Loading...
Backup Documents 07/14/2020 Item #16C 8 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP C TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO v THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE l'rint on pink paper. Attach to original document. I he completed routing slip and original documents are to be birsvarded to the(ount) Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing_lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office SRT 07/14/20 4. BCC Office Board of County CaS Commissioners ..30(3M 5. Minutes and Records Clerk of Court's Office5 �0`��, 11f0PRIMARY CONTACT INFORMATION CJF , Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Diana Dueri Contact Information 239-252-4218 Contact/Department Agenda Date Item was July 14,2020 Agenda Item Number 16C8 Approved by the BCC Type of Document Work order to Kyle Construction Inc.,for Number of Original 1 Attached the amount of$328,300.00 under Request Documents Attached for Quotation 14-6213 for Underground Utility Contracting Services for"Goodland and Bellaire Water Main Replacement" PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP OK N/A 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be DD signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's DD Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the DD document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's DD signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip DD should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 07/14/2020 and all changes made during DD N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the Chairman's signature. 16 C8 Ann P. Jennejohn From: Ann P.Jennejohn Sent: Wednesday, August 5, 2020 1:53 PM To: DueriDiana Subject: Item #16C8 (July 14, 2020 BCC Meeting) Attachments: Item #16C8 (July 14, 2020 BCC Meeting).pdf Hi agaivt Diavta, Avt executed copy of Itevvt #16C8, from the July 14, 2020 13CC Meeting is attached for your records. Thank you! Ann Jennejohn f3MR Senior Deputy Clerk tt.tTtxk.,,, Clerk to the Value Adjustment Board Office: 2.39-252-8406 4 Fax: 239-252-8408 (if applicable) Ahn.Jehhejohn@CollierClerk.com *[ ,ea- Office of the Clerk of the Circuit Court & Comptroller of Collier County 3299 Tamiami Trail, Suite #401 Naples, FL 34112-5324 www.CollierClerk.com 1 16 C8 WORK ORDER/PURCHASE ORDER Contract 14-6213 "Annual Contract for Underground Utilities and General Contractors" Contract Expiration Date:January 3, 2021 This Work Order is for professional water main replacement construction services for work known as: Project Name: Goodland and Bellaire Water Main Replacement Project No: 70174.9.2 The work is specified in RFQ #14-6213 dated May 7, 2020 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to:Kyle Construction,Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I Goodland and Bellaire Water Main Construction * Task II Goodland and Bellaire Water Main Construction Allowance Schedule of Work: Complete work within 120 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement# 14-6213 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs(LS+RC)ZTime&Material (T&M) (established hourly rate —Schedule A) ❑Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task I $278,300.00(NLS) Task II $ 50,00.00(T&M) TOTAL FEE $328,300.00 ogwaysgoea °um Oft foamsCDun4o.rdk. Diana C. Dueri ,;,n�.io,.9*nd"'°`e" e,de.ar.uaumkg,.nect us m PREPARED BY: Data 20060'I0.1531-04IXY Diana C. Dueri, Senior Project Manager Date ,y14), } 05262020 4 Page I of 3 f ft0 16C F:7111._____:„Ai 6/2/2020 APPROVED BY: Benjamin N. Bulled,Principal Project Manager Date Digitally signed by ChmelikTom C h m e I i kTo m Date:2020.06.02 13:28:53 APPROVED BY: 00 Tom Chmelik, EPMD Director Date (-2 /2 „ APPROVED BY: -0(. - Pamela Libby, Water Di�tr`ibtion and Wellfield Mgr Date f� I! i 9 Johnssen b Dtig yally signed by Johnssen_b i APPROVED BY: — [3ate:2020.06.1812:30:08-04'00' Beth Johnssen, In-Ground Services Director Date DiCu rr Am is Datle:202 0 050 2902tally signed by mfa 1 APPROVED BY: -04'00' i Joe Bellone, Operations Support Director Date t I Digitally signed by YilmazGeorge YilmazGeorge I APPROVED BY: Date:2020.06.19 14:58:46-04'00' Dr. George Yilmaz,Public Utilities Administrator Date i f i By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief,all relevant facts concerning past,present, or currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates i to the proposed work;and bear on whether the Firm has a potential conflict have been fully disclosed. i 5 Additionally,the Firm agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. £ t g. ACCEPTED BY: A i i i ,. ! ://4 /4.