GG MSTU Agenda 11/17/2020Page 1 of 1
GOLDEN GATE BEAUTIFICATION M.S.T.U.
8300 Radio Road
READ AHEAD Naples, FL 34104 READ AHEAD
AGENDA
NOVEMBER 17, 2020
I. CALL TO ORDER
II. ATTENDANCE
Advisory Committee Patricia Spencer – Chair (10/06/2021)
Paula Rogan – Vice Chair (10/06/2023)
Florence “Dusty” Holmes (10/06/2021)
Ron Jefferson (10/06/2022)
- Vacancy -
Staff Michelle Arnold – PTNE Director
Dan Schumacher, Harry Sells – Project Managers
Contractors Mike McGee – Landscape Architect (McGee & Assoc)
Mike Patterson – Grounds Maintenance (Mainscape)
III. PLEDGE OF ALLEGIANCE
IV. APPROVAL OF AGENDA
V. APPROVAL OF MINUTES OCTOBER 20, 2020
VI. LANDSCAPE MAINTENANCE REPORT – MAINSCAPE
VII. LANDSCAPE ARCHITECT’S REPORTS – MCGEE & ASSOCIATES
A. Tropicana Boulevard
B. Sunshine Boulevard
C. Coronado Parkway & Hunter Boulevard
VIII. PROJECT MANAGER’S REPORT
A. Budget Report.
B. Bridge Painting.
C. Ornamental Pruning & Plant Replacements.
D. Pkwy Bridge Replacement.
IX. OLD BUSINESS
X. NEW BUSINESS
XI. PUBLIC COMMENTS
XII. ADJOURNMENT
NEXT MEETING:
DECEMBER 15, 2020 AT 4:30 PM
GOLDEN GATE COMMUNITY CENTER
18.A.2
Packet Pg. 319 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
October 20, 2020 Golden Gate MSTU 1/4
GOLDEN GATE M.S.T.U. ADVISORY
COMMITTEE
8300 Radio Road
Naples, FL 34104
OCTOBER 20, 2020
MINUTES (via ZOOM remote access)
I. Call to Order
The meeting was called to order at 4:32 P.M. by Ms. Spencer. Attendance was called and a
quorum of four was present.
II. Attendance
Advisory Committee Patricia Spencer – Chair
Paula Rogan
Florence “Dusty” Holmes
Ron Jefferson
Vacancy
Staff Dan Schumacher, Collier County – Project Manager
Rosio Garcia, Collier County – Administrative Assistant
Landscape
Other Wendy Warren, Premier Staffing – Transcriptionist
III. Pledge of Allegiance
The Pledge of Allegiance was not recited (virtual meeting).
IV. Approval of Agenda
Chair Spencer moved to approve the Agenda of the Golden Gate Advisory Committee as presented.
Second by Ms. Holmes. Carried unanimously 4 - 0.
V. Approval of Minutes September 15, 2020
Chair Spencer moved to approve the minutes of the September 15, 2020 meeting as presented.
Second by Ms. Rogan. Carried unanimously 4 - 0.
18.A.2
Packet Pg. 320 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
MINUTES (via ZOOM remote access)
October 20, 2020 GOLDEN GATE MSTU 2/4
VI. Landscape Maintenance Report – Mainscape Landscaping Company
Mr. Schumacher reported:
Structural pruning and canopies were lifted on one hundred three (103) live oaks, one hundred
sixty-two (162) Sabal palms and three (3) Fox Tail palms.
Silk Floss and Hong Kong Orchid trees will also be pruned.
Mr. McGee and he will verify the counts on all trees for invoice verification.
Medians have been cleaned; weed control has been applied.
Mainscape will update tree and plant counts for median renovation and provide quotes by
roadway.
In response to the Committee’s inquiry regarding maintenance between the north end bridge and Green
Boulevard, Mr. Schumacher advised the Road Maintenance Department is responsible for mowing the
area. He will follow-up to ensure maintenance is performed in a timely manner.
VII. Landscape Architect’s Report – McGee & Associates
Mr. Schumacher will issue a Notice-to-Proceed (NTP) to Mr. McGee for Landscape Architectural
Services on approval of the 2021 County contract for the Golden Gate M.S.T.U.
VIII. Project Manager’s Report
A. Budget Report
Mr. Schumacher summarized the “Golden Gate MSTU Fund Budget 153 dated
October 20, 2020” for information purposes and provided an overview of the budget noting:
FY21 Ad Valorem property tax revenue budget is $443,200.00, an increase of 11.44% over
FY20.
Total revenue FY21 is $1,354,434.75 including investment interest, transfers, and
contributions.
The FY-21 Millage rate remains constant at 0.5000%.
Current Operating Expense Budget is $330,834.75 of which Commitments total
$185,022.61; Expenditures $127.14.
Uncommitted Operating Expense funds available are $145,685.00.
Purchase Orders for standard maintenance contracts have or are being processed.
The Landscape Ground Maintenance Purchase Order is for routine monthly maintenance;
Landscape Incidentals PO covers plant replacements.
Florida Power & Light expense funds electricity for lights and pumps.
Forestry Resources, operating under a County Contract, will supply mulch for application
on completion of median refurbishment.
HydroPoint’s annual subscription Purchase Order for a suite of ongoing performance
management tools, will be issued.
The FY-20 Purchase Order balance for Premier Staffing in the amount of $1,534.75,
available for outstanding 2020 invoice submissions, will be closed out.
Transfer to 111, Line 37, is for Staff salaries.
Budget Transfers Appraiser and Tax Collector, Lines 38 and 39, are fees billed by the
appropriate entities.
Improvements General Fund, Line 35, reserved to fund capital projects or multi-year
landscape contract deficit, available balance is $905,000.00.
