#20-7747-ST (DEC Contracting Group, Inc.)CONSTRUCTION AGREEMENT
THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ("Owner")
hereby contracts with DEC Contracting Group, Inc. ("Contractor") of 1560 Matthew Drive, Suite
B, Fort Myers, FL 33907, a Corporation authorized to do business in the State of Florida, to
perform all work ("Work") in connection with Immokalee Health Building HVAC and Roof
Replacement Invitation to Bid No. 20-7747-ST ("Project"), as said Work is set forth in the Plans
and Specifications prepared by Victor J. Latavish, AIA, the Engineer and/or Architect of Record
("Design Professional") and other Contract Documents hereafter specified.
Owner and Contractor, for the consideration herein set forth, agree as follows:
Section 1. Contract Documents.
A. The Contract Documents consist of this Agreement, the Exhibits described in Section 6
hereof, the Legal Advertisement, the Bidding Documents and any duly executed and issued
addenda, Change Orders, Work Directive Changes, Field Orders and amendments relating
thereto. All of the foregoing Contract Documents are incorporated by reference and made a part
of this Agreement (all of said documents including the Agreement sometimes being referred to
herein as the "Contract Documents" and sometimes as the "Agreement" and sometimes as the
"Contract"). A copy of the Contract Documents shall be maintained by Contractor at the Project
site at all times during the performance of the Work.
B. Owner shall furnish to the Contractor one reproducible set of the Contract Documents and
the appropriate number of sets of the Construction Documents, signed and sealed by the Design
Professional, as are reasonably necessary for permitting.
Section 2. Scope of Work.
Contractor agrees to furnish and pay for all management, supervision, financing, labor, materials,
tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to
diligently, timely, and fully perform and complete in a good and workmanlike manner the Work
required by the Contract Documents.
Section 3. Contract Amount.
In consideration of the faithful performance by Contractor of the covenants in this Agreement to
the full satisfaction and acceptance of Owner, Owner agrees to pay, or cause to be paid, to
Contractor the following amount (herein "Contract Amount"), in accordance with the terms of this
Agreement: One Million Two Hundred Sixty -Six Thousand, Ninety -Three Dollars and 00/100
($1,266,093.00).
Section 4. Bonds.
A. If applicable, the Contractor shall provide Performance and Payment Bonds, in the form
prescribed in Exhibit B-1 and B-2, in the amount of 100% of the Contract Amount, the costs of
which are to be paid by Contractor. The Performance and Payment Bonds shall be underwritten
by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner;
provided, however, the surety shall meet the requirements of the Department of the Treasury
Fiscal Service, "Companies Holding Certificates of Authority as Acceptable Sureties on Federal
Bonds and as Acceptable Reinsurance Companies" circular. This circular may be accessed via
the web at www.fms.treas.gov/c570/c570.html#certified. Should the Contract Amount be less
10 Construction Services Agreement: Revised 072118 (v6) CAO
than $500,000, the requirements of Section 287.0935, F.S. shall govern the rating and
classification of the surety.
B. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent,
its right to do business is terminated in the State of Florida, or it ceases to meet the requirements
imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter,
substitute at its cost and expense another bond and surety, both of which shall be subject to the
Owner's approval.
Section 5. Contract Time and Liquidated Damages.
A. Time of Performance.
Time is of the essence in the performance of the Work under this Agreement. The
"Commencement Date" shall be established in the written Notice to Proceed to be issued by the
Project Manager, as hereinafter defined. Contractor shall commence the Work within five (5)
calendar days from the Commencement Date. No Work shall be performed at the Project site
prior to the Commencement Date. Any Work performed by Contractor prior to the
Commencement Date shall be at the sole risk of Contractor. Contractor shall achieve Substantial
Completion within three hundred thirty (330) calendar days from the Commencement Date
(herein "Contract Time"). The date of Substantial Completion of the Work (or designated portions
thereof) is the date certified by the Design Professional when construction is sufficiently complete,
in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or
designated portions thereof) for the use for which it is intended. Contractor shall achieve Final
Completion within thirty (30) calendar days after the date of Substantial Completion. Final
Completion shall occur when the Agreement is completed in its entirety, is accepted by the Owner
as complete and is so stated by the Owner as completed. As used herein and throughout the
Contract Documents, the phrase "Project Manager" refers to the Owner's duly authorized
representative and shall mean the Division Administrator or Department Director, as applicable,
acting directly or through duly authorized representatives.
B. Liquidated Damages in General.
Owner and Contractor recognize that, since time is of the essence for this Agreement, Owner will
suffer financial loss if Contractor fails to achieve Substantial Completion within the time specified
above, as said time may be adjusted as provided for herein. In such event, the total amount of
Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. Should
Contractor fail to achieve Substantial Completion within the number of calendar days established
herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, One
Thousand Six Hundred Sixty -Five Dollars ($1,665.00) for each calendar day thereafter until
Substantial Completion is achieved. Further, in the event Substantial Completion is reached, but
the Contractor fails to reach Final Completion within the required time period, Owner shall also
be entitled to assess and Contractor shall be liable for all actual damages incurred by Owner as
a result of Contractor failing to timely achieve Final Completion. The Project shall be deemed to
be substantially completed on the date the Project Manager (or at his/her direction, the Design
Professional) issues a Certificate of Substantial Completion pursuant to the terms hereof.
Contractor hereby expressly waives and relinquishes any right which it may have to seek to
characterize the above noted liquidated damages as a penalty, which the parties agree represents
a fair and reasonable estimate of the Owner's actual damages at the time of contracting if
Contractor fails to Substantially or Finally Complete the Work within the required time periods.
C. Computation of Time Periods.
When any period of time is referenced by days herein, it shall be computed to exclude the first
day and include the last day of such period. If the last day of any such period falls on a Saturday
2
Construction Services Agreement: Revised 072118 (v6)
1
or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day
shall be omitted from the computation, and the last day shall become the next succeeding day
which is not a Saturday, Sunday or legal holiday.
D. Determination of Number of Days of Default.
For all contracts, regardless of whether the Contract Time is stipulated in calendar days or working
days, the Owner will count default days in calendar days.
E. Right of Collection.
The Owner has the right to apply any amounts due Contractor under this Agreement or any other
agreement between Owner and Contractor, as payment on such liquidated damages due under
this Agreement in Owner's sole discretion. Notwithstanding anything herein to the contrary,
Owner retains its right to liquidated damages due under this Agreement even if Contractor, at
Owner's election and in its sole discretion, is allowed to continue and to finish the Work, or any
part of it, after the expiration of the Contract Time including granted time extensions.
F. Completion of Work by Owner.
In the event Contractor defaults on any of its obligations under the Agreement and Owner elects
to complete the Work, in whole or in part, through another contractor or its own forces, the
Contractor and its surety shall continue to be liable for the liquidated damages under the
Agreement until Owner achieves Substantial and Final Completion of the Work. Owner will not
charge liquidated damages for any delay in achieving Substantial or Final Completion as a result
of any unreasonable action or delay on the part of the Owner.
G. Final Acceptance by Owner.
The Owner shall consider the Agreement complete when the Contractor has completed in its
entirety all of the Work and the Owner has accepted all of the Work and notified the Contractor in
writing that the Work is complete. Once the Owner has approved and accepted the Work,
Contractor shall be entitled to final payment in accordance with the terms of the Contract
Documents.
H. Recovery of Damages Suffered by Third Parties.
Contractor shall be liable to Owner to the extent Owner incurs damages from a third party as a
result of Contractor's failure to fulfill all of its obligations under the Contract Documents. Owner's
recovery of any delay related damages under this Agreement through the liquidated damages
does not preclude Owner from recovering from Contractor any other non -delay related damages
that may be owed to it arising out of or relating to this Agreement.
Section 6. Exhibits Incorporated.
Exhibits Incorporated: The following documents are expressly agreed upon, attached hereto and
made a part of this Agreement for Solicitation 20-7747-ST "Immokalee Health Building HVAC
and Roof Replacement".
Exhibit A-1:
Contractor's Bid Schedule
Exhibit A-2:
Contractor's Bid Submittal Forms and Addendums
Exhibit A-3:
Contractor's List of Key Personnel
Exhibit B-1:
Payment Bond Forms ❑ Not Applicable
Exhibit B-2:
Performance Bond Forms ❑ Not Applicable
Exhibit B-3:
Insurance Requirements
Exhibit C:
Release and Affidavit Form
Exhibit D:
Contractor Application for Payment Form
3
Construction Services Agreement: Revised 072118 (v6)
CAS
Exhibit E: Change Order Form
Exhibit F: Certificate of Substantial Completion Form
Exhibit G: Final Payment Checklist
Exhibit H: General Terms and Conditions
Exhibit I: Supplemental Terms and Conditions ❑ Applicable ® Not Applicable
The following documents are expressly agreed to be incorporated by reference and made a part
of this Agreement for Solicitation 20-7747-ST "Immokalee Health Building HVAC and Roof
Replacement". The complete contract documents, including Addendum with attachments, are
available on the County's on-line bidding system: https://www.bidsync.com/bidsync-cas , which
the parties agree comprise the final integrated agreement executed by the parties.
Sections corresponding to any checked box ( ® ) expressly apply to the terms of this Agreement
and are available through the County's on-line bidding.
®Exhibit J: Technical Specifications
❑Exhibit K: Permits
❑Exhibit L: Standard Details
®Exhibit M: Plans and Specifications prepared by Victor J. Latavish, AIA
®Exhibit N: Environmental Health and Safety Requirements for Construction Projects
Section 7. Notices
A. All notices required or made pursuant to this Agreement by the Contractor to the Owner
shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the
following:
Collier County Board of County Commissioners, FL
c/o Facilities Management Division
3335 Tamiami Trail East
Naples, FL 34112
Attn: Timothy Rygiel, Project Manager
Phone: (239) 252-8380
Email: Timothy. Rygiel(a)colliercountyfl.gov
B. All notices required or made pursuant to this Agreement by Owner to Contractor shall be
made in writing and shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile,
addressed to the following:
DEC Contracting Group, Inc.
1560 Matthew Drive, Suite B
Fort Myers, FL 33907
Attn: Douglas R. Masch II, President
Phone: (239) 332-4322
Email: doug@deccontracting.com
C. Either party may change its above noted address by giving written notice to the other party
in accordance with the requirements of this Section.
4
Construction Services Agreement: Revised 072118 (4)
�q
Section 8. PUBLIC ENTITY CRIMES.
