Loading...
Agenda 12/08/2020 Item #16D12 (CAT Park & Ride Study)12/08/2020 EXECUTIVE SUMMARY Recommendation to approve the Collier Area Transit Park and Ride Study. OBJECTIVE: For the Board of County Commissioners (Board) to review and approve the Collier Area Transit (CAT) Park and Ride Study. CONSIDERATIONS: In 2005, a Park & Ride Study was conducted and found that there were favorable conditions and locations for Park & Ride facilities within Collier County. There has been significant development in the County since that time, thus an update was needed to reflect the current and planned conditions. The Metropolitan Planning Organization (MPO) hired the consulting team of Jacobs to identify and develop a standardized methodology for locating, operating, and maintaining Park & Ride Sites within Collier County. The Park and Ride Study was performed in collaboration with CAT and the MPO and will be incorporated by reference into the MPO’S 2045 Long Range Plan (LRTP) and the CAT Transit Development Plan (TDP) 2021-2030. This Study is ultimately being thought of as a method to help address the impacts of traffic congestion and parking constraints at some facilities. Park and Ride Facilities provide areas where commuters can park and take public transit, carpool, or vanpool into more urban areas. This Study also documents and prioritizes sites and provides implementation strategies to successfully locate potential lots near multimodal facilities, such as transit, pathways, sidewalks, or bike lanes, providing access to alternative transportation modes for travelers. There were thirty-two (32) sites evaluated and discussed in the Study, of those the (10) sites were identified as priority sites. The Study also provided Park and Ride facility type descriptions, lot size, and cost estimates for priority sites, with possible funding options for priority sites. Funding allocation for the priority sites will be identified at a future date when the need is warranted to improve the transit system. The Study provides the County with a Park and Ride Handbook containing site evaluation methodology and evaluation forms to use for the future. The Park and Ride Study was formally endorsed by the MPO Board on 11/13/2020. FISCAL IMPACT: There is no financial commitment with the approval of this Agenda Item. GROWTH MANAGEMENT IMPACT: There is no Growth Management impact associated with this Executive Summary. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, raises no legal issues at this time, and requires majority vote for approval. -JAK RECOMMENDATION: Staff recommends that the Board of County Commissioners review and approve the CAT Park and Ride Study. Prepared By: Zachary Karto, Senior Planner, Public Transit & Neighborhood Enhancement Division ATTACHMENT(S) 1. Attachment 1 - CAT Park and Ride Study (PDF) 2. Attachment 2 - Appendix B Park and Ride Handbook (PDF) 16.D.12 Packet Pg. 3051 12/08/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.D.12 Doc ID: 14261 Item Summary: Recommendation to approve the Collier Area Transit Park and Ride Study. Meeting Date: 12/08/2020 Prepared by: Title: Senior Planner – Public Transit & Neighborhood Enhancement Name: Zachary Karto 11/18/2020 3:03 PM Submitted by: Title: Division Director - Pub Tran & Nbrhd Enh – Public Transit & Neighborhood Enhancement Name: Michelle Arnold 11/18/2020 3:03 PM Approved By: Review: Public Transit & Neighborhood Enhancement Caroline Soto Additional Reviewer Completed 11/18/2020 3:29 PM Public Transit & Neighborhood Enhancement Omar Deleon Additional Reviewer Completed 11/18/2020 4:18 PM Public Transit & Neighborhood Enhancement Michelle Arnold Additional Reviewer Completed 11/19/2020 9:24 AM Metropolitan Planning Organization Brandy Otero Additional Reviewer Completed 11/19/2020 9:34 AM Operations & Veteran Services Kimberley Grant Level 1 Reviewer Completed 11/19/2020 4:11 PM Public Services Department Todd Henry Level 1 Division Reviewer Completed 11/20/2020 11:10 AM Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 11/20/2020 4:40 PM County Attorney's Office Jeffrey A. Klatzkow Level 2 Attorney Review Completed 11/23/2020 9:02 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 11/20/2020 4:43 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/23/2020 11:40 AM Budget and Management Office Ed Finn Additional Reviewer Completed 11/24/2020 10:54 AM County Manager's Office Sean Callahan Level 4 County Manager Review Completed 11/30/2020 10:45 AM Board of County Commissioners MaryJo Brock Meeting Pending 12/08/2020 9:00 AM 16.D.12 Packet Pg. 3052 Collier MPO and CAT Park-and-Ride Study November 2020 16.D.12.a Packet Pg. 3053 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF i Contents 1. Introduction ..................................................................................................................................................... 1-1 2. Study Methodology ........................................................................................................................................ 2-1 2.1 Research .........................................................................................................................................................2-1 2.2 Site Identification ........................................................................................................................................2-1 2.3 Site Evaluation .............................................................................................................................................2-2 2.4 Public Participation ....................................................................................................................................2-3 3. Site Identification ........................................................................................................................................... 3-1 3.1 Priority Sites from CUTR Report ............................................................................................................3-1 3.2 Commute Patterns .....................................................................................................................................3-2 3.2.1 Deficient Corridors .....................................................................................................................3-2 3.2.2 Regional Interconnectivity .......................................................................................................3-4 3.2.3 Demographics ..............................................................................................................................3-4 3.2.4 Land Use ........................................................................................................................................3-6 3.3 Beach Facilities ............................................................................................................................................3-7 3.4 Candidate Locations Based on Stakeholder Input ..........................................................................3-8 3.5 Proposed Park-and-Ride Sites ...............................................................................................................3-9 4. Site Design ....................................................................................................................................................... 4-1 4.1 Facility Types ................................................................................................................................................4-1 4.2 Lot Size Estimation .....................................................................................................................................4-1 5. Site Evaluations ............................................................................................................................................... 5-1 5.1 Evaluation Ranking .....................................................................................................................................5-1 5.2 Priority Sites ..................................................................................................................................................5-1 5.3 Alternate Sites ..............................................................................................................................................5-3 5.3.1 Alternates for Public-Private Partnerships ........................................................................5-4 5.3.2 Alternates for Developed Lots ...............................................................................................5-4 5.3.3 Phased Development ................................................................................................................5-4 6. Cost Estimates ................................................................................................................................................. 6-1 7. Funding Sources ............................................................................................................................................. 7-1 7.1 Federal Funding ..........................................................................................................................................7-1 7.2 State Funding ...............................................................................................................................................7-2 7.3 Local Funding ...............................................................................................................................................7-4 7.4 Alternative Funding Strategies ..............................................................................................................7-4 8. Recommendations and Conclusions .......................................................................................................... 8-1 8.1 Best Practices ...............................................................................................................................................8-1 8.2 Property Acquisition and Lease Agreements ....................................................................................8-1 8.3 Promotion of the Facilities.......................................................................................................................8-2 8.4 Park-and-Ride Handbook ........................................................................................................................8-2 9. References ........................................................................................................................................................ 9-1 16.D.12.a Packet Pg. 3054 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF ii Appendices Appendix A. Park-and-Ride Research Memorandum Appendix B. Park-and-Ride Handbook Appendix C. Public Involvement Appendix D. Site Evaluation Results and Demographic Maps Appendix E. Site Design and Cost Estimates Tables Table 3-1. 2005 Priority Locations ............................................................................................................................ 3-2 Table 3-2. Proposed Park-and-Ride Locations Serving Deficient Corridors ................................................... 3-3 Table 3-3. Proposed Park-and-Ride Locations for Regional Interconnectivity .............................................. 3-4 Table 3-4. Proposed Park-and-Ride Locations Based on Employee Commute Patterns ............................ 3-6 Table 3-5. Beach Parking Demand (2017–2019) .................................................................................................. 3-7 Table 3-6. Beach Capacity Total Turnarounds (2017–2019) ............................................................................. 3-8 Table 3-7. Proposed Park-and-Ride Locations for Beach Access ...................................................................... 3-8 Table 3-8. Proposed Park-and-Ride Locations Based on Stakeholder Input ................................................. 3-9 Table 4-1. Types of Park-and-Ride Facilities .......................................................................................................... 4-1 Table 5-1. Final Evaluation Rankings ....................................................................................................................... 5-2 Table 7-1. Federal Funding Sources ......................................................................................................................... 7-1 Table 7-2. State Funding Sources ............................................................................................................................. 7-3 Figures Figure 1-1. Benefits of Using Park-and-Ride .......................................................................................................... 1-1 Figure 1-2. Florida Park-and-Ride Locations (2020) ........................................................................................... 1-2 Figure 2-1. Guide Sign from Main Arterial .............................................................................................................. 2-1 Figure 3-1. Priority Locations from 2005 ................................................................................................................ 3-1 Figure 3-2. Top Zip Codes for Home vs. Work Area ............................................................................................... 3-5 Figure 3-3. Collier County Employment and Residency ...................................................................................... 3-5 Figure 3-4. Final Proposed Site Locations ............................................................................................................ 3-10 Figure 3-5. Close Up of Final Proposed Site Locations ..................................................................................... 3-11 Figure 5-1. Recommended Priority Sites (Including Alternative Locations) .................................................. 5-3 Figure 7-1. Seed to Table Park-and-Ride lot .......................................................................................................... 