Total available balance, less committed expenses, is $1,303,184.57.
18.A.2
Packet Pg. 321 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
MINUTES (via ZOOM remote access)
October 20, 2020 GOLDEN GATE MSTU 3/4
Hart’s Electrical will investigate the reported daytime lighting malfunction on Median # 6,
Tropicana Blvd, and repair, as necessary.
B. Welcome Sign - Collier Blvd. (South)
In accordance with County policy, a “Quick Quote” solicitation was posted online to install
a new replacement “Welcome to Golden Gate” sign in the west right-of-way (ROW) by the
canal bridge.
Eight (8) proposals were received; five (5) were rejected due to failure to meet project
specifications.
Qualified contractors will be contacted to provide additional details for the turnkey project
related to permitting, manufacturing of the sign, and installation.
Mr. Schumacher contacted the Collier County Sign Review and Permitting Departments to verify
the sign, as designed, conforms to County standards. The Committee will be updated on the project
at a future meeting.
C. Bridge Painting
Mr. Schumacher reported:
Albert English, Director of Road Maintenance Division, has expressed preliminary
interest in the Golden Gate MSTU’s offer to help fund painting of bridges in Golden Gate
City.
Select bridge sites were visited to review the scope of the project and ear mark potential
bridges for refurbishment.
A bridge inventory list for seventeen (17) bridges in the Golden Gate community was
previously received from the Road Maintenance Division.
The project would pertain to bridges on secondary roads.
Approval of the project by the M.S.T.U. Advisory Committee would be contingent on an
agreement with the county Road Maintenance Division to assume future maintenance of
the painted surfaces.
Paint cost will be borne by the M.S.T.U.; labor cost will be the responsibility of Road
Maintenance.
Bridge paint color will comply to the Florida DOT standard.
Mr. Schumacher will update the Committee on the status of the project at a future meeting.
D. Leaning FPL Light Poles
Mr. Schumacher is awaiting confirmation from the Collier County liaison for Florida Power &
Light (FPL) verifying the concrete light poles on Coronado Parkway and Hunter Boulevard have
been straightened.
E. Structural Pruning
This topic was discussed under Item VI. Landscape Maintenance Report.
IX. Old Business
None
18.A.2
Packet Pg. 322 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
MINUTES (via ZOOM remote access)
October 20, 2020 GOLDEN GATE MSTU 4/4
X. New Business
A. Parkway Bridge Replacement
Mr. Schumacher reported the Santa Barbara canal bridge on Golden Gate Parkway has a structural
defect and the Road Maintenance Department plans to replace it.
He will:
Request a drawing of the new bridge and forward it to the Committee,
Clarify the status of the accompanying pedestrian bridge.
Inquire if a public meeting will be held for residents.
Ascertain funding and implementation sequence for the project.
Confirm entity responsible for irrigation and landscape installation.
The Committee will work with McGee & Associates to design an irrigation and landscape plan if
the M.S.T.U. assumes responsibility for this feature.
XI. Public and Board Comments
Mr. Jefferson attended a meeting of the Collier County Economic Development Council (EDC) during
which the feasibility of expanding Collier Boulevard, US 951 to six (6) lanes was discussed.
Development of the Golden Gate Country Club 167-acre golf course by the County may necessitate the
infra-structure modification.
He noted the M.S.T.U. may want to consider postponing the “Welcome to Golden Gate” sign in the
west right-of-way (ROW) by the canal bridge project as the sign location may interfere with the
expanded roadway.
Mr. Schumacher will research plans, establish a timeline for potential roadway expansion in the area
and add the item to the November Agenda.
XII. Adjournment
There being no further business to come before the Committee, the meeting was adjourned
by the Chair at 5:15 P.M.
GOLDEN GATE MSTU ADVISORY COMMITTEE
________________________________
Patricia Spencer, Chair
The Minutes were approved by the Committee on , 2020 as presented , or
as amended ______.
NEXT MEETING:
NOVEMBER 17, 2020 – 4:30 PM
GOLDEN GATE COMMUNITY CENTER
4701 GOLDEN GATE PARKWAY
NAPLES, FL 34116
-Subject to permission from the County Manager-
18.A.2
Packet Pg. 323 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
Golden Gate MSTU
Fund 153
November 17, 2020
FY-21 Vendor Item PO# Budget Commitments Expenditures
Budget
Remainder
1 CUR AD VALOREM TAX (493,900.00)$ -$ (2,316.90)$ (491,583.10)$
2 DEL AD VALOREM -$ -$ -$ -$
3 OVERNIGHT INTEREST -$ -$ -$ -$
