Loading...
Agenda 12/08/2020 Item #16A44 (Contract #20-7710 to Atkins North America, Inc.)12/08/2020 EXECUTIVE SUMMARY Recommendation to award Agreement No. 20-7710 to Atkins North America, Inc., pertaining to Request for Professional Services (“RPS”) No. 20-7710, Surveying and Mapping, Environmental Evaluation, and Preliminary Engineering Design for Restoration of Plantation Island Waterways (Project No. 60238), in the amount of $423,404. OBJECTIVE: Recommendation to award a contract to Atkins North America, Inc. (“Atkins”), pertaining to RPS No. 20-7710, “Surveying and Mapping, Environmental Evaluation, and Preliminary Engineering Design for Restoration of Plantation Island Waterways” (the “professional engineering services”) related to the post- Hurricane Irma restoration of the waterways of Plantation Island. CONSIDERATIONS: At the July 14, 2020 meeting (Agenda Item 16A.37), the Board approved the selection committee’s ranking of the top three firms that submitted proposals for RPS # 20 -7710 and authorized staff to begin contract negotiations with the top-ranked firm, Atkins, to provide professional engineering services. Plantation Island is a census-designated rural community located southeast of Everglades City in Collier County with approximately two miles of man-made and natural waterways. The waterways serve as stormwater conveyance and some navigability to the Barron River and neighboring tidal waters. In 2017, the severe winds and storm surges of Hurricane Irma deposited heavy amounts of vegetative debris and silt throughout the canal system leading to degradation of the water quality, a nd usable condition of the waterways of the community. The Florida State Legislature appropriated funding through House Bill 3187 in FY2019-20 budget for pre-design and environmental evaluation studies to assess the structural and ecological conditions of the canals to determine the best course of action for prioritized restoration of the waterways. At the Board’s direction, staff negotiated and reached the attached proposed agreement with Atkins to provide professional engineering services in the amount of $423,404. FISCAL IMPACT: Funding, in the amount of $423,404, is available in the Plantation Island Waterways project number 60238, $312,500 within Growth Management Grant Fund (711) and $110,904 within Stormwater Capital Projects Fund (325). The funding sources are an FDEP Grant and general governmental transfers. GROWTH MANAGEMENT IMPACT: The proposed project is in accordance with the goals, objectives, and policies of all applicable sections of the Stormwater Management and the Conservation and Coastal Management elements of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: To award Agreement No. 20-7710 to Atkins North America, Inc., pertaining to RPS No. 20-7710, “Surveying and Mapping, Environmental Evaluation, and Preliminary Engineering Design for Restoration of Plantation Island Waterways,” in the amount of $423,404, and authorize the Chairman to sign the attached agreement. Prepared By: Brittany Lazo, Stormwater, Capital Project Planning, Impact Fees and Program Management Division 16.A.44 Packet Pg. 2209 12/08/2020 ATTACHMENT(S) 1. 20-7710 AtkinsNorth_Insurance 10-29-20 (PDF) 2. 20-7710 AtkinsNorth_VendorSigned (PDF) 16.A.44 Packet Pg. 2210 12/08/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.44 Doc ID: 13953 Item Summary: Recommendation to award Agreement No. 20-7710 to Atkins North America, Inc., pertaining to Request for Professional Services (“RPS”) No. 20-7710, “Surveying and Mapping, Environmental Evaluation, and Preliminary Engineering Design for Restoration of Plantation Island Waterways,” in the amount of $423,404. Meeting Date: 12/08/2020 Prepared by: Title: – Capital Project Planning, Impact Fees, and Program Management Name: Brittany Lazo 11/03/2020 11:12 AM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 11/03/2020 11:12 AM Approved By: Review: Growth Management Department Judy Puig Deputy Department Head Review Skipped 11/03/2020 11:15 AM Growth Management Department Judy Puig Additional Reviewer Completed 11/03/2020 11:21 AM Procurement Services Opal Vann Additional Reviewer Completed 11/03/2020 11:28 AM Procurement Services Sue Zimmerman Additional Reviewer Completed 11/03/2020 11:49 AM Capital Project Planning, Impact Fees, and Program Management Gerald Kurtz Additional Reviewer Completed 11/03/2020 3:30 PM Procurement Services Evelyn Colon Additional Reviewer Completed 11/06/2020 1:50 PM Procurement Services Sandra Herrera Additional Reviewer Completed 11/08/2020 8:02 PM Growth Management Department Lisa Taylor Additional Reviewer Completed 11/12/2020 2:16 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 11/17/2020 7:31 AM Growth Management Department Lisa Abatemarco Additional Reviewer Completed 11/18/2020 10:19 AM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 11/18/2020 6:50 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 11/19/2020 9:06 AM Grants Valerie Fleming Level 2 Grants Review Completed 11/19/2020 9:13 AM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 11/20/2020 3:35 PM Grants Carrie Kurutz Additional Reviewer Completed 11/23/2020 10:45 AM 16.A.44 Packet Pg. 2211 12/08/2020 Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 11/23/2020 11:04 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/23/2020 11:42 AM Grants Therese Stanley Additional Reviewer Completed 11/24/2020 10:55 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 11/24/2020 12:52 PM County Manager's Office Sean Callahan Level 4 County Manager Review Completed 11/30/2020 10:16 AM Board of County Commissioners MaryJo Brock Meeting Pending 12/08/2020 9:00 AM 16.A.44 Packet Pg. 2212 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2016 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY B 2,000,000 GLO0137576-06 Manashi Mukherjee X ATL-005175199-01 1,000,000 1,000,000 X 26247 1,000,000 Annual Aggregate:'(See additional page)' of Marsh USA Inc. ATLANTA, GA 30326 N X10/15/2020 2 10/15/2021 04/30/2020 10/15/2021 