-. 6/1 /2020 Kyle Construction,Inc Date i 1 (Remainder of page intentionally left blank) i 1 1 I Page 2 of 3 1 16 Ca ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K. Kinzel,Clerk of Courts COLLIER COUNTY,FLORIDA &Comptroller,, By: By: r Burt . Saunders,Chairman Dated: 71Z" ` es ks ►. ..alrnllan sJ as g'n&t re Qtl Appro as to f rm 1 ality: By: .l�G Depu County Attorney Scott R. Teach Item# iC¢Cg AgendDate �'� L' Date 25. Reed saauty terk 4.;D 1 6 C8 From: Diana Dueri, Senior Project Manager 239-252-4218,Telephone Number 239-252-3989,Fax Number Diana.Dueri@colliercountyfl.gov To: Potential Quoters REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT 14-6213 "Underground Utilities and General Contractors" Selected Vendors: Douglas N Higgins Haskins Inc. Kyle Construction Mitchell& Stark Southwest Utility Quality Enterprises As provided in the referenced contract,the County Division is soliciting quotes for the referenced project. RFQ Goodland and Bellaire Water Main Replacement Friday,May 15, 2020 at 3:00 PM.By e-mail to RFQ Due Date: Diana.Dueri@colliercountyf.gov Pre-Quote Meeting: No meeting Required Q&A Deadline: Monday,May 11 2020 at 5:00 PM Number of Days to Final Completion: 90 days substantial/120 days total Scope Provided Yes Plans and Specs: Yes Liquidated Damages: $1,665.00 per day Payment&Performance Bonds If over$200,000.00 Your quotation response for this project is due no later than the date and time specified above.We will not accept any quotation responses later than the noted time and date.If your firm is unable to respond electronically,your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified.We look forward to your participation in this request for information/quotation process. Nit Thc.. Firm s Complete Legal Name (239) bc-13- '7059 C2390 643-46'19 Telepho> /Fax u ber Title Are,, r N A im 5 li jas2a Print C:Jim Flanagan,Procurement Manager-Acquisitions Chf)� OLLIER COUNTYGOODLAND AND BELLAIRE WATER MAIN IMPROVEMENTSENGINEER OPINION OF PROBABLE CONSTRUCTION COST ENGINEERING 1 V L C8 SECTION 1: GENERAL ITEM EST. UNIT EXTENDED NO. DESCRIPTION UNIT QTY PRICE PRICE 1 Mobilization/Demobilization 1 LS $ 15,000.00 $ 15,000.00 2 Maintenance of Traffic 1 LS $ 2,000.00 $ 2,000.00 3 Survey Layout&Record Drawings 1 LS $ 3,000.00 $ 3,000.00 4 Pre-and Post-Construction Video 1 LS $ 1,800.00 $ 1,800.00 SECTION 1 SUBTOTAL: $ 21,800.00 SECTION 2:WATER SYSTEM ITEM EST. EXTENDED NO. DESCRIPTION UNIT UNIT PRICE QTY. PRICE 5 Install Water Main Pipelines[LABOR ONLY] a. 8"DIP CL350 60 LF $ 45.00 $ 2,700.00 b. 10"DIP CL350 1,680 LF $ 50.00 $ 84,000.00 6 Install Gate Valves and Boxes[LABOR ONLY] a. 8-inch Gate Valve 3 EA $ 1,000.00 $ 3,000.00 b. 10-inch Gate Valve 8 EA $ 1,500.00 $ 12,000.00 7 Relocate Bacteriological Sample Point[LABOR ONLY] 1 EA $ 1,000.00 $ 1,000.00 8 Connect to Existing Water Main [LABOR ONLY] a. Connect to Existing 8-inch Water Main 3 EA $ 4,500.00 $ 13,500.00 b. Connect to Existing 10-inch Water Main 5 EA $ 4,500.00 $ 22,500.00 c. Connect to Existing 24-inch Water Main 2 EA $ 6,500.00 $ 13,000.00 SECTION 2 SUBTOTAL: $ 151,700.00 SECTION 3: RESTORATION ITEM EST. EXTENDED NO. DESCRIPTION QTY. UNIT UNIT PRICE PRICE 9 Abandon and Grout Water Main a. 10-inch Water Main 20 LF $ 20.00 $ 400.00 b. 24-inch Water Main 1,600 LF $ 15.00 $ 24,000.00 10 Abandon and Remove Water Main a. 8-inch Water Main 40 LF $ 10.00 $ 400.00 b. 10-inch Water Main 60 LF $ 10.00 $ 600.00 c. 24-inch Water Main 60 LF $ 10.00 $ 600.00 11 General Restoration 1 LS $ 27,000.00 $ 27,000.00 12 Sidewalk Restoration 550 SY $ 41.00 $ 22,550.00 13 Asphalt Driveway Restoration 220 SY $ 15.00 $ 3,300.00 14 Roadway Trench Repair with Temporary Asphalt Patch 75 SY $ 50.00 $ 3,750.00 15 Final Roadway Milling and 1.5-inch SP9.5 Asphalt Overlay 600 SY $ 37.00 $ 22,200.00 SECTION 3 SUBTOTAL: $ 104,800.00 SECTION 4: ALLOWANCE ITEM EST. EXTENDED NO. DESCRIPTION QTY. UNIT UNIT PRICE PRICE Allowance: An allowance for unforeseen conditions will be made at the appropriate contract price of time&materials, lump sum, and/or 16 contract unit price. Use of allowance must be approved by Collier 1 T&M $ 50,000 $ 50,000.00 County prior to the execution of the work. SECTION 4 SUBTOTAL: $ 50,000.00 SUMMARY SECTION 1: GENERAL $ 21,800.00 SECTION 2:WATER SYSTEM $ 151,700.00 SECTION 3: RESTORATION $ 104,800.00 SECTION 4:ALLOWANCE $ 50,000.00 TOTAL: $ 328,300.00 6/25/2020 P.O.BOX 1550,FORT MYERS,FL 33900f1E50Phone:(239)334-0046*Fax:(239)334-3661 Email:MWTQjohnsoneng.com •