8.1 By its execution of this Contract, Construction Contractor acknowledges that it has been
informed by Owner of the terms of Section 287.133(2)(a) of the Florida Statutes which read as
follows:
"A person or affiliate who has been placed on the convicted vendor list following
a conviction for a public entity crime may not submit a bid on a contract to provide
any goods or services to a public entity for the construction or repair of a public
building or public work, may not submit bids on leases of real property to a public
entity, may not be awarded or perform work as a contractor, supplier,
subcontractor, or consultant under a contract with any public entity in excess of
the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of
36 months from the date of being placed on the convicted vendor list."
Section 9. Modification.
No modification or change to the Agreement shall be valid or binding upon the parties unless in
writing and executed by the party or parties intended to be bound by it.
Section 10. Successors and Assigns.
Subject to other provisions hereof, the Agreement shall be binding upon and shall inure to the
benefit of the successors and assigns of the parties to the Agreement.
Section 11. Governing Law.
The Agreement shall be interpreted under and its performance governed by the laws of the State
of Florida.
Section 12. No Waiver.
The failure of the Owner to enforce at any time or for any period of time any one or more of the
provisions of the Agreement shall not be construed to be and shall not be a waiver of any such
provision or provisions or of its right thereafter to enforce each and every such provision.
Section 13. Entire Aareement.
Each of the parties hereto agrees and represents that the Agreement comprises the full and entire
agreement between the parties affecting the Work contemplated, and no other agreement or
understanding of any nature concerning the same has been entered into or will be recognized,
and that all negotiations, acts, work performed, or payments made prior to the execution hereof
shall be deemed merged in, integrated and superseded by the Agreement.
Section 14. Severability.
Should any provision of the Agreement be determined by a court to be unenforceable, such a
determination shall not affect the validity or enforceability of any other section or part thereof.
5
Construction Services Agreement: Revised 072118 (v6) CA()
Section 15. Chanae Order Authorization.
The Project Manager shall have the authority on behalf of the Owner to execute all Change Orders
and Work Directive Changes to the Agreement to the extent provided for under the Owner's
procurement ordinance and policies and accompanying administrative procedures.
Section 16. Construction.
Any doubtful or ambiguous language contained in this Agreement shall not be construed against
the party who physically prepared this Agreement. The rule sometimes referred to as "fortius
contra proferentum" (pursuant to which ambiguities in a contractual term which appears on its
face to have been inserted for the benefit of one of the parties shall be construed against the
benefited party) shall not be applied to the construction of this Agreement.
Section 17. Order of Precedence
In the event of any conflict between or among the terms of any of the Contract Documents, the
terms of the Construction Agreement and the General Terms and Conditions shall take
precedence over the terms of all other Contract Documents, except the terms of any
Supplemental Conditions shall take precedence over the Construction Agreement and the
General Terms and Conditions. To the extent any conflict in the terms of the Contract Documents
including the Owner's Board approved Executive Summary cannot be resolved by application of
the Supplemental Conditions, if any, or the Construction Agreement and the General Terms and
Conditions, the conflict shall be resolved by imposing the more strict or costly obligation under
the Contract Documents upon the Contractor at Owner's discretion.
6
Construction Services Agreement: Revised 072118 (v6)
CAO
IN WITNESS WHEREOF, the parties have executed this Agreement on the date(s)
indicated below.
TWO WITNESSES:
t
FIRST WITNESS
Brad Ninkovich
Print Name
S OND WITN S
Patrick Elek
Print Name
Date: Tune 19, 2020
ATTEST:
Crystal K. Kinzel, Clerk of Courts
& Corpptroller
CONTRACTOR:
DEC Contracting Group, Inc.
By:
Douglas R. Masch Il, President Tune 19,2020
Print Name and Title Date
OWNER:
BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY FLORIDA
• rti
f.
BY: BY:
fittest as to rman's
�ignature•Only.
AV
to Forma Legality:
akssi�su�ounty Attorney
i�'pu
Y J? —
Print Name
oiO4 �e�ig
Burt L. Saunders, Chairman
7
Construction Services Agreement: Revised 072118 (v6)
*,CA
EXHIBIT A-1: CONTRACTOR'S BID SCHEDULE
(FOLLOWING THIS PAGE)
8
Construction Services Agreement: Revised 072118 (v6)
9
Solicitation No: 20-7747-ST
Facilities Project No: 50176
Project Title: IImmokalee Health Building HVAC and Roof Replacement
Bid Due Date: May 19, 2020 @ 3:00 pm
BID SCHEDULE
BIDDER: DEC CONTRACTING GROUP, INC.
Line Item Description
1 General Conditions
2 Demolition
3 Structural Work
4 Roof System
5 Interior Construction & Finishes
6 HVAC and Controls
7 Electrical
Total
$101,037
$32,684
$27,619
$192,805
$47,262
$609,957
$154,729
BUILDING $1,166,093
OWNERALLOWANCE $100,000
Total Lump Sum Bid - BUILDING + OWNER ALLOWANCE: $1,266,093
Owners Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction
to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the
Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or
the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order
with proper documentation of Time and Materials supporting the change.
NOTE: Breakdown of trade values Is for the purpose of bid analysis and for the development of historical cost Information
NOTE: Award will be made on Total Lump Sum Bid.
EXHIBIT A-2: CONTRACTOR'S BID SUBMITTAL FORMS AND ADDENDUM
(FOLLOWING THIS PAGE)
Construction Services Agreement: Revised 072118 (v6)
0
County
Adi*mm�rative ServiossrXiie�w
ADDENDUM #1
Memorandum
Enmi|:(Lisa �OipnQpcoNa*"utit yigov)
loloVhoou:(230-2S2-8A35)
Date: 4/17/2020
From: Lisa [)ien.Procurement Strategist
To: |ntaveaind Parties
3ub]act: Addendum#1 '20-7747'ST|mnookm|eoHealth Center HVAGand Roof Replacement
This addendum has been issued for the following items identifying clarifications, changes, deletions, or
additions to the original solicitation documents and bid schedule for the above referenced solicitation.
Pre- bid meeting and Bid Opening — Conference Bridge
n The Scheduled Pnab|dMeeting for April 28.2020ai1O:OUamandthe bid Opening
scheduled for May 18,2O20ot3:0Dpm will both buconducted onthe Pn/cuneman\
Services Conference Bridge
o Connect with Procurement Services Conference Bridge by calling 239-252-7205 and
entering access code 212121
o Site visits can be arranged through the procurement strategist after tho pro -bid aieetiiig
Please acknowlodge receipt of this Addendum and Include with your bid.
(QQ»«
DEC Contracting Group, Inc.
Date
S/l9/2O2U
Kyou require oVuiUnne||nNnnaUno.planoopusiovxes|innnoomSvnuw`-Iino^,conudmeusinothe above nonmuiofonnuUon.
^v,mmxr-nmplm,-Addendum-mvm-10-10
colki. Comity
Momorandum
Email:(Lisa,OionQcoil'rercountyll.gov)
Tolophono: (239.252-8935)
ADDENDUM 42
Date: 4/21/2020
From: Lisa Oion, Procurement Strategist
To: Interested Parties
Subject: Addendum 02 - 20-7747-ST lmmnkalno Health Coninr HVAC and Roof Replacement
This addendum has been issued for the following items Identifying clarifications, changes, dolellons, or additions to the original solicitation
documents and bid schedule for the abovo referenced solicitation.
Pro-bld meeting, Bid Opening and Site Visit
. 20-7747ST — Addendum 112
0 The Scheduled Pro -bid meeting and bid opening for this solicitation are through QTe procurement Services Conference Bridge only.
Procurement Services Conference Bridge: 239-252.7205 — Access Code: 212121
o A non -mandatory Site Visit will follow irnnledlately all or the Pre -Bid Moollng at Immokalee Health Center located at 419 N. 1" Street
in Immokalee, Florida 341,12. Bidders seeking to attend the site visit must indicaln their Intent to attend during the Pre -Bid
conference call so that arrangements can be made to nccommodate social distancing conventions - Procuremont/Project
Management/Design Entity staff to lead small groups as necessary. Accommodations can be made for travel time.
o Due to the COVID-19 pandemic, the Irnmokaloo Heallh Cantor is following CDC and Departmont of Health guidanco. Upon aniving
at the Immokalee Health Center be prepared to answer questions of genaral health.
Please for a pt this Addendum and Inciudo with your bid. 5/19/2020
( l);nat"re) Contracting Group, Inc. Date
(Name of Firm)
It you require additional Information, please post a question on SidSync on-line or contact nla using tho nbovo contact information.
Appcn lit r• Tempina - Addendum my 10.10.18
OCNO
Email: (Lisa.Olon®collio(countyfl.gov)
T 7 TyLt t , Tolophono: (230-252.8935)
ADDENDUM #3
Memorandum
Data: 4/22/2020
From: Lisa Oien, Procurement Strategist
To: Interested Parties
Subject: Addendum #3 - 20-7747-ST Irnmokalee Health Center HVAC and Roof Replacement
This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for the above referenced solicitation.
Exhibit M Roplacement
20-7747-ST - Addendum rr3
• Now Document 20.7747-ST Exhibit M - Plans pdf print pdf
• Removed Document 20-7747-ST Exhibit M - PLANS pdf
This is a formatting update only, the information on Exhibit M remains the sarne.
Pleasnkrm'p
t of ihls Adrfonrlurn and inraudo with your bid.
5/19/2020
(Signatur. C Contracting Group, Inc. Date
(Name of Firm)
It you require nddttionai inforinabon, please post n question on NdSync on-line or contact me using the above contact information
AppWia Memplate - Addmdurtrmv l IS-18
'kw� nth'
'tsttart t�
Momorandum
Data: 4/22/2020
Email: (Lisa.01e11@COIllarroun1y11.0ov)
Telephone: (239.252.8935)
►IRM )WJftltQAMIZf
From: Lisa Oien, Procurement Strategist
To: Interested Parties
Subject: Addendur #4 •20.7747-ST Immokalee Health Center HVAG and Roof Replacement
This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for the above referenced solicitation.
Exhibit M Roplacement -Note
10-1747-ST• Addendum #4
Note: Exhibit M document replacement with addendum #3 was for a formatting change only.