4 INVESTMENT INTEREST (8,000.00)$ -$ -$ (8,000.00)$
5 INTEREST TAX COLLECTOR -$ -$ -$ -$
6 INS CO REFUNDS -$ -$ -$ -$
7 REVENUE STRUCTURE (501,900.00)$ -$ (2,316.90)$ (499,583.10)$
8 TRANS FROM PROPERTY APPRAISER -$ -$ -$ -$
9 TRANS FROM TAX COLLECTOR -$ -$ -$ -$
10 CARRY FORWARD GEN (825,900.00)$ -$ -$ (825,900.00)$
11 CARRY FORWARD OF ENCUMB (1,534.75)$ -$ -$ (1,534.75)$
12 NEG 5% EST REV 25,100.00$ -$ -$ 25,100.00$
13 TRANSFERS & CONTRIB (802,334.75)$ -$ -$ (802,334.75)$
14 TOTAL REVENUE (1,304,234.75)$ -$ (2,316.90)$ (1,301,917.85)$
15 WORKERS COMPENSATION -$ -$ -$ -$
16 PERSONNEL SERVICES -$ -$ -$ -$
17 ENG. FEES & OTHERS McGee & Associates Landscape Architect TBD 40,000.00$ 23,290.00$ -$ 16,710.00$
18 INDIRECT COST REIMBURSE Collier County Indirect Cost Direct Pay 7,000.00$ 7,000.00$ -$ -$
Mainscape Landscape Incidentals 4500206700 30,000.00$ 30,000.00$ -$
19 LANDSCAPE INCIDENTALS 30,000.00$ 30,000.00$ -$ -$
Mainscape Grounds Maintenance 4500206700 107,251.60$ 12,748.40$
20 OTHER CONTRACTUAL 200,000.00$ 107,251.60$ 12,748.40$ 80,000.00$
21 ELECTRICITY FPL Electricity 4700004404 3,500.00$ 2,543.02$ 231.98$ 725.00$
22 RENT EQUIPMENT 300.00$ -$ -$ 300.00$
23 INSURANCE GENERAL Collier County Insurance General Direct Pay 700.00$ 700.00$ -$ -$
HydroPoint Data Controller Renewal VISA -$ -$
SiteOne Pumps & Related Items 4500207010 2,177.45$ 322.55$
24 SPRINKLER SYSTEM 10,000.00$ 2,177.45$ 322.55$ 7,500.00$
Forestry Resources Mulch TBD -$ -$
25 MULCH 12,000.00$ -$ -$ 12,000.00$
Hart's Electrical Lighting Maintenance 4500207294 2,000.00$ -$
26 LIGHTING MAINTENANCE 12,000.00$ 2,000.00$ -$ 10,000.00$
27 LICENSE & PERMITS Licenses & Permits Collier County - Cartegraph 4,000.00$ -$ -$ 4,000.00$
Amazon US Flags VISA -$ -$
Premier Staffing Transcriptionist (FY19)450019931 1,534.75$ -$
Premier Staffing Transcriptionist (FY20) 4500207137 2,950.00$ -$
28 OTHER MISCELLANEOUS 4,534.75$ 4,484.75$ -$ 50.00$
29 OFFICE SUPPLIES Office Supplies 300.00$ -$ -$ 300.00$
J.M. Todd Copier CPC (new)4500207221 300.00$ 83.32$ 16.68$
30 COPYING CHARGES 300.00$ 83.32$ 16.68$ 200.00$
Howard Fertilzer Fertilizer for Golden Gate VISA -$ -$
31 FERT HERB CHEM 5,000.00$ -$ -$ 5,000.00$
32 OTHER OPERATING 1,000.00$ -$ -$ 1,000.00$
33 OTHER TRAINING 200.00$ -$ -$ 200.00$
34 OPERATING EXPENSE 330,834.75$ 179,530.14$ 13,319.61$ 137,985.00$
Quick Quote #20-0901-GG 951 Welcome Sign TBD -$
35 IMPROVEMENTS GENERAL 905,000.00$ -$ -$ 905,000.00$
36 CAPITAL OUTLAY 905,000.00$ -$ -$ 905,000.00$
37 TRANS - FUND 153 TO FUND 111 Reimbursement for Staff Support 53,700.00$ -$ -$ 53,700.00$
38 TRANS TO PROPERTY APPRAISER 4,400.00$ -$ 923.04$ 3,476.96$
39 TRANS TO TAX COLLECTOR 10,300.00$ -$ 69.51$ 10,230.49$
40 TRANSFERS 68,400.00$ -$ 992.55$ 67,407.45$
41 TOTAL BUDGET 1,304,234.75$ 179,530.14$ 14,312.16$ 1,110,392.45$
797,305,507 FY 10 Final Taxable Value Total Available Balance 1,110,392.45$
548,992,684 FY 11 Final Taxable Value Plus Commited And Not Spent 179,530.14$
478,980,702 FY 12 Final Taxable Value
516,253,177 FY 13 Final Taxable Value Estimated Cash 1,289,922.59$
533,888,677 FY 14 Final Taxable Value
575,541,732 FY 15 Final Taxable Value
611,031,317 FY 16 Final Taxable Value
673,743,701 FY 17 Final Taxable Value
749,340,700 FY 18 Final Taxable Value Prepared: 11/12/2020
813,136,298 FY 19 Final Taxable Value
885,608,742 FY 20 Final Taxable Value
987,780,379 FY 21 July Est. Taxable Value
11.54% Adjustment FY 20 to FY 21
0.5%FY 21 MSTU Millage Rate 0.5 mill cap
Estimated Cash Less
Uncollected Ad Valorem Taxes 798,339.49$
18.A.2
Packet Pg. 324 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
Golden Gate Parkway (CR 886) at
Santa Barbara Canal
Bridge Replacement Project
November 2020
The bridge on Golden Gate Parkway over Santa
Barbara Canal is nearing the end of its useful
life and needs to be replaced. The existing four-
lane bridge (two eastbound travel lanes and two
westbound travel lanes) was originally constructed
in 1971, with two adjacent pedestrian bridges added
in 2008. Due to the age of the main bridge, Collier
County will be replacing the three existing bridges
with a single bridge that includes both shoulders
and sidewalk on each side. These improvements
are anticipated to enhance mobility and maintain
connectivity for vehicles, bicycles, and pedestrians.
Growth Management Department
Transportation Engineering Division
New bridge design
Design of the new bridge is scheduled to be completed in spring 2022. The bridge will have two, 12-
foot travel lanes (in each direction), an approximately eight-foot shoulder, and a 12-foot sidewalk on
each side. Collier County plans to install landscaping in the 13-foot wide median as part of a future
corridor improvement project.
