Loading...
Backup Documents 10/13/2020 Item #16A16 ORIGINAL DOCUMENTS CHECKLIST & ROUTINCtI4it 1 6 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routingjines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. Risk-Management Risk 3. County Attorney Office County Attorney Office Cm& In l 1 a 110 4. BCC Office Board of County B L.►� 10-16-20 Commissioners "%i 5. Minutes and Records Clerk of Court's Office • ia:00 %O1Cr o PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Jessica Arencibia Phone 239-252-8345 Contact/ Department Agenda Date Item was October 13,2020 Agenda Item Number 16A 16 Approved by the BCC Type of Document Work order with Taylbr Engineering,Inc.,to Number of Original 1 Attached provide professional surveying services for Documents Attached Naples Beach Renourishment PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature?STAMP OK N/A 2. Does the document need to be stint to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be JA signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JA document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JA signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on October 13,2020 and all changes made JA during the meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes,if applicable. 9. Initials of attorney verifying that the attached document is the version approved by the BCC,all changes directed by the BCC have been made,and the document is ready for dm, Chairman's signature. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 I6A16 Ann P. Jennejohn From: Ann P. Jennejohn Sent: Monday, October 19, 2020 1:31 PM To: 'ArencibiaJessica' Subject: Item #16A6 (10-13-20 BCC Meeting) Attachments: Item #16A16 (10-13-20 BCC Meeting).pdf Hi Jessica, An executed copy of Item #16A16, Frowt the BCC's October 13, 2020 Meeting is attached For your records. Thank you. Ann ✓enneJotin BMR Senior Deputy Clerk 4 <<.tiTtYh.kr4 Clerk to the Value Adjustment Board t�" rF,, Office: 239-252-8406 = Fax: 239-252-8408 (if applicable) Ann.Jennejohn@CollierClerk.cov r'x.,,, `; Office of the Clerk of the Circuit Court & Comptroller of Collier County 32q Tavniavni Trail, Suite #401 Naples, FL 34112-5324 www.Colliereterk.com I6Ai6 WORK ORDER/PURCHASE ORDER Contract 18-7432-CZ"Professional Services Library Coastal Engineering Category" Contract Expiration Date:March 9,2025 This Work Order is for professional Surveying Services for work known as: Project Name:Naples Beach Truck Haul Nourishment Project Project No: 90068 The work is specified in the proposal dated September 28,2020 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, Work Order/Purchase Order# is assigned to:Taylor Engineering,Inc. Scope of Work:As detailed in the attached proposal and the following: * Task 1 Pre and Post Placement Surveys * Task 2 FDEP Monitoring Surveys Schedule of Work: Complete work within 60 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement 11 18-7432-CZ will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above,the County will compensate the Firm in accordance with following method(s):[Negotiated Lump Sum (NLS)❑Lump Sum Plus Reimbursable Costs(LS*RC)ETime& Material (T&M) (established hourly rate—Schedule B) Cost Plus Fixed Fee(CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task 1 -Project Kickoff Meeting and Survey Review S63,072.00 T&M Task 2—Engineering and Project Design $7,772.00 T&M Total Project Fees: S70,844.00 Newly synod by PREPARED BY: MillerAndrew" _. 0(2:40.04CO Andy Miller,Principal Project Manager Date APPROVED BY: DisplatlyiU'•dby Patterson ar°"°`_°"' Amy Patterson,Department Director Date A 1 6 A 1 6 APPROVED BY: ` i fhlf:i'.4--- ill',(1 �-a / .I !"li !