Please r", V"Irnk Addondurn and include with your laitl•5/19/2020
(sicnatu Contracting Group, Inc. ante
(Name of Firm)
If you requite additional Information, p!easo post a question on aidSync on-line or contact me using the above contact information
Appeendfr f-rrmplate-"Midurnaev to48&18
C;A- Eelail:(LIsa.0lenQcolliercaturlyll.gov)
lw m lty Tolophono: (239.252•8935)
ADDENDUM #5
Memorandum
Date: 51412020
rrom: Lisa Oien, Procurement Strategist
To: Interested Parties
Subject: Addendumifs - 20.7747-ST Imrnokalee Health Center HVAC and Roof Replacement
This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for ilia above referenced solicitation.
Sign In Shoats and Minutes — April 20, 2020
20.7747•ST- Addendum 115
:; Sign in Shoots
Meeting Minutes
Please a la o ' ipt t tills Addendum and iticillda with your bid. 5/19/2020
Si nat� Date
(� Contracting Group, Inc.
(Name of Firm)
if you require ndditional information, please poet a yuosllon on eidSync on -lino or contact nw using the above contart information
Appt V, r•7crnplim-Addendum-rev 1e-18.18
9
Email: (Lisa.0ien�,ir colliercauntyfi gov)
Tolophone: (239.252-6935)
ADDENDUM #6
Memorandum
Date: 5/4l2020
From: Lisa Olen, Procurement Strategist
To: Interested Parties
Suhjoct: Addendum N - 20-7747-ST Immokalee Health Center HVAC and roof Replacement
This addondurn has been issued for the following ilerns identifying cinrifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for the above referenced solicitation.
Additional Pro -Bid Mooting and Sito Vinit
20-7747-ST- Addendum Rb
o An additional Pre -bid meeting for this solicitation is scheduled for Wednesday May G, 2020 at 10:00 AM. The meeting is to be held
through the procurement Services Conference Bridge. Please attend through the Procurement Services Conference Bridge: 239-
252-7205 — Access Code: 212121
c A non -mandatory Site Visit will follow immpdiately after the Pre -Rid tLqqjLnA at Immokalee Health Center located at 419 N. 1" Street
In Immokaloe, Florida 34142. Bidders seeking to attend the silo visit must indicate thoir intent to attend during the Pre -Bid
conference call so that arrangements can be made to accommodate social distancing conventions - Procurement/Project
ManagementiDesign Entity staff to lead small groups as necessary. Accommodations can be made for travel time,
r) Due to the COVID-19 pandomic, the Immokalee Health Center is following CDC and Department of Health guidance. Upon arriving
at the Immokalee Health Center be prepared to answer questions of general health.
Please ttivik
Kk�Addendum and include with your hld, 5/19/2020
(Signature C Contracting Group, Inc, f"t`'
(Name of Firm)
It you requim additional information, plowm peat a quoston on BidSync on -lino at contact ma using lho nhovn contact information
AC, mrill r-T"Plate -Add endum-rev 10.IS, 19
9
ter C.oty
-:.r� xc 13
Email:(I.Isa.Oien®coliiorcountytl.gov)
Telephone: t230-252-8035)
ADDENDUM 117
Memorandum
Date: 5/412020
Froin: Use Oien, Procurement Strategist vie Jim Flanagan, Procurement Manager, Construction Team
To: Interested Parties
Subject: Addendum #7 - 20-7747-ST Immokatee Wealth Center 11VAC and Roof Replacement
This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for the above referenced solicitation.
Additional Pro -Bid Meeting and Site Visit (Pro•Bld Mooting 02) — Pro -Bid Mooting Minutus and Sign -in Sheets
May 6 2020 - Pro -Bid Mooting #2
20.7747-ST- Addendum 117
o Addendurn #7 — Pre -Bid Mtg 112 — Pre -Bid Mlg Minutes and Sign in Sheets, attached.
Pioase ac no e c pt tt dondum and Includo with your hid.
5/19/2020
E��
0608ttlrtl ontra'Ning Group, Inc. gate
(Name of Firm)
It you requlru ndddiwial infonnnGon, plunso post a quasllon on aldSync on-line or i laq ma using the nbove coftict Inrormatron
A0lrrndi,l r'leIT) ,Inlr—Add endumauv 10.18.18
9
Email: (Lisa.Oien(%)colltorcotuttyg,gov)
Lt t Telephone: (239.252-8035)
P _;
ADDENDUM NO
Memorandum
Data: 5/712020
From: Lisa Dien, Procurement Strategist via Jim Flanagan, Procurement Manager, Construction Team
To: Interested Parties
Subject: Addendum 98 - 20-7747-ST tmmokalee Health Center HVAC and Roof Replacement
This addendum has been issued for the following items identifying clarifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for the above referenced solicitation.
Additional Site Visit (#3)
20.7747-ST'• Addendum 118
A non -mandatory additional Site Visit (113) at Immokalee Health Center located at 419 N. 161 Street in Immokaleo, Florida 34142. On
Monday May 11, 2020 at 10:00 AM.
o It you need access to the roof, you will need to bring your own laddor.
o Due to the COMD-19 pandemic, the Imrnokalee Health Center Is following CDC and Department of Health guidance. Upon arriving
at the immokalee Health Center be prepared to answer questions of general health.
Ploasotymll ouWaphlondtiniand includo with your bld.5/19/2020
(Slgnatur D RYC Contracting Group, Inc.
(Name of Firm)
It you require additional information, please post a question on oidSync on-line or contact me using the above contact Information.
Appmdi%F-impute-Wmdum-rry 10.19.18
9
Email: (LIsa.Oion�ji colliorcountyfl.gov)
cl- Cowity Telephone: (230-252.0035)
ADDENDUM 119
Momorandum
Date: 5112/2020
From: Lisa Olen, Procurement Strategist
To: Interested Parties
Subject: Addendum #9-20-7747-ST Immokalee Health Center HVAC and Roof Replacement
This addendum has been issued for the following Items identifying clarifications, changes, deletions, or additions to the original solicitation
documents and bid schedule for the above referenced solicitation.
Submitted Questions and Rosponsos
i 20-7747-ST Immokalee Health Building HVAC and Roof Replacement — Addendum #9
c questions 1-19 and Responses
011estion I
(hlestitnr you call out lightweight Concrete and on page I I of the plans it showing teclun plank decking, could please clnrify the
correct decking pleas:.
lllanks,
William Clements Univcrsal Contracting (Submitted: Apr 20, 20209:07:52 ARi FAYI)
Refer to details on sheet A2.111cur illustrations and material designations. and specifications section 7 0150 phut I A. A.1
tier description of existing roof system, which includes existing retrofit IigllIWeigh I concrete rued insulation over Iue original
existing techun deck, (Answered: Apr 20, 2020 3:05:28 Phil EDT)
Append, IF -I cmplate-Ad dmdum•4.v 10.18.11
OA(
Question 2
Are the fastcners of the rooting system to be mechunically atluehad into the lightweight concrete or to the structural deck?
(Submitted: Apr 22, 2020 5:11.40 pM EDT)
Answer
Mechanically fasten to the lightweight concrete deck. (Answered: May 6, 2020 10:05:48 AM EDT)
Question 3
Is there: it sign in sheet from the pre -hid meeting? (Submitted: Apr 311, 2020 12:36:26 1'M EDT)
Answer
'rite sign in 511CCI5 will he [mailable with an addendum yet to he released. (Aosrrcrcd: May 1, 2020 9:47:48 AM EDT)
• Addendum t#5 with sign in sheets and minutes have been uploaded for view (A nstrered: NIny 6, 2020 10:05:48 AM
Em.)
Question 4
Please explain the materials for the existing roof and llte process for removing and replacing. (Submi(ted: May 1, 2020 9:48:32
A11 EDT)
Answer
• I'lense refer answer to question ill above, and to [details I through 7 on sheet A-2.1 t', hick ilh[atrate the locations of
existing materials, stmetural drawings which indicate additional supports required, mechanical drtm ings which indicate I-IVAC
curb locations. and specifications including hill not limited to section 07 0150 (Answered: May 6, 2020 10:05:48 AM LDT)
Question 5
It appears that the details and plan view of the roof structure ore in conflict with each other. Sections detail 1.50 whereas plan view
of structure details W6x 15.
mm
I low are the it"v, beams to be connected to the existing structure? Where ore the beams located (above or below file roof deck)? vdit
The structural and architectural roul' plan shows it pitched roof. 'I he existing structure is it flat root'. Is the rool'str ucture changing?
Do all curbs receive reinl'orcement treatment? Are existing curbs being changed to a different size?
Appmdli F.Imiphte-Addmdum-rsv 10.18,18
O-A
It appmrs that the roof either has existing bulb tees and/or bar joist. Presuming the W6xl 5 beams shown are below the roof deck, Are
the existing joists being modified to accommodate the beams?
Will the roof require shoring to execute any modifications?
Are the structural frames to support the HVAC equipment to be In the scope of the structural steel provider? (Submitted: May 5, 2020
10:52:36 AM EDT)
Answer
• AS THIS 1S A MULTIPLE QUESTION, EACH QUESTION WITHIN THIS QUESTION HAS BEEN BROKEN OUT
AND ANSWERED BELOW.
Q: It appears that the details and plan view of the roof structure are in conflict with each other. Sections detail L5x5 whereas
plan view of structure details W6x15.
A: Except where larger members are indicated on plan, use typical details illustrated on sheet S 1.0 for typical for curb or rack
supports. In general, heavier members are indicated on plan for heavy loads and typical steel angles are used for fan curbs and
rack supports.
Q: How are the new beams to be connected to the existing suucturc? Where arc the beams located (above or below the roof
deck)?
A: Connections are welded, and beams are below the roof deck. Steel fabricator shall detail connections on shop drawings.
Q: The structural and architectural roof plan shows a pitched roof. The existing structure is a flat roof. Is the roof structure
changing?
A: The existing steel roof framing and original tcctum roof deck are flat. The tapered insulation and lightweight concrete were
added in a previous re -roofing project and now provide a sloped roof surface,
Q: Do all curbs receive reinforcement treatment?
A: Yes
ApperAb FTempUte-Addenduff +m MMIi
0
Q; Arc existing curbs bring changed toll. dif erent sits?
A: Yes
Q: It nppcars that the roofeitllcr hus; existing bulb tees and/or barjoist. Presuming the W6x 15 beams shown are below the roof
dock. Are the existingjoists being modified to accommodate the bcanls?
A: W6 bails arc only located between existing \\'IG or W 12 bctuns. The \V At 'Ai!k'A AA' s are to be connected to tilt:
webs ofthe existing hams.