What to expect during construction
Construction of the new bridge is expected to begin soon after design is finished in 2022 and be completed
by late 2022. The work will take place in two phases in order to maintain travel on the bridge at all
times. During construction, both directions of travel will use one side of the bridge (one lane in each
direction) while work occurs on the other side. Once half of the bridge is constructed, traffic will shift to
the new structure to allow construction on the second half of the bridge. Throughout construction travel
will be maintained for vehicles, bicycles, and pedestrians with limited traffic delays during peak periods.
Temporary lane closures may be necessary. The county does not anticipate fully closing the road at any
time during this work. However, detours will be provided should a temporary, full closure be necessary.
Access to businesses and residents near the bridge will be maintained.
Bridge replacement
18.A.2
Packet Pg. 325 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
Growth Management Department
Transportation Engineering Division
For more information about this project, please contact:
Connie Deane
Community Liaison
Connie.Deane@colliercountyfl.gov
239.252.8192
Dennis F. McCoy, P.E.
Senior Project Manager
Dennis.McCoy@colliercountyfl.gov
239.252.5726
Growth Management Department
Transportation Engineering Division
2885 South Horseshoe Drive
Naples, FL 34104
Golden Gate Parkway (CR 886) at
Santa Barbara Canal
Bridge Replacement Project
www.colliercountyfl.gov/transportationprojectsFor additional project details, please visit:
Any planned lane closures and detours will be announced in the county’s weekly Road Alert Report.
The Road Alert is available on the county’s website at colliercountyfl.gov/RoadAlerts. To obtain
electronic notices, sign up at www.colliercountyfl.gov/sign-up-for-e-notices. The Road Alert informs the
traveling public about scheduled road and bridge construction as well as maintenance projects along
major roadways in Collier County where lane closures are planned or traffic flow may be affected.
Stay updated!
18.A.2
Packet Pg. 326 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist Page 1 of 2
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: November 2020
Location: Tropicana Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: Mainscape Contractor’s Representative: Jeff Dulaney
Observation Date: 11/2/2020 Report Date: 11/3/2020 Report No.: 1 (FY-21)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
All locations: X X 35 All paver areas need to be pressure washed. M&A: Wet and Forget Product maybe tested
Median #1 X X X North half of the median needs renovation plantings. M&A: 11-3-20 Remove all Bougainvillea back to existing
Juniper. Install (475) 1 gal. size Dwarf Asian Jasmine
from north end to existing Junipers. Install (9) 10” pot
Acehmea blanchetiana “Rasberry” Bromeliad between
Oak trees and Sabal palms.
Median #2
Pedestrian shelter at 31st Ave.
SW
Median #3 Bridge X X 19 Review Blueberry flax lily for insects/snails and/or disease due to the decline of the bed.
Remove dead foliage and pull away any mulch in contact with plant bases.
M&A: 6/10/19 Recommend removing north side Flax lily
and replant with Yellow African iris 1 gal., Approx. 36
plants 4’ o.c., 4’ off back of curbing and guard rail.
Median #4
Pedestrian Shelter at 28th Ave.SW
Median #5 X X 35 At address 2600: Oak 18” caliper, 50% damaged in main trunk from broken off large
branch.
Recommend removal and replace. M&A: 7/9/18: Remove
Oak tree and grind stump to planting depth and remove
debris. Backfill any hole to match existing profile with
clean native topsoil (3 c.y. +/-). Install (1) Quercus
virginiana ‘Cathedral’ Live Oak 14’-16’ ht., 7’-8’ spr, 6”-7”
cal., 44” B&B or 100 gal.
X X 35 At address 2582: Holly tree has upper trunk damaged. Needs structural and corrective
pruning to regrow new main leader.
X X 34 At address 2530: Jacaranda tree needs structural and corrective pruning.
Median #6 X Light Poles #1, 2 & 3 were on at 10:00 AM.
QUARTERLY ADDRESSED
Accent/Street Lighting No major issue observed.
Lighting Disconnect & Sensor
Locations
East R/W between 13th Ave. & PL. Lighting Disconnect & Sensor
West Alley off 28th Ave. SW Lighting Disconnect & Sensor
West R/W in Alley between G.G. Pkwy. & 26 th PL. SW, Lighting Disconnect & Sensor
West R/W at corner of 30th PL. SW & Tropicana Lighting Disconnect & Sensor
Fertilizations: X X Refer to FY-20-21 schedule.
Irrigation: X Previous month water use total per WeatherTrak controller estimate 108,837 gallons.
18.A.2
Packet Pg. 327 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Report Date: 11/3/20 Report No.: 1 (FY-21)
Page 2 of 2
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
18.A.2
Packet Pg. 328 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist Page 1 of 4
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: November 2020
Location: Sunshine Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: Mainscape Contractor’s Representative: Jeff Dulaney
Observation Date: 11/2/2020 Report Date: 11/3/2020 Report No.: 1 (FY-21)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
All locations X 26 Median numbers on the ends of medians need to be refreshed.
Median #1 X 53 On the north end about 60 L.F. of Juniper has been damaged. It appears to have been
run over. Prune out damaged and dead foliage. (Photo)
M&A 11/12/18: Review Juniper bed for replacements.
X 65 Two Juniper plants have been damaged and need to be replaced with 3 gal. size.
Median #2 X X 26 At address 2184: South end of Plumbago shrub bed needs to have dead plants removed
and new plants installed. (9) 3 gal. size Plumbago.
M&A: 11-3-20 Remove remaining Plumbago and replant bed
with (21) 3 gal. Bougainvillea ‘Silhouette’.
X X 26 At address 2160: North end of Plumbago shrub bed needs to have dead plants removed
and new plants installed. (5) 3 gal. size Plumbago.
