Loading...
Lely Beautification MSTU Agenda 07/23/2020Page 1 of 1 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 8300 Radio Road Naples, FL 34104 PROJECTOR PJEC AGENDA JULY 23RD, 2020 I. CALL TO ORDER II. ATTENDANCE Tony Branco - Chair (10/1/21) Kathleen Dammert - Vice Chair (10/1/22) Linda Rae Jorgensen (10/1/21) Jackie Lowry (10/1/22) Kathleen Slebodnik (10/1/21) Michelle Arnold – Director, PTNE Division Dan Schumacher – Project Mgr, PTNE Division Michael McGee – McGee & Associates Gary Gorden – Superb Landscape Services Wendy Warren – Premier Staffing III. APPROVAL OF AGENDA IV. APPROVAL OF MINUTES – JUNE 25TH, 2019 V. CHAIRMAN’S REPORT – TONY BRANCO A. Community Assessment. VI. CONTRACTOR REPORTS A. Landscape Architect’s Report – McGee & Associates (M&A) B. Landscape Maintenance Report – Superb Landscape Services (SLS) VII. PROJECT MANAGER’S REPORT – DAN SCHUMACHER A. Budget Report. B. Lighting Inspection Report. C. Plant & Tree Replacements. D. Street & Traffic Signs. E. Non-potable Water Signs. VIII. ONGOING BUSINESS A. Refurbishment of St Andrews Entryway Monuments. IX. NEW BUSINESS A. LED Radar Speed Signs. B. ThermoPlastic Crosswalks – Paver Style. X. COMMITTEE MEMBER COMMENTS XI. PUBLIC COMMENT XII. ADJOURNMENT NEXT MEETING: AUGUST 20, 2020 AT 2:00 PM Collier County Library East Naples Branch 8787 Tamiami Trail East Naples, FL 34113 (239) 775-5592 - Subject to permission from the County Manager - 26.A.2 Packet Pg. 1056 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) 1/6 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 3299 Tamiami Trail East Suite 103 Naples, FL 34113 Minutes June 25, 2020 I. Call to Order Chairman Branco called the meeting to order at 2:02 PM. A quorum of four was present. II. Attendance Committee Members: Tony Branco, Chair; Kathleen Dammert, Vice-Chair; Linda Jorgensen; Jacalyn Lowry (Excused); Kathleen Slebodnik County: Michelle Arnold, PTNE Director (Excused); Dan Schumacher, Project Manager; Rosio Garcia Others: Michael McGee – McGee & Associates; Gary Gorden – Superb Landscape Services III. Approval of Agenda Ms. Dammert moved to approve the June 25, 2020 Agenda of the Lely Golf Estates Beautification M.S.T.U. as amended: Add: Item V. Chairman’s Report - B. Traffic Monitoring Signage; C. Crosswalk Enhancement. Second by Ms. Jorgensen. Carried unanimously 4 - 0. IV. Approval of Minutes – February 20, 2020 Ms. Dammert moved to approve the minutes of the February 20, 2020 Lely Golf Estates Beautification M.S.T.U. meeting as presented. Second by Ms. Jorgensen. Carried unanimously 4 - 0. Chairman Branco expressed his appreciation to Director Arnold and the Staff for organizing a virtual meeting for the Lely Golf Estates Beautification MSTU. V. Chairman’s Report – Tony Branco A. Community Assessment Chair Branco reported he conducted drive throughs and shared the following observations:  Fallen Palm fronds need to be removed.  Medians on St. Andrews and Forest Hills Boulevards should be trimmed.  Pebble Beach Boulevard has been maintained.  Front entrance plantings look good.  McGee & Associates Summary Report “R” (repeat) item status: three (3) landscape items are two years old; three (3) are eighteen months old; ten (10) exceed twelve months and two (2) are six months or more. Mr. Schumacher reported status of landscape replenishment will be updated during Mr. McGee’s summary review presentation noting significant progress has been made. B. Traffic Monitoring Signage Chairman Branco updated Committee and Staff on his research into radar speed signage options to calm traffic on St. Andrews Boulevard. Specifications and a price quote were presented. 26.A.2 Packet Pg. 1057 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) MINUTES June 25, 2020 LELY GOLF ESTATES MSTU 2/6  Traffic Logix SafePace 100 offers a compact, lightweight, solar powered speed sign with battery backup.  Sign dimensions are 29” (h), 23” (w) and 3.5” (d).  Digits are 11” (h) by 5.6” (w), 98 LEDs per digit.  A “strobe light” activation feature is available.  The black and white color option would be compatible with current signage.  Two signs are recommended for the roadway. Each sign is $2,599.00 plus a $125.00 freight charge.  