Q: Will the roof require shoring to execute any modifications?
A: Contr wor is responsible to shore roof and till other related necessary work.
Are the structural frames to support the HVAC equipment to be in the scope of the structural steel provider!
A: Delegating work among trades is the Contractors responsibility (Anslvcred: May 8, 2020 9:39:10 AM EDT)
Question G
In regards to the acoustical ceiling Irim, the spec calls tier " shadme molding" \Hach Can't ill capped III IuIIIinni11. Is II ok if Ills.:
Irim finish is steel? (Submilted: Niny 5, 2020 2:11:18 I'M EDT)
Answer
Yes (Answered: hilly 8, 2020 9:39:10 AN EDT)
Question/ 7
\\'hen will the additional site visit he scheduled'! (Submitted: May 6, 2020 8:23:05 Ahli EMT)
Answer ;,Iz
May 6, utter the non mandatoD- second pre -hid a site visit Is available (Answered: Play G, 2020 10:08:55 A;'\t k:PT)
Question 8
Addendum 5 and 6 was posted 96120 at 8:59am on llidsync even though they are dated 514. Addendum 6 says another prebid was qkf
being schedule for today at Wool. Was this 2nd prebid lnrmdatory lrS the notice does not give enough time to get to n prebid when it is
Appendf% r-umplaw-Addandum rav MIS, IS
Cr*O
posted 111 8:59 the same day of the prehid.
What was the purpose of having it 2nd prehid7 (Submitted: May G, 202119:50:01) AM FAYF)
Answer
• No, tile second pre -hid is not mandatory (Answered: Alay 0, 2021) 10:07;15 AAl EDT)
• The Second non nlandauln, meeting Nvas to salcguard that the public was notified of the Solicialion. (Answered: Mny 0,
2020 10;20:27 AAl EDT)
Que.stioll9
1 tee noti l ication of the seamdury site visit was posted till hour bel'orc it was scheduled. Ile such it short time Cramc. is there ally
chance tier another site visit to view existing conditions or can we visit ourselves? (Submitted: May 6, 2020 5:05:50 Ph1 EDT)
Answer
Sec Addendum 89
u A nun -mandatory additional Site Visit (113) at Immokalec I leallh Culler located at 419 N. I st Street in Immokalee. I'lorida
34142. Qn Monday May 11. 2020 at 10:00 AM. vdit
o If you need access to the root', you will need to hring your own ladder.
o Due to the COVID-19 paniicnlic, the immokalce Health C'entcr is following CDCand Department of Health guidanec. Upon
arriving at the hnmokalec I lealth C cmer he prepared to answer questions ofgeocral health. (Answered; May 7, 2020 4:01:22
P,NI EDT)
Qllestillll III
Sheet \14.0 holes I & 9 Indicate c\isting exhaust %yMem It) renllall and to rclocale 15' ITom edge of root', Sheet M3.0 does not
illdicate the location of the cxhtiusl duet work liar Ibis unit and which room it needs to exhaust. (Submitted: May 7, 2020 2:50:24 PM
EDT)
Answer C{_'�l.i
Sheet M.3 indicates exhaust aim above office 108 ducted to Inlcl in corner of TI3 examination 109. (Answered: Alay 8,
2(j20 9:44:55 AAI EDT)
Appnwdia r-Umplate-Addendum•rav 1616111
0
Question I I
Will subcontractors be required to obtain Collier County I teilfty hedges for their workers? (Submitted: May 7, 2020 2:52:23 PM
EDT)
Answer
Ycs (Answered: May 8, 21`120 9:4d:55 AM HYF)
Question 12
Shea S2.0 I01l-,1 has no additional roofing framing. Please advise if additional roof' than ing is required Itar ItTU-4. (Submitted:
May 7, 2020 2:56:31 I'M Lu'r)
Answer edit
Refer to typical Roof Opening DetaiI on sheet S Ltl and provide I.4 x d x 114 at R't UA opening. (Answered: Nlny 8,
2020 9:39.10 A6l EDT)
Question 13
'I'he building permit application painting is listed as a major work item, however tlae only reference is ul touch up ifareas are
damaged during construction. Is the interior of the building to he completely repninted? (Submitted: May 7, 2020 2:58:28 I'AI EDT)
Answer a
No (Answered: May 8, 2020 9:44:55 AM EDT")
Questlrrn 14
To what extent are existing furnishings to remain? Is the contractor responsible to move or store furnishing to complete the work?
(Submitted: May 7, 2020 3:02:07 P,41 EDT)
Answer edit
Collier County to move furniture to contractor pmvided storage. (Answered: May 8, 2020 9:49:1.1 AM FIDT)
Question 15
0951 13-3 3.4-13 states cap material Aluminum painted white. Can this be statdard }:rid with steel cap painted white since it is inn t:dit,
conditioned space, with temperature and humidity being controlled? (Submitted: May 7, 2020 3:09:50 I'M EDT)
Appmdl. F-remplite-Addmdum-rev 10.16-18
9
Answer
• Yes (Answered: May 8, 2020 9:53:07 AAl EDT)
Question IG
Shea A-I.G It'I'U-I thrill 101)-4 detail WA-1 I, this note does not exist on sheet A-2.1. Detail 7/A2.1 seems to III this location.
('lease conlirrn That there is not a detail 8/A2.1. (Submitted: Aiay 7, 2020 3:13:52 i'M EDT)
cdit
Answer
. Detail 7/2.1 is correct (Answered: May 8, 2021)9:53:07 Ant EDT)
Questian 17
Sheet A-1.5 keynote F states remove existing lightning protection system, no system was IirunrL Please confirm than anew complete
lightning protection system needs to be installed. (Submit(ed: Atny 7, 2020 3:17:22 mi EDT)
Answer
• Yes (Answerer: May 8, 2020 9:44:55 ANI EDT)
Question 18
Is all existing low voltage cable Win, phone. access control, CCTV, eta) that has been abandoned to be removed from above ceiling
under this contract? (Submitted: Moy 7, 2020 3:21:41 PA1 EDT)
Answer gl:
Yes (Answered: play 8, 2020 9:44:55 AM EDT)
Question 19
11'e.eisting active loin voltage cable is Imind to be not supported horn structure I.E. laying on existing ceiling system is the existing
active low voltage cable to be properly supported under this contract? (Submitted: May 7, 2020 3:24:52 PA1 EDT► edit
Answer
App.4A r•Tempiele—Addendum4ev 10.18-I8
e
Ycs (Answered: May 8, 2020 9:44:55 AM ED'1)
Pleaae aC n If dum and Include with your bid. 5/19/2020
(signature) C ontracting Group, Inc. bate
(Name of•fimt)
If you require additional InfammUon, please post a question on nldSync on-ane or contact mo using the above contact Infomtallon.
APprndh Kemplee —AddwWwn-m10-mis
0
FORM 1- BID RESPONSE FORM
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
Immokalee Health Building HVAC and Roof Replacement
BID NO.20-7747-ST
Full Name of Bidder DEC Contracting Group, Inc.
Main Business Address 1560 Matthew Drive, Suite B
Place of Business Fort Myers, FL 33907
Telephone No.239-332-4322 Fax No. 239-332-0180
State Contractor's License # CGC1526430
State of Florida Certificate of Authority Document Number P 14000020944
Federal Tax Identification Number 46-4934701
DUNS # 079391270 CCR#
Cage Code
74UA6
To: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA
(hereinafter called the Owner)
The undersigned, as Bidder declares that the only person or parties interested in this Bid as principals are those named
herein, that this Bid is submitted without collusion with any other person, firm or corporation; that it has carefully
examined the location of the proposed Work, the proposed form of Agreement and all other Contract Documents and
Bonds, and the Contract Drawings and Specifications.
Bidder proposes, and agrees if this Bid is accepted, Bidder will execute the Agreement included in the Bidding
Documents, to provide all necessary machinery, tools, apparatus and other means of construction, including utility
and transportation services necessary to do all the Work, and furnish all the materials and equipment specified or
referred to in the Contract Documents in the manner and time herein prescribed and according to the requirements of
the Owner as therein set forth, furnish the Contractor's Bonds and Insurance specified in the General Conditions of
the Contract, and to do all other things required of the Contractor by the Contract Documents, and that it will take full
payment the sums set forth in the following Bid Schedule:
Unit prices shall be provided in no more than two decimal points, and in the case where further decimal points
are inadvertently provided, rounding to two decimal points will be conducted by Procurement Services Division
staff.
Upon notification that its Bid has been awarded, the Successful Bidder will execute the Agreement form attached to
the Bidding Documents within ten (10) calendar days and deliver the Surety Bond or Bonds and Insurance Certificates
as required by the Contract Documents. The bid security attached is to become the property of the Owner in the event
the Agreement, Insurance Certificates and Bonds are not executed and delivered to Owner within the time above set
forth, as liquidated damages, for the delay and additional expense to the Owner, it being recognized that, since time
is of the essence, Owner will suffer financial loss if the Successful Bidder fails to execute and deliver to Owner the
required Agreement, Insurance Certificates and Bonds within the required time period. In the event of such failure,
the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. It is
hereby agreed that it is appropriate and fair that Owner receive liquidated damages from the Successful Bidder in the
event it fails to execute and deliver the Agreement, Insurance Certificates, and Bonds as required hereunder. The
Construction Solicitation Doc rev 02-21-20
9
Successful Bidder hereby expressly waives and relinquishes any right which it may have to seek to characterize the
above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of
Owner's actual damages at the time of bidding if the Successfiil Bidder fails to execute and deliver the Agreement,
Insurance Certificates, and Bonds in a timely manner,
Upon receipt of the signed and approved agreement and Purchase Order, the undersigned proposes to commence work
at the site within five (5) calendar days from the commencement date stipulated in the written Notice to Proceed unless
the Project Manager, in writing, subsequently notifies the Contractor of a modified (later) commencement date. The
undersigned further agrees to substantially complete all work covered by this Bid within Three Hundred Thirty
(330) consecutive calendar days, computed by excluding the commencement date and including the last day of such
period, and to be fully completed to the point of final acceptance by the Owner within Thirty (30) consecutive calendar
days after Substantial Completion, computed by excluding commencemcnt date and including the last day of such
period.
