PTAC Agenda 01/19/2021
Public Transit Advisory Committee
Collier Area Transit
Hybrid Meeting
Collier County Museum, Lecture Hall, 3331 Tamiami Trail East, Naples, FL 34112
January 19, 2021
3:00 p.m.
1. Call to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes
a. October 20, 2020 Minutes
b. November 17, 2020 Minutes
5. Committee Action
6. Reports and Presentations
a. Beach Bus Service
b. FDDC Grant Update
7. Member Comments
8. Public Comments
9. Next Meeting Date – February 16th, 2021 (Location TBD)
10. Adjournment
Two or more members of the Board of County Commissioners may be present and may participate at the
meeting. The subject matter of this meeting may be an item for discussion and action at a future BCC meeting.
Collier Area Transit operates in compliance with Federal Transit Administration, (FTA) program requirements and
ensures that transit services are made available and equitably distributed and provides equal AGENDA access and
mobility to any person without regard to race, color, or national origin, disability, gender or age. Title VI of the Civil
Rights Act of 1964; FTA Circular 4702.1A, "Title VI and Title VI Dependent Guidelines for Federal Transit
Administration Recipients.
Anyone who required an auxiliary aid or service for effective communication, or other reasonable accommodations
in order to participate in this proceeding, should contact the Collier County Facilities Management Department
located at 3335 Tamiami Trail East, Naples, Florida 34112 or 239-252-8380 as soon as possible, but no later than 48
hours before the scheduled event. Such reasonable accommodations will be provided at no cost to the individual.
MINUTES OF THE PUBLIC TRANSIT ADVISORY COMMITTEE
MEETING
October 20, 2020
LET IT BE REMEMBERED, the Public Transit Advisory Committee in and for
the County of Collier, having conducted business herein, met on this date at 3:00
P.M. in REGULAR SESSION via hybrid video/teleconference/in-person at the
Collier Area Transit Office, 8300 Radio Road, Naples FL 34104, with the
following members present:
ADVISORY COMMITTEE MEMBERS PRESENT:
Chairman: Mr. John DiMarco
Vice-Chairman: Mr. Arthur Dobberstein
Mr. James Bennett
Mr. Peter Berry
Mr. Devon Browne
Mr. James Caton
Ms. Sonja Lee Samek
ALSO PRESENT:
Ms. Michelle Edwards-Arnold, Director, Public Transit and Neighborhood
Enhancement
Mr. Bill Gramer, Jacobs Engineering Group
Mr. Omar DeLeon, Public Transit Manager, Collier Area Transit
Mr. Zachary Karto, Senior Planner, Collier Area Transit
Ms. Felicia Kirby, Jacobs Engineering Group
Ms. Josephine Medina, Senior Planner, MPO, Collier County
Mr. Braian Morales, General Manager, MV Transportation, Inc.
Ms. Brandy Otero, Associate Project Manager, Collier County
Ms. Elena Ortiz-Rosado, Events, Sales & Marketing Coordinator, Collier Area Transit
Mr. Javier Ortiz-Velez, Jacobs Engineering Group
Page 1
I. Call to Order
Mr. DiMarco called the meeting to order at 3:00 P.M.
II. Roll Call
Roll call was taken, and a quorum established.
III. Approval of Agenda
Mr. Dobberstein requested that an update of the Transit Development Plan be added as an
agenda item for discussion. This topic will be added as item VI (b) Status of the TDP.
Mr. Dobberstein entered a motion to approve the agenda, with the noted addition. Mr.
Bennett seconded the motion. All members were in favor. The motion was carried.
IV. Approval of Minutes – September 15, 2020
Mr. Berry entered a motion to approve the September 15, 2020 meeting minutes, as
presented. Mr. Bennett seconded the motion. All members were in favor. The motion
was carried.
V. Committee Action
a. Final Park & Ride Study Report – Mr. Javier Ortiz-Velez
Mr. Ortiz addressed PTAC to review the final Park-and-Ride study report. Jacobs
Engineering Group provided consulting services to the Collier Metropolitan Planning
Organization (MPO) and to Collier Area Transit (CAT) for identification and
development of a standardized methodology for locating, operating, and maintaining
possible Park-and-Ride sites within Collier County. There is an approximate 2%
population growth in Collier County, which results in traffic congestion on its arterial
network. Park-and-Ride locations may help alleviate some of the congestion by
providing areas where commuters may park their vehicles and utilize public transit to
urbanized areas. A previous Park-and-Ride study was conducted for Collier County in
2005, the results of which indicated there were favorable conditions and locations where
these sites could be successful.