Cost of mounting posts and installation would be funded by the MSTU. Mr. Schumacher reported a County portable speed read out is in the queue for placement on a Lely roadway mid-late August. Ms. Dammert motioned to approve the purchase of two (2) SafePace 100 speed monitoring radar signs from Traffic Logix at a cost not-to-exceed $6,000.00. Second by Ms. Jorgensen. Carried unanimously 4-0. C. Crosswalk Enhancement Paver installation for crosswalks at two (2) intersections on St. Andrews Blvd. (Warren St and Wildflower Way), is complete. During Committee discussion the following was addressed:  Utilization of the paver material with brick faux finish for Lely crosswalk installation. Possible locations include: 1. St. Andrews Boulevard by the Presbyterian Church 2. Pebble Beach Boulevard, 3. Forest Hills/St. Andrews Boulevard intersection 4. Forest Hills/Augusta Boulevard intersection.  The product has been used by the City of Naples and in other County locations with satisfactory durability performance.  The Road Maintenance Division may assume responsibility for the projects. Mr. Schumacher will investigate details from the Warren and Wildflower crosswalks, to report at the July meeting. VI. Contractor Reports A. Landscape Architect’s Report – McGee & Associates (M&A) Mr. McGee summarized the “Lely Golf Estates Landscape Observation Report FY19-20” dated June 2, 2020. All Locations  “Strike throughs” indicate jobs are complete and will be removed from next month’s report.  Yellow highlighting indicates items needing to be addressed to avoid plant damage or potential safety issues. Saint Andrews Boulevard Median & US41 in bound R/W South  Superb Landscape Services (Superb) will prune and/or remove Paurotis fronds and stems behind the sidewalk edge.  Superb will research and apply recommended pesticide to Spider Lily plants.  Installation of bricks for the easternmost bench location has been scheduled by Superb. 26.A.2 Packet Pg. 1058 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) MINUTES June 25, 2020 LELY GOLF ESTATES MSTU 3/6 Saint Andrews Boulevard Median & US41 Out bound R/W North  Ficus growth was removed from the monument. Saint Andrews Boulevard Medians #’s 1 and 2  Superb will remove dead/diseased Crinum Lilies.  Superb will review and adjust strapping of trees by the Lely Presbyterian church. Median #3  Superb will confirm if the Queen Crape Myrtle tree with damaged trunk was replaced.  Road Maintenance has been notified of required curb repair.  McGee & Associates will re-evaluate recommendation to expand the Plumbago bed. Median #6  Alexander Palm tree planting is complete. Forest Hills Boulevard  Refurbishment tree plantings are complete. Median #12  One (1) Crape Myrtle planted.  Superb will prune regenerated Crape Myrtle damaged by auto accident; Mr. McGee will evaluate condition.  East curb section south of light pole broken; repair responsibility of Road Maintenance Department. Forest Hills Cart Crossing and Lake  Superb will review condition of Perennial Peanut and provide count for replacements. Pebble Beach Boulevard Median #16  Three (3) Christmas Palms to be installed by Superb. Median #18  Mr. Schumacher will verify replanting of Washingtonia Palm. Median #19  Superb will apply repellant to Perennial Peanut to deter rabbit activity; alternate plants will be considered. Pebble Beach Blvd. Golf Cart Crossing  Mr. Gorden will consult with Mr. Kindelan about replacements for diseased Spider Lilies on the southeast corner. Thorncrest Lane cul-de-sac 320  Two (2) Sabal Palms were planted. Briarcliff Ln. cul-de-sac #22  One (1) Sabal Palm was planted. Doral Circle E R/W &West R/W & Rattlesnake Hammock Road  Missing stone veneer in three (3) locations on the roadside face bridge wall will be replaced by Superb. Mr. Gorden will retrieve two (2) stones from Chairman Branco. 26.A.2 Packet Pg. 1059 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) MINUTES June 25, 2020 LELY GOLF ESTATES MSTU 4/6  Superb has polymer sand between paver joints and valley gutter. Median #23  Hardwood trees and shrubs have been trimmed.  Foxtail Palm seed stalks have been pruned. Warren Street Pump Station  Superb will weed around filters. Fertilization  8-0-12-180 fertilizer was applied prior to June 1, 2020. Water Usage May 2020 Reuse Water Use for Warren Street of 222,890 gallons was typical; Valley Stream’s water use data was recorded as 9,740 potable gallons. B. Landscape Maintenance Report – Superb Landscape Services (Superb) Mr. Gorden reported the “slip joint” leak in the irrigation system at Warren Street was repaired. VII. Project Managers Report – Dan Schumacher A. Budget Report Mr. Schumacher summarized the “Lely MSTU Fund Budget 152 dated June 25, 2020” for information purposes and provided an overview of the budget noting:  FY-20 Ad Valorem property tax revenue budget is $286,300.00, an increase of 5.93% over FY19. The Millage rate is 2.0000 mils.  