7-4 16.D.12.a Packet Pg. 3055 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF iii Acronyms and Abbreviations AUIR Annual Update Inventory Report B&A boarding and alighting CAT Collier Area Transit CDP Census-designated place CUTR Center for Urban Transportation Research FDOT Florida Department of Transportation FTA Federal Transit Administration FY fiscal year LeeTran Lee County Transit LOS level of service LRTP Long Range Transportation Plan MOD Mobility on Demand MPO Metropolitan Planning Organization MUTCD Manual on Uniform Traffic Control Devices PL priority location PPP Public Participation Plan ROW right-of-way SIS Strategic Intermodal System STP Surface Transportation Program TDC Tourist Development Council TDP Transit Development Plan TIP Transportation Improvement Program USF University of South Florida 16.D.12.a Packet Pg. 3056 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 1-1 1. Introduction As the population of Collier County (hereafter, “the County”) continues to increase, traffic congestion has become a growing concern on the County’s arterial network. The County is considering development of park-and-ride facilities to help alleviate some of the congestion, providing areas where commuters can park and take public transit, carpool, or vanpool into more urban areas. Figure 1-1 illustrates the many benefits to using park-and-ride facilities. This approach is popular throughout the state as evidenced by the numerous park-and-ride facilities in urban and urban core areas within Florida, indicating these facilities are primarily correlated around interstates and highways (refer to Figure 1-2). Ideal locations for park-and-ride lots would serve congested roadways and target regional and local commuter trips, such as work, shopping, the beach, or the airport, to reduce the number of vehicles on those heavily congested corridors. In 2005, Collier County addressed park-and-ride strategies by commissioning a study by the University of South Florida (USF) Center for Urban Transportation Research (CUTR) (USF 2005) that identified primary transportation corridors, including major roads and the fixed-route public transit networks provided by Collier Area Transit (CAT) and Lee County Transit (LeeTran). The study developed a list of 32 possible sites that were evaluated and then further refined to 12 prioritized park-and-ride sites. Since that time, continuous population growth, commercial develop- ment, and the expanded CAT system have changed the “existing conditions” and the study is now outdated. Thus, an update is needed to reflect current and planned conditions. This Park-and-Ride Study updates the analysis and recommendations from the 2005 CUTR Report by confirming whether the park-and-ride locations previously identified are still suitable and by identifying additional sites to address changing land use in the County, regional commuter and transit travel patterns, and the CAT system. This Study was performed in conjunction with the ongoing Collier Metropolitan Planning Organization (MPO) 2045 Long Range Transportation Plan (LRTP) update (Jacobs 2020) and the CAT Transit Development Plan (TDP) to update the park-and-ride strategies and prioritized sites for the County. The new proposed sites are designed to take advantage of existing infrastructure whenever possible and use County-owned parcels where practical. This Study documents and prioritizes sites and provides implementation strategies to successfully integrate additional park-and-ride locations into the multimodal transportation system currently serving the County. Park-and-ride lots provide options for commuters and other travelers who can benefit from carpooling or who need reliable transit options in the County, including businesses, recreational facilities, or schools. In addition to helping address the impacts of traffic congestion and parking constraints at some facilities, park-and-ride lots offer transit service for individuals without personal transportation and who need viable options to and from work or other activities. Locating potential lots near multimodal facilities, such as transit, pathways, sidewalks, or bike lanes, provides access to alternative transportation modes for travelers. Figure 1-1. Benefits of Using Park-and-Ride 16.D.12.a Packet Pg. 3057 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 1-2 Figure 1-2. Florida Park-and-Ride Locations (2020) 16.D.12.a Packet Pg. 3058 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 1-3 Park-and-ride facilities serve as conveniences to commuters and may be promoted to reduce the demand for limited traffic capacity during peak travel hours. To entice commuters to give up their cars for sub- stantial portions of their daily trips, park-and-ride facilities must be conveniently located. This means commuters must not have to drive far to the park-and-ride site. In addition, the site should not be in a direction contrary to the commuters’ work or other destination. Park-and-ride facilities should be located to capture the maximum portion of the common “trunk” trips of commuters. The major trunk of travel for commuter trips in Collier and Lee Counties is I-75. Therefore, park-and-ride facilities should be provided as close as possible to the interchanges. There are several northbound/southbound and eastbound/westbound roadways that are also used for major commuting patterns within the County. A common commuting pattern for residents travelling to work is westbound in the morning and eastbound in the evening. Some of the major eastbound/ westbound arterials and major collectors include Immokalee Road, Vanderbilt Beach Road, Pine Ridge Road, Golden Gate Parkway, and Golden Gate Boulevard. Some of the major arterials for northbound/ southbound trips in Collier County include US 41, Goodlette-Frank Road, Airport Road, Livingston Road, Santa Barbara Boulevard, SR 29, and Collier Boulevard. Therefore, park-and-ride facilities serving work patterns should be located as close as possible to these major roadways. Promoting transit and personal mobility options are areas of growing interest in the County as the population steadily increases and it becomes costly and impractical to add capacity to the local roadways and intersections because of right-of-way (ROW) requirements, drainage, and environmental concerns. The County has successfully implemented intercounty transit service options within the County limits and continues to explore additional public transportation connections to link residents with nearby jobs, services, and tourist destinations. An implementable, cost-effective, and well-vetted park-and-ride strategy is an important component of an effective and wholistic transit system, helping to extend the reach of the available transit services to attract new users and offer alternatives to commuters. 16.D.12.a Packet Pg. 3059 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 2-1 2. Study Methodology 2.1 Research The Florida Department of Transportation (FDOT) State Park-and-Ride Guide (FDOT 2012) provides a basis for planning, site selection, site evaluation, site size estimation, and funding options. In addition to FDOT guidelines, the 2005 CUTR Report (USF 2005) was reviewed and comparable programs in Florida and throughout the U.S were researched. The goal of the review was to identify strategies to increase local demand and use and to identify the best practices that may be integrated into park-and-ride lots within the County. The studies were also reviewed for conventional and innovative funding strategies for developing, implementing, and maintaining park-and-ride lots and programs. Strategies and best practices identified during the research were analyzed for their application to both existing and planned lots within the County. Top recommendations for the County include: • Enhance online resources, such as a webpage dedicated to the park-and-ride program detailing the overall vision, benefits of its use, and identification of each site or lot with photos and descriptions of each location. • Install guide signs off main arterials, per Manual on Uniform Traffic Control Devices (MUTCD) (FHWA 2009), to advertise and direct users to the lots in addition to the entrance of the lot (refer to Figure 2-1). • Provide park-and-ride at transfer stations to serve a wide variety of commute patterns. This could include a designated lot or shared-use parking at an existing lot. • Provide an additional sense of security by locating lots adjacent to the sheriff facilities, or by installing lighting, video surveillance, and fencing with timed gates. • Offer direct shuttles and vanpooling to accommodate participants in employment-based or destination-specific lots. Another economical strategy is to lease parking spaces within private properties, such as shopping plazas or churches. Leased spaces can include the condition that park-and-ride spaces are only available for weekdays or weekends if serving both the lot’s demand and the targeted ridership. For example, if the targeted ridership is employee commuters (weekdays) and the proposed location is to lease spaces from a church (high demand on weekends), providing spaces only during weekdays could offer a more attractive public-private partnership than without such an arrangement. Appendix A provides further details on the research findings and recommendations. 2.2 Site Identification To ensure a thorough list of potential sites, several criteria were analyzed to identify ideal sites for future locations. Locations were predominantly proposed along existing and planned transit routes that have the highest potential to serve as park-and-ride lots. Sites were identified first based on locations within the County where informal park-and-ride already occurs. Sites were evaluated to serve major employment, educational, and tourism destinations. Research included the review of the TDP, LRTP, U.S. Census Bureau data, Land Development Regulations, land use patterns, and cell phone (global positioning system directional and delay) travel data. The U.S. Census Bureau data were used to identify employment figures and commute patterns. The Annual Update Figure 2-1. Guide Sign from Main Arterial Source: MUTCD (FHWA 2009) 16.D.12.a Packet Pg. 3060 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 2-2 Inventory Report (AUIR) was used to identify existing and projected congested corridors. Sites were also identified based on stakeholder input. A similar analysis should be used for identifying any future lot locations considered within the County. The following factors provided the basis for selecting potential sites in the County: • Location, dimensions, and ownership of potential site • Existing ingress/egress and multimodal access to the site • Safety and security, such as lighting and cameras • Estimated costs to acquire or lease site • Estimated operating costs • Estimated costs to construct the park-and-ride lot • Estimated transit/park-and-ride demand at site (that is, existing and latent demand for transit route and bus stop) 2.3 Site Evaluation To evaluate and prioritize potential sites, evaluation criteria using the FDOT State Park-and-Ride Guide (FDOT 2012) site selection evaluation methodology were developed and included scoring based on such factors as location and economic feasibility. These criteria were then tailored to the needs of the County. The ranking of the criteria helps identify which locations along existing and planned transit routes have the highest potential as successful park-and-ride lots. The sites were analyzed and ranked based on the following core conditions: • Visibility - Is the site easy to find or close to a primary roadway? • Location - Is the site close to key activity area (businesses, stores, retail)? Is the site near a pathway or major roadway? Is the property available? Are property owners on developed land in favor of a lease agreement? • Access - Is there easy access in and out of the site? If traffic makes it consistently difficult to access the facility, customers will be discouraged from using it. • Transit Linkage - Does the site offer a broad range of route options? Potential near-term linkages between CAT and LeeTran will also need to be addressed. • Cost - Is it cost-effective to develop this site? A currently developed site would cost less as an initial investment. The ranking of prioritized sites entails both a qualitative and quantitative analysis. Sites must first pass the initial screening for feasibility and effectiveness (qualitative). Feasible sites were then evaluated using the evaluation criteria, which provided scoring to rank and prioritize the potential success of the site (quantita- tive). A team consisting of representatives from CAT, Collier MPO, and Jacobs jointly developed the evaluation criteria. The project team assigned weighting to each question to tailor the assessment to County conditions. The weightings reflect the locations’ viability for a park-and-ride as well as its anticipated level of success. The weightings are designated as follows: • 1 - Basic site requirement • 2 - Desirable benefit for the site • 3 - Significant benefit to the success of the site 16.D.12.a Packet Pg. 3061 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 2-3 Site evaluation methodology was prepared to explain the objective and scoring options for each question within the evaluation criteria. This Study uses the FDOT State Park-and-Ride Guide evaluation criteria and the site evaluation methodology, so the evaluation herein can be performed for any potential locations under consideration by CAT. Refer to Appendix B for the methodology and evaluation forms developed as part of this Study. Note: A discrepancy exists within some site maps on the site evaluation forms. Revised routes are not reflected on the site maps, as the GIS files were being updated by CAT. However, the latest route layouts were incorporated into the scoring for question 2 of the Site Evaluation Forms. The CAT interactive map was used to evaluate question 2 and the scoring of each site was based on the latest revised route layout (for example, R121 and R28). 2.4 Public Participation The Collier MPO developed a Public Participation Plan (PPP) to identify outreach activities, outline methods that will be used to measure outreach effectiveness, and ensure that relevant activities align with the Collier MPO’s guiding principles. The PPP outlines a strategy for leveraging existing outreach and acquiring the necessary new data through the public involvement process. Consistent with the Collier MPO PPP, a Park-and-Ride Study PPP was developed to reach all demographic groups including, but not limited to, commuters, students, large employers, transportation disadvantaged, senior citizens, and the disabled community (refer to Appendix C for the Park-and-Ride Study PPP). For purposes of consistency and efficiency with the LRTP, the outreach efforts for this Park-and-Ride Study mimic the LRTP, with some project-specific required adjustments to ensure swift committee and board approval. However, because of stay-at-home orders resulting from the COVID-19 pandemic, planned public meetings were cancelled and were no longer feasible within the timeline of this Study. The Park- and-Ride Study PPP was modified to accommodate the stay-at-home orders. However, the original Park- and-Ride Study PPP is also provided in Appendix C to apply to any future public participation regarding park-and-ride studies for the County. The modified PPP used electronic forms of communication and included outreach via email and online surveys. PowerPoint presentations were made available to organization representatives for discussion and feedback regarding the organization’s needs and potential site locations. The PowerPoint presentations were provided through the Microsoft Teams platform and in person (prior to the issuance of stay-at-home orders) and included the following organizations: • Collier MPO Board • Technical Advisory Committee • Citizen’s Advisory Committee • Congestion Management Committee • Collier County Parks & Recreation Division • Greater Naples Chamber of Commerce • Arthrex (large employer) • Enterprise Rent-a-Car (vanpools for Collier County) • Collier County Tourism Division • LeeTran The key stakeholder identified for each organization was provided links to the online survey to further distribute to obtain feedback. Additional stakeholders within the Collier MPO’s adviser network and large area employers within the County were identified and provided a handout describing the project with links to the public survey, but none of the organizations requested a PowerPoint presentation. These organizations included, but were not limited to, representatives of the disabled community, Walmart, Target, Publix, Naples 16.D.12.a Packet Pg. 3062 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 2-4 Community Hospital, Bayshore and Immokalee Community Redevelopment Agency, the Restaurant and Lodging Association, and the Chambers of Commerce for Greater Naples, Immokalee, Marco Island, and Everglades City. Appendix C includes a copy of the distributed handout. The online public survey was also promoted using several other platforms to enhance public participation from participants outside demographic and employer organizations. The handout information and survey links were posted on the MPO and CAT websites and on CAT social media. The MPO published the link and project summary in their newsletter, which is distributed to the MPO’s entire adviser network. CAT emailed all County employees the handout and survey links, and fliers with the survey links were posted in each CAT bus to encourage ridership response. Refer to Appendix C for results of the public participation surveys. 