#20-7797 (Earth Tech Enterprises, Inc.)
CONSTRUCTION AGREEMENT THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ("Owner") hereby contracts with Earth Tech Enterprises, Inc. ("Contractor") of 6180 Federal Court Fort Myers, Florida 33905, authorized to do business in the State of Florida, to perform all work ("Work") in connection with Collier Beach Renourishment 2020-2021, Invitation to Bid No. 20- 7797 ("Project"), as said Work is set forth in the Plans and Specifications prepared by Taylor Engineering, Inc., the Engineer and/or Architect of Record ("Design Professional") and other Contract Documents hereafter specified. Owner and Contractor, for the consideration herein set forth, agree as follows: Section 1. Contract Documents. A. The Contract Documents consist of this Agreement, the Exhibits described in Section 6 hereof, the Legal Advertisement, the Bidding Documents and any duly executed and issued addenda, Change Orders, Work Directive Changes, Field Orders and amendments relating thereto. All of the foregoing Contract Documents are incorporated by reference and made a part of this Agreement (all of said documents including the Agreement sometimes being referred to herein as the "Contract Documents" and sometimes as the "Agreement" and sometimes as the "Contract"). A copy of the Contract Documents shall be maintained by Contractor at the Project site at all times during the performance of the Work. B. Owner shall furnish to the Contractor one reproducible set of the Contract Documents and the appropriate number of sets of the Construction Documents, signed and sealed by the Design Professional, as are reasonably necessary for permitting. Section 2. Scope of Work. Contractor agrees to furnish and pay for all management, supervision,financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely, and fully perform and complete in a good and workmanlike manner the Work required by the Contract Documents. Section 3. Contract Amount. In consideration of the faithful performance by Contractor of the covenants in this Agreement to the full satisfaction and acceptance of Owner, Owner agrees to pay, or cause to be paid, to Contractor the following amount(herein "Contract Amount"), in accordance with the terms of this Agreement: One Million Ninety-Four Thousand Seven Hundred Dollars ($1,094,700.00). Section 4. Bonds. A. If applicable, the Contractor shall provide Performance and Payment Bonds, in the form prescribed in Exhibit B-1 and B-2, in the amount of 100% of the Contract Amount, the costs of which are to be paid by Contractor. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall meet the requirements of the Department of the Treasury Fiscal Service, "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsurance Companies" circular. This circular may be accessed via the web at www.fms.treas.gov/c570/c570.html#certified. Should the Contract Amount be less than $500,000, the requirements of Section 287.0935, F.S. shall govern the rating and classification of the surety. CAO Construction Services Agreement:Revised 072118(v6) B. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall,within five(5) calendar days thereafter, substitute at its cost and expense another bond and surety, both of which shall be subject to the Owner's approval. Section 5. Contract Time and Liquidated Damages. A. Time of Performance. Time is of the essence in the performance of the Work under this Agreement. The "Commencement Date" shall be established in the written Notice to Proceed to be issued by the Project Manager, as hereinafter defined. Contractor shall commence the Work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Contractor shall achieve Substantial Completion within Thirty (30) calendar days from the Commencement Date (herein "Contract Time"). The date of Substantial Completion of the Work (or designated portions thereof) is the date certified by the Design Professional when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. Contractor shall achieve Final Completion within Thirty (30) calendar days after the date of Substantial Completion. Final Completion shall occur when the Agreement is completed in its entirety, is accepted by the Owner as complete and is so stated by the Owner as completed. As used herein and throughout the Contract Documents, the phrase "Project Manager" refers to the Owner's duly authorized representative and shall mean the Division Administrator or Department Director, as applicable, acting directly or through duly authorized representatives. B. Liquidated Damages in General. Owner and Contractor recognize that, since time is of the essence for this Agreement, Owner will suffer financial loss if Contractor fails to achieve Substantial Completion within the time specified above, as said time may be adjusted as provided for herein. In such event, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, two thousand dollars ($2,000.00) for each calendar day thereafter until Substantial Completion is achieved. Further, in the event Substantial Completion is reached, but the Contractor fails to reach Final Completion within the required time period, Owner shall also be entitled to assess and Contractor shall be liable for all actual damages incurred by Owner as a result of Contractor failing to timely achieve Final Completion. The Project shall be deemed to be substantially completed on the date the Project Manager (or at his/her direction, the Design Professional) issues a Certificate of Substantial Completion pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to Substantially or Finally Complete the Work within the required time periods. C. Computation of Time Periods. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 2 Construction Services Agreement:Revised 072118(v6) CAO D. Determination of Number of Days of Default. For all contracts, regardless of whether the Contract Time is stipulated in calendar days or working days, the Owner will count default days in calendar days. E. Right of Collection. The Owner has the right to apply any amounts due Contractor under this Agreement or any other agreement between Owner and Contractor, as payment on such liquidated damages due under this Agreement in Owner's sole discretion. Notwithstanding anything herein to the contrary, Owner retains its right to liquidated damages due under this Agreement even if Contractor, at Owner's election and in its sole discretion, is allowed to continue and to finish the Work, or any part of it, after the expiration of the Contract Time including granted time extensions. F. Completion of Work by Owner. In the event Contractor defaults on any of its obligations under the Agreement and Owner elects to complete the Work, in whole or in part, through another contractor or its own forces, the Contractor and its surety shall continue to be liable for the liquidated damages under the Agreement until Owner achieves Substantial and Final Completion of the Work. Owner will not charge liquidated damages for any delay in achieving Substantial or Final Completion as a result of any unreasonable action or delay on the part of the Owner. G. Final Acceptance by Owner. The Owner shall consider the Agreement complete when the Contractor has completed in its entirety all of the Work and the Owner has accepted all of the Work and notified the Contractor in writing that the Work is complete. Once the Owner has approved and accepted the Work, Contractor shall be entitled to final payment in accordance with the terms of the Contract Documents. H. Recovery of Damages Suffered by Third Parties. Contractor shall be liable to Owner to the extent Owner incurs damages from a third party as a result of Contractor's failure to fulfill all of its obligations under the Contract Documents. Owner's recovery of any delay related damages under this Agreement through the liquidated damages does not preclude Owner from recovering from Contractor any other non-delay related damages that may be owed to it arising out of or relating to this Agreement. Section 6. Exhibits Incorporated. Exhibits Incorporated: The following documents are expressly agreed upon, attached hereto and made a part of this Agreement for Solicitation 20-7797 Collier Beach Renourishment 2020- 2021. Exhibit A-1: Contractor's Bid Schedule Exhibit A-2: Contractor's Bid Submittal Forms and Addendums Exhibit A-3: Contractor's List of Key Personnel Exhibit B-1: Payment Bond Forms n Not Applicable Exhibit B-2: Performance Bond Forms Not Applicable Exhibit B-3: Insurance Requirements Exhibit C: Release and Affidavit Form Exhibit D: Contractor Application for Payment Form Exhibit E: Change Order Form Exhibit F: Certificate of Substantial Completion Form Exhibit G: Final Payment Checklist Exhibit H: General Terms and Conditions 3 Construction Services Agreement:Revised 072118(v6) CAv Exhibit I: Supplemental Terms and Conditions ❑ Applicable I Not Applicable The following documents are expressly agreed to be incorporated by reference and made a part of this Agreement for Solicitation 20-7797 Collier Beach Renourishment 2020-2021. The complete contract documents, including Addendum with attachments, are available on the County's on-line bidding system: https://www.bidsync.com/bidsync-cas/, which the parties agree comprise the final integrated agreement executed by the parties. Sections corresponding to any checked box ( ® ) expressly apply to the terms of this Agreement and are available through the County's on-line bidding. ®Exhibit J: Technical Specifications ❑Exhibit K: Permits ❑Exhibit L: Standard Details ❑Exhibit M: Plans and Specifications prepared by Taylor Engineering, Inc. ®Exhibit N: Environmental Health and Safety Requirements for Construction Projects Section 7. Notices A. All notices required or made pursuant to this Agreement by the Contractor to the Owner shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Collier County Board of County Commissioners, FL do Coastal Zone Management Capital Project Planning Building 2685 Horseshoe Drive S Naples, FL 34104 Attn: Andrew Miller, Contract Administrator/Project Manager Phone: 239-252-2922 Email: Andrew.Miller(a�colliercountyfl.gov B. All notices required or made pursuant to this Agreement by Owner to Contractor shall be made in writing and shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Earth Tech Enterprises, Inc. 6180 Federal Court Fort Myers, Florida 33905 Attn: Christopher Gehring Phone: 239-774-1223 Email: cg earthtechenterprises.com C. Either party may change its above noted address by giving written notice to the other party in accordance with the requirements of this Section. Section 8. PUBLIC ENTITY CRIMES. 8.1 By its execution of this Contract, Construction Contractor acknowledges that it has been informed by Owner of the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows: 4 Construction Services Agreement:Revised 072118(v6) "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." Section 9. Modification. No modification or change to the Agreement shall be valid or binding upon the parties unless in writing and executed by the party or parties intended to be bound by it. Section 10. Successors and Assigns. Subject to other provisions hereof, the Agreement shall be binding upon and shall inure to the benefit of the successors and assigns of the parties to the Agreement. Section 11. Governing Law. The Agreement shall be interpreted under and its performance governed by the laws of the State of Florida. Section 12. No Waiver. The failure of the Owner to enforce at any time or for any period of time any one or more of the provisions of the Agreement shall not be construed to be and shall not be a waiver of any such provision or provisions or of its right thereafter to enforce each and every such provision. Section 13. Entire Agreement. Each of the parties hereto agrees and represents that the Agreement comprises the full and entire agreement between the parties affecting the Work contemplated, and no other agreement or understanding of any nature concerning the same has been entered into or will be recognized, and that all negotiations, acts, work performed, or payments made prior to the execution hereof shall be deemed merged in, integrated and superseded by the Agreement. Section 14. Severability. Should any provision of the Agreement be determined by a court to be unenforceable, such a determination shall not affect the validity or enforceability of any other section or part thereof. Section 15. Change Order Authorization. The Project Manager shall have the authority on behalf of the Owner to execute all Change Orders and Work Directive Changes to the Agreement to the extent provided for under the Owner's procurement ordinance and polices and accompanying administrative procedures. 5 Construction Services Agreement:Revised 072118(v6) Section 16. Construction. Any doubtful or ambiguous language contained in this Agreement shall not be construed against the party who physically prepared this Agreement. The rule sometimes referred to as "fortius contra proferentum" (pursuant to which ambiguities in a contractual term which appears on its face to have been inserted for the benefit of one of the parties shall be construed against the benefited party) shall not be applied to the construction of this Agreement. Section 17. Order of Precedence In the event of any conflict between or among the terms of any of the Contract Documents, the terms of the Construction Agreement and the General Terms and Conditions shall take precedence over the terms of all other Contract Documents, except the terms of any Supplemental Conditions shall take precedence over the Construction Agreement and the General Terms and Conditions. To the extent any conflict in the terms of the Contract Documents including the Owner's Board approved Executive Summary cannot be resolved by application of the Supplemental Conditions, if any, or the Construction Agreement and the General Terms and Conditions, the conflict shall be resolved by imposing the more strict or costly obligation under the Contract Documents upon the Contractor at Owner's discretion. **** 6 Construction Services Agreement:Revised 072118(v6) IN WITNESS WHEREOF, the parties have executed this Agreement on the date(s) indicated below. CONTRACTOR: TW W S: Earth Tech Enterprises, Inc. FRST WI MESS Bernard F. McGover By: `�-- Pfl Christopher Gehring-President September 28,2020 Print Name and Title Date SEC D Matthew mith Print Name Date: September 28,2020 ATTEST: OWNER: Crystal K. Kinzel, Clerk of Courts BOARD OF COUNTY COMMISSIONERS & Comptroller OF COLLIER COUNTY FLORIDA } Y BY: el*UU e CX' BY: Attest as to I 7 Burt L. Saunders, Chairman sighature oni roved apis Fo egality: 1—A�County Attorney Dfr 1.rrfe Prin Na� 7 Construction Services Agreement.Revised 072118(v6) Ott. EXHIBIT A-1: CONTRACTOR'S BID SCHEDULE (FOLLOWING THIS PAGE) 8 Construction Services Agreement:Revised 072118(v6) CAS) Project IS: 20-7797 Project Title: COLLIER BEACH RENOURISHMENT 2020-2021 Bid Due Date: September 3,2020 @ 3:00 pm REVISED BID SCHEDULE BIDDER: Earth Tech Enterprises, Inc. Hid Description_ lnmsport,placement,and pttding of pre-purchased beach fill material from Stewart's Immokalee Sand mine to north Naples Beach.The construction access will be the north beach access of the Lowdermilk Park, ITEM DESCRIPTION Units Quantity Unit Total NO, Price 1 Mobilization/Demobilization LS 1 $30,000.00 $30,000.00 2 Transport,Fill Placement,Grading,and Tilling Tons 67,500 $14.90 $1,005,750.00 3 Surveys(includes stakeout,and post-construction) LS 1 $30,000.00 $30,000.00 4 Silt pence LF 1,300 $1.50 $1,950.00 5 Turbidity Monitoring ES 1 $12,000.00 $12,000.00 6 Weight Ticket Tracking L5 1 $15,000.00 $15,000.00 BID TOTAL $1,094,700.00 fit UvVNER RESERVES THE RIGHT TO AWARD TO THE LOWEST RESPONSIVE RESPONSIBLE BIDDER IF DETERMINED THAT SUCH AWARD IS IN THE REST INTEREST OF THE COUNTY,. CAO ',. EXHIBIT A-2: CONTRACTOR'S BID SUBMITTAL FORMS AND ADDENDUM (FOLLOWING THIS PAGE) 9 Construction Services Agreement:Revised 072118(v6) ID Email:C ntt?i t McCanna'c cc 1]it rcoiirs y4i,¢fir! Co �� °t -}' Telephone: 239-252-8992 Attn nistrat>ve Services f vison P r era->jrig ADDENDUM #1 Memorandum Date: 8/17/2020 From: Cynthia McCanna, Procurement Strategist To: interested Parties Subject: Addendum #1 20-7797— Collier Beach Renourishment 2020-2021 This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation documents and bid schedule for the above referenced solicitation. 1. Completion days changed in the solicitation; revised solicitation attached. The Successful Bidder shall be required to finally complete all Work within ninety{48} i calendar days from and after the Commencement Date specified in the Notice to Proceed, The final completion days includes substantial completion days of thirty {3tl)calendar days.with an additional si4y-(4) r :; calendar days to final completion- ----- Please acknowledge receipt 9f1his Addendum and include with your bid. 9-3-2020 (Signature) Date Earth Tech Enterprises,Inc. (Name of Firm) if you require additional information,please post a question on BidSync on-line or contact me using the above contact information. Appendix f-Template Addendum•rev 10-18-18 CA() Co er CountyI Email: t Cyrthia McCannaAcolliercountyflagov ......,00.0.-‘,...--N...".....---.0.... Telephone: 239-252-8992 Aritroist'at(ve Services Dvs4oe ADDENDUM #2 Memorandum Date: 8/21/2020 From: Cynthia McCanna, Procurement Strategist To: Interested Parties Subject: Addendum #2 20-7797- Collier Beach Renourishment 2020-2021 This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation documents and bid schedule for the above referenced solicitation. I. Add language to the specifications as stated below in red. SECTION 2,01 BEACH FILL MATERIAL A. The beach fill material source for this project is limited to Stewart Mining Inc., located at 2301 Edwards Grove Rd, lmmokalee, FL 34142. i ht ;/,;,emt;,- , .f',i, y $ „,,•,,,?$., :' 9W w,yis:,,,,-0 ,,v,,,q,;t;14 .f.,-„'.,m MO ti.thW 4 /7 / Please acknowledge receipt of this/lddendtim and include with your bid. / ,, \ / , --,,-- Y. 9-3-2020 (Signature) / \ Date Earth Tech Enterprises,Inc. (Name of Firm) If you require additional information,please post a question on SidSync on-fine or contact me using the above contact information. Appendix F-Template-Addendum-rev 10-18-18 ier Comity Email: Cynthia.McCannatkolliercountyfl.gov Admirosiratve Services Di\Asbn Telephone: 239,252.8992 PK,*fferpent Setvnes ADDENDUM #3 Date: August 24,2020 From: Cynthia McCanna,Procurement Strategist To: Interested Bidders Subject: Addenda # 3—20-7797 Collier Beach Renourishment 2020-2021 This Addenda has been issued for the following items identifying clarifications,changes,deletions,and/or additions to the scope of work,solicitation documents and/or bid schedule for the above referenced solicitation: ADDITION: The Minutes and Sign-In sheet from the August 24,2020 Pre-Bid Meeting has been posted to BidSync: 20-7797 Pre-Bid Meeting Minutes 20-7797 Pre-Bid Meeting Sing-In Sheets If you require additional information please post a question on our Bid Sync( um,.bidync.corn) bidding platform under the solicitation for this project. Please sign sign below and return copy of 's Addendum tit your submittal for the above referenced solicitation. 9-3-2020 (Signature) Date Earth Tech Enterprises,Inc. (Name of Firm) ier County Email: iithia.McCaniurasol I iercountyll.gq.k Administrative Services sion Telephone: (239)252 - 8992 servx;es Addendum 4 Date: 8/2812020 From: Cynthia McCanna, Procurement Strategist- Acquisitions To: Interested Bidders Subject: Addendum 4 The following clarifications are issued as an addendum identifying the following clarification to the scope of work,changes,deletions,or additions to the original solicitation document for the referenced solicitation: Change I. Sec Revised Bid Schedule. Line Item 7 has been removed. 7 II4IC-44+1I4e4f&I€I4-4413C-4444e I tS I 4' I $0,00 I If you require additional information,please post a question on our Bid Sync ev%.WV‘. OM)bidding platform under the solicitation for this project. Please sign below and return a co I of is Addendum with your submittal for the above referenced solicitation. 71L7," 9-3-2020 (Signature) Date Earth Tech Enterprises,Inc. (Name of Finn) Email: Cynthia.McCanna sx.coNiercounty#l,gov Colter County Telephone: 239-252-8992 Adrrnistte Ser. tvisn Purchasing ADDENDUM#5 Memorandum Date: 8/28/2020 From: Cynthia McCanna, Procurement Strategist To: Interested Parties Subject: Addendum #5 20-7797— Collier Beach Renourishment 2020-2021 This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation documents and bid schedule for the above referenced solicitation. Revisions to Exhibit J Technical Specifications 2020-08-07 AAM(2) 1. Construction Time: Revise the following Sections as follows: SECTION 1.05 CONSTRUCTION TIME The schedule for construction and key milestones are described below. The construction will follow a continuous north to south direction. No timeout for delays will be granted except for major weather events. It is anticipated that the CONTRACTOR may begin mobilization in mid-October,2020 and begin placing sand on beach at the beginning of November,2020.The hours of operation extend from one half hour after sunrise to one hall hour before sunset, per permit requirements,with no work being allowed on Sundays. No beach activities will be permitted the Thursday, Friday, Saturday, and Sunday of Thanksgiving (November 26-29, 2020) or the week of Christmas (December 24, 2020-January 3, 2021).CONTRACTOR shall manage the placement events on the beach. Substantial Completion shall be 30 calendar days from the Commencement Date specified in the Notice to Proceed (NTP), and final completion shall be 60 calendar days from the Commencement Date specified in the NTP. If final completion of the work falls after 60 calendar days from the Commencement Date specified in the NTP, the COUNTY shall assess CONTRACTOR for Liquidated Damages (LD's) at $2,000 per day until final completion occurs. The COUNTY reserves the right to cancel the contract if final completion does not occur by 60 calendar days from the Commencement Date specified in the NTP.Completion is defined as beach placement of the sand quantities shown on the Bid Form and grading of the cross-sections shown in the Construction Drawings. Sediment QAJQC plan: Revise the following Sections as follows: Section 1.07 Submittals P. Sediment Quality Control Reports 1. Sediment QA/QC Plan compliance will be the responsibility of Stewart Mining, Inc. The CONTRACTOR will not be required to provide sediment testing. Appendix F-Template—Addendum-rev 10-18-18 2. Beach Fill Material: Revise the following Sections as follows: SECTION 2.01 BEACH FILL MATERIAL A. The beach fill material source for this project is limited to Stewart Mining Inc., located at 2301 Edwards Grove Rd, lmmokalee, FL 34142. The maximum daily quantity of fill material available from the source will be 4,500 tons. Stewart Mining Inc. will be responsible for compliance with the Sediment QA/QC Plan. The Contractor will not be required to provide sediment testing. The following sections 2,01 B through 2.01 C are provided for information only. 3. Contractor Responsibilities: Revise the following Sections as follows: SECTION 1.08 CONTRACTOR RESPONSIBILITIES H. Maintenance of Traffic 1. The CONTRACTOR shall provide and maintain fencing, barricades,warning signals,and/or flagmen as required by local,State,or Federal regulations or as required by the Construction Drawings or Technical Specifications in the project area to ensure public safety. If the CONTRACTOR is not able to keep and maintain the public at a safe distance from construction activity, the CONTRACTOR shall notify the OWNER and request assistance in controlling public access to the construction site.The Maintenance of Traffic and Pedestrian Plan provided under Submittals (Paragraph 1.05 K) must also include a description of truck haul management methods to be used when a truck arrives at the Construction Access. 2. The CONTRACTOR will be required to include two off-duty police officers per day to direct and control traffic. Their presence will be required anytime hauling or unloading operations are taking place and shall be present to address any issues that may arise during construction activities. Payment will be a CONTRACTOR responsibility and should be included in their bid. 4. Fill Material Transportation: Revise the following Sections as follows: SECTION 3.01 FILL MATERIAL TRANSPORTATION 9. The CONTRACTOR shall remove a concrete bench and the adjacent palm tree located in the Construction Access. All other remaining trees are to be avoided as best as possible. Any existing vegetation damaged in order to establish the minimum required path width for truck access will be required to be removed and replaced with the same kind of vegetation, All potential bidders are advised to visit the site to estimate the cost of the associated impacts. Please acknowledge r et of this ddendum and include with your bid. 9-3-2020 (Signature) ` . Date Earth Tech Enterprises,Inc. (Name of Firm) If you require additional information, please post a question on BidSync on-line or contact me using the above contact information. Appendix F-Template—Addendum-rev 10-18-18 °J Co ,ercoi1Lnt1y Email; C. icrcowily:1, Administratve Services Dvision Telephone: (239) 252 - 8992 Pf(y.:Ixemerl Serocm ADDENDUM#6 Memorandum Date: 8/28/2020 From: Cynthia McCanna, Procurement Strategist To: Interested Parties Subject: Addendum #6 20-7797 — Collier Beach Renourishment 2020-2021 The tbilowing.clarifications are issued as an addendum identifying the following clarification to the scope of work,changes,deletions,or additions to the original solicitation document for the referenced solicitation: Change I.. Delete Line Item 1.07-0 on the Submittal Register L : 4.07 0 Quuhiy tiffEki-Rept+os - - if you require additional intbrmation,please post a question on our Bid Sync( . bidding platform under the solicitation for this project. Please sign below and ret rn a cody of this Addendum witl)yofir submittal for the above referenced solicitation. 9-3-2020 (Signature) P Date Earth Tech Enterprises,Inc. (Name of Firm) patty City Co Email: crithia.McCannacolliercountvfl,gpv Adminstative SenActs()vision Telephone: (239)252 - 8992 Proem ement Servos ADDENDUM#7 Memorandum Date: 8/31/2020 From: Cynthia McCanna, Procurement Strategist To: Interested Parties Subject: Addendum#7 20-7797—Collier Beach Renourishment 2020-2021 The following clarifications are issued as an addendum identifying the following clarification to the scope of work,changes, deletions, or additions to the original solicitation document for the referenced solicitation: Change I, See attached Revision Expanded Truck Haul Map. If you require additional information,please post a question on our Bid Sync(www.bidsync,com)bidding platform under the solicitation for this project, Please sign below and retur a copy of t is Addendum with.yOur submittal for the above referenced solicitation. „ ) 9-3-2020 (Signature) \ Date Earth Tech Enterprises,Inc. (Name of Firm) C.At)1 FORM I-BID RESPONSE FORM BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA Collier Beach Renourishment 2020-2021 RID NO.20-7797 Earth Tech Enterprises,Inc. Full Name of Bidder Main Business Address 6180 Federal Court Fort Myers,Florida 33905 Place of Business 6180 Federal Court Fort Myers,Florida 33905 239-774-1223 Telephone No. Fax No. CGC016677 State Contractor's License P00000098390 State of Florida Certificate of Authority Document Number 59-3679652 Federal Tax Identification Number 171511137 4YD47 DUNS # CCR4 Cage Code To: BOARD OF COUNTY COMMISSIONERS OF COLLIER MUNTY,FLORIDA (hereinafter called the Owner) The undersigned,as Bidder declares that the only person or parties interested in this Bid as principals are those named herein, that this Bid is submitted without collusion with any other person. firm or corporation: that it has carefully examined the location of the proposed Work,the proposed form of Agreement and all other Contract Documents and Bonds,and the Contract Drawings and Specifications. Bidder proposes, and agrees if this Bid is accepted, Bidder-will execute the Agreement included in tin. Bidding Documents, to provide all necessary machinery, tools, apparatus and other means of construction, including utility and transportation services necessary to do all the Work, and furnish all the materials and equipment specified or referred to in the Contract Documents in the manner and time herein prescribed and according to the requirements of the Owner as therein set forth, furnish the Contractor's Bonds and Insurance specified in the General Conditions of the Contract,and to do all other things required of the Contractor by the Contract Documents,and that it will take full payment the sums set forth in the following Bid Schedule: Unit prices shall be provided in no more than two decimal points,and in the case where further decimal points are inadvertently provided,rounding to two decimal points will be conducted by Procurement Services Division staff, Upon notification that its Bid has been awarded, the Successful Bidder will execute the Agreement form attached to the Bidding Documents within ten(10)calendar days and deliver the Surety Bond or Bonds and Insurance Certificates as required by the Contract Documents. The bid security attached is to become the property of the Owner in the event the Agreement, Insurance Certificates and Bonds are not executed and delivered to Owner within the time above set forth as liquidated damages, for the delay and additional expense to the Owner it being recognized that, since time is of the essence. Owner will suffer financial loss if the Successful Bidder fails to execute and deliver to Owner the required Agreement, Insurance Certificates and Bonds within the required time period. In the event of such failure, the total amount of Owner's damages. will be difficult, if not impossible, to definitely ascertain and quantify. It is hereby agreed that it is appropriate and fair that Owner receive liquidated damages from the Successful Bidder in the event it fails to execute and deliver the Agreement. Insurance Certificates. and Bonds as required hereunder, The Construction Solicitation Doc rev 02-21-20 Successful Bidder hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty. which the parties agree represents a fair and reasonable estimate of Owner's actual damages at the time of bidding if the Successful Bidder fails to execute and deliver the Agreement, Insurance Certificates,and Bonds in a timely manner. Upon receipt of the signed and approved agreement and Purchase Order,the undersigned proposes to commence work at the site within lie(5)calendar days from the commencement date stipulated in the written Notice to Proceed unless the Project Manager, in writing,subsequently notifies the Contractor of a modified (later)commencement date. The undersigned further agrees to substantially complete all work covered by this Bid within thirty (30) consecutive calendar days.computed by excluding the commencement date and including the last day of such period, and to be fully completed to the point of final acceptance by the Owner within sixty (60) consecutive calendar days after Substantial Completion.computed by excluding commencement date and including the last day of such period. Acceptance and acknowl ed an Authorize Agent Signature: Christopher Gehring Title: President 9-3-2020 Date: Construction Solicitation Doc rev 02-21-20 „' FORM 2-CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT Collier Beach Renourishment 2020-2021 Bid No.20-7747 ,N,411W Personnel Category Christopher Gehring Construction Superintendent Butch McGovern Project Manager Construction Solicitation Doc rev 02-21-20 OCAS ____ [— FO��%3'�%�TERI�I �D&�N�A��URE�S � THIS FOR0 .M0STBE COMPLETED OBBID SHALL BE DEEMED NON-RESPONSIVE All 8iddeo mhoO confinn b; siDumuo that they will pm6dc the manufacturers and materials outlined in Uvn8hj specifications, including compliance vith Florida Statute 255,20 to provide lumber,thnberuod other foroey/odncm � produced an(]manufactuyed in the state of'l-'Iol-ida as long as the price,fittiess and quality are equal. Exocphonx(whul / equals ire accqpmh|c) may be ,:qvc,xcd by completing the Material Manufacturer Exception Lim below, If all cxccpdmm for munufaotur*ruud/*r mmehu| is proposed and Dwcd below and is not approved by Enpineur9rQjeo` &1uuuger.8iddcruhxUfurnish the manufacturer named it)thespecificalion,Acceptance of'thiN form does not constitute acceptance oy material pnpumvd oil this list, Complete and sign section AORB Section A(Acceptance of all manufactures and materials in Bid specifications) On behall'of mv finn. I confirm that we will use all manufacturers and materials as specifically outlined in the Rid specifications. � Cmopwoy' th Date 93202' Signature:� oo � ------- Bo,donR(Exception requested m Bid specifications manufacturers and mutndak) Y , EXQHPTI0NMATBUaL EXCEPDONMANUk,ArTiRFR V ' 2 -----' _, 4. - Please insert inscrt additional pugc»onnecessary, s/A Cwmpnny� _ ____________-_-______'____________ _ Signature..",-,", um/e _ __� _��_ ______________-____�__' ___-____�___ _____ FORM 4-LIST OF MAJOR SUBCONTRACTORS THIS LIST MUST BE COMPLETED OR BID MAY BE DEEMED NON-RESPONSIVE The undersigned states that the following is a list of the proposed subcontractors for the major categories outlined in the requirements of the Bid specifications, The undersigned acknowledges its responsibility for ensuring that the Subcontractors for the major categories listed herein are"qualified"(as defined in Ordinance 2017-08 and Section 15 of Instructions to Bidders)and meet all legal requirements applicable to and necessitated by the Contract Documents, including,but not limited to proper licenses, certifications, registrations and insurance coverage. The Owner reserves the right to disqualify any Bidder who includes non-compliant or non-qualified Subcontractors in its bid offer, Further.the Owner may direct the Successful Bidder to remove,'replace any Subcontractor,at no additional cost to Owner,which is found to he non-compliant with this requirement either before or after the issuance of the Award of Contract by Owner. (Attach additional sheets as needed). Further. the undersigned acknowledges and agrees that promptly after the Award of Contract, and in accordance with the requirements of the Contract Documents. the Successful Bidder shall identify all Subcontractors it intends to use on the Project. The undersigned further agrees that all Subcontractors subsequently identified for any portion of work on this Project must be qualified as noted above. 