32 sites were evaluated in the current study, which included 12 locations studied in 2005.
A standardized methodology for locating, evaluating, and pursuing Park-and-Ride sites
within Collier County was identified. Sites were identified and evaluated based on
proximity to existing and planned Transit routes, commuter patterns and major
employment locations, deficient roads, regional interconnectivity, tourist destinations,
and educational facilities. Feedback from the public was solicited via an online survey,
as well as stakeholder input, including the Chamber of Commerce, major employers, and
other County agencies, all of which assisted in the identification of ultimate destinations
throughout the County when using a Park-and-Ride, including Marco Island, Immokalee,
and Everglades City. Criteria to evaluate the success of a site included various factors,
such as visibility, transit linkage, location, access, and cost to develop the site.
Page 2
10 of the 32 sites evaluated were identified as priority locations. The priority locations
include both proposed partnerships with private organizations and newly developed lots,
providing signage for existing spaces on shared-use lots such as the Government
Campus, Coastland Center Mall, Freedom Square, Physicians Regional Hospital-Pine
Ridge, New VA Hospital, and Railhead. Proposed new lots would be located at
Creekside, with connection with LeeTran, Immokalee Health Department, Beach parking
overflow lots at Pine Ridge Road and Vanderbilt Beach Road, as well as the Radio Road
Transfer Station lot. Next steps for existing lots and spaces includes updating websites
and maps, promotion of existing lots, installation of guide signs off main arterials, as well
as replacement of existing signs. Partnerships with private organizations to utilize
existing lots and parking spaces would be pursued. Funding would need to be identified
and established, including grant applications to support the acquisition of property for the
development of new lots, conceptual site plans, design and permitting. Service may then
be established via CAT route, vanpool, express bus, or MOD, with promotion to the
public of these services.
Mr. Browne inquired as to the results of any follow up of the effectiveness/benefit of the
Park-and-Ride locations which had been built following the 2005 study. Mr. Ortiz stated
that the sites were reviewed with respect to how they were being used within the
conditions of 2020, however no official tracking of use has been established. It was
noted that promotion to the public has been suboptimal and the sites have not been used
to capacity, but these issues would be taken into consideration if the County decided to
move forward with this program. Mr. DeLeon clarified that several of the sites are
comprised of a few parking spots at County libraries and are not standalone, dedicated
lots. As such, greater visibility to the community of the dual purpose of the parking spots
at these locations is needed. The parking lot of several of the locations is adjacent to a bus
stop.
Mr. Caton questioned whether the creation of overflow lots at Pine Ridge and Vanderbilt
Beach roads was practical, given the already limited availability of beach parking. It was
clarified that these sites were selected to relieve traffic congestion for all commuters,
including those that may have a work or entertainment destination, particularly during
tourist season, holidays, weekends, etc. It was also noted that the two sites designated for
beach parking are not located at the beach, but are off-site. Riders would park their
vehicles and then utilize transit to travel on to the beach or their desired destination. Mr.
Browne inquired as to the anticipated capacity and target utilization times, season versus
off-season at these two locations, and whether alternative uses during non-peak times are
being considered. It was clarified that basic capacity and turnaround counts are tracked
by the Parks and Recreation Division, which was studied by quarter in order to determine
the suggested number of parking spaces needed to serve each location, as well as to
adjust for population growth through 2040. Alternative use during non-peak times has
been considered, such as parking overflow for the Mercato, other local shopping
destinations, or to support other special entertainment or events.
Page 3
Mr. Browne reiterated the benefit of private/public partnerships with businesses and
possibly utilizing a portion of the parking lot on weekends only, which are typically peak
days for beachgoers.