16.D.12.a Packet Pg. 3063 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-1 3. Site Identification This section summarizes proposed sites reviewed as part of this Study. The site identification process described within Section 2.2 should be reevaluated if conditions change in the County for any future lots considered. It should be noted that proposed sites can serve multiple areas, patterns, and needs. 3.1 Priority Sites from CUTR Report The 2005 CUTR Report identified 46 potential sites and recommended 12 sites as potential priority sites (USF 2005). These 12 priority sites were evaluated and identified in Table 3-1 with the Site ID beginning with “PL” (priority location). Because land development and the transportation network in the County has experienced major growth since the 2005 study, the potential priority locations were reevaluated for feasibility and likelihood of success, with some sites being relocated or removed as applicable. Refer to Figure 3-1 for the relocated or removed priority sites within County jurisdiction. Figure 3-1. Priority Locations from 2005 16.D.12.a Packet Pg. 3064 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-2 Table 3-1. 2005 Priority Locations Source: 2005 CUTR Report (USF 2005) Proposed Location/ Description for Site Park-and- Ride Site ID Notes Walmart, exit 111 off I-75 PL-1 Proposed using existing spaces on the shared-use lot. Heritage Bay PL-2 Northeast corner of Immokalee Rd. and Collier Blvd. Evaluated at the new Government Services Center at Heritage Bay. Immokalee Rd., intersection of CAT Blue Route, Marco Express, Immokalee Circulator, and future LeeTran connections PL-3 Evaluated at SL-3, approximately 200 feet south of the intersection described (East Main St. and Immokalee Rd.). USDA Center and Fairgrounds, Immokalee Rd and 39th Ave. NE PL-4 Refer to site name as Agricultural Center and Fairgrounds. Proposed using existing spaces at the parking lot. Vacant lot behind Wilson Blvd. gas station PL-5 Corner of Golden Gate Blvd. and Wilson Blvd. Relocated to SL-14 (Golden Gate & 1st Street NW) as County will acquire property. Proposed location less than 0.15 miles away. Vacant lot west of Elizabeth Ann Seton Catholic Church and School PL-6 Removed because there is an existing park-and-ride at the Golden Gate Library approximately 0.5 miles away. Coastland Mall PL-7 Southeast corner of Golden Gate Pkwy. and US 41. Proposed using existing spaces on the shared-use lot. Parkway Plaza Shopping Center PL-8 Golden Gate Pkwy./Coronado Pkwy. Removed because there is an existing park-and-ride at the Golden Gate Library less than 0.15 miles away. Freedom Square Shopping Center PL-9 Proposed using existing spaces; however, if new lot is developed, excellent location to serve as a transfer station. Naples Outlet Mall PL-10 Proposed using existing spaces on the shared-use lot. Ave Maria University PL-11 Development Order indicates Ave Maria to promote transit. Miromar Outlets PL-12 Removed because it is located in Estero, FL (not within the County’s jurisdiction and outside study area). 3.2 Commute Patterns Employment data and commute patterns were reviewed for major employers in the County. The employment commute patterns were reviewed in conjunction with existing and planned deficient corridors identified in the AUIR (Collier County 2019) and proposed developments in the County. 3.2.1 Deficient Corridors Based on forecasted traffic volumes, roadways or segments that are not projected to achieve the adopted minimum acceptable level of service (LOS E), as identified in the Growth Management Plan, are classified as deficient. To address existing and projected deficiencies within the County, sites were targeted immedi- ately upstream the direction of travel for the deficient segment. Sites were provided to address each 16.D.12.a Packet Pg. 3065 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-3 deficient roadway as identified in the 2019 AUIR (refer to Table 3-2) with deficiencies projected to 2029. Refer to Appendix D for a map of evaluation sites in relation to the deficient segments. Table 3-2. Proposed Park-and-Ride Locations Serving Deficient Corridors Source: 2019 AUIR Update Deficiencies Report Deficient Segment Park-and-Ride Site ID Movement Served Old US 41 (US 41 to Lee County Line) and Tamiami Trail E. (Immokalee Rd. to Wiggins Pass Rd.) SL-15; SL-1 Proposed sites serving each direction. Immokalee Rd. (Goodlette-Frank Rd. to Livingston Rd.) PL-1; SL-15 Proposed sites serving each direction. Immokalee Rd. (I-75 to Santa Barbara Blvd. to Everglades Blvd. and Oil Well Rd.) SL-5; SL-17 for east side; SL-16; PL-2 Proposed sites serving each direction. Randall Blvd. (Immokalee Rd. to Everglades Blvd.) SL-5, PL-3, PL-4, Pl-11 Proposed sites serving each direction. Goodlette-Frank (Vanderbilt Beach Rd. to Immokalee Rd.) SL-15; SL-25 Proposed sites serving each direction. Pine Ridge Rd. (Airport Rd. to I-75) SL-18, SL-24; SL-7 Proposed sites serving each direction. Golden Gate Pkwy. (Goodlette-Frank Rd. to I-75) SL-18; SL-8; PL-8; PL-7 Proposed sites serving each direction. Wilson Blvd. (Vanderbilt Beach Rd. to Randall Blvd.) SL-14, SL-5, SL-17, Also supported by the existing park-and-ride at the Golden Gate Estates Library. Site to alleviate congestion heading southbound in the morning and northbound in the afternoon. Collier Blvd. (Manatee Rd. to Mainsail Dr.) PL-9, PL-10, SL-13 Existing park-and-ride at the Marco Island Library serves commuters heading northbound in the morning. Proposed sites to alleviate congestion heading southbound in the morning and northbound in the afternoon. Tamiami Trail (Airport Rd. to Rattlesnake Hammock Rd.) SL-11, SL-20 Proposed sites serving each direction. Collier Blvd. (Davis Blvd. to I-75) SL-21, PL-9, PL-10, SL-13, SL-8, SL-9 Surrounding sites serving each direction. Pine Ridge Rd. (Shirley St. to I-75) SL-7, SL-18 Proposed sites serving each direction. Golden Gate Pkwy. (Santa Barbara Blvd. to Collier Blvd.) SL-8, PL-6, PL-2, SL-9 Surrounding sites serving each direction. Serving vehicles going through this corridor (destination not in corridor). Tamiami Trail E. (Greenway Rd. to San Marco Dr.) PL9, PL-10, SL-13, SL-23 Proposed sites serving each direction. SR-82 (Lee County Line to SR 29) SL-3, SL-22 Proposed sites serving westbound in the morning and eastbound in the evening. Immokalee Rd (Collier Blvd. to Oil Well Rd.) PL-2, PL-4, Sl-5, SL-17 Vanderbilt Beach Rd. extension expected to reduce volumes. Proposed sites serving westbound in the morning and eastbound in the evening. N. 1st Street (New Market Rd to SR 29) SL-3, SL-22 Proposed sites serving each direction. 16.D.12.a Packet Pg. 3066 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-4 3.2.2 Regional Interconnectivity Sites were proposed to support regional interconnectivity within the state of Florida and intercity transit. FDOT identifies the Strategic Intermodal System (SIS) highway corridors in Collier County as I-75, SR 29, and SR 82 (FDOT 2019). These highways provide regional interconnectivity between cities and counties within Florida. Additionally, there are state grant sources for projects that support regional travel along SIS corridors. Park-and-ride sites were located as close as possible to interchanges and intersections along these highways. The TDP proposed a new CAT route to accommodate commuters traveling to Lehigh Acres. Sites were proposed in Immokalee to serve the commute into Lee County from Lehigh Acres. Additionally, Lee County is developing a new park-and-ride lot to serve the commute from Lehigh Acres to employment areas. Table 3-3 lists proposed locations for regional interconnectivity. Table 3-3. Proposed Park-and-Ride Locations for Regional Interconnectivity Proposed Location/Description Park-and-Ride Site ID Comments Railhead SL-1 Located on County property adjacent to the railroad tracks along Old US 41. Can also serve the Southwest Florida International Airport. Immokalee Health Department SL-3 Location is adjacent to SR 29. Target (Immokalee Rd.) SL-16 Located adjacent to I-75 interchange to support regional commuters from Lee County. PL-1 is the alternative to this location. Creekside Transfer Station SL-15 Currently the only transfer station connecting to LeeTran. Provides interconnectivity to Lee County. Supports the airport and Gulf Coast Mall. Physicians Regional Hospital (Pine Ridge Rd.) SL-18 Adjacent to I-75 interchange. Can provide carpool opportunities for commuters working outside the County. Lehigh Acres SL-3 Servicing commuters heading into Lee County using the TDP’s proposed Lehigh Acres route. Connection to LeeTran should be explored with Lee County. Carnestown SL-23 Adjacent to SR 29 to service the City of Everglades with its proposed vanpool service. Golf Course/VA Hospital Lot SL-8 Adjacent to I-75 interchange for commuters heading eastbound. Sports Complex SL-9 Adjacent to I-75 interchange for commuters heading eastbound. Resource Recovery Park SL-19 Adjacent to I-75 interchange for commuters heading eastbound. 3.2.3 Demographics U.S. Census data was extracted from the U.S. Census Bureau’s Center for Economic Studies using data collected from 2017. The U.S. Census data displayed correlations of employee commute patterns by home and work areas through zip codes and places, which included cities, Census-designated places 16.D.12.a Packet Pg. 3067 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-5 (CDPs), etc. The analysis of the employee commute patterns displayed most Census tracks where workers live had the highest density quadrants at: •Golden Gate Estates region and northeast section of Collier County •Between Immokalee Road and Vanderbilt Beach Road, east of Airport Pulling Road •Between Vanderbilt Beach Road and north of Golden Gate Parkway, between Livingston Road and I-75 The home-to-work distance directional analysis resulted in approximately 49 percent of workers traveling less than 10 miles, approximately 20 percent traveling between 10 to 24 miles, 7 percent traveling 25 to 50 miles, and 24 percent traveling greater than 50 miles. The longer commutes are likely for commuters living in Immokalee and Marco Island and commuters traveling to these outskirt locations for employment. The cities, CDPs, and places where workers live resulted in: 5.9 percent Golden Gate CDP, 4.1 percent City of Bonita Springs, 3.5 percent for Immokalee CDP, 3 percent at Lehigh Acres CDP, 2.7 percent City of Naples, 2.1 percent City of Marco Island, and 2 percent Cape Coral City, with the remaining locations less than 2 percent. Cities, CDPs, and places with the largest employers are as follows: City of Naples (13 percent), City of Marco Island (3.7 percent), City of Bonita Springs (2.8 percent), and Immokalee CDP (2.6 percent), with the remainder less than 2 percent. The highest jobs per square mile are along the west boundary and coastline of Collier County, west of I-75, in Marco Island and in Immokalee. The data shows that traffic flow patterns for employment head west in the mornings and east in the evenings, indicating the need to support commuters to Marco Island and Immokalee. Refer to Figure 3-2 for zip code boundaries displaying top home area (residential) versus work areas. Appendix D provides additional demographic maps used in this analysis. Because park-and-ride lots should be located within less than 50 percent of commuters’ travel time (Renaissance Planning Group 2013), potential sites were evaluated around the employee’s home, evaluating direction of travel based on employment centers and places with the largest employers. The Census data showed 89,002 people employed and living inside the County, 52,918 people employed in the County but living outside the County, and 51,782 people living in the County but employed outside the County, as indicated on Figure 3-3. Of the employed workers in the County, approximately 63 percent live in the County. There is a close balance of commuters entering and leaving the County for work, indicating the need for interconnected service to Figure 3-3. Collier County Employment and Residency Source: 2017 U.S. Census Data Figure 3-2. Top Zip Codes for Home vs. Work Area Source: 2017 U.S. Census Data 16.D.12.a Packet Pg. 3068 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-6 surrounding counties and regional interconnectivity. The Census data show that most commuters come from Lee County surrounding I-75 and the Hendry County border. 3.2.4 Land Use Employment centers and business districts analyzed included, but were not limited to, the Coastland Center Mall, hospitals, County government campus (main campus, Horseshoe Drive, and planned Resource Recovery Park), Arthrex, Mercado, Waterside Shops, and retirement communities, such as Vi at Bentley Village and Moorings Park. Planned unit developments were used to determine location of commercial and residential areas (Collier County 2020). Employee commute patterns in underserved areas were also evaluated for the City of Everglades, Ave Maria, City of Immokalee, and City of Marco Island. Table 3-4 lists proposed sites that consider employee commute patterns. Table 3-4. Proposed Park-and-Ride Locations Based on Employee Commute Patterns Commute Pattern or Area Park-and-Ride Site ID Comments Employment in the City of Marco Island PL-9, PL-10, SL-13, SL-3, SL-22 Many sites serve this area; however, these are targeted lots. Employment in the City of Cape Coral (Lee County) SL-15, SL-16, PL-1 Existing Seed-to-Table lot also serves this area. Employment in the City of Immokalee and ZIP 34142 SL-5, SL-17, PL-4, PL-11, PL-9, PL-10, SL-13 Existing lot at Golden Gate Estates Library also serves this commute. Employees commuting from Golden Gate CDP PL-6, SL-8 Existing lot at the Golden Gate Library also serves this area. Employees commuting from City of Bonita Springs and City of Cape Coral PL-1, SL-16 Existing Seed-to-Table lot also serves this area. Employees commuting from Immokalee CDP SL-3, SL-22 Employees commuting from Lehigh Acres CDP SL-3, SL-22 Lee County is in progress for developing a park-and-ride lot for Lehigh Acres within Lee County limits. Employees commuting from City of Naples Pl-8, PL-7, SL-12, SL-20, SL-6 Employees commuting from Marco Island Existing at Marco Island Library Advertisement and guide signs are recommended to increase awareness of this lot. 16.D.12.a Packet Pg. 3069 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-7 Table 3-4. Proposed Park-and-Ride Locations Based on Employee Commute Patterns Commute Pattern or Area Park-and-Ride Site ID Comments Employment circulation: inflow and outflow to Collier County SL-15, SL-16, PL-1 To and from Lee County and City of Bonita Springs. SL-3, SL-22 To and from Lehigh Acres. SL-8, Sl-9, SL-19 To and from Broward and Dade County. SL-23 To and from Monroe County. Employees commuting from City of Everglades SL-23 In conjunction with proposed vanpool service. Employees commuting from Ave Maria PL-11 Serving Ave Maria residents. 