Total revenue FY-20 is $694,987.69 including investment interest, transfers and contributions (minus a 5% reserve of $14,500).  Current Operating Expense Budget is $257,392.00 of which Commitments total $72,294.60; $141,842.68 is expended.  Uncommitted Operating Expense funds available are $42,254.72.  Purchase Orders “rolled over” to the FY-20 Budget reflect balances as follows: Line 36, Improvements General Lykins-Signtek for renovation of the Lely Gateway Monument Refurbishment in the amount of $47,062.00. Lykins-Signtek in the amount of $5,848.00, of which $3,571.73 is expended, for street and traffic sign replacements. Florida Irrigation Supply Inc. (FIS) for HydroPoint Controls to upgrade the irrigation system in the amount of $755.69. Hart’s Electrical in the amount of $3,630.00, of which $600.53 is expended, for HydroPoint ground rods installation.  The FY-19 fund transfer from Capital Outlay Funds to Operating Expense was credited back in the FY-20 budget.  Capital Outlay Fund, Line 56, reserved to fund capital projects, available balance is $168,950.00.  Reserves for Insurance and Catastrophic/Hurricane funds total $150,000.00. A request to consolidate the two categories into a single “fixed” dollar amount entitled Reserves for Insurance has been submitted to the County Budget Office for the FY-20 budget; the request is not yet resolved.  Items highlighted in Red indicate closed out Purchase Orders.  Total available balance, less committed expenses, is $363,551.88. 26.A.2 Packet Pg. 1060 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) MINUTES June 25, 2020 LELY GOLF ESTATES MSTU 5/6 B. Lighting Inspection Report The Lely M.S.T.U. Lighting Inspection summary dated June 4, 2020 indicated six (6) outages. Graybar Electric provide a quote in the amount of $550.00 per unit for Lumec LED lamp replacement. Light replacements as well as stock inventory will be ordered. On receipt, Hart’s Electric will install the lenses. Mr. Schumacher will confirm the quote conforms to the County contract. Faded State and County flags at the St. Andrews Boulevard entrance will be replaced in July 2020. C. Plant and Tree Replacements This topic was discussed under Item VI-A, Landscape Architect’s Report. D. Street &Traffic Signs  The Doral Circle double sided street sign installation is complete.  Installation by Lykins-Signtek of two (2) crosswalk signs and multiple remaining street signs will be scheduled for July. E. Non-Potable Water Signs Nine (9) potable water signs, without posts, at a cost of $49.00 will be ordered. Mr. Schumacher will research signpost options and update the Committee at the July meeting. VIII. Ongoing Business A. Refurbishment of St. Andrews Entryway Monuments Mr. Schumacher calculated the load structure of the proposed Entryway Monuments. Consultation with an engineer from RDA, the structural engineer firm under contract with the County, rendered an opinion that the proposed monument design structure did not require reinforcement to ensure compliance with wind mitigation standards. Based on the opinion, a request to approve the Monuments design as presented, was submitted to Diane Compagnone, Sign Review Specialist for Collier County. Lykins-Signtek is on board to proceed with the project once design approval has been secured. Mr. Schumacher will inform Chairman Branco of application progress and update the Committee on the status of the ruling at the proposed July 2020 meeting. IX. New Business None X. Committee Member Comments None XI. Public Comment None 26.A.2 Packet Pg. 1061 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) MINUTES June 25, 2020 LELY GOLF ESTATES MSTU 6/6 XII. Adjournment There being no further business to come before the Committee, the meeting was adjourned by the Chair at 3:31 PM. LELY GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE ________________________________ Tony Branco, Chairman The Minutes were approved by the Committee on , 2020, as presented ____, or as amended _____. NEXT MEETING: JULY 23, 2020 – 2:00 