BAP0137575-06 Professional Liability A 4,000,000 2,000,000 X 19445 American Guarantee & Liability Ins Co 1,000,000 X C X Collier County Board of County Commissioners is included as additional insured where required by written contract with respect to general liability and auto liability coverages. Waiver of subrogation is applicable 10/27/2020 NOC 1,000,000 10/15/2020 1,000,000 Re: RPS No. 20-7710; Surveying and Mapping, Environmental Evaluation, and Preliminary Engineering Design for Restoration of Plantation Island Waterways, “For any and All work performed on behalf of Collier County named insured subject to policy terms and conditions. X 3295 Tamiami Trail East, Bldg C-2 Naples, FL 34112 Collier County where required by written contract and subject to policy terms and conditions. This insurance is primary and non-contributory over any existing insurance and limited to liability arising out of the operations of the A National Union Fire Ins Co. of Pittsburgh PA CN102421774-Atkin-GAWE.-20-21 Limit: Per Claim 50,000 10/15/2021 2,000,000 AUC9304209-18 (claims made policy) 4,000,000 16535 1,000,000 1,000,000 04/30/2021 WC0137577-06 TWO ALLIANCE CENTER MARSH USA, INC. X 3560 LENOX ROAD, SUITE 2400 X 4030 West Boy Scout Blvd., Ste 700 Atkins North America, Inc. Tampa, FL 33607 X 15808715 10/15/2020 Board of County Commissioners 10/15/2020 A 10/15/2021 Zurich American Insurance Company 16.A.44.a Packet Pg. 2213 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) ACORD 101 (2008/01) The ACORD name and logo are registered marks of ACORD © 2008 ACORD CORPORATION. All rights reserved. THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER:FORM TITLE: ADDITIONAL REMARKS ADDITIONAL REMARKS SCHEDULE Page of AGENCY CUSTOMER ID: LOC #: AGENCY CARRIER NAIC CODE POLICY NUMBER NAMED INSURED EFFECTIVE DATE: 22 Atlanta �� Professional Liability placement was made by Marsh Canada. Marsh USA has only acted in the role of a consultant to the client with respect to the placement, which is indicated here for your convenience. � �� �� � Professional Liability:� Certificate of Liability Insurance CN102421774 MARSH USA, INC.� 4030 West Boy Scout Blvd., Ste 700� Atkins North America, Inc.� Tampa, FL 33607 25 16.A.44.a Packet Pg. 2214 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2215 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2216 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2217 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2218 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2219 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2220 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2221 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2222 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2223 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2224 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2225 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2226 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2227 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2228 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2229 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2230 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.a Packet Pg. 2231 Attachment: 20-7710 AtkinsNorth_Insurance 10-29-20 (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2232Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2233Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2234Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2235Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2236Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2237Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2238Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2239Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2240Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2241Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2242Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2243Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2244Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2245Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2246Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2247Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.b Packet Pg. 2248 Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2249Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2250Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2251Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2252Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2253Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2254Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2255Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2256Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2257Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2258Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2259Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2260Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2261Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2262Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2263Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2264Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.b Packet Pg. 2265 Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2266Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2267Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2268Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2269Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2270Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2271Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2272Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2273Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2274Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2275Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2276Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study) 16.A.44.bPacket Pg. 2277Attachment: 20-7710 AtkinsNorth_VendorSigned (13953 : Plantation Island Waterways Pre Design Study)