2.HMajor Category of Work Subcontractor and Address 1, Electrical Mechanical Plumbin 4. Site Work J, Earth Tech Enterprises,Inc. 5. Identify other subcontractors that represent more than 10% of price or that affect the cr pathitical of t .schedule Earth Tech nte es,Inc Company, 9-3-2020 Signature: Date: Construction Solicitation Doc rev 02-21-20 -1)-1110' EARTH TECH ENTERPRISES PROPOSED SUB ( UN I RAC I ORS COM PANY SCOPE OF WORK Oceanside Solutions Survey & jrbjL Control Kate's Enviro Fencing erosion control devices yes Gulf Shore Trucking Materials Transport Yes ciAo (PLEASE SEE ATTACHED LIST) FORMS-STATEMENT OF EXPERIENCE OF BIDDER The Bidder is required to state below what work of similar magnitude completed within the last five (5) years is a judge of its experience, skill and business standing and of its ability to conduct the work as completely and as rapidly as required under the terms of the Agreement. (protect name) (project owner) (protect location) (Owner's address) (project description) (Owner's contact person) (title) S (project start:completion dates) (contract value) (phone) (email) (protect name) (project owner) (project ) location) ((owners address) (project description) (Owner's contact person) (title) S (project start completion dates) (contract value) (phone) (email) 3. .._.......... . (project name) � (project owner) (protect location) (Owner's address) (project description) (Owner's contact person) (title) (project start completion dates) (contract value) (phone) (email) ) Construction Solicitation Doc rev 02-21-20 le FORM 5-STATEMENT OF EX:P.ERIE NCE OF BIDDER 4. (project name) (project owner) (project location) (Owner's address) (project description) (Owners contact person) (title) S (project completion date) (contract'alue.) (phone) (email) 5. .......... (protect name) (project owner) (project location) (Owner's address) (project description) (Owner's contact person) )title) (protect completion date) (contract value) (phone) (email) 6, (protect name) (project owner) (project location) (Owner's address) (project description) (Owner's contact perso n) (title) 5 (project completion date) (contract value) (phone) (email) Company Signature Date. Construction Solicitation Doc rev 02-21-20 OA() -43111110 EARTH TECH Er.NTF-FPRISFS Earth Tech Enterprises Beach Project Experience Fort Island Beach Sand Re-nourishment Completed February 2020 Crystal River, Florida Cost $272,800 Owner Contact Citrus County Board of County Commissioners Francine Nobles-Director Parks and Recreation 2804 West Marc Knighton Court lecanto, FL 34461 352-527-7540 H;3;i;, ,c,tiir5' :rLir?usbt c:.t{:rrt Citrus County Florida contracted with Earth Tech Enterprises to supply and transport approximately 6,200 tons of FDEP approved beach sand from Cemex Materials Mine in Davenport, Florida. The work has to be in compliance with permits issues by FDEP,Army Corp of Engineers, US Fish and Wildlife and Marine Fish and Wildlife Sanctuary This was a truck haul only. The sand was placed on the beach by county forces The project took approximately 5 days to complete. CA() EARTH TECH E:NTI-:RPRIS15 Earth Tech Enterprises Beach Project Experience Clam Pass, Park Shore and North Park Shore Beach Re-nourishment Completed November 2019 Naples, Florida Cost $3,579,500 Owner Contact Collier County Board of County Commissioners Gary McAlpin P.E.Coastal Zone Manager 2800 North Horseshoe Drive Naples, FL 34104 239-252-5342 This was another repeat project for Collier County's' Coastal Zone Management Department. The award to Earth Tech this contract to Re-Nourish three areas of beach in Northern Collier County. The scope of the project called for the truck in-haul of approximately 165,000 tons of FDEP approved beach sand from Stewart Materials Mine located in lmmokalee, Florida. This project was in very active high-end residential area tourist season.The owner and stakeholders were highly sensitive to any impact to this popular beach and resorts surrounding the area. Extensive coordination was done with law enforcement to minimize the negative impacts of a large truck in haul. At the Southern end of the beach sand was transport directly on to the beach. On the Northern end of the beach overland conveyors were used to transport sand to beach. The criteria called for(2)dump/placement sites operating and once. Due to sensitivity of the schedule the contract required Earth Tech to maintain production at both sites and work 7 days a week. The scope of the nourishment contract requirement included beach transport with escorts, placement of sand, surveying, turbidity observation, dune restoration and compliance with permits issues by FDEP, Army Corp of Engineers, US Fish and Wildlife and Marine Fish and Wildlife Sanctuary Earth Tech began work on October 15,2019 and finished on November 22,2019 for a total of days. This was 5 days ahead of the contract duration. -1-11110 EARTH TECH t:N.trppRtses Smathers Beach Nourishment(truck in haul & placement)Completed June 2019 Key West, Florida Cost $1,236,160 Owner Contact City of Key West Florida The City of West awarded Earth Tech this contract to Re-Nourish their main beach Smather's Beach and three smaller beaches along the Atlantic Ocean. The scope of the project called for the truck in-haul of approximately 20,760 tons of FDEP approved beach sand from Vulcan Materials Witherspoon Mine located in Moorehaven, Florida. Earth Tech assisted the City of Key West with the direct materials purchase program allowing the City to directly purchase the sand materials. Earth Tech was responsible to truck the materials to the jobsite. The contract required Earth Tech to work with City's staff to conduct individual truck QC sampling and recording of tonnages(by truck ticket). This project was started at the height of the winter tourist season.The owner and stakeholders were highly sensitive to any impact to this popular beach and resorts surrounding the area. Earth Tech set up a large staging area for trucks in the right away directly across from the beach. With the ability to stage a significant number of sand trucks,the daily placement of sand was greatly accelerated without taking away parking for beach goers. Temporary fencing,way finder signs and groundmen were used to route beach goers around the work sites The scope of the nourishment contract requirement included beach transport with escorts, placement of sand, surveying, turbidity observation, dune restoration and compliance with permits issues by FDEP, Army Corp of Engineers, US Fish and Wildlife and Marine Fish and Wildlife Sanctuary Earth Tech began work on May 21,2019 and has completed all work by June 6,2019. The total duration of 16 days well ahead of the 45 days allowed. CAO EARTH TECH ENTIRPi tSt S Central Marco Island Beach re-grade(dredge and placement) Completed April 2019 Marco Island, Florida Cost $1,1.53,100 Owner Contact Collier County Board of County Commissioners Gary McAlpin P.E.Coastal Zone Manager 2800 North Horseshoe Drive Naples, FL 34104 239-252-5342 The regrading involved relocating approximately 175,000 cubic yards of sand from the swash zone (above -5.0 feet NAVD) landward creating a gradual slope from the dune area at approximately+6.5 feet NAVD(+0.5J-0.0 feet) at the most landward point to existing grade along the beach upland of the area of excavation. Earth Tech accomplished the work using a series of hydraulic excavators,off road haul trucks and dozers. This project was started at the height of the winter tourist season. The owner and stakeholders were highly sensitive to any the negative fall out if the project encumbered on residents or visitors to the beach. To ensure that there was minimal impact to beach use,the project area work area was broken up and constructed in three segments. Each segment was completed to design intent before moving on to the next segment, Extensive temporary fencing, way finder signs and groundmen were used to route beach goers around the work sites. Additional challenges occurred when active gopher tortoise and burrowing owl habitats were discovered inside the work zone. In conjunction with Collier County environmental staff,state and federal agencies, Earth Tech modified their work plan to coordinate hauling and sand placement to avoid any impact to the required protective zones. The scope of the nourishment contract requirement included beach transport with escorts, placement of sand, surveying, turbidity monitoring, dune restoration and compliance with permits issues by FDEP, Army Corp of Engineers,US Fish and Wildlife and FEMA. Earth Tech began work on February 2,2019 and finished on April 15, 2019 for at total of 70 days. This was 5 days ahead of the contract duration. r „\ EARTH TECH IN)I RPRlSL:S North End Interim Beach Nourishment (truck in haul &placement) Completed September 2018 Longboat Key, Florida Cost $1,109,500 Owner Contact Town of Long Boat Key,Florida sac Brownman,Public Works Director 600 General Harris Street Longboat Key, Florida 34228 (941) 361-1988 jbrownmanfi Iongboatkey.org This was the third project Earth Tech completed for The Town of Long Boat Key.This was an emergency award to take care of some badly eroded sections of public beach at the Northern end of Long Boat Key. The scope of the project called for the truck in-haul of approximately 30,000 tons of FDEP approved beach sand from Cemex Materials Mine in Davenport, Florida. A particular challenge was the limited access to beach and adequate staging for the sand trucks. The truck staging was along residential streets. This required a very detailed MOT plan and extensive coordination with town staff and public safety officials. In order to get on to the beach existing fence and beach berms/dunes were removed. Upon completion new berms where constructed and native dune vegetation was planted. An existing concrete T groin was in the center of the beach fill area and Earth Tech was required to construct a structural sound ramp system to allow transport of the sand over the T groin to avoid damage. The contract requirements included beach transport with escorts, placement of sand, surveying, turbidity monitoring, dune restoration and compliance with permits issues by FDEP, Army Corp of Engineers, US Fish and Wildlife and FEMA. Earth Tech also completed the post construction surveys including required as built survey. Due to unusual red tide events, this beach was closed to the public throughout the duration of the project. This greatly assisted the schedule. The work was completed in 20 days a full 10 days under the 30 day time window established by the Town of Long Boat Key. rw~ EARTH TECH F.N1 t t-R P l't t S E S 2016 Beach Nourishment(truck in haul &placement) Completed December 2016 Naples, Florida Cost $ 1,923,100 Owner Contact Collier County Board of County Commissioners Gary McAlpin P.E.Coastal Zone Manager 2800 North Horseshoe Drive Naples,FL 34104 239-252-5342 This was the second consecutive time Earth Tech was awarded the contract for Collier County's Beach Nourishment program. The scope of the project called for the truck in- haul of approximately 116,000 tons of beach sand from Stewart Materials Mine in Immokalee, Florida. Collier County purchased the sand materials direct under contract with the sand mine. Earth Tech was responsible to truck the materials to the jobsite. The contract required Earth Tech to work with Collier County staff to conduct individual truck QC sampling and recording of tonnages(by truck ticket). The area this beach nourishment was lined with high end residential condominiums and beach front resorts including the Naples Ritz Carlton. The work was done during the height of the winter tourism season. Access to the two beach segments was limited to only a single access at each location. To accelerate the schedule, Earth Tech duplicated operations and worked both segments of the beach at the same time. This effort required extensive maintenance of traffic, daily construction of temporary routes for the public to get on and off the beach,2 way radio communication with the offsite staging to move trucks in and out without shutting down roads or disrupting normal traffic patterns and daily communication with law enforcement agencies as it relates maintaining the approved truck travel routes The nourishment contract requirements included beach transport with escorts, placement of sand, tilling, surveying, turbidity monitoring, dune restoration and compliance with permits issues by FDEP, Army Corp of Engineers, US Fish and Wildlife and FEMA. Earth Tech also completed the post construction surveys including required as built survey. No beach activities were permitted the Thursday, Friday,Saturday,and Sunday of Thanksgiving Beach nourishment activities began November 2, 2016. The contract called for substantial completion of all work by January 3, 2017. Earth Tech had the project completed and fully accepted in December 10, 2016, which was approximately 3 full weeks ahead of schedule. 1.r;r; EARTH TECH ENTI kr}r isr s 2016 South End Emergency Beach Nourishment (truck in haul &placement) Completed October 2016 Longboat Key, Florida Cost $1,813,100 941- Duration:9 days Owner Contact Town of Long Boat Key,Florida Juan Florensa, Public Works Director 600 General Harris Street Longboat Key, Florida 34228 (941)361-6411 ext. 2210 ji`forensaC longboatkey.org After the successful completion of the Central Key Beach re-nourishment, the Town of Long Boat Key award Earth Tech Enterprises an emergency in haul truck sand placement project in front of the Resort at Longboat Key Club. This was to start upon completion of the town's 210,000 cubic yard off shore dredging project.The contract called for Earth Tech to mobilize to the site on Monday September 19, 2016 to ensure that the work would be completed by mid-October to minimize the impact to the resort's seasonal bookings. On September 2, 2016 Hurricane Herminie passed off the coast of Longboat Key, which delayed the de-mobilization of Norfolk Dredging. Earth Tech was able adjust their mobilization operations and made the required man power adjustments to allow Norfolk Dredging to simultaneously de-mobilize through our project at the South end beach therefore,eliminating schedule impacts to both projects. This project called for the truck in-haul of approximately 50,000 tons of beach sand from Stewart Materials Mine in immokalee, Florida. Access to the beach was between the Resort at Longboat Key Club and New Pass. Earth Tech provided extensive maintenance of traffic and coordination to avoid disruption to the resort's guests, staff and daily beach activities. Earth Tech constructed a truck access corridor directly off the resort's main parking area and between two of the resort's guestroom buildings,which remained active during the project. Due to the lack of beachfront Earth Tech had to first construct a pad out into the Gulf of Mexico to build a pad for the beach mats required for stockpiling of sand and area to load off road haul trucks. Scope of work for Earth Tech Enterprises included truck haul of sand, beach transport with escorts, placement of sand, tilling, surveying, turbidity monitoring, and compliance with permits issued by FDEP,Army Corp of Engineers,UD Fish and Wildlife and FEMA. This project was done during one of most active Sea Turtle nesting seasons in history and Earth Tech's on-site personnel worked extremely close with Mote Marine's turtle nest monitoring staff to ensure that beach hauls and sand placement did not impact numerous active sea turtle nests. As with most beach nourishment projects Earth Tech's operations were Monday through Saturday 6:30 a.m. to 7:30 p.m. averaging 4,500 tons of in haul materials each day. Earth Tech completed the project in 9 days,despite the significant challenge of allowing another contractor to de-mobilize through our work area and avoided distribution to normal working operations of the resort and activities of the guests. CAO EARTH TECH f N1tJ4PttUS1;S Central Key Beach Nourishment Project (truck in haul & placement) Completed July 2016 Longboat Key, Florida Cost $10,966,375 Duration: 100 days Owner Contact: Town of Longboat Key Florida Juan Florensa, Public Works Director 600 General Harris Street Longboat Key, Florida 34228 (941)361-6411 ext.2210 jflorensa, lonpboatkey.org In March of 2016 Earth Tech Enterprises,Inc.was awarded a contract with the Town of Longboat Key, Florida for a truck haul and placement of 307,000 tons of sand for the Central Key Beach Nourishment. The project area covered approximately 8.0 miles of beach. Earth Tech selected sand from Stuart Materials in Immokalee, Florida. The truck haul routes were through downtown Sarasota and St.Armand's Circle. Once on to Longboat Key, trucks were limited to using the two lane Gulf of Mexico Drive. This required above normal maintenance of traffic planning and daily communication with the town and public safety agencies. The nourishment contract requirements included truck haul of sand, beach transport with escorts, placement of sand, tilling, surveying, turbidity monitoring, dune restoration and compliance with permits issues by FDEP, Army Corp of Engineers, UD Fish and Wildlife and FEMA. Earth Tech also completed the pre and post construction surveys including required as built survey. The project was broken into three segments each with an access corridor on to the beach. These corridors had limited space and during peak periods of truck traffic, Earth Tech was staging trucks at various locations on Longboat Key because the contract would not allow staging of trucks along Gulf of Mexico Drive. Another particular challenge was the requirement that work was limited to one segment at a time. Upon completion of each segment Earth Tech was required to demobilize restore the area and them mobilize to the next segment. Additionally, the project was underway during an extremely active Sea Turtle Nesting and Shorebird Nesting season Earth Tech worked closely with the regulatory agencies including early morning meetings with Mote Marine's Sea Turtle Nest monitoring team and the Shore bird monitoring consultant for clearance prior to the start of beach haul activities. The Town of Longboat Key's contract called for October 19, 2018 Substantial completion and Earth Tech was substantially complete on July 13, 2016. During the(100) days on site Earth Tech hauled in and placed on average 3,070 tons of sand,which was well above the contractual minimum of 2,000 tons sand. Earth Tech was able to achieve this schedule despite losing production days due to Tropical Storm Colin and mandatory shut downs over Memorial Day and July 4ch weekends. EARTH TECH 1N`TE=:RPRIST«`S Naples Beach Re-nourishment (sand placement)Completed November 2014 Naples, Florida Cost$748,000 Owner Contact Collier County Board of County Commissioners Gary McAlpin P.E. Coastal Zone Manager 2800 North Horseshoe Drive Naples, FL 34104 239-252-5342 GaryMcAipin(a7colliergov.net The Collier County Board of County Commissioners contracted with Earth Tech Enterprises to place,grade and transport approximately 90,000 tons of beach quality sand on Naples Beach to repair damages as a result of Tropical Storm Debby. This was a truck haul project with sand provided from the Stewart Mine in Immokalee, Florida. The county had a contract with another vendor to supply and deliver the sand. Scope of work for Earth Tech Enterprises included beach transport,placement of sand,tilling,surveying,turbidity monitoring, and compliance with permits issues by FDEP,Army Corp of Engineers, UD Fish and Wildlife and FEMA. Beach nourishment activities began November 10,2014.The contract called for substantial completion of all work in(34)consecutive calendar days and fully completed to the point of final acceptance by the owner within seven (7)consecutive calendar days after Substantial Completion. No beach activities were permitted the Thursday, Friday,Saturday,and Sunday of Thanksgiving. The project was completed and fully accepted in December 15, 2014. Cho EARTH TECH EN"r"E rYr>Fttst s Clam Pass—Emergency Beach Repairs (dredging and upland sand placement) Completed April 2013 Naples, Florida cost $206,000 Owner Contact: Collier County Florida cf a Humiston&Moore Engineers Brett Moore, P.E. President 5676 Strand Court Naples,Florida 34110 239-594-2021 bdm Phuminstonandmoore.com This project involved Earth Tech completing emergency repairs at Clam Pass, the inlet between Clam Bay and the Gulf of Mexico. Since January 2013 Clam Pass had been closed off from the Gulf of Mexico due to the accumulation of sand that had migrated into the channel,cutting off tidal exchange and jeopardizing the health of the Clam Bay estuary system. The U.S. Army Corp of Engineers issued Collier County a Nationwide Permit 3 for "emergency" one time dredging of the inlet. Special conditions were added to the permit to protect manatees and sea turtles. The permit also specified that dredging had to be performed from the bay side toward the Gulf of Mexico,with the final cut reconnecting Clam Bay done at low tide. Earth Tech opted to use a series of track backhoes cut 25,000 cubic yards of sand from the inlet to open water flow into the pass. With no land access to the upland dump sites, the materials were transported on the beach. Grading and placement of the sand had to be done at night to avoid daytime closure of the beachfront areas used by the Pelican Bay Community to South and Naples Grande Hotel to the North. Cf,CI —**12/1/10 EARTH TECH F.:P4 t 1 Pt SU S Doctors Pass—Emergency Beach Berm Nourishment (haul in with conveyors) Completed July 2010 Naples, Florida Cost S90,000 Owner Contact Collier County Board of County Commissioners Gary McAlpin,Coastal Zone Manager 2800 North Horseshoe Drive Naples, FL 34104 239-252-5342 GaryMcAlpinPcolliergov.net Collier County officials declared a state of emergency to fix an eroded dune that had left two condominiums south of Doctors Pass in Naples vulnerable to hurricanes. Collier County hired Earth Tech because of their previous experience with beach nourishment projects. This was a 10,000 ton truck haul project with sand provided from the Stewart Mine in Immokalee, Florida. Access to the beach work area was severely restricted and sand placement to the work area was done using a series of conveyors. Additional challenges Earth Tech overcame include working through daily summer storms, protection of existing dune vegetation and coordination of work with regulatory agencies to avoid disruption to active sea turtle nests that were with in projection area. &iAA3 -111610 EARTH TECH E NTERPRl5 5 t;p(y EARTH TECH ENTERPRISES Restoration Client Refereir.,;s Collier County, Florida Gary McAlpin, P.E. - Director Coastal Zone Management 2800 South Horseshoe Drive Naples, Florida 34014 239-252-2966 Garyi caLptn i coliiercountvfi.gov City of Key West, Florida Johnnie Yongue, EIT-Project Manager Public Works 633 Palm Ave Key West, Florida 33040 305-809-3867 jyongue@@cityufkeywest-fl-gov Town of Long Boat Key Isac Brownman, Director Public Works Department 600 General Harris Street Long Boat Key, Florida 34228 941-361-1988 ibrownman@jon hoatkey.arq 4 FORM 6-TRENCH SAFETY ACT Bidder acknowledges that included in the various items of the bid and in the Total Bid Price are costs for complying with the Florida Trench Safety Act(90-96,Laws of Florida)effective October 1, 1990.The Bidder further identifies the cost to be summarized below: Trench Safety Units of Unit Unit Extended Cost Measure Measure (Quantity) (Description) (LF,SY) benching LF 1,000 $2.00 S 2,000.00 1. 2. 3. 4, 5. 2,000.00 TOTAL $ Failure to complete the above may result in the Bid being declared non-responsive. Earth Tech Enterpe ,Inc. Company: Date: 9-3-2020 Signature: Construction Solicitation Doc rev 02-21-20 c FORM 7-BID BOND KNOW ALL MEN BY THESE PRESENTS, that we Earth Tech Enterprises,Inc. (herein after called the Principal) and Atlantic Specialty Insurance Company , (herein called the Surety), a corporation chartered and existing under the laws of the State of MN with its principal offices in the city of Plymouth and authorized to do business in the State of Florida are held and firmly bound unto the Board of County Commissioners Collier County (hereinafter called the Owner),in the full and just sum of "'5%of Bid Amount"** dollars(S""*5%of Bid Amount•**)good and lawful money of the United States of America,to he paid upon demand of the Owner,to which payment well and truly to be made,the Principal and the Surety bind themselves,their heirs,and executors,administrators,and assigns,jointly and severally and firmly by these presents. Whereas, the Principal is about to submit, or has submitted to the Owner, a Bid for furnishing all labor, materials, equipment and incidentals necessary to furnish.install,and fully complete the Work on the Project known as Bid No. 20-7797 Collier Beach kenourishment 2020-2021 NOW, THEREFORE, if the Owner shall accept the Bid of the PRINCIPAL and the PRINCIPAL shall enter into the required Agreement with the Owner and within ten days after the date of a written Notice of Award in accordance with the terms of such Bid,and give such bond or bonds in an amount of 100%the total Contract Amount as specified in the Bidding Documents or Contract Documents with good and sufficient surety for the faithful performance of the Agreement and for the prompt payment of labor,materials and supplies furnished in the prosecution thereof or,in the event of the failure of the PRINCIPAL to enter into such Agreement or to give such bond or bonds,and deliver to Owner the required certificates of insurance,if the PRINCIPAL shall pay to the OBLIGEE the fixed sum of S 5%of Bid Amount noted above as liquidated damages,and not as a penalty,as provided in the Bidding Documents,then this obligation shall be null and void,otherwise to remain in full force and effect. IN TESTIMONY 'hereof. the P4eipal and Surety have caused these presents to be duly signed and sealed this 3rd day of September i 2020. Earth Tech Enterprise's;�lnc, Principal c BY — -- ,�"` (Seal) Christopher Gehring,Preside t ntic Specialty Insurance Company Surety "„7:01_. , (Seal) M�hew .Smith,Attorney' act Countersigne� na na Appointed Producing Agent for OCAQ' a.. (:'<1 Power of Attorney KNOW ALL MEN BYTHESE PRESENTS,that ATLANTIC SPECIALTY INSURANCE COMPANY,a New York corporation with its principal office in Plymouth. Minnesota,does hereby constitute and appoint: Matthew T.Smith,Heather Paruta,Jessica Martin,each individually if there be more than one named,its true and lawful Attorney-in-Fact,to make,execute,seal and deliver,for and on its behalf as surety,any and all bonds,recognizances,contracts of indemnity,and all other writings obligatory in. the nature thereof;provided that no bond or undertaking executed under this authority shall exceed in amount the sum of:unlimited and the execution of such bonds, recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof in pursuance of these presents,shall he as binding upon said Company as if they had been fully signed by an authorized officer of the Company and sealed with the Company seal. This Power of Attorney is made and executed by authority of the following resolutions adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANC.E.COMPANY on the twenty-fifth day of September,2012: Resolved: That the President,any Senior Vice President or Vice-President(each an"Authorized Officer")may execute for and in behalf of the Company any and all bonds.recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof,and affix the seal of the Company thereto;and that the Authorized Officer may appoint and authorize an Attorney-in-Fact to execute on behalf of the Company any and all such instruments and to affix the Company seal thereto;and that the Authorized Officer may at any time remove any such Attorney-in-Fact and revoke all power and authority given to any such Attorney-in. Fact. Resolved: That the Attorney-in-Fact may be given full power and authority to execute for and in the name and on behalf of the Company any and all bonds, recognizances.contracts of indemnity,and all other writings obligatory in the nature thereof,and any such instrument executed by any such Attorney-in-Fact shall • be as binding upon the Company as if signed and sealed by an Authorized Officer and,further,the Attorney-in-Fact is hereby authorized to verify any affidavit required to be attached to bonds,recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof. This power of attorney is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty-fifth day of September,2012: Resolved: That the signature of an Authorized Officer,the signature of the Secretary or the Assistant Secretary,and the Company seal may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing an Attorney-in-Fact for purposes only of executing and sealing any bond, undertaking,recognizance or other written obligation in the nature thereof,and any such signature and seal where so used,being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. IN WITNESS WHEREOF,ATLANTIC SPECIALTY INSURANCE COMPANY has caused these presents to be signed by an Authorized Officer and the seal of the Company to be affixed this twenty-seventh day of April.2020. ,•.'"*01 tN 4L�.,. hi' €n SEA(_ m; Ae( ' 1986 s'- By z STATE OF MINNESOTA `yb.t'xw yos'4abt' Paul J.Brehm,Senior Vice President HENNEPIN COUNTY `lA , 's` On this twenty-seventh day of April,2020,before me personally came Paul J.Brehm,Senior Vice President of ATLANTIC SPECIALTY INSURANCE COMPANY,tome personally known to be the individual and officer described in and who executed the preceding instrument,and he acknowledged the execution of the same,and being by me duly sworn,that he is the said officer of the Company aforesaid,and that the seal affixed to the preceding instrument is the seal of said Company and that the said seal and the signature as such officer was duly affixed and subscribed to the said instrument by the authority and at the direction of the Company. / >+, ALISON DWAN NASH•TROUT • L 0. NOTARY PUBLIC•MINNESOTA 11'fr 4 :t-• My Commission Expires January 31,2025 Notary Public I,the undersigned,Secretary of ATLANTIC SPECIALTY INSURANCE COMPANY,a New York Corporation,do hereby certify that the foregoing power of attorney is in full force and has not been revokettitgif resolution. set ..._._.........-............._...._.....day of....-....-. fop-i=now in force. Signed and sealed. Dated <tt"GtsR9GgayI.'s _t SEAL ml �r ...-. �� 198E ••.,. a-*- This Power of Attorney expires axd�'° ry roa .zb f.�' January 31,2025 ` Kara Barrow,Secretary CAO 1 [ FORM 8-INSURANCE AND BONDING REQUIREMENTS The Vendor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in FORM 8 of this solicitation. The Vendor shall procure and maintain property insurance upon the entire project,if required,to the full insurable value of the scope of work. The County and the Vendor waive against each other and the County's separate Vendors, Contractors, Design Consultant,Subcontractors,agents and employees of each and all of them,all damages covered by property insurance provided herein,except such rights as they may have to the proceeds of such insurance. The Vendor and County shall, where appropriate, require similar waivers of subrogation from the County's separate Vendors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining its own liability insurance. Certificates issued as a result of the award of this solicitation must identify"For any and all work performed on behalf of Collier County",or,the specific solicitation number and title. The General Liability Policy provided by Vendor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Vendor under this solicitation and shall contain a severability of interests provisions. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County,OR Collier County Government,OR Collier County.The Certificates of Insurance must state the Contract Number, or Project Number,or specific Project description, or must read: For any and all work performed on behalf of Collier County. The amounts and types of insurance coverage shall conform to the minimum requirements set forth in FORM 8 with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Vendor has any self- insured retentions or deductibles under any of the below listed minimum required coverage, Vendor must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be Vendor's sole responsibility. Coverage( shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation,whichever is longer. The Vendor and/or its insurance carrier shalt provide thirty (30) days written notice to the County of policy cancellation or non-renv.val on the part of the insurance carrier or the Vendor. The Vendor shall also notify the County, in a like manner,within twenty-four(24)hours after receipt,of any notices of expiration,cancellation,non- renewal or material change in coverage or limits received by Vendor from its insurer and nothing contained herein shall relieve Vendor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Vendor hereunder,Vendor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. Should at any time the Vendor not maintain the insurance coveragets).required herein,the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage )and charge the Vendor for such coverage( )purchased. If Vendor fails to reimburse the County for such costs within thirty (30)days after demand, the County has the right to offset these costs from any amount due Vendor under this Agreement or any other agreement between the County and Vendor.The County shall be under no obligation to purchase such insurance,nor shall it be responsible for the coverage W purchased or the insurance company or companies used. The decision of the County to purchase such insurance coveragets)shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Vendor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Vendor to provide the County with such renewal certificate(s)shall be considered justification for the County to terminate any and all contracts. CAO Collier County Florida Insurance and Bonding Requirements Insurance/Bond Type Required Limits 1. IZ Worker's Compensation Statutory Limits of Florida Statutes. Chapter 440 and all Federal Government Statutory Limits and Requirements Evidence of Workers'Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption.An application for exemption can be obtained online at https:!.'apps,fidfs.comlbocexempti 2. X4 Employer's Liability S 1,000,000 single limit per occurrence 3. Commercial General Bodily Injury and Property Damage Liability(Occurrence Forn1)patterned after the S1,000,000 single limit per occurrence, $2.000.000 aggregate for Bodily current ISO form Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability, 4. Z Indemnification To the maximum extent permitted by Florida law, the Contractor/Vendor shall defend,indemnify and hold harmless Collier County,its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys'fees and paralegals'fees,to the extent caused by the negligence, recklessness,or intentionally wrongful conduct of the Contractor/Vendor or anyone employed or utilized by the Contractor/Vendor in the performance of this Agreement. 5. (2) Automobile Liability $ 1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired;Automobile Included 6. Other insurance as 0 Watercraft S Per Occurrence noted: 0 United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. Per Occurrence 0 Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. Per Occurrence D Aircraft Liability coverage shall be carried in limits of not less than 55.000,000 each occurrence if applicable to the completion of the Services under this Agreement. Per Occurrence il Pollution S 1,000,000 Per Occurrence 0 Professional Liability Per claim&in the aggregate ci Project Professional Liability S Per Occurrence 0 Valuable Papers Insurance SPer Occurrence 0 Cyber Liability S Per Occurrence 0 Technology Errors&Omissions S Per Occurrence ‘,0 \.,_ Carler County Acierinistatve Services.Department Pi.cagerr*tu See Aces FORM 9-CONFLICT OF INTEREST AFFIDAVIT The Vendor certifies that,to the best of its knowledge and belief, the past and current work on any Collier County project affiliated with this solicitation does not pose an organizational conflict as described by one of the three categories below: Biased ground rules—The firm has not set the"ground rules" for affiliated past or current Collier County project identified above (e.g., writing a procurement's statement of work, specifications, or performing systems engineering and technical direction for the procurement)which appears to skew the competition in favor of my firm. Impaired objectivity—The firm has not performed work on an affiliated past or current Collier County project identified above to evaluate proposals past performance of itself or a competitor. which calls into question the contractor's ability to render impartial advice to the government. Unequal access to information —The firm has not had access to nonpublic information as part of its performance of a Collier County project identified above which may have provided the contractor (or an affiliate)with an unfair competitive advantage in current or future solicitations and contracts. In addition to this signed affidavit,the contractor vendor must provide the following: 1. All documents produced as a result of the work completed in the past or currently being worked on for the above- mentioned project;and, 2. Indicate if the information produced was obtained as a matter of public record(in the"sunshine")or through non- public(not in the"sunshine")conversation(s),meeting(s).document(s)and/or other means. Failure to disclose all material or having an organizational conflict in one or more of the three categories above be identified,may result in the disqualification for future solicitations affiliated with the above referenced project(s). By the signature below,the firm(employees,officers and/or agents)certifies,and hereby discloses,that,to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the project ide Tied above has been fully disclosed and does not pose an organizational conflict. Earth e h E rprises,Inc. Compan ame Signature Christopher Gehring-President Florida Print Name and Title State of County of Lee The foregoing instrument was acknowledged before me by means of fi(physical presence or 0 online notarization, this 3rd day of September (month). 