Agenda 10/27/2020 Item #16A 1 (PL20190001458)10/27/2020 16.A.1 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer utility facilities for Vi at Bentley Village - Multi -Family Building, PL20190001458, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and/or Final Obligation Bond in the total amount of $19,367.46 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance of the potable water and sewer facilities, and to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $19,367.46, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Vi at Bentley Village - Multi -Family Building, has constructed the potable water and sewer facilities within dedicated easements to serve this private development. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on August 12, 2019. 3) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 4) A final inspection to discover defects in materials and workmanship have been conducted by staff on September 16, 2020, in coordination with Public Utilities, and these facilities have been found to be satisfactory and acceptable. 5) All potable water and sewer utilities are owned and maintained by the Developer. 6) Staff recommends final acceptance of the subject utility facilities and to release the Utility Performance Security (UPS) and Final Obligation Bond in the total amount of $19,367.46. 7) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - DDP RECOMMENDATION: To approve final acceptance of the potable water and sewer utility facilities for Vi at Bentley Village - Multi -Family Building, PL20190001458, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $19,367.46 to the Project Engineer or the Developer's designated agent. Prepared by: Lucia S. Martin, Associate Project Manager, Development Review Division Packet Pg. 378 16.A.1 10/27/2020 ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) Packet Pg. 379 16.A.1 10/27/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.1 Doe ID: 13583 Item Summary: Recommendation to approve final acceptance of the potable water and sewer utility facilities for Vi at Bentley Village — Multi -Family Building, PL20190001458, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and/or Final Obligation Bond in the total amount of $19,367.46 to the Project Engineer or the Developer's designated agent. Meeting Date: 10/27/2020 Prepared by: Title: Technician — Growth Management Development Review Name: Lucia Martin 09/16/2020 8:07 AM Submitted by: Title: Director — Growth Management Department Name: Matthew McLean 09/16/2020 8:07 AM Approved By: Review: Growth Management Department Judy Puig Level 1 Reviewer Growth Management Operations & Regulatory Management Rose Burke Engineering & Natural Resources Jack McKenna Additional Reviewer Growth Management Department Matthew McLean Additional Reviewer County Attorney's Office Derek Perry Level 2 Attorney Review Growth Management Department James C French Deputy Department Head Review Growth Management Department Thaddeus Cohen Department Head Review Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Office of Management and Budget Laura Zautcke Additional Reviewer County Manager's Office Geoffrey Willig Level 4 County Manager Review Board of County Commissioners MaryJo Brock Meeting Pending Completed 09/16/2020 8:55 AM Additional Reviewer Completed Completed 09/28/2020 1:35 PM Completed 09/28/2020 1:57 PM Completed 09/28/2020 1:59 PM Completed 09/28/2020 2:29 PM Completed 09/28/2020 4:23 PM Completed 09/28/2020 4:51 PM Completed 09/29/2020 2:14 PM Completed 09/29/2020 6:44 PM Completed 10/19/2020 11:34 AM 10/27/2020 9:00 AM Packet Pg. 380 16.A.1.a Vi AT BENTLEY VILLAGE MULTI -FAMILY BUILDING COqL p ER CNTY LELY TTL 30NITA KORY BAREFOOT ORES SHORES BEACH 5 AUDUBON COUNT" ..wept GLU9 7 14W BAY R FCRE5T 9 — fr W THE WATERGLADES 2 RETREAT Iiawls5 NEST )1LlAGE PLACE GULF OF MEXI O rAN, ,GALE: 1" = 4000E SITE LOCATION CYPRESS L HEAD 1 3 STCNE I fERIAL LAKES L.dwp� K ESTATES 5 — NfCLJw C_R j SJNN CIYT1CCIN5 GULF TRIAL RIGHTS BAY PINES I WI SERIAL GULF WEST HARBOR WIGGINS PASS LJhNDINGS J 20 fn w r� Z CG } T PALM PALM RIVER RIVER 21 MCQLE SHORES 22 H. PARK LOCATION MAP ,k il IMPERIAL GOLF ESTATES 14 2.3 rL Cm G m 0 0 J C a Packet Pg. 381 16.A.1.b Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond $15,367.46 2019644511 Final Obligation Bond $4,000.00 2019644511 Total Amount $19,367.46 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Gl a Packet Pg. 382 16.A.1.b