Acceptance and acknowledged by an Authorize Agent
Signature:
Title: President
Date:
5/19/2020
Construction Solicitation Doc rev 02-21-20
!� r
FORM 2 - CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT
Immokalee Health Building HVAC and Roof Replacement
BID NO. 20-7747-ST
Name
Pat Elek
Douglas R. Masch II
Construction Solicitation Doc rev 02-21-20
Personnel Category
Construction Superintendent
Project Manager
FORM 3 - MATERIAL MANUFACTURERS
THIS FORM MUST BE COMPLETED OR BID SHALL BE DEEMED NON -RESPONSIVE
All Bidders shall confirm by signature that they will provide the manufacturers and materials outlined in this Bid
specifications, including compliance with Florida Statute 255.20 to provide lumber, timber and other forest products
produced and manufactured in the State of Florida as long as the price, fitness and quality are equal. Exceptions (when
equals are acceptable) may be requested by completing the Material Manufacturer Exception List below. If an
exception for a manufacturer and/or material is proposed and listed below and is not approved by Engineer/Project
Manager, Bidder shall furnish the manufacturer named in the specification. Acceptance of this form does not constitute
acceptance of material proposed on this list.
Complete and sign section A OR B.
Section A (Acceptance of all manufactures and materials in Bid specifications)
On behalf of my firm, I confirm that we will use all manufacturers and materials as specifically outlined in
the Bid specifications.
Company: DEC Contracting Group, Inc.
5/19/2020
Signature: -------__- Date:.._. ---- -
Section B (Exception requested to Bid specifications manufacturers and materials)
EXCEPTION MATERIAL EXCEPTION MANUFACTURER
1.
2.
3.
4.
5.
Please insert additional pages as necessary.
Company:
Signature: Date
Construction Solicitation Doc rev 02-21-20
0
_ FORM 4 - LIST OF MAJOR SUBCONTRACTORS -I
THIS LIST MUST BE COMPLETED OR BID MAY BE DEEMED NON -RESPONSIVE
The undersigned states that the following is a list of the proposed subcontractors for the major categories outlined in
the requirements of the Bid specifications.
The undersigned acknowledges its responsibility for ensuring that the Subcontractors for the major categories listed
herein are "qualified" (as defined in Ordinance 2017-08 and Section 15 of Instructions to Bidders) and meet all legal
requirements applicable to and necessitated by the Contract Documents, including, but not limited to proper licenses,
certifications, registrations and insurance coverage. The Owner reserves the right to disqualify any Bidder who
includes non -compliant or non -qualified Subcontractors in its bid offer. Further, the Owner may direct the Successful
Bidder to remove/replace any Subcontractor, at no additional cost to Owner, which is found to be non -compliant with
this requirement either before or after the issuance of the Award of Contract by Owner. (Attach additional sheets as
needed). Further, the undersigned acknowledges and agrees that promptly after the Award of Contract, and in
accordance with the requirements of the Contract Documents, the Successful Bidder shall identify all Subcontractors
it intends to use on the Project. The undersigned further agrees that all Subcontractors subsequently identified for any
portion of work on this Project must be qualified as noted above.
Major Category of Work
Subcontractor and Address
I .
Electrical
Nauti Electric, 4313 SE13th Place, Cape Coral,
2.
Mechanical
WENTCO, Inc., 5877 Enterprise Pkwy., Fort Myers, FL
3.
Plumbing
N/A
4.
Site Work
N/A
5.
Identify other subcontractors
that represent more than 10%
of price or that affect the
critical path of the schedule
CFS Roofing Services,8831 Business Park Dr., Fort Myers, FL
Company:
Signature:
Construction Solicitation Doc rev 02-21-20
te: 5/19/2020
0
FORM 5 - STATEMENT OF EXPERIENCE OF BIDDER
The Bidder is required to state below what work of similar magnitude completed within the last
five (5) years is a judge of its experience, skill and business standing and of its ability to conduct
the work as completely and as rapidly as required under the terms of the Agreement.
1 Eagle Lakes Aquatic Park
(project name)
Naples, FL
(project location)
New Aquatic Facility
(project description)
5/152017-6/25/2018 $8,704,437
(project start/completion dates) (contract value)
2. GMD Building Renovations
(project name)
2800 Horseshoe Dr., Naples, FL
(project location)
Renovation of 40,000 sq ft building
(project description)
12/04/2018-10/07/2019 $ 3,352,932
(project start/completion dates) (contract value)
3. Collier Seminole Bathhouse
(project name)
Collier Seminole State Park
(project location)
New construction of State Park bathhouse
(project description)
07/15/2019-02/12/2020 $ 680,252
(project start/completion dates) (contract value)
Construction Solicitation Doc rev 02-21-20
Collier County BOCC
(project owner)
3299 Tamiami Trail E., Naples, FL
(Owner's address)
James Morton
(Owner's contact person) (title)
239-253-0868 James.Morton@colliercountyfl.gov
(phone) (email)
Collier County BOCC
(project owner)
3299 Tamiami Trail, E., Naples, FL
(Owner's address)
John McCormick CC Facilities Management
(Owner's contact person) (title)
239-252-5203 Jolin.McCormick@colliercountyfl.gov
(phone) (email)
Florida Department of Environmental Protection
(project owner)
3800 Commonwealth Blvd. MS 38, Tallahassee, FL
(Owner's address)
Andy Carrier Construction Project Consultant II
(Owner's contact person) (title)
941-286-4398 andy.j.carriei•@floridadep.gov
(phone) (email)
0
FORM 5 - STATEMENT OF EXPERIENCE OF BIDDER
4. CC First Floor Court House Renovations
(project name)
Collier County
Collier County BOCC
(project owner)
3299 Tamiami Trail, E., Naples, FL
(project location) (Owner's address)
New Courthouse and Access Control Dan Rodriguez Public Utilities Deputy Department Head
(project description) (Owner's contact person) (title)
09/2017 $ 1,943,773 239-252-2504 dan.rodriguez@colliercountyfl.gov
(project completion date) (contract value) (phone) (email)
5. Supervisor of Elections
(project name)
Collier County
(project location)
Interior Buildout & Access Control Work
(project description)
06/08/2016 $1,784,102
(project completion date) (contract value)
6. CCSO Orangetree Substation
(project name)
Collier County
(project location)
New Construction CCSO Substation
(project description)
02/08/2017 $2,520,369.19
(project completion date) (contract value)
Cornpaw
Signature:
Construction Solicitation Doc rev 02-21-20
Collier County BOCC
(project owncr)
3299 Tamiami Trail, E., Naples, FL
(Owner's address)
Margaret Bishop Principal Project Manager
(Owner's contact person) (title)
239-253-8219 Margaret.Bishop@colliercountyfl.gov
(phone) (email)
Collier County BOCC
(project owner)
3299 Tamiami Trail, E., Naples, FL
(Owner's address)
MargaretBishop Principal Project Manager
(Owner's contact person) (title)
239-253-8219 Margaret.Bishop@colliercountyfl.gov
(phone) (email)
9
r—�—!_ FORM 6 - TRENCH SAFETY ACT
Bidder acknowledges that included in the various items of the bid and in the Total Bid Price are costs for complying with the Florida
Trench Safety Act (90-96, Laws of Florida)
effective October
1, 1990. The Bidder further identifies the cost to be summarized below:
Trench Safety
Units of
Unit
Unit Extended Cost
Measure
Measure
uanti
Cost
(Description)
Li F•SY)
1.
-A-1144
LN_
A//A A11A_
2.
3.
4.
5.
TOTAL $
Failure to complete the above may result in the Bid being declared non -responsive.
DEC Contracting Group, Inc.
Company:
Signature:
Construction Solicitation Doc rev 02-21-20
Date: 5/ 19/2020
0
FORM 7 - BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we DEC Contracting Group, Inc,
(herein after called the Principal) and
Liberty Mutual Insurance Company , (herein called the Surety), a corporation chartered and
existing under the laws of the State of Massachusetts with its principal offices in the city of Mahwah, N1
and authorized to do business in the State of Florida are held and firmly bound unto the
Collier County Board of County Commissioners (hereinafter called the Owner), in the full and just sum
of Five Percent of the Amount Bid dollars ($ 5% ) good and lawful money of
the United States of America, to be paid upon demand of the Owner, to which payment well and truly to be made, the
Principal and the Surety bind themselves, their heirs, and executors, administrators, and assigns, jointly and severally
and firmly by these presents.
Whereas, the Principal is about to submit, or has submitted to the Owner, a Bid for furnishing all labor, materials,
equipment and incidentals necessary to furnish, install, and fully complete the Work on the Project known as Bid No.
20-7747-ST- Immolcalee Health Building HVAC and Roof Replacement.
NOW, THEREFORE, if the Owner shall accept the Bid of the PRINCIPAL and the PRINCIPAL shall enter into the
required Agreement with the Owner and within ten days after tine date of a written Notice of Award in accordance with
the terms of such Bid, and give such bond or bonds in an amount of 100% the total Contract Amount as specified in the
Bidding Documents or Contract Documents with good and sufficient surety for the faithful performance of the Agreement
and for the prompt payment of labor, materials and supplies furnished in the prosecution thereof or, in the event of the
failure of the PRINCIPAL to enter into such Agreement or to give such bond or bonds, and deliver to Owner the required
certificates of insurance, if the PRINCIPAL shall pay to the OBLIGEE the fixed sum of $ Am Percent 15%) e noted above
as liquidated damages, and not as a penalty, as provided in the Bidding Documents, then this obligation shall be null and
void, otherwise to remain in full force and effect.
IN TESTIMONY Thereof, the Principal and Surety have caused these presents to be duly signed and sealed"this
19th day of May 20 20 l
{" 1
Appointed Producing Agent for Liberty Mutual Insurance Company
9
Respectfully Submitted:
State of _
County of
Douglas R. March II being first duly sworn on oath deposes and says
_.. that the Bidder on the above Bid is organized as indicated and that all statements herein made are made on behalf of such Bidder and
that this deponent is authorized to make them.
_ Douglas R. Masch 11 , also deposes and says that it has examined and carefully prepared its
Bid fi•om the Bidding Documents, including the Contract Drawings and Specifications and has checked the same in detail before
submitting this Bid; that the statements contained herein are true and correct.
(a) Corporation
The Bidder is a corporation organized and existing under the laws of the State of Florida which operates under the legal
name of DEC Contracting Group, Inc. and the full names of its officers arc as follows:
President Douglas R. Masch II
Secretary
Manager
The is authorized to sign construction bids and contracts for the company by action of its
Board of Directors taken a certified copy of which is hereto attached (strike out this last sentence
if not applicable).