PM COLLIER COUNTY LIBRARY EAST NAPLES BRANCH 8787 TAMIAMI TRAIL EAST NAPLES, FL 34113 (239) 775-5592 Subject to permission from the County Manager 26.A.2 Packet Pg. 1062 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) McGee & Associates Landscape Architecture Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Page 1 of 4 Phone (239) 417-0707 * Fax (239) 417-0708 LC 098 * FL 1023A Project: LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Landscape Architect Observation Report: July 2020 Location: MSTU DISTRICIT ROADWAYS Project Manager: Dan Schumacher, Collier County Public Services Division, Public Transportation & Neighborhood Enhancements Department Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa Contractor: Superb Maintenance Contractor’s Representative: Robert Kindelan, Gary Gorden Report Date: FY19-20, 7/6/2020, R1 7-20-20 Observation Date: 7/6/2020 Report No. 10 (FY20) AC - Indicates major or repeating items recommended to be discussed by the Advisory Committee S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE/COMMENTS column when and which items are corrected. Note: Copy picture out of comment boxes a nd then paste to additional sheet if picture is desired in larger size. LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS All locations X X Palm trees need seed stalks removed. Strikethrough indicates items that have been addressed or being addresses and will be removed from the next month’s report. Yellow highlighting indicates items that need to be addressed as soon as possible for safety issues or potential plant damage. St. Andrews Blvd. & US 41 In bound R/W South X X 2 Prune and/or remove Paurotis fronds and stems two foot behind sidewalk edge. X X 2 Review spider lily plants adjacent to Screw Pine tree for missing and poor performance. X X 10 At the easternmost bench location, the existing soil around the bench paver pad has eroded onto the pad and it is recommended due to the elevation difference to install a residential scale segmental concrete block retaining wall around three side of the pa d. Recommend or approved equal Anchor Artisana Wall Systems 3” retaining wall units with Torpedo base blocks at paver pad level. Base block plus three rows total along back of pad and one foot toward roadway on side and then begin stair step down along both side toward road. Use end cap or freestanding wall blocks on stair step rows for finished look on three sides. Color shall be determined by Committee . (Sample)(photo) Committee Approved: Yes, 1/16/20 Out bound R/W North Suncoast Credit Union side of sidewalk X 3 Remove volunteer Ficus growth off entry monument. St. Andrews Blvd. Median #1 2 Remove dead and/or diseased foliage off bottom of Crinum lilies. Median #2 2 Remove dead and/or diseased foliage off bottom of Crinum lilies. Median #3 X X Second Queen’s Crape Myrtle tree from the west end of median has damaged main trunk and needs to be replaced. (photo) X 4 Review tree bracing on new Queen’s crape tree plantings and replace if not secure. X X 14 At address 105: On east or inbound side of median at Plumbago bed three feet (+/-) of curbing is broken and should be repaired. Committee Approved: Yes, 5/16/19 X X X 15 At address 105: Expand the Plumbago bed 8 ft. both eastward and 12 ft. westward to add (12 14) Plumbago 3 gal. (6) on east end and (8) on west end. Will require (4) additional spray sprinkler heads and (3) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 . 7/6/20 M&A Recommend doing installation of Plumbago shrubs. Two turf areas will also need to be removed. Median #4 No major issues observed. Commented [MM1]: Commented [MM2]: Commented [MM3]: 26.A.2 Packet Pg. 1063 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY19-20 7/6/2020, R1 7-20-20 Observation Date: 7/6/2020 Report : 10 (FY20) Page 2 of 4 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Median #5 X X X At address 152: Remove Ilex tree between Queen’s Crape Myrtle trees by flush cutting. Median #6 X X X 14 At address 228: Recommend installing (3) Alexander palms, Add (2) between existing Washingtonia palms and (1) west of westernmost Washingtonia palm. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (3) bubblers loca tions with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 X X X 14 At address 246: Recommend installing (3) Alexander palms, Add (2) between existing and removed Washingtonia palms and (1) east of easternmost Washingtonia palm. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (3) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 Median #7 No major issues observed. Median #8 No major issues observed. Median #8A No major issues observed. Median #9 No major issues observed. Median #10 No major issues observed. Forrest Hills Blvd Median #11 X X X 14 At address 556: Recommend installing (3) Alexander palms, Add (1) between northern existing two palms and (2) south of southernmost Washingtonia palm. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (3) bubblers lo cations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 Median #12 X X 14 At address 413: Auto accident, remove damaged and broken plant materials and provide count for replacements. (2) Crape myrtles damaged , (photo) M&A 12/5/19 Only one Crape myrtle needs t o be replaced. M&A 07/06/20 Contractor will prune to regrow existing sprouting tree. X X X 13 At address 407: Recommend installing (3) Alexander palms, Add (1) between northern existing two palms and (2) between south two Washingtonia palms. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (3) bubblers locat ions with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 X X At address 413: East curb section has been broken just south of light pole. The north of light pole is old chipped length of curbing. Committee Approved: Yes, 5/16/19 Forest Hills Cart Crossing & Lake X X X 5 Perennial peanut planting is not actively growing. Contractor needs to review and provide count for replanting. M&A 7/6/20 Recommend not replanting northeast and southeast areas. Southwest and northwest areas should have turf added to reduce beds to a point 3 -4 foot off existing Xanadu plants. Valley Stream Cr. Median #13 X X On south end one Pigmy Date Palm has been flag ged because of overall decline. The decline is consistent with Ganoderma disease. Removal is recommended. Pebble Beach Blvd. Median #14 No major issues observed. Median #15 No major issues observed. Median #16 X X X 15 At address 64: Recommend installing (3) Adonidia (Christmas palm) double Alexander palms, Add (1) to south side of light pole #8 and (2) to north side of light pole #8. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (3) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 Median #17 No major issues observed. Commented [MM4]: 26.A.2 Packet Pg. 1064 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY19-20 7/6/2020, R1 7-20-20 Observation Date: 7/6/2020 Report : 10 (FY20) Page 3 of 4 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Median #18 X X X 31 At address 164: (1) Washingtonia removed . Option 1: Consider removal of all remaining Washingtonia palms and replant with smaller palms (i.e. Foxtail, Alexander, Christmas palms) M&A: 6/12/18 hole filled and ready for replacement planting. M&A 5/7/19: Add (1) Adonidia double Alexander palm in removed Washingtonia palm location. Remove the middle one of the south three existing Washingtonia palms to include stump and plant Alexander palm. Field grown B & B with double 10 ft. clear trunks. Align trunks with median. Will require (1) (2) bubblers locations with (2) adjustable flood bubblers per tree. Committee Approved: Yes, 5/16/19 Median #19 X X X 18 Recommend adding (10 25 45) additional 1 gal. size , 1 ft. o.c., Perennial Peanut ‘Golden Glory’ plants to existing planting on east end. Committee Approved: Yes, 5/16/19. M&A 7/6/20 Recommended Plant replacements: Ixora ‘Petite’ Red or Yellow Taiwan dwarf Ixora in 3 gal. size, Dwarf As ian Jasmine, or replant with ‘Ecoturf’ perennial peanut in 1 gal. size Pebble Beach Blvd. Golf Cart Crossing X X 14 Southeast corner: Existing Spider lily plants are in decline. It appears to be fungus or herbicide related. (10 +/-) plants are missing and/or dead. (photo) Thorncrest Ln. cul-de-sac #20 No major issues observed. X X 31 (3) Sabal palms removed . Grind or remove stumps and replace missing Sabal with the same. M&A: 11-5-18 Recommended replacing only (2) Sabal palms that are furthest away from ex. manhole in the middle of the circle. Briarcliff Ln. Cu-de-sac #21 X X 31 (1) Sabal palms removed . Hurricane debris storage and removal has caused about 60 dwarf Bougainvillea plants to be removed and/or damaged to the point of replacement. Grind or remove stumps and replace missing Sabal with the same. Replant missing Bougainvillea. M&A: 