3.3 Beach Facilities Collier County serves as a destination location with the Gulf of Mexico coastline and beaches as its major generator of tourism (Naples beaches attract visitors worldwide). County and city public beaches reach capacity with both residents and tourists during peak season from October through March, causing informal park-and-ride to occur for beach access and beach hotel parking. Acquiring additional public beach access is costly and the limited opportunities attract private businesses, making it challenging for the County to acquire ideal locations at a reasonable cost. Several hotels along the coastline have constructed parking garages to support their parking demands, with hotel expansions requiring additional parking capacity, such as the Ritz-Carlton of Naples constructing a second parking garage to accom- modate their expansion. Beach capacity statistics were reviewed for the County beaches from 2017 through 2019. Table 3-5 lists the number of days during the fiscal year (FY) that each beach reached parking capacity. Table 3-6 displays the quantity of vehicles required to turn around at beach parking lots resulting from lack of capacity. Turnarounds were only counted where park attendants or vehicle counters exist. The beach parking locations not listed do not have statistics on turnaround counts (Sullivan, pers. comm. 2020). Table 3-5. Beach Parking Demand (2017–2019) Source: Sullivan, pers. comm. 2020 Beach Days at Capacity FY 17 FY 18 FY 19 a Barefoot Beach Access 84 54 72a Barefoot Beach Preserve 39 24 30 Clam Pass Beach Park 36 10a 29 Conner Park 9a 1a 5 South Marco Beach 156 177 164 North Gulf Shore Beach 32 16 35 Tigertail Beach Park 13 8 12 Vanderbilt Beach Park 71 29 45 a Value has missing quarterly data. All Quarter 4 data for FY 19 was not included. 16.D.12.a Packet Pg. 3070 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-8 Table 3-6. Beach Capacity Total Turnarounds (2017–2019) Source: Sullivan, pers. comm. 2020 Beach Turnarounds FY 17 FY 18 FY 19 a Barefoot Beach Preserve 9,433 11,109 6,805 Clam Pass Beach Park 5,740 3,447a 4,539 Tigertail Beach Park 5,778 4,816 4,075 Vanderbilt Beach Park 2,793 2,689 1,460 a Value has missing quarterly data. All Quarter 4 data for FY 19 was not included. Beach parking locations were considered for areas under the existing power transmission lines that parallel Livingston Road on the west. Because of limited land use options, a park-and-ride facility under the transmission lines is an innovative use of the property. However, during stakeholder meetings, while the Parks & Recreation Division recommended beach park-and-ride lots east of US 41 because of its congestion, the County Tourism Division requested to locate beach lots closer than Livingston Road. Vacant properties were examined around Goodlette-Frank Road to serve beaches along the arterials of Pine Ridge Road, Vanderbilt Beach Road, and Immokalee Road. Refer to Table 3-7 for proposed beach sites. Of the existing County beaches, Clam Pass and Barefoot Beach Preserve have capacity to support additional visitors but available areas can only be accessed by walking and do not have access by shuttle or boardwalk. There is an existing CAT beach express bus that circulates from the Creekside transfer station to Conner Park to Delnor-Wiggins Pass State Park. However, each proposed beach lot is recommended to have a designated beach shuttle during tourism season, if one does not exist. Table 3-7. Proposed Park-and-Ride Locations for Beach Access Proposed Location/Description Park-and-Ride Site ID Comments Beach lot (Goodlette-Frank Road) SL-24 Undeveloped 13-acre parcel along Goodlette- Frank Rd. Beach lot (Vanderbilt Beach Road) SL-25 Undeveloped 5-acre parcel between US 41 and Goodlette-Frank Rd. Beach lot (Pine Ridge Road) SL-26 Undeveloped 1.6-acre parcel adjacent to Goodlette-Frank Rd. with parcel to the north 3.4 Candidate Locations Based on Stakeholder Input Using public participation data (Appendix C), candidate sites were evaluated against locations already identified to determine any additional sites. Survey responses included requests for proposed sites already being considered such as: • shuttle to beach • Lee County to main government campus • close to I-75 16.D.12.a Packet Pg. 3071 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-9 • East Naples • parking to help travel to Marco Island for work • Golden Gate Estates express bus • within Orangetree area to reduce traffic from Golden Gate Estates Table 3-8 lists additional locations added based on stakeholder feedback. Park-and-ride lots on the outskirts of downtown Naples to serve places that approach parking capacity, such as 5th Avenue North and Cambier Park are recommended. Continued communication is needed between the County and City of Naples to identify and develop park-and-ride lots to serve the downtown Naples area. Table 3-8. Proposed Park-and-Ride Locations Based on Stakeholder Input Proposed Location/Description Park-and-Ride Site ID Comments Pine Ridge and Collier Boulevard (CR 951) SL-8 Requested along CR 951 to serve the Golden Gate Estates area. Location proposed to capture area after existing lot at Estates Library. Downtown Naples (5th Ave., Cambier Park, beaches) N/A Requested to serve crowded destination spots within the City of Naples. Big Corkscrew Regional Island Park SL-4 Removed because PL-4 (Agricultural Center and Fairgrounds) is closer and serves same targeted ridership. 3.5 Proposed Park-and-Ride Sites Based on the site identification described herein, the complete list of the evaluation sites developed is shown on Figure 3-4 and Figure 3-5. 16.D.12.a Packet Pg. 3072 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-10 Figure 3-4. Final Proposed Site Locations 16.D.12.a Packet Pg. 3073 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 3-11 Figure 3-5. Close Up of Final Proposed Site Locations 16.D.12.a Packet Pg. 3074 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 4-1 4. Site Design 4.1 Facility Types The targeted ridership and area served will determine the type of park-and-ride facility. Table 4-1 lists the types of park-and-ride lots identified in this Study serving the County’s current conditions. A full list of park-and-ride facility types, with descriptions and standards for each, are identified in Table 3-1 of the FDOT State Park-and-Ride Guide. Table 4-1. Types of Park-and-Ride Facilities Source: State Park-and-Ride Guide (FDOT 2012) Facility Type Description Recommended Site Size Shared-use (hosted on existing lots) Signing existing parking spaces in a privately-owned lot. Typically located at shopping plazas to ideally reduce additional trips taken by the user. Lease agreements are required for this private- public partnership. Recommended 5 to 10 spaces based on demand. For developer agreements, a minimum of 5 spaces is recommended; however, quantity should be tailored to the size of the development it would serve based on full build-out. Remote 20+ miles from employment. Low population growth anticipated. Refer to the FDOT State Park-and-Ride Guide for site size estimation calculations. Urban Fringe Located along the boundaries of an urban area. Serves areas of high concentrations of employees (home residence). Refer to the FDOT State Park-and-Ride Guide for site size estimation calculations. Parking Deficiency Supports locations where parking deficiencies already exist. Informal park- and-ride and carpool may already occur. Refer to the FDOT State Park-and-Ride Guide for site size estimation calculations. 4.2 Lot Size Estimation The quantity of parking spaces recommended and total lot size (acres) was estimated for each Priority Site. The lot size estimation was based on the FDOT (2012) State Park-and-Ride Guide methodology, tailored to the information provided or accessible. Once the lot size (quantity of spaces) is estimated, future build-out was determined with a design year of 2045. Acreage required for the lot was then estimated, including sidewalk, bus bay waiting areas, and stormwater treatment. It is recommended to acquire properties with the full acreage required to develop the 2045 build-out. Refer to Appendix E for detailed calculations on site size. Typically, lots are constructed to operate at 75 percent capacity. However, consideration should be made based on construction costs and funding available to determine the size constructed. Designs can be tailored to accommodate size and shape of the property available for parking. For example, a combination of pervious and impervious spaces may be used to reduce the area needed for stormwater treatment. Cost estimates were prepared based on lot size (refer to Section 6). Such additional features as restrooms, car charging stations, or ride sharing accommodations were not included in the lot size estimation and cost estimates. If such additional features with the site are desired, it is recommended to prepare a conceptual site plan to estimate additional space and utilities required for the site size, as well as a revised cost estimate. 16.D.12.a Packet Pg. 3075 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 4-2 For shared-use lots on private property, the number of spaces provided usually ranges between 5 to 30 (Franklin Regional Council of Governments 2008). Because most sites proposed on shared-use are for employees and carpools at locations that still have available capacity, a quantity of 5 spaces, no greater than 10, was proposed for shared-use lots to serve current conditions. 16.D.12.a Packet Pg. 3076 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 5-1 5. Site Evaluations 5.1 Evaluation Ranking Site visits were performed at each proposed shared-use lot to identify additional features that could benefit or hinder the success of the lot. Such features include lighting, security cameras, and the capacity of the existing lot (that is, does the lot already reach capacity or is it underutilized). Sites that ranked the highest reduce single occupancy trips and increase transit ridership. Sites with proposed alternative transportation modes, as opposed to transit, to serve the site (such as an express bus, vanpool, Mobility on Demand [MOD], etc.) are indicated under the comments section within each evaluation. Table 5-1 summarizes the final scores and prioritized rank. Refer to Appendix D for site photos and evaluation reports on each location. The TDP update was not finalized prior to the completion of this Study. The draft TDP report was used to evaluate planned transit routes along each site, with planned routes noted in the comments section of each form indicated as ‘TDP Proposed Routes’ (Medina 2020). Because the evaluations were based on the existing network, the scoring was not affected if the TDP-proposed routes no longer accommodated a site. However, if a vanpool service or MOD was proposed for the area, it was scored as an additional site benefit. If the TDP plans to eliminate transit along a proposed site and a direct shuttle, vanpool, or MOD service is not pursued by CAT to accommodate, the proposed site should not be pursued. Of the 32 sites evaluated, the top 14 ranked sites are recommended as priority sites. A total of 4 sites are proposed on existing lots, while 3 are not on County property and will require lease agreements. The average score of evaluated sites was 81.5 percent with a standard deviation of 7.8. 5.2 Priority Sites Figure 5-1 shows a map of the recommended priority site locations (including alternate locations) according to rank and recommended alternate. If a priority site cannot be pursued at the proposed location, the next highest-ranked site will be pursued. A site may be eliminated if agreement with property owners cannot be reached for property acquisition or lease. 16.D.12.a Packet Pg. 3077 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 5-2 Table 5-1. Final Evaluation Rankings Rank Site ID Final Score Site Name Lease Agreement Required? County Owned? Parking Spacesa Lot Size (acres) Alternate Locations Targeted Ridership/ Destination Served Notesb 1 SL-15 102.8 Creekside 78 1.28 SL-1 Commuting between Collier and Lee County Phase I: Plaza not interested, proceed to Phase II. Options for lot location provided. 2 SL-20 101.0 Government Campus  5-10 Commuters to work. Commuters to CBD Recommended adjacent to museum parking (closest to transfer station). 3 PL-7 98.6 Coastland Center Mall  5-10 SL-2 Commuters to work, Commuters to shopping/ entertainment Options provided to serve this location. 4 PL-9 93.8 Freedom Square shopping center  5 PL-10, SL-13 Commuters to Marco Island or Everglades City Recommended over two alternate locations. 5 SL-18 91.3 Physicians Regional (Pine Ridge)  5 Commuters to work, Carpool 6 SL-22 89.3 Immokalee Government Center  43 0.91 SL-3 All trips for Immokalee residents; Remote facility SL-3 is recommended over SL-22 because of funding obtained. 7 SL-13 87.9 Marco Island (Crossing 951 & 41)  5 PL-9, Pl-10 Commuters to Marco Island or Everglades City Reevaluate need if higher-ranked alternate, PL-9, is developed. 8 SL-8 87.6 Golf Course / VA hospital  10 SL-10 Commuters to work, Regional interconnectivity County to determine development plans and adding spaces for park-and-ride/ 9 PL-10 87.5 Naples Outlet Mall  5 Pl-9, SL-13 Commuters to Marco Island or Everglades City Reevaluate need if higher-ranked alternates, SL 13 and PL-9, are developed. 10 SL-3 86.9 Immokalee Health Dept  43 0.91 SL-22 All trips for Immokalee residents leaving Immokalee Recommended over SL-22 because location has Tiger Grant funding for CAT transfer station. 11 SL-26 85.6 Beach Lot (Pine Ridge Rd)  420 4.81 Beach parking deficiency County to determine plans for the lot. 12 SL-25 85.6 Beach Lot (Vanderbilt Beach Rd)  373 4.21 Beach parking deficiency County to determine plans for the lot. 13 SL-1 85.4 Railhead (Old US 41)  94 1.46 SL-15 Airport, Commuters to work, Commuters between Collier and Lee County If SL-15 is constructed, a smaller site size is recommended. Size should be reevaluated based on site size of SL-15. 14 SL-10 83.1 Radio Rd Transfer Station lot 67 0.88 SL-8 Parking deficiency for transfer station and employment center Serves the Radio Rd. transfer station lot, which receives informal park-and-ride and is reaching parking capacity. 15 SL-6 82.9 The Marketplace at Pelican Bay  5 SL-25 Commuters to work Not recommended if SL-25 is built. 16 SL-11 82.8 Shoppes at Hammock Cove (Thomasson Dr)  5 SL-20 Commuters to work, Commuters to shopping/ entertainment 17 SL-5 81.5 Publix Plaza (Randall Blvd)  5 Commuters to work, primarily westbound 18 PL-1 80.4 Walmart (Immokalee Rd)  5 - 10 SL-16 Commuting between Collier and Lee County Options provided. 