(b) Co -Partnership
The Bidder is a co -partnership consisting of individual partners whose full names are as follows:
The co -partnership does business under the legal name of:
(c) Individual
The Bidder is an individual whose full name is and if operating under a trade name, said
trade name is
Complete for information contained in (a) Corporation, (b) Cc-Partmership or (c) Individual from previous page.
r—, '-5 —
STATE OF Florida
COUNTY OF Lee
The foregoing instrument wa
Douglas R. Masch II
Florida corporation, o
My Commission Expires:
(AFFIX OFFICIAL SEAL)
DEC Contracting Gro tp, Inc.
L'e'1l Trn
BY: I ko
Name of Bi yped)
Douglas R. Masch 11
Signature
President
Title
s acknowledged before the this 19th day of May , 20 20 by
, as President of DEC Contracting Group, Inc, a
n behalf of the corporati9rt. Jle/she is erso 11 known to the or has produced
�� as identi catio and id t no ta—Ice an oath.
ignature of Notary)
NAME: -,Y1G L. •s� .y�v a
REGINA L. DUNN
* * MY COMMISSION# GG 019425
o� EXPIRES: August 29, 2020
�FOF Flo'* Bonded Thru Budget Notary Services
(Legibly Printed)
Notary Public, State ofr<—
CONSENT OF SURETY
KNOW ALL MEN BY THESE PRESENTS, that for and in consideration of the sum of $1.00
lawful money of the United States of America, the receipt whereof is hereby acknowledged, paid
the undersigned corporation, and for other valuable consideration Liberty Mutual Insurance
Company, incorporated organized and existing under the laws of the State of Massachusetts and
licensed to do business in the State of Florida, certified and agrees, that if the contract for the
Collier County Board of County Commissioners — Bid No. 20-7747-ST - Immokalce Health
Building HVAC and Roof Replacement is awarded to DEC Contracting Group, Inc., the
undersigned Corporation will execute the bond or bonds as required of the contract documents and
will become Surety in the full amount set forth in the contract documents for the faithful
performance of all obligations of the Contractor.
Signed and sealed this 19th day of May, 2020.
Liberty ut 'al I urance Company
By: _
f
Rachael Hurley, Attorney -in -Fact
Witness:
Marc Michalcwsky, As to Surety
State of
County of
New Jers
Union
SURETY ACKNOWLEDGMENT
On this 19t" day of May, 2020,
Before me personally came Rachael Hurley to me known, who being by me duly
sworn, did depose and say that he/she is an Attorney -in -Fact of
Liberty Mutual Insurance Company the corporation described in and which executed
the within instrument; that he/she knows the corporate seal of said corporation; that the
seal affixed to the within instrument is such corporate seal, and that he/she signed the
said instrument and affixed the said seal as Attorney -in -Fact by authority of the Board of
Directors of said corporation and by authority of this office under the Standing
Resolutions thereof. _
LISA� BR�L`
Commission # 50119811
Notary Public, State of New Jersey
y Commission Expires
January My commission expires
/ 10, 2025
cno
�1+I Liber3
Mutuw
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
Certificate No: 8200288-969516
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the Slate of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the Stale of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies'), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Marc J.
Michalewsky; Sandra A. Pace; Thomas M. True; Lisa A. Anderson; Kemal BrkaDOViC; Cheryl R. Coleman; Mary J. D'Amalu; Rachael Hurley
all of the city of Westfield state of NJ each individually if there be more than one named, its true and lawful attorney -in -tact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 14t1l day of January , 2019 .
vi
O
c
m State of PENNSYLVANIA
County of MONTGOMERY
Liberty Mutual Insurance Company
P� INs(Jpq Pv11 INSN INSUgq The Ohio Casualty Insurance Company
�o°aPDRgrm yC gJ `°aro�r� \�P4°aro�r ym West American Insurance Company
J? om cr�3 o m a mo m
gs'1912 0
s1919+�0 Q 1991 0
d�9B�cNasdD oN�wPs�yD� Ys lNDIANr da iRd'�/
David M. Carey, Assistant Secretary
On this loth day of January 2019 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance 1 o
Company, The Ohio Casually Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes = �
therein contained by signing on behalf of the corporations by himself as a duly authorized officer. `: w
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
IAVT
<- COMMONWEALTH OF PENNSYLVANIA
Noll rial Seal
0+Teresa Pestella.e, Notary Public
Upper Mar+onTwp., Montgomery County By:
9Y My Commission Expires March 29, 2021
erase Pastella, Notary Public
.4 Member, Pennsylvenla Assodatlon of Naiades
'e,Tllf?Y PtS'w,i
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV — OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attomey, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys-in-
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 19th day of May , 2020 .
P� INsu �11 INSV iNSU/tq
`J o°aP0 LC� yJ 4oaroryr Q9y vP °aroa�� ym
1912 � � o y 1919 W o a 1991 0
YdJI'88ACHU6-aD ZONAMPe�� D Y INDIAN�' D$ By,
Renee C. Llewellyn, Assistant Secretary
LMS-12873 LMIC OCIC WAIC Multi Co 062018
00
00
3E
0 ca
1 p
N O
ram
0 Q)
a0
m�
>o
N N
Do
(V
M
C 00
00
0 —
o to
LIBERTY MUTUAL INSURANCE COMPANY
FINANCIAL STATEMENT — DECEMBER 31, 2019
Assets
Cash and Bank Deposits ......................................... $778,754,989
*Bonds — U.S Government ..................................... 2,780,808,610
*Other Bonds............................................................ 12,645,608,792
*Stocks..................................................................... 16,385,435,431
Real Estate.............................................................. 235,608,378
Agents' Balances or Uncollected Premiums........... 6,217,983,641
Accrued Interest and Rents ..................................... 102,273,390
Other Admitted Assets ............................................ 11,957,106,292
Total Admitted Assets.....................................
.......................................................................... 51.1 13 579.52
3
Liabilities
Unearned Premiums ................................................
$8,007,146,482
Reserve for Claims and Claims Expense .................
21,532,853,787
Funds Held Under Reinsurance Treaties .................
507,868,920
Reserve for Dividends to Policyholders ..................
1,143,826
Additional Statutory Reserve ..................................
125,722,000
Reserve for Commissions, Taxes and
Other Liabilities ................................................
4,117,460,075
Total.................................................................
$34,292,195,090
Special Surplus Funds ................. $32,768,443
Capital Stock ............................... 10,000,075
Paid in Surplus ............................ 10,044,978,933
Unassigned Surplus ..................... 6,723,636,983
Surplus to Policyholders.................................16,811,384,434
Total Liabilities and Surplus ................................
P51 103.579.524
1J��pRi'a/�q'r'�.
F o * Bonds are stated at amortized or investment value; Stocks at Association Market Values.
1912 °s The foregoing financial information is taken from Liberty Mutual Insurance Company's financial
ym,,y"JsAr oS�= statement filed with the state of Massachusetts Department of Insurance.
I, TIM MIKOLAJEWSKI, Assistant Secretary of Liberty Mutual Insurance Company, do hereby certify that the foregoing is a true, and
correct statement of the Assets and Liabilities of said Corporation, as of December 31, 2019, to the best of my knowledge and belief.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Corporation at Seattle, Washington, this 271h day of
March, 2020,
Assistant Secretary
S-1262LMIC/a 3/20
a
FORM 8 - INSURANCE AND BONDING REQUIREMENTS
The Vendor shall at its own expense, carry and maintain insurance coverage from responsible companies duly
authorized to do business in the State of Florida as set forth in FORM 8 of this solicitation. The Vendor shall procure
and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work.
The County and the Vendor waive against each other and the County's separate Vendors, Contractors, Design
Consultant, Subcontractors, agents and employees of each and all of them, all damages covered by property insurance
provided herein, except such rights as they may have to the proceeds of such insurance. The Vendor and County shall,
where appropriate, require similar waivers of subrogation from the County's separate Vendors, Design Consultants
and Subcontractors and shall require each of them to include similar waivers in their contracts.
Collier County shall be responsible for purchasing and maintaining its own liability insurance.
Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf
of Collier County", or, the specific solicitation number and title.
The General Liability Policy provided by Vendor to meet the requirements of this solicitation shall name Collier
County, Florida, as an additional insured as to the operations of Vendor under this solicitation and shall contain a
severability of interests provisions.
The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County
Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance
must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all
work performed on behalf of Collier County.
The amounts and types of insurance coverage shall conform to the minimum requirements set forth in FORM 8 with
the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Vendor has any self -
insured retentions or deductibles under any of the below listed minimum required coverage, Vendor must identify on
the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide
satisfactory evidence of financial responsibility for such obligations. All self -insured retentions or deductibles will be
Vendor's sole responsibility.
Coverageu shall be maintained without interruption from the date of commencement of the Work until the date of
completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer.
The Vendor and/or its insurance carrier shall provide thirty (30) days written notice to the County of policy
cancellation or non -renewal on the part of the insurance carrier or the Vendor. The Vendor shall also notify the
County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non -
renewal or material change in coverage or limits received by Vendor from its insurer and nothing contained herein
shall relieve Vendor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any
policy to be provided by Vendor hereunder, Vendor shall immediately take steps to have the aggregate limit reinstated
to the full extent permitted under such policy.
Should at any time the Vendor not maintain the insurance coverage(s) required herein, the County may terminate the
Agreement or at its sole discretion shall be authorized to purchase such coverage(s) and charge the Vendor for such
coverage(sj purchased. If Vendor fails to reimburse the County for such costs within thirty (30) days after demand,
the County has the right to offset these costs from any amount due Vendor under this Agreement or any other
agreement between the County and Vendor. The County shall be under no obligation to purchase such insurance, nor
shall it be responsible for the coverageW purchased or the insurance company or companies used. The decision of
the County to purchase such insurance coverage,{s) shall in no way be construed to be a waiver of any of its rights
under the Contract Documents.
If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work,
the Vendor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10)
calendar days after the expiration date on the certificate. Failure of the Vendor to provide the County with such
renewal certificate(s) shall be considered justification for the County to terminate any and all contracts.
01CA0
Collier County Florida
Insurance and Bonding Requirements
Insurance / Bond Type Required Limits
1. ® Worker's Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government
Statutory Limits and Requirements
Evidence of Workers' Compensation coverage or a Certificate of Exemption issued
by the State of Florida is required, Entities that are formed as Sole Proprietorships
shall not be required to provide a proof of exemption, An application for exemption
can be obtained online at httlrS-Pa rlrti1M!,s,co nu e�c rl�tl(
2. ® Employer's Liability $1,000,000 single limit per occurrence
3. ® Commercial General Bodily Injury and Property Damage
Liability (Occurrence
Form) patterned after the $1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury
current ISO form Liability and Property Damage Liability. This shall include Premises and Operations;
Independent Contractors; Products and Completed Operations and Contractual
Liability.