Mr. Caton inquired as to incentives for private businesses to assign designated parking as
a Park-and-Ride location, which may be taking spots from employees or visitors to the
business. Mr. Gramer noted promotion to business owners of possible tax and/or zoning
benefits, as well as trip-chaining benefits for riders who may access multiple local
businesses. Mr. Caton also suggested potential pop-up Park-and-Rode locations
associated with a specific activity, such as a weekend farmer’s market or flea market,
which would not require zoning, construction, or infrastructure. Mr. Karto concurred and
noted that existing parking garages in the City of Naples are an example of locations
which would allow riders to park their vehicle and board a shuttle for access to
downtown, the Pier, or other areas of local interest. Potential Park-and-Rode locations are
evaluated for multiuse potential, including for commuters, tourism, as well as trade
access, dependent upon location and target market. Mr. Browne recommended analysis
for greatest community impact when considering ranking of the top ten locations.
Mr. Dobberstein noted some complexity in accessing the Pine Ridge Road location,
possibly impacting use. Mr. Gramer noted that to offer the most Park-and Ride locations,
efficiency, cost of each location, as well as access management were evaluated and
scored, and if deemed non-feasible, were not considered further. The limited availability
of beach parking in Marco Island, as well as of available land for purchase by the County
was acknowledged. Sites outside of Marco Island are being identified to transport riders
onto the Island, as well as implementation of a trolley service for residents to utilize on
the Island, which will also alleviate beach parking issues. Mr. DiMarco inquired whether
fixed bike racks will be available at Park-and Ride locations. It was noted that serving all
commuters is the goal, which would include pedestrians, bicyclists, as well as potentially
offering charging stations for electric vehicles.
Mr. Dobberstein commented upon the lack of plan development following the 2005 study
and encouraged practical usage of the findings of the most recent study. Mr. Berry
inquired whether a target date has been identified for the implementation of identified
next steps. Mr. Graber stated that the promotion of existing lots via the website, as well
as possible placement of guide signs onsite would be short-term, first steps towards
functioning, usable park-and-ride locations, which could be used as a model for more
park-and-ride locations to follow. It was further noted by Mr. Karto that a manual has
been created for use by County staff which details criteria to follow in the evaluation of
potential park-and-ride locations. Mr. Dobberstein commented upon the benefit to
employers to market this amenity to their employees. Mr. DeLeon also noted the
potential for partnerships with commercial developments where Park-and Ride locations
may be appropriated as part of the project. Mr. Bennett suggested that a Park-and-Ride
located near the Collier-Lee County border would be useful for the many people who
travel into the county each day for work.
Page 4
Mr. DeLeon stated that several potential locations have been identified along the county
line corridor, including at Miromar Outlets. Ms. Arnold further stated that partnership
with LeeTran is being considered, to share costs associated with the service.
Ms. Arnold summarized by noting Advisory Committee suggestions to assign general
target dates for next step items, as well as analysis for greatest community impact when
considering ranking of the top ten locations. These suggestions may be incorporated into
the Transit Development Plan and/or the manual created for use in planning upcoming
Park-and-Ride projects; the evaluation of where sites may be located, as well as a
reference tool in discussion with developers.
Mr. DiMarco entered a motion to endorse the final Park-and-Ride Study, with the
addition of the assignment of a schedule to identified next step items. Mr. Bennett
seconded the motion. All members were in favor. The motion was carried.
b. Florida Developmentally Disadvantaged Council Grant
PTNE staff received an invitation by the Florida Developmental Disabilities Council to
participate in a 12-month pilot transportation voucher project which utilizes $150K in
grant funding. No matching funds are required. The project is designed to provide
additional transportation options for residents with intellectual and/or developmental
disabilities by making on-demand service available, in addition to scheduled paratransit
rides. The pilot program is underway in both Hillsborough County and the City of
Jacksonville, with funding available to support the program in eight additional counties
and areas within Florida.
Participation in the program will afford an opportunity to test partnerships with taxis and
Transportation Network Companies (TNCs, including Uber and Lyft) and provide a
greater level of service to the disabled members of the community. A decision to move
forward with the pilot program has been made, with necessary approvals in place to
begin. A Work Plan has been created, which identifies goals for the program, as well as
the boundaries where the service will be provided. The service will be available 7 days a
week, 6:00 a.m. to 10:00 p.m. A partnership with Uber has been established to provide
this service to the community, currently in discussion for the use of wheelchair accessible
vehicles. This may entail partnership with a third contractor, a local taxi company which
provides wheelchair accessible vehicles (WAV). All eligible passengers currently in the
CAT Connect system will be uploaded onto the Uber Central platform, allowing for
booking same day service via a smartphone. No additional application will be required to
utilize the new program. Transit will have access to Uber Central to run reports and
evaluate the data. The trip cost will be $20, with the initial $4 paid for by the passenger
and $16 subsidized by the grant. Any cost beyond $20 will be the responsibility of the
passenger. The Agreement is planned to be presented to the Board of County
Commissioners at the October 27, 2020 meeting, working thereafter with Uber to finalize
the agreement, as well as for wheelchair access vehicles. The program is scheduled to
begin in December 2020, running through September 2021, with monthly assessments
done.