2020 (year),by Christopher GcbrIng (name of person acknowledging). Si IT of ic S e of Florida) Bernard F.McGovern (Print.Type,or Stamp Commissioned Name of Notary Public) Pers Tally Known OR Produced Identification 17 'RARD F.MCGOVERN MY COMMtSS1ON#GG 218543 EXPIRES;June 22,2022 Bonded-Mu Want Public Undetwriturs Cotr C01141,11Y Acnistratve Seomos DoparreM FORM 10-VENDOR DECLARATION STATEMENT BOARD OF COUNTY COMMISSIONERS Collier County Government Complex Naples,Florida 34112 Dear Commissioners: The undersigned, as Vendor declares that this response is made without connection or arrangement with any other person and this proposal is in every respect fair and made in good faith,without collusion or fraud. The Vendor hereby declares the instructions,purchase order terms and conditions, requirements,and specifications!scope of work of this solicitation have been fully examined and accepted. The Vendor agrees.if this solicitation submittal is accepted,to execute a Collier County document for the purpose of establishing a formal contractual relationship between the firm and Collier County, for the performance of all requirements to which the solicitation pertains. The Vendor states that the submitted is based upon the documents listed by the above referenced Solicitation. Further,the vendor agrees that if awarded a contract for these goods and/or services,the vendor will not be eligible to compete,submit a proposal,be awarded,or perform as a sub- vendor for any future associated with work that is a result of this awarded contract. 3rd Sepber 20 IN WITNESS WHEREOF,WE have hereunto subscribed our names on this day of tem 20--in the County of Lee .in the State of Florida Firm's Legal Earth Tech Enterprises,Inc. Name: 6180 Federal Court Address: Fort Myers,Florida 33905 City,State,Lip Code: P00000098390 Florida Certificate of Authority Document Number 59-3679652 Federal Tax Identification Number 4YD47 *CCR#or CAGE Code *Only if Grant Funded 239-774-1223 relephone: Email: cgáearthtechenterprises.corn Signature by: Christopher Gehring (Typed and written) Title: President AdditionaI Contact Information Sendpad loons ter, Earth Tech Enterprises,Inc. reeit.trc'd ildiffercro C cmaf+an), name used as.rare, from«bole.) Contact name. Lisa Gehring I ftle: Vice President Address: 6180 Federal Court City Slate. 1b' Fort Myers,Florida 33905 Teleialsranc• 239-774-1223 l:,;ntya i l_ Iisa@:earhtechentcrprises.com Office servicing t"'n1licr County to place orders ( '_Lt 1Rd if tiiffctc°ra1. fron abtt).i'7 01112ta ntstase� i itle Address: City. State./JF Iele•phono d mail Butch McGovern-Chief Operating Officer Secondaryt ont.at` for this Solicitation f itt:aii butch@earthtechenterprises.com 239-774-1223 x14 Cot"- County Acirrerestratve Serwes De Pa r trn t ;),N1 kter",EN5 . FORM II-IMMIGRATION A,FFIDAVIT CERTIFICATION This Affidavit is required and should be signed, notarized by an authorized principal of the firm and submitted with formal solicitation submittals. Further, Vendors are required to be enrolled in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Vendor's bid. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-VerifY Memorandum of Understanding for the company which will be produced at the time of the submission of the Vendor's bid or within five(5)day of the County's Notice of Recommend Award, FAILURE TO EXECUTE THIS AFFIDAVIT CERTIFICATION AND SUBMIT WITH VENDOR'S PROPOSAL/BID MAY DEEM THE VENDOR NON-RESPONSIVE, Collier County will not intentionally award County contracts to any Vendor who knowingly employs unauthorized alien workers,constituting a violation of the employment provision contained in 8 U.S.C:. Section 1324 a(e)Section 274A(e)of the Immigration and Nationality Act("INA"). Collier County may consider the employment by any Vendor of unauthorized aliens a violation of Section 274A(e) of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A(e)of the INA shall be grounds for unilateral termination of the contract by Collier County. Vendor attests that they are fully compliant with all applicable immigration laws(specifically to the 1986 Immigration Act and subsequent Amendment(s))and agrees to comply with the provisions of the Memorandum of Understanding with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E-Verify), operated by the Department of Homeland Security in partnership with the Social Security Administration at the time of submission of the Vendor's hid. Earth Tech F te s,Inc. Company Tlfr Signature Christopher Gehring-President Print Name and Title Florida State of Lee County of The foregoing instrument was acknowledged before inc by means oflecphysite or 0 online notarization, this 3rd day of September (month), 2020 (year),by Christopher Gehring' (name of person acknowledging). iatur-o No -State of Florida) Bernard F.McGovern (Print.Type.or Stamp Commissioned Name of Notary Public) Personally Known OR Produced Identification BERNARD F.MCGOVERN Type of Identification Produced • MY COMMISSION#GG 218543 ..-"ks-•••:6,/ EXPIRES:June 22,2022 '',:f.0,:;,•,;?•;'' Bonded Thru Wary Public Undervititers FORM 12-BIDDERS CHECKLIST IMPORTANT: No bid shall be considered unless it is made on unaltered Bid forms which are included in the Bidding Documents.Please read carefully,sign in the spaces indicated and return with your Bid. Bidder should check off each of the following items as the necessary action is completed: /I. The Bid has been signed. /2. The Bid prices offered have been reviewed. /3. The price extensions and totals have been checked. /4. Bid Schedule has been completed and attached. /5. Any required drawings,descriptive literature,etc.have been included. /' Any delivery information required is included. 7. The following on-line standard documents have been reviewed and accepted in BidSync: a. Construction bid instructions form b. Construction services agreement c. Purchase order terms and conditions /8. All of the following bid forms have been completed and signed: a. Bid Form(Form I) b. Contractors Key Personnel(Form 2) c. Material Manufacturers(Form 3) d. List of Major Subcontractors(Form 4) e. Statement of Experience(Form 5) f. Trench Safety Act(Form 6) g. Bid Bond Form(Form 7) h. Insurance and Bonding Requirements(Form 8) i. Conflict of Interest Affidavit(Form 9) j. Vendor Declaration Statement(Form 10) k. Immigration Law Affidavit Certification(Form 1 1)MUST be signed and attached with your submittal or you MAY be DEEMED NON-RESPONSIVE I. Signed Grant Provisions and Assurances package in its entirety.if applicable.are executed and should be included with your submittal. All forms must be executed,or you MAY be DEEMED NON-RESPONSIVE. 9. Copies of required information have been attached a. Business tax Receipt(Collier County Businesses Only) b. Company's E-Verify profile page or memorandum of understanding c. Certificate of Authority to Conduct Business in State of Florida(sunbiz.org) d. Any required professional licenses—valid and current(myfloridalicense.corn) (ie:General Contractors license,Underground Utility and Excavation,Builders, Trade Contractors,etc..as applicable,requested and/or required.) 10. If required,the amount of Bid bond has been checked,and the Bid bond or cashier's check has been submitted. /1 I. Any addenda have been signed and acknowledgement form attached and included,or you MAY be DEEMED NON-RESPONSIVE. /12, The Bid will be uploaded in time to be received no later than the specified opening date and time.otherwise the Bid cannot be considered. 0 1--Vent) • Unpin)cr siarti- orripan Infonnanon Page 1 of I issat 1111 , offma Nam Employment Eligibility Verification Company Information y NA,tf. c . <iq As*ea Pr<ysica I Latar<on Address sl A ddriort,11 Infurmation 3:.00;al R4ITIDrt olF.17113,,yet, P,ten'Crqonlat OrganQatton Destgon(ffin Vies. rtht Erndo r VI, latr, oa% uir mme,....2.-rv.1.4,1,;,,,,ps, 11 19 N15 Cis•f3 2019 FLORIDA PROFIT CORPORATION ANNUAL REPORT FILED DOCUMENT#P00000098390 Jan 22, 2019 Entity Name: EARTH TECH ENTERPRISES, INC. Secretary of State 9106956672CC Current Principal Place of Business: 6180 FEDERAL COURT FT MYERS, FL 33905 Current Mailing Address: 6180 FEDERAL COURT FT MYERS, FL 33905 US FEI Number: 59-3679652 Certificate of Status Desired: No Name and Address of Current Registered Agent: GEHRING,CHRISTOPHER L 3420 3RD AVE.S.W. NAPLES,FL 34117 US The above named entity submits this statement for the purpose of changing its registered office or registered agent,or both,in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : Title PD Title VP Name GEHRING,CHRISTOPHER L Name LIRETTE-GEHRING,LISA A Address 3420 3RD AVE.S.W. Address 3420 3RD AVE SW City-State-Zip: NAPLES FL 34117 City-State-Zip: NAPLES FL 34117 Title AGENT Name KERSKIE,SCOTT Address 6180 FEDERAL COURT City-State-Zip: FT MYERS FL 33905 I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shalt have the same regal effect as if made under oath;that f am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607,Florida Statutes;end that my name appears above,or on an attachment With all Other like empowered. SIGNATURE:CHRISTOPHER GEHRING VP 01/22/2019 Electronic Signature of Signing Officer/Director Detail Date Detail by FEI/EIN Number Page 1 of 2 Florida Department of State DIVISION OF CORPORATION:, P r • a E I 1 7 Department of State / Division of Corporations / Search Records / Search by FEUEIN Number/ Detail by FEI/EIN Number Florida Profit Corporation EARTH TECH ENTERPRISES, INC. Filing Information Document Number P00000098390 FEI/EIN Number 59-3679652 Date Filed 10/18/2000 State FL Status ACTIVE Principal Address 6180 Federal Court Ft Myers, FL 33905 Changed: 01/02/2018 Mailing Address 6180 Federal Court Ft Myers, FL 33905 Changed: 01/02/2018 Registered Agent Name&Address GEHRING, CHRISTOPHER L 3420 3RD AVE. S.W. NAPLES, FL 34117 Address Changed: 04/11/2007 Officer/Director Detail Name&Address Title PD GEHRING, CHRISTOPHER L 3420 3RD AVE. S.W. NAPLES, FL 34117 Title VP LIRETTE-GEHRING, LISA A http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=FeiNumber&directio... 9/22/2020 Detail by FEI/EIN Number Page 2 of 2 3420 3RD AVE SW NAPLES, FL 34117 Title Agent Kerskie, Scott 6180 Federal Court Ft Myers, FL 33905 Annual Reports Report Year Filed Date 2019 01/22/2019 2020 01/15/2020 2020 07/09/2020 Document Images 07/09/2020--AMENDED ANNUAL REPORT View image in PDF format 01/15/2020--ANNUAL REPORT View image in PDF format 12/02/2019--AMENDED ANNUAL REPORT View image in PDF format 01/22/2019--ANNUAL REPORT View image in PDF format 01/02/2018--ANNUAL REPORT View image in PDF format 03/01/2017--ANNUAL REPORT View image in PDF format 02/11/2016--ANNUAL REPORT View image in PDF format 01/15/2015--ANNUAL REPORT View image in PDF format 02/26/2014--ANNUAL REPORT View image in PDF format 01/17/2013--ANNUAL REPORT View image in PDF format 03/13/2012--ANNUAL REPORT View image in PDF format 03/14/2011--ANNUAL REPORT View image in PDF format 02/16/2010--ANNUAL REPORT View image in PDF format 07/22/2009--ANNUAL REPORT View image in PDF format 03/2$/2009--ANNUAL REPORT View image in PDF format 04/30/2008--ANNUAL REPORT View image in PDF format 04/11/2007--ANNUAL REPORT View image in PDF format 04/26/2006--ANNUAL REPORT View image in PDF format 04/30/2005--ANNUAL REPORT View image in PDF format 04/28/2004--ANNUAL REPORT View image in PDF format 05/02/2003--ANNUAL REPORT View image in PDF format 03/28/2002--ANNUAL REPORT View image in PDF format 04/02/2001--ANNUAL REPORT View image in PDF format 10/18/2090--Domestic Profit View image in PDF format Florida Department of State,Division of Corporations S http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=FeiNumber&directio... 9/22/2020 1 =iIj , u rt ti v c.J le cc D m © I o -4 m Z o E. U. _V u. c O c w › , .., J p >" N ,t U , u. CI t— w c 'D ° W• Q 0 2 0 c , 1 W 1-- u rt H „ a v3 W q -� a . _ i- w ,j y n a � �. z F — Z w i z 0. w Q e-I s cn L 0 O ce w < u < � Cm CC CC ¢ aW � - _Jo ° � m W wO z � CJ z LU 0 I Z e, 571 T C4 o a 6 o W U stZ tawrgZ EXHIBIT A-3: CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT Name Personnel Category Christopher Gehring Construction Superintendent Butch McGovern Project Manager 10 Construction Services Agreement:Revised 072118(v6) CAO $},;;, +r v f x . > F ? 4 Y1^ :3 3,yi,YNl tr '''' yw, Gov., � 7 ti '"..��� 3 � M��'A°46 ,frS�'�_`: +�+,� y�,,,�f ,a�,"as �, i t y 4 Q �7 -t✓'t �i _ r ei Y c D,•a yYF .5 R-x . t 4. 4"V '�4 k ;,--. , 09/28/2020 RE: Earth Tech Enterprises, Inc. Bond No: 800099117 To Whom it May Concern, Please accept this letter authorizing Collier County Board of Commissioners to enter any and all dates necessary to complete the payment and performance bond on the above captioned. Please fax completed copy to our office. Warmest Regards, Smith Insurance & Bonds ,arP/L: thew T. Smith Attorney in Fact Atlantic Specialty Insurance Company (1114 SURL I Y BON & C'CsMMLRCIAL IN�L ANCL LXPL k'S SMITHINSURANCE & BONDS FLSuretyBonds.com 1239.243.9729 1866_976.2.185 5260 S.unmir in CornmDrs Way S.rite 3C2 I Fnrt My ern, F 33907 ©rm= Document issued to comply with the Florida Statue Chapter 713.245 Front page of Performance and Payment Bond Bond Number: 800099117 Surety: Atlantic Speciality Insurance Company Local Address: Atlantic Speciality Insurance Company 605 Highway 169 North Suite 800 Plymouth, MN 55441 Phone: 239-243-9729 Contractor: Earth Tech Enterprises, Inc. 6180 Federal Court Fort Myers, FL 33905 Owner: Collier County Board of Commissioners 2800 North Horseshoe Drive Naples, FL 34104 239-252-5342 Obligee Name: SAME Contract Number: na Amount of Bond: $ $1,094,700.00 Project Description: 20-7797 Collier Beach Renourishment 2020-2021 Legal Description of NA Property: (111111) SAL IY BOND & COMMLRC_IAL INSLk.ANC1 LXPL'S SMN SU R ANC E FtSuretyBonds.com 1 239.243.9729 1 866.976.2185 I �T BONDS 5260 S.tnne•• VVSy, E.r?r. .?C? 1 r:".rt hAysr3, =. 32907 n©rm®in EXHIBIT B-1: PUBLIC PAYMENT BOND 20-7797 Bond No. 800099117 Contract No. 20-7797 KNOW ALL MEN BY THESE PRESENTS: That Earth Tech Enterprises, Inc. , as Principal, and Atlantic Speciality Insurance Company , as Surety, located at 605 Highway 169 Ninth, Suite 800 Plymouth , MN 55441 (Business Address) are held and firmly bound to Collier County Board of County Commissioners as Obligee in the sum of One Million Ninety-Four Thousand Seven Hundred Dollars zero cents ($ 1,094,700.00 )for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns,jointly and severally. ,�� WHEREAS, Principal has entered into a contract dated as of the L tay of(VitlJ�,� � 20 510 , with Obligee for 20-7797-Collier Beach Renourishment 2020-2021 in Collier County, Florida accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to herein as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.05(2). In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this �3�day of Qrp 20 , the name of each party being affixed and these presents duly signed by its under-signed representative, pursuant to authority of its governing body. 11 Construction Services Agreement:Revised 072118(v6) Signed, sealed d d livered in the presen PRINCIPAL 4 Earth Tech Enterpises, Inc. Christopher hring, President BY: Christopher Gehring Witnesses a to Principal NAME: Earth Tech Enterprises,Inc. ITS: President STATE OF Florida COUNTY OF Collier The foregoing instrument was acknowledged before me by means of Q physical presence or ❑ online notarization, this 2S11" day of SF.e1Q,- 3En-- , 20 20 , by c vtiN_L S f d ('144"-- CI€/44-i r fr- ,as to No Sloe-„— of E Q .'n+ Ta c►+ EwrE tiP.IS' S , p..c. , a V-- a ti, n ra corporation, on behalf of the corporation. He/she is personally known to me OR has produced as i ntification and did (did not) take an oath. :Awe Zz, 262.'t� My Commis ' • s- os�RVP� •. BERNARD F.MCGOVERN (Signature f Notary Public) : ,& c,_ MY COMMISSION#GG 218543 G� oh r EXPIRES:June 22,2022 6 ✓/x- 0 1� vv E ta 1.`-) °'FoFFS°P.' Bonded Thru Notary Public Underwriters *"See fo owing page (Legibly Printed) (AFFI ` FICIAL SEAL) Notary Public, State of Commission No.: ATTEST: SURETY: (Printed Name) (:. 'ness Address (Authorized Sign. re) Witnesses to Surety (Printed Name) 12 Construction Services Agreement:Revised 072118(v6) ..f OR -� na s Attorney in Fact ttach Power of Attorney) Matthew T Smith Witnesses Heather Paruta (Printed Name) Atlantic Speciality Insurance Company 605 Highway 169 North Plymouth, Minnesota, 55441 (Business Address) 239.243.9729 (Telephone Number) STATE OF Florida COUNTY OF Lee The foregoing instrument was acknowledged before me by means of 0 physical presence or 0 online notarization, this 28 day of September , 20 20 , by Matthew T Smith ,as Attorney in Fact of Atlantic Specialty Insurance Company, a MN corporation, on behalf of the corporation. He/she is personally known to me OR has produced Personal known as identification and did (did not) take an oath. , My Commission Expires: 03/03/2023 (Signature of Notary Public) Name: Lori A Sanders SOY PUB LORIASANDERS (Legibly Printed) '% Commisslon#GG302337 FL (AFFIX*I -'7, lAL 14tarch3,2023 Notary Public, State of: of n,e' Bonded n�Budget Notary s«vtas Commission No.: GG302337 13 Construction Services Agreement:Revised 072118(v6) (;A.(3 EXHIBIT B-2: PUBLIC PERFORMANCE BOND 20-7797 Bond No. 800099117 Contract No. 20-7797 KNOW ALL MEN BY THESE PRESENTS: That Earth Tech Enterprises, Inc. , as Principal, and Atlantic Speciality Insurance Company as Surety, located at 605 Highway 169 North, Suite 800, Plymouth. Minnesota 55441 (Business Address) are held and firmly bound to Collier County Board of County Commissioners , as Obligee in the sum of One Million Ninety-Four Thousand Seven Hundred Dollars zero cents ($ 1,094,700.00 )for the payment whereof we bond ourselves,our heirs, executors, personal representatives, successors and assigns,jointly and severally, WHEREAS, Principal has entered into a contract Ad,�ted as of the 13 day of 20 `� , with Obligee for 20-7Collier Beach Renourishment 2020-2021 in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to herein as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract; and 2. Pays Obligee any and all losses,damages, costs and attorneys'fees that Obligee sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Obligee; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract,then this bond is void;otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The Surety,for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alterations or additions to the terms of the Contract or to work or to the specifications. This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Obligee for more than the penal sum of this Performance Bond regardless of the number of suits that may be filed by Obligee. 14 Construction Services Agreement:Revised 072118(v6) IN WITNESS WHEREOF, the above parties have executed this instrument this I, day of oa-obte , 20 , the name of each party being affixed and these presents duly signed by its u dersigned representative, pursuant to authority of its governing body. Signed, seal d nd delivered in the prese ce of: PRINCIPAL Earth Tech Enterprises, Inc. Ch ' topher G hring, President BY: Christopher Gehring Witnesses o Prin ipal NAME: Earth Tech Enterprises, Inc. ITS: President STATE OF FL COUNTY OF Collier The foregoing instrument was acknowledged before me by means of lW'physical presence or ❑ online notarization, this l 'rt day of SE9 " r3 rE ^ %- , 20 20 , by C.Hntsiopl4Ed' (ct krt.4►�tt ,as PIL S Io‘tiT of f tiTµ TE -w E.+rcpittseri 1-N4. a _ Ft-. ti.aP. corporation, on behalf of the corporation. He/she is personally known to me OR has produced — as identification and did (did not) take an oath. My Commission Expires: '3--......s. La, 2,02,2— (SignatGre f Notary Public) Name: G1..,n,..� J ^ `' .�., F„ (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of: T7-0'"--t n°' Commission No.: G Cs Z' 8 5'43 ge:,i ;. BERNARD F.MCGOVERN c`1. MY COMMISSION#GG 218543 a EXPIRES:June 22,2022 ""f*PPV''' Bonded Thru Notary Public Underwriters 15 Construction Services Agreement:Revised 072118(v6) ATT - • SURETY: (Printed Name) : iness Address) (Authorized Signa Witnesses as to Surety (Printed Nam OR s A orney i Fact (A ch Power of Attorney) Matthew T Smith, Attorney in Fact, - J a � Witnesses (Printed Name) 605 Highway 169 North Plymouth, Minnesota 55441 (Business Address) 239.243.9729 (Telephone Number) STATE OF FL COUNTY OF Lee The foregoing instrument was ackipledged before meby means of ❑ physical presence or 0 online notarization, this day of September 20 20, by Matthew T Smith ,as Attorney in Fact of Atlantic Specialty Insurance Company , a MN corporation, on behalf of the corporation. He/she is personally known to me OR has produced Personally known /-as identification and did (did not) take an oath. My Commission Expires: tx�Pue LORIASANDERS (Signature of Notary Public) * iLr Commission#GG 302337 Lori Sanders Expires March 3,2023 140,A,o, Bonded Tin Budget Notary seams (Legibly Printed) NotaryPublic, State of: FL (AFFIX OFFICIAL SEAL) Commission No.: GG302337 16 Construction Services Agreement:Revised 072118(v6) One Beacon Power of Attorney INSURANCE GROUP KNOW ALL MEN BY THESE PRESENTS,that ATLANTIC SPECIALTY INSURANCE COMPANY,a New York corporation with its principal office in Plymouth, Minnesota,does hereby constitute and appoint: Matthew T.Smith,Heather Paruta,Jessica Martin,each individually if there be more than one named,its true and lawful Attorney-in-Fact,to make,execute,seal and deliver,for and on its behalf as surety,any and all bonds,recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof;provided that no bond or undertaking executed under this authority shall exceed in amount the sum of:unlimited and the execution of such bonds, recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof in pursuance of these presents,shall be as binding upon said Company as if they had been fully signed by an authorized officer of the Company and sealed with the Company seal. This Power of Attorney is made and executed by authority of the following resolutions adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty-fifth day of September,2012: Resolved: That the President,any Senior Vice President or Vice-President(each an"Authorized Officer")may execute for and in behalf of the Company any and all bonds,recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof,and affix the seal of the Company thereto;and that the Authorized Officer may appoint and authorize an Attorney-in-Fact to execute on behalf of the Company any and all such instruments and to affix the Company seal thereto;and that the Authorized Officer may at any time remove any such Attorney-in-Fact and revoke all power and authority given to any such Attorney-in- Fact. Resolved: That the Attorney-in-Fact may be given full power and authority to execute for and in the name and on behalf of the Company any and all bonds, recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof,and any such instrument executed by any such Attorney-in-Fact shall be as binding upon the Company as if signed and sealed by an Authorized Officer and,further,the Attorney-in-Fact is hereby authorized to verify any affidavit required to be attached to bonds,recognizances,contracts of indemnity,and all other writings obligatory in the nature thereof. This power of attorney is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty-fifth day of September,2012: Resolved: That the signature of an Authorized Officer,the signature of the Secretary or the Assistant Secretary,and the Company seal may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing an Attorney-in-Fact for purposes only of executing and sealing any bond, undertaking,recognizance or other written obligation in the nature thereof,and any such signature and seal where so used,being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. IN WITNESS WHEREOF,ATLANTIC SPECIALTY INSURANCE COMPANY has caused these presents to be signed by an Authorized Officer and the seal of the Company to be affixed this twenty-seventh day of April,2020. 00"-r•ri igN9, G` q it,. pFIPORgTF. r' 714iff/11.44 . !co "'SEAL _ 1986 0 By STATE OF MINNESOTA % b�+Fw YOP*aa' Paul J.Brehm,Senior Vice President HENNEPIN COUNTY '1 *,,o`' On this twenty-seventh day of April,2020,before me personally came Paul J.Brehm,Senior Vice President of ATLANTIC SPECIALTY INSURANCE COMPANY,to me personally known to be the individual and officer described in and who executed the preceding instrument,and he acknowledged the execution of the same,and being by me duly sworn,that he is the said officer of the Company aforesaid,and that the seal affixed to the preceding instrument is the seal of said Company and that the said seal and the signature as such officer was duly affixed and subscribed to the said instrument by the authority and at the direction of the Company. 411. .dig �'. .• e.,. ALISON DWAN NASH•TROUT A f. Llit 5,INOTARY PUBLIC•MINNESOTA My Commission Expires January 31,2025 Notary Public I,the undersigned,Secretary of ATLANTIC SPECIALTY INSURANCE COMPANY,a New York Corporation,do hereby certify that the foregoing power of attorney is in full force and has not been revoked,and the resolutions set forth above are now in force. Signed and sealed. Dated day of ,00ro 40 LpRPORglE,9Z�'` e '- SEAL rnI 1986 0 This Power of Attorney expires =y`'~Fw yO'-,b1' January 31,2025 - s„ sir �a "•" Kara Barrow,Secretary EXHIBIT B-3: INSURANCE REQUIREMENTS The Contractor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in EXHIBIT B of this solicitation. The Contractor shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Contractor waive against each other and the County's separate Contractors, Design Consultant, Subcontractors, agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Contractor and County shall, where appropriate, require similar waivers of subrogation from the County's separate Contractors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County", or, the specific solicitation number/contract number and title. The General Liability Policy provided by Contractor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Contractor under this solicitation and shall contain a severability of interests provisions. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. The amounts and types of insurance coverage shall conform to the minimum requirements set forth in EXHIBIT B with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Contractor has any self-insured retentions or deductibles under any of the below listed minimum required coverage, Contractor must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be Contractor's sole responsibility. Coverage(s) shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer. The Contractor and/or its insurance carrier shall provide thirty (30) days written notice to the County of policy cancellation or non-renewal on the part of the insurance carrier or the Contractor. The Contractor shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non-renewal or material change in coverage or limits received by Contractor from its insurer and nothing contained herein shall relieve Contractor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Contractor hereunder, Contractor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. 17 Construction Services Agreement:Revised 072118(v6) r� Should at any time the Contractor not maintain the insurance coverage(s) required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage(s) and charge the Contractor for such coverage(s) purchased. If Contractor fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due Contractor under this Agreement or any other agreement between the County and Contractor. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverage(s) purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverage(s) shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Contractor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Contractor to provide the County with such renewal certificate(s)shall be considered justification for the County to terminate any and all contracts. 18 Construction Services Agreement:Revised 072118(v6) ( O Collier County Florida Insurance and Bonding Requirements Insurance/Bond Type Required Limits 1. ❑ Worker's Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and Requirements Evidence of Workers' Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption. An application for exemption can be obtained online at https://apps.fldfs.com/bocexempt/ 2. ❑ Employer's Liability $ single limit per occurrence 3. ❑ Commercial General Bodily Injury and Property Damage Liability (Occurrence Form) patterned after the current $ single limit per occurrence, $2,000,000 aggregate for Bodily Injury ISO form Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. 4. ❑ Indemnification To the maximum extent permitted by Florida law, the Contractor/Vendor/Consultant shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the ContractorNendor/Consultant or anyone employed or utilized by the ContractorNendor/Consultant in the performance of this Agreement. 5. ❑ Automobile Liability $ Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included 6. ❑ Other insurance as ❑ Watercraft $ Per Occurrence noted: ❑ United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑Aircraft Liability coverage shall be carried in limits of not less than$5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ Per Occurrence ❑ Pollution $ Per Occurrence ❑ Professional Liability $ Per claim& in the aggregate • $1,000,000 per claim and in the aggregate • $2,000,000 per claim and in the aggregate ❑ Project Professional Liability $ Per Occurrence ❑ Valuable Papers Insurance $ Per Occurrence 19 Construction Services Agreement:Revised 072118(v6) CAO ❑ Cyber Liability $ Per Occurrence ❑ Technology Errors& Omissions $ Per Occurrence 7. ❑ Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers' check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 8. ❑ Performance and For projects in excess of $200,000, bonds shall be submitted with the executed Payment Bonds contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as"A-"or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders'surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New York 10038. 9. ❑ Consultant shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Consultant shall provide County with certificates of insurance meeting the required insurance provisions. 10. ❑ Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required.This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Contractor's policy shall be endorsed accordingly. 11. ❑ The Certificate Holder shall be named as Collier County Board of County Commissioners,OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. 12. ❑ Thirty(30) Days Cancellation Notice required. Consultant's Insurance Statement We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. Name of Firm Date Consultant Signature Print Name Insurance Agency Agent Name Telephone Number 20 Construction Services Agreement:Revised 072118(v6) EXHIBIT C: RELEASE AND AFFIDAVIT FORM COUNTY OF (COLLIER) STATE OF (FLORIDA) Before me,the undersigned authority, personally appeared who after being duly sworn,deposes and says: (1) In accordance with the Contract Documents and in consideration of $ to be received, ("Contractor") releases and waives for itself and it's subcontractors, material-men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated ,20 for the period from to . This partial waiver and release is conditioned upon payment of the consideration described above. It is not effective until said payment is received in paid funds. (2) Contractor certifies for itself and its subcontractors, material-men, successors and assigns,that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed,shall be fully satisfied and paid upon Owner's payment to Contractor. (3) Contractor agrees to indemnify,defend and save harmless Owner from all demands or suits,actions,claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No. CONTRACTOR BY: Witness ITS: President DATE: Witness [Corporate Seal] STATE OF COUNTY OF The foregoing instrument was acknowledged before me by means of ❑ physical presence or 0 online notarization, this day of , 20 , by as of a corporation, on behalf of the corporation. He/she is personally known to me OR has produced as identification and did (did not)take an oath. My Commission Expires: (Signature of Notary Public) NAME: (Legibly Printed) Notary Public, State of (AFFIX OFFICIAL SEAL) Commissioner No.: 21 Construction Services Agreement:Revised 072118(v6) 7 EXHIBIT D FORM OF CONTRACT APPLICATION FOR PAYMENT Collier County Board of County Commissioners(the OWNER) or Collier County Water-Sewer Owner's Project Bid No. Manager's Name: Project No. County's Division Name Purchase Order No. Submitted by Contractor Application Date: Representative: Name Contractor's Name & Payment Application No. Address: Original Contract Time: Original Contract Price: $ Revised Contract Time: Total Change Orders to Date: $ Revised Contract Amount: $ Total Value of Work Completed & $ Stored to Date: Retainage @10% $ Retainage @ 10% through [Insert $ through [Insert Date] date] Retainage @ % $ Less Retainage $ after[Insert date] Total Earned Less Retainage $ Less previous payment(s) Percent Work Completed % AMOUNT DUE THIS $ to Date: APPLICATION: Percent Contract Time Completed to Date: Liquidated Damages to $ Remaining Contract Balance $ Be Accrued ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens,claims, security interests and encumbrances(except such as covered by Bond acceptable to OWNER); (3)all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; and (4) CONTRACTOR has only included amounts in this Application for Payment properly due and owing and CONTRACTOR has not included within the above referenced amount any claims for unauthorized or changed Work that has not been properly approved by Owner in writing and in advance of such Work. Contractor's Name Contractor's Signature: Date: Type Title: Shall be signed by an authorized representative of the Contractor. Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by: Design Professional's Name: Signature: Date: Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by: Owner's Project Manager Name: Signature: Date: 22 Construction Services Agreement:Revised 072118(v6) EXHIBIT D(Continued) SCHEDULE OF VALUES Project Name: Project Number. Date: Period To: ITEM DESCRIPTION SCHEDULED WORK COMPLETED STORED TOTAL PERCENT BALANCE 10% _% TOTAL NUMBER VALUE MATERIALS COMPLETED COMPLETE TO FINISH RETAINAGE RETAINAGE RETAINAGE PRENOUS APPLICATIONS THIS &STORED (reduced rate) WTHHELD THRU DATE SINCE DATE PERIOD TO DATE TOTALS .Explanation for the two columns under Previous Applications:The Thru Date is where you will place all information until the contract is complete unless a release or reduction of retainage issue cor into play. If this happens,all information up to the date of the%change in retainage is placed in the Thru Date column.Information after that date is placed in the Since Date column.This states what has happened since the change in retainage. 