VERIFICATION OF FINAL COST PROJECT NAME: BENTLEY VILLAGE LOCATIO SECTION 9, TOWNSHIP 48 S. RANGE 25 E. NAME & ADDRESS OF OWNER: CC- NAPLES, INC 71 S. WACKER DRIVE, SUITE 900 CHICAGO, ILLINOIS 60606 TYPE OF UTILITY SYSTEM; POTABLE WATER (MATERIAL AND SERVICES) ITEM SIZE CQUAN. UNIT COST TOTAL CONNECT TO EX. WATER MA 8 1 EA $3,071.00 $3,071.00 MASTER METER ASSEMBLY 8 1 EA $50,976,10 $50,976.10 RELOCATE FIRE HYDRANT ASSEMBLY 1 EA $2,333,00 $2.333.00 FIRE HYDRANT ASSEMBLY 2 EA $4,395,76 $8.791.52 GATE VALVE 8" 2 EA $1,675,20 $3.350.40 PIV 6" 1 EA $2,403,08 $2,403.08 INLINE CHECK VALVE 6" 1 EA $1,918.48 $1,918.48 FDC 1 EA $1,668,50 $1,668.50 BUILDING RISER 6" 1 EA $1,766,90 $1,756.90 SCH 80 T, 30 LF $18.24 $547.20 DR-14 6" 80 LF $22.25 $1,780.00 DR-14 8" 1195 LF $30.63 $36,602.85 FITTINGS 1 LS $13,169.00 $13,169.00 TOTAL COST CERTIFYING: I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as -installed system. P.E., Project Engineer OF: HOLE MONTES, INC. 950 Encore Way Naples, K5N0 Auth¢rized signature of Underground Contractor OF: f Haleakala Construction Inc. 6758 Taylor Road Naples, FI 34109 $125,307.03 •aaaa```�ER..Y". No 423-i7 ��'•STATE* OF 40 R ID .0 a W. Terry Cole, P.E. cn=W. Terry Cole, P.E., o=W. TERRY COLE PE - This item has been electronically signed and sealed by W. Terry Cole using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies., ou, email=terrycole@hmeng.co m,c=US 2019.06.19 14:24:53-04'00' STATE OF FLORIDA I } SS: COUNTY OF COLLIER } '���►iL111111111J7j/ p « `7�J�01 The foregging instrument was signed and acknowledged before me this T 9by JAJ SON who Is personally known to me and who did not take an ea�G� ,-'h�AISSEDF��'•.- y ���� USILF-5 CHVI l U: ' • � CON ��isER >o � � �Q�G4 , ao j n — GL _ SEAL: Nothry Publlc Signature RGG 1fii3717 . = .� � Z tvoliffy X} STATF Orr \"N C:lUserslAccountinglAppDatalLocallMicrasoftlWindowslINetCache\Content.Outlook\T3HL655T16� J>+� � �r�3of Verification of Final Cost - RECEIVED SUN 18 2019 WATER El Q Packet Pg. 383 16.A.1.b VERIFICATION OF FINAL COST PROJECT NAME: BENTLEY VILLAGE LOCATI❑ SECTION 9, TOWNSHIP 48 S. RANGE 25 E. NAME & ADDRESS OF OWNER: CC- NAPLES, INC 71 S. WACKER DRIVE, SUITE 900 CHICAGO, ILLINOIS 60606 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIAL AND SERVICES) ITEM SIZE QUAN. UNIT COST TOTAL SET 8-10' MANHOLE ON EXISTING STUB 1 EA $9,941.92 $9,941.92 8-10' MANHOLE 1 EA $8,941.92 $8,941.92 8" SDR-26 8-10' CUT 27 LF $57.30 $1,547.10 CONNECT 6" LATERAL TO EX. MAIN 1 EA $3,626.00 $3,626.00 6" LATERAL TO EX. CLUSNOUISE WI CLEANOUT: 160 ILF $23.36 $3,737,60 8" LATERAL TO BUILDING 10 LF $57.30 $573.00 TOTAL COST $28,367.54 CERTIFYING: I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as -installed system. W. Terry Cole, P.E. cn=W. Terry Cole, P.E., o=W. ,��■►�Ry� �►■,�� TERRY COLE PE - This item has ,.` �� •+, �'• �G k N$41 t�` +y been electronically signed and P.E., Project Engineer -�� sealed by W. Terry Cole using a No 42347 Digital Signature. Printed copies *: = of this document are not F: HOLE MONTES, INC. _ *_ considered signed and sealed 950 Encore ay Q=•_ STATEOF :gym: and the signature must be N L 3 10 '+�Fs `� ❑ R [O P�� ++�+� verified on any electronic copies., ����e ��„►�� ��+� email=terrycole@hmeng.com, c=US Aut Pori td Signature o nderground Contractor 2019.06.19 14:24:06 -04'00' OF: Haleakala Construction Inc. 5758 Taylor Road Naples, FI 34109 STATE OF FLORIDA j y SS: COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this j�d�V W%0 1 , 2011 by Jm 5o whq is personally known to me and who did not take an oath.�ti�ti� �i • [0 6ER �o ?• �7DL- �{Lt�Cir:'lQ ILr- SEAL: = Z����� '° o Notary Pubic Signature NGG 166717 _ D 9A get tided ft■tl�C,e•. yti� C:1Users%ccountinglAppoatalLocallMicrosoft\WindowsllNetCache\Content.OutlooklT3HLBS6�j --A a ?Qoliy of1�(f ation of Final Cast SEWER ���, &LI[' STATEO' t Gl Q RECEIVED JUN 1$ 20l Packet Pg. 384 Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Description Refundable Bonds Cashier Name: Batch Number: Entered By: Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT 2019644511 2019-067785 07/26/2019 $19,367.46 Payment Method Amount Paid Check $19,367.46 $19,367.46 $0.00 Classic Residence Management LP 71 South Wacker Drive, Suite 900 Chicago, IL 60606 Reference Number PL20190001458 ThomasThompson 8457 LuciaMartin Check Number 1019395554 Oriainal Amount GL Account Fee Paid $19,367.46 $19,367.46 670-000000-220113 Gl a Packet Pg. 385