Loading...
Amendment #1 - Lakewood Coutry Club INSTR 5922682 OR 5815 PG 1352 RECORDED 9/14/2020 2:23 PM PAGES 9 CLERK OF THE CIRCUIT COURT AND COMPTROLLER COLLIER COUNTY FLORIDA REC$78.00 Amendment No. 1 to Major User Agreement for Delivery and Reuse of Irrigation Quality (IQ) Water Lakewood Country Club THIS Amendment No. 1 to Major User Agreepi nt for he Del' ery and Reuse of IQ Water (the"Amendment") is made and entered into this )'"flay of ' - 2020 by and between Lakewood Country Club of Naples, Inc., a Florida non-profit corporation,whose mailing address is 4235 Lakewood Blvd. Naples, FL 34112 (hereinafter referred to as "User'") and the Collier Water- Sewer District (hereinafter referred to as "District"), collectively, the Parties hereto ("Parties"). This Amendment will take effect on October 1, 2020 and will be effective through September 30, 2025. RECITALS WHEREAS, on June 25, 2013. the Collier County Board of County Commissioners adopted Collier County Ordinance No. 2013-48, relating to the Collier County Water-Sewer District ("District") Irrigation Quality ("IQ") Water. which among other matters requires Users to enter into Agreements with the District for the sale and purchase of IQ Water; and WHEREAS. IQ Water offers an environmentally sustainable method for managing wastewater disposal, conserving potable water sources, and Section 403.064, F.S. encourages local governments to implement reuse projects and places limitations on deep well injection and other forms of effluent disposal; the District desires to use for itself and make available to the public, IQ Water as an alternative water resource to be used for both irrigation and non-irrigation purposes; and. WHEREAS, all wastewater treatment plant permittees that reuse IQ Water or dispose of effluent upon any property owned by another party, must enter into a binding agreement between the involved parties to ensure that construction, operation. maintenance, and monitoring of such use meets the requirements of Chapters 62-600, 62-620 and 62-610. F.A.C.: and. WHEREAS. the Board has also adopted an IQ Water Policy, as it may be supplemented and amended from time to time, which is intended to provide beneficial public use of IQ Water by ensuring the optimum utilization of the District's limited water supplies; and. WHEREAS.on June 11, 2013.the Collier County Board of County Commissioners approved a standardized format for the Major User Agreement for Delivery and Reuse of IQ Water (the "Agreement") to be utilized by all of the Major Users of the District's IQ Water; and WHEREAS, the Agreement has a five-year term commencing on October 1. 2015 and is scheduled to terminate on September 30. 2020. subject to being renewed for successive five-year terms upon the mutual agreement of the parties as set forth in numbered paragraph 7. Term. of the Agreement; and WHEREAS. the parties wish to extend the term of this Agreement for another five-year term Words amuck Through are deleted; Words Underlined are added t ;�� to the terms of this Agreement to provide the User with additional volumes of IQ Water beyond the User's Allocation to approximate the historic volumes delivered to the User. Delivery of this additional IQ Water at any time does not grant the User with an increase to its Allocation under this Agreement. No Allocations will exceed the amount as is determined by the availability of the IQ Water. I f th U d f li it' the., nt of IQ W ter recei„ed to a speci fic The District agrees that it will provide the User with its Allocation of IQ Water instead of the deep injection of IQ Water (including charging aquifer storage and recovery wells); except for reclaimed water needed for water reclamation facility treatment processes, injection well testing, flushing and other regulatory requirements or as it may be deemed necessary by the District to do so from time to time in order to protect the Public's health and safety. For purposes of this Agreement. each day equals a twenty-four (24) hour period, which begins at midnight, 12:00 a.m. The District retains the right and sole discretion with respect to delivery times to the Users. 1Q \��er Availability, existing Majovr-UU,`ersswill--ti n then zed nt ,1etermined by the IQW A D „tilization change e .l, e f r e isting Major Users , ,i11 a based on then nt of the Ma;or 4. Numbered paragraph 15. User Responsibilities Downstream of the Point of Delivery is hereby amended as follows: 15. USER RESPONSIBILITIES DOWNSTREAM OF THE POINT OF DELIVERY. Except to the extent. if any, clearly and expressly specified in the special provisions paragraph in this Agreement to the contrary. the User shall take full responsibility for the design, construction, permitting, financing. compliance, operation, maintenance, and repair of the IQ water system downstream of the POD as outlined in Ordinance No. 2013-48. All User-owned pump stations must be equipped to automatically shut down due to low pressure or lack of flow. The District shall not be liable for User 3 Words Steel rough are deleted; Words Underlined are added (FDEP) provides its approval of the reinstatement to the District in a writing, if necessary. The User will be responsible for all costs incurred by the District and the User resulting from the cross connection. These costs include all potable or IQ Water used, including all potable water used for flushing lines, and follow-up cross connection inspections performed by a licensed professional irrigation contractor or a certified Reclaimed