Page 5
Finally, the completed pilot program will be evaluated, with a cost comparison with the
current CAT Connect service.
Mr. Dobberstein inquired whether drivers will be specially trained in the transport of
developmentally disabled passengers, as well as whether passengers may request the
service using methods other than online. It was clarified by Mr. DeLeon that specialized
training for drivers is a requirement of the grant funding; clarification will be sought
regarding methods available for riders to request the service. Mr. Dobberstein inquired
whether this program may divert riders from utilizing CAT Connect and whether this will
affect revenue. It was noted that feedback from the program in Hillsborough County
reflected use of both the on-demand service and the traditional scheduled service, as
needed. The program is being offered by CAT as a benefit to the local community by
providing greater mobility options. The service will be multi-load; however, it will be
clarified whether an additional fee will be required if a guest joins an eligible rider. Mr.
Dobberstein noted the possibility for more partnership opportunities with Uber following
the use of this program. Mr. DeLeon concurred, stating that Uber now has personnel
dedicated to managing Transit contracts. As well, Uber has been utilized as a link to
facilitate the movement of people to bus stops or transit stations, utilizing a voucher or
credit system.
An update on the program will be provided to PTAC following presentation to the BCC.
VI. Reports and Presentations
a. CAT Performance Measures
Annual CAT performance measures were shared with PTAC. In comparison of FY19 to
FY20, a decrease in ridership of 20% was seen. An uptick in ridership was seen at the
beginning of the year, November to February 2019, pre-COVID, which significantly
impacted ridership beginning in February. Ridership for the past several months has
maintained at a 33% decrease from the previous year. No revenue was reported during
the months of free service to the community, and lower revenue is noted in August 2020
when fares were reinstituted, attributed to the lower ridership. Despite decreased
ridership in September, the increase in revenue is attributed to $58K in passes purchased
by a developer for their employees. There has been a slight increase in revenue miles and
hours from the year before, attributed to the use of additional vehicles to accommodate
social distancing for riders. On-time performance was 90% during the time of suspended
fares, which decreased slightly with the reinstitution of fares.
b. Status of the TDP
The draft TDP was released to the public for 30 days for review and comment, however
with no feedback received. The TDP is scheduled to be presented to the BCC at the
October 27, 2020 meeting.
VII. Member Comments
+Mr. DiMarco requested an update on the potential use of electric shuttles along
Bayshore Drive.
Page 6
Mr. Karto clarified that discussions with the Bayshore CRA are ongoing, currently with
two electric shuttles under consideration for use on Bayshore Drive. A public survey is
planned to solicit feedback on services of interest in that area. A copy of the survey will
be shared with PTAC when released.
+Mr. Dobberstein suggested that a brief, descriptive summary be provided to PTAC of
consultants chosen for Transit projects.
+Mr. DiMarco noted that the Advisory Committee members have not been updated on
the Government website and requested that this be amended.
VIII. Public Comments
There were no additional comments from members of the public.
IX. Next Meeting Date – November 17, 2020
X. Adjournment
There being no further business for the good of the County, the meeting was adjourned.
Public Transit Advisory Committee
___________________________________
John DiMarco, Chairman
These minutes approved by the Committee on _________________as presented ___ or as
amended___.
