CRA Stormwater Subcommittee Agenda 10/23/2020C;01*er C094P,11*r
Bayshore/Gateway Triangle CRA
Stormwater Subcommittee
Meeting Agenda
October 23, 2020
3:00 p.m.
I. Introductions
II. Review and acceptance of August 7, 2020 meeting minutes (Attachment 1)
III. Old Business
A. Redevelopment Plan Priorities
The Committee identified the following areas as initial priorities:
1. Becca Avenue, Weeks Street, Pine Street. (See Attached Map)
2. Gateway Triangle Neighborhood (See Attached Map)
a. Quadrant 1
b. Quadrant 4
3. Comprehensive study of the Lake Kelly area —17 acres
IV. Discussion
1. Washington Ave Alley Way (Attachment)
2. Palmetto Court
V. Next Meeting Date and Discussion Topics
VI. Adjournment
August 7, 2020
MINUTES OF THE GATEWAY/BAYSHORE CRA STORMWATER
SUBCOMMITTEE
Naples, Florida, August 7, 2020
LET IT BE REMEMBERED, the Gateway/Bayshore CRA Stormwater Subcommittee in
met on this date at 2:00 PM in a REGULAR SESSION at 3299 Tamiami Trail E, Suite
103 Naples, F134112 with the following persons present:
Committee Members: Maurice Gutierrez
Steve Rigsbee
Al Schantzen
Mike Sherman
Camille Kielty
Kris LaClair (Excused)
ALSO PRESENT:
Debrah Forester, CRA Director
Tami Scott, CRA Project Manager
Amy Patterson, IF, CCP & FM Director (Excused)
Gino Santabarbara, Principal Planner
Robert Wiley, Project Manager
1
August 7, 2020
I. Introductions
The meeting was held via Zoom.
Mr. Santabarbara called the meeting to order at 2: 00 p.m.
II. Review of February 21, 2020 Meeting Minutes
The minutes of the February 21, 2020 minutes were reviewed and no changes were proposed.
III. New Business
A. Priorities
a. Committee Members — Priority List (See Attachment 2 and 2A)
The Committee reviewed the spreadsheet "Committee Priorities — No Order of Priorities " and
commented on their priorities:
Mr. Sherman — Jeepers Drive due to the construction of new homes on the street and the present
day design is inadequate to handle stormwater during significant rain events. Especially issues
for the older homes on the street as the newer homes are constructed at a higher elevation.
Ms. Kielty — Becca Avenue due to the increased activity with the opening of Celebration Park
and public transportation availability. Also, increased pedestrian traffic in the area due to new
activities. Pine Street due to the presence of insects and stormwater treatment issues. Shoreview
Drive as water collects in certain areas during rain storms.
Mr. Schantzen — Becca Avenue and Weeks Street due to ongoing nuisance flooding and the
areas were identified in the 2011 Q. Grady Minor study. Holly Street given it is a low-lying area
subject to flooding.
Mr. Rigsbee — provided photos of stormwater infrastructure in a variety of locations. The
improvements are in need of maintenance and not functioning as intended leading to issues in the
Triangle area which need to be addressed.
Mr. Santabarbara noted the goal would be to prioritize items to be addressed so they could be
implemented through the County's Local Mitigation Strategy and funding sought.
b. Linwood Way — Community Complaint (Attachment 2B).
The Committee reviewed "Attachment B — Subject Re: Linwood Way Alley " which outlined an
issue with drainage in the alley and a review by County staff.
Mr. Wiley reported access is narrow with no drainage infrastructure and one potential solution is
installing a series of drainage grates in the road to improve drainage.
B. 17 Acres
a. Al Schantzen — Lake Kelly Outflow Barrier (See Attachment 3)
Discussion occurred on the 17-acre parcel owned by the CRA and the plans for the Lake Kelly
area with the following noted:
• Investigation may want to be undertaken to determine if the Lake Kelly outflow is
impeded on the southerly end due to development or other historical activities.
• Consideration should be given to developing an overall stormwater plan for the area to
determine available capacity and any opportunities for incorporating stormwater from the
vacant lot privately owned on the southwest side of the property or other streets into the
system (i.e. Jeepers Drive).
2
August 7, 2020
• Other options for Jeepers Drive include the feasibility of opening up culvert at the east
end for discharge into the Kelly Lake outfall however this could be problematic due to
permitting issues with the various agencies.
b. Design Plan and Stormwater Impact (See Attachment 4)
The Committee noted the region should be divided into study areas by priority to facilitate the
design, funding and construction activities required to implement the projects in a timely
manner.
Mr. Santabarbara reported there are funds available for initiating studies.
