Loading...
Lely Beautification MSTU Agenda 08/20/2020Page 1 of 1 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 8300 Radio Road Naples, FL 34104 PROJECTOR PJEC AGENDA AUGUST 20TH, 2020 Michelle Arnold – Director, PTNE Division Dan Schumacher – Project Mgr, PTNE Division Michael McGee – McGee & Associates Gary Gorden – Superb Landscape Services Wendy Warren – Premier Staffing A.Landscape Architect’s Report – McGee & Associates (M&A) B.Landscape Maintenance Report – Superb Landscape Services (SLS) VII.PROJECT MANAGER’S REPORT – DAN SCHUMACHER C.Refurbishment of St Andrews Entryway Monuments. I.CALL TO ORDER II.ATTENDANCE Tony Branco - Chair (10/1/21) Kathleen Dammert - Vice Chair (10/1/22) Linda Rae Jorgensen (10/1/21) Jackie Lowry (10/1/22) Kathleen Slebodnik (10/1/21) III.APPROVAL OF AGENDA IV.APPROVAL OF MINUTES – JULY 23RD, 2020 V.CHAIRMAN’S REPORT – TONY BRANCO A.Community Assessment. VI.CONTRACTOR REPORTS A.Budget Report. B.Lighting Inspection Report. C.Plant & Tree Replacements. D.Non-potable Water Signs. VII.ONGOING BUSINESS A.LED Radar Speed Signs. B.ThermoPlastic Crosswalks – Paver Style VIII.NEW BUSINESS IX.COMMITTEE MEMBER COMMENTS X.PUBLIC COMMENT XI.ADJOURNMENT NEXT MEETING: SEPTEMBER 17, 2020 AT 2:00 PM Collier County Library East Naples Branch 8787 Tamiami Trail East Naples, FL 34113 (239)775-5592 - Subject to permission from the County Manager - 1/7 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 8300 Radio Road Naples, FL 34104 Minutes (via ZOOM remote access) July 23, 2020 I. Call to Order Chairman Branco called the meeting to order at 2:04 PM. A quorum of four was present. II. Attendance Committee Members: Tony Branco, Chair; Kathleen Dammert, Vice-Chair; Linda Jorgensen; Jacalyn Lowry; Kathleen Slebodnik County: Michelle Arnold, PTNE Director; Dan Schumacher, Project Manager; Rosio Garcia, Administrative Assistant Others: Michael McGee – McGee & Associates; Gary Gorden – Superb Landscape Services III. Approval of Agenda Ms. Dammert moved to approve the July 23, 2020 Agenda of the Lely Golf Estates Beautification M.S.T.U. as amended: Add: Item V. Chairman’s Report - B. Wastewater Pump Refurbishment; C. Bench. Second by Ms. Slebodnik. Carried unanimously 4 - 0. IV. Approval of Minutes – June 25, 2020 Ms. Dammert moved to approve the minutes of the June 25, 2020 Lely Golf Estates Beautification M.S.T.U. meeting as presented. Second by Ms. Slebodnik. Carried unanimously 4 - 0. V. Chairman’s Report – Tony Branco A. Community Assessment Chair Branco shared the following observations from his drive through:  Overall, the community looks good.  The Doral entrance needs some attention and new plants.  A tall shrub at Pebble Beach Boulevard golf cart crossing was trimmed by golf course maintenance staff.  A solar panel hit by a palm frond at golf course estates was repositioned to face south.  Retaining wall repair on St. Andrews Boulevard is complete; mulch and pea gravel for paver joints application scheduled week ending August 1, 2020.  McGee & Associates Summary Report demonstrated landscape refurbishment progress. “R” (repeat) item status: one (1) landscape items are two years old; three (3) are eighteen months old; three (3) exceed twelve months and one (1) is six months or more. The Committee requested items eighteen months and older be addressed by the August 2020 meeting. Mr. Schumacher noted significant improvements have been made as referenced in a revised status of the landscape summary report dated July 20, 2020. MINUTES (via ZOOM remote access) July 23, 2020 LELY GOLF ESTATES MSTU 2/7 B. Wastewater Pump Refurbishment – Saint Andrews Boulevard Chair Branco distributed a “Neighborhood Notice” from the Collier County Public Utilities Department, Engineering and Project Management Division, dated July 17, 2020 outlining the Wastewater Pump Station 300.06 Rehabilitation at Saint Andrews Boulevard project located in the median of Saint Andrews Boulevard stating: “The project will rehabilitate 35-year-old infrastructure that has