M&A: 11-3-20 Remove remaining Plumbago and replant bed
with (21) 3 gal. Bougainvillea ‘Silhouette’.
X X 29 At address 2172: Plumbago shrub beds contain defoliated plants. Review for insects and
prune out dead wood.
M&A: 1/7/19 Shrubs are dry and irrigation coverage needs to
be reviewed, as well as possible additional heads added.
X X 35 At address 2052: Juniper runover. 4-5 plants damaged. Review to remove damaged or
dead and provide count for replacements. 3 gal. size.
X X 35 At address 2224: (1) Tabebuia ‘Ipe’ has lifted and needs to be reset. (1) Tabebuia ‘Ipe’
has been removed. Recommend replacement.
The Tabebuia if reset could use additional soil backfill around
base to cover exposed root system. M&A: 09/11/18 Additional
review of lifted Tabebuia tree has revealed upper canopy
damage from hurricane Irma that will require the tree to be
removed and replaced. M&A: 1/7/19: Install Tabebuia ‘Ipe’,
11’–13’ ht., 3.5” cal., 5’-6’ spr., 36” B&B or 65 Gal.
X X 35 At address 2184: (1) Tabebuia ‘Ipe’ has lifted and needs to be reset.
X X 35 At address 2160: (2) Tabebuia ‘Ipe’ have been removed. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X X 35 At address 2112: (1) Golden Tabebuia damaged. Remove and replace. M&A: 1/7/19: Install Tabebuia ‘Golden’, 11’–13’ ht., 3.5” cal.,
5’-6’ spr., 36” B&B or 65 Gal.
X X 35 At address 2112: (2) Tabebuia ‘Ipe’ damaged. Remove and replace. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X X 35 At address 2101: (1) Golden Tabebuia damaged. Remove and replace. M&A: 1/7/19: Install Tabebuia ‘Golden’, 11’–13’ ht., 3.5” cal.,
5’-6’ spr., 36” B&B or 65 Gal.
X 42 Address 2112: Replant (13) dwarf Bougainvillea ‘Helen Johnson’ 3 gal. size at location
where water service repair occurred.
X 74 At address 2274: Replace auto accident damaged Juniper on south end of median. M&A: Appears 3-3 gal. plants will be needed. M&A: 7/8/14
another accident has occurred in same location. Approx. 50
Commented [MM1]:
18.A.2
Packet Pg. 329 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 11/3/2020 Report No.: 1 (FY21)
Page 2 of 4
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
L.F. of Juniper damaged. Review and remove damaged and
provide count for replacements. M&A: 11-11-15 Review area
and provide count for replacement Juniper 3 gal. size.(photo)
Median #3 - Pump Station
Location- 5 hp, 6” well, VFD
X X 35 At address 1991: Reset Tabebuia ‘Ipe’.
X X 35 At address 1960: Oak tree needs structural and corrective pruning.
X X X 35 At address 1944: (2) Tabebuia ‘Ipe’ damaged. Remove and replace. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X 35 At address 1944: (1) Silk Floss tree has upper trunk damage. Structural and corrective
pruning needed to regrow main leader.
X X X 35 At address 1945: (2) Tabebuia ‘Ipe’ damaged. Remove and replace. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X X 35 At address 1936: Oak tree needs structural and corrective pruning.
X X 35 At address 1900: Oak tree needs structural and corrective pruning.
X 35 Address 1960 to 1944: Bougainvillea shrubs have been runover. Prune out damaged
wood and provide count for replacements. (photo)
X 69 Light pole accident on south end of median. Multiple Juniper have been run over and are
damaged and broken. Prune out damaged foliage and branches and review in 30 days
for replacements.
M&A: 12-12-14 Damaged plants have been removed. M&A:
11-11-15 Review Juniper for replacement count and submit
estimate.
Median #4
Median #5 X X 4 On north tip of median auto damage has occurred to the Juniper. Prune out damaged or
dead foliage and provide count for replacements with 3 gal. size Juniper Parsoni.
X X 35 Oak trees need structural and corrective pruning. M&A: 5/7/28 Prune back branches a minimum of 4-feet away
from fixture.
X 35 Prune Oak tree branches away from light poles. M&A 5-13-19: Light is being blocked by the Oak tree foliage.
Median #6 X 42 Address 1750: Remove (3) declined dwarf Bougainvillea and replant (3) dwarf
Bougainvillea ‘Helen Johnson’ 3 gal. size. Review existing soil and plant roots for any
issues.
X 47 At address 1771: Cut surface circling root. Cut to remove or cut minimum 1-inch wide
section out of the center of the root.
X 52 Previous light pole accident has left some dead and damaged Juniper plants. Provide
count and replacement proposal. (5-6) 3 gal. size replacements.
18th Place SW Median X X Sabal palms not pruned.
X X X 47 Auto accident damaged 10-15 plants (photo) Recommend removing all the Bougainvillea
and replant median with Perennial Peanut “Ecoturf” variety in 1 gal. 12” o.c., 36” offset
from back of curbing. If all is not approved then recommend doing area of damaged
Bougainvillea. In either case hand watering will be required so it should be included in the
proposal.
M&A: 12/01/19 Bougainvillea not pruned and median contains
weeds.