23 Construction Services Agreement:Revised 072118(v6) Exhibit D (Continued) Stored Materials Record Formula:A+ B -C - D= E A B C D E Invoice Previously Received Previously Installed Balance To Date Description Supplier Number Received This Period Installed This Period Install 24 Construction Services Agreement:Revised 072118(v6) CAO EXHIBIT E: CHANGE ORDER An electronic data entry form may be found at: http://bccspOl/SiteDirectory/ASD/Purchasinci/Formsl/Forms/Default.aspx Change Order Form Contract*: Change* F urchase Order*: Project*: Co ntracto r)Fi rrn Name: Project Name: Project Manager Name Department: Original ContraotWork Order Amount Csginal8CC Approval Date:Agenda Item et Current ECC Approved Amount Last BCC Approval Data Agenda item* Current ContraotAN ork Order Amount SAP Contract Expiration Data Waster) Colter Amount of the Change IVD! Total Change from a igi na I Amount Revised ContractVi orx Order Total 0.00 AO IWO! Change from C urrerd sc.:.Approved Amount Cumulative Changes 0,00 ri/70! Change f Tann C txr ent Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceel Original Last Approved Revised Date Date Completion Dato Date trto Tts mange) *of Days Added Select Tasks 0 Add new task(s) 0 Delete task(s) 0 Change task(s) 0 Other '5"2,210t70;; Provide a respo n se to the following:1.1detai led and specific exp lanationdratio nale of the requested change(s)to the task(s)and I or the add itio n al days added I if requested);2.)why this change was not included in the original contract;and,3.)describe the impact if this change is not processed. Attach adcfritoral informattor from the Deagn Profess ioral aro or Cortractor if reeled. Prepared by: Dale: (Project Manager Name and Department) A ceplance of this Charge Order shall consirt.de a modification to cont ractl work order identified stove and will be subject to ail the same terms and collide ons as contained in the contract r work order indicated above,as fully as if the same were staled in 1hi5 adoeplanoe. The adjustment.if any,to the Contract s hall constrtute a full and final settlement of any and all claims of the Contractor)Vendor Con s u hart r Design Professional arising out of or related vo the c tune set forth herein,including claims for im pact and delay CriSIS. Accepted by: Date: {Contractor:Vendor,'Cons uilammt t Des ign Professional and Name of Finn.if project applCa.ble) Approved by: Dale: (Design Profess ioral and Name of Finn,if project applicable) Approved by: Date: (Procisrernem Professional 25 Construction Services Agreement.Revised 072118(v6) EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION OWNER'S Project No. Design Professional's Project No. PROJECT: CONTRACTOR Contract For Contract Date This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To OWNER And To Substantial Completion is the state in the progress of the Work when the Work (or designated portion) is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN PROFESSIONAL,and that Work is hereby declared to be substantially complete in accordance with the requirements of the Contract Documents on: DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within days of the above date of Substantial Completion. The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties shall be as follows: 26 Construction Services Agreement:Revised 072118(v6) CFO RESPONSIBILITIES: OWNER: CONTRACTOR The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the Contract Documents. Executed by Design Professional on , 20 Design Professional By: Type Name and Title CONTRACTOR accepts this Certificate of Substantial Completion on 20 CONTRACTOR By: Type Name and Title OWNER accepts this Certificate of Substantial Completion on , 20 OWNER By: Type Name and Title 27 Construction Services Agreement:Revised 072118(v6) CM) EXHIBIT G: FINAL PAYMENT CHECKLIST Bid No.: Project No.: PO No.: Date: Contractor: The following items have been secured by the for the Project known as and have been reviewed and found to comply with the requirements of the Contract Documents. Original Contract Amount: Final Contract Amount: Commencement Date: Substantial Completion Time as set forth in the Agreement: Calendar Days. Actual Date of Substantial Completion: Final Completion Time as set forth in the Agreement: Calendar Days. Actual Final Completion Date: YES NO 1. All Punch List items completed on 2. Warranties and Guarantees assigned to Owner(attach to this form). 3. Effective date of General one year warranty from Contractor is: 4. 2 copies of Operation and Maintenance manuals for equipment and system submitted (list manuals in attachment to this form). 5. As-Built drawings obtained and dated: 6. Owner personnel trained on system and equipment operation. 7. Certificate of Occupancy No.: issued on (attach to this form). 8. Certificate of Substantial Completion issued on 9. Final Payment Application and Affidavits received from Contractor on: 10. Consent of Surety received on 11. Operating Department personnel notified Project is in operating phase. 12. All Spare Parts or Special Tools provided to Owner: 13. Finished Floor Elevation Certificate provided to Owner: 14. Other: If any of the above is not applicable, indicate by N/A. If NO is checked for any of the above, attach explanation. Acknowledgments: By Contractor: (Company Name) (Signature) (Typed Name&Title) By Design Professional: (Firm Name) (Signature) (Typed Name&Title) By Owner: (Department Name) (Signature) (Name &Title) 28 Construction Services Agreement:Revised 072118(v6) CAO EXHIBIT H: GENERAL TERMS AND CONDITIONS 1. INTENT OF CONTRACT DOCUMENTS. 1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein. 1.2 If before or during the performance of the Work Contractor discovers a conflict, error or discrepancy in the Contract Documents, Contractor immediately shall report same to the Project Manager in writing and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification from the Project Manager; said interpretation or clarification from the Project Manager may require Contractor to consult directly with Design Professional or some other third party, as directed by Project Manager. Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing any portion of the Work. 1.3 Drawings are intended to show general arrangements, design and extent of Work and are not intended to serve as shop drawings. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the drawings, specifications or other Contract Document provisions, Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon the Contractor, as determined by the Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the Contract Documents. 2. INVESTIGATION AND UTILITIES. 2.1 Subject to Section 2.3 below, Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work and the general and local conditions, and particularly, but without limitation, with respect to the following: those affecting transportation, access, disposal, handling and storage of materials; availability and quality of labor; water and electric power; availability and condition of roads; work area; living facilities; climatic conditions and seasons; physical conditions at the work-site and the project area as a whole;topography and ground surface conditions; nature and quantity of the surface materials to be encountered; subsurface conditions; equipment and facilities needed preliminary to and during performance of the Work; and all other costs associated with such performance. The failure of Contractor to acquaint itself with any applicable conditions shall not relieve Contractor from any of its responsibilities to perform under the Contract Documents, nor shall it be considered the basis for any claim for additional time or compensation. 29 Construction Services Agreement:Revised 072118(v6) CAO 2.2 Contractor shall locate all existing roadways, railways, drainage facilities and utility services above, upon, or under the Project site, said roadways, railways, drainage facilities and utilities being referred to in this Sub-Section 2.2 as the"Utilities". Contractor shall contact the owners of all Utilities to determine the necessity for relocating or temporarily interrupting any Utilities during the construction of the Project. Contractor shall schedule and coordinate its Work around any such relocation or temporary service interruption. Contractor shall be responsible for properly shoring, supporting and protecting all Utilities at all times during the course of the Work. The Contractor is responsible for coordinating all other utility work so as to not interfere with the prosecution of the Work (except those utilities to be coordinated by the Owner as may be expressly described elsewhere in the Contract Documents). 2.3 Notwithstanding anything in the Contract Documents to the contrary, if conditions are encountered at the Project site which are (i) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (ii) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, and which reasonably should not have been discovered by Contractor as part of its scope of site investigative services required pursuant to the terms of the Contract Documents, then Contractor shall provide Owner with prompt written notice thereof before conditions are disturbed and in no event later than three(3)calendar days after first observance of such conditions. Owner and Design Professional shall promptly investigate such conditions and, if they differ materially and cause an increase or decrease in Contractor's cost of, or time required for, performance of any part of the Work, Owner will acknowledge and agree to an equitable adjustment to Contractor's compensation or time for performance, or both, for such Work. If Owner determines that the conditions at the site are not materially different from those indicated in the Contract Documents or not of an unusual nature or should have been discovered by Contractor as part of its investigative services, and that no change in the terms of the Agreement is justified, Owner shall so notify Contractor in writing, stating its reasons. Claims by Contractor in opposition to such determination by Owner must be made within seven (7) calendar days after Contractor's receipt of Owner's written determination notice. If Owner and Contractor cannot agree on an adjustment to Contractor's cost or time of performance, the dispute resolution procedure set forth in the Contract Documents shall be complied with by the parties. 3. SCHEDULE. 3.1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award, shall prepare and submit to Project Manager, for their review and approval, a progress schedule for the Project (herein "Progress Schedule"). The Progress Schedule shall relate to all Work required by the Contract Documents, and shall utilize the Critical Path method of scheduling and shall provide for expeditious and practicable execution of the Work within the Contract Time. The Progress Schedule shall indicate the dates for starting and completing the various stages of the Work. 3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly updates to the Progress Schedule shall be subject to the Project Manager's review and approval. Contractor shall submit the updates to the Progress Schedule with its monthly Applications for Payment noted below. The Project Manager's review and approval of the submitted Progress Schedule updates shall be a condition precedent to the Owner's obligation to pay Contractor. 3.3 All work under this Agreement shall be performed in accordance with the requirements of all Collier County Noise Ordinances then in effect. Unless otherwise specified, work will generally be 30 Construction Services Agreement:Revised 072118(v6) CM) limited to the hours of 7 a.m. to 7 p.m., Monday through Saturday. No work shall be performed outside the specified hours without the prior approval of the Project Manager. 4. PROGRESS PAYMENTS. 4.1 Prior to submitting its first monthly Application for Payment, Contractor shall submit to Project Manager, for their review and approval, a schedule of values based upon the Contract Price, listing the major elements of the Work and the dollar value for each element. After its approval by the Project Manager, this schedule of values shall be used as the basis for the Contractor's monthly Applications for Payment. This schedule shall be updated and submitted each month along with a completed copy of the Application for Payment form signed by the Contractor's authorized representative and attached to the Agreement as Exhibit D. 4.2 Prior to submitting its first monthly Application for Payment, Contractor shall provide to the Project Manager the list of its Subcontractors and materialmen submitted with its Bid showing the work and materials involved and the dollar amount of each subcontract and purchase order. Contractor acknowledges and agrees that any modifications to the list of Subcontractors submitted with Contractor's Bid and any subsequently identified Subcontractors are subject to Owner's prior written approval. The first Application for Payment shall be submitted no earlier than thirty(30)days after the Commencement Date. Notwithstanding anything herein to the contrary, if approved by Owner in its sole discretion, Contractor may submit its invoice for any required Payment and Performance Bonds prior to the first Application of Payment provided that Contractor has furnished Owner certified copies of the receipts evidencing the premium paid by Contractor for the bonds. 4.3 Unless expressly approved by Owner in advance and in writing, said approval at Owner's sole discretion, Owner is not required to make any payment for materials or equipment that have not been incorporated into the Project. If payment is requested on the basis of materials and equipment not incorporated into the Project, but delivered and suitably stored at the site or at another location, and such payment and storage have been agreed to by Owner in writing,the Application for Payment also shall be accompanied by a bill of sale, invoice or other documentation warranting that the Owner has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, together with evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect Owner's interest therein, all of which shall be subject to the Owner's satisfaction. Thereafter, with each Application for Payment, Contractor also shall complete and submit to Owner as part of its Application for Payment, the Stored Materials Record attached hereto and made a part hereof as Exhibit D. 4.4 Contractor shall submit its monthly Application for Payment to the Project Manager or his or her designee, as directed by Owner (which designee may include the Design Professional). After the date of each Application for Payment is stamped as received and within the timeframes set forth in Section 218.735 F.S., the Project Manager, or Design Professional, shall either: (1) Indicate its approval of the requested payment; (2) indicate its approval of only a portion of the requested payment, stating in writing its reasons therefore; or (3) return the Application for Payment to the Contractor indicating, in writing, the reason for refusing to approve payment. Payments of proper invoices in the amounts approved shall be processed and paid in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Procurement Services Division and the Clerk of Court's Finance Department respectively. 4.5 In the event of a total denial by Owner and return of the Application for Payment by the Project Manager, the Contractor may make the necessary corrections and re-submit the Application for Payment. The Owner shall, within ten (10) business days after the Application for Payment is 31 Construction Services Agreement:Revised 072118(v6) �"1 stamped and received and after Project Manager approval of an Application for Payment, pay the Contractor the amounts so approved. 4.6 Owner shall retain ten percent(10%) of the gross amount of each monthly payment request or ten percent(10%) of the portion thereof approved by the Project Manager for payment, whichever is less. Such sum shall be accumulated and not released to Contractor until final payment is due unless otherwise agreed to by the Owner in accordance with Florida Statute 255.078. The Project Manager shall have the discretion to establish, in writing, a schedule to periodically reduce the percentage of cumulative retainage held throughout the course of the Project schedule. Owner shall reduce the amount of the retainage withheld on each payment request subsequent to fifty percent (50%)completion subject to the guidelines set forth in Florida Statute 255.078 and as set forth in the Owner's procurement ordinance and polides. 4.7 Monthly payments to Contractor shall in no way imply approval or acceptance of Contractor's Work. 4.8 Each Application for Payment, subsequent to the first pay application, shall be accompanied by a Release and Affidavit, in the form attached as Exhibit C, acknowledging Contractor's receipt of payment in full for all materials, labor, equipment and other bills that are then due and payable by Owner with respect to the current Application for Payment. Further, to the extent directed by Owner and in Owner's sole discretion, Contractor shall also submit a Release and Affidavit from each Subcontractor, sub-subcontractor, or supplier in the form attached as Exhibit C acknowledging that each Subcontractor, sub-subcontractor or supplier has been paid in full through the previous month's Application for Payment. The Owner shall not be required to make payment until and unless these affidavits are furnished by Contractor. 4.9 Contractor agrees and understands that funding limitations exist and that the expenditure of funds must be spread over the duration of the Project at regular intervals based on the Contract Amount and Progress Schedule. Accordingly, prior to submitting its first monthly Application for Payment, Contractor shall prepare and submit for Project Manager's review and approval, a detailed Project Funding Schedule, which shall be updated as necessary and approved by Owner to reflect approved adjustments to the Contract Amount and Contract Time. No voluntary acceleration or early completion of the Work shall modify the time of payments to Contractor as set forth in the approved Project Funding Schedule. 4.10 Notwithstanding anything in the Contract Documents to the contrary, Contractor acknowledges and agrees that in the event of a dispute concerning payments for Work performed under this Agreement, Contractor shall continue to perform the Work required of it under this Agreement pending resolution of the dispute provided that Owner continues to pay Contractor all amounts that Owner does not dispute are due and payable. 4.11 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract.Any untimely submission of invoices beyond the specified deadline period is subject to non- payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. 4.12 The County may, at its discretion, use VISA/MASTER card credit network as a payment vehicle for goods and/or services purchased as a part of this contract. The County may not accept any additional surcharges (credit card transaction fees) as a result of using the County's credit card for transactions relating to this solicitation 32 Construction Services Agreement:Revised 072118(v6) 5. PAYMENTS WITHHELD. 5.1 The Project Manager may decline to approve any Application for Payment, or portions thereof, because of subsequently discovered evidence or subsequent inspections that reveal non- compliance with the Contract Documents. The Project Manager may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) Defective Work not remedied; (b) third party claims filed or reasonable evidence indicating probable filing of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents by Contractor. 5.2 If any conditions described in 5.1. are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Provided however, in the event of an emergency, Owner shall not be required to provide Contractor any written notice prior to rectifying the situation at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or non-liquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 5.3 In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off-set the amount owed to the County by applying the amount owed to the vendor or contractor for services performed of for materials delivered in association with a contract. 6. FINAL PAYMENT. 6.1 Owner shall make final payment to Contractor in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Procurement Services Division and the Clerk of Court's Finance Department after the Work is finally inspected and accepted by Project Manager as set forth with Section 20.1 herein, provided that Contractor first, and as an explicit condition precedent to the accrual of Contractor's right to final payment, shall have furnished Owner with a properly executed and notarized copy of the Release and Affidavit attached as Exhibit C, as well as, a duly executed copy of the Surety's consent to final payment and such other documentation that may be required by the Contract Documents and the Owner. Prior to release of final payment and final retainage, the Contractor's Representative and the Project Manager shall jointly complete the Final Payment Checklist, a representative copy of which is attached to this Agreement as Exhibit G. 6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and all claims by Contractor against Owner arising out of this Agreement or otherwise relating to the Project,except those previously made in writing in accordance with the requirements of the Contract Documents and identified by Contractor as unsettled in its final Application for Payment. Neither the acceptance of the Work nor payment by Owner shall be deemed to be a waiver of Owner's right to enforce any obligations of Contractor hereunder or to the recovery of damages for defective Work not discovered by the Design Professional or Project Manager at the time of final inspection. 33 Construction Services Agreement:Revised 072118(v6) 7. SUBMITTALS AND SUBSTITUTIONS. 7.1 Contractor shall carefully examine the Contract Documents for all requirements for approval of materials to be submitted such as shop drawings, data, test results, schedules and samples. Contractor shall submit all such materials at its own expense and in such form as required by the Contract Documents in sufficient time to prevent any delay in the delivery of such materials and the installation thereof. 7.2 Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier, the naming of the item is intended to establish the type, function and quality required. Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other suppliers may be accepted by Owner if sufficient information is submitted by Contractor to allow the Owner to determine that the material or equipment proposed is equivalent or equal to that named. Requests for review of substitute items of material and equipment will not be accepted by Owner from anyone other than Contractor and all such requests must be submitted by Contractor to Project Manager within thirty (30) calendar days after Notice of Award is received by Contractor, unless otherwise mutually agreed in writing by Owner and Contractor. 7.3 If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor shall make application to the Project Manager for acceptance thereof, certifying that the proposed substitute shall adequately perform the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that specified. The application shall state that the evaluation and acceptance of the proposed substitute will not prejudice Contractor's achievement of substantial completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents(or in the provisions of any other direct contract with Owner for the Project) to adapt the design to the proposed substitute and whether or not incorporation or use by the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service shall be indicated. The application also shall contain an itemized estimate of all costs that will result directly or indirectly from acceptance of such substitute, including costs for redesign and claims of other contractors affected by the resulting change, all of which shall be considered by the Project Manager in evaluating the proposed substitute. The Project Manager may require Contractor to furnish at Contractor's expense additional data about the proposed substitute. 7.4 If a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, sequence, technique or procedure of construction acceptable to the Project Manager, if Contractor submits sufficient information to allow the Project Manager to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents. The procedures for submission to and review by the Project Manager shall be the same as those provided herein for substitute materials and equipment. 7.5 The Project Manager shall be allowed a reasonable time within which to evaluate each proposed substitute and, if need be, to consult with the Design Professional. No substitute will be ordered, installed or utilized without the Project Manager's prior written acceptance which shall be evidenced by a Change Order, a Work Directive Change, a Field Order or an approved Shop Drawing. The Owner may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute. The Project Manager will 34 Construction Services Agreement:Revised 072118(v6) record time required by the Project Manager and the Project Manager's consultants in evaluating substitutions proposed by Contractor and making changes in the Contract Documents occasioned thereby. Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse Owner for the charges of the Design Professional and the Design Professional's consultants for evaluating each proposed substitute. 8. DAILY REPORTS, SIGNED AND SEALED AS-BUILTS AND MEETINGS. 8.1 Unless waived in writing by Owner, Contractor shall complete and submit to Project Manager on a weekly basis a daily log of the Contractor's work for the preceding week in a format approved by the Project Manager. The daily log shall document all activities of Contractor at the Project site including, but not limited to, the following: 8.1.1 Weather conditions showing the high and low temperatures during work hours, the amount of precipitation received on the Project site, and any other weather conditions which adversely affect the Work; 8.1.2 Soil conditions which adversely affect the Work; 8.1.3 The hours of operation by Contractor's and Sub-Contractor's personnel; 8.1.4 The number of Contractor's and Sub-Contractor's personnel present and working at the Project site, by subcontract and trade; 8.1.5 All equipment present at the Project site, description of equipment use and designation of time equipment was used (specifically indicating any down time); 8.1.6 Description of Work being performed at the Project site; 8.1.7 Any unusual or special occurrences at the Project site; 8.1.8 Materials received at the Project site; 8.1.9 A list of all visitors to the Project 8.1.10 Any problems that might impact either the cost or quality of the Work or the time of performance. The daily log shall not constitute nor take the place of any notice required to be given by Contractor to Owner pursuant to the Contract Documents. 8.2 Contractor shall maintain in a safe place at the Project site one record copy of the Contract Documents, including, but not limited to, all drawings, specifications, addenda, amendments, Change Orders, Work Directive Changes and Field Orders, as well as all written interpretations and clarifications issued by the Design Professional, in good order and annotated to show all changes made during construction. The annotated drawings shall be continuously updated by the Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Work Directive Changes and Field Orders, and all concealed and buried installations of piping, conduit and utility services. All buried and concealed items, both inside and outside the Project site, shall be accurately located on the annotated drawings as to depth and in relationship to not less than two (2) permanent features 35 Construction Services Agreement:Revised 072118(v6) (e.g. interior or exterior wall faces). The annotated drawings shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in a contrasting color. The "As-Built" record documents, together with all approved samples and a counterpart of all approved shop drawings shall be available to the Project Manager or Design Professional for reference. Upon completion of the Work and as a condition precedent to Contractor's entitlement to final payment, these "As-Built" record documents, samples and shop drawings shall be delivered to Project Manager by Contractor for Owner. 8.3 Contractor shall keep all records and supporting documentation, which concern or relate to the Work hereunder for a minimum of five (5) years from the date of termination of this Agreement or the date the Project is completed or such longer period as may be required by law, whichever is later, pursuant to Florida Public Records Law Chapter 119 and comply with specifically those contractual requirements in 119.0701(2)(a)-(b) as follows: IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: Communication and Customer Relations Division 3299 Tamiami Trail East, Suite 102 Naples, FL 34112-5746 Telephone: (239) 252-8999 The Contractor must specifically comply with the Florida Public Records Law to: 1. Keep and maintain public records required by the public agency to perform the service. 2. Upon request from the public agency's custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the public agency. 4. Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the Contractor or keep and maintain public records required by the public agency to perform the service. If the Contractor transfers all public records to the public agency upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency's custodian of public records, in a format that is compatible with the information technology systems of the public agency. 9. CONTRACT TIME AND TIME EXTENSIONS. 9.1 Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and material-men, as well as coordinating its Work with all 36 Construction Services Agreement:Revised 072118(v6) work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures, as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's suppliers and contractors as set forth in Paragraph 12.2. herein. 9.2 Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. 9.3 No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of its duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage For Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 9.4 In no event shall any approval by Owner authorizing Contractor to continue performing Work under this Agreement or any payment issued by Owner to Contractor be deemed a waiver of any right or claim Owner may have against Contractor for delay damages hereunder. 10. CHANGES IN THE WORK. 10.1 Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any alleged changes must be approved by Owner in writing prior to starting such items. Owner will not be responsible for the costs of any changes commenced without Owner's express prior written approval. Failure to obtain such prior written approval for any changes will be deemed: (i) a waiver of any claim by Contractor for such items and (ii) an admission by Contractor that such items are in fact not a change but rather are part of the Work required of Contractor hereunder. 10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change Order in the manner as Owner and Contractor shall mutually agree. 10.3 If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work 37 Construction Services Agreement:Revised 072118(v6) Directive. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 11 of these General Conditions or else be deemed to have waived any claim on this matter it might otherwise have had. 10.4 In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10%) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all Subcontractors' and sub-subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5%) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15%). All compensation due Contractor and any Subcontractor or sub-subcontractor for field and home office overhead is included in the markups noted above. No markup shall be placed on sales tax, shipping or subcontractor markup. 10.5 Owner shall have the right to conduct an audit of Contractor's books and records to verify the accuracy of the Contractor's claim with respect to Contractor's costs associated with any Change Order or Work Directive Change. 10.6 The Project Manager shall have authority to order minor changes in the Work not involving an adjustment to the Contract Amount or an extension to the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes may be effected by Field Order or by other written order. Such changes shall be binding on the Contractor. 10.7 Any modifications to this Contract shall be in compliance with the County procurement ordinance and policies and Administrative Procedures in effect at the time such modifications are authorized. 11. CLAIMS AND DISPUTES. 11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time or other relief with respect to the terms of the Contract Documents. The term "Claim"also includes other disputes and matters in question between Owner and Contractor arising out of or relating to the Contract Documents. The responsibility to substantiate a Claim shall rest with the party making the Claim. 11.2 Claims by the Contractor shall be made in writing to the Project Manager within forty-eight (48) hours from when the Contractor knew or should have known of the event giving rise to such Claim or else the Contractor shall be deemed to have waived the Claim. Written supporting data shall be submitted to the Project Manager within fifteen (15) calendar days after the occurrence of the event, unless the Owner grants additional time in writing, or else the Contractor shall be deemed to have waived the Claim. All Claims shall be priced in accordance with the provisions of Subsection 10.4. 11.3 The Contractor shall proceed diligently with its performance as directed by the Owner, regardless of any pending Claim, action, suit or administrative proceeding, unless otherwise agreed to by the Owner in writing. Owner shall continue to make payments in accordance with the Contract Documents during the pendency of any Claim. 38 Construction Services Agreement:Revised 072118(v6) 12. OTHER WORK. 12.1 Owner may perform other work related to the Project at the site by Owner's own forces, have other work performed by utility owners or let other direct contracts. If the fact that such other work is to be performed is not noted in the Contract Documents, written notice thereof will be given to Contractor prior to starting any such other work. If Contractor believes that such performance will involve additional expense to Contractor or require additional time, Contractor shall send written notice of that fact to Owner and Design Professional within forty-eight(48) hours of being notified of the other work. If the Contractor fails to send the above required forty-eight (48) hour notice, the Contractor will be deemed to have waived any rights it otherwise may have had to seek an extension to the Contract Time or adjustment to the Contract Amount. 12.2 Contractor shall afford each utility owner and other contractor who is a party to such a direct contract (or Owner, if Owner is performing the additional work with Owner's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work and shall properly connect and coordinate its Work with theirs. Contractor shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of the Project Manager and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other Contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.3 If any part of Contractor's Work depends for proper execution or results upon the work of any other contractor or utility owner (or Owner), Contractor shall inspect and promptly report to Project Manager in writing any delays, defects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. Contractor's failure to report will constitute an acceptance of the other work as fit and proper for integration with Contractor's Work. 13. INDEMNIFICATION AND INSURANCE. 