reached the end of its useful life. The rehabilitation of this wastewater system will bring the pump station into compliance with new standards meant to enhance safety and reliability. We do not anticipate any sewer service interruptions during this project. The scope of work includes: • Installation of a remote diesel generator to prevent sewer overflows during power outages. • Coating the interior of the wet well structure to protect the concrete walls from corrosion. • Replacing the existing wastewater submersible pumps with more efficient and reliable pumps. • Replacing the deteriorating riser pipes inside the wet well with corrosion-proof high-density polyethylene (HDPE). • Removing the difficult to maintain, nonstandard valves and control housing and replacing it with new standard valves and above ground HDPE pipe. • Replacing the existing electrical components with a standard control panel to meet current standards and codes. • Restoration and landscaping in accordance with community input. This project was approved by the Board of County Commissioners on July 14, 2020. Construction is anticipated to start in two months.” Chair Branco requested Mr. McGee recommend landscaping for the median. Mr. Schumacher will forward the design and plant recommendations to the Public Utilities Department (PUD). Ms. Lowry arrived. A quorum of five was present. C. Bench – Forest Hills and Augusta Boulevards The Committee agreed to withdraw consideration for a bench installation in the Forest Hill Blvd. Right of Way (RPW) at Augusta Boulevard to accommodate children waiting for the school bus. VI. Contractor Reports A. Landscape Architect’s Report – McGee & Associates (M&A) Mr. McGee summarized the “Lely Golf Estates Landscape Observation Report FY19-20” dated July 6th and 20th, 2020. All Locations  “Strike throughs” indicate jobs are complete and will be removed from next month’s report.  Many issues have been addressed; remaining items are plant replacements. Saint Andrews Boulevard Median #3  Address 105: Expand Plumbago bed and replace turf, as necessary. Median #5  Address 152: Remove Ilex tree by flush cutting. MINUTES (via ZOOM remote access) July 23, 2020 LELY GOLF ESTATES MSTU 3/7 Forest Hills Cart Crossing and Lake  Perennial Peanut installation recommended. Pebble Beach Boulevard New Project recommendation: Convert planting on median tips to Perennial Peanut. Median #16  Substitute three (3) Alexander Palms for Christmas Palms due to lack of product availability. Median #18  Mr. McGee revised planting configuration eliminating third Washingtonia Palm; the center Washingtonia Palm root ball was removed and landscaping in area was replenished. Median #19  Perennial Peanut quantity will be tripled. Doral Circle west R/W & Rattlesnake Hammock Median #23  A quote has been requested from Superb Landscape for annual replacement of twenty (20) Pentas and twenty-five (25) Purslane in colors to match US41 and Saint Andrews Blvd. Warren Street Pump Station  Superb Landscape will clean the area of debris and weeds week ending August 1st. Water Usage June 2020 Reuse Water Use for Warren Street of 123,545 gallons; potable water 340 gallons. Valley Stream’s water use data was recorded as 9,840 potable gallons. Usage was deemed normal. Mr. Schumacher will determine scope of work, secure quotes from Superb Landscaping for various items and submit proposal to the Committee at the August meeting as follows:  Replace Ilex tree Median #5 Saint Andrews Blvd.  Install Alexander Palms Median # 16 Pebble Beach Blvd.  Perennial Peanut installation Median #19 Pebble Beach Blvd.  Perennial Peanut installation Forest Hills Crossing.  Annual Plant replacement of Pentas and Pursulane at Doral Circle. B. Landscape Maintenance Report – Superb Landscape Services (Superb)  St. Andrews Boulevard: Median #1 was cleaned up; Median #2 will be maintained week ending August 2nd; Median #3 tree stakes were tightened.  Flax Lilies and Bougainvilleas were trimmed.  