19 PL-2 78.5 Government Services Center at Heritage Bay  5 Commuters to work, primarily westbound or southbound 20 SL-24 77.2 Beach lot (Goodlette-Frank Rd) 420 4.81 Beach parking deficiency 21 SL-17 76.8 Rural Village (Immokalee Rd)  Needs Sizing PL-4 Commuters to work, primarily westbound 22 SL-7 75.7 Dicks Sporting Goods (Naples Blvd)  5 Commuters to work, Commuters to shopping/ entertainment 23 SL-2 75.1 Naples Plaza shopping center  5 PL-7 Commuters to work, Commuters to shopping/ entertainment 24 SL-21 75.1 Physicians Regional - Collier  5 Commuters to work, Carpool, primarily north and southbound 25 SL-16 75 Target (Immokalee Rd)  5 PL-1 Commuting between Collier and Lee County Lease for Phase 1 26 PL-4 73.3 Agricultural Center and Fairgrounds  Needs Sizing SL-17 Commuters to work, primarily westbound; Remote facility Phased as demand increases. 27 SL-23 73.3 Carnestown  Needs Sizing Commuters to work; remote facility 28 SL-9 73.1 Sports Complex  5 Commuters to work, Carpool 29 SL-14 71.7 Golden Gate Estates (1st St)  Needs Sizing Commuters to work, Carpool; Remote facility 30 PL-11 68.8 Ave Maria  5 Commuters to work, Carpool; Remote facility Options provided. 31 SL-12 66.1 Naples Airport  5 Commuters to work, Carpool Options provided. 32 SL-19 50.6 Resource Recovery Park  Needs Sizing Commuters to work a Quantity of parking spaces estimated to serve 2045 needs. Refer to Appendix E for site size calculations and FDOT State Park-and-Ride Guide for site sizing guidance. b Refer to Appendix D for the Site Evaluation on each location. Notes: Sites removed or relocated include PL-3, PL-5, PL-6, PL-12, SL-4 (Big Corkscrew Regional Park). Refer to Table 3-1 for details. 16.D.12.a Packet Pg. 3078 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 5-3 Figure 5-1. Recommended Priority Sites (Including Alternative Locations) 16.D.12.a Packet Pg. 3079 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 5-4 5.3 Alternate Sites Some service areas had alternative sites (separate site IDs) evaluated or phased development listed within the comments section. The alternate with the highest rank should be pursued first and the other alternates pursued as applicable. Sites with higher-ranked alternates should have its site size reevaluated based on the size of the higher-ranked alternate that is developed. These locations in the Priority Sites include SL-22, SL-13, PL-10, and SL-1. Options are also presented on the evaluation forms for locations that may have more than one property pursued, if the recommended parcel is not successful. Alternative sites should be evaluated to pursue on a case-by-case basis, based on whether it is proposed on a shared-use or developed lot. 5.3.1 Alternates for Public-Private Partnerships For sites requiring public-private partnerships, sites were proposed on shared-use lots where the participating property owner would host a park-and-ride site on their lot. In this scenario, a lease agreement would be required, and the designated parking spaces would be signed as park-and-ride. Alternative sites on shared-use lots are considered interchangeable but can also be used in conjunction with each other where applicable. For example, PL-9, PL-10, and SL-13 are all proposed on a shared-use lots that requires a lease agreement and are alternates to each other. All three locations ranked as a priority site. However, all three sites may not need to be pursued. The highest-ranked site (PL-9) should be pursued first. If the property owner at the highest-ranked site is not amenable to providing the quantity of proposed parking spaces, the remaining spaces recommended should be pursued at the next highest- ranked alternate location. 5.3.2 Alternates for Developed Lots For developed lots with alternative sites, only one site shall be pursued with the other alternate site resized or eliminated. For example, SL-1 (Creekside) and SL-15 (Railhead) are alternates proposed for a transfer facility and connection with LeeTran. SL-15 resulted in a higher score because it already serves as a transfer station and accommodates several routes but requires the County to purchase property within an approximate 0.5-mile range. However, if property cannot be acquired within a reasonable price, the County should pursue its alternate, SL-1, which is on County-owned property. The transfer station with LeeTran and applicable CAT routes should be evaluated and rerouted to accommodate the new location as appropriate. If SL-15 is purchased and constructed, the site size for SL-1 should be significantly reduced. SL-22 (Immokalee Government Center) and SL-3 (Immokalee Health Department) are the two alternates proposed in the City of Immokalee and are both ranked within the top priority sites. Although the Immokalee Government Center scored slightly higher than the Immokalee Health Department, the Health Department already has funding in place from the Tiger Grant awarded in 2018 to construct a bus transfer station (Collier County 2020). Therefore, because of the proximity of the two lots, SL-3 should be the lot constructed and SL-22 removed from consideration. 5.3.3 Phased Development Some sites proposed various options for a location within the individual evaluation form. The evaluation was performed on the proposed phase, with an interim or long-term solution indicated as the applicable phase. Typically, approximately 5 spaces are proposed as an interim Phase I solution, with the fully developed lot as the long-term solution. 16.D.12.a Packet Pg. 3080 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 5-5 Some locations had options presented to pursue. The prioritized option should be pursued first, then if an agreement or property acquisition cannot be made at agreeable terms, then the next option should be pursued for that location. 16.D.12.a Packet Pg. 3081 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 6-1 6. Cost Estimates Cost estimates were developed for the priority site locations. Cost estimates included initial construction costs, estimated operating costs, and anticipated leasing fees. Initial construction costs included the cost of land acquisition, design, permitting, and the development of the site with recommended amenities. The estimate for SL-15 is $564,940, $352,251 for SL-3, $2,587,310 for SL-26, $2,318,200 for SL-25, and $565,013 for SL-10. Refer to Appendix E for a detailed breakdown of estimated costs and site size requirements. As noted in Section 4.2, additional features such as restrooms and utilities were not included in the cost estimates. Additional amenities desired, such as those proposed for SL-3, should be added to the cost estimates provided. The cost estimate for a new beach express shuttle to serve SL-26 is proposed to operate only during peak season. Because the beach only reached maximum capacity 36 days per year within the last 3 years (refer to Table 3-5), the cost estimate for a beach shuttle is anticipated to align with the cost of the R29a Beach Bus. A new beach express shuttle is also recommended to serve SL-25. The cost for new service to accom-modate the sites would be added to the cost estimates provided. The yearly maintenance cost per space for maintaining pavement, drainage, landscaping, and fencing is anticipated to cost at $130 per space per year for 2020. The yearly leasing fee for shared-use lots on private property is anticipated to be minimal, estimated at approximately $15 per space per year for 2020 (FDOT 2012). 16.D.12.a Packet Pg. 3082 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 7-1 7. Funding Sources An important consideration for prioritizing park-and-ride sites is determining available funding for developing and maintaining the site. Federal, state, and local funding options were reviewed in relation to each proposed park-and-ride site. Funding allocation will be needed for all elements of the development and maintenance including design, ROW acquisition or lease, construction, promotion, monitoring, operating, and management of the development and maintenance of the facilities. Funding will also be needed for any future expansion or improvements to the sites. The FDOT State Park-and-Ride Guide (FDOT 2012) summarizes potential federal and state funding sources for building park-and-ride facilities. The programs were evaluated for funding, implementing, and maintaining park-and-ride facilities as applicable to the proposed sites for the County. Refer to Section 8.2 for recommended funding sources to pursue for priority lots. 7.1 Federal Funding Federal resources are available and generally targeted to support the highway system and improve its capacity. Table 7-1 summarizes potential federal resources for programs administered by the Federal Transit Administration (FTA). A recent award of the FY 17 Buses and Bus Facilities Infrastructure Investment Program through the FTA was to Lee County for the transfer station and park-and-ride lot (FTA 2020). Table 7-1. Federal Funding Sources Source: State Park-and-Ride Guide (FDOT 2012) Funding Source Agency Description Comments 5309 Bus and Bus Facilities (Transit Project Earmarks) FTA The Capital Investment Grants and Loans Program (formerly Discretionary Grants) provides transit capital assistance for new fixed guideway systems and extensions to existing fixed guideway systems (New Starts), fixed guideway modernization, and bus and bus-related facilities. Project must be consistent with the MPO plan, and typically matched on 80/20 basis. Small Starts FTA This program is following a simplified process for projects seeking less than $75 million in federal discretionary “Small Starts” funds and with a total project cost not exceeding $250 million. Has many requirements that are still in process. Exclusivity of corridor, model, and ridership may be issues. Very Small Starts FTA FTA has defined a class of projects that are very simple, low-cost, and demonstrably effective called Very Small Starts projects within the Small Starts Program. FTA’s intent is that Very Small Starts will qualify for an even simpler and expedited evaluation and rating process. Designed for the bus rapid transit services. Can be as high as 80/20 funding. 16.D.12.a Packet Pg. 3083 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 7-2 Table 7-1. Federal Funding Sources Source: State Park-and-Ride Guide (FDOT 2012) Funding Source Agency Description Comments 5307 Formula Funds FTA The Urbanized Area Formula Grants Program provides transit capital and operating assistance to urbanized areas with populations of more than 50,000. Approximately $18 billion is provided to transit agencies for bus and rail vehicle replacements and facility recapitalization. Project must be consistent with MPO plan and Transportation Improvement Program (TIP). Typically used by transit agencies for non-project-specific funding. 5311 Capital Grant Program FTA This program provides grants for transportation projects that are included in a state program of mass transportation service projects (including service agreements with private providers of mass transportation service) for areas other than urbanized areas. Each state receives an apportioned amount based on its amount of non-urban area. This program is often used for operating assistance. Eligible activities include planning and marketing for intercity bus transportation; capital grants for intercity bus shelters; joint-use stops and depots; operating grants through purchase-of- service agreements, user-side subsidies, and demonstration projects. CMAQ Funds FTA A modification to the law during Transportation Equity Act of the 21st Century provides states that receive the minimum apportionment of 0.5 percent with some flexibility to use CMAQ funds for Surface Transportation Program (STP)- eligible purposes. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. STP Funds FTA These funds are excess highway funds or those chosen to be flexed to transit projects. Federal and state funds that are flexed are permanently removed from a highway project or from potential highway project funding. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. 7.2 State Funding FDOT has a Park-and-Ride Grant Program that supports the purchase or leasing of private land for the construction of park-and-ride lots, as well as the promotion (advertisement) and monitoring of the lots. It is an integral part of the Commuter Assistance Program. The Central Office has established criteria for detailed park-and-ride planning, implementation, and evaluation. All local park-and-ride projects are reviewed for eligibility by the FDOT District office, and suitable projects are considered for funding. Table 7-2 summarizes potential state resources for programs administered by FDOT. 16.D.12.a Packet Pg. 3084 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 7-3 Table 7-2. State Funding Sources Source: State Park-and-Ride Guide (FDOT 2012) Funding Source Agency Description Associated Issues Transit/Rail Service Development FDOT Discretionary funding allocated to specific projects by FDOT policy makers to assist in initiating new transit or rail service. Assistance can be either capital or operating grants, although operating assistance is limited to a defined timeframe (typically 3 years). Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. Strategic Intermodal System FDOT An initiative by FDOT to provide funding for statewide and regionally significant transportation facilities and services. Initial focus is on improving intercity transportation corridors, rather than local services. Park-and-Ride; Commuter Assistance Programs FDOT Programs to facilitate the use of car pools/vanpools by providing funding for planning, marketing, and capital projects. Historically, focus has been on commuter assistance. Intermodal Development FDOT Program designed to provide funding for improved access, connections to other modes (for example, airports, seaports, and rail), and to facilitate intermodal or multimodal movement of people and goods. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. Public Transit Block Grants FDOT Formula grants to established transit providers for use on capital projects or operating assistance. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. State Infrastructure Bank Loans FDOT Provides low interest loans for transportation projects – all modes. Repayment terms are flexible and are negotiated on a case-by-case basis. This is a financing tool, not a grant. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. Not a grant—requires repayment. TRIPS FDOT Program to improve travel on regionally significant facilities or benefit regional travel or commerce; 50 percent of project cost or 50 percent of non- federal share. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. CIGP FDOT Up to 50 percent for improvements to relieve congestion on State Highway System. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. New Starts FDOT Dollar-for-dollar match of local funds for New Starts projects. Project must be consistent with the local comprehensive plan and must be included in MPO plan and TIP. 16.D.12.a Packet Pg. 3085 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 7-4 7.3 Local Funding Local funding is typically required to match the federal and state resources. Local funds can include general Capital Funds or various taxes, such as sales tax, property tax, local business tax, taxes associated with transportation (such as vehicle registration fees), or tourist development tax. The County’s tourist development tax is governed by the Tourist Development Council (TDC) and TDC tax dollars are used for the promotion of tourism. Any projects and expenditures of tourist development tax must be approved by the TDC. This is a potential funding source to assist with park-and-ride lots associated with beach park facilities or those specifically designed to support tourism. Projects seeking TDC funding require TDC Board conceptual approval prior to advancement to ensure eligibility and support. Another possible local funding option includes working with the County MPO Congestion Management System to determine if their program has potential for funding certain park-and-ride facilities. Park-and- ride lots would be eligible under this program if they are located along corridors that do not meet an acceptable level of service and do not have funding for widening within the next 5 years. The Congestion Management Committee would review selected park-and-ride lots that meet this program’s goal to determine if it would be advanced for recommendation. If advanced, the Congestion Management Committee would prioritize the project and bring to the MPO Board for final approval. 7.4 Alternative Funding Strategies An alternative strategy for the development of additional park-and-ride lots in congested areas is to work with new commercial developments in their conceptual and design stage. When designing parking requirements for a commercial use, allowing developers to provide required parking spaces offsite can help promote park-and-ride facilities and reduce congestion. The developer could be given the option to either build a park-and-ride offsite or participate in a joint planned effort with funds from several developers being pooled for constructing lots or parking garages. Offsite parking for developers can be made more attractive by providing incentives and benefits, such as increased square footage capability for buildings, water treatment and storage, or even reduced development fees. The Seed-to-Table park-and-ride lot near the intersection of Livingston Road and Immokalee Road is a good example of such an arrangement (refer to Figure 7-1). Seed-to-Table is a retail market and café who funded and constructed a park-and-ride lot on County property. The design of the lot incorporates one section designated for Seed-to-Table use only and another section for public use. Because the lot is not ideal for pedestrian commute to the shopping center, the County required Seed-to-Table to provide a shuttle service to safely bring users (targeted for employees) across Livingston Road to the shopping center. Another alternative strategy is to use regulatory requirements to implement revisions to County and City systems (Naples, Marco Island, and Everglades City). For example, modifications to the Concurrency Management System Ordinances could be made by revising mitigating improvements to accept transit, instead of contributing to roadway improvements. This Figure 7-1. Seed to Table Park-and-Ride lot 16.D.12.a Packet Pg. 3086 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 7-5 would be advantageous where developments are increasing trips on corridors that have limited or no capability for ROW expansion (for example, Immokalee Road around I-75) or congested segments that cannot improve capacity or level of service because of financial limitations or environmental restrictions. It is recommended for the County and its associated municipalities to endorse this ordinance change. A standard process would need to be developed for computing transit fees as an alternative mitigating improvement. Specific areas or segments should be selected where this option is available to developers. The associated fees should be updated as needed in conjunction with the transit or mobility plan accepting this alternative (FDOT 2012). 16.D.12.a Packet Pg. 3087 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 8-1 8. Recommendations and Conclusions Park-and-ride priority lots should be adopted into the County’s LRTP and TDP updates. In addition, new sites should be acquired and reserved for the future along corridors identified in the AUIR or LRTP as deficient and along corridors with high commuter patterns, even if transit is currently not yet provided along that route. The County’s property acquisition team should inform CAT when any opportunities arise for potential purchase of land near these main arterials to serve this demand, as well as for beach parking within a 3-mile radius of beaches at capacity (refer to Table 3-5) especially in areas with limited availability, such as South Marco Beach Access in Marco Island. 8.1 Best Practices Designing and building cost-efficient park-and-ride facilities is key for the success of funding and feasibility. Facilities should be designed with landscaping that requires little to no maintenance to further reduce upkeep costs. In addition, Collier County Vertical Construction Standards should be incorporated where applicable for such items as video surveillance. Designing the sites with conventional facility standards that are used around the County, such as standard lighting fixtures and gates, will allow for efficient maintenance and servicing. Strategies and best practices should be incorporated into site design where feasible, as noted in Appendix A. Where appropriate based on parking and roadway capacity, park-and-ride spaces on shared- use lots can be designed for use only from Monday through Friday or weekends only. For the lots designed to accommodate offsite airport parking for the Southwest Florida International Airport. If charging is desired, parking meters and the PayByPhone system, or equivalent, could be implemented, with numbered parking spaces. The County shall determine the maximum amount of days to allow overnight parking. Expired spaces may be ticketed or towed at the owner’s expense. Using a parking meter that can be paid through an online (PayByPhone) portal would allow commuters who have unplanned extended trips to pay for the additional parking days remotely. The PayByPhone parking system with phone application is used by more than 300 cities designed to accommodate this service. An MOD service should be developed with Lee County to serve the airport commuters, such as those using SL-1. Lots allowing overnight parking should be fenced with automatic timed gates and night vision cameras to increase safety and security. 8.2 Property Acquisition and Lease Agreements To develop new lots, the following actions are recommended: • Establish funding, secure local funds, or obtain grants as applicable • Acquire property • Design and permit • Construct To establish funding for SL-15 (Creekside) and SL-10 (Radio Rd Transfer Station lot), grants may be pursued as the facility will also serve the transfer station. It is recommended to pursue the bus and bus facilities grant; however, funding can also be pursued using public transit block grants or possibly through the MPO’s Congestion Management Committee. For SL-3 (Immokalee Health Department), the funding for the transit center was included with Immokalee Complete Streets grant proposal, which was awarded the Tiger IX Grant in March 2018. The project 16.D.12.a Packet Pg. 3088 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 8-2 included a bus bay, canopy shelter, waiting area, trash receptacles, vending machines, restrooms, and Americans with Disabilities Act improvements. For the proposed beach lots, SL-26 (Pine Ridge Rd) and SL-25 (Vanderbilt Beach Rd), it is recommended to pursue TDC funds and the bus and bus facilities grant. An alternate funding source could be through public transit block grants. For shared-use lots requiring private-public partnerships, funding should be pursued using the FDOT Park- and-Ride commuter assistance programs. Property owners of the priority locations on shared-use lots were contacted. CAT and Collier MPO should more formally engage with property owners at proposed lease locations to describe the project and inform on the benefits a park-and-ride can bring to commercial lots. A sample maintenance agreement can be found in the FDOT State Park-and-Ride Guide. 8.3 Promotion of the Facilities As discussed in Appendix A, guide signs following the latest MUTCD guidelines are recommended on the major arterial leading to each park-and-ride lot (existing and future) provided within the County, as well as at the entrance of each lot. In addition, CAT should create a separate webpage identifying each lot and shared-use site available for park-and-ride within the County, with photos and descriptions of each lot. The webpage should include information on the benefits of using park-and-ride and links for commuter service and MOD available. In addition, park-and-ride locations should be added to the overall CAT map and to the interactive bus route maps’ Real Time Trip Planner webpage (CAT 2020). The facilities can also be promoted by installing amenities to entice users to the lot, such as electric vehicle car charging stations. To help commuters to reach their ultimate destination after taking transit, alternative methods such as electric scooter stations can be installed at popular stops. Each developed park-and-ride lot and transfer station should have informational signs about the lots available within the County and information on CAT and the commuter assistance program. To advertise designated beach park-and-ride lots, tourism and Parks & Recreation websites should promote the lots to increase awareness. Pamphlets of the beach shuttle should be available at hotels and tourist locations. The Parks & Recreation Division recommended the beach shuttle be exchanged with a beach trolley, with open windows and beach graphic wraps to attract tourists and entice users. Additional promotion and marketing strategies outlined in FDOT State Park-and-Ride Guide (FDOT 2012) should be pursued as resources and funding are available. For all beach park-and-ride lots, digital ‘real-time’ tracking signs indicating the quantity of available spaces is proposed along the arterials. Real-time tracking for SL-26 should be posted at the park-and-ride lot (Pine Ridge Road) for drive-by trips as well as on US 41 prior to visitors entering Seagate Drive. This will reduce trips on Seagate Drive and promote lot use. The real-time tracking should also be posted online to allow visitors to plan their route accordingly during peak season. The online location should be easy to search, with the location posted on the interactive sign. It would be ideal for the website to indicate ‘real-time’ availability of parking at each of the County beach lots. 8.4 Park-and-Ride Handbook A Park-and-Ride Handbook was developed to assist in the evaluation process for future sites analyzed after the conclusion of this Study (refer to Appendix B). The handbook should also be used as the basis for any future park-and-ride studies performed for the County. The handbook includes guidance on the site selection and evaluation process as well as the Evaluation Methodology and Evaluation Forms. 16.D.12.a Packet Pg. 3089 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 8-3 Weighting and evaluation methodology should be reevaluated as demographics, needs, and development changes occur within the County from the current 2020 conditions of this Study. 16.D.12.a Packet Pg. 3090 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 9-1 9. References BMI, Burgess & Niple, Inc., and Fitzgerald & Halliday, Inc. 2003. Northern Virginia Park & Ride Lot Feasibility Study Final Report. Prepared for: Virginia Department of Transportation Northern Virginia District. April. http://www.virginiadot.org/projects/resources/NorthernVirginia/NoVA-pknride-study.pdf. Coastal Region MPO. “Park and Ride Lot Initiative." Accessed July 2020. https://www.thempc.org/Core/Pr#gsc.tab=0. Collier County. 2016. IMMOKALEE COMPLETE STREETS GROWING CONNECTIONS TO CREATE MOBILITY OPPORTUNITIES TIGER 2016 APPLICATION. https://www.colliercountyfl.gov/home/showdocument?id=65746 Collier County. 2019. ANNUAL UPDATE & INVENTORY REPORT/CAPITAL IMPROVEMENT ELEMENT SCHEDULE UPDATE ON PUBLIC FACILITIES 2019 AUIR/CIE. Prepared by Comprehensive Planning Section Zoning Division Growth Management Department. Collier County. 2019. Collier County Sports Complex & Events Center. December 10. https://www.colliercountyfl.gov/home/showdocument?id=90757 Collier Metropolitan Planning Organization (MPO). 2020. Public Participation Plan. June 12. Commonwealth of Massachusetts. 2020. "Park and Ride." Accessed July 2020. https://www.mass.gov/park-and-ride. Commuter Services of Pennsylvania. 2020. "Park & Ride Map." Accessed July 2020. https://pacommuterservices.org/park-ride-map/. Connetics Transportation Group, Moffatt & Nichol, and Symbioscity. 2014. Park-And-Ride Lot Study Final Report. Prepared for: Coastal Region MPO. September. https://www.thempc.org/eagenda/x/acat/2014/October%2020,%202014%20Regular%20Meeting%20 of%20the%20CORE%20MPO%20ACAT%20on%20Monday,%20October%2020,%202014/47438766- 0949-402D-8459-D1A489615413.pdf David Plummer and Associates, Inc. 2010. Miami-Dade Countywide Consolidated Park-and-Ride Facilities Plan. October. http://miamidadetpo.org/library/studies/consolidated-park-and-ride-facilities-plan-final- 2010-10.pdf Emerald Coast Regional Council. 2020. Park and Ride. Accessed August 17. https://www.ecrc.org/programs/transportation_planning/park_and_ride.php Federal Highway Administration (FHWA). 2009. Manual on Uniform Traffic Control Devices for Streets and Highways. 2009 Edition. U.S. Department of Transportation. December. Federal Transit Administration (FTA). 2020. “Fiscal Year 2017 Bus and Bus Facilities Projects.” Accessed July 2020. https://www.transit.dot.gov/funding/grants/fiscal-year-2017-bus-and-bus-facilities-projects. Florida Department of Environmental Protection (FDEP). 2009. Florida's Statewide Comprehensive Outdoor Recreation Plan. FDEP Division of Recreation and Parks. November 16. https://floridadep.gov/sites/default/files/OutdoorRecreationinFlorida2008.pdf 16.D.12.a Packet Pg. 3091 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 9-2 Florida Department of Transportation (FDOT). 2012. State Park-and-Ride Guide. Prepared for: Florida Department of Transportation Transit Office. June 1. https://fdotwww.blob.core.windows.net/sitefinity/docs/default- source/content/transit/pages/finalparkandrideguide20120601.pdf?sfvrsn=a592696c_0 Florida Department of Transportation (FDOT). 2019. SIS Atlas. October 31. https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/programs/ mspi/pdf/sis-atlas-103119d82d9d26abf840a38ffc216e03e26474.pdf Florida Department of Transportation (FDOT). 2020. Commute Connector. Accessed August 17. https://commuteconnector.agilemile.com. Franklin Regional Council of Governments. 2008. Franklin County Park and Ride Study. Prepared for: Franklin County. September. https://frcog.org/wp-content/uploads/2014/04/%E2%80%A2- ParkandRideStudy_Final-Report-%E2%80%A2-.pdf Google. 2020a. “Park & Ride, San Carlos Drive, Fort Myers Beach.” Accessed July 2020. https://earth.google.com/web/. GradyMinor. 2018. Clam Pass Parking Garage. May 29. Jacobs. 2020. Collier MPO 2045 Long Range Transportation Plan. December 2020 (expected). Karto, Zachary , Senior Planner, Collier Area Transit. 2020. Personal communication (email) with Felicia Kirby, Jacobs. July 13. Lee County Transit (LeeTran). 