� Thaddcus Cohen,Department Head Date By the signature below,the Firm(including employees,officers and/or agents)certifies,and hereby discloses, that,to the best of their knowledge and belief,all relevant facts concerning past,present, or currently planned interest or activity (financial, contractual, organizational, or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY:Taylor Engirn.661 �c James N.Marino, N wArw P.E.c.cE P.E,DCEN 30 SEP 20 James N.Marino Date 'CAQ 1 16A16 IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS CYys ! {,IClrk of Courts COLLIER UNTY,FLORIDA By: CLAM C- , By: ,Chairman Dated: • Ek b—t 41-� '"``�I to Chain n's Name of Firm only. By: First Witness Signature tTypelprint signature and thief l'Type/print witness namet Second Witness f Type/print witness namet rev to Form and gality: sits j�ItlCQouunty Attto��Q,�� WUeer VIVU e1 Print Name Item# Abend 11 Date �I� ' Rec tb 1 41 P.ec'd r Ue�Ck K . � 16A1 6 TAYLOR ENGINEERING , 'Ina.tnemsumompliggamMEIDeiivering Leading-Edge Solutions September 28,2020(Revised) Mr.Andrew Miller,P.E. Principal Project Manager Collier County Coastal Zone Management 2685 South Horseshoe Drive, Unit 103 Naples,Florida 34104 RE: Naples Beach Renourishment Truck Haul Project Collier County, Florida Mr. Miller: Per your request, Taylor Engineering is pleased to submit the enclosed scope of work and fee proposal (Exhibit A) for surveying services during construction of the Naples Beach Renourishment Project. Taylor Engineering will perform these services on a time and materials basis,for a total cost not- to-exceed fee of$70,844.00. Please contact me at(941)702-5871 or jphillips@taylorengineering.com with any questions. Sincerely, / ? IA -— lenna N.Phillips,M.S. Regional Office Lead Attachments(1) 1800 2^" Street, Suite 714 Sarasota, FL 34236 I (941) 702-5871 WWW.TAYLORENGINEERING.COM CAS` 16A1 6 TAYLOR ENGINEERING , I N C . + + Delivering Leading-Edge Solutions Exhibit A-Scope of Services Naples Beach Truck Haul Survey Services Collier County,Florida Introduction: Collier County (COUNTY) has contracted with Taylor Engineering, Inc. (TAYLOR) to perform engineering services related to renourishment of the Naples Beach, located south of Doctor's Pass. The project will entail placement of approximately 35,000 CY of beach quality fill from an upland sand source along the beach, located from the south jetty to approximately R-60. The beach quality sand will be sourced and hauled from Stewart Mines in lmmokalee, FL to the project site. TAYLOR and subcontractor Hyatt Survey, Inc. (SUBCONSUL'l'ANT) will provide all labor and materials to complete professional surveying and mapping services during construction of this project as detailed below. Assumptions: • Removal of grade stakes will be the responsibility of the contractor. • All data will be supplied in plan view only as well as an ASCII / FDEP data file formats. • All data will be referenced to the North American Vertical Datum of 1988 (NAVD) and Florida State Plane Coordinate System, Florida West Zone (0902), NAD 483/i 1 datum. Scope of Work: Task I —Beach Surveys "TAYLOR, via subcontract to Hyatt Survey Inc. will perform beach profile surveys of the project limits as established in the construction plans. Survey work will include one (1) pre- placement and one (1) post-placement survey to document construction progress. The beach profiles (cross sections) will be surveyed at one-hundred (100) foot intervals within the survey limits (for a total of approximately thirty-four (34) sections). Elevations will be collected a minimum of every twenty (20) feet and at all grade breaks along each profile extending to 150 feet beyond the design toe of slope. The beach fill template will be laid out (one time) on 100- foot intervals. Pre- and post-placement surveys to be performed for no more than three (3) weeks(21 days) from the start of construction. One (1) post construction topographic/bathymetric survey of the project limits will be performed to include a total of six (6) beach profiles surveyed from FDEP Monument "R-58A" to "R-60". Profiles will be surveyed along the azimuths as directed by the FDEP. Profile data will be collected at no more than 10 foot intervals along the length of each cross section. Each cross section will commence upland of the constructed fill and extend offshore to a point located 3000 feet seaward of the monument or to a depth of 30 feet, whichever is reached first. TAYLOR will review all survey data for completeness. 