11-5-18 Approx. (27) total shrubs should be replanted. Plant no shrubs closer than 5 feet off back of curbing. M&A 5/7/19: On hold until rainy season 2019. Heather Grove Ln. Cul-de-sac #22 No major issues observed. Baltusrol Signs No major issues observed. Doral Cr. East R/W X 8 The bridge wall on the roadside face along the east R/W has three locations where stone veneer is missing. (photo) M&A: 3/3/20 two stones still missing on east wall X X 19 Recommend large open joints between pavers and valley gutter have polymer sand applied to fill large gaps. Committee Approved: Yes, 5/16/19. M&A 7/6/20: Contractor installed sand, but it has been washed away. Confirm polymer sand was used and if so, it is recommended to have the joints filled with cement mortar. West R/W & Rattlesnake Hammock Rd. X X X 19 Recommend large open joints between pavers and valley gutter have polymer sand applied to fill large gaps. Committee Approved: Yes, 5/16/19. M&A 7/6/20: Contractor installed sand, but it has been washed away. Confirm polymer sand was used and if so, it is recommended to have the joints filled with cement mortar. Median #23 X X Install 20 Pentas and 25 Purslane, match US 41 & St. Andrews planting colors. Commented [MM5]: Commented [MM6]: 26.A.2 Packet Pg. 1065 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY19-20 7/6/2020, R1 7-20-20 Observation Date: 7/6/2020 Report : 10 (FY20) Page 4 of 4 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS X X 2 Reset and re-stake northernmost Jatropha tree. Prune damaged or broken braches out of remaining Jatropha shrubs. X X 4 Prune seed stalks off Foxtail palm. Median #24 Treasure Point Cul-de-sac No major issues observed. Warren St. Pumping Station X X Weeds around pump station. Fertilization X X 8-0-12 applied before June 1st. 26.A.2 Packet Pg. 1066 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) Lely MSTU Fund 152 July 23, 2020 FY-20 Vendor Item PO# Budget Commitments Expenditures Budget Remainder 1 CUR AD VALOREM TAX (286,300.00)$ -$ (271,480.15)$ (14,819.85)$ 2 DEL AD VALOREM -$ -$ (3,982.51)$ 3,982.51$ 3 OVERNIGHT INTEREST -$ -$ (2,121.63)$ 2,121.63$ 4 INVESTMENT INTEREST (2,000.00)$ -$ (5,746.25)$ 3,746.25$ 5 INTEREST TAX COLLECTOR -$ -$ (164.94)$ 164.94$ 6 INS CO REFUNDS -$ -$ -$ -$ 7 REVENUE STRUCTURE (288,300.00)$ -$ (283,495.48)$ (4,804.52)$ 8 TRANS FROM PROPERTY APPRAISER -$ -$ -$ -$ 9 TRANS FROM TAX COLLECTOR -$ -$ -$ -$ 10 CARRY FORWARD GEN (366,100.00)$ -$ -$ (366,100.00)$ 11 CARRY FORWARD OF ENCUMB (55,087.69)$ -$ -$ (55,087.69)$ 12 NEG 5% EST REV 14,500.00$ -$ -$ 14,500.00$ 13 TRANSFERS & CONTRIB (406,687.69)$ -$ -$ (406,687.69)$ 14 TOTAL REVENUE (694,987.69)$ -$ (283,495.48)$ (411,492.21)$ 15 WORKERS COMPENSATION 100.00$ 0.88$ 2.67$ 96.45$ 16 PERSONNEL SERVICES 100.00$ 0.88$ 2.67$ 96.45$ 17 ENG. FEES & OTHERS McGee & Associates Landscape Architect 4500198916 15,000.00$ 9,877.70$ 7,462.30$ (2,340.00)$ 18 INDIRECT COST REIMBURSE Collier County Indirect Cost Direct Pay 5,700.00$ -$ 5,700.00$ -$ 19 LANDSCAPE INCIDENTALS Superb Landscape Services Incidentals 4500198921 60,892.00$ 23,478.33$ 36,521.67$ 892.00$ Superb Landscape Services Grounds Maintenance 4500198921 -$ 11,896.00$ 78,104.00$ Lykins-Signtek Sign Maintenance VISA -$ -$ 425.00$ 20 OTHER CONTRACTUAL 95,000.00$ 11,896.00$ 78,529.00$ 4,575.00$ 21 ELECTRICITY FPL Electricity 4700004056 5,000.00$ 2,712.39$ 2,287.61$ -$ 22 WATER AND SEWER Collier County Utilities Water Usage 4700004057 15,000.00$ 3,679.51$ 7,055.49$ 4,265.00$ J.M. Todd Shared Copier Lease 4500199713 133.06$ J.M. Todd Shared Copier Lease new 4500201393 99.22$ 23 RENT EQUIPMENT 300.00$ 99.22$ 133.06$ 67.72$ 24 INSURANCE GENERAL Collier County Insurance General Direct Pay 500.00$ 125.00$ 375.00$ -$ FIS - Florida Irrigation Supply Pumps & related items 4500198903 -$ -$ 957.84$ (957.84)$ Home Depot Sprinkler system maint. VISA -$ -$ 5.98$ -$ Site One Pumps & related items 4500200821 -$ 1,891.38$ 108.62$ -$ HERITAGE LANDSCAPE SUPPLY Pumps & related items 4500203597 -$ 197.20$ Amazon Purchase Irrigation clamp milliam VISA -$ 56.84$ Hydropoint Data Hydropoint Controller Renewal VISA -$ 670.00$ FIS - Florida Irrigation Supply Pumps & related items 4500200704 -$ 1,626.11$ 877.94$ 22,495.95$ 25 SPRINKLER SYSTEM 25,000.00$ 3,517.49$ 2,874.42$ 18,608.09$ Forestry Resources Mulch VISA -$ 2,999.45$ Forestry Resources Mulch VISA 621.60$ Forestry Resources