4. ® Indemnification To the maximum extent permitted by Florida law, the ContractorNendor shall
defend, indemnify and hold harmless Collier County, its officers and employees from
any and all liabilities, darnages, losses and costs, including, but not limited to,
reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence,
recklessness, or intentionally wrongful conduct of the Contractor/ Vendor or anyone
employed or utilized by the Contractor/Vendor in the performance of this Agreement.
5. ® Automobile Liability $1,000,000 Each Occurrence; Bodily Injury & Property Damage,
Owned/Non-owned/Hired; Automobile Included
6. ❑ Other insurance as ❑ Watercraft $ Per Occurrence
noted:
❑ United States Longshoreman's and Harborworker's Act coverage shall be
maintained where applicable to the completion of the work.
$ Per Occurrence
❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the
completion of the work.
$ Per Occurrence
❑ Aircraft Liability coverage shall be carried in limits of not less than $5,000,000
each occurrence if applicable to the completion of the Services under this Agreement.
$ Per Occurrence
❑ Pollution $ Per Occurrence
❑ Professional Liability $ Per claim & in the aggregate
❑ Project Professional Liability $ Per Occurrence
❑ Valuable Papers Insurance $ Per Occurrence
❑ Cyber Liability $ Per Occurrence
❑ Technology Errors & Omissions $ Per Occurrence
0
7. ® Bid bond Shall be submitted with proposal response in the form of certified fields, cashiers'
check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or
proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made
payable to the Collier County Board of County Commissioners on a bank or trust
company located in the State of Florida and insured by the Federal Deposit Insurance
Corporation,
8. ® Performance and For projects in excess of $200,000, bonds shall be submitted with the executed
Payment Bonds contract by Proposers receiving award, and written for 100% of the Contract award
amount, the cost borne by the Proposer receiving an award. The Performance and
Payment Bonds shall be underwritten by a surety authorized to do business in the
State of Florida and otherwise acceptable to Owner; provided, however, the surety
shall be rated as "A-" or better as to general policy holders rating and Class V or
higher rating as to financial size category and the amount required shall not exceed
5% of the reported policy holders' surplus, all as reported in the most current Best
Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New
York, New York 10038.
9. ® Vendor shall ensure that all subcontractors comply with the same insurance requirements that lie is required to
meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance
provisions.
10. ® Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial
General Liability where required. This insurance shall be primary and non-contributory with respect to any other
insurance maintained by, or available for the benefit of, the Additional Insured and the Vendor's policy shall be
endorsed accordingly.
11. ® The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of
County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates
of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For
any and all work performed on behalf of Collier County.
12. ® On all certificates, the Certificate Holder must read: Collier County Board of County Commissioners, 3295
Tamiami Trail East, Naples, FL 34112
13. N Thirty (30) Days Cancellation Notice required.
14. Collier County shall procure and maintain Builders Risk Insurance on all construction projects where it is deemed
necessary. Such coverage shall be endorsed to cover the interests of Collier County as well as the Contractor.
Premiums shall be billed to the project and the Contractor shall not include Builders Risk premiums in its project
proposal or project billings. All questions regarding Builder's Risk Insurance will be addressed by the Collier
County Risk Management Division.
4/9/20 - CC
Vendor's Insurance Acceptance
By submission of the bid Vendor accepts and understands the insurance requirements of these specifications and that
the evidence of insurability may be required within five (5) days of the award of this solicitation. The insurance
submitted must provide coverage for a minimum of six (6) months from the date of award.
Co r r Cuu axe,
Adminisbative SerAxis Depaxtment
Plmurenwnl Ser✓ir's Omsion
FORM 9 — CONFLICT OF INTEREST AFFIDAVIT
The Vendor certifies that, to the best of its knowledge and belief, the past and current work on any Collier County
project affiliated with this solicitation does not pose an organizational conflict as described by one of the three
categories below:
Biased ground rules —The firm has not set the "ground rules" for affiliated past or current Collier County
project identified above (e.g., writing a procurement's statement of work, specifications, or performing
systems engineering and technical direction for the procurement) which appears to skew the competition in
favor of my firm.
Impaired objectivity — The firm has not performed work on an affiliated past or current Collier County
project identified above to evaluate proposals / past performance of itself or a competitor, which calls into
question the contractor's ability to render impartial advice to the government.
Unequal access to information — The firm has not had access to nonpublic information as part of its
performance of a Collier County project identified above which may have provided the contractor (or an
affiliate) with an unfair competitive advantage in current or future solicitations and contracts.
In addition to this signed affidavit, the contractor / vendor must provide the following:
1. All documents produced as a result of the work completed in the past or currently being worked on for the above -
mentioned project; and,
2. Indicate if the information produced was obtained as a matter of public record (in the "sunshine") or through non-
public (not in the "sunshine") conversation (s), meeting(s), document(s) and/or other means.
Failure to disclose all material or having an organizational conflict in one or more of the three categories above be
identified, may result in the disqualification for future solicitations affiliated with the above referenced project(s).
By the signature below, the firm (employees, officers and/or agents) certifies, and hereby discloses, that, to the best
of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity
(financial, contractual, organizational, or otherwise) which relates to the project identified above has been fully
disclosed and does not pose an organizational conflict.
DEC Contracting Group, Inc.
State of Florida
I --, , / __Company Name
' ` Signature
. Douglas Masch II/ President
Print Name and Title
County of Lee % 4
The foregoing instrument was acknowledged before me by means of [R phyysical presence or ❑ online notarization,
this 19 day of May (month), 2020 (year), by D uglas R.Masch It (name
of person acknowledging).
Q (Slkq5ure of Notary Public - State of Florida)
(Print, Type, or Stamp Commissioned Name of Notary Public)
Personally Known OR Produced Identification
Type of Identification Produced
01ruo,� REGINAL.DUNNOt#0.25
MY COMMISSION # GG
k @Xd-n,, udgetNOler Sordeos
So^dodThr�OudgelNolary
Ter County
Administrative SeiVr s Dpoartnir ri
prrr"urem(k nt servicos Dlq ion
FORM 10 -VENDOR DECLARATION STATEMENT
BOARD OF COUNTY COMMISSIONERS
Collier County Government Complex
Naples, Florida 34112
Dear Commissioners:
The undersigned, as Vendor declares that this response is made without connection or arrangement with any other
person and this proposal is in every respect fair and made in good faith, without collusion or fraud. The Vendor hereby
declares the instructions, purchase order terms and conditions, requirements, and specifications/scope of work of this
solicitation have been fully examined and accepted.
The Vendor agrees, if this solicitation submittal is accepted, to execute a Collier County document for the purpose of
establishing a formal contractual relationship between the firm and Collier County, for the performance of all
requirements to which the solicitation pertains. The Vendor states that the submitted is based upon the docurnents
listed by the above referenced Solicitation. Further, the vendor agrees that if awarded a contract for these goods
and/or services, the vendor will not be eligible to compete, submit a proposal, be awarded, or perform as a sub -
vendor for any future associated with work that is a result of this awarded contract.
IN WITNESS �IIEREOF, WE have hereunto subscribed our names on this 19 day of May 2020 in
the County of ee , in the State of FL
Firm's Legal DEC Contracting Group, Inc.
Name:
Address: 1560 Matthew Drive, Suite B
City, State, Zip Fort Myers, FL 33907
Code:
Florida P14000020944
Certificate of
Authority
Document
Number 46-4934701
Federal Tax
Identification
Number
*CCR II or
CAGE Code
*Only if Grant
Funded
Telephone: 239-332-4322
Email: info@deccontracting.com
Signature by: Douglas R. Masch II
(Typed and
written) President
Title:
S�Y PUp� REGINAL. DUNN
ro ......
i� MY COMMISSION g GG 019425
a
EXPIRES: August 29, 2020
N��iFaFF�pQ\o Bonded ihfu Budget Notary Servlcos
(✓At)
Additional Contact Information
Send payments to:
(required if different Company name used as payee
from above)
Contact name:
Title:
Address:
City, State, ZIP
Telephone:
Email:
Office servicing Collier
County to place orders
(required if different
from above)
Contact name:
Title:
Address:
City, State, ZIP
Telephone:
Email:
Secondary Contact for
this Solicitation:
Email:
Phone:
0
C;P 110r C01411ty
Ariitiinstr�rtivr, .-i�rvic=� C7+�part�nwit
prcwurerrwo* Sefviue; Ciivi5lov
FORM I 1 - IMMIGRATION AFFIDAVIT CERTIFICATION
This Affidavit is required and should be signed, notarized by an authorized principal of the firm and submitted with
formal solicitation submittals. Further, Vendors are required to be enrolled in the E-Verify program, and provide
acceptable evidence of their enrollment, at the time of the submission of the Vendor's bid. Acceptable evidence
consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify
Memorandum of Understanding for the company which will be produced at the time of the submission of the Vendor's
bid or within five (5) day of the County's Notice of Recommend Award.
FAILURE TO EXECUTE THIS AFFIDAVIT CERTIFICATION AND SUBMIT WITH VENDOR'S
PROPOSAL/BID MAY DEEM THE VENDOR NON -RESPONSIVE.
Collier County will not intentionally award County contracts to any Vendor who knowingly employs unauthorized
alien workers, constituting a violation of the employment provision contained in 8 U.S.C. Section 1324 a(e) Section
274A(e) of the Immigration and Nationality Act ("INA").
Collier County may consider the employment by any Vendor of unauthorized aliens a violation of Section 274A (e)
of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A (e) of the INA
shall be grounds for unilateral termination of the contract by Collier County.
Vendor attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration
Act and subsequent Amendment(s)) and agrees to comply with the provisions of the Memorandum of Understanding
with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E-Verify),
operated by the Department of Homeland Security in partnership with the Social Security Administration at the time
of submission of the Vendor's bid.
State of Florida
DEC Contracting Group, Inc.
Company Name
Signature
Douglas R. Masch IF President
Print Name and Title
County of Lee
The foregoing instrument was acknowledged before me by means of phsical pre nce or ❑ online notarization,
this 19 day of May _ (month), 2020 (year), by Douglas . Masch (name
of person acknowledging).