1800 2nd Street. Suite 714 I Sarasota. FL 34236 (9411 702-5871 WWW.TAYLORENGINEERING.COM CAO 16Ai C TAYLOR ENGINEERING , I N C . Delivering Leading-Edge Solutions 'l'ask 2—Volume Calculation &Survey Reviews During the construction phase, TAYLOR will perform volume calculations for each day that the contractor places fill to evaluate construction progress. TAYLOR will compare the volume calculations to the truck weight ticket tonnage to verify that the fill placement meets the permitted design template and confirm contractor payment. Deliverables TAYLOR shall provide the following: • Volume calculations for each day that the contractor places fill. • A plan view drawings for all surveys in AutoCAD and PDF format. • Six (6) signed and sealed copies of each survey drawing from a licensed Professional Surveyor and Mapper. Schedule TAYLOR will begin immediately upon Notice to Proceed and will provide daily survey services so as to follow the construction schedule. Performance of Task 1 services assumed to be completed within three (3) weeks or twenty-one (21) days. Additional mobilizations will be invoiced at regular hourly rates attached hereto. All work associated with final survey reviews under Task 2 to be completed within 60 days. Fee Estimate TAYLOR will perform the scope of services as outlined below. TAYLOR will invoice the COUNTY on a monthly basis. All work will he performed based on Time and Materials Not To Exceed a total fee of S70,844.00. The work shall be performed in two separate tasks as follows: Task 1 Fee: S63,072.00 Task 2 Fee: $7,772.00 Total Fee: S70,844.00 1800 2^0 Street. Suite 714 I Sarasota, FL 34236 I (941) 702-S871 WWW.TAYLORENGINEERING.COM 16A1 6 TAYLOR ENGINEERING , I N C . Delivering Leading-Edge Solutions COST SUMMARY BY TASK P2020-079: COLLIER CO NAPLES BEACH TRUCK HAUL SURVEY SERVICES TASK 1 Beach Surveys Labor Hours Rate Cost Task Totals Senior Project Manager 4.0 $ 203.00 $ 812.00 Project Manager 8.0 $ 160.00 $ 1,280.00 Total Man-Hours 12.0 Labor Cost $ 2,092.00 Non-Labor Units Cost Hyatt Survey 1.0 $60,980.00 $ 60,980.00 Total Non-Labor Cost $ 60,980.00 Total Task 1 $ 63.072.00 TASK 2: Volume Calculations and Survey Reviews Labor Hours Rate Cost Task Totals Senior Project Manager 4.0 S 203.00 $ 812.00 Project Manager 16.0 S 160.00 $ 2,560.00 Engineer 8.0 S 130.00 $ 1,040.00 Senior Designer 24.0 $ 140.00 $ 3,360.00 Total Man-Hours 52.0 Labor Cost $ 7,772.00 Total Task 2 S 7,772.00 Total $ 70,844.00 1800 2^d Street, Suite 714 I Sarasota, FL 34236 1 (941) 702-5871 WWW.TAYLORENCINEERING.COM CAa 16A16 DoaSign Envelope ID:B9E37CE7.2882-4A84-B009-7E80747FB82C SCHEDULE B ATTACHMENT 1 RATE SCHEDULE 11Ae HK1#!►Rale Principal 5231 Senior Project Manager $203 Project Manager S160 Senior Engineer S177 _— — Engineer $130 _ Senior inspector $126 Inspector $93 Senior Planner $150 Planner 5120 Senior Designer $140 Designer $105 Environmental Specialist 5120 i Senior Environmental Specialist $167 - Scientist/Geologist S115 Senior Scientist/Geologist S153 Marine Biologist/Hydrogeologist 5120 Senior Marine Biologist/H_ydrogoologist $145 Senior GIS Specialist 5155 GIS Specialist S115 Clerical/Administrative 573 Senior Technician S103 Technician $83 Surveyor and Mapper 5125 CADD Technician S107 Survey Crew-2 mart _ S145 Survey Crew-3 nuun $1,0 Survey Crew-4 man $215 7 Senior Architect 5160 --- Architect - S125 The above hourly rates are applicable to Time and Materials task(s)only. The above list may not be all inclusive. Hourly rates for additional categories required to provide particular project services shall be