18th Ave. S.W. Median X X Sabal palms not pruned
X X 23 Weeds in perennial peanut. The entire median weeds and Perennial peanut plants have
been apparently killed with herbicide. M&A: 4/8/19 Median will
Commented [MAM2]:
Commented [MM3]:
Commented [MAM4]:
18.A.2
Packet Pg. 330 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 11/3/2020 Report No.: 1 (FY21)
Page 3 of 4
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
be replanted in rainy season due to no irrigation. M&A: 9/9/19
Median replanted with perennial peanut, but plants look water
stressed and bed contains weeds. M&A: 12/01/19 Median
contains weeds. M&A: 03/01/20 Perennial peanut planting
needs total replanting. M&A 7/8/20 Additionally, hand remove
and spray weeds median where existing perennial peanut
was located. Provide count for 1 gal. Perennial peanut
‘Ecoturf’ replacements based upon 18 inches on center
plantings located 4 feet off back of curbing and 3-foot radius
off trees. Plantings will need to be hand watered at planting
and during supplement ally if rain is not occurring by tanker
until established. M&A: 8/31/20 Median Ready for replanting.
QUARTERLY ADDRESSED
Accent/Street Lighting X Accent lights were on during daylight from Sunset northward.
Lighting Electric Meters &
Irrigation Controller Electric
Source Locations
Lighting Electric Meter 2271 Sunshine Blvd., 1 SUN, Alley off 23rd Ave. SW
Lighting Electric Meter & Irrigation Controller Electric, 1995 Sunshine Blvd., 2 SUN, Alley
off 20th PL. SW
Lighting Electric Meter 4642 18th Pl. SW, 3 SUN, North R/W
Fertilizations: X Refer to FY20-21 schedule.
Irrigation: Previous month water use total per WeatherTrak controller estimate 160,209 gallons.
18.A.2
Packet Pg. 331 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 11/3/2020 Report No.: 1 (FY21)
Page 4 of 4
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
18.A.2
Packet Pg. 332 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708 Page 1 of 7
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: November 2020
Location: Coronado Parkway & Hunter Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: Mainscape Contractor’s Representative: Jeff Dulaney
Observation Date: 11/2/2020 Report Date: 11/3/2020 Report No.: 1 (FY-21)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
Coronado Pkwy. - All locations X X Medians have had weeds sprayed and/or removed and renovation could begin.
X X All areas need mulch applied. M&A: 3/1/20 Partial mulching has occurred.
X X 10 All Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A: 8/3/20 All weeds have been cut
down and sprayed. Removal of large dead weed clumps
and continued spraying will need to occur before replanting
areas. M&A: 8/31/20 Locations have had weeds sprayed
and/or removed and renovation could begin.
X X 28 Recommend that all paver areas be pressure washed following the irrigation conduit
installation.
M&A: “Wet & Forget” test area recommended
X 28 Median numbers need to be refreshed.
X X 35 All canopy type trees need minor broken branches removed.
Median #1- Pavers X 34 Pressure cleaning recommended
Median #2- Pavers X 34 Pressure cleaning recommended
Median #3 X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand weed
where existing Perennial peanut coverage exist and spray
areas where existing perennial peanut was located . Provide
count for 1 gal. Perennial peanut ‘Ecoturf’ replacements
based upon 18 inches on center plantings located 4 feet off
back of curbing and 3-foot radius off trees. M&A: 8/31/20
Locations have had weeds sprayed and/or removed and
renovation could begin.
X 26 North end Foxtail palm is in serious decline with no new center frond. Removal is
recommended, and any replanting of a new Foxtail should include soil amendments to the
backfill soil. If one more fertilization attempt is to be performed it is recommended t o apply
3 lbs. per palm of Manganese Sulfate within a curb to curb and 10 -foot north and south
area away from the trunk.
M&A 11/12/18: Palm is dead and needs to be removed.
Replacement is recommended with review of soil after
removal for amendments. M&A: 12/01/19 Palm removed
replacement recommended.
Median #4 X X 2 The eastern four Alexander palms are missing from previous auto accidents. The 7 th
Alexander palm from the east end has been broke at the base. It appears to be an auto
accident, but may have been from lightening. Replacement of all palms is recommended.
18.A.2
Packet Pg. 333 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 11/3/20 Report No.: 1 (FY21)
Page 2 of 7
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
(5) Alexander palm locations will need stumps removed and then replanted with 10 ft.
clear trunk ht. min. palms.
X X 4 The easternmost Alexander palm has been removed and needs to be replaced. Remove
stump and replace with 10 ft. clear trunk size palm.
X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand remove
and spray east and west median ends where existing
perennial peanut was located. Provide count for 1 gal.
Perennial peanut ‘Ecoturf’ replacements based upon 18
inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be
approximately (19) plants in two rows between Alexander
palms.
Median #5 X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand remove
and spray weeds median where existing perennial peanut
was located. Provide count for 1 gal. Perennial peanut
‘Ecoturf’ replacements based upon 18 inches on center
plantings located 4 feet off back of curbing and 3 -foot radius
off trees. It is estimated there to be approximately (19)
plants in two rows between Alexander palms.
Median #6 X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand remove
and spray weeds on the east and west median ends where
existing perennial peanut was located. Provide count for 1
gal. Perennial peanut ‘Ecoturf’ replacements based upon 18
inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be
approximately (19) plants in two rows between Alexander
palms. Provide count of missing Yellow African Iris plants in
the middle area of the median, 3 gal. size, 4’ o.c., (12+/-
plants needed).
Median #7 X 11 Juniper plantings need to be reviewed for replacements.
Median #8 X X 11 Juniper plantings need to be reviewed for replacements.
Median #9 - Pavers X 11 Pressure cleaning recommended
Median #10 X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand
remove and spray east and west median ends where
existing perennial peanut was located. Provide count for 1
gal. Perennial peanut ‘Ecoturf’ replacements based upon 18
18.A.2
Packet Pg. 334 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 11/3/20 Report No.: 1 (FY21)
Page 3 of 7
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be
approximately (19) plants in two rows between Alexander
palms.
X X 35 At address 5256: Sabal palm leaning. Reset.