Page 7
MINUTES OF THE PUBLIC TRANSIT ADVISORY COMMITTEE
MEETING
November 17, 2020
LET IT BE REMEMBERED, the Public Transit Advisory Committee in and for
the County of Collier, having conducted business herein, met on this date at 3:00
P.M. in REGULAR SESSION via hybrid video/teleconference/in-person at the
Collier Area Transit Office, 8300 Radio Road, Naples FL 34104, with the
following members present:
ADVISORY COMMITTEE MEMBERS PRESENT:
Vice-Chairman: Mr. Arthur Dobberstein - Zoom
Mr. James Bennett - Zoom
Mr. Peter Berry – In person
Mr. Devon Browne - Zoom
Mr. James Caton – In person
Ms. Sonja Lee Samek - Zoom
Absent:
Chairman: Mr. John DiMarco
ALSO PRESENT:
Ms. Michelle Edwards-Arnold, Director, Public Transit and Neighborhood
Enhancement
Mr. Omar DeLeon, Public Transit Manager, Collier Area Transit
Mr. Zachary Karto, Senior Planner, Collier Area Transit
Marirka Maldonado, ParaTransit Manager, MV Transit
Ms. Brandy Otero, Associate Project Manager, Collier County
Ms. Elisabeth Schuck, Senior Associate, Tindale Oliver
Page 1
I. Call to Order
Mr. Dobberstein called the meeting to order at 3:00 P.M.
II. Roll Call
Roll call was taken, and a quorum established.
III. Approval of Agenda
A vote on approval of the meeting agenda could not be done due to a lack of an in-person
quorum.
IV. Approval of Minutes – October 20, 2020
A vote on approval of the October 20, 2020 meeting minutes could not be done due to a
lack of an in-person quorum.
V. Committee Action
a. Transit Impact Analysis Study: Collier County and Collier Area Transit (CAT),
in partnership with the Collier Metropolitan Planning Organization (MPO) initiated a
Transit Impact Analysis Study to determine how Transit can best be integrated into the
Development Review process to mitigate impacts on the transit system from development
projects. The current development process requires CAT to reactively respond to impacts
of development on transit infrastructure and service; in many instances, necessitating
accommodation of the demand the development project places on the transit system,
without the financial resources to help mitigate the costs. The appropriateness of
developer contribution to the Transit infrastructure for a new development project was
also studied.
The study process considered two tracts, technical analysis and review of data
information, demographics, development patterns, comparison in operations with select
peer transit systems, as well as an in-depth study of the current Development Review
process. Secondly, engagement with Agency Staff, working closely with the Project
Advisory team, including MPO staff, CAT staff, and Collier County Transportation and
Growth Management staff, as well as senior County leadership.
The key findings of demographics and Transit reflect a high annual average growth rate
in Collier County, with growth shifting eastward. Seasonal peak ridership averages 10%
higher than non-peak, with increasing operating costs per rider, which is consistent with
state and national trends.
The key findings of Peer Review among five comparable peers reveal that CAT has the
lowest passenger trips and trips per revenue mile, the second lowest revenue hours per
capita/operating expense per capita, and the second highest trip length. Substantial
service sector economy is seen; high journey to work mode share despite relatively low
overall ridership.
Page 2
The key findings of review of the Development Review process reveal no formal system
to consider development impacts to the transit system and no transit related mitigation
required of developers. Transportation Demand Management (TDM) is a defined set of
strategies aimed at maximizing traveler choices. Development is often scaled back to
avoid TDM requirements and some TDM strategies may be chosen based on cost or ease
of implementation, not necessarily effectiveness. Modification of inconsistent regulatory
language and policies on TDM implementation, monitoring, and evaluation is necessary.
There are many limitations within the County in terms of density and challenges to
provide transit in specific areas, as well as in funding of operations. The County is
currently not eligible for funding of operations via a sales tax, with a focus then on
general funds for increasing revenue for the Transit system. Developer funded mitigation
is a short-term solution, requiring eventual necessity of a new revenue source.
One potential approach studied was transit site access improvements. There is currently
no requirement for site-related transit infrastructure, as there is for sidewalks, bike lanes,
and pathways. The establishment of transit site access regulations is recommended,
proportional to the scale of development, apply to development along existing/planned
transit routes, consistent with the scale and design of typical CAT facilities and which are
similar to other site access requirements. Mr. Dobberstein inquired as to whether
accommodations in routing would add time to the route. It was noted that an “in lieu of’
payment option has been suggested if the addition of transit infrastructure directly on the
site being developed is impractical, with mutual agreement that the bus stop may be
located in close proximity. Early discussions with developers are key to incorporation of
improvements during site development.
Longer-term strategies were studied which would modify some areas into more transit
oriented development areas, with area specific redevelopment goals, districts and
corridors, and modification of the development review process accordingly.