C. Discussion on Priorities/Rankings
a. Redevelopment Plan Priorities (See Attachment 5)
The Committee identified the following areas as initial priorities:
1. Becca Avenue, Weeks Street and Pine Street.
2. Shadowlawn Dive in the area of Francis Drive.
3. Comprehensive study of the Lake Kelly area as discussed.
4. Andrews Avenue to US41 East of Shadowlawn Drive.
Ms. Forester noted she will obtain cost estimates for the study areas and forward the
information to the CRA Board for their review.
D. Thomasson Drive Update
Ms. Scott provided an update on the Thomasson Drive project noting there are some Change Orders
in progress for alterations to the sidewalk on the south side due to widening and deepening of the
swale in the area.
E. Next Meeting Date and Discussion Topics
Discussion occurred on whether the Windstar outfall swale was ever completed and/or is functioning
as intended. It was noted the maintenance would be the responsibility of the Homeowners
Association and it may be beneficial to contact the development's management representatives to
determine the status of the swale.
Ms. Forester reported the next Committee meeting is anticipated to be held in October.
IV. Adjournment
There being no further business for the good of the County, the meeting was adjourned by the
order of the Chair at 4:30 P.M.
GATEWAY/BAYSHORE CRA STORMWATER
SUBCOMMITTEE
These Minutes were approved by the Committee on , as presented , or as
amended
Item III. a. 1
The Study area has been separated into eight (8) sub -areas based on geography, the
drainage area they are located in and the level of drainage improvements existing (see
Map 4). Each of these are not mutually exclusive (i.e., certain adjacent streets were
constructed in similar periods with similar attention to drainage provided). The areas
consisted of the following:
+ Area X: This area consists of the streets connecting to Becca and Weeks
Avenues. This area drains to the tidal canals connected to Haldeman Creels with a
portion of the area draining to the Bayshore Drive drainage system by way of inlets
located near the intersections. This area is low in elevation, especially at the west end
of Becca Avenue where the outfall for a significant portion of the area is located. The
northern end of Pine Street nearer to US 41 is higher and does not appear to have
significant drainage problems. The area is lacking swales and culverts and those
present are in poor condition. The outfall is tidally influenced and has limited
conveyance because of its size.
PAGE 35
_ � • 7 7 ww s s- � �[ �• r f t
Mt� f 4[ k• {' .i i Si-f � Fi4 '� i arr - - _- r r.
.`row• '�' � �'�-,� +w+., � - J3C4SS`"'�[?I�i1VB.. �, �� ti r.y �
fa
Jew C.
uperDr
f P._ W
irk OLOu I ,0 r :.� r •�
YOfkshir Cjr-u I
OW
ply Y e fir Li -
' . w.
GQ
CL
do
IL
dq
Oil ,#ice k LA
y. R r p #
RPr.AyAVra 1 ,
rye r,UOAL
w,T ti
r Y And
Vol win moo
��- ..,5L�4t3� t1 � � .� � � CS.. uN��� l ,�� LiiiiiilW ,j��- � •
R7
�s
,�,
r �'.
�P
�►4ed.
s
l -- '
Ll
4 - - -
's e, .. fir.
_ g
Mi Ft.
LF
Ems, TI P' t. 1
a _ _ RM - �
Flu- ..� � fir.
a `R $ er g at
?L S i �i�+ :._ R t}s ,v tp .: } _� 1! 3t,, w J3
TIM`s""l .0 �i' �i '9 �.3�I l '4 i;{ 4: vi P CF--. x-w "FFiFCCv: S �Yu L i '
_ f
i 4 @> �z s .
.,
_ •I - low +�ll� et Ya a 0 '' fir •.. e
n F,�
oAlt so
„s!l ACC, k
-- ffi'F r71r '`fie i r — i- .. -
moq It, isn..
jr no r CC I
in r jaww8
L a a ar a' a. ter F I
a
or
'r
r
f _
1 �1
� 1
C
t � $
L-IM -F•-nIr
orAr
�e
di
4.
,fir • �' � _ .b• - ti� - __ • �
} lwlargvr a -Avg
ir
'F2 E4 ar'n�ar a=Tr ip
Jcffc'•sc�-. r� �..-
OL
r � � � - - _� - �+ y � � Lois - -- ►.�` - - � ..�
r _
ON" Now _ y �` . S'i�".1
fro corn:
.1�
YEW
JXIPL
Aw
F, qff �
.Amp" im rn' f`
i
fly- t ti,# + ■ # ffkl
-
Ir
to
lit
�"`
_ • � ` fir: � Am* IL .rtItIL-
* ,'...
IL
AN
a
�
I- i et Is Lit'.,
Jo
i-L
2020 Goagle T +
GO
' OL