Jatropha and Ixora were pruned on Doral Circle. Mr. Gorden will:  Provide quantity count for Perennial Peanut on the tips on Pebble Beach Boulevard; lower sprinkler heads to 6”, apply herbicide and install black plastic ground covering to median tip areas at time of installation.  Reapply polymer sand fill to paver joints at the St. Andrews retainer wall.  Evaluate / re-apply polymer sand application on pavers at Doral entrance. VII. Project Manager’s Report – Dan Schumacher A. Budget Report Mr. Schumacher summarized the “Lely MSTU Fund Budget 152 dated July 23, 2020” for information purposes and provided an overview of the budget noting:  FY-20 Ad Valorem property tax revenue budget is $286,300.00, an increase of 5.93% over FY19. The Millage rate is 2.0000 mils. MINUTES (via ZOOM remote access) July 23, 2020 LELY GOLF ESTATES MSTU 4/7  Total revenue FY-20 is $694,987.69 including investment interest, transfers, and contributions (minus a 5% reserve of $14,500).  Current Operating Expense Budget is $257,392.00 of which Commitments total $64,569.29; $154,007.49 is expended.  Uncommitted Operating Expense funds available are $38,615.22.  Purchase Orders “rolled over” to the FY-20 Budget reflect balances as follows: Line 36, Improvements General Lykins-Signtek for renovation of the Lely Gateway Monument Refurbishment in the amount of $47,062.00. Lykins-Signtek in the amount of $5,848.00, of which $4,321.73 is expended, for street and traffic sign replacements. Florida Irrigation Supply Inc. (FIS) for HydroPoint Controls to upgrade the irrigation system in the amount of $755.69. Hart’s Electrical in the amount of $3,630.00, of which $600.53 is expended, for HydroPoint ground rods installation.  The FY-19 fund transfer from Capital Outlay Funds to Operating Expense was credited back in the FY-20 budget.  Capital Outlay Fund, Line 56, reserved to fund capital projects, available balance is $168,950.00.  Reserves for Insurance and Catastrophic/Hurricane funds total $150,000.00. A request to consolidate the two categories into a single “fixed” dollar amount entitled Reserves for Insurance has been submitted to the County Budget Office for the FY-20 budget; the request is not yet resolved.  Items highlighted in Red indicate closed out Purchase Orders.  Total available balance, less committed expenses, is $358,459.51. A budget amendment to transfer funds from Capital Outlay to Landscape Incidentals to finance Median Restoration may be required. Mr. Schumacher will inform Committee members of the request, subject to Board of County Commissioner (BCC) approval, if a shortfall occurs. B. Lighting Inspection Report The Lely M.S.T.U. Lighting Inspection summary dated July 6, 2020 indicated six (6) outages. Ms. Slebodnik emailed light outage observations to Mr. Schumacher. He will confirm outages and ensure the lighting report is accurate. Hart’s will be directed to replace the sign tube lights on St Andrews Blvd and Doral Circle. Lumec LED retrofit lamp replacements have been ordered. Upon receipt of shipment, Hart’s Electric will install them. C. Plant and Tree Replacements This topic was discussed under Item VI-A, Landscape Architect’s Report. D. Street &Traffic Signs  Fifteen traffic, speed limit and crosswalk signs were installed by Lykins-Signtek.  East side “exit” double sided street sign missing on Doral Circle will be replaced. MINUTES (via ZOOM remote access) July 23, 2020 LELY GOLF ESTATES MSTU 5/7 Curbs Mr. Schumacher requested Mr. McGee tabulate an inventory list of damaged curbs in the district for submission to the Road Maintenance Division. Repair work will be scheduled during routine roadway maintenance. E. Non-Potable Water Signs Nine (9) non-potable water signs, without posts, at a cost of $49.00 were ordered. Mr. Schumacher will purchase signpost and schedule installation. VIII. Ongoing Business A. Refurbishment of St. Andrews Entryway Monuments Mr. Schumacher has tabulated the load calculations for the proposed Entryway Monuments. Additionally, a P.E. licensed structural engineer with Bridging