Transportation Demand Management strategies were explored, which are ways
developers can have exception to concurrency in specific areas, with the goal to shift
from single occupant vehicle trips to alternative modes, shifting trips out of the peak
travel periods to reduce congestion. Post-Covid, higher telework levels will likely
continue. Best practices findings applicable to Collier County revealed that TDM
programs can be more challenging in the suburban settings than higher density urban
areas. Commuter benefit transit programs, such as personal transit pass systems are often
deeply discounted and generate increased ridership; however, do not generate additional
revenue for the transit system. Parking pricing and supply limitations were seen to
increase TDM effectiveness in the suburban context, however this concept would be
more applicable to employees required to pay for employer parking in Collier County,
where the majority of parking is free and other strategies would likely be pursued. More
robust programs will require greater staffing resources in management and
administration. Evaluation and monitoring of programs would be necessary to gauge
effectiveness over time.
Page 3
Recommendations resulting from the study include looking at implementing transit site
access requirements and refreshing the TDM program and strategies which currently
exist. Draft regulatory language was provided which requires various types of
infrastructure for development projects located on existing routes or planned routes in the
ten-year Transit Development Plan or the first five years of the Long Range
Transportation Plan. The noted requirements per the type of infrastructure were based on
the size of the development in terms of traffic generation. All construction would remain
consistent with CAT guidelines, the scale of the development, and ADA accessible.
Additionally, adjustment of the TDM strategies in the Growth Management Plan and the
Land Development Code is recommended, with creation of a tiered approach of existing
strategies, so that developers would be required to choose complementary strategies from
each tier, as opposed to choosing cheaper or easier options. Strategies for newer
technologies such as electric vehicles, charging stations, and preferential parking were
given, as well as a recommendation that park and ride spaces be provided as an option for
transit riders, including within a development if the site can support it. Language has
been provided which requires any development on an existing or planned transit route to
include at least one transit related strategy, as well as adding additional support for
bicycle facilities, on-site storage, and amenities if the development project is located near
pathways or bicycle lanes. Language also includes enhanced reporting and monitoring
requirements, as well as provided streamlined language between the Growth
Management Plan and the Land Development Code.
A recommendation was made by Mr. Caton for flexibility within the TDP to adjust the
larger strategy in response to developer choices.
Regarding impact fees, Collier County currently has a roadway impact fee, which does
not include Transit, bicycle traffic, sidewalks, etc., and has not moved to a multimodal
impact fee.
Next steps include presentation of recommendations to the CAC, TAC, and MPO Board
in December 2020. Draft language will ultimately be reviewed by the County Attorney,
who will finalize regulatory language prior to presentation to the Board of County
Commissioners.
Consensus in support of study recommendations was received from all PTAC
members in attendance.
b. 5310, 5311, 5339 Grant Applications: The 5310, 5311, and 5339 are competitive
grant applications which are submitted annually to the Florida Department of
Transportation (FDOT), and which identify specific projects associated with each grant.
The grants are specific to rural areas. 5310 and 5311 have local match requirements,
utilizing either State funds, a combination of State and local funding, or just local funds.
The final submission date is December 14, 2020.
Page 4
5310: Funds are being requested for the purchase of three paratransit vehicles and
associated technology. The vehicles are approximately $83K each, utilizing FDOT
contract pricing, with 3 wheelchair capacity. All vehicles in the fleet are purchased with
grant funds, with need evaluated on a yearly basis. 5310 funding is specific to paratransit.
5311: This grant is being requested for operational expenditures associated with
providing service to rural areas, including Immokalee, Golden Gate Estates, as well as
other outlying areas of Collier County.
5339: Funds are being requested for improvements to nine bus stops in rural locations,
including adding bus shelters, benches, trash cans, bike racks, and ADA compliance.
While there is ongoing discussion with LeeTran regarding funding of regional routes,
there is currently no pursuit of grant funding in partnership with surrounding counties.
Exploration of regional/partnership grants to test new transportation technologies and
modalities is a viable option for consideration.
Consensus in support of the submission of grant applications as presented was
received from all PTAC members in attendance.
VI. Reports and Presentations
There were no additional reports and presentations.
VII. Member Comments
+It was noted by Ms. Arnold that an amendment change to the by-laws to adjust the
number of in-person quorum from 4 to 3 is under consideration, and will be discussed
with the County Attorney. Any new information related to this item will be discussed at
the next meeting.