MULCH VISA 155.40$ 26 MULCH 10,000.00$ -$ 3,776.45$ 6,223.55$ Hart's Electrical Lighting Maintenance 4500198902 2,611.94$ 388.06$ Solar Illuminations Replacement Solar LED VISA -$ 141.99$ Graybar Electric Lumec LED Retrofit Kits VISA 3,769.50$ -$ 27 LIGHTING MAINTENANCE 10,000.00$ 6,381.44$ 530.05$ 3,088.51$ 28 LICENSE & PERMITS Licenses & Permits Collier County - Cartegraph 4,000.00$ 773.33$ -$ 3,226.67$ Premier Staffing Transcriptionist 4500198922 -$ 1,912.47$ 987.53$ Whited Holiday Décor Xmas Decorations 4500199269 -$ -$ 3,000.00$ Amazon US Flags VISA -$ -$ 54.58$ 29 OTHER MISCELLANEOUS 6,500.00$ 1,912.47$ 4,042.11$ 545.42$ 30 OFFICE SUPPLIES Office Supplies 300.00$ -$ -$ 300.00$ J.M. Todd Copier CPC 4500199712 64.62$ J.M. Todd Copier CPC new 4500201396 116.41$ 33.59$ 31 COPYING CHARGES 300.00$ 116.41$ 98.21$ 85.38$ Howard Fertilzer Fertilizer for Lely VISA -$ 1,600.00$ Forestry Resources Fertilizer for Lely VISA -$ 2,998.67$ 32 FERT HERB CHEM 3,500.00$ -$ 4,598.67$ (1,098.67)$ 33 OTHER OPERATING Home Depot Irrigation supplies VISA 200.00$ -$ 23.45$ 176.55$ 34 OTHER TRAINING 200.00$ -$ -$ 200.00$ 35 OPERATING EXPENSE 257,392.00$ 64,569.29$ 154,007.49$ 38,815.22$ Lykins-Signtek Monuments Refurbishment 4500196149 47,062.00$ -$ Lykins-Signtek Street & Traffic Signs 4500196430 1,526.27$ 4,321.73$ FIS - Florida Irrigation Supply HydroPoint - Controls Equipment 4500196841 755.69$ -$ Superb Landscape Serv HydroPoint - Test & Install 4500197412 -$ 1,050.00$ Hart's Electrical HydroPoint - Install Ground Rods 4500197415 3,029.47$ 600.53$ 36 IMPROVEMENTS GENERAL 227,295.69$ 52,373.43$ 5,972.26$ -$ 37 CAPITAL OUTLAY 227,295.69$ 52,373.43$ 5,972.26$ 168,950.00$ 38 TRANS FROM 152 FUND TO 111 FUND Reimbursement for Staff Support 50,800.00$ -$ 50,800.00$ -$ 39 TRANS FROM PROPERTY APPRAISER 2,500.00$ -$ 2,292.91$ 207.09$ 40 TRANS FROM TAX COLLECTOR 6,900.00$ -$ 6,509.25$ 390.75$ 41 TRANSFERS 60,200.00$ -$ 59,602.16$ 597.84$ 42 RESERVES FOR CONTINUING OPERATIONS - INSURANCE 150,000.00$ -$ -$ 150,000.00$ 43 RESERVES 150,000.00$ -$ -$ 150,000.00$ 44 TOTAL BUDGET 694,987.69$ 116,943.60$ 219,584.58$ 358,459.51$ 119,917,030 FY 10 Final Taxable Value Total Available Balance 358,459.51$ 104,325,032 FY 11 Final Taxable Value Plus Commited And Not Spent 116,943.60$ 95,871,609 FY 12 Final Taxable Value 92,697,303 FY 13 Final Taxable Value Estimated Cash 475,403.11$ 95,718,423 FY 14 Final Taxable Value 99,596,489 FY 15 Final Taxable Value 106,888,467 FY 16 Final Taxable Value 116,823,687 FY 17 July Taxable Value 127,802,080 FY 18 July Taxable Value 135,136,761 FY 19 July Taxable Value 143,146,025 FY 20 July Taxable Value 5.93% Adjustment FY19 to FY20 FY 20 July Taxable Value FY 19 Millage 2.0000 2.0000 2.0 mill cap Extension 286,292 270,274 FY 20 Gross Taxable Value 143,146,025 Minus: New Const. Annex. 910,166 Plus: Amendment #1 TV Component 0 Adj. Taxable Value 142,235,859 Prior year FY19 Levy (Proceeds) 270,273 Rolled Back Rate (less Amend One) 1.9002 91% of Rolled Back Rate 1.7292 prepared 7/15/20 Estimated Cash Less Uncollected Ad Valorem Taxes 460,583.26$ 26.A.2 Packet Pg. 1067 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) Lely Beautification MSTU TUBE A B C D E Sign ‐ Enter 1 Sign ‐ Exit 2 X SPOT AB Flagpole ‐ US 1 Flagpole ‐ FL 2 Flagpole ‐ BCC 3 LUMINAIRE AB Single 1 Single 2 Single 3 Single 4 Single 5 Single 6 Single 7 Single 8 Single 9 Single 10 Single 11 LUMINAIRE AB Double 1 Double 2 Double 3 X Double 4 Double 5 Double 6 X Double 7 X Double 8 Double 9 Double 10 Double 11 Double 12 Double 13 Double 14 Double 15 Double 16 Double 17 Double 18 Double 19 Double 20 X Double 21 Single 22 Single 23 1909 PEBBLE BEACH BLVD LELY MSTU LIGHTING INSPECTION Inspection Date:7/6/2020 ST. ANDREWS ENTRANCE  ‐  FROM US‐41 Notes    Inspected by Superb Landscape Services 1/2    26.A.2 Packet Pg. 1068 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) Lely Beautification MSTU 'LELY'  SIGN AB Solar Light  TUBES AB Sign ‐ Enter 1 X Sign ‐ Exit 2 LUMINAIRE AB Double 1 Double 2 Single 3 Single 4 Single 5 Single 6 1909 LELY MSTU LIGHTING INSPECTION 7/6/2020 Notes FOREST HILLS @ AUGUSTA DORAL CIRCLE    Inspected by Superb Landscape Services 2/2    26.A.2 Packet Pg. 1069 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) Traffic Safety Corp., 2708 47th Ave. Sacramento, CA, 95822, USA Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Traffic Safety