Water Field Inspector as mandated by the District. IQ Water service will not be restored prior to submittal of a written report summarizing the cross connection inspections with subsequent written approval by the District. The User shall provide results of cross connection inspections performed upon initial connection to the District's System and take all reasonable precautions to prevent any cross connections while making repairs or extensions to the User's irrigation system. The User must provide the results of a cross connection inspection performed at each internal service connection prior to each future Agreement renewal. At the end of the five-year term, one hundred percent of all potable and IQ Water service connections shall have been inspected. The results of the cross connection inspections must be submitted to the District by the User within thirty days of inspection. At the time of the Agreement Renewal, the User is required to submit a minimum of three cross connection inspections. The service connections that require inspections are listed in Exhibit "C." Additional cross connections inspections may be required as determined by the District when additional service connections are made or cross connections are found. All inspections are to be completed on the Cross-Connection Inspection Form (Exhibit "F"). One inspection form is required for each potable meter service connection. All units receiving potable water from that service connection must be tested for a cross connection. Inspection should be completed by a licensed professional irrigation contractor or a certified Reclaimed Water Field Inspector or an individual that has been trained to complete cross connection inspections. 6. Numbered paragraph 26. Notices is hereby amended as follows: NOTICES. Any notice,request,demand,instruction or other communication to be given to either party hereunder shall be in writing sen# electronically with a request for confirmation or receipt. or by facsimile with automated confirmation of receipt; or hand delivery by a private service; or by registered or certified United States mail, return receipt requested, postage prepaid; or personal delivery addressed as follows: 5 Words Streek-Through are deleted; Words Underlined are added Witnesses: AS TO USER • fitness (Signature) Name 3(,ihn 11 i ,R icn Lakewood Country Club of Naples, Inc., a Florida n -prQ4iit corporatio By: ap,, ye,b__ , i, tness ignature) .Di.O l C C t" r l,, Pr e>l 1 E4- r Printed,name and title Name: (hflb\ M< VYfl\ STATE OF -- toil COUNTY OF The foregoing Amendment No. 1 to Major User Agreement for Delivery and Reuse of Irrigation Quality (IQ) Wate�r�jy�as ackno ledged bFfore me by means of physical resence or El online Ytariza ion this 7wi day of 0, j , 2020 by Di ;D�h`\ P hpF 1 (Name),as ref,' jcent (Title), on behalf of Lakewood Country Club o`f'Naples, Inc., a Florida non- profit corporation. Such person(s)Notary Public must check applicable box: o°°,2 5'", % are personally known to me. T sr: Ry'•gyp: ❑ produced her current driver license. �'MY Comm.Exp,res.tn: AUGUST 30,2020: ❑ produced as identification. 1 • No.GG 309320 : : , 4k;*.elpyR.1...:;46 k a i 10 4 4 MS; .; ,P. k • r .L1 A Le _i jt i 4,o *Him No Pub i lI Prin ed N of Notary: UI [( LA' e Fs Commission Number: ,, ' ' 1 L My Commission Expires: A UL 3D,c3; O' 7 Words StruckStfuelt4lifough are deleted; Words Underlined are added 0 Exhibit F to Major User Agreement Collier County Public Utilities Irrigation Quality Section Cross Connection Inspection Form Subdivision Address Reclaimed Meter# Meter Read Meter Size Potable Meter i# Meter Read Meter Size Hydraulic Test Procedures 1. Notify facility owner of your presence and intent to conduct cross connection inspection. If no one answers the door,check if potable meter is running. Come back to inspect at a later time if potable meter is running. 2. Proceed with inspection if no one answers the door and potable meter is not running 3. Turn off reclaimed water meter supply valve 4. Turn on potable meter supply valve 5. Turn on and run each irrigation zone. No flow should be observed from the irrigation system. Did this test pass? Yes No 6. If step 6 passed,then turn off potable water supply and turn on the reclaimed water supply 7. Open hose bibs on the outside of the building. Check for flow. There should not be any flow out of hose bibs after 10 seconds. Did this test pass? Yes No 8. If both tests passed make sure both meters are turned back on 9. If one or both tests fail,then shut and lock the reclaimed water meter and contact Collier County Irrigation Quality Water Section (239)-252-6251 10. Inform homeowner of actions taken if you find a cross connection. General Survey Information 1. Backflow assembly present and accessible Yes No 2. Facility has outside hose bib vacuum breakers installed Yes No 3. Reclaimed water meter box is purple Yes No 4. Reclaimed water signage at entrance of subdivision or onsite Yes No 5. Any hose bibs found on the reclaimed water irrigation system Yes No 6 Reclaimed water used for lawn,vegetation, or common areas only Yes No 7. Reclaimed water used for edible crops Yes No 9. Reclaimed water used for swimming pool Yes No 10. Reclaimed water piped into building Yes No 11. Is meter locked off? Yes No 12. Is a cross connection present? Yes No Inspected by: Signature: Date: Company Performing Inspection:_ Please return all completed forms to the Collier County Irrigation Quality Section,4370 Mercantile Ave,Naples,FL 34104