13.1 To the maximum extent permitted by Florida law, the Contractor shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. 13.2 The duty to defend under this Article 13 is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, Owner and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to Contractor. Contractor's obligation to indemnify and defend under this Article 13 will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the Owner or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 13.3 Contractor shall obtain and carry, at all times during its performance under the Contract Documents, insurance of the types and in the amounts set forth in Exhibit B-3 to the Agreement. 39 Construction Services Agreement:Revised 072118(v6) Further, the Contractor shall at all times comply with all of the terms, conditions, requirements and obligations set forth under Exhibit B-3. 14. COMPLIANCE WITH LAWS. 14.1 Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, worker's compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Project Manager in writing. To the extent any law, rule, regulation, code, statute, or ordinance requires the inclusion of certain terms in this Agreement in order for this Agreement to be enforceable,such terms shall be deemed included in this Agreement. Notwithstanding anything in the Contract Documents to the contrary, it is understood and agreed that in the event of a change in any applicable laws, ordinances, rules or regulations subsequent to the date this Agreement was executed that increases the Contractor's time or cost of performance of the Work, Contractor is entitled to a Change Order for such increases, except to the extent Contractor knew or should have known of such changes prior to the date of this Agreement. 14.2 By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 14.3 Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States. The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet- based means of verifying employment eligibility of workers in the United States; it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: • Commodity based procurement where no services are provided. • Where the requirement for the affidavit is waived by the Board of County Commissioners Contractors/Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Contractor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Contractors are also required to provide the Collier County Procurement Services Division an executed affidavit certifying they shall comply with the E-Verify Program. The affidavit is attached to the solicitation documents. If the Bidder/Contractor does not comply with providing both the acceptable E-Verify evidence and the executed affidavit the bidder's/Contractor's proposal may be deemed non- responsive. 40 Construction Services Agreement:Revised 072118(v6) C,P-l) Additionally, Contractors shall require all subcontracted Contractors to use the E-Verify system for all purchases not covered under the "Exceptions to the program" clause above. For additional information regarding the Employment Eligibility Verification System (E-Verify) program visit the following website: http://www.dhs.gov/E-Verify. It shall be the Contractor's responsibility to familiarize themselves with all rules and regulations governing this program. Contractor acknowledges, and without exception or stipulation, any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324,et seq. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s)to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. 15. CLEANUP AND PROTECTIONS. 15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 15.2 Any existing surface or subsurface improvements, including, but not limited to, pavements, curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery, not indicated in the Contract Documents to be removed or altered, shall be protected by Contractor from damage during the prosecution of the Work. Subject to the Section 2.3 above, any such improvements so damaged shall be restored by Contractor to the condition equal to that existing at the time of Contractor's commencement of the Work. 16. ASSIGNMENT. 16.1 Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. Any attempt to assign or otherwise transfer this Agreement, or any part herein, without the Owner's consent, shall be void. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 17. PERMITS, LICENSES AND TAXES. 17.1 Pursuant to Section 218.80, F.S., Owner will pay for all Collier County permits and fees, including license fees, permit fees, impact fees or inspection fees applicable to the Work through an internal budget transfer(s). Contractor is not responsible for paying for permits issued by Collier County, but Contractor is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier County agencies when the Contractor is acquiring permits. Owner will not be obligated to pay for any permits obtained by Subcontractors. 17.2 All permits,fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. 41 Construction Services Agreement:Revised 072118(v6) 17.3 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 18. TERMINATION FOR DEFAULT. 18.1 Contractor shall be considered in material default of the Agreement and such default shall be considered cause for Owner to terminate the Agreement, in whole or in part, as further set forth in this Section, if Contractor: (1) fails to begin the Work under the Contract Documents within the time specified herein; or (2) fails to properly and timely perform the Work as directed by the Project Manager or as provided for in the approved Progress Schedule;or(3) performs the Work unsuitably or neglects or refuses to remove materials or to correct or replace such Work as may be rejected as unacceptable or unsuitable; or (4) discontinues the prosecution of the Work; or (5) fails to resume Work which has been suspended within a reasonable time after being notified to do so; or (6) becomes insolvent or is declared bankrupt, or commits any act of bankruptcy; or(7) allows any final judgment to stand against it unsatisfied for more than ten (10) days; or(8) makes an assignment for the benefit of creditors; or (9) fails to obey any applicable codes, laws, ordinances, rules or regulations with respect to the Work; or(10) materially breaches any other provision of the Contract Documents. 18.2 Owner shall notify Contractor in writing of Contractor's default(s). If Owner determines that Contractor has not remedied and cured the default(s)within seven(7)calendar days following receipt by Contractor of said written notice or such longer period of time as may be consented to by Owner in writing and in its sole discretion, then Owner, at its option, without releasing or waiving its rights and remedies against the Contractor's sureties and without prejudice to any other right or remedy it may be entitled to hereunder or by law, may terminate Contractor's right to proceed under the Agreement, in whole or in part, and take possession of all or any portion of the Work and any materials, tools, equipment, and appliances of Contractor, take assignments of any of Contractor's subcontracts and purchase orders, and complete all or any portion of Contractor's Work by whatever means, method or agency which Owner, in its sole discretion, may choose. 18.3 If Owner deems any of the foregoing remedies necessary, Contractor agrees that it shall not be entitled to receive any further payments hereunder until after the Project is completed. All moneys expended and all of the costs, losses, damages and extra expenses, including all management, administrative and other overhead and other direct and indirect expenses (including Design Professional and attorneys' fees) or damages incurred by Owner incident to such completion, shall be deducted from the Contract Amount, and if such expenditures exceed the unpaid balance of the Contract Amount, Contractor agrees to pay promptly to Owner on demand the full amount of such excess, including costs of collection, attorneys' fees (including appeals) and interest thereon at the maximum legal rate of interest until paid. If the unpaid balance of the Contract Amount exceeds all such costs, expenditures and damages incurred by the Owner to complete the Work, such excess shall be paid to the Contractor. The amount to be paid to the Contractor or Owner, as the case may be, shall be approved by the Project Manager, upon application, and this obligation for payment shall survive termination of the Agreement. 18.4 The liability of Contractor hereunder shall extend to and include the full amount of any and all sums paid, expenses and losses incurred, damages sustained, and obligations assumed by Owner in good faith under the belief that such payments or assumptions were necessary or required, in completing the Work and providing labor, materials, equipment,supplies, and other items therefore or re-letting the Work, and in settlement, discharge or compromise of any claims, demands, suits, and judgments pertaining to or arising out of the Work hereunder. 42 Construction Services Agreement:Revised 072118(v6) 18.5 If, after notice of termination of Contractor's right to proceed pursuant to this Section, it is determined for any reason that Contractor was not in default, or that its default was excusable, or that Owner is not entitled to the remedies against Contractor provided herein, then the termination will be deemed a termination for convenience and Contractor's remedies against Owner shall be the same as and limited to those afforded Contractor under Section 19 below. 18.6 In the event (i) Owner fails to make any undisputed payment to Contractor within thirty (30) days after such payment is due or Owner otherwise persistently fails to fulfill some material obligation owed by Owner to Contractor under this Agreement, and (ii) Owner has failed to cure such default within fourteen (14) days of receiving written notice of same from Contractor, then Contractor may stop its performance under this Agreement until such default is cured, after giving Owner a second fourteen (14) days written notice of Contractor's intention to stop performance under the Agreement. If the Work is so stopped for a period of one hundred and twenty(120)consecutive days through no act or fault of the Contractor or its Subcontractors or their agents or employees or any other persons performing portions of the Work under contract with the Contractor or any Subcontractor, the Contractor may terminate this Agreement by giving written notice to Owner of Contractor's intent to terminate this Agreement. If Owner does not cure its default within fourteen (14) days after receipt of Contractor's written notice, Contractor may, upon fourteen (14) additional days' written notice to the Owner, terminate the Agreement and recover from the Owner payment for Work performed through the termination date, but in no event shall Contractor be entitled to payment for Work not performed or any other damages from Owner. 19. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION. 19.1 Owner shall have the right to terminate this Agreement without cause upon seven (7) calendar days written notice to Contractor. In the event of such termination for convenience, Contractor's recovery against Owner shall be limited to that portion of the Contract Amount earned through the date of termination, together with any retainage withheld and reasonable termination expenses incurred, but Contractor shall not be entitled to any other or further recovery against Owner, including, but not limited to, damages or any anticipated profit on portions of the Work not performed. 19.2 Owner shall have the right to suspend all or any portions of the Work upon giving Contractor not less than two (2) calendar days' prior written notice of such suspension. If all or any portion of the Work is so suspended, Contractor's sole and exdusive remedy shall be to seek an extension of time to its schedule in accordance with the procedures set forth in the Contract Documents. In no event shall the Contractor be entitled to any additional compensation or damages. Provided, however, if the ordered suspension exceeds six (6) months, the Contractor shall have the right to terminate the Agreement with respect to that portion of the Work which is subject to the ordered suspension. 20. COMPLETION. 20.1 When the entire Work(or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Project Manager in writing that the entire Work (or such designated portion)is substantially complete.Within a reasonable time thereafter, Owner, Contractor and Design Professional shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner, after conferring with the Design Professional, does not consider the Work (or designated portion) substantially complete, Project Manager shall notify Contractor in writing giving the reasons therefore. If Owner, after conferring with the Design Professional, considers the Work (or designated portion) substantially complete, Project Manager 43 Construction Services Agreement:Revised 072118(v6) CA° shall prepare and deliver to Contractor a Certificate of Substantial Completion which shall fix the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punch-list of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portion thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punch-list. The Project Manager, shall coordinate with the Contractor the return of any surplus assets, including materials, supplies, and equipment. 20.2 Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Project Manager and Design Professional will make such inspection and, if they find the Work acceptable and fully performed under the Contract Documents shall promptly approve payment, recommending that, on the basis of their observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Neither the final payment nor the retainage shall become due and payable until Contractor submits: (1) Receipt of Contractor's Final Application for Payment. (2) The Release and Affidavit in the form attached as Exhibit C. (3) Consent of surety to final payment. (4) Receipt of the final payment check list. (5) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipts, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the Work's acceptability, even though the Design Professional may have issued its recommendations. Unless and until the Owner is completely satisfied, neither the final payment nor the retainage shall become due and payable. 21. WARRANTY. 21.1 Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any subcontractor or material men supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers,fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one(1)year after Substantial Completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. Further, in the event of an emergency, Owner may commence to correct any defective Work, without prior notice to Contractor, at Contractor's expense. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 44 Construction Services Agreement:Revised 072118(v6) CEO 21.2 No later than 30 days prior to expiration of the warranty, the Project Manager, or another representative of the Owner, shall conduct an inspection of the warranted work to verify compliance with the requirements of the Agreement. The Contractor's Representative shall be present at the time of inspection and shall take remedial actions to correct any deficiencies noted in the inspection. Failure of the Contractor to correct the cited deficiencies shall be grounds for the Owner to disqualify the Contractor from future bid opportunities with the Owner, in addition to any other rights and remedies available to Owner. 22. TESTS AND INSPECTIONS. 22.1 Owner, Design Professional, their respective representatives, agents and employees, and governmental agencies with jurisdiction over the Project shall have access at all times to the Work, whether the Work is being performed on or off of the Project site, for their observation, inspection and testing. Contractor shall provide proper, safe conditions for such access. Contractor shall provide Project Manager with timely notice of readiness of the Work for all required inspections, tests or approvals. 22.2 If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish Project Manager the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Project Manager. 22.3 Contractor is responsible, without reimbursement from Owner, for re-inspection fees and costs; to the extent such re-inspections are due to the fault or neglect of Contractor. 22.4 If any Work that is to be inspected,tested or approved is covered without written concurrence from the Project Manager, such work must, if requested by Project Manager, be uncovered for observation. Such uncovering shall be at Contractor's expense unless Contractor has given Project Manager timely notice of Contractor's intention to cover the same and Project Manager has not acted with reasonable promptness to respond to such notice. If any Work is covered contrary to written directions from Project Manager, such Work must, if requested by Project Manager, be uncovered for Project Manager's observation and be replaced at Contractor's sole expense. 22.5 The Owner shall charge to Contractor and may deduct from any payments due Contractor all engineering and inspection expenses incurred by Owner in connection with any overtime work. Such overtime work consisting of any work during the construction period beyond the regular eight(8)hour day and for any work performed on Saturday, Sunday or holidays. 22.6 Neither observations nor other actions by the Project Manager or Design Professional nor inspections, tests or approvals by others shall relieve Contractor from Contractor's obligations to perform the Work in accordance with the Contract Documents. 23. DEFECTIVE WORK. 23.1 Work not conforming to the requirements of the Contract Documents or any warranties made or assigned by Contractor to Owner shall be deemed defective Work. If required by Project Manager, Contractor shall as directed, either correct all defective Work, whether or not fabricated, installed or completed, or if the defective Work has been rejected by Project Manager, remove it from the site and replace it with non-defective Work. Contractor shall bear all direct, indirect and consequential 45 Construction Services Agreement:Revised 072118(v6) costs of such correction or removal (including, but not limited to fees and charges of engineers, architects, attorneys and other professionals) made necessary thereby, and shall hold Owner harmless for same. 23.2 If the Project Manager considers it necessary or advisable that covered Work be observed by Design Professional or inspected or tested by others and such Work is not otherwise required to be inspected or tested, Contractor, at Project Manager's request, shall uncover, expose or otherwise make available for observation, inspection or tests as Project Manager may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, Contractor shall bear all direct, indirect and consequential costs of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction (including, but not limited to, fees and charges of engineers, architects, attorneys and other professionals), and Owner shall be entitled to an appropriate decrease in the Contract Amount. If, however, such Work is not found to be defective, Contractor shall be allowed an increase in the Contract Amount and/or an extension to the Contract Time, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction. 23.3 If any portion of the Work is defective, or if Contractor fails to supply sufficient skilled workers, suitable materials or equipment or fails to finish or perform the Work in such a way that the completed Work will conform to the Contract Documents, Project Manager may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated. The right of Project Manager to stop the Work shall be exercised, if at all, solely for Owner's benefit and nothing herein shall be construed as obligating the Project Manager to exercise this right for the benefit of Design Engineer, Contractor, or any other person. 23.4 Should the Owner determine, at its sole opinion, it is in the Owner's best interest to accept defective Work, the Owner may do so. Contractor shall bear all direct, indirect and consequential costs attributable to the Owner's evaluation of and determination to accept defective Work. If such determination is rendered prior to final payment, a Change Order shall be executed evidencing such acceptance of such defective Work, incorporating the necessary revisions in the Contract Documents and reflecting an appropriate decrease in the Contract Amount. If the Owner accepts such defective Work after final payment, Contractor shall promptly pay Owner an appropriate amount to adequately compensate Owner for its acceptance of the defective Work. 23.5 If Contractor fails, within a reasonable time after the written notice from Project Manager, to correct defective Work or to remove and replace rejected defective Work as required by Project Manager or Owner, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any of the provisions of the Contract Documents, Owner may, after seven (7) days written notice to Contractor, correct and remedy any such deficiency. Provided, however, Owner shall not be required to give notice to Contractor in the event of an emergency. To the extent necessary to complete corrective and remedial action, Owner may exclude Contractor from any or all of the Project site, take possession of all or any part of the Work, and suspend Contractor's services related thereto,take possession of Contractor's tools, appliances, construction equipment and machinery at the Project site and incorporate in the Work all materials and equipment stored at the Project site or for which Owner has paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Design Professional and their respective representatives, agents, and employees such access to the Project site as may be necessary to enable Owner to exercise the rights and remedies under this paragraph. All direct, indirect and consequential costs of Owner in exercising such rights and remedies shall be charged against Contractor, and a Change Order shall be issued, incorporating the necessary revisions to the Contract Documents, including an appropriate decrease to the Contract Amount. Such direct, indirect and consequential costs shall 46 Construction Services Agreement:Revised 072118(v6) CAO include, but not be limited to, fees and charges of engineers, architects, attorneys and other professionals, all court costs and all costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of Contractor's defective Work. Contractor shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by Owner of Owner's rights and remedies hereunder. 24. SUPERVISION AND SUPERINTENDENTS. 24.1 Contractor shall plan, organize, supervise, schedule, monitor, direct and control the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be responsible to see that the finished Work complies accurately with the Contract Documents. Contractor shall keep on the Work at all times during its progress a competent resident superintendent, who shall be subject to Owner's approval and not be replaced without prior written notice to Project Manager except under extraordinary circumstances. The superintendent shall be employed by the Contractor and be the Contractor's representative at the Project site and shall have authority to act on behalf of Contractor. All communications given to the superintendent shall be as binding as if given to the Contractor. Owner shall have the right to direct Contractor to remove and replace its Project superintendent, with or without cause. Attached to the Agreement as Exhibit A-1 is a list identifying Contractor's Project Superintendent and all of Contractor's key personnel who are assigned to the Project; such identified personnel shall not be removed without Owner's prior written approval, and if so removed must be immediately replaced with a person acceptable to Owner. 24.2 Contractor shall have a competent superintendent on the project at all times whenever contractor's work crews, or work crews of other parties authorized by the Project Manager are engaged in any activity whatsoever associated with the Project. Should the Contractor fail to comply with the above condition, the Project Manager shall, at his discretion, deduct from the Contractor's monthly pay estimate, sufficient moneys to account for the Owner's loss of adequate project supervision, not as a penalty, but as liquidated damages, separate from the liquidated damages described in Section 5.B, for services not rendered. 25. PROTECTION OF WORK. 25.1 Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or any one for whom Contractor is legally liable for is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any moneys necessary to replace such loss or damage shall be deducted from any amounts due Contractor. 25.2 Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 25.3 Contractor shall not disturb any benchmark established by the Owner or Design Professional with respect to the Project. If Contractor, or its subcontractors, agents or anyone for whom Contractor is legally liable, disturbs the Owner or Design Professional's benchmarks, Contractor shall immediately notify Project Manager and Design Professional. The Owner or Design Professional shall re-establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith 47 Construction Services Agreement:Revised 072118(v6) 26. EMERGENCIES. 26.1 In the event of an emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor,without special instruction or authorization from Owner or Design Professional is obligated to act to prevent threatened damage, injury or loss. Contractor shall give Project Manager written notice within forty-eight (48) hours after Contractor knew or should have known of the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Project Manager determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty-eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 27. USE OF PREMISES. 27.1 Contractor shall maintain all construction equipment, the storage of materials and equipment and the operations of workers to the Project site and land and areas identified in and permitted by the Contract Documents and other lands and areas permitted by law, rights of way, permits and easements, and shall not unreasonably encumber the Project site with construction equipment or other material or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or any land or areas contiguous thereto, resulting from the performance of the Work. 28. SAFETY. 28.1 Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 28.1.1 All employees on or about the project site and other persons and/or organizations who may be affected thereby; 28.1.2 All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Project site; and 28.1.3 Other property on Project site or adjacent thereto, including trees, shrubs, walks, pavements, roadways, structures, utilities and any underground structures or improvements not designated for removal, relocation or replacement in the Contract Documents. 28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and regulations of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. Contractor shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of underground structures and improvements and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation or replacement of their property. Contractor's duties and responsibilities for the safety and protection of the Work shall continue until such time as the Work is completed and final acceptance of same by Owner has occurred. 48 Construction Services Agreement:Revised 072118(v6) All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 28.3. Contractor shall designate a responsible representative located on a full time basis at the Project site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to Owner. 28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner property. All employees of Contractor, as well as those of all subcontractors and those of any other person or entity for whom Contractor is legally liable (collectively referred to herein as "Employees"), shall not possess or be under the influence of any such substances while on any Owner property. Further, Employees shall not bring on to any Owner property any gun, rifle or other firearm, or explosives of any kind. 28.5 Contractor acknowledges that the Work may be progressing on a Project site which is located upon or adjacent to an existing Owner facility. In such event, Contractor shall comply with the following: 28.5.1 All Owner facilities are smoke free. Smoking is strictly prohibited; 28.5.2 All Employees shall be provided an identification badge by Contractor. Such identification badge must be prominently displayed on the outside of the Employees' clothing at all times. All Employees working at the Project site must log in and out with the Contractor each day; 28.5.3 Contractor shall strictly limit its operations to the designated work areas and shall not permit any Employees to enter any other portions of Owner's property without Owner's expressed prior written consent; 28.5.4 All Employees are prohibited from distributing any papers or other materials upon Owner's property, and are strictly prohibited from using any of Owner's telephones or other office equipment; 28.5.5 All Employees shall at all times comply with the OSHA regulations with respect to dress and conduct at the Project site. Further, all Employees shall comply with the dress, conduct and facility regulations issued by Owner's officials onsite, as said regulations may be changed from time to time; 28.5.6 All Employees shall enter and leave Owner's facilities only through the ingress and egress points identified in the site utilization plan approved by Owner or as otherwise designated, from time to time, by Owner in writing; 28.5.7 When requested, Contractor shall cooperate with any ongoing Owner investigation involving personal injury, economic loss or damage to Owner's facilities or personal property therein; 28.5.8 The Employees may not solicit, distribute or sell products while on Owner's property. Friends, family members or other visitors of the Employees are not permitted on Owner's property; and 49 Construction Services Agreement:Revised 072118(v6) 28.5.9 At all times, Contractor shall adhere to Owner's safety and security regulations, and shall comply with all security requirements at Owner's facilities, as said regulations and requirements may be modified or changed by Owner from time to time. 29. PROJECT MEETINGS. Prior to the commencement of Work, the Contractor shall attend a pre-construction conference with the Project Manager, Design Professional and others as appropriate to discuss the Progress Schedule, procedures for handling shop drawings and other submittals, and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. During the prosecution of the Work, the Contractor shall attend any and all meetings convened by the Project Manager with respect to the Project, when directed to do so by Project Manager or Design Professional. The Contractor shall have its subcontractors and suppliers attend all such meetings (including the pre-construction conference) as may be directed by the Project Manager. 30. VENDOR PERFORMANCE EVALUATION. Owner has implemented a Vendor Performance Evaluation System for all contracts awarded in excess of $25,000. To this end, vendors will be evaluated on their performance upon completion/termination of this Agreement. 31. MAINTENANCE OF TRAFFIC POLICY. For all projects that are conducted within a Collier County Right-of-Way, the Contractor shall provide and erect Traffic Control Devices as prescribed in the current edition of the Manual On Uniform Traffic Control Devices (MUTCD), where applicable on local roadways and as prescribed in the Florida Department of Transportation's Design Standards(DS),where applicable on state roadways. These projects shall also comply with Collier County's Maintenance of Traffic Policy, #5807, incorporated herein by reference. Copies are available through Risk Management and/or Procurement Services Division, and is available on-line at colliergov.net/purchasing. The Contractor will be responsible for obtaining copies of all required manuals, MUTCD, FDOT Roadway & Traffic Design Standards Indexes, or other related documents, so to become familiar with their requirements. Strict adherence to the requirements of the Maintenance of Traffic ("MOT") policy will be enforced under this Contract. All costs associated with the Maintenance of Traffic shall be included on the line item on the bid page. If MOT is required, MOT is to be provided within ten (10) days of receipt of Notice of Award. 32. SALES TAX SAVINGS AND DIRECT PURCHASE. 32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. Additionally, as directed by Owner and at no additional cost to Owner, Contractor shall comply with and fully implement the sales tax savings program with respect to the Work, as set forth in section 32.2 below: 32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from sales tax and may wish to generate sales tax savings for the Project, Owner reserves the right to make direct purchases of various construction materials and equipment included in the Work("Direct Purchase"). 50 Construction Services Agreement:Revised 072118(v6) - Contractor shall prepare purchase orders to vendors selected by Contractor,for execution by Owner, on forms provided by Owner. Contractor shall allow two weeks for execution of all such purchase orders by Owner. Contractor represents and warrants that it will use its best efforts to cooperate with Owner in implementing this sales tax savings program in order to maximize cost savings for the Project. Adjustments to the Contract Amount will be made by appropriate Change Orders for the amounts of each Owner Direct Purchase, plus the saved sales taxes. A Change Order shall be processed promptly after each Direct Purchase, or group of similar or related Direct Purchases, unless otherwise mutually agreed upon between Owner and Contractor. With respect to all Direct Purchases by Owner, Contractor shall remain responsible for coordinating, ordering, inspecting, accepting delivery, storing, handling, installing, warranting and quality control for all Direct Purchases. Notwithstanding anything herein to the contrary, Contractor expressly acknowledges and agrees that all Direct Purchases shall be included within and covered by Contractor's warranty to Owner to the same extent as all other warranties provided by Contractor pursuant to the terms of the Contract Documents. In the event Owner makes a demand against Contractor with respect to any Direct Purchase and Contractor wishes to make claim against the manufacturer or supplier of such Direct Purchase, upon request from Contractor Owner shall assign to Contractor any and all warranties and Contract rights Owner may have from any manufacturer or supplier of any such Direct Purchase by Owner. 32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for sale tax under Chapter 212, Florida Statutes, and for its responsibilities for Federal excise taxes. 33. SUBCONTRACTS. 33.1 Contractor shall review the design and shall determine how it desires to divide the sequence of construction activities. Contractor will determine the breakdown and composition of bid packages for award of subcontracts, based on the current Project Milestone Schedule, and shall supply a copy of that breakdown and composition to Owner and Design Professional for their review and approval prior to submitting its first Application for Payment. Contractor shall take into consideration such factors as natural and practical lines of severability,sequencing effectiveness, access and availability constraints, total time for completion, construction market conditions, availability of labor and materials, community relations and any other factors pertinent to saving time and costs. 