Solutions, under contract with the County, was consulted and an informal opinion of the proposed monument design modifications was provided. The opinion recommends that the incremental architectural enhancements would not be expected to increase the likelihood of the walls being blown down in a hurricane. Based on the opinion, a spread sheet analysis and request to approve the Monuments design as presented, was submitted to Diane Compagnone, Sign Review Specialist for Collier County. Mr. Schumacher will share the results on the status of the ruling with the Committee. The project is “on hold” pending a decision by the County. IX. New Business A. LED Radar Speed Signs Chairman Branco updated Committee and Staff on his research into radar speed signage options to calm traffic on St. Andrews Boulevard. Specifications and a price quote were presented.  Traffic Logix SafePace 100 offers a compact, lightweight, solar powered speed sign with battery backup.  Sign dimensions are 29” (h), 23” (w) and 3.5” (d).  Digits are 11” (h) by 5.6” (w), 98 LEDs per digit.  A “strobe light” activation feature is available.  The black and white color option would be compatible with current signage.  Two signs are recommended for the roadway. Each sign is $2,599.00 plus a $125.00 freight charge; data collection is $400.00 per sign.  Cost of mounting posts and installation would be funded by the MSTU. Ms. Dammert Motioned to approve the purchase of two (2) SafePace 100 speed monitoring radar signs from Traffic Logix at a cost not-to-exceed $7,000.00. Second by Ms. Lowry. Carried unanimously 5 - 0. Ms. Arnold arrived. B. Thermoplastic Crosswalks – Paver Style Mr. Schumacher requested a quote (RFQ) for thermoplastic paver installation with brick faux finish for crosswalks at two (2) intersections on St. Andrews and Pebble Beach Boulevards. MINUTES (via ZOOM remote access) July 23, 2020 LELY GOLF ESTATES MSTU 6/7 Chair Branco suggested Mr. Schumacher research potential financial benefit for mobilization and material costs if multiple intersections from US 41 to Forest Hills and St. Andrews Boulevards were done simultaneously presenting a homogenous appearance for the community. The Road and Bridge Division may assume responsibility for project execution. Mr. Schumacher will update the Committee on the quote status at the August 2020 meeting. X. Committee Member Comments 1. Tuscany Villa Landscaping Italian Cypress planted to camouflage Tuscany Villa’s diesel generator by the newsstand on St. Andrews Boulevard is dying. Mr. McGee expressed concern with the choice of Italian Cypress prior to installation noting it is prone to mites and poses a maintenance issue. He recommended Podocarpus, Mast Tree or Syzgium Paniculatum “Myrtifolia” as specified in his summary report dated 12.5.19 as alternative product. Ms. Arnold noted in January 2019 that Tuscany Villa is private property, the planting was permitted and approved by Collier County. Tuscany Villa is not an M.S.T.U.’s asset and involvement in the project is out of their jurisdiction. The Committee will consider avenues to file a complaint to have Tuscany Villa replace the Italian Cypress. 2. Residential Property Damage Ms. Slebodnik reported Superb Landscape personnel damaged her mailbox and failed to report the incident. The invoice for $140.00, paid by Ms. Slebodnik, will be submitted to Superb Landscape by Staff for reimbursement. XI. Public Comment None XII. Adjournment There being no further business to come before the Committee, the meeting was adjourned by the Chair at 3:28 PM. LELY GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE ________________________________ Tony Branco, Chairman The Minutes were approved by the Committee on , 2020 as presented or as amended ___. MINUTES (via ZOOM remote access) July 23, 2020 LELY GOLF ESTATES MSTU 7/7 NEXT MEETING: AUGUST 20, 2020 – 2:00 PM COLLIER COUNTY LIBRARY EAST NAPLES BRANCH 8787 TAMIAMI TRAIL EAST NAPLES, FL 34113 (239) 775-5592 Subject to permission from the County Manager McGee & Associates Landscape Architecture Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Page 1 of 3 Phone (239) 417-0707 * Fax (239) 417-0708 LC 098 * FL 1023A Project: LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Landscape Architect Observation Report: August 2020 Location: MSTU DISTRICIT ROADWAYS Project Manager: Dan Schumacher, Collier County Public Services Division, Public Transportation & Neighborhood Enhancements Department Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa Contractor: Superb Maintenance Contractor’s Representative: Robert Kindelan, Gary Gorden Report Date: FY19-20, 8/5/2020 Observation Date: 8/5/2020 Report No. 11 (FY20) AC - Indicates major or repeating items recommended to be discussed by the Advisory Committee S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE/COMMENTS column when and which items are corrected. Note: Copy picture out of comment boxes a nd then paste to additional sheet if picture is desired in larger size. LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS All locations X X Palm trees need seed stalks removed. Strikethrough indicates items that have been addressed or being addresses and will be removed from the next month’s report. Yellow highlighting indicates items that need to be addressed as soon as possible for safety issues or potential plant damage. St. Andrews Blvd. & US 41 In bound R/W South X X 2 Prune and/or remove Paurotis fronds and stems two foot behind sidewalk edge. X X 3 Review spider lily plants adjacent to Screw Pine tree for missing and poor performance. Out bound R/W North Suncoast Credit Union side of sidewalk No major issues observed. St. Andrews Blvd. Median #1 No major issues observed. Median #2 No major issues observed. Median #3 X X 2 Second Queen’s Crape Myrtle tree from the west end of median has damaged main trunk and needs to be replaced. (photo) X 4 Review tree bracing on new Queen’s crape tree plantings and replace if not secure. X X X 16 At address 105: Expand the Plumbago bed 8 ft. both eastward and 12 ft. westward to add (12 14) Plumbago 3 gal. (6) on east end and (8) on west end. Will require (4) additional spray sprinkler heads and (3) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 . 7/6/20 M&A Recommend doing installation of Plumbago shrubs. Two turf areas will also need to be removed. Median #4 No major issues observed. Median #5 X X X 2 At address 152: Remove Ilex tree between Queen’s Crape Myrtle trees by flush cutting. Median #6 No major issues observed. Median #7 X X Second Foxtail palm from west end : Review adjacent irrigation head and bubbler to confirm they are shutoff. Median #8 No major issues observed. Median #8A No major issues observed. Median #9 No major issues observed. Median #10 No major issues observed. Forrest Hills Blvd No major issues observed. Commented [MM1]: McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY19-20 8/5/2020 Observation Date: 8/5/2020 Report : 11 (FY20) Page 2 of 3 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Median #11 Median #12 No major issues observed. X X At address 413: East curb section has been broken just south of light pole. The north of light pole is old chipped length of curbing. Committee Approved: Yes, 5/16/19 Forest Hills Cart Crossing & Lake X X X 6 Perennial peanut planting is not actively growing. Contractor needs to review and provide count for replanting. M&A 7/6/20 Recommend not replanting northeast and southeast areas. Southwest and northwest areas should have turf added to reduce beds to a point 3 -4 foot off existing Xanadu plants. Valley Stream Cr. Median #13 No major issues observed. Pebble Beach Blvd. Median #14 No major issues observed. Median #15 No major issues observed. Median #16 X X X 16 At address 64: Recommend installing (3) Adonidia (Christmas palm) double Alexander palms, Add (1) to south side of light pole #8 and (2) to north side of light pole #8. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will requi re (3) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 Median #17 No major issues observed. Median #18 X X X 32 At address 164: (1) Washingtonia removed . Option 1: Consider removal of all remaining Washingtonia palms and replant with smaller palms (i.e. Foxtail, Alexander, Christmas palms) M&A: 6/12/18 hole filled and ready for replacement planting. M&A 5/7/19: Add (1) Adonidia double Alexander palm in removed Washingtonia palm location. Remove the middle one of the south three existing Washingtonia palms to include stump and plant Alexander palm. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (1) (2) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 Median #19 X X Prune off Foxtail palm seed stalks. X X X 19 Recommend adding (10 25 45) additional 1 gal. size , 1 ft. o.c., Perennial Peanut ‘Golden Glory’ plants to existing planting on east end. Committee Approved: Yes, 5/16/19. M&A 7/6/20 Recommended Plant replacements: Ixora ‘Petite’ Red or Yellow Taiwan dwarf Ixora in 3 gal. size, Dwarf Asian Jasmine, or replant with ‘Ecoturf’ perennial peanut in 1 gal. size Pebble Beach Blvd. Golf Cart Crossing X X 15 Southeast corner: Existing Spider lily plants are in decline. It appears to be fungus or herbicide related. (10 +/-) plants are missing and/or dead. (photo) Thorncrest Ln. cul-de-sac #20 No major issues observed. Briarcliff Ln. Cu-de-sac #21 No major issues observed. Heather Grove Ln. Cul-de-sac #22 No major issues observed. Baltusrol Signs No major issues observed. Doral Cr. East R/W X 9 The bridge wall on the roadside face along the east R/W has three locations where stone M&A: 3/3/20 two stones still missing on east wall Commented [MM2]: McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY19-20 8/5/2020 Observation Date: 8/5/2020 Report : 11 (FY20) Page 3 of 3 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS veneer is missing. (photo) X X 20 Recommend large open joints between pavers and valley gutter have polymer sand applied to fill large gaps. Committee Approved: Yes, 5/16/19. M&A 7/6/20: Contractor installed sand, but it has been washed away. Confirm polymer sand was used and if so, it is recommended to have the joints filled with cement mortar. West R/W & Rattlesnake Hammock Rd. X X 3rd Foxtail palm from Doral Cr.; Recommend application of Tec -Mag and installation of palm fertilizer spikes around palm. X X X 20 Recommend large open joints between pavers and valley gutter have polymer sand applied to fill large gaps. Committee Approved: Yes, 5/16/19. M&A 7/6/20: Contractor installed sand, but it has been washed away. Confirm polymer sand was used and if so, it is recommended to have the joints filled with cement mortar. Median #23 X X 2 Install 20 Pentas and 25 Purslane, match US 41 & St. Andrews planting colors. X X 2 Reset and re-stake northernmost Jatropha tree. Prune damaged or broken bra nches out of remaining Jatropha shrubs. X X 4 Prune seed stalks off Foxtail palm. Median #24 Treasure Point Cul-de-sac No major issues observed. Warren St. Pumping Station No major issues observed. Fertilization X X 8-0-12 applied before June 1st. Commented [MM3]: Lely Beautification MSTU TUBE A B C D E Sign ‐ Enter 1 X Sign ‐ Exit 2 X SPOT AB Flagpole ‐ US 1 Flagpole ‐ FL 2 Flagpole ‐ BCC 3 LUMINAIRE AB Single 1 Single 2 Single 3 Single 4 Single 5 Single 6 Single 7 Single 8 Single 9 Single 10 Single 11 LUMINAIRE AB Double 1 Double 2 Double 3 X Double 4 Double 5 Double 6 X Double 7 X Double 8 Double 9 Double 10 Double 11 Double 12 Double 13 Double 14 Double 15 Double 16 Double 17 Double 18 Double 19 X Double 20 Double 21 Single 22 Single 23 1909 PEBBLE BEACH BLVD LELY MSTU LIGHTING INSPECTION Inspection Date:8/4/2020 ST. ANDREWS ENTRANCE  ‐  FROM US‐41 Notes    Inspected by Superb Landscape Services 1/2    Lely Beautification MSTU 'LELY'  SIGN AB Solar Light  TUBES AB Sign ‐ Enter 1 X Sign ‐ Exit 2 LUMINAIRE AB Double 1 Double 2 Single 3 Single 4 Single 5 Single 6 1909 LELY MSTU LIGHTING INSPECTION 8/4/2020 Notes FOREST HILLS @ AUGUSTA DORAL CIRCLE    Inspected by Superb Landscape Services 2/2