2019. LeeTran System Map. https://www.leegov.com/leetran/PublishingImages/Lee%20Tran%20System%20Map%202019%20web. pdf Manatee County Area Transit (MCAT). 2018. MCAT Transit Development Plan 2019 - 2028 Major Update Final Report. Prepared for: Manatee County. Prepared by: Manatee County Area Transit. August. https://www.mymanatee.org/UserFiles/Servers/Server_7588306/File/Departments/MCAT/Agency%20I nformation/Transit%20Development%20Plan/Manatee-Connect-TDP-Final-Report-1.pdf Manatee County Area Transit (MCAT). 2019. 2019-2020 Annual Progress Report for the MCAT Transit Development Plan 2019-2028 Major Update. August. https://www.mymanatee.org/published/ August%206,%202019%20-%20Regular%20Meeting%20on%20Tuesday,%20August% 2006,%202019/71D20B1E-CBE7-4E7A-8F1E-084047CBB58D.pdf Manatee County Area Transit (MCAT). 2020. “Bus Routes and Maps.” https://www.mymanatee.org/departments/mcat/bus_routes_and_maps. Accessed July 2020. Matthew C. Boyer & Associates. 2014. Humboldt County Association of Governments Park and Ride Study: Technical Memorandum: #1B (Commute Patterns). Prepared for: Humboldt County. April. http://www.hcaog.net/sites/default/files/tm_1b_draft_final_042814.pdf Matthew C. Boyer & Associates. 2017. Draft Park-and-Ride Master Plan. Prepared for El Dorado County Transit Authority. January 24. http://3nmak51dheck3t8vkw20jvcz-wpengine.netdna-ssl.com/wp- content/uploads/2017/01/Report-Draft-El-Dorado-Transit-Park-and-Ride-Master-Plan-2017-02-02.pdf 16.D.12.a Packet Pg. 3092 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 9-3 Medina, Josephine, Senior Planner, Collier MPO. 2020. Personal communication (email) with Felicia Kirby, Jacobs. April 1, 2020. Miami-Dade County. 2020. "Metrobus Park and Ride Lots." Accessed July 2020. https://www.miamidade.gov/global/transportation/metrobus-park-ride.page. Miami-Dade County. 2018. Dolphin Station Truck Parking and Park & Ride Site Feasibility Study. Prepared for: Miami-Dade County. Accessed June 2020. https://www.mdxway.com/pdf/2- Dolphin%20Park%20and%20Ride%20Transportation%20Aesthetics%20Review%20Committee%20pres entation.pdf Olson, Nancy, Regional Manager, Parks & Recreation. 2018. Personal communication (email) with Felicia Kirby, Jacobs. May 23. Renaissance Planning Group. 2013. Regional Park-And-Ride Strategic Implementation Plan for the Sarasota/Manatee Metropolitan Planning Organization. Prepared for: Sarasota MPO. December. Ride Solutions. Park-And-Ride Study: Inventory, Use, and Need for the Roanoke and New River Valley Regions. Prepared for: Virginia Department of Transportation. Prepared by: Ride Solutions. http://nrvrc.org/wp-content/uploads/2015/07/Park-And-Ride-Study-2009.pdf Spillar, Robert J. 1997. Park-and-Ride Planning and Design Guidelines. Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. October. http://cdn.wspgroup.com/8kzmue/park-and-ride-planning-and-design- guidelines.pdf Sullivan, Jake, Acting Manager Region I, Collier County. 2020. Personal communication (email) with Felicia Kirby, Jacobs. March 3, 2020. Tindale-Oliver & Associates, Inc. 2011. Transit Development Plan FY 2012 - 2021 Final Report. Prepared for: Lee County Transit. September. https://www.leegov.com/leetran/Documents/LeeTran_2012_TDP.pdf Tindale-Oliver & Associates, Inc. 2012. Conceptual Vision for Park-and-Ride Facilities Final Report. Prepared for: Pasco County MPO. December. https://www.pascocountyfl.net/DocumentCenter/View/ 11055/Pasco-Park-and-Ride-Vision---Final?bidId= Tindale-Oliver & Associates, Inc. 2012. Transit Infrastructure Guidelines Manual. Prepared for: Pasco County Metropolitan Planning Organization. December. Tindale-Oliver & Associates, Inc. 2018. MCAT Transit Development Plan 2019 - 2028 Major Update Final Report. Prepared for Manatee County Area Transit. August. https://www.mymanatee.org/UserFiles/Servers/Server_7588306/File/Departments/MCAT/Agency%20I nformation/Transit%20Development%20Plan/Manatee-Connect-TDP-Final-Report-1.pdf University of South Florida (USF). 2005. COLLIER COUNTY Park & Ride Site Identification Study. Prepared for: Collier County. Prepared by: Center for Urban Transportation Research (CUTR). November. University of South Florida (USF). 2011. TBEST Model Enhancements Parcel Level Demographic Data Capabilities and Exploration of Enhanced Trip Attraction Capabilities. Prepared for: State of Florida Department of Transportation (FDOT). Prepared by: Center for Urban Transportation Research (CUTR). September. https://www.nctr.usf.edu/wp-content/uploads/2011/11/77801.pdf 16.D.12.a Packet Pg. 3093 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Collier MPO and CAT Park-and-Ride Study PPS0715201202SWF 9-4 Valley Metro. 2018. North Glendale Park-And-Ride Study Final Report. May. https://www.valleymetro.org/ sites/default/files/uploads/event-resources/n_glendale_pnr_study_final_rpt_0518.pdf Valley Metro. 2020. "Park-and-Rides." https://www.valleymetro.org/park-and-ride. Accessed July 2020. Vanasse Hangen Brustlin, Inc. (VHB). 2019. Transit Development Plan Major Update (2020–2029). Prepared for Sarasota County Area Transit. August. https://www.scgov.net/home/ showdocument?id=42942 Collier County. 2020. Collier County GIS Hub. Accessed April 15. https://hub- collierbcc.opendata.arcgis.com/search?q=pud%20Collier%20County. U.S. Census Bureau. 2020. OnTheMap. Accessed April 29, 2020. https://onthemap.ces.census.gov. Caltrans. 2020. "Park and Ride Program." Accessed July 2020. https://dot.ca.gov/caltrans-near- me/district-11/programs/district-11-planning-local-assistance/district-11-park-ride-program. Citrus Connection. 2020. “Routes/Services.” Accessed July 2020. https://ridecitrus.com/routes/. City of New York. 2020. "FAQ: Park-n-Ride." Accessed July 2020. https://www1.nyc.gov/site/opa/commuters/faq-park-n-ride.page. Google. 2020b. “Gow B. Fields Park and Ride.” Accessed July 2020. https://earth.google.com/web/. Lee County. 2020. "Lee Tran Beach Park and Ride." Accessed July 2020. https://www.leegov.com/facilities/project?pID=25/. Broward County Transit. 2020. System Map. Accessed August 17. https://www.broward.org/BCT/Documents/SystemMap.pdf. Palm Tran. 2020. Accessed August 17. https://www.palmtran.org/. PayByPhone. 2020. Accessed September 2020. https://www.paybyphone.com/. Collier County. 2020. TIGER GRANT IX. Accessed September 14, 2020. https://www.colliercountyfl.gov/your-government/divisions-a-e/capital-project-planning-impact-fees- and-program-management/transportation-planning-section/grants/tiger. Collier Area Transit. 2020. MyStop. Accessed September 16. http://collierivl.availtec.com/infopoint/. 16.D.12.a Packet Pg. 3094 Attachment: Attachment 1 - CAT Park and Ride Study (14261 : Collier Area Transit Park and Ride Study) Appendix B Park-and-Ride Handbook 16.D.12.b Packet Pg. 3095 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 1 CAT Park and Ride Handbook October 2020 Collier MPO and CAT 16.D.12.b Packet Pg. 3096 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 2 Table of Contents 1.Introduction ......................................................................................................................................................... 3 2.Evaluation Methodology ................................................................................................................................... 5 3.Evaluation Form ................................................................................................................................................11 4.References ......................................................................................................................................................... 18 16.D.12.b Packet Pg. 3097 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 3 1. Introduction This Park-and-Ride Handbook is established for Collier County to follow a standard procedure for identifying and evaluating future park-and-ride sites. This handbook should be used as a basis for repeating any park-and-ride studies in the future. Contents of the handbook include: 1. Evaluation Methodology for direction on completing the evaluation forms. 2. Evaluation Form to assess each site. The analysis procedure outlined in Figure 1-1 should be followed for identifying, evaluating, and recommending future sites. The latest best practices should be incorporated into the analysis and design process as well as those outlined in the Research Memorandum (refer to Appendix A of the Collier MPO and CAT Park-and-Ride Study). It is preferable to visit the proposed site, especially if it would be a shared- use lot, to determine any additional site benefits or constraints. The methodology should be updated to evaluate planned routes if CAT has accepted planned or revised routes to their existing system. The weighting, evaluation methodology scoring, and questions should be reevaluated as demographics, needs and development occurs within Collier County from the conditions at the time of this study. Funding sources should be reevaluated as available options change. 16.D.12.b Packet Pg. 3098 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 4 Figure 1-1. Park-and-ride evaluating procedure 16.D.12.b Packet Pg. 3099 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and CAT Park-and-Ride Handbook PPS0715201202SWF 5 2. Evaluation Methodology This methodology provides instruction for evaluating potential park-and-ride sites on the evaluation form. These criteria will provide quantitative ratings to determine the site’s anticipated level of success. The evaluation criteria summarized herein scores the proposed site based on many factors including location and economic feasibility. These criteria were based on the Florida Department of Transportation State Park and Ride Guide site selection evaluation methodology and tailored to the local conditions within Collier County (hereafter, “the County”). Weighted values were assigned to tailor the assessment to the County’s specific needs. The weightings were assigned by a project team consisting of representatives from Collier Area Transit, Collier Metropolitan Planning Organization, and Jacobs Engineering Group Inc. The weightings reflect the criteria’s anticipated contribution to the success of the site, with designations as follows: 1. Basic site requirement 2. Desirable benefit 3. Significant benefit The assigned weighting (W) is indicated after each question. The proposed number of spaces shall be indicated on each form. For shared-use lots, between 5 and 10 spaces were proposed. For new developed lots, the quantity of proposed spaces was calculated as detailed in the Collier MPO and CAT Park-and-Ride Study. The evaluation criteria are as follows: 1) Is the site on a major arterial? (W=3) Sites are more desirable if located along a major arterial. The farther the distance is from the site, the less convenient the site is to travelers. Therefore, as the distance from a major arterial increases, the less desirable the location is. Scoring Criteria: Along major: 10 pts; Within 0.25 mi: 8 pts; Within 0.5 mi: 6 points; Within 0.75 mi: 4 pts. 2) Is the site located on an existing transit line? If so, indicate which route. (W=2) Sites along an existing transit line are more desirable. The further the site is from an existing transit line, the further an existing route will have to go to accommodate the new location. A new route may also be needed if an existing transit line cannot reasonably accommodate the new location. Route number is requested for informational purposes only. All routes that are located along the site shall be listed. This question should be evaluated based on the latest route layouts. Note: Planned routes proposed within the draft TDP were noted in the comments section for each evaluation. Scoring Criteria: On existing: 10 pts; Within 0.25 miles: 8 pts; Within 0.5 miles: 6 pts. 3) Is there an existing bus stop adjacent to the site? If so, indicate the bus stop ID. Is it a well-used stop? (W=1) If the site already has a bus stop, the transit service does not need to provide a new stop at the proposed site. A new stop would require coordination with adjacent property owners, an easement 16.D.12.b Packet Pg. 3100 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 6 or right-of-way (ROW) acquisition, and passenger amenities. Ridership is requested for information only using count data provided by CAT. Scoring Criteria: Yes: 10 pts, Within 250 ft: 8 pts; Within 500 ft: 6 pts; Within 750 ft: 4 pts; Within 1,000 ft: 2 pts. 4) Does the existing bus stop have passenger amenities (shelter & bench)? If no, is there ROW available for amenities at the site? (W=1) A site with a shelter and bench is more attractive to commuters. If the site needs a shelter and bench, construction costs to the site will increase. Scoring Criteria: Shelter & bench: 10 pts; Bench only: 7 pts; ROW available: 6 pts. 5) Is the site located upstream of a congested segment based on anticipated travel path in the AM and/or PM? Note what applies and anticipate future growth. (W=2) The site is more desirable if it is located directly upstream of a congested area. This will reduce the quantity of traffic travelling through the congested area. AM and PM traffic flow will be used to determine whether the Site is ‘upstream’ of anticipated travel path. Refer to the latest AUIR for existing and anticipated deficient roads. Scoring Criteria: Within 0.5 mi: 10 pts; Within 1 mi: 8 pts; Within 2 mi: 4 pts. 6) Does the site have good visibility (from arterial)? (W=1.5) Visibility is more desirable as it is associated with safety and security. Additional factors such as lighting can help increase visibility and provide a feeling of safety. Remote locations with less visibility are less desirable. In addition, a site that is visible from the side of a major arterial increases’ awareness of the park-and-ride. • Clearly Visible: entirely visible from main arterial • Partially Visible: lot is visible from main arterial, but sight line may be slightly obstructed by vegetation, walls, etc. • Semi-Visible: visible from access road Scoring Criteria: Clearly visible: 10 pts; Partially visible: 8 pts.; Semi-visible: 5 pts. 7) How far is the site from the Central Business District (CBD) or Activity Center? (W=1.5) Sites were evaluated based on their distances from CBD or Activity Center. If a site is too close, commuters will walk instead of using transit. Conversely, if too far, it reduces attractiveness of the site. A site within a range of slightly more than 1 mile will be the most attractive to prompt users to use the lot and transit system. Use Google Maps for mileage approximations. CBD’s and activity centers included, but was not limited to, the City of Naples, Coastland Center Mall, hospitals, government campus, Mercato, Waterside Shops, high employment areas such as Marco Island, hotels, Arthrex, Vanderbilt Beach Hotels, retirement communities (Moorings Park, Via Bentley), etc. Scoring Criteria: 1-3 miles: 10 pts; Within 5 miles: 8 pts; Within 10 miles: 5 pts; <1 or >10 miles: 0 pts. 16.D.12.b Packet Pg. 3101 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 7 8) Does the site have sufficient access (ingress and egress) from the adjacent roadway? (W=3) A site with easy/quick access is more desirable for users. A site may include recommended access improvements when constructed. Desirable ingress and egress include right in, right out, left in, left out and distance to signals. • Excellent: Signal access or left in, left out, right