33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying or providing any portion of the Work pursuant to a contract with Contractor. Contractor shall be solely responsible for and have control over the Subcontractors. Contractor shall negotiate all Change Orders, Work Directive Changes, Field Orders and Requests for Proposal, with all affected Subcontractors and shall review the costs of those proposals and advise Owner and Design Professional of their validity and reasonableness, acting in Owner's best interest, prior to requesting approval of any Change Order from Owner. All Subcontractors performing any portion of the Work on this Project must be "qualified" as defined in Collier County Ordinance 2013-69, meaning a person or entity that has the capability in all respects to perform fully the Agreement requirements with respect to its portion of the Work and has the integrity and reliability to assure good faith performance. 33.3 In addition to those Subcontractors identified in Contractor's bid that were approved by Owner, Contractor also shall identify any other Subcontractors, including their addresses, licensing information and phone numbers, it intends to utilize for the Project prior to entering into any subcontract or purchase order and prior to the Subcontractor commencing any work on the Project. The list identifying each Subcontractor cannot be modified, changed, or amended without prior written approval from Owner. Any and all Subcontractor work to be self-performed by Contractor must be approved in writing by Owner in its sole discretion prior to commencement of such work. 51 Construction Services Agreement:Revised 072118(v6) ID Contractor shall continuously update that Subcontractor list, so that it remains current and accurate throughout the entire performance of the Work. 33.4 Contractor shall not enter into a subcontract or purchase order with any Subcontractor, if Owner reasonably objects to that Subcontractor. Contractor shall not be required to contract with anyone it reasonably objects to. Contractor shall keep on file a copy of the license for every Subcontractor and sub-subcontractor performing any portion of the Work, as well as maintain a log of all such licenses.All subcontracts and purchase orders between Contractor and its Subcontractors shall be in writing and are subject to Owner's approval. Further, unless expressly waived in writing by Owner, all subcontracts and purchase orders shall (1) require each Subcontractor to be bound to Contractor to the same extent Contractor is bound to Owner by the terms of the Contract Documents, as those terms may apply to the portion of the Work to be performed by the Subcontractor, (2)provide for the assignment of the subcontract or purchase order from Contractor to Owner at the election of Owner upon termination of Contractor, (3) provide that Owner will be an additional indemnified party of the subcontract or purchase order, (4) provide that Owner, Collier County Government, will be an additional insured on all liability insurance policies required to be provided by the Subcontractor except workman's compensation and business automobile policies, (5) assign all warranties directly to Owner, and (6) identify Owner as an intended third-party beneficiary of the subcontract or purchase order. Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract, copies of the Contract Documents to which the Subcontractor will be bound. Each Subcontractor shall similarly make copies of such documents available to its sub- subcontractors. 33.5 Each Subcontractor performing work at the Project Site must agree to provide field (on-site) supervision through a named superintendent for each trade (e.g., general concrete forming and placement, masonry, mechanical, plumbing, electrical and roofing) included in its subcontract or purchase order. In addition, the Subcontractor shall assign and name a qualified employee for scheduling direction for its portion of the Work. The supervisory employees of the Subcontractor (including field superintendent, foreman and schedulers at all levels) must have been employed in a supervisory (leadership) capacity of substantially equivalent level on a similar project for at least two years within the last five years. The Subcontractor shall include a resume of experience for each employee identified by it to supervise and schedule its work. 33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and purchase orders shall provide: 33.6.1 That the Subcontractor's exclusive remedy for delays in the performance of the subcontract or purchase order caused by events beyond its control, including delays claimed to be caused by Owner or Design Professional or attributable to Owner or Design Professional and including claims based on breach of contract or negligence, shall be an extension of its contract time. 33.6.2 In the event of a change in the work, the Subcontractor's claim for adjustments in the contract sum are limited exclusively to its actual costs for such changes plus no more than 10% for overhead and profit. 33.6.3 The subcontract or purchase order, as applicable, shall require the Subcontractor to expressly agree that the foregoing constitute its sole and exclusive remedies for delays and changes in the Work and thus eliminate any other remedies for claim for increase in the contract price, damages, losses or additional compensation. Further, Contractor shall require all Subcontractors to similarly incorporate the terms of this Section 33.6 into their sub-subcontracts and purchase orders. 52 Construction Services Agreement:Revised 072118(v6) 33.6.4 Each subcontract and purchase order shall require that any claims by Subcontractor for delay or additional cost must be submitted to Contractor within the time and in the manner in which Contractor must submit such claims to Owner, and that failure to comply with such conditions for giving notice and submitting claims shall result in the waiver of such claims. 34. CONSTRUCTION SERVICES. 34.1 Contractor shall maintain at the Project site, originals or copies of, on a current basis, all Project files and records, including, but not limited to, the following administrative records: 34.1.1 Subcontracts and Purchase Orders 34.1.2 Subcontractor Licenses 34.1.3 Shop Drawing Submittal/Approval Logs 34.1.4 Equipment Purchase/Delivery Logs 34.1.5 Contract Drawings and Specifications with Addenda 34.1.6 Warranties and Guarantees 34.1.7 Cost Accounting Records 34.1.8 Labor Costs 34.1.9 Material Costs 34.1.10 Equipment Costs 34.1.11 Cost Proposal Request 34.1.12 Payment Request Records 34.1.13 Meeting Minutes 34.1.14 Cost-Estimates 34.1.15 Bulletin Quotations 34.1.16 Lab Test Reports 34.1.17 Insurance Certificates and Bonds 34.1.18 Contract Changes 34.1.19 Permits 34.1.20 Material Purchase Delivery Logs 34.1.21 Technical Standards 34.1.22 Design Handbooks 34.1.23 "As-Built" Marked Prints 34.1.24 Operating & Maintenance Instruction 34.1.25 Daily Progress Reports 34.1.26 Monthly Progress Reports 34.1.27 Correspondence Files 34.1.28 Transmittal Records 34.1.29 Inspection Reports 34.1.30 Punch Lists 34.1.31 PMIS Schedule and Updates 34.1.32 Suspense (Tickler) Files of Outstanding Requirements The Project files and records shall be available at all times to Owner and Design Professional or their designees for reference, review or copying. 34.2 Contractor Presentations At the discretion of the County, the Contractor may be required to provide a brief update on the Project to the Collier County Board of County Commissioners, "Board", up to two (2) times per contract term. Presentations shall be made in a properly advertised Public Meeting on a schedule 53 Construction Services Agreement:Revised 072118(v6) Ci-0 to be determined by the County Manager or his designee. Prior to the scheduled presentation date, the Contractor shall meet with appropriate County staff to discuss the presentation requirements and format. Presentations may include, but not be limited to, the following information: Original contract amount, project schedule, project completion date and any changes to the aforementioned since Notice to Proceed was issued. 35. SECURITY. The Contractor is required to comply with County Ordinance 2004-52, as amended. Background checks are valid for five (5) years and the Contractor shall be responsible for all associated costs. If required, Contractor shall be responsible for the costs of providing background checks by the Collier County Facilities Management Division for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four(4) years. All of Contractor's employees and subcontractors must wear Collier County Government Identification badges at all times while performing services on County facilities and properties. Contractor ID badges are valid for one (1) year from the date of issuance and can be renewed each year at no cost to the Contractor during the time period in which their background check is valid, as discussed below. All technicians shall have on their shirts the name of the contractor's business. The Contractor shall immediately notify the Collier County Facilities Management Division via e-mail (DL-FMOPSCa�colliergov.net)whenever an employee assigned to Collier County separates from their employment. This notification is critical to ensure the continued security of Collier County facilities and systems. Failure to notify within four (4) hours of separation may result in a deduction of$500 per incident. CCSO requires separate fingerprinting prior to work being performed in any of their locations. This will be coordinated upon award of the contract. If there are additional fees for this process, the Contractor is responsible for all costs. 36. VENUE. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 37. VALUE ENGINEERING. All projects with an estimated cost of $10 million or more shall be reviewed for consideration of a Value Engineering (VE) study conducted during project development.A "project"shall be defined as the collective contracts, which may include but not be limited to: design, construction, and construction, engineering and inspection (CEI) services. Additionally, any project with an estimated construction value of$2 million or more may be reviewed for VE at the discretion of the County. 38. ABOVEGROUND/UNDERGROUND TANKS. 38.1 The contractor shall ensure compliance with all NFPA regulations: specifically 110 & 30/30A; FDEP chapter 62 regulations: specifically 761, 762, 777, and 780; 376 & 403 Florida Statutes; and 54 Construction Services Agreement:Revised 072118(v6) STI, UL, PEI, ASME, NACE, NLPA, NIST & API referenced standards pertaining to the storage of hazardous materials and petroleum products. 38.2 The contractor shall notify the Solid & Hazardous Waste Management Department (SHWMD) prior to the installation, removal, or maintenance of any storage tank, including day tanks for generators, storing/will be storing petroleum products or hazardous materials. The contractor shall provide a 10 day and 48-hour notice to SHWMD 239-252-2508 prior to commencement. The contractor shall provide the plans pertaining to the storage tank systems containing hazardous materials/petroleum products to the SHWMD prior to plans submittal to a permitting entity and then SHWMD must approve the plans prior to contractor's submittal for permitting. 39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on Owner's projects who are neat, clean, well-groomed and courteous. Subject to the Americans with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The Owner may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Owner's projects is not in the best interest of the County. 40. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision- making authority and by Owner's staff person who would make the presentation of any settlement reached during negotiations to Owner for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed-upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision-making authority and by Owner's staff person or designee who would make the presentation of any settlement reached at mediation to Owner's Board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under Section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 55 Construction Services Agreement:Revised 072118(v6) EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS 56 Construction Services Agreement:Revised 072118(v6) EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES FEDERAL EMERGENCY MANAGEMENT AGENCY PUBLIC ASSISTANCE The supplemental conditions contained in this section are intended to cooperate with, to supplement, and to modify the general conditions and other specifications. In cases of disagreement with any other section of this contract,the Supplemental Conditions shall govern.This is an acknowledgement that FEMA financial assistance will be used to fund all or a portion of the contract. Pursuant uniform requirements of federal awards (2 CFR Part 200.23) the definition of CONTRACTOR is an entity that receives a Contract/Purchase Order. Compliance with Federal Law, Regulations and Executive Orders:The Sub-Recipient(County)agrees to include in the subcontract that (i) the subcontractor is bound by the terms of the Federally-Funded Subaward and Grant Agreement, (ii) the subcontractor is bound by all applicable state and Federal laws and regulations, and (iii) the subcontractor shall hold the Division and Sub-Recipient harmless against all claims of whatever nature arising out of the subcontractor's performance of work under this Agreement, to the extent allowed and required by law. Specifically, the Contractor shall be responsible for being knowledgeable and performing any and all services under this contract in accordance with the following governing regulations along with all applicable Federal law, regulations, executive orders, FEMA policies, procedures, and directives. O 2 C.F.R. Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards O 44 C.F.R. Part 206 o The Robert T. Stafford Disaster Relief and Emergency Assistance Act, Public Law 93- 288, as amended, 42 U.S.C. 5121 et seq., and Related Authorities o FEMA Public Assistance Program and Policy Guide (Version 4, most recent update, Effective June 1, 2020) EXHIBIT I-1 EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES Access to Records: (1) The contractor agrees to provide the County, the FEMA Administrator, the Comptroller General of the United States, or any of their authorized representative's access to any books, documents, papers, and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts, and transcriptions. (2)The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed. (3) The contractor agrees to provide the FEMA Administrator or his authorized representatives' access to construction or other work sites pertaining to the work being completed under the contract. (4) In compliance with the Disaster Recovery Act of 2018, the County and the Contractor acknowledge and agree that no language in this contract is intended to prohibit audits or internal reviews by the FEMA Administrator or the Comptroller General of the United States. Changes: To be eligible for FEMA assistance under the non-Federal entity's FEMA grant or cooperative agreement, the cost of the change, modification, change order, or constructive change must be allowable, allocable, within the scope of its grant or cooperative agreement, and reasonable for the completion of project scope. OHS Seal, Logo, and Flags: The contractor shall not use the DHS seal(s), logos, crests, or reproductions of flags or likenesses of DHS agency officials without specific FEMA pre- approval. No Obligation by Federal Government: The Federal Government is not a party to this contract and is not subject to any obligations or liabilities to the non-Federal entity, contractor, or any other party pertaining to any matter resulting from the contract. Program Fraud and False or Fraudulent Statements or Related Acts: The Contractor acknowledges that 31 U.S.C. Chap. 38 (Administrative Remedies for False Claims and Statements) applies to the Contractor's actions pertaining to this contract. Administrative, Contractual, or Legal Remedies (over $250,000): Unless otherwise provided in this contract, all claims, counter-claims, disputes and other matters in question between the local government and the contractor, arising out of or relating to this contract, or the breach of it,will be decided by arbitration, if the parties mutually agree, or in a Florida court of competent jurisdiction. Termination: See Standard Purchase Order and/or Contract Terms and Conditions Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708) (over $100,000): Where applicable, all contracts awarded by the solicitor in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). (1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. (2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1)of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this section, in the sum of$27 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this section. EXHIBIT I-2 EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES (3) Withholding for unpaid wages and liquidated damages. The County or FEMA shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act,which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2) of this section. (4) Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1) through (4) of this section and a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1) through (4) of this section." Rights to Inventions Made Under a Contract or Agreement: Exempt from FEMA Public Assistance Funding Clean Air Act(over$150,000): 1. The contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq. 2.The contractor agrees to report each violation to the County and understands and agrees that the County will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency, and the appropriate Environmental Protection Agency Regional Office. 3. The contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA. Federal Water Pollution Control Act (over $150,000): 1. The contractor agrees to comply with all applicable standards, orders, or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq. 2. The contractor agrees to report each violation to the County and understands and agrees that the County will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency, and the appropriate Environmental Protection Agency Regional Office. 3. The contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA. Suspension and Debarment: (1) This contract is a covered transaction for purposes of 2 C.F.R. pt. 180 and 2 C.F.R. pt. 3000. As such the contractor is required to verify that none of the contractor, its principals (defined at 2 C.F.R. § 180.995), or its affiliates (defined at 2 C.F.R. § 180.905) are excluded (defined at 2 C.F.R. § 180.940) or disqualified (defined at 2 C.F.R. § 180.935). (2) The contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C and must include a requirement to comply with these regulations in any lower tier covered transaction it enters into. (3) This certification is a material representation of fact relied upon by the County. If it is later determined that the contractor did not comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C, in addition to remedies available to the County, the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. (4) The bidder or proposer agrees to comply with the requirements of 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The bidder or proposer further agrees to include a provision requiring such compliance in its lower tier covered transactions. Byrd Anti-Lobbying Amendment (31 U.S.C. § 1352 (as amended) (over $100,000): Contractors who apply or bid for an award of$100,000 or more shall file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any EXHIBIT I-3 C EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the recipient." Procurement of Recovered Materials (§200.322) (Over$10,000): 1. In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA- designated items unless the product cannot be acquired— a. Competitively within a timeframe providing for compliance with the contract performance schedule; b. Meeting contract performance requirements; or c.At a reasonable price. 2. Information about this requirement, along with the list of EPA-designated items, is available at EPA's Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive- procurement-guideline-cpg-program 3. The Contractor also agrees to comply with all other applicable requirements of Section 6002 of the Solid Waste Disposal Act." Contracting with small and minority businesses,women's business enterprises, and labor surplus area firms §200.321 (a) The Solicitor must take all necessary affirmative steps to assure that minority businesses, women's business enterprises, and labor surplus area firms are used whenever possible. (b) Affirmative steps must include: (1) Placing qualified small and minority businesses and women's business enterprises on solicitation lists; (2)Assuring that small and minority businesses, and women's business enterprises are solicited whenever they are potential sources; (3) Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority businesses, and women's business enterprises; (4) Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women's business enterprises; (5) Using the services and assistance, as appropriate, of such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce; and (6) Requiring the prime contractor, if subcontracts are to be let, to take the affirmative steps listed in paragraphs (1)through (5) of this section. CONSTRUCTION ACTIVITIES Equal Employment Opportunity Clause (§60-1.4): Except as otherwise provided under 41 C.F.R. Part 60, all contracts that meet the definition of"federally assisted construction contract" in 41 C.F.R. § 60-1.3 must include the equal opportunity clause provided under 41 C.F.R. §60- 1.4. During the performance of this contract, the contractor agrees as follows: (1)The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. EXHIBIT I-4 EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES (2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. (3)The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant.This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the contractor's legal duty to furnish information. (4)The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers'representatives of the contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (5) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (6)The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part an the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (8) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs(1)through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the contractor may request the United States to enter into such litigation to protect the interests of the United States. Davis Bacon Act: Exempt under FEMA Public Assistance Funding Copeland Anti-Kickback Act: Exempt under FEMA Public Assistance Funding EXHIBIT I-5 EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES STATE PROVISIONS Indemnification: a. The County shall be fully liable for the actions of its agents, employees, partners, or subcontractors and shall fully indemnify, defend, and hold harmless Department and its officers, agents, and employees, from suits, actions, damages, and costs of every name and description arising from or, relating to: personal injury and damage to real or personal tangible property alleged to be caused in whole or in part by County, its agents, employees, partners, or subcontractors; provided, however, that County shall not indemnify for that portion of any loss or damages proximately caused by the negligent act or omission of Department; ii. the County 's breach of this Agreement or the negligent acts or omissions of County. b. The County 's obligations under the preceding paragraph with respect to any legal action are contingent upon Department giving County: (1)written notice of any action or threatened action; (2) the opportunity to take over and settle or defend any such action at County 's sole expense; and (3) assistance in defending the action at County 's sole expense. The County shall not be liable for any cost, expense, or compromise incurred or made by Department in any legal action without County 's prior written consent, which shall not be unreasonably withheld. c. Notwithstanding sections a. and b. above, the following is the sole indemnification provision that applies to Counties that are governmental entities: Each party hereto agrees that it shall be solely responsible for the negligent or wrongful acts of its employees and agents. However, nothing contained herein shall constitute a waiver by either party of its sovereign immunity or the provisions of Section 768.28, F.S. Further, nothing herein shall be construed as consent by a state agency or subdivision of the State to be sued by third parties in any matter arising out of any contract or this Agreement. d. No provision in this Agreement shall require Department to hold harmless or indemnify County, insure or assume liability for County 's negligence, waive Department's sovereign immunity under the laws of Florida, or otherwise impose liability on Department for which it would not otherwise be responsible. Any provision, implication or suggestion to the contrary is null and void. Statutory Notices Relating to Unauthorized Employment and Subcontracts: a. The Department shall consider the employment by any contractor/subcontractor of unauthorized aliens a violation of Section 274A(e) of the Immigration and Nationality Act. If contractor/subcontractor knowingly employs unauthorized aliens, such violation shall be cause for unilateral cancellation of this Agreement. The County shall be responsible for including this provision in all subcontracts with private organizations issued as a result of this Agreement. b. Pursuant to Sections 287.133 and 287.134, F.S., the following restrictions apply to persons placed on the convicted vendor list or the discriminatory vendor list: i. Public Entity Crime. A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a Grantee, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, F.S., for CATEGORY TWO for a period of36 months following the date of being placed on the convicted vendor list. ii. Discriminatory Vendors. An entity or affiliate who has been placed on the discriminatory vendor list may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, EXHIBIT I-6 EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity. iii. Notification. The County shall notify Department if it or any of its suppliers, subcontractors, or consultants have been placed on the convicted vendor list or the discriminatory vendor list during the life of the Agreement. The Florida Department of Management Services is responsible for maintaining the discriminatory vendor list and posts the list on its website. Questions regarding the discriminatory vendor list may be directed to the Florida Department of Management Services, Office of Supplier Diversity, at(850)487-0915. Applicable Laws: The contractor shall comply with all applicable federal, state and local rules and regulations in providing services to the County. The contractor acknowledges that this requirement includes, but is not limited to, compliance with all applicable federal, state and local health and safety rules and regulations. Local Preference: Pursuant to Section 255.0991, F.S. local vendor preference is not applicable. Lobbying: No funds received pursuant to this Agreement may be expended for lobbying the Legislature, the judicial branch or a state agency. Record Keeping: The contractor shall maintain and retain sufficient records demonstrating its compliance with the terms of the Agreement for a period of at least five (5) years after final payment is made and shall allow the County, the State, or its authorized representatives access to such records for audit purposes upon request. Inspector General Cooperation:The Parties agree to comply with Section 20.055(5), Florida Statutes,for the inspector general to have access to any records, data and other information deemed necessary to carry out his or her duties and incorporate into all subcontracts the obligation to comply with Section 20.055(5), Florida Statutes. Conflict of Interest: The County covenants that it presently has no interest and shall not acquire any interest which would conflict in any manner or degree with the performance of services required. This Contract/Work Order is subject to chapter 112, F.S. The vendor shall disclose the name of any officer, director, employee, or other agent who is also an employee of the State. County shall also disclose the name of any State employee who owns, directly or indirectly, more than a five percent(5%) interest in the Contractor's company or its affiliates. In order to comply with Florida Auditor General report 201 4-064 regarding conflicts of interest and to be consistent with Section 287,057(17)(a)(I),F.S.,all monitoring data and statistical analysis must be provided directly and concurrently from the monitor to the FDEP, County, permittee and engineering consultant. Data Collection: All data collection and processing, and the resulting product deliverables, shall comply with the standards and technical specifications contained in the Department's Monitoring Standards for Beach Erosion Control Projects (2014) and all associated state and federal permits, unless otherwise specified in the approved scope of work for an eligible Project item. The monitoring standards may be found at: https://floridadep.Qov/water/beaches-inlets-ports/documents/monitoring-overview-physical-monitoring EXHIBIT I-7 EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES PAGE LEFT INTENTIALLY BLANK EXHIBIT I-8 � i EXHIBIT FEDER4LCONTF0\CTPROVISIONS AND ASSURAN�ES ' � _ .... ............. ....................................................... \ Acknowledgement of Terms, Conditions, and Grant Clauses Certification This is an acknowledgement that FEMA financial assistance will be used to fund all o/ u portion of the contract, The contractor will comply with all applicable Federal |ew, regu|edons, executive ordens. FEMA po|ioien, prncoduras, and directives, � , If the Contractor subcontracts any of the work required under this Agnewman$, a copy of the signed ` subcontract must be available tothe County for review and approval. The Contractor agrees bo include io � the subcontract that(1)the subcontractor is bound by the terms of this AgreemenL (ii)the subcontractor is bound by all applicable a|a1a and 0oUena/ |ovvo and regulations, and (iii) the subcontractor shall hold the County and the Grantor Agency harmless against all claims of whatever nature arising out of the J subcontractor's performance of work under this Agreement,to the extent allowed and required by low,The � County may document in the quarterly report the Contractor's progress /n performing its work under this ' agreement. On behalf of my firm, I acknowledge, the grant requirements identified in this documert. x Vendor/Contractor Name Earth—Tech En Date9-3-%O2o | Authorized Signature Christopher de esident ° ������.... �������` / / EXHIBIT FEDERAL CONTRACT PROVISIONS AND ASSORANCE� _ CERTIFICATION REGARDING DEBARMENT,SUSPENSION, ���L�)���L[�' x � and VOLUNTARY EXCLUSION / ----------- ---- -- -- U Contractor Covered Transactions ^ (|) The prospective subcontractor of the Sub-recipient, Collier County, certifies, by submission of this � donumeni, that neither it nor its principals is presently debarred, suap*ndad, proposed for debarment, declared ineligible,or voluntarily excluded from participation in this transaction by any Federal department or agency. � (2) Where the Sub-recipient's subcontractor is unable to certify to the above statement,the prospective contract shall attach on explanation to this form. CONTRACTOR Signature Pre . Name and Title 81*o Federal Court � __ Street Addvese___ Fort Myers,Florida 3owA5 8 City, State,Zip � 171511137 DUNS Number 9-3-2020 1— ----- Sub-ReupientName Collier County Board of County Commissioners � � DEWConkoc Number: FEVIApnojmct Numbar� � � ; ____ _ EXHIBIT|-1O (X() � � EXHIBIT I FEDERAL CONTRACT PROVISIONS AND ASSURANCES COWER COUNTY ANTICIPATED DISADVANTAGED,MINORITY,WOMEN OR VETERAN PARTICIPATION STATEMENT be°An',ist Unven410,4 Statusep r.'I resist Pa ris PR ME to erste;pro,,,d4 i f*13.11t roternent:I 3,14,1314 soorgt itoopoervailon that:Ixdatta a sumo , A. PRIME VENDOR/CONTRACTOR INFORMATION PTV!.NAME PSAME FE 0 PsuLate A conTnncT ooLLnn',mown I Earth Tech Enterprises,Inc 59-3679652 TBD S.Mif PP LIE A FLOP DA<EPT FED 0:SADN4YPAGED VITEstAts N. V 4 fait,4.3 CT urn on Tviis cok‘TnnoT vahonT,'on.o,r,i,..t.,,6 a P,ESSEI,YEAPPSE' CONSTRUCTION 7 0, "4 Oft'MEENI,..Et OF M. A SIA.1,11.EXSAIY,,AN't AGED DEE 7' '1 1I NEM Ca CEPT/PCATON FROM THE SMALL BUsLNEot VI E' '' CONSUSTATON7 Y ;.; tom N 733TION, 3 Stay CE DISAELED YEPEPtio WEE) ', a OThEP? Y SSE Ell Y 0 IS T4 1 SUEMSS ON A nrosion 7 N (y!..) a'tt,S,PC3a0Y;NUMEEP B. IF PRIME HAS SUBCONTRACTOR OR SUPPLIER WHO IS A DISADVANTAGED MTNORITY,WOMEN-OWNED,SMALL BUSINESS CONCERN OR SERVICE DISABLED VETERAN,PRIME IS TO COMPLETE THIS NEXT SECTION DE kneverE sottonmtncron on SUPPUER TYPE OF WORK OP EIPSNICTri,CODE SUES/SUPPLIEFS PERCENT OF cowman terrinim. NAME SPECIALTY (Set EICI EXXEAR AMOUNT DOSE Las . , WHE Gulf Shore Trucking Hauler NMW 350,000 33% WBE Kate's Envrio Fencing Silt Fence NMW 1,000 less than We . . Tot/ill: 351,000 34% I . . C. SECTION TO BE COMPLETED BY PRIME VENDOR/CONTRACTOR i NAME OF sunnotrrIn DATE ITTLE or suanurren Earth Tech Enterprises,Inc. 9-3-2020 President 1 th4341.ADORES'S Of PAPPIE ispentrrital Truntiota taLIMESER FAX hithaffER i cg@earthtechenterprises.com 239-774-1223 -II t,r,fatcrn s used to trod and report ant,:pated Der or LEE!ortl0paRcr,RI tetra y.‘,..eltstil contracts. The anttvpreP DEE or MU arnaum IP•c,untari In .0,m not become pal of the co1it,eclu3,1*.1rs Tha form TaList be surnitfic at•Ptha)of fes.ponAt to a so itnt0ft 4 and e3,4)3en ea irded a Cowire tont,aft,the Atm*A 3! he afaed to opdre the 3n1/4,,rhatoon,or the grant collo!ance f f ',_,., , , .„„'-': ',,, -,,,,,: ,:::.:0•;;;‘,$=',:c.v1 t1,4":',61tit ,. slack Amerstan EA hisparAc A mysTscan n3 Patrol*Mt:143n tai Subc0ns Asian American 43.3 331.1144401/4 AMEPIcan APA .3011.-Mq13:01ty tNN311411 NOMA" Other not of any other gfoup artad 0 D.SECTION TO BE COMPLETED BY COMER COUNTY 0 EPA;WEN"'%Mil 401.1.34a C01473 3CT*1 F3'3/3 or PC,TED TANT PROGRAM CONTRACT • ACCEPTED EY I DATE EXHIBIT 1-11 .--) | } EXHIBIT FEDERA�C(]NTRACTPRUV|SIONSANDASSURAwCES — ' ------- --� } ...........__....... . LOBBYING CERTIFICATION JT h submitted n � ' i The undersigned [Contractor)certifies,to the best of his or her knowledge, that: � 1, No Federal appropriated funds have been paid or will be paid,by or on behalf of the undersigned,to any person ` for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress,or an employee of a Member of Congress in connection with the awarding of any Federal oun1nac(, the making of any Federal Anant, the making of any Federal |oon, the entering into of any cooperative U agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, � loan, or cooperative agreement, 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing � or attempting 1n influence un officer oremployee of any agency,a Member of Congress,anoffioeror employee of Congress, or an employee of Member of Congress in connection with this Federal contract, grant, |oom. or [ cooperative agreement, the undersigned mhoU complete and submit Standard Form- LLL^ "Disclosure Form to � Report Lnbbying."