35 At address 5273: (2) Jatropha removed. Consider replacement with alternate plant (e.g. Crape
Myrtles) or leave unplanted and increase shrub or ground
cover plantings. M&A: 7/9/18 Install (1) 15 gal. multi-stem
shrub 4’ ht.
X X X 35 At address 5301: (2) Jatropha removed. Consider replacement with alternate plant (e.g. Crape
Myrtles) or leave unplanted and increase shrub or ground
cover plantings. M&A: 7/9/18 Install (1) 15 gal. multi-stem
shrub 4’ ht.
X X X 35 At address 5327: (2) Jatropha removed. Consider replacement with alternate plant (e.g. Crape
Myrtles) or leave unplanted and increase shrub or ground
cover plantings. M&A: 7/9/18 Install (1) 15 gal. multi-stem
shrub 4’ ht.
Median #11 Bridge X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand remove
and spray east and west median ends where existing
perennial peanut was located. Provide count for 1 gal.
Perennial peanut ‘Ecoturf’ replacements based upon 18
inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be
approximately (19) plants in two rows between Alexander
palms.
Median #12 X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand remove
and spray median where existing perennial peanut was
located. Provide count for 1 gal. Perennial peanut ‘Ecoturf’
replacements based upon 18 inches on center plantings
located 4 feet off back of curbing and 3 -foot radius off trees.
It is estimated there to be approximately (19) plants in two
rows between Alexander palms.
X 48 One Alexander palm on the east end of the median has been cut off at ground level.
Replacement is recommended.
M&A: 10/7/16 Recommend replacement of Alexander palm,
10 ft. clear trunk ht. min.
Median #13 X X 4 Additionally, hand remove and spray median to remove weeds where existing Society
Garlic plants are located. Provide count for 1 gal. Society Garlic plants replacements
based upon 18 inches on center plantings located 4 feet off back of curbing and 3-foot
radius off trees.
Median #14 X X 4 Hand removal with herbicide applications during weekly services should address weed
issues in Blueberry Flax lily. Provide count for missing plants at 1 gal. size replacement
18.A.2
Packet Pg. 335 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 11/3/20 Report No.: 1 (FY21)
Page 4 of 7
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
plants.
Hunter Blvd. - All locations X X Heavy weed coverage exist in medians 3 thru 9
X 10 All areas need mulch applied.
X 29 Median numbers need to be refreshed.
X X 35 All canopy type trees need minor broken branches removed.
Median #1 X X 11 Juniper plantings need to be reviewed for replacements. M&A 7/8/20 Hand removal with herbicide applications
during weekly services should address weed issues in
Juniper plants. Provide count for missing plants at 3 gal.
size replacement plants. M&A: 8/3/20 Weeds have been
addressed and replacements should be installed.
Median #2 X X 4 Additionally, hand remove and spray weeds on south end of median where existing
perennial peanut was located. Provide count for 1 gal. Perennial peanut ‘Ecoturf’
replacements based upon 18 inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be approximately (19) plants in two rows
between Alexander palms.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
X 66 (3) Big Rose plant is dead. Provide estimate for replacement at 1 gal. size. M&A:
4/15/15 Contractor is trying to locate a nursery supplier.
M&A 7/9/18: Install (3) 1 or 3 gal. Crown of thorn ‘Big Rose’
Median #3 X X 4 Additionally, hand remove and spray weeds on south and north median ends where
existing perennial peanut was located. Provide count for 1 gal. Perennial peanut ‘Ecoturf’
replacements based upon 18 inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be approximately (19) plants in two rows
between Alexander palms.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
X X 4 Additionally, hand remove and spray weeds in Bougainvillea planting areas. Provide count
of missing plants at 3 gal. size replacement plants.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
X X X 34 Median received additional flooding during storm and planting bed soil has been removed.
All shrub or ground cover plantings need to be removed. Median will need an additional 4
to 6-inch layer of soil added prior to any renovation planting work. Existing Alexander
palms and Crape myrtles need additional soil placed around exposed root systems as
soon as possible.
M&A: 7/9/18 Renovation Recommendation: Install by
topdressing/backfilling entire median with clean native
topsoil (85 c.y. +/-). Median soil profile to be 4-inch below
top of curbing or pavers and elevate to 4” to 8” above curb
along centerline of median.
Median #4 X X 4 Additionally, hand remove and spray weeds in median where existing perennial peanut
was located. Provide count for 1 gal. Perennial peanut ‘Ecoturf ’ replacements based upon
18 inches on center plantings located 4 feet off back of curbing and 3 -foot radius off trees.
It is estimated there to be approximately (19) plants in two rows between Alexander
palms.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
X 37 Fourth Alexander palm from the north end has died. Please review for possible cause.
Replacement should include fungicide soil drench.
M&A: Do not remove Alexander palm. New Frond has
emerged from the bud. Treat with fungicide and fertilize with
4 lbs. 13-3-13 palm special fertilizer. M&A: 7/9/18 Install (1)
Alexander palm 10’ clear trunk. (24) 3 gal. Juniper ‘Parsonii’
at missing locations between palms. M&A: 8/3/20 Weeds
have been addressed and replacements should be
installed.
Median #5
Pump station – Median #5, 7.5
X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
18.A.2
Packet Pg. 336 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 11/3/20 Report No.: 1 (FY21)
Page 5 of 7
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
hp, 8” well feeds Hunter &
Coronado, Irrinet in median
controls Piccolos
renovation plantings. M&A 7/8/20 Additionally, hand remove
and spray weeds on south and north median ends where
existing perennial peanut was located. Provide count for 1
gal. Perennial peanut ‘Ecoturf’ replacements based upon 18
inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. M&A: 8/3/20 Weeds have been
addressed and replacements should be installed.