VIII. Public Comments
There were no comments from members of the public.
IX. Next Meeting Date – December 15, 2020
X. Adjournment
There being no further business for the good of the County, the meeting was adjourned.
Public Transit Advisory Committee
___________________________________
Arthur Dobberstein, Vice-Chairman
These minutes approved by the Committee on _________________as presented ___ or as
amended___.
Page 5
EXECUTIVE SUMMARY
Reports/Presentations
Item 6a
Collier Area Transit Beach Bus
Objective:
To provide Beach Bus service to Collier County residents and visitors.
Considerations:
Collier Area Transit (CAT), after its third successful year of the Beach Bus service and a successful
kick off to its fourth is again offering the Beach Bus to Collier County residents and visitors. The
fourth season was unfortunately cut short due to COVID49 but started out with the highest
ridership of all seasonal starts.
The Beach Bus season will be from February 4th until May 30th3 2021. The service will consist of
a free shuttle traveling on Immokalee Rd from Creekside to Delnor-Wiggins Pass State Park
stopping at Conner Park in between. The route is the same alignment used for previous seasons
which has seen continuous growth. A change for this season is the utilization of a gasoline powered
trolley. (See attached Photo)
The Beach Bus service will operate from 8:00 a.m. to 3:00 p.m., then again from 4:30 p.m. to 7:10
p.m., Thursdays, Fridays, Saturdays, and Sundays with a 30-minute frequency. The Beach Bus
will offer a `flag down' service, so riders can catch a free ride anywhere along the route. Anyone
using the trolley to enter Delnor-Wiggins Pass State Park will be required to pay the Park entrance
fee of $2. Collier County has an agreement with the State Park to collect the fees on their behalf
and to honor the State Park issued passes.
Overall, CAT
has had great
success
in
growing the Beach Bus
service in previous 4 years and
plans continue
to provide the
service
for
the foreseeable future.
Recommendation:
This item is information only. No approval required.
Prepared by: I Date: 1 jrJ ' ZUZI
ac Karto, Senior Planner
Approved by: Date:
Michelle Arnold, PINE ivision Director
Kim
lot
dloo
Ad
a-,-
sop,
EXECUTIVE SUMMARY
Repo rts/Presentations
Item 6b
FDDC Grant Update
Objective:
To update the committee on the Florida Developmental Disabilities Council grant and service.
Considerations:
On August 6, 2020, Public Transit &Neighborhood Enhancement (PTNE) staff received an
invitation from Florida Developmental Disabilities Council (FDDC) to take part in a 12-month
pilot grant transportation voucher project for $150,000. Funding is originated from the Department
of Health and Human Services and passed thru to the FDDC. The project is designed to provide
increased transportation options for residents with intellectual and developmental disabilities. It is
the intent of this project to meet those transportation needs that are currently not being met through
Collier Area Transit's (CAT) paratransit system.
The proposed voucher project in Collier County is expected to serve a113,260 passengers actively
using the County's ADA paratransit system and is projected to provide an additional 8,125 annual
trips. The existing paratransit system provides approximately 79,000 annual trips. With the
implementation of the voucher program, an increase of 10.3% in the annual trip volume is
expected.
Staff is working on completing the agreement with Uber Technologies, Inc. (Uber) to provide
users with increased accessibility to life -sustaining and quality of life activities under a same -day
demand response platform that includes ADA accessible vehicles. Uber will provide a safe and
convenient on -demand shared rides service to supplement the CAT paratransit system. Passengers
will pay a minimum of $4 fare for the trip. The grant will support a per -trip cost up to $16. If the
cost of the trip is over $20, passengers will be responsible for paying that amount in addition to
the $4 fare previously described. As an example, a trip costing $27.50 would result in the grant
paying $16 and the passenger paying $11.50 ($4 + $7.50). The service will be available from 6:00
a.m. to 10:00 p.m. seven (7) days a week. Eligible passengers will be able to access the service
through a mobile app. The voucher pilot program will run through September 2021.
RECOMMENDATION:
This item is info ation o No approval re uired.
Prepared by: Date: �5
Omar De Leon, TransiZ`1 er
Approved by: Date: i [ S %[
Michelle Arnold, PTNE Division Director