENINSULA IMPROVEMENT CORPORATION DBA PENINSULA ENGINEERING, ou=A01410D0000016D02 E187090000476D, cn=David J Hurst Date: 2020.11.10 16:35:52 -05'00' 16.A.7.b Packet Pg. 438 Attachment: Opinion of Probable Cost - AMUC (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 2 of 4 Project: Task: Prepared By: AJS Date: 9/28/2020 Checked By: DJH (Revised) Date: 11/10/2020 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE WAT-1 2" POLYTUBE WATER SERVICE (C900, DR18) 23 LF 12.00$ 276.00$ WAT-2 6" PVC WATER SERVICE (C900, DR18) 102 LF 15.00$ 1,530.00$ WAT-3 6" PVC WATER SERVICE (C900, DR14) 126 LF 16.40$ 2,066.40$ WAT-4 8" PVC WATER MAIN (C900, DR18) 1,791 LF 21.70$ 38,864.70$ WAT-5 8" PVC WATER MAIN (C900, DR14) 140 LF 23.00$ 3,220.00$ WAT-6 10" PVC WATER MAIN (C900, DR18) 1,496 LF 36.00$ 53,856.00$ WAT-7 10" PVC WATER MAIN (C900, DR14) 42 LF 38.30$ 1,608.60$ WAT-8 6" GATE VALVE 11 EA 1,185.00$ 13,035.00$ WAT-9 8" GATE VALVE 4 EA 1,361.00$ 5,444.00$ WAT-10 10" GATE VALVE 5 EA 2,000.00$ 10,000.00$ WAT-11 AIR RELEASE VALVE 2 EA 1,713.00$ 3,426.00$ WAT-12 TEMPORARY BACTERIAL SAMPLE POINT 8 EA 324.00$ 2,592.00$ WAT-13 PERMANENT BACTERIAL SAMPLE POINT 1 EA 2,222.00$ 2,222.00$ WAT-14 1-1/2" DOUBLE WATER SERVICE (SHORT SIDE) (COMPLETE)14 EA 977.00$ 13,678.00$ WAT-15 1-1/2" DOUBLE WATER SERVICE (LONG SIDE) (COMPLETE)7 EA 1,214.00$ 8,498.00$ WAT-16 1" SINGLE WATER SERVICE (SHORT SIDE) (COMPLETE)6 EA 572.00$ 3,432.00$ WAT-17 1" SINGLE WATER SERVICE (LONG SIDE) (COMPLETE)4 EA 823.00$ 3,292.00$ WAT-18 FIRE HYDRANT ASSEMBLY (COMPLETE) 11 EA 4,129.00$ 45,419.00$ WAT-19 AUTOMATIC FLUSHING DEVICE 1 EA 1,500.00$ 1,500.00$ WAT-20 TEMPORARY BLOW-OFF (INCLUDING GATE VALVE) 2 EA 700.00$ 1,400.00$ WAT-21 REMOVE EX. BLOW-OFF AND CONNECT TO EX. WATER MAIN 2 EA 1,000.00$ 2,000.00$ WAT-22 TESTING 1 LS 1,500.00$ 1,500.00$ SUB-TOTAL = 218,859.70$ National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-AMUC_Rev01 16.A.7.b Packet Pg. 439 Attachment: Opinion of Probable Cost - AMUC (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 3 of 4 Project: Task: Prepared By: AJS Date: 9/28/2020 Checked By: DJH (Revised) Date: 11/10/2020 SANITARY SEWER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE SAN-1 8" SDR 26 PVC GRAVITY SEWER MAIN (0'-6' CUT) 608 LF 30.70$ 18,665.60$ SAN-2 8" SDR 26 PVC GRAVITY SEWER MAIN (6'-8' CUT) 319 LF 34.90$ 11,133.10$ SAN-3 8" SDR 26 PVC GRAVITY SEWER MAIN (8'-10' CUT) 690 LF 43.10$ 29,739.00$ SAN-4 8" SDR 26 PVC GRAVITY SEWER MAIN (10'-12' CUT) 353 LF 49.70$ 17,544.10$ SAN-5 8" SDR 26 PVC GRAVITY SEWER MAIN (12'-14' CUT) 310 LF 68.60$ 21,266.00$ SAN-6 8" SDR 26 PVC GRAVITY SEWER MAIN (14'-16' CUT) 346 LF 93.20$ 32,247.20$ SAN-7 4' SANITARY SEWER MANHOLE (0'-6' CUT) 2 EA 4,879.00$ 9,758.00$ SAN-8 4' SANITARY SEWER MANHOLE (6'-8' CUT) 2 EA 5,830.00$ 11,660.00$ SAN-9 4' SANITARY SEWER MANHOLE (8'-10' CUT) 3 EA 7,264.00$ 21,792.00$ SAN-10 4' SANITARY SEWER MANHOLE (10'-12' CUT) 1 EA 8,529.00$ 8,529.00$ SAN-11 4' SANITARY SEWER MANHOLE (12'-14' CUT) 1 EA 10,316.00$ 10,316.00$ SAN-12 4' SANITARY SEWER MANHOLE (14'-16' CUT) 1 EA 12,478.00$ 12,478.00$ SAN-13 6" SERVICE LATERAL (SINGLE) 19 EA 950.00$ 18,050.00$ SAN-14 6" SERVICE LATERAL (DOUBLE) 21 EA 997.00$ 20,937.00$ SAN-15 CORE EX. MANHOLE AND CONNECT 1 EA 3,500.00$ 3,500.00$ SAN-16 REMOVE BOOT AND CONNECT 1 EA 1,500.00$ 