in, right out or access off two roads (10 pts) • Good: Directional access with U-turns available within 0.2 miles • Fair: Directional access with U-turns available within 0.5 mile • Poor: One direction in, U-turns not available within 1 mile Scoring Criteria: Excellent: 10 pts; Good: 8 pts; Fair: 6 pts; Poor: 0 pts. 9) Is the location on the correct side of the road for transit pickup (serving proper direction for anticipated demand)? (W=2) A site will be more convenient and reduce travel time when on the correct side of the road (direction of travel) for the commute to the destination. Scoring Criteria: Yes: 10 pts; No: 0 pts. 10) Is the site in proximity to an existing park-and-ride facility serving the same route? (W=1.5) If the site is located too close to an existing Park and Ride site serving the same route, the new location may not attract enough new users or attract users from the existing site. Therefore, the site is expected to have less cost benefit. Sites that have further spacing will likely generate more overall use resulting in a greater cost benefit. The Radio Road transfer station and Seed-to-Table lots were evaluated as park-and-ride facilities in addition to those marked on the System Map accessed from the CAT website which identifies park-and-ride lots at the Headquarters Library, Estates Library, Golden Gate Library, and Marco Island library. *Note: If an existing park-and-ride facility is over capacity and cannot be expanded, the scoring should not penalize the site. Park-and-ride facilities at capacity should be noted but excluded in the evaluation of this question. Scoring Criteria: >10 mi: 10 pts; 5-10 mi: 7 pts; <5 miles but different direction: 2 pts; <5 mi and same direction: -40 pts. 11) Is the anticipated commuter driving distance minimal (from home to the site) for the majority of targeted ridership? Identify targeted ridership. (W=1) A site is more desirable when the commuter has less distance to travel to reach the site. If the site is too far, commuters are less likely to use the site. The commuter driving distance is estimated based on factors such as survey results, anticipated targeted ridership, adjacent developments, etc. Targeted ridership shall be identified for information only. Use the US Census maps, census- designated places (CDP’s), and Google Earth for measurements. Scoring Criteria: 1-3 mi: 10 pts; 4-6 mi: 8 pts; 7-10 mi: 6 pts; >10 mi: 0 pts. 16.D.12.b Packet Pg. 3102 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 8 12) Is the site within or adjacent to a commercial area? (W=2) A site is more attractive if commuters can utilize adjacent commercial areas. If commercial areas are within close range, commuters can easily incorporate other trips into the original trip and may result in reduced vehicle miles traveled. This will help identify public/private partnerships and Sites with multi-use amenities. Scoring Criteria: Yes: 10 pts; Within 250 ft: 8 pts; Within 500 ft: 6 pts; Within 750 ft: 4 pts; Within 1,000 ft: 2 pts. 13) Are there pedestrian and/or bicycle facilities adjacent to the site that connect to the transit stop? Is adding infrastructure feasible? (W=2.5) Bicycle and pedestrian facilities make a location more attractive. If a site is located within close range of an existing bicycle or pedestrian facility, it can be used to reach the transit stop at minimal cost. Feasibility of adding facilities is for information only. If a transit stop does not currently exist, respond indicating if bicycle and pedestrian facilities exist for proposed new location. Scoring Criteria: At site: 10 pts; Within 250 ft: 8 pts; Within 500 ft: 6 pts; Within 750 ft: 4 pts; Within 1,000 ft: 2 pts. 14) Does the site have existing parking facilities that can be used? (W=3) If a site already has parking spaces that can be utilized, there are significant cost savings to developing the site. If the proposed site is on private property assume 5 spaces. If the lot is on private property and there are usually many spaces available assume 5-10 spaces. Assume >10 if developing a new parcel. Scoring Criteria: >10 spaces: 10 pts; 5-10 spaces: 7 pts; <5 spaces: 2 pts. 15) If the answer to Question 14 was no, is there available ROW at the site for a minimum of 5 spaces? 10 spaces? More than 10 spaces? Is it owned by the County? (W=2) If the site has available ROW that can be purchased to allow at least 5 spaces, the site is worth pursuing. If ROW available would provide less than 5 spaces, it is less desirable to invest in that location. If the property is already owned by the County, savings will include purchase of the property and quicker schedule to develop the site. Scoring Criteria: ROW available & County owned: 10 pts; ROW available & Privately owned: 5 pts. 16) If the answer to Question 14 was no, what is the location zoned as? (W=1) If a location needs to be rezoned to allow for a Park and Ride site, there could be opposition from the public. In addition, it would take additional time and budget to rezone the property for a Park and Ride location. Collier County interactive GIS zoning maps can be accessed from: https://colliercountygmd.maps.arcgis.com/apps/webappviewer/index.html?id=d3f4802ac5b743 39b21b27467ff4c9fb Scoring Criteria: Commercial or Industrial: 10 pts; Residential: 0 pts. 16.D.12.b Packet Pg. 3103 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 9 17) Does the Site have capability for expansion? (W=1) If the site is successful, having the ability to expand and accommodate future growth is more desirable. As traffic projections show an increase in congestion along major arterials, Park and Ride usage is expected to increase. • Excellent: Empty space for development or has undeveloped area within the parcel • Good: Undeveloped parcels within range of the lot. • Fair: On private lot, capability for expansion with shopping center area can approach different property owner along same route • Poor: Privately owned and not many available spaces usually observed Scoring Criteria: Excellent: 10 pts; Good: 8 pts; Fair: 3 pts; Poor: 0 pts. 18) How much time is anticipated to acquire and develop the Site as a Park and Ride? (W=1.5) The quicker a site can be developed, the more desirable it is. If a site is anticipated to have a long acquisition, zoning, and construction period, the site is deemed less desirable. • Within 6 months: for developed properties on County property (ex. Library) • Within 9 months: for privately owned locations proposed for a lease agreement, anticipated more than 6 months but less than 9 months. Timeline based on the following schedule:  1-2 months get in contact with property owner and setup meeting with proper contacts  1-2 month discuss and negotiate location of spaces, costs, etc.  1-2 month get lease agreement contract established and finalized, signatures and draft BCC agenda item  1 month BCC item internal approvals and BCC approval  1 month obtain P&R signs and install • Over 9 months: for undeveloped parcels requiring design, permitting, construction, and some cases property acquisition. Scoring Criteria: Within 6 months: 10 pts; Within 9 months: 8 pts; Over 9 months: 4 pts. 19) Would the Site encourage employee ride sharing? (W=1) Sites that are anticipated to encourage employee ride sharing are more desirable. Additional benefits include reduced trips on the road and reduced carbon emissions. Use US Census maps and deficient roadways listed in the latest AUIR. • Likely: within 3 miles of high-density areas or remote areas • May encourage: within 3 miles Medium- density areas • Not likely: travelers commuting short distances and spaces usually available at destination Scoring Criteria: Likely: 10 pts; May encourage: 5 pts; Not likely: 0 pts. 16.D.12.b Packet Pg. 3104 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 10 20) Include any additional Site benefits and/or negative features associated with this location. (W=2.5) Identify if there are any additional unique benefits to the site to increase usage. Unique benefits can increase the site’s usage over other locations. For example, numerous adjacent planned land use developments are underway near an intersection, the proposed site is located upstream to reduce trips through the congested area. Negative features unique to the site which make it less desirable for users will receive negative points. Scoring Criteria: Benefit or negative feature (± pts) as follows: • Lighting: +2 pts • Cameras: +2 pts • Increased security (near sheriff office, EMS, mall patrol, etc): +5 pts • Lack of available parking spaces if on private lot or lot seen to be full: -3 pts • ADA compliant Bus Stop: +3 • Transfer facility (+10) or for every additional route location serves (+2 not to exceed 10) • Connection to other service route (ex. LeeTran, established vanpool) (+12) • Public restroom facilities available (+5) • Established express route serves location (+2). Note: if a location was currently not served by transit but is proposed within the TDP to be served by mobility on demand (MOD), vanpool, or express points were provided in this section. • Assisting underserved and isolated communities, including Everglades City, Marco Island, Immokalee, and Ave Maria (+8) • Serving regional commuters (+10) • Other: serving areas that reach parking capacity and informal P&R naturally occurs (+10). Comments Any sites with alternates, phasing, or options proposed were indicated in the comments section. The draft TDP proposed routes were indicated in each evaluation under the comments section as “TDP Proposed Routes.” 16.D.12.b Packet Pg. 3105 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 11 3. Evaluation Form 16.D.12.b Packet Pg. 3106 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park and Ride Site Evaluation Form Proposed Location Name: Address: City, State, Zip: Evaluation Criteria 3 (Along major: 10 pts; Within 0.25 mi: 8 pts; Within 0.5 mi: 6 points; Within 0.75 mi: 4 pts) 2 (On existing: 10 pts; Within 0.25 miles: 8 pts; Within 0.5 miles: 6 pts) 1 (Yes: 10 pts, Within 250 ft: 8 pts; Within 500 ft: 6 pts; Within 750 ft: 4 pts; Within 1,000 ft: 2 pts) 1 (Shelter & bench: 10 pts; Bench only: 7 pts; ROW available: 6 pts) 2 (Within 0.5 mi: 10 pts; Within 1 mi: 8 pts; Within 2 mi: 4 pts) 1.5 (Clearly visible: 10 pts; Partially visible: 8 pts; Semi-visible: 5 pts) 1.5 (1-3 miles: 10 pts; Within 5 miles: 8 pts; Within 10 miles: 5 pts; <1 or >10 miles: 0 pts) 6. Does the site have good visibility (from arterial)? 7. How far is the Site from the CBD or Activity Center? and/or PM? Note what applies and anticipate future growth. Score Weight Total 3. Is there an existing bus stop adjacent to the Site? If so, indicate the bus stop ID. 5. Is the Site located upstream of a congested segment based on anticipated travel path in the AM Is it a well-used stop? available for amenities at the Site? No. of Proposed Spaces:Location ID:Overall Score (%): 4. Does the existing bus stop have passenger amenities (shelter & bench)? If no, is there ROW 1. Is the Site on a major arterial? 2. Is the Site located on an existing transit line? If so, indicate which route(s). [insert Location ID here]Page 1 of 6 16.D.12.b Packet Pg. 3107 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park and Ride Site Evaluation Form 3 (Excellent: 10 pts; Good: 8 pts; Fair: 6 pts; Poor: 0 pts) 2 (Yes: 10 pts; No: 0 pts) 1.5 (>10 mi: 10 pts; 5-10 mi: 7 pts; <5 mi different direction: 2 pts; <5 miles same direction: -40 pts) 1 (1-3 mi: 10 pts; 4-6 mi: 8 pts; 7-10 mi: 6 pts; >10 mi: 0 pts) 2 (Yes: 10 pts; Within 250 ft: 8 pts; Within 500 ft: 6 pts; Within 750 ft: 4 pts; Within 1,000 ft: 2 pts) 2.5 (At site: 10 pts; Within 250 ft: 8 pts; Within 500 ft: 6 pts; Within 750 ft: 4 pts; Within 1,000 ft: 2 pts) 3 (>10 spaces: 10 pts; 5-10 spaces: 7 pts; <5 spaces: 2 pts) 2 (ROW available & County owned: 10 pts; ROW available & Privately owned: 5 pts) 1 (Commercial or Industrial: 10 pts; Residential: 0 pts) of targeted ridership? Identify targeted ridership. 11. Is the anticipated commuter driving distance minimal (from home to the Site) for the majority 10. Is the Site in close proximity to an existing Park and Ride facility serving the same route? 9. Is the location on the correct side of the road for transit pickup (serving proper direction for anticipated demand)? 13. Are there pedestrian and/or bicycle facilities adjacent to the Site that connect to the transit 12. Is the Site within or adjacent to a commercial area? stop? Is adding infrastructure feasible? 8. Does the Site have sufficient access (ingress and egress) from the adjacent roadway? Score Weight Total 14. Does the Site have existing parking facilities that can be utilized? 16. If the answer to Question 14 was no, what is the location zoned as? 15. If the answer to Question 14 was no, is there available ROW at the Site for a minimum of 5 spaces? 10 spaces? More than 10 spaces? Is it owned by the County? [insert Location ID here]Page 2 of 6 16.D.12.b Packet Pg. 3108 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park and Ride Site Evaluation Form 1 (Excellent: 10 pts; Good: 8 pts; Fair: 3 pts; Poor: 0 pts) 1.5 (Within 6 months: 10 pts; Within 9 months: 8 pts; Over 9 months: 4 pts) 1 (Likely: 10 pts; May encourage: 5 pts; Not likely: 0 pts) 2.5 (Lighting: 2 pts; Cameras: 2 pts; Increased security: 5 pts; ADA compliant bus stop: 3 pts; Transfer facility: 10 pts or every additional route served: 2 pts NTE 10; Connection to other service route: 12 pts; Public restrooms: 5 pts; Established express, carpool, etc.: 2 pts; Serving underserved or isolated communities: 8 pts; Serving regional commuters: 10 pts; Serving location reaching parking capacity or P&R occurring informally: +10pts; Lack of available spaces: -3pts) 20. Include any additional Site benefits and/or negative features associated with this location. Score Weight Total 18. How much time is anticipated to acquire and develop the Site as a Park and Ride? 19. Would the Site encourage employee ride sharing? 17. Does the Site have capability for expansion? [insert Location ID here]Page 3 of 6 16.D.12.b Packet Pg. 3109 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park and Ride Site Evaluation Form Photos of Proposed Location Comments: [insert Location ID here]Page 4 of 6 16.D.12.b Packet Pg. 3110 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park and Ride Site Evaluation Form Photos of Proposed Location [insert Location ID here]Page 5 of 6 16.D.12.b Packet Pg. 3111 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park and Ride Site Evaluation Form Site Map of Proposed Location [insert Location ID here]Page 6 of 6 16.D.12.b Packet Pg. 3112 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study) CAT Park-and-Ride Handbook PPS0715201202SWF 18 4.References AECOM. (June 2012). Florida Department of Transportation State Park-and-Ride Guide. Retrieved from https://fdotwww.blob.core.windows.net/sitefinity/docs/default- source/content/transit/pages/finalparkandrideguide20120601.pdf?sfvrsn=a592696c_0 Coastal Region MPO. “Park and Ride Lot Initiative." https://www.thempc.org/Core/Pr#gsc.tab=0. Accessed July 2020. Collier County. 2020. Collier County Zoning. Accessed June 28, 2020. https://colliercountygmd.maps.arcgis.com/apps/webappviewer/index.html?id=d3f4802ac5b74339b21b 27467ff4c9fb 16.D.12.b Packet Pg. 3113 Attachment: Attachment 2 - Appendix B Park and Ride Handbook (14261 : Collier Area Transit Park and Ride Study)