mutually agreed upon by the County and firm, in writing,on a project by project basis, as needed, and will be set forth in the Work Order agreed upon by the parties. ® Grant Funded. The above rates are for purposes of providing estimate(s), as required by the grantor agency. Page 2 of 3 First Amendment to Agroemmt N I$-7432-CZ Taylor Engineering,inc. 16A1 6 yatt t1kV1:Y July 27,2020 Bryan D. Flynn,PE ESA I Environmental Science Associates 4200 West Cypress Street, Suite 450 Tampa, FL 33607 Re: Proposal for Professional Surveying&Mapping Services Naples Beach Truck Haul Renourishment Project Collier County, Florida Dear Mr. Flynn Hyatt Survey Services, Inc.is pleased to submit this proposal for the following professional surveying services required on the above-referenced project: SCOPE OF SERVICES I. Pre&Post Placement Surveys: a Hyatt Survey will perform one(1)Pre-placement and one(1)Post-placement survey of the beach renourishment project limits as established in the construction plans and specifications for the above-referenced project. (Approximately 3,400 If.) b. Hyatt Survey will survey beach profiles(cross sections), referenced to the North American Vertical Datum of 1988(NAVD),at one-hundred(100)foot intervals within the survey limits (Approximately thirty-four(34)sections). c. Elevations will be collected a minimum of every twenty(20')feet and all grade breaks along each profile extending to 150'beyond the design toe of slope. d. No volume calculations will be performed as part of this scope of services. e. Hyatt Survey Services, Inc.will layout the beach fill template(one time)on 100-foot intervals. f. Removal of grade stakes will be the responsibility of the contractor g. Hyatt Survey anticipates no more than three(3)weeks,twenty-one(21)days for the pre/post placement surveys to be completed. Additional mobilizations will be invoiced at our regular hourly rates attached hereto. h. Hyatt Survey will provide each survey drawing in AutoCAD&PDF format prepared to the client's CAD/layer specifications as well as six(6)signed and sealed copies of each survey drawing. 2012 Lena Road,Bradenton,Florida 34208 Phone: 941-748-4693 Fax: 941-744-1643 CO II 16A16 Hyatt t,UKvtY Bryan D. Flynn, PE ESA I Environmental Science Associates July 27,2020 Page 2 II. FDEP Beach Monitoring Surveys: a. Hyatt Survey will perform one(1)post construction topographic/bathymetric survey of the Naples Beach Renourishment Project in Collier County, Florida.A total of six(6)beach profiles will be surveyed from FDEP Monument"R-58A"to"R-60." b. Profiles will be surveyed along the azimuths as directed by the FDEP. Profile data will be collected at no more than 10' intervals along the length of each cross section. Each cross section will commence upland of the constructed fill and extend off shore to a point 3000' seaward of the monument or a depth of 30',whichever is reached first. c. Hyatt Survey will utilize an Odom"CVM"digital survey fathometer with a 200 kHz transducer for the measurement of all sounding data. An Odom"Digibar Sound Velocity Profiler will be utilized for the measurement of all sound velocity corrections. d. Hyatt Survey will utilize Trimble RTK GPS for horizontal positioning of the survey vessel combined with"Hypack"hydrographic survey software for data collection. e. Conventional survey methods(RTK GPS or Robotic Total Station)will be utilized to collect upland topographic data. f. All data will be referenced to the Florida State Plane Coordinate System, Florida West Zone(0902), NAD'83/11 datum. g. All data will be referenced to the North American Vertical Datum of 1988(NAVD'88). h. All data will be supplied in plan view only as well as an ASCII I FDEP data file formats. i No fill volumes will be calculated as part of this scope of services. j. Hyatt Survey will provide the survey in AutoCAD and PDF formats prepared to the clients CAD/layer specifications as well as six(6)signed and sealed copies of each survey drawing. Hyatt Survey proposes to provide the services for the lump sum fees as follows 1. Beach Nourishment Area Pre/Post Placement Surveys: S 55,990.00 2. FDEP Beach Monitoring Surveys: Post-construction S 4,990.00 2012 Lena Road,Bradenton,Florida 34208 Phone:941-748-4693 Fax: 941-744-1643 C,40 16A16 Hyatt tiR\ L Y Bryan D. Flynn,PE ESA j Environmental Science Associates July 27,2020 Page 3 All work will be performed in accordance with the"standards of practice'outlined in Chapter 5J17 of the Florida Administrative Code,pursuant to Section 472.027, Florida Statutes and in accordance with the procedures as set forth by the project engineer as well as the USAGE Hydrographic Survey Manual. I have attached our standard`General Contract, Provisions and Conditions'as part of this agreement.To accept this proposal,please sign where indicated below and return a copy of this document as your acceptance of this agreement and our authorization to proceed. If you have any questions or comments, please do not hesitate to contact me at 941-748-4693. I look forward to working with you on this project. Sincerely, HYATT SURVEY SERVICES,INC. Pamela A.Hyatt, P.S.M. President Accepted by: ESA I Environmental Science Associates Sign here: Date: Print name here: Duly Authorized Representative 2012 Lena Road,Bradenton,Florida 34208 Phone: 941-748-4693 Fax:941-744-1643 16A16 41yatt:Ift� I1• HYATT SURVEY SERVICES, INC. RATE SCHEDULE BILLING UNIT HOURLY RATE Field Crews: Field Survey Crew:(2 Person) $140.00 Note Al'Field Crew rates include ether'obotic total station or R?K GPS equipment. Hydrographic Survey Crew: Single Beam Surveys: $250.00 Note Hydrogreohic Survey Crew rate includes all personnel and equipment for ar 8-hour day. Office: Project Surveyor $110.00 Professional Surveyor&Mapper $135.00 'All reimbursable costs if any, wilt be invoiced a!cost plus 10%unless negotiated otherwise 2012 Lena Road, Bradenton, Florida 34208 Phone: 941-748-4693 Fax: 941-744-1643 'C7v! ova _ l 6 A 1 6 4tga . xis a 4n J 1 A71Ntg1•.pr•, a a 2 ��'� 2 2 W C a O. z a ~O I .0 . .e I:,,444si 44^4 k R r-•, 444444. : u• — — z S4.9 tL'4.W Y•Y,CO. ..." .a. 'i: I • qip - Cr' h.`i,..f1,,..,m O Z Ili I ESQJIUnn.....+uJ 10,1 • n/� �[- Inal N N - .i 1 . 'n "i • a 1 .4"..a.d"1i I in 1 r1▪ t : pnanr�W+tM III • Y 11 II III 11 L i ....Ht..... 1 111 f z; . _ _________ 1 1 .: ....,...., till ll II S r. A••'U•4 IM • *+MMaNJ+O W Wp•ero+ ,. +wuwoy ` • E t 1 t 3 t. .• a5 Y P � I, I t s r + a. 2i E � X EJw 141 d 16A1 6 Coilier County P•a:uemmt Sermua Dwu,on Direct Select Form Request Date Contract No. Proposal Cost Estimate Construction Cost Estimate 9/1/20 18-7432-CZ $60,980 j $1 .75M Requested By(Use name as it appears in Outlook). Division I Department: Andrew Miller Coastal Zone Management Administrative Agent(If different from Requestor): Library Category: Coastal Engineering Vendor Name: Taylor Engineering Work Assignment Title: Survey Support Services Description of Requested Services: Pre-construction survey, Post Construction survey, and construction survey support for the November 2020 truck haul beach renourishment at Doctors Pass to R-60/ Lowdermilk Park. Justification: ❑Q Past experience with project (Select all that apply and explain • 0 Continuation of previous work assignment below) I 0 Unique qualifications ❑ Other Comments/Explanation of Direct Select: Taylor is the engineer of record and will be the best firm to be able to manage and direct their surveyor subconsultant for the specific requirements of this beach renourishment project, and to ensure timely processing of data during construction to allow for real time design modifications, if needed. r 04.4 Requestor: Andrew Miller Signature:MillerAndrew m,,009,ccs Date: -Dane _ Amy Patterson P��°' Division Director: Signature:Patterson_ao.k NZOC9„122319 Date: Procurement Director: Signature:Cat Bigelow �- Date: -- CAO