1,500.00$ SAN-17 TELEVISION INSPECTION 2,626 LF 5.30$ 13,917.80$ SAN-18 TESTING 1 LS 1,500.00$ 1,500.00$ SUB-TOTAL SANITARY SEWER = 264,532.80$ National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-AMUC_Rev01 16.A.7.b Packet Pg. 440 Attachment: Opinion of Probable Cost - AMUC (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 4 of 4 Project: Task: Prepared By: AJS Date: 9/28/2020 Checked By: DJH (Revised) Date: 11/10/2020 IRRIGATION ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE IRR-1 4" PVC IRRIGATION MAIN (C900,DR18) 3,246 LF 11.50$ 37,329.00$ IRR-2 4" PVC IRRIGATION MAIN (C900,DR14) 212 LF 12.40$ 2,628.80$ IRR-3 4" GATE VALVE 6 EA 820.00$ 4,920.00$ IRR-4 1-1/2" DOUBLE IRRIGATION SERVICE (SHORT SIDE) (COMPLETE)7 EA 977.00$ 6,839.00$ IRR-5 1-1/2" DOUBLE IRRIGATION SERVICE (LONG SIDE) (COMPLETE)14 EA 1,214.00$ 16,996.00$ IRR-6 1" DOUBLE IRRIGATION SERVICE (SHORT SIDE) (COMPLETE)4 EA 572.00$ 2,288.00$ IRR-7 1" DOUBLE IRRIGATION SERVICE (LONG SIDE) (COMPLETE)3 EA 823.00$ 2,469.00$ IRR-8 TEMPORARY BLOW-OFF (INCLUDES GATE VALVE) 2 EA 700.00$ 1,400.00$ IRR-9 REMOVE EX. BLOW-OFF AND CONNECT TO EX. IRRIGATION MAIN 2 EA 1,000.00$ 2,000.00$ IRR-10 TESTING 1 LS 1,500.00$ 1,500.00$ SUB-TOTAL = 78,369.80$ National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-AMUC_Rev01 16.A.7.b Packet Pg. 441 Attachment: Opinion of Probable Cost - AMUC (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 1 of 5 Project: Task: Prepared By:AJS Date:9/30/2020 Checked By:DJH Date:9/30/2020 PERCENT DOLLAR EARTHWORK 80,231.50$ -$ PAVING 404,336.09$ -$ DRAINAGE 108,042.90$ -$ LANDSCAPE AND LIGHTING 70,500.00$ -$ TOTAL 663,110.49$ 0% -$ EARTHWORK, PAVING, DRAINAGE, LANDSCAPE AND LIGHTING: TOTAL O.P.C. = NOTES: 1) 2) David Hurst, P.E. FL Registration #60727 Peninsula Engineering Certificate of Authorization #28275 SUB-TOTAL CONTINGENCY 663,110.49$ TOTAL All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. This Opinion of Probable Cost shall be used for Review Fee Calculation Purposes Only. National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) Calculation Summary 80,231.50$ 404,336.09$ 70,500.00$ 108,042.90$ 663,110.49$ P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-CC.xlsx David J Hurst Digitally signed by David J Hurst DN: c=US, o=PENINSULA IMPROVEMENT CORPORATION DBA PENINSULA ENGINEERING, ou=A01410D0000016D02 E187090000476D, cn=David J Hurst Date: 2020.09.30 15:14:14 -04'00' 16.A.7.c Packet Pg. 442 Attachment: Opinion of Probable Cost - County (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 2 of 5 Project: Task: Prepared By: AJS Date: 9/30/2020 Checked By: DJH Date: 9/30/2020 EARTHWORK ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 TURBIDITY BARRIER / INLET PROTECTION 1 LS 7,811.50$ 7,811.50$ EW-2 SILT FENCE - SINGLE ROW 1 LS 12,228.00$ 12,228.00$ EW-3 SILT FENCE - DOUBLE ROW 1 LS 2,592.00$ 2,592.00$ EW-4 CONSTRUCTION ENTRANCE 1 LS 3,000.00$ 3,000.00$ EW-5 FINISH GRADING 1 LS 49,600.00$ 49,600.00$ EW-6 NPDES MAINTENANCE 9 MONTH 500.00$ 4,500.00$ EW-7 NOI 1 LS 500.00$ 500.00$ SUB-TOTAL EARTHWORK = 80,231.50$ National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-CC.xlsx 16.A.7.c Packet Pg. 443 Attachment: Opinion of Probable Cost - County (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 3 of 5 Project: Task: Prepared By: AJS Date: 9/30/2020 Checked By: DJH Date: 9/30/2020 PAVING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT) 1 LS 58,720.55$ 58,720.55$ PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIFT) 1 LS 58,720.55$ 58,720.55$ PAV-3 8" LIMEROCK BASE 1 LS 94,768.00$ 94,768.00$ PAV-4 12" STABILIZED SUBGRADE 1 LS 18,976.65$ 18,976.65$ PAV-5 TYPE 'A' CURB 1 LS 2,150.24$ 2,150.24$ PAV-6 2' VALLEY GUTTER 1 LS 59,220.00$ 59,220.00$ PAV-7 4' SIDEWALK VALLEY CROSSING 1 LS 690.00$ 690.00$ PAV-8 CONCRETE SIDEWALK (4" THICK) 1 LS 86,337.10$ 86,337.10$ PAV-9 WHEELSTOP 1 LS 200.00$ 200.00$ PAV-10 ADA DETECTABLE WARNING 1 LS 600.00$ 600.00$ PAV-11 SOD (BAHIA - BETWEEN BOC AND SIDEWALK AND 1' BEYOND SIDEWALK)1 LS 12,453.00$ 12,453.00$ PAV-12 MAIL KIOSK 1 LS 3,000.00$ 3,000.00$ PAV-13 SIGNAGE AND STRIPING 1 LS 8,500.00$ 8,500.00$ SUB-TOTAL PAVING = 404,336.09$ National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-CC.xlsx 16.A.7.c Packet Pg. 444 Attachment: Opinion of Probable Cost - County (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 4 of 5 Project: Task: Prepared By: AJS Date: 9/30/2020 Checked By: DJH Date: 9/30/2020 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 15" RCP STORM SEWER 1 LS 3,463.00$ 3,463.00$ DRA-2 18" RCP STORM SEWER 1 LS 19,617.50$ 19,617.50$ DRA-3 24" RCP STORM SEWER 1 LS 31,494.40$ 31,494.40$ DRA-4 VALLEY GUTTER INLET 1 LS 4,500.00$ 4,500.00$ DRA-5 DOUBLE VALLEY GUTTER INLET 1 LS 40,968.00$ 40,968.00$ DRA-6 REMOVE PLUG AND INSTALL INLET 1 LS 5,000.00$ 5,000.00$ DRA-7 REMOVE EXISTING PLUG AND CONNECT TO RCP 1 LS 3,000.00$ 3,000.00$ SUB-TOTAL DRAINAGE = 108,042.90$ National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-CC.xlsx 16.A.7.c Packet Pg. 445 Attachment: Opinion of Probable Cost - County (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 5 of 5 Project: Task: Prepared By: AJS Date: 9/30/2020 Checked By: DJH Date: 9/30/2020 LANDSCAPE AND LIGHTING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE LL-1 LANDSCAPE 1 LS 30,000.00$ 30,000.00$ LL-2 STREET LIGHTING 1 LS 40,500.00$ 40,500.00$ SUB-TOTAL LANDSCAPE AND LIGHTING = 70,500.00$ NOTES: 1) National Golf and Country Club Phase 2 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) LANDSCAPE COST INCLUDE CODE MIN LANDSCAPING, SOD, MULCH, AND SECONDARY IRRIGATION P:\Active_Projects\P-LENN-011\001_National-PPL-Ph2\Budgets\Cost_Estimates\OPC\FeeCalc\OPC_Detail-National_PPL-Ph2-CC.xlsx 16.A.7.c Packet Pg. 446 Attachment: Opinion of Probable Cost - County (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••Digitally signed by Lance T Miller, PSM #5627 DN: cn=Lance T Miller, PSM #5627, o=and the signature must be verified on any electronic copies. SHA-1 authentication code must be verified on any electronic copies., ou=Digitally signed and sealed using a SHA-1 authentication code; and Printed copies of this document are not considered signed and sealed, email=lance.miller@stantec.com, c=US Date: 2020.12.14 16:05:31 -05'00' Adobe Acrobat version: 2020.013.2006616.A.7.dPacket Pg. 447Attachment: Plat Map (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 16.A.7.dPacket Pg. 448Attachment: Plat Map (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2) 16.A.7.dPacket Pg. 449Attachment: Plat Map (14546 : Final Plat - National Golf and Country Club at Ave Maria, Phase 2)