Corp. | 1/14/2020 xwalk.com sales@xwalk.com +1.888.446.9255 USA +1.916.394.9884 Worldwide +1.916.394.2809 Fax RADAR SIGNS General Description The SafePace 100 driver feedback sign is the solution that fits your budget. This compact radar speed sign offers exceptional visibility and power efficiency in a lightweight and portable solution. Featuring the options you need at remarkably affordable pricing, the SafePace 100 driver feedback sign will help you keep your neighborhoods safe for years to come. Features • Energy Efficient: The sign can function up to 3 weeks autonomously with optional battery power depending on traffic volume. • Optimal Visibility: Unique light enhancing, anti‐glare lens system, as well as automatic ambient light adjustment, provide brilliant visibility even in poor lighting conditions. • User Friendly: Software interface is user friendly and can be programmed to set sign parameters quickly and easily. Optional data collection allows you to download traffic data, and generate statistical reports. • High strength aluminum sign face and individual optical lenses to protect against vandalism and theft • Stealth Mode: Baseline traffic data can be collected for comparison and analysis while speed display appears blank to motorists. • Speed Violator Strobe: Programmable flashing strobe alerts drivers to slow down when they exceed the threshold speed you choose. • Universal Mounting: Optional mounting brackets let you use one sign at multiple locations with the turn of a key. • Superior construction and durability for long‐lasting performance. SafePace 100 Specifications Digit Size 11" Height 29" Weight 21 lb. 24/7, 365 Scheduling √ Data Collection √ Solar Compatibility √ Battery Operated √ Universal Mounting √ Cloud Compatibility √ Trailer Compatibility √ Dolly Compatibility √ Hitch Compatibility √ Warranty 2 Years SafePace 100 Driver Feedback Radar Speed Sign Choice of faceplate colors available. 26.A.2 Packet Pg. 1070 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) Traffic Safety Corp., 2708 47th Ave. Sacramento, CA, 95822, USA Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Traffic Safety Corp. | 1/14/2020 xwalk.com sales@xwalk.com +1.888.446.9255 USA +1.916.394.9884 Worldwide +1.916.394.2809 Fax RADAR SIGNS Feature Specifications Dimensions Digits 11"(h) x 5.6"(w), 98 LEDs per digit Unit with “YOUR SPEED” Sign Mounted Full size sign: 29.0"(h) x 23.0"(w) x 3.5"(d) Sign Weight (includes “YOUR SPEED” sign (2 lb.) mounted) AC Powered 21 lb. 4 Cell Battery Powered Model 25 lb. Solar Powered Model 23 lb. (not including solar panel or bracket) General Specifications Operating Tempera- tures F° (C°)-40° (-40°) to 185° (85°) Speed Units Miles per hour (mph) or kilometers per hour (km/h) Faceplate Yellow or white high-intensity prismatic reflective sheeting on sign face with black colored text. MUTCD approved colors and format. Bashplate Aluminum, 0.25" Communications Bluetooth (standard), GSM/GPRS (optional, for use with SafePace Cloud) Programming SafePace Pro sign management software, SafePace Cloud remote sign management, 24/7 365 day unlimited programming and scheduling 23.0” (w) 29.0” (h) 3.5” (d) 11.0” (h-digits) 5.6” (w-digits) Feature Specifications Power Options (Electrical Specifications) AC Power Input 100~240 V AC DC Power Input 12 V DC Solar Panel Options 20W, 50W Radar Strobe Dual Strobe and Single Strobe Internal SS300 Doppler (FCC approved) Radar RF Out 5 mW maximum Radar F-center 24.125 GHz or 24.200 GHz Pickup Distance Up to 300 feet Beam 24° (vertical) x 12° (horizontal), linear polarization CE Mark Yes Display LEDs 208 Digits 196 Amber, 23°, 5 mm, luminous intensity (5,000 – 12,000 mcd/LED) Speed Violator Strobes 12 White, 15°, 5 mm, luminous intensity (18,000 – 28,000 mcd/LED) Optical Lenses 208 Ambient Light Sensors 1 sensor and automatic brightness control Enclosure Construction 12 gauge aluminum, flat black powder coated front for reduced glare and maxi- mum contrast; light gray powder coated body to minimize heat absorption Weatherproof Rating Weatherproof, NEMA 4X-12, IP65 level compliant. Non-sealed and ventilated. Warranty Sign 2 years Batteries 1 year 26.A.2 Packet Pg. 1071 Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates Beautification MSTU - July 23, 2020) 26.A.2Packet Pg. 1072Attachment: Lely Golf MSTU Meeting Agenda & Backup - July 23, 2020 (13076 : Lely Golf Estates