Median #6 X X 4 Additionally, hand remove and spray weeds on south median end where existing
perennial peanut was located. Provide count for 1 gal. Perennial peanut ‘Ecoturf’
replacements based upon 18 inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees. It is estimated there to be approximately (19) plants in two rows
between Alexander palms.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
X X 4 Additionally, hand remove and spray north end of median to remove weeds where e xisting
Society Garlic plants are located. Provide count for 1 gal. Society Garlic plants
replacements based upon 18 inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
X X 22 At address 2007: Reset Oak.
X X 22 At address 2043: Reset Oak.
X 28 Additional median flooding has washed soil onto the east and west roadways along the
middle to south end of the median. Removal should occur as soon as possible.
X X 35 At address 2116: Reset Oak.
X X 35 At address 2100: Reset Oak.
X X X 35 At address 2018: (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4” ht.
Median #7 X X 4 Additionally, hand remove and spray median to remove weeds. Provide count of missing
Yellow African Iris plants in median, 3 gal. size, 4’ o.c., 2 -3 feet off palms.
M&A: 8/3/20 Weeds have been addressed and
replacements should be installed.
Median #8 X X 4 On west end of median auto accident to streetlight pole and one Alexander palm. Remove
damaged palm debris and stump and replace with 10 ft. clear trunk size palm.
X X 4 Additionally, hand remove and spray existing weeds and vine throughout the median.
Prune plants as required during normal weekly services.
M&A: 8/3/20 Weeds have been addressed through 50% of
the median.
X 11 At address 5375: Tree removed and planting hole open and coned off.
X 11 At address 5395 - 5390: Replacement Oak needs to be reviewed for replacement.
X 11 Perennial peanut plantings under weed control process. Perennial Peanut plantings are not fully recovering. M&A:
3/1/20 Perennial Peanut plantings will need complete
renovation plantings. M&A 7/8/20 Additionally, hand
remove and spray weeds on east median end where
existing perennial peanut was located. Provide count for 1
gal. Perennial peanut ‘Ecoturf’ replacements based upon 18
inches on center plantings located 4 feet off back of curbing
18.A.2
Packet Pg. 337 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 11/3/20 Report No.: 1 (FY21)
Page 6 of 7
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
and 3-foot radius off trees. It is estimated there to be
approximately (19) plants in two rows between Alexander
palms.
X X 35 At address 5281: (1) Oak tree reset.
X X X 35 (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4’ ht.
X X 35 At address 5325: Oak tree reset.
35 (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4’ ht.
X X X 35 (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4’ ht.
Median #9 X X 4 Additionally, hand remove and spray weeds on east and west median ends where existing
perennial peanut was located. Provide count for 1 gal. Perennial peanut ‘Ecoturf’
replacements based upon 18 inches on center plantings located 4 feet off back of curbing
and 3-foot radius off trees.
X X 4 Additionally, hand remove and spray weeds in median Iris plantings. Provide count of
missing and additional Yellow African Iris plants in the middle area of the median, 3 gal.
size, 4’ o.c.,
X X X 52 17 – Big Rose crown of thorn have been partially up rooted due to recent storm winds
and/or fallen trees. It is recommended to dig, replant and hand water in plants. Cut back
plants as required in order for plants to stand upright. 1 – Big Rose plant has been broken
at base and needs to be replaced.
M&A: Additional storm damage to the crown of thorn has
occurred. Recommend removal of all plants and replant
median with dwarf Bougainvillea ‘Helen Johnson’ in 3 gal.
size containers. Provide count and proposal recommended.
M&A 7/9/18: Remove Big Rose install (68) Yellow African
Iris 4’ o.c., 4.5’ off back of curbing in 3 rows.
Median #10 X X 4 Additionally, hand remove and spray weeds median where existing perennial peanut was
located. Provide count for 1 gal. Perennial peanut ‘Ecoturf’ replacements based upon 18
inches on center plantings located 4 feet off back of curbing and 3 -foot radius off trees. It
is estimated there to be approximately (19) plants in two rows between Alexander palms.
Median #11 X 5 Silk floss tree needs pruning for structure, thinning and shaping.
X X 35 35 -40 Society Garlic plants are missing. Replacement recommended. M&A 7/9/18: Install 40 Society Garlic plants, 1 gal., 24” o.c.
in missing locations. Additionally, hand remove and spray
median to remove weeds where existing Society Garlic
plants are located. Provide count for 1 gal. Society Garlic
plants replacements based upon 18 inches on center
plantings located 4 feet off back of curbing and 3 -foot radius
off trees. M&A 7/8/20 Additionally, hand remove and spray
median to remove weeds where existing Society Garlic
plants are located. Provide count for 1 gal. Society Garlic
plants replacements based upon 18 inches on center
plantings located 4 feet off back of curbing and 3 -foot radius
off trees.
18.A.2
Packet Pg. 338 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 11/3/20 Report No.: 1 (FY21)
Page 7 of 7
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
Median #12 X X 4 Hand removal with herbicide applications during weekly services should address weed
issues in Blueberry Flax lily. Provide count for missing plants at 1 gal. size replacement
plants.
X X 4 The westernmost Alexander palm has been removed and needs to be replaced. Remove
stump and replace with 10 ft. clear trunk size palm.
QUARTERLY ADDRESSED
Fertilization: X Refer to FY20-12 schedule.
General Irrigation: X Previous month water use total per WeatherTrak controller estimate 83,647 gallons.
18.A.2
Packet Pg. 339 Attachment: Golden Gate MSTU Meeting Agenda & Backup - November 17, 2020 (14332 : Golden Gate Beautification MSTU - November 17,