(Sigma of Notary Public - State of Florida)
Regina L. Dunn
(Print, Type, or Stamp Commissioned Name of Notary Public)
Personally Known OR Produced Identification
Type of Identification Produced
rn POae
REGINAL,DUNN
MY COMMISSION # GG 019425
*
"
EXPIRES: August 29, 2020
4
Nf�rFOPF��e\o
BondedThruBudpotNolarySetdcoe
e
. Ir RICK SCOTT, GOVERNOR JONATHAN ZACHEM, SECRETARY
� 3"0
dbpr
a
dq �
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
THE GENERAL CONTRACTOR HEREIN IS CERTIFIED UNDER THE
PROVISIONS OF CHAPTER 489, FLORIDA STATUTES
MASCH, DOUGLAS RAYMOND II
DEC CONTRACTING GROUP, INC
1560 MATTHEW DR SUITE B
FORT MYERS FL 33907
LICENSE NUMBER: CGC1526430
EXPIRATION DATE: AUGUST 31, 2020
Always verify licenses online at MyFloridaLicense.com
Do not alter this document in any forrn.
Bit
,
This is your license. It is unlawful for anyone other- than the licensee to use this document.
OCAO
State of Florida
Department of State
I certify from the records of this office that DEC CONTRACTING GROUP,
INC. is a corporation organized under the laws of the State of Florida, filed on
March 3, 2014.
The document number of this corporation is P 14000020944.
I further certify that said corporation has paid all fees due this office through
December 31, 2020, that its most recent annual report/uniform business report
was filed on January 8, 2020, and that its status is active.
I further certify that said corporation has not tiled Articles of Dissolution.
Given under my {rand and the
Great Seal of the State of Florida
at Tallahassee, the Capital, this
the Eighth day of January, 2020
S'CrCictUl"r of'State
Tracking Number: 8993718684CC
To authenticate this certificate,visit the following site,enter this number, and then
follow the instructions displayed.
https;//se►vices.sunbiz.org/Filings/CertifieateOfstatus/CertificateAuthentication
5/18/2020
E-Verify: Employer Wizard - Company Infonnation
1�11'11"', yVf, twify
Welcome
regina Bunn
Company Information
Company Name
DEC Contracting Group, Inc.
Company ID Number
860864
Doing Business As (DBA) Name
DUNS Number
079391270
Physical Location
Address 1
1560 Matthew Drive, Suite B
Address 2
City
Fort Myers
State
FL
Zip Code
33907
County
LEE
Mailing Address
Address 1
1560 Matthew Drive, Suite B
Address 2
City
Fort Myers
State
FL
Zip Code
MENU
https://e-verify.uscis.gov/web/EmployerWizard.aspx
5/18/2020
33907
E-Verify: Employer Wizard -Company Information
Additional Information
Employer Identification Number
464934701
Total Number of Employees
1 to 4
Parent Organization
Administrator
Organization Designation
Employer Category
None of these categories apply
View i Edit
NAICS Code
236 - CONSTRUCTION OF BUILDINGS
View / Edit
Total Hiring Sites
1
Ciew /Edit
Total Points of Contact
2
View / Edlt
View Original MOU Template
Last Login: 01/17/202010:06 AM
U.S. Department of Homeland Security
https://e-verify.uscis.gov/web/EmployerWizard.aspx OCX()
2/3
FORM 12 -'BIDDERS CHECKLIST
IMPORTANT: Please read carefully, sign in the spaces indicated and return with your Bid. Bidder should
check off each of the following items as the necessary action is completed:
1. The Bid has been signed.
2. The Bid prices offered have been reviewed.
3. The price extensions and totals have been checked.
4. Bid Schedule has been completed and attached.
5. Any required drawings, descriptive literature, etc. have been included.
6. Any delivery information required is included,
7. The following on-line standard documents have been reviewed and accepted in BidSync:
a. Construction bid instructions form
b. Construction services agreement
c. Purchase order terms and conditions
8. All of the following bid forms have been completed and signed:
a. Bid Form (Form 1)
b. Contractors Key Personnel (Form 2)
c. Material Manufacturers (Form 3)
d. List of Major Subcontractors (Form 4)
e. Statement of Experience (Form 5)
f. Trench Safety Act (Form 6)
g. Bid Bond Form (Form 7)
h. Insurance and Bonding Requirements (Form 8)
i. Conflict of Interest Affidavit (Form 9)
j. Vendor Declaration Statement (Form 10)
k. Immigration Law Affidavit Certification (Form 11) MUST be signed and attached with your
submittal or you MAY be DEEMED NON -RESPONSIVE
1. Signed Grants Provisions Package (if applicable) MUST be utilized for each required reference
and included with your submittal, or you MAY be DEEMED NON -RESPONSIVE
9. Copies of required information have been attached
a. Business tax Receipt (Collier County Businesses Only)
b. Company's E-Verify profile page or memorandum of understanding ✓
c. Certificate of Authority to Conduct Business in State of Florida (sunbiz.org)
d. Any required professional licenses — valid and current (myfloridalicense.com)✓
(ie: General Contractors license, Underground Utility and Excavation, Builders,
Trade Contractors, etc., as applicable, requested and/or required.)
10. If required, the amount of Bid bond has been checked, and the Bid bond or cashier's check has been
submitted. f
11. Any addenda have been signed and acknowledgement form attached and included, or you MAY be
DEEMED NON -RESPONSIVE. ✓
12. The Bid will be uploaded in time to be received no later than the specified opening date and time, otherwise
the Bid cannot be considered.
9
EXHIBIT A-3: CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT
Name
Pat Elek
Douglas R. Masch II
Personnel Category
Construction Superintendent
Project Manager
10
Construction Services Agreement: Revised 072118 (v6)
TRUE & ASSOCIATES
J
June 25, 2020
Collier County Government
Purchasing Department
3295 Tatniatni Trail East
Naples, FL 34112
Insurance, Surety, Group Benefits & Life
Re: DEC Contracting Croup, Inc.
Performance and Payment Bond No. 015211551
Immokalee Health Building HVAC & Roof Replacement — Bid No. 20-7747-ST
To Whom It May Concern:
The above captioned bond has been issued and dated June 25, 2020. The contact date has been
left blank at the request of Collier County. Once the contract date has been established, print the
contract date on the original bond and provide an executed copy for our files.
Thank you and should you have any questions please feel free to contact me at 908-379-2333 or
rhudcA a trucassoc.com.
Surety Account Manager
Attorney -in -Fact on Behalf of Liberty Mutual Insurance Company
----------------------------------------------------------------------------------
108 Walnut Avenue 325 North Avenue East
Cranford, NJ 07016 Westfield, NJ 07090
Phone:908-232-0760 Phone:908-232-0760
Fax:908-931-9040 Fax:908-232-5761
Headquarters
6 Leigh Street
Clinton, NJ 08809
Phone: 908-713-6711
Fax: 908-713-6831
30 Wall Street, 811 Floor
New York, NY 10005
Phone: 212-766-1400
'This Bond replaces and supersedes the previous bonds issued and dated June 19, 2020 and July 14, 2020'
EXHIBIT B-1: PUBLIC PAYMENT BOND
ITB# 20-7747-ST
KNOW ALL MEN BY THESE PRESENTS: That
Bond No. 015211551
Contract No. 20-7747-ST
DEC Contracting Group, Inc.
as Principal, and
Liberty Mutual Insurance Company as Surety,
located at 1200 MacArthur Boulevard, 3rd Floor, Mahwah, NJ 07430 (Business
Address) are held and firmly bound to Collier County Government, Purchasing Department as Obligee in the
SUM of One Million Two Hundred Sixty Six Thousand Ninety Three and 00/100 Dollars ($ 1,266,093.00 ) for the
payment whereof we bind ourselves, our heirs, executors, personal representatives, successors
and assigns, jointly and severally.
WHEREAS, Principal has entered into a contract dated as of the L day of
20,)D with Obligee for Immokalee Health Building HVAC Roof Replacement - Bid No. 20-7 T In
accordance with drawings and specifications, which contract is
incorporated by reference and made a part hereof, and is referred to herein as the Contract.
THE CONDITION OF THIS BOND is that if Principal:
Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes,
supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the
prosecution of the work provided for in the Contract, then this bond is void; otherwise it remains
in full force.
Any changes in or under the Contract and compliance or noncompliance with any formalities
connected with the Contract or the changes do not affect Sureties obligation under this Bond.
The provisions of this bond are subject to the time limitations of Section 255.05(2). In no event
will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment
Bond, regardless of the number of suits that may be filed by claimants.
IN WITNESS WHEREOF, the above parties have executed this instrument this 251h day of
June 20 20 , the name of each party being affixed and these presents duly signed
by its under -signed representative, pursuant'to authority of its governing body.
11
Construction Services Agreement: Revised 072118 (v6)
Signed, sealed and delivered
in the presence of:
Witnesses as to Prirtcipal
STATE OF Florida
COUNTY OF ZgE
PRINCIPAL
DEC Contracting Group, Inc.
---�kA 1hr
BY: /
NAME: 4c,rtS �4ScH
ITS: Pt%S/Lrawr
The foregoing instrument was acknowledged before meby means of ❑ physical presence or ❑
oLnotarization, this ZT day of sJyxj!E 20,2,(,,), by
..G L.AS A. MAS'c-H 9- as
of DEC Contracting Group, Inc. a Florida corporation, on
behalf of the corporation. He/she is personally known to me OR has/(��did
as identification and d
take an oath.
My Commission Expires: - -
(Signature of Notary Public)
�4- ' PATRICK WILLIAM ELEK
Commiss'sin # GG 951733
pa= Expires April 30, 2024
(AFFIX OFFICIAL SEAL)
ATTEST:
N/A
N/A
Witnesses to Surety
NAME: /: J 2 : c/,— Gt/.`/-4..1 EI�
(Legibly Printed)
Notary Public, State of
Commission No.: GrG. 9f/ 7333
SURETY:
Liberty Mutual Insurance Company
(Printed Name)
(Business Address
N/A
(Authorized Signature)
N/A
(Printed Name)
12
Construction Services Agreement: Revised 072118 (v6)
OR
kC
As Attorney in Fact
(Attach Power of Attorne>Sr)
Lisa Diana, Witness as to Surely Rachael Hurley, Attorney -in -Fact
Witnesses (Printed Name)
1200 MacArthur Boulevard
3rd Floor
Mahwah, NJ 07430
(Business Address)
201