|n accordance with its instructions. � � 3 The undersigned shall require that the language of this certification be included Un the award documents for all � eubawmrdaa( all tiers (including subcontracts, aubgrants. and contracts under grants, |oane, and cooperative agreements)and that all subrecipients shall certify and disclose accordingly. � This certification is o material representation of fact upon which no||anoa was placed when this transaction was h made or entered into. Submission of this oedifivaUunima prerequisite for making m,entering into this transaction 1 imposed by31. U.SC� § 1352(as amended by the Lobbying Disclosure Act of1SQ5).Any person who fails tmfile the required certification shall bosubject too civil penalty of not less than $1O.UO8 and riot more than $10O.8OO � for each such failure. ` The Contractor certifies or affirms the truthfulness and accuracy of each statement of its certification and � disclosure, if any, In addition, the Contractor understands and agrees that the provisions ny31 U�S,C, 3801 et � omq..apply bo this certification and disclosure, ifany. Earth Tech Enterprises, c. Contractor(Firm..~ - . tignotv of----- tior i rzodOffida| Christopher Gehring-President Name and -Title o/Contractor's Authorized Official 9-3-2Q20 _ DeCm � � � _ EXHIBIT|'12 � � ACC CERTIFICATE OF LIABILITY INSURANCE DAT (MMID YY ) 20 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT WendyL. Hingson NAME: g VTC Insurance Group PHONE (239) 275-8226 FAX (2391 sus-ea3l IA/0.No,Exit; (AIC Ndi: Troy Office E-MAIL whin son@vtcins.com ADDRESS: g 1175 W. LongLake Ste. 200 INSUREESI AFFORDING COVERAGE Troy MI 48098-4960 _ INSURERA:American Casualty Co. of Reading, PA 20427 INSURED INSURER B:Continental Insurance Co. 35289 Earth Tech Enterprises, Inc. INSURER C:Underwri ter s of Lloyd's, London 15642 6180 Federal Ct. INSURER D:Ameri sure Insurance Company 10488 Fort Myers, FL 33905 INSURER E:Zurich American Insurance Co 16535 INSURER F: COVERAGES CERTIFICATE NUMBER:2020-2021 Term REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 1NSR ADDL 5UBR POLICY POLICY NUMBER IMMIDD/Y EYYY) (MM DD/YYYY) LTR TYPE OF INSURANCE INSD WVD LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE A 1 CLAIMS-MADE I X I OCCUR PREMISESO(Ea Eoccurrrrence) $ 100,000 X Includes: Contractual Liab X 6080440888 4/5/2020 4/5/2021 MED EXP(Any one personl $ 15,000 & XCU Coverage PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X jECT LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 2,000,000 (Ea acGdenll B X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED X SCHEDULED AUTOS AUTOS X 6080440860 4/5/2020 4/5/2021 BODILY INJURY(Per accident) $ _ NON-OWNED PROPERTY DAMAGE X HIRED AUTOS X AUTOS (Pet accdent) $ $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,000 C EXCESSLIAB CLAIMS-MADE SCX1013320 4/5/2020 4/5/2021 AGGREGATE $ 5,000,000 DED X RETENTION$ 0 Follows Form $ WORKERS COMPENSATION X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE E L EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N N I A D (Mandatory in NH) WC211171301 4/5/2020 4/5/2021 E L DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under —`— DESCRIPTION OF OPERATIONS below Inc. USL & H E L DISEASE-POLICY LIMIT $ 1,000,000 E Inland Marine I145666360 4/5/2020 4/5/2021 Leased/Rented Any One!Lem $800,000 Deductible: $25,000 DESCRIPTION OF OPERATIONS I LOCATIONS(VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) Project: Collier Beach Renourishment 2020 - 2021, Bid No. 20-7797 Collier County Board of County Commissioners are included as Additional Insured under the captioned Commercial General Liability and Automobile Liability Policies on a primary and non-Contributory basis if and to the extent required by written contract. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Collier County Board of County THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Commissioners ACCORDANCE WITH THE POLICY PROVISIONS. 3295 Tamiami Trail East Naples, FL 34112 AUTHORIZED REPRESENTATIVE I�� ^^ Alan Chandler/V510 (&/ s..-1 ( ...,Q@,___ l _ ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS025(201401) AccoRD 4o CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 9/30/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Wendy Hingson VTC Insurance Group PHONE No,Ezt): (239) 275-8226 FAX (239) 275-9631 E-MAIL LAlC,No): Troy Office E-MAILADDRESS: whingson@vtcins.com 1175 W. Long Lake Ste. 200 INSURER(S)AFFORDING COVERAGE NAIC# Troy MI 48098-4960 INsuRERA:Underwriters At Lloyd's of London 15792 INSURED INSURER B: Earth Tech Enterprises, Inc. INSURERC: 1680 Federal Court INSURER D: Fort Myers, Florida 33905 INSURERS: INSURER F: COVERAGES CERTIFICATE NUMBER:2020-21 Proj spec.Collier REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, INSR ADDL SUBR LTR TYPE OF INSURANCE POLICY EFF POLICY EXP -------- -INSD WVO POLICY NUMBER (MMIDDIYYYY) (MM/DD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS-MADE X OCCUR DAMAGE TO REM EU PREMISES(Ea occurrence) $ X Pollution Liabity Coverage ENP000510401 9/2B/2020 9/28/2021 MED EXP(Any one person) $ Collier Beach Renourishment PERSONAL&ADV INJURY $ GEMLAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 1,000,000 POLICY X Tel: LOC PRODUCTS-COMP/OPAGG $ OTHER. AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ (Ea accident) ANY AUTO BODILY INJURY(Per person) $ ALL OVVNED SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ HIRED AUTOS NON-OWNED PROPERTY DAMAGE AUTOS (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION PER OTH AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? NIA Ei EACH ACCIDENT $ (Mandatory In NH) E L DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,maybe attached It more space Is required) Project: Collier Beach Renourishment 2020 - 2021, Bid No. 20-7797 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Collier County Board of County Commissioners ACCORDANCE WITH THE POLICY PROVISIONS. 3295 Tamiami Trail East Naples, FL 34112 AUTHORIZED REPRESENTATIVE Alan Chandler/V510 ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS025(201401) CNA CNA PARAT JUNT Blanket Additional Insured - Owners, Lessees or Contractors - with Products-Completed Operations Coverage Endorsement This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART It is understood and agreed as follows: I. WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this coverage part, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused in whole or in part by your acts or omissions, or the acts or omissions of those acting on your behalf: A. in the performance of your ongoing operations subject to such written contract;or B. in the performance of your work subject to such written contract, but only with respect to bodily Injury or property damage Included in the products-completed operations hazard,and only If: 1. the written contract requires you to provide the additional insured such coverage;and 2. this coverage part provides such coverage. II. But if the written contract requires: A. additional insured coverage under the 11-85 edition, 10-93 edition, or 10-01 edition of CG2010, or under the 10- 01 edition of CG2037;or B. additional insured coverage with 'arising out of language; or C. additional insured coverage to the greatest extent permissible by law; then paragraph I.above is deleted in its entirety and replaced by the following: 0 WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this coverage part, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of your work that is subject to such written contract. III. Subject always to the terms and conditions of this policy, including the limits of insurance,the Insurer will not provide such additional insured with; A. coverage broader than required by the written contract; or in B. a higher limit of insurance than required by the written contract. IV. The insurance granted by this endorsement to the additional insured does not apply to bodily Injur y,property damage, or personal and advertising Injury arising out of: A. the rendering of, or the failure to render,any professional architectural,engineering,or surveying services, --�— including: 1. the preparing,approving,or failing to prepare or approve maps,shop drawings, opinions, reports,surveys, field orders,change orders or drawings and specifications; and _ 2. supervisory,inspection, architectural or engineering activities; or B. any premises or work for which the additional insured is specifically listed as an additional insured on another endorsement attached to this coverage part. V. Under COMMERCIAL GENERAL LIABILITY CONDITIONS,the Condition entitled Other Insurance is amended to add the following,which supersedes any provision to the contrary in this Condition or elsewhere in this coverage part: —" CNA75079XX(f 0 16) Page 1 of 2 Policy No: 608044 oB86 AMERICAN CASUALTY CO OF RFADING,PA • Endorsement No: 4 Insured Name: EARTH TECH ENTERPRISES INC Effective Date; 04/05/2020 Copyright CNA All flights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its permission. CNA CNA PARAMOUNT Blanket Additional Insured - Owners, Lessees or Contractors - with Products-Completed ---- __.. Operations Coverage Endorsement Primary and Noncontributory Insurance With respect to other insurance available to the additional insured under which the additional Insured is a named insured,this insurance is primary to and will not seek contribution from such other insurance,provided that a written contract requires the insurance provided by this policy to be: 1. primary and non-contributing with other Insurance available to the additional insured;or 2. primary and to not seek contribution from any other insurance available to the additional Insured. But except as specified above, this insurance will be excess of all other insurance available to the additional insured. VI. Solely with respect to the insurance granted by this endorsement, the section entitled COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: The Condition entitled Duties In The Event of Occurrence,Offense,Claim or Suit is amended with the addition of the following: Any additional insured pursuant to this endorsement will as soon as practicable: 1. give the Insurer written notice of any claim, or any occurrence or offense which may result in a claim; 2. send the Insurer copies of all legal papers received,and otherwise cooperate with the insurer in the investigation, defense,or settlement of the claim; and 3. make available any other insurance, and tender the defense and indemnity of any claim to any other insurer or self-insurer,whose policy or program applies to a loss that the Insurer covers under this coverage part. However, if the written contract requires this insurance to be primary and non-contributory,this paragraph 3. does not apply to insurance on which the additional insured is a named insured. The Insurer has no duty to defend or indemnify an additional insured under this endorsement until the Insurer receives written notice of a claim from the additional insured. VII. Solely with respect to the Insurance granted by this endorsement,the section entitled DEFINITIONS is amended to add the following definition: Written contract means a written contract or written agreement that requires you to make a person or organization an additional insured on this coverage part, provided the contract or agreement: A. Is currently in effect or becomes effective during the term of this policy; and B. was executed prior to: 1. the bodily injury or property damage;or 2. the offense that caused the personal and advertising injury; for which the additional insured seeks coverage. Any coverage granted by this endorsement shall apply solely to the extent permissible by law. All other terms and conditions of the Policy remain unchanged. This endorsement,which forms a part of and is for attachment to the Policy issued by the designated Insurers,takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below,and expires concurrently with said Policy. CNA75079XX(10-16) Page 2 of 2 Policy No: 608044088_8 AMERICAN CASUALTY CO OF REAI)ING,Pp, Endorsement No: 4 Insured Name:EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance services Oflioe,Inc.,with Its permission. CNA CNA PARA PUNT Contractors' General Liability Extension EndorSement It is understood and agreed that this endorsement amends the COMMERCIAL GENERAL LIABILITY COVET AGE PART as follows. If any other endorsement attached to this policy amends any provision also amended by this endorsement, then that other endorsement controls with respect to such provision, and the changes made by this endorsement with respect to such provision do not apply. TABLE OF CONTENTS 1. Additional insureds 2. Additional Insured-Primary And Non-Contributory To Additional Insured's Insurance 3. Bodily Injury—Expanded Definition 4. Broad Knowledge of Occurrence/Notice of Occurrence 5. Broad Named Insured 6. Broadened Liability Coverage For Damage To Your Product And Your Work 7. Contractual Liability-Railroads 8. Electronic Data Liability 9. Estates,Legal Representatives and Spouses 10. Expected Or Intended Injury—Exception for Reasonable Force 11. General Aggregate Limits of Insurance—Per Project 12. In Rem Actions 13. Incidental Health Care Malpractice Coverage 14. Joint Ventures/Partnership/Limited Liability Companies 15. Legal Liability— Damage To Premises /Alienated Premises /Property In The Named Insured's Care, Custody or Control 16. Liquor Liability 17. Medical Payments 18. Non-owned Aircraft Coverage 19. Non-owned Watercraft 20. Personal And Advertising injury—Discrimination or Humiliation 21. Personal And Advertising Injury-Contractual Liability 22. Pro —_ — perty barrage-Elevators 23. Supplementary Payments 24. Unintentional Failure To Disclose Hazards 25. Waiver of Subrogation—Blanket 26. Wrap-Up Extension:OCIP CCIP,or Consolidated(Wrap-Up)Insurance Programs CNA74705XX(1-15) Page 1 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,PA Endorsement No: Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Flights Reserved, Includes copyrighted material of Insurance Services Ofilce,Inc.,with Its permisslon. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement 1. ADDITIONAL INSUREDS a. WHO IS AN INSURED is amended to include as an Insured any described A. through H. below whom a Named Insured Is required to add person addiorganization ional l stu ed on this C h paragraphs under a written contract or written agreement, provided such contract or agreement: Coverage Part (1) is currently in effect or becomes effective during the term of this Coverage Part; and (2) was executed prior to: (a) the bodily injury or property damage; or (b) the offense that caused the personal and advertising injury, for which such additional insured seeks coverage, b. However, subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with: (1) a higher limit of insurance than required by such contract or agreement; or (2) coverage broader than required by such contract or agreement, and in no event broader than that described by the applicable paragraph A.through H.below. Any coverage granted by this endorsement shall apply only to the extent permissible by law. A. Controlling Interest Any person or organization with a controlling interest in a Named Insured, but only with respect to such person or organization's liability for bodily injury,property damage or personal and advertising injury arising out of: 1. such person or organization's financial control of a Named Insured;or 2. promises such person or organization owns, maintains or controls while a Named Insured leases or occupies such promises; provided that the coverage granted by this paragraph does not apply 10 structural alterations, new construction or demolition operations performed by,on behalf of,or for such additional insured. B. Co-owner of Insured Premises A co-owner of a premises co-owned by a Named Insured and covered under this insurance but only with respect to such co-owner's liability for bodily injury, property damage or personal and advertising injury as co-owner of such promises. C. Lessor of Equipment Any person or organization from whom a Named Insured leases equipment, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused, in whole or in part, by the Named Insured's maintenance, operation or use of such equipment, provided that the occurrence giving rise to such bodily Injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. D. Lessor of Lend Any person or organization from when) a Named Insured leases land but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such land, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. The CNA74705XX(1-15) _ Page 2 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,PA Endorsement te: 1 Insured Name; EARTH TECH ENTERPRISES INC Effective Date; 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its pemysalon, CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such addit!anal insured, E. Lessor of Premises An owner or lessor of premises leased to the Named Insured, or such owner or lessor's real estate Manager, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such part of the premises leased to the Named Insured, and Provided that the occurrence giving rise to such bodily injury or property damage,or the offense giving rise to such and advertising injury, takes place prior to the termination of such lease. The coverage personal paragraph does not apply to structural alterations, now construction or demolition operationsperformedd by this on p behalf of, or for such additional Insured. by, on F. Mortgagee,Assignee or Receiver A mortgagee, assignee or receiver of premises but only with respect to such mortgagee, assignee or receiver's liability for bodily injury, property damage or personal and advertising injury arising out of the Named Insured's ownership, maintenance,or use of a premises by a Named Insured, The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by,on behalf of, or for such additional insured. G. State or Governmental Agency or Subdivision or Political Subdivisions—Permits A state or governmental agency or subdivision or political subdivision that has issued a permit or authorization but only with respect to such state or governmental agency or subdivision or political subdivision's liability for bodily injury,property damage or personal and advertising injury arising out of: 1. the following hazards in connection with premises a Named Insured owns, rents, or controls and to which this insurance applies: 0 a. the existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoistaway openings, sidewalk vaults,street banners, or decorations and similar exposures;or b. the construction,erection, or removal of elevators;or c. the ownership, maintenance or use of any elevators covered by this insurance; or 2. the permitted or authorized operations performed by a Named Insured or on a Named Insured's behalf. The coverage granted by this paragraph does not apply to: FS a. Bodily injury,property damage or personal and advertising injury arising out of operations performed for the state or governmental agency or subdivision or political subdivision; or b. Bodily Injury or property damage included within the products-completed operations hazard. 1.1.11111 With respect to this provision's requirement that additional Insured status must be requested under a written contract or agreement, the Insurer will treat as a written contract an Named Insured to add the governmental entity as an additional insuredY governmental permit that requires the H. Trade Show Event Lessor 1. With respect to a Named Insured's participation in a trade show event as an exhibitor, presenter or displayer, any person or organization whom the Named Insured is required to include as an additional insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury caused by: CNA74705XX(1-15) —__-- -_ Page 3 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,PA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved, Includes copyrighted materiel of Insurance Services Office,Inc.,with Its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement a. the Named Insured's acts or omissions; or b. the acts or omissions of those acting on the Named Insured's behalf, in the performance of the Named Insured's ongoing operations at the trade show event premises during the trade show event, 2. The coverage granted by this paragraph does not apply to bodily injury or property damage included within the products-completed operations hazard, 2. ADDITIONAL INSURED-PRIMARY AND NON-CONTRIBUTORY TO ADDITIONAL INSURED'S INSURANCE The Other Insurance Condition in the COMMERCIAL GENERAL LIABILITY CONDITIONS Section is amended to add the following paragraph: If the Named Insured has agreed in writing in a'contract or agreement that this Insurance is primary and non- contributory relative to an additional insurod's own insurance, then this insurance is primary, and the Insurer will not seek contribution from that other insurance. For the purpose of this Provision 2., the additional insurod's own insurance means insurance on which the additional insured is a named insured. Otherwise, and notwithstanding anything to the contrary elsewhere in this Condition, the insurance provided to such person or organization is excess of any other insurance available to such person or organization. 3. BODILY INJURY—EXPANDED DEFINITION Under DEFINITIONS,the definition of bodily injury is deleted and replaced by the following: Bodily injury moans physical injury, sickness or disease sustained by a person, Including death, humiliation, shock, mental anguish or mental injury sustained by that person at any time which results as a consequence of the physical injury,sickness or disease. 4. BROAD KNOWLEDGE OF OCCURRENCE/NOTICE OF OCCURRENCE Under CONDITIONS, the condition entitled Duties in The Event of Occurrence, Offense,Claim or Suit is amended to add the following provisions: A. BROAD KNOWLEDGE OF OCCURRENCE The Named Insured must give the Insurer or the Insurer's authorized representative notice of an occurrence, offense or claim only when the occurrence, offense of claim is known to a natural person Named Insured, to a partner, executive officer, manager or member of a Named Insured, or an employee designated by any of the above to give such notice. B. NOTICE OF OCCURRENCE The Named Insured's rights under this Coverage Part will not be prejudiced if the Named Insured falls to give the Insurer notice of an occurrence, offense or claim and that failure is solely due to the Named Insured's reasonable belief that the bodily Injury or property damage is not covered under this Coverage Part. However, the Named Insured shall give written notice of such occurrence, offense or claim to the Insurer as soon as the Named Insured is aware that this insurance may apply to such occurrence, offense or claim. 5, BROAD NAMED INSURED WHO IS AN INSURED is amended to delete its Paragraph 3.in its entirety and replace it with the following: 3. Pursuant to the limitations described in Paragraph 4. below, any organization in which a Named Insured has management control: a. on the effective date of this Coverage Part; or CNA74705XX(1-15) Page 4 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,pA Endorsement te: 1 InsuredNae: EARTH ENTERPRISES INC Effective Date; 04/05/2020 trl Copyright CNA AU Rights Reserved. Includes copyrighted materiel of Insurance Services Office,Inc„with Its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement b. by reason of a Named Insured creating or acquiring the organization during the policy period, qualifies as a Named Insured, provided that there is no other similar liability insurance, whether contributory,excess,contingent or otherwise,which provides coverage to such organization, or whic ld have provided coverage but for the exhaustion of its limit, and without regard to whether its covers e h w°u have narrower than that provided by this insurance. g is broader or But this BROAD NAMED INSURED provision does not apply to: (a) any partnership, limited liability company or joint venture;or (b) any organization for which coverage is excluded by another endorsement attached to this Coverage Part. For the purpose of this provision, management control means: A. owning interests representing more than 50% of the voting, appointment or designation power for the selection of a majority of the Board of Directors of a corporation; or B. having the right, pursuant to a written trust agreement, to protect, control the use of, encumber or transfer or sell property hold by a trust. 4. With respect to organizations which qualify as Named Insureds by virtue of Paragraph 3. above, this insurance does not apply to: a. bodily injury or property damage that first occurred prior to the date of management control, or that first occurs after management control ceases; nor b. personal or advertising injury caused by an offense that first occurred prior to the date of management control or that first occurs after management control ceases. 0 5. The insurance provided by this Coverage Part applies to Named Insureds when trading under their own names or under such other trading names or doing-business-as names (dba) as any Named Insured should choose to employ. 6. BROADENED LIABILITY COVERAGE FOR DAMAGE TO YOUR PRODUCT AND YOUR WORK A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled F Exclusions is amended to delete exclusions k.and I.and replace them with the following: This insurance does not apply to: k. Damage to Your Product Property damage to your product arising out of it, or any part of it except when caused by or resulting from: (1) fire; (2) smoke; (3) collapse; or (4) explosion. I. Damage to Your Work -= Property damage to your work arising out of it, or any part of it and included in the products-completed operations hazard. This exclusion does not apply: (1) If the damaged work, or the work out of which the damage arises, was performed on the Named Insured's behalf by a subcontractor; or CNA74705XX(1-15) Page 5 of 17 Policy No: 6080440888 AMERICAN CASUALTY Co OF READING,PA Endorsement No; 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material or Insurance Services Office,Inc.,with Its permission. NA CNA PARAMOUNT CNA Contractors' General Liability Extension Endorsement (2) If the cause of loss to the damaged work arises as a result of; (a) fire; (b) smoke; (c) collapse; or (d) explosion. B. The following paragraph is added to LIMITS OF INSURANCE: subject to 5.above, $100,000 is the most the Insurer will pay under Coverage A for the sum of darna,ge3 arising out of any one occurrence because of property damage to your product and your work that is caused by lire, smoke, collapse or explosion and is included within the product-completed operations hazard. This sublimit does not apply to property damage to your work if the damaged work, or the work out of which the damage arises,was performed on the Named Insured's behalf by a subcontractor. C. This Broadened Liability Coverage For Damage To Your Product And Your Work Provision does not apply if an endorsement of the same name is attached to this policy. 7. CONTRACTUAL LIABILITY—RAILROADS With respect to operations performed within 50 feet of railroad property, the definition of Insured contract is replaced by the following: Insured Contract means: a. A contract for a lease of promises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner is not an insured contract; b. A sidetrack agreement; c. Any easement or license agreement; d. An obligation, as required by ordinance, to Indemnify a municipality, except in connection with work for a municipality; e. An elevator maintenance agreement; f. That part of any other contract or agreement pertaining to the Named Insured's business (including an indemnification of a municipality in connection with work performed for a municipality) under which the Named Insured assumes the tort liability of another party to pay for bodily injury or property damage to a third person or organization. Tort liability means a liability that would be imposed by law in the absence of any contract or agreement, Paragraph I.does not include that part of any contract or agreement: (1) That indemnifies an architect,engineer or surveyor for injury or damage arising out of: (a) Preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (b) Giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage; (2) Under which the Insured, if an architect, engineer or surveyor, assumes liability for an injury or damage arising out of the insured's rendering or failure to render professional services, including those listed in (1) above and supervisory, inspection, architectural or engineering activities, 8. ELECTRONIC DATA LIABILITY CNA74705XX(1-15) Page 6 of 17 Policy No: 6080440668 AMERICAN CASUALTY CO OF READING,PA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/207.0 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc„with Its permission, CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement A. Under COVERAGES, Coverage A — Bodily injury and Property Damage Liability, the pare Exclusions is amended to delete exclusion p.Electronic Data and replace it with the following: graph entitled This insurance does not apply to: p. Access Or Disclosure Of Confidential Or Personal Information And Data-related Liability Damages arising out of; (1) any access to or disclosure of any person's or organization's confidential or personal information, including patents, trade secrets, processing methods, customer lists, financial information, credit card information, health information or any other type of nonpublic information;or (2) the loss of, loss of use of, damage to, corruption of, inability to access, or Inability to manipulate electronic data that does not result from physical injury to tangible property. However:unless Paragraph (1)above applies, this exclusion does not apply to damages because of bodily injury. This exclusion applies even if damages are claimed for notification costs, credit monitoring expenses, forensic expenses, public relation expenses or any other loss, cost or expense incurred by the Named Insured or others arising out of that which is described In Paragraph(1)or(2)above. B. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $100,000 is the most the Insurer will pay under Coverage A for all damages arising out of any ono occurrence because of property damage that results from physical injury to tangible property and arises out of electronic data. C. The following definition is added to DEFINITIONS: Electronic data means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software (including systems and applications software), hard or floppy disks, CD-ROMS, tapes, drives,cells, data processing devices or any other modia which are used with electronically controlled equipment. • D. For the purpose of the coverage provided by this ELECTRONIC DATA LIABILITY Provision, the definition of property damage in DEFINITIONS is replaced by the following: fk Property damage means: 11, a. Physical injury to tangible property, including all resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the occurrence that caused it;or c. Loss of, loss of use of, damage to, corruption of, inability to access, or inability to properly manipulate electronic data, resulting from physical injury to tangible property. All such loss of electronic data shall be deemed to occur at the time of the occurrence that caused it, For the purposes of this insurance,electronic data is not tangible property. E. If Electronic Data Liability is provided at a higher limit by another endorsement attached to this policy, then the $100,000 limit provided by this ELECTRONIC DATA LIABILITY Provision is part of, and not in addition to, that higher limit, 9. ESTATES, LEGAL REPRESENTATIVES,AND SPOUSES The estates, heirs, legal representatives and spouses of any natural person Insured shall also be insured under this policy; provided, however, coverage is afforded to such estates, heirs, legal representatives, and spouses only for CNA74705XX(1-15) Page 7 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READINC,PA Endorsement te: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material ci Insurance Services Mice,Inc.,with Its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement claims arising solely out of their capacity or status as such and, in the case of a spouse, where such damages tram marital commonproperty, aintl hold property orclaim seeks nity jointly p p y properly transferred from such natural person Insured to such spouse. No coverage is provided for any act, error or omission of an ostato lroir, legal representative, or spouse outside the scope of such person's capacity or status as such, provided however that the spouse of a natural person Named Insured and the spouses of members or partners of joint venture or partnership Named Insureds are insureds with respect to such spouses'acts, errors or omissions in the conduct of the Named Insured's business, 10. EXPECTED OR INTENDED INJURY—EXCEPTION FOR REASONABLE FORCE Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Expected or Intended Injury and replace it with The following: This insurance does not apply to: Expected or Intended Injury Bodily injury or property damage expected or intended from the standpoint of the insured. This exclusion does not apply to bodily injury or property damage resulting from the use of reasonable force to protect persons or property, 11. GENERAL AGGREGATE LIMBS OF INSURANCE-PER PROJECT A. For each construction project away from premises the Named Insured owns or rents, a separate Construction Project General Aggregate Limit, equal to the amount of the General Aggregate Limit shown in the Declarations, Is the most the Insurer will pay for the sum of: 1. All damages under Coverage A, except damages because of bodily injury or property damage included in the products-completed operations hazard;and 2. All medical expenses under Coverage C, that arise from occurrences or accidents which can be attributed solely to ongoing operations at that construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations, nor the Construction Project General Aggregate Limit of any other construction project. B. Alf: 1. Damages under Coverage B, regardless of the number of locations or construction projects Involved; 2. Damages under Coverage-A, caused by occurrences which cannot be attributed solely to ongoing operations at a single construction project, except damages because of bodily injury or property damage included in the products-completed operations hazard;and 3. Medical expenses under Coverage C caused by accidents which cannot be attributed solely to ongoing operations at a single construction project, will reduce the General Aggregate Limit shown in the Declarations. C. The limits shown in the Declarations for Each Occurrence, for Damage To Premises Rented To You and for Medical Expense continue to apply, but will be subject to either the Construction Project General Aggregate Limit or the General Aggregate Limit shown in the Declarations, depending on whether the occurrence can be attributed solely to ongoing operations at a particular construction project. D. When coverage for liability arising out of the products-completed operations hazard is provided, any payments for damages because of bodily injury or property damage included in the products-completed operations hazard will reduce the Products-Completed Operations Aggregate Limit shown in the Declarations, regardless of the number of projects Involved. CNA74705XX(1-15) Page 8 of 17 Policy No: G080440888 AMERICAN CASUALTY CO OF READING,pA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its permission, CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement E. II a single construction project away from premises owned by or ranted to the Insured has been ab<3ndoned and then restarted, or It the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables,the project will still be doomed to be the same construction project. F. The provisions of LIMITS OF INSURANCE not otherwise modified by this endorsement shall continue to apply as stipulated. 12. IN REM ACTIONS A quasi in rem action against any vossol owned or operated by or for the Named Insured, or chartered by or for the Named Insured, will be treated in the same manner as though the action wore in porsonam against the Named Insured. 13. INCIDENTAL HEALTH CARE MALPRACTICE COVERAGE Solely with respect to bodily injury that arises out of a health care incident: A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Insuring Agreement is amended to replace Paragraphs 1.b.(1)and 1.b.(2)with the following: b. This insurance applies to bodily Injury provided that the professional health care services are Incidental to the Named Insured's primary business purpose,and only if: (1) such bodily injury is caused by an occurrence that takes place In the coverage territory. (2) the bodily injury first occurs during the policy period. All bodily injury arising from an occurrence will be deemed to have occurred at the time of the first act, error, or omission that is part of the occurrence; and B. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to: im add the following to the Employers Liability exclusion: This exclusion applies only if the bodily injury arising from a health care Incident is covered by other liability insurance available to the Insured (or which would have been available but for exhaustion of its limits). ii. delete the exclusion entitled Contractual Liability and replace it with the following: This insurance does not apply to: Contractual Liability the Insured's actual or alleged liability under any oral or written contract or agreement, Including but riot limited to express warranties or guarantees. mmi ill. add the following additional exclusions: This insurance does not apply to: Discrimination any actual or alleged discrimination, humiliation or harassment, including but not limited to claims based on an individual's race, creed, color, age, gender, national origin, religion, disability, marital status or sexual orientation. Dishonesty or Crime Any actual or alleged dishonest,criminal or malicious act, error or omission, Medicare/Medicaid Fraud CNA74705XX(1-15) Page 9 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,PA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its permIssbn, CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement any actual or alleged violahnn of law with respect to Medicare, Medicaid, Tricare or any similar federal, state or local governmental program. Services Excluded by Endorsement Any health care Incident for which coverage is excluded by endorsement. C. DEFINITIONS is amended to: i. add the following definitions: Health care incident means an act, error or omission by the Named Insured's employees or volunteer workers in the rendering of: a. professional health care services on behalf of the Named Insured or b. Good Samaritan services rendered in an emergency and for which no payment Is demanded or received. Professional health care services moans any health care services or the related furnishing of food, beverages, medical supplies or appliances by the following providers in their capacity as such but solely to the extent they are duly licensed as required: a. Physician; b. Nurse; c. Nurse practitioner; • d. Emergency medical technician; e. Paramedic; f. Dentist; g. Physical therapist; h. Psychologist; i. Speech therapist; I. Other allied health professional; or Professional health care services does not include any services rendered in connection with human clinical trials or product testing. ii. delete the definition of occurrence and replace it with the following: Occurrence means a health care incident. All acts, errors or omissions that are logically connected by any common fact,circumstance,situation, transaction, event, advice or decision will be considered to constitute a single occurrence; iii. amend the definition of Insured to: a. add the following: the Named Insured's employees are Insureds with respect to: (1) bodily injury to a co-employee while in the course of the co-employee's employment by the Named Insured or while performing duties related to the conduct 01 the Named Insured's business; and CNA74705XX(1-15) Page 10 of 17 Policy No: b080440888 AMER J.CAN CASUALTY CO OF READING,PA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted materiel at Insurance Services Office,Inc.,with tis permission, CNA CNA PARANpUNT Contractors' General Liability Extension Endorsement (2) bodily injury to a volunteer worker while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. the Named Insured's volunteer workers are Insureds with respect to: (1) bodily injury to a co-volunteer worker while performing duties related to the conduct of the Named Insured's business;and (2) bodily injury to an employee while in the course of the employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. b. delete Subparagraphs(a),(b),(c)and(d)of Paragraph 2.a.(1)of WHO IS.AN INSURED. D. The Other Insurance condition is amended to delete Paragraph b.(1) in its entirety and replace it with the following: Other Insurance b. Excess Insurance (1) To the extent this insurance applies, It is excess over any other insurance, self insurance or risk transfer instrument, whether primary, excess, contingent or on any other basis, except for insurance purchased specifically by the Named Insured to be excess of this coverage. 14. JOINT VENTURES/PARTNERSHIP/LIMITED LIABILITY COMPANIES WHO IS AN INSURED is amended to delete its last paragraph and replace it with the following: g No person or organization is an Insured with respect to the conduct of any current or past partnership,joint venture or limited liability company that is not shown as a Named Insured in the Declarations, except that if the Named Insured was a joint venturer, partner, or member of a limited liability company and such joint venture, partnership or limited liability company terminated prior to or during the policy period, such Named Insured is an Insured with respect to A3 its interest in such joint venture, partnership or limited liability company but only to the extent that: a. any offense giving rise to personal and advertising injury occurred prior to such termination date, and the A personal and advertising Injury arising out of such offense first occurred after such termination date; b. the bodilyInjury or property 1 rY p damage first occurred after such termination date;and C. there is no other valid and collectible insurance purchased specifically to insure the partnership, joint venture or limited liability company; and If the joint venture, partnership or limited liability company is or was insured under a consolidated (wrap-up) insurance program,then such insurance will always be considered valid and collectible for the purpose of paragraph c.above. But this provision will not serve to exclude bodily injury, property damage or personal and advertising injury that would otherwise be covered under the Contractors General Liability Extension Endorsement provision entitled WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS. Please see that provision for the definition of consolidated(wrap-up)insurance program. • 15. LEGAL LIABILITY — DAMAGE TO PREMISES / ALIENATED PREMISES / PROPERTY IN THE NAMED INSURED'S CARE,CUSTODY OR CONTROL A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusion J.Damage to Property in its entirety and replace it with the following: This insurance does not apply to: - CNA74705XX(1-15) Policy No: 608044O8OO Page 11 of 17 Endorsement No: 1 AMERICAN CASUALTY CO OF READING,PA Effective Date: 04/05/2020 Insured Name: EARTH TECH ENTERPRISES INC Copyright CNA All Rights Reserved_ Includes copyrighted material at Insurance Services Office,Inc„with Its permission, CNA CNA PAR_ MOUNT Contractors' General Liability Extension Endorsement j. Damage to Property • Property damage to: (1) Property the Named Insured owns, rents,or occupies, including any costs or expenses incurred by you, or any other person, organization or entity, for repair, replacomont, enhancement, r maintenanco of such property for any reason, including prevention of injury to a person rStoration damage to another's property; or (2) Premises th these Named m ed Insured sells, gives away or abandons, if the property damage arises out of any par(3) Property loaned to the Named Insured; (4) Personal property in the care, custody or control of the Insured; (5) That particular part of real property on which the Named Insured or any contractors or subcontractors working directly or Indirectly on the Named Insured's behalf are performing operations, if the property damage arises out of those operations;or (6) That particular part of any property that must be restored, repaired or replaced because your work was incorrectly performed on it. Paragraphs(1),(3)and(4)of this exclusion do not apply to property damage (other than damage by fire)to premises rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, nor to the contents of premises rented to the Named Insured for a period of 7 or fewer consecutive days.A separate limit of insurance applies to Damage To Premises Rented To You as described in LIMITS OF INSURANCE. Paragraph(2)of this exclusion does not apply if the premises are your work. Paragraphs (3), (4), (5) and (6) of this exclusion do not apply to liability assumed under a sidetrack agreement, Paragraph (6) of this exclusion does not apply to property damage included in the products-completed operations hazard. Paragraphs(3)and(4)of this exclusion do not apply to property damage to: i, tools, or equipment the Named Insured borrows from others, nor ii. other personal property of others in the Named Insured's care,custody or control while being used in the Named Insured's operations away from any Named Insured's premises. However,the coverage granted by this exception to Paragraphs(3)and(4)does not apply to: a. property at a job site awaiting or during such property's Installation,fabrication, or erection; b. property that is mobile equipment leased by an Insured; c. property that Is an auto,aircraft or watercraft; d. property in transit; or e. any portion of property damage for which the Insured has available other valid and collectible insurance, or would have such insurance but for exhaustion of its limits, or but for application of one of its exclusions, A separate limit of insurance and deductible apply to such property of others. See LIMITS OF INSURANCE as amended below, CNA74705XX(1-15) Policy No: 6080440888 Page 12 of 17 AMERICAN CASUALTY CO OF READING ,pA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright Ct A At Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its permission, CNA CNA PARq� MOUNT Contractors' General Liability Extension Endorsement B: Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the Paragraph entitled Exclusions is amended to delete its last paragraph and replace it with the following: Exclusions c. through n. do not apply to damage by fire to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner, nor to damage to the contents of premises rented to a Named Insured for a period of or fewer consecutive days. A separate limit of insurance applies to this coverage as described in LIMITS OF INSURANCE, C. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5.above, $25,000 is the most the Insurer will pay under Coverage A for damages arising out of any one occurrence because of the sum of all property damage to borrowed tools or equipment, and to other personal property of others in the Named Insured's care, custody or control, while being used in the Named Insured's operations away from any Named Insured's promises. The Insurer's obligation to pay such property damage does not apply until the amount of such property damage exceeds$1,000.1he Insurer has the right but not the duty to pay any portion of this $1,000 it) order to effect settlement. If the Insurer exercises that right, the Named Insured will promptly reimburse the Insurer for any such amount, D. Paragraph 6., Damage To Premises Rented To You Limit,of LIMITS OF INSURANCE is deleted and replaced by the following: 6. Subject to Paragraph 5. above, (the Each Occurrence Limit), the Damage To Premises Rented To You Limit is the most the Insurer will pay under Coverage A for damages because of property damage to any one premises while rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, including contents of such premises rented to the Named Insured for a period of 7 or fewer consecutive days.The Damage To Premises Rented To You Limit is the greater of: a. $500,000;or b. The Damage To Premises Rented To You Limit shown in the Declarations. E. Paragraph 4.b.(1)(aXii)of the Other Insurance Condition is deleted and replaced by the following: (ii) That is property insurance for premises rented to the Named Insured,for premises temporarily occupied by the Named Insured with the permission of the owner; or for personal property of others in the Named Insured's care, custody or control; 16. LIQUOR LIABILITY Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Liquor Liability. This LIQUOR LIABILITY provision does not apply to any person or organization who otherwise qualifies as an `� additional insured on this Coverage Part. 17. MEDICAL PAYMENTS A. LIMITS OF INSURANCE is amended to delete Paragraph 7. (the Medical Expense Limit) and replace it with the following: 7. Subject to Paragraph 5. above (the Each Occurrence Limit), the Medical Expense Limit is the most the Insurer will pay under Coverage C— Medical Payments for all medical expenses because of bodily injury sustained by any one person.The Medical Expense Limit is the greater of: (1) $15,000 unless a different amount is shown here: $N,NNN,NNN,NNN; or (2) the amount shown in the Declarations for Medical Expense Limit. CNA74705XX(1-15) -- Page 13 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF REknING,PA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date; 04/05/2b20 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc„with Rs permission. CNACNA PARAMOUNT Contractors' General Liability Extension EndorSement B. Under COVERAGES, the Insuring Agreement of Coverage C — Medical Payments is amended to replace Paragraph 1.a.(3Xb)with the following: (b) The expenses are incurred and reported to the Insurer within three years of the date of the accident;and 18. NON-OWNED AIRCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended as follows: The exclusion entitled Aircraft,Auto or Watercraft is amended to add the following: This exclusion does not apply to an aircraft not owned by any Named Insured, provided that: 1. the pilot in command holds a currently effective certificate issued by the duly constituted authority of the United States of America or Canada, designating that person as a commercial or airline transport pilot; 2. the aircraft is rented with a trained,paid crew to the Named Insured;and 3. the aircraft is not being used to carry persons or property for a charge, 19. NON-OWNED WATERCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to dolote subparagraph (2) of the exclusion entitled Aircraft, Auto or Watercraft, and replace it with tho following. This exclusion does not apply to: (2) a watercraft that is not owned by any Named Insured, provided the watercraft is: (a) less than 75 feet long;and (b) not being used to carry persons or property for a charge. 20. PERSONAL AND ADVERTISING INJURY—DISCRIMINATION OR HUMILIATION A. Under DEFINITIONS,the definition of personal and advertising injury is amended to add the following tort: Discrimination or humiliation that results in injury to the feelings or reputation of a natural person. B. Under COVERAGES, Coverage B — Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to: 1. delete the Exclusion entitled Knowing Violation Of Rights Of Another and replace It with the following: This insurance does not apply to: Knowing Violation of Rights of Another Personal end advertising injury caused by or at the direction of the Insured with the knowledge that the act would violate the rights of another and would inflict personal and advertising injury. This exclusion shall not apply to discrimination or humiliation that results in injury to the feelings or reputation of a natural person, but only if such discrimination or humiliation is not done intentionally by or at the direction of: (a) the Named Insured;or (b) any executive officer, director, stockholder, partner, member or manager (if the Named Insured is a limited liability company)of the Named Insured. 2. add the following exclusions: CNA74705XX(1-15) Page 14 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,PA Endorsement No: i Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc„with Its pernYsslon. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement This insurance does not apply to: Employment Related Discrimination Discrimination or humiliation directly or indirectly related to the employment, prospective employment, past employment or termination of employment of any person by any Insured, Premises Related Discrimination discrimination or humiliation arising out of the sale, rental, lease or sub-lease or prospective sale, rental, lease or sub-lease of any room, dwelling or premises by or at the direction of any Insured. Notwithstanding the above, there is no coverage for fines or penalties levied or imposed by a governmental entity because of discrimination. The coverage provided by this PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization whose status as an Insured derives solely from Provision 1.ADDITIONAL INSURED of this endorsement;or attachment of an additional insured endorsement to this Coverage Part. This PERSONAL AND ADVERTISING INJURY—DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 21. PERSONAL AND ADVERTISING INJURY-CONTRACTUAL LIABILITY A. Under COVERAGES, Coverage B —Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Contractual Liability. B. Solely for the purpose of the coverage provided by this PERSONAL AND ADVERTISING INJURY - g CONTRACTUAL LIABILITY provision, the following changes are made to the section entitled SUPPLEMENTARY PAYMENTS—COVERAGES A AND B: 1. Paragraph 2.d. is replaced by the following: m d. The allegations in the suit and the information the Insurer knows about the offense alleged in such suit are such that no conflict appears to exist between the interests of the Insured and the interests of the indemnitee; 2. The first unnumbered paragraph beneath Paragraph 2.f.(2Xb)Is deleted and replaced by the following: So long as the above conditions are met, attorneys fees incurred by the Insurer in the defense of that indemnitee, necessary litigation expenses incurred by the Insurer, and necessary litigation expenses incurred by the indemnitee at the Insurer's request will be paid as defense costs. Such payments will not be deemed to be damages for personal and advertising Injury and will not reduce the limits of insurance. C. This PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY Provision does not apply if Coverage B —Personal and Advertising injury Liability is excluded by another endorsement attached to this ,p.paosionIM Coverage Part. This PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY Provision does not apply to any E✓ person or organization who otherwise qualifies as an additional insured on this Coverage Part_ 22. PROPERTY DAMAGE—ELEVATORS A. Under COVERAGES, Coverage A - Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended such that the Damage to Your Product Exclusion and subparagraphs(3), (4) and(6) of the Damage to Property Exclusion do not apply to property damage that results from the use of elevators. CNA74705XX(1-15) Page 15 of 17 Policy No: 6080440888 AMERICAN CASUALTY CO OF READING,PA Endorsement No: 1 Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement B. Solely for the purpose of the coverage provided by this PROPERTY DAMAGE — ELEVATORS provision, the Other Insurance conditions is amended to add the following paragraph: This insurance is excess over any of the other insurance, whether primary, excess,-contingent or on any other basis that is Property insurance covering property of others damaged from the use of elevators. 23. SUPPLEMENTARY PAYMENTS The section entitled SUPPLEMENTARY PAYMENTS—COVERAGES A AND B is amended as follows: A. Paragraph 1.b.is amended to delete the$250 limit shown for the cost of bail bonds and replace it with a $5,000. limit; and B. Paragraph 1.d. is amended to delete the limit of $250 shown for daily loss of earnings and replace it with a $1,000. limit. 24. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS If the Named Insured unintentionally fails to disclose all existing hazards at the Inception date of the Named Insured's Coverage Part,the Insurer will not deny coverage under this Coverage Part because of such failure. 25. WAIVER OF SUBROGATION-BLANKET Under CONDITIONS, the condition entitled Transfer Of Rights Of Recovery Against Others To Us is amended to add the following: The Insurer waives any right of recovery the Insurer may have against any person or organization because of payments the Insurer makes for injury or damage arising out of: 1. the Named Insured's ongoing operations;or 2. your work included in the products-completed operations hazard. However, this waiver applies only when the Named Insured has agreed in writing to waive such rights of recovery in a written contract or written agreement,and only if such contract or agreement: 1. is in effect or becomes effective during the term of this Coverage Part;and 2. was executed prior to the bodily injury, property damage or personal and advertising injury giving rise to the claim, 26. WRAP-UP EXTENSION:OCIP,CCIP,OR CONSOLIDATED(WRAP-UP)INSURANCE PROGRAMS Note: The following provision does not apply to any public construction project in the state of Oklahoma, nor to any construction project in the state of Alaska, that is not permitted to be insured under a consolidated (wrap-up) insurance program by applicable state statute or regulation. If the endorsement EXCLUSION — CONSTRUCTION WRAP-UP is attached to this policy, or another exclusionary endorsement pertaining to Owner Controlled Insurance Programs (O,C.I,P,) or Contractor Controlled Insurance Programs(C.C.I.P.)is attached,then the following changes apply: A. The following wording is added to the above-referenced endorsement: With respect to a consolidated (wrap-up) insurance program project in which the Named Insured is or was involved, this exclusion does not apply to those sums the Named Insured become legally obligated to pay as damages because of: 1. Bodily injury, property damage, or personal or advertising Injury that occurs during the Named insured's ongoing operations at the project, or during such operations of anyone acting on the Named Insured's behalf; nor CNA74705XX(1-15) Page 16 of 17 Policy No: 50804408a8 AMERICAN CASUALTY CO OF READING,PA Endorsement No: Insured Name: EARTH TECH ENTERPRISES INC Effective Date: 04/05/2020 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with Its permission. CNA CNA PARAMpU T Contractors' General Liability Extension EndorSement 2. Bodily injury or property damage Included within the products-completed operations hazard that arises out of those portions of the project that are not residential structures. B. Condition 4.Other Insurance is amended to add the following subparagraph 4.b.(1Xc): This insurance is excess over: (c) Any of the other insurance whether primary, excess,contingent or any other basis that is insurance available to the Named Insured as a result of the Named Insured being a participant in a consolidated (wrap-up) insurance program, but only as respects tho Named Insured's involvement in that consolidated(wrap-up) insurance program. C. DEFINITIONS is amended to add the following definitions: Consolidated(wrap-up) insurance program means a construction, erection or demolition project for which the prime contractor/project manager or owner of the construction project has secured general liability insurance covering some or all of the contractors or subcontractors involved in the project, such as an Owner Controlled Insurance Program (O.C.I.P.)or Contractor Controlled Insurance Program(C,C.I.P.). Residential structure means any structure where 30%or more of the square foot area is used or is Intended to be used for human residency, including but not limited to: 1. single or multifamily housing, apartments, condominiums, townhouses, co-operatives or planned unit developments; and 2. the common areas and structures appurtenant to the structures in paragraph 1. (including pools, hot tubs, detached garages, guest houses or any similar structures). However, when there is no individual ownership of units, residential structure does not include military housing, college/university housing or dormitories, long term care facilities, hotels or motels. Residential structure also does not include hospitals or prisons. This WRAP-UP EXTENSION: OCIP, CCIP,OR CONSOLIDATED(WRAP-UP) INSURANCE PROGRAMS Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. Ir 8 All other terms and conditions of the Policy remain unchanged. m _ This endorsement,which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. a CNA74705XX(1-15) Policy No: 6080440888� Page 17 of 17 Endorsement No: 1 AMERICAN CASUALTY CO OF READING,PA Effective Date: 04/05/2020 Insured Name: EARTH TECH ENTERPRISES INC Copyright CNA All nights Reserved. Includes copyrighted material at Insurance Services Office,Inc.,with Its permission, CNABusiness Auto Policy Policy Endorsement CONTRACTORS EXTENDED COVERAGE ENDORSEMENT - BUSINESS AUTO PLUS 4 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM 1. LIABILITY COVERAGE A. Who Is An Insured The following is added to Section II, Paragraph A.1., Who Is An Insured: 1. a. Any incorporated entity of which the Named Insured owns a majority of the voting stock on the date of inception of this Coverage Form; provided that, b. The insurance afforded by this provision A.1. does not apply to any such entity that is an insured under any other liability "policy" providing auto coverage. 2. Any organization you newly acquire or form, other than a limited liability company, partnership or joint venture, and over which you maintain majority ownership interest. The insurance afforded by this provision A.2.: a. Is effective on the acquisition or formation date, and is afforded only until the end of the policy period of this Coverage Form, or the next anniversary of its inception date, whichever is earlier. b. Does not apply to: (1) Bodily injury or property damage caused by an accident that occurred before you acquired or formed the organization; or (21 Any such organization that is an insured under any other liability "policy" providing auto coverage. 3. Any person or organization that you are required by a written contract to name as an additional insured is an insured but only with respect to their legal liability for acts or omissions of a person, who qualifies as an insured under SECTION II — WHO IS AN INSURED and for whom Liability Coverage is afforded under this policy. If required by written contract, this insurance will be primary and rlutl-cunl.ribul.ury to insurance on which the additional Insured is a Named Insured. 4. An employee of yours is an insured while operating an auto hired or rented under a contract or agreement in that employee's name, with your permission, while performing duties related to the conduct of your business. "Policy", as used in this provision A. Who Is An Insured, includes those policies that were in force on the inception date of this Coverage Form but: 1. Which are no longer in force; or 2. Whose limits have been exhausted. B. Bail Bonds and Loss of Earnings Section II, Paragraphs A.2. (2) and A.2. (4) are revised as follows: 1. In a.(2), the limit for the cost of bail bonds is changed from $2,000 to $5,000; and 2. In a.(4), the limit for the loss of earnings is changed from $250 to $500 a day. Form No: CNA63359XX (04-2012) ----- Endorsement Effective Date: Endorsement Expiration Date: Policy No:ct1A 6080440860 Endorsement No: 12; Page: 1 of 4 Policy Effective Daate:te:04 /05/2020 Underwriting Company: The Continental Insurance Company. 1 51 N Franklin St, Chicago, IL 60606 Policy Page: 73 of 130 e Cuuyiiglit CNA All Rights Reserved. Includes co pyrighted material of the CNABusiness Auto Policy Policy Endorsement C. Fellow Employee Section II, Paragraph 8.5 does not apply, Such coverage as is afforded by this provision C. is excess over any other collectible insurance, II. PHYSICAL DAMAGE COVERAGE A. Glass Breakage — Hitting A Bird Or Animal — Falling Objects Or Missiles The following is added to Section III, Paragraph A.3.: With respect to any covered auto, any deductible shown in the Declarations will not apply to glass breakage if such glass is repaired, in a manner acceptable to us, rather than replaced. B. Transportation Expenses Section III, Paragraph A.4.a. is revised, with respect to transportation expense incurred by you, to provide: a. $60 per day, in lieu of $20; subject to b. $1,800 maximum, in lieu of $600. C. Loss of Use Expenses Section III, Paragraph A.4.b. is revised, with respect to loss of use expenses incurred by you, to provide: a, $1,000 maximum, in lieu of $600. D. Hired "Autos" The following is added to Section III. Paragraph A.: 5. Hired "Autos" If Physical Damage coverage is provided under this policy, and such coverage does not extend to Hired Autos, then Physical Damage coverage is extended to: a. Any covered auto you lease, hire, rent or borrow without a driver; and b. Any covered auto hired or rented by your employee without a driver, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business. c. The most we will pay for any one accident or loss is the actual cash value, cost of repair, cost of replacement or $75,000, whichever is less, minus a $500 deductible for each covered auto. No deductible applies to loss caused by fire or lightning. d. The physical damage coverage as is provided by this provision is equal to the physical damage coverage(s) provided on your owned autos. e. Such physical damage coverage for hired autos will: (1) Include loss of use, provided it is the consequence of art accident for which the Named Insured is legally liable, and as a result of which a monetary loss is sustained by the leasing or rental concern. (2) Such coverage as is provided by this provision will be subject to a limit of $750 per accident- E. Airbag Coverage The following is added to Section III, Paragraph B.3.: The accidental discharge of an airbag shall not be considered mechanical breakdown. Form No: CNA63359XX l04-20121 Endorsement Effective Date: Policy No:BUA 6080440860 Endorsement Expiration Date: Policy Effective Date;04/0512020 Endorsement No: 12;Page: 2 of 4 Underwriting Company: The Continental Insurance Company, 151 N Franklin St,Chicago, IL 60606 Policy Page: 74 of 130 Copyright CNA All Rights Reserved. Includes copyrighted material of the CNA Business Auto Policy Policyy Et7dors F. Electronic Equipment ement Section III, Paragraphs B.4.c and B.4.d. are deleted and replaced by the following: c. Physical Damage Coverage on a covered auto also applies to loss to any permanently installed electronic equipment including its antennas and other accessories d. A $100 per occurrence deductible applies to the coverage provided by this provision. G. Diminution In Value The following is added to Section lli, Paragraph B.6.: Subject to the following, the diminution in value exclusion does not apply to: a. Any covered auto of the private passenger type you lease, hire, rent or borrow, for a period of 30 days or less, while performing duties related to the conduct of without a driver and your business; b. Any covered auto of the private passenger type hired or rented by your employee driver for a period of 30 days or less, under a contract in that individual employee's Ithout a your permission, while performing duties related to the conduct of your business. name, with c. Such coverage as is provided by this provision is limited to a diminution in value loss arising directly out of accidental damage and not as a result of the failure to make repairs; faulty or incomplete maintenance or repairs; or the installation of substandard parts. d. The most we will pay for loss to a covered auto in any one accident is the lesser of: 11) $5,000; or (2) 20% of the auto's actual cash value (ACV). Ill. Drive Other Car Coverage — Executive Officers The following is added to Sections II and HI: 1. Any auto you don't own, hire or borrow is a covered auto for Liability Coverage while being used by, and for Physical Damage Coverage while in the care, custody or control of, any of your ".executive officers", except: a. An auto owned by that "executive officer" or a member of that person's household; or b. An auto used by that "executive officer" while working in a business of selling, servicing, repairing or parking autos. Such Liability and/or Physical Damage Coverage as is afforded by this provision. (1) Equal to the greatest of those coverages afforded any covered auto; and (2) Excess over any other collectible insurance. 2. For purposes of this provision, "executive officer" means a person holding any of the officer positions created by your charter, constitution, by-laws or any other similar governing document, and, while a resident of the same household, includes that person's spouse. Such "executive officers" are insureds while using a covered auto described in this provision. IV. BUSINESS AUTO CONDITIONS A. Duties In The Event Of Accident, Claim, Suit Or Loss The following is added to Section IV, Paragraph A.2.a.: Form No: CNA63359XX (04-2012) �.._ Endorsement Effective Date: Policy No:BUA 6080410860 Endorsement No: 12; Page: 3 of 4 Endorsement Expiration Date: Policy Effective Date:04/05/2020 Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 Policy Page: 75 of 130 "'Copyright CNA All Rights Reserved. Includes copyrighted —`— • • material of the CA Business Auto Policy Pulls y Endorsernent (4) Yaw employees may know of an accident or loss. This will not mean that you Itav�. such knowledge, unless such accident or loss is known to you or if you are not an individual, to any of your executive officers or partners or your insurance manager. The following is added to Section (V, Paragraph A.2.b.: (6) Your employees may know of documents received concerning a claim or suit. This will not mean or if you are that you have such knowledge, unless receipt of such documents is known to you not an individual, to any of your executive officers or partners or your insurance manager. B. Transfer Of Rights Of Recovery Against Others To Us The following is added to Section IV, Paragraph A,S. Transfer Of Rights Of Recovery Against Others To Us: We waive any right of recovery we may have, because of payments we make for injury or damage, against any person or organization for whom or which you are required by written contract or agreement to obtain this waiver from us. This injury or damage must arise out of your activities under a contract with that person or organization. You must agree to that requirement prior to an accident or loss. C. Concealment, Misrepresentation or Fraud The following is added to Section IV, Paragraph B.2.: Your failure to disclose all hazards existing on the date of inception of this Coverage Form shall not prejudice you with respect to the coverage afforded provided such failure or omission is not intentional. D. Other Insurance • The following is added to Section IV, Paragraph B.S.: Regardless of the provisions of Paragraphs 5.a. and 5.d. above, the coverage provided by this policy shall be on a primary non-contributory basis. This provision is applicable only when required by a written contract. That written contract must have been entered into prior to Accident or Loss. E. Policy Period, Coverage Territory Section IV, Paragraph B. 7.(S(.(al- is revised to provide: a. 45 days of coverage in lieu of 30 days. V. DEFINITIONS Section V. paragraph C. is deleted and replaced by the following: Bodily injury means bodily injury, sickness or disease sustained by a person, including mental anguish, mental injury or death resulting from any of these. Form No: CNA63359XX (04-2012) Endorsement Effective Date: Policy No:RDA 6080440860 Endorsement Expiration Date: Policy Effective Date: 04/05/2020 Endorsement No: 12; Page:4 of 4 Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, It 60606 Policy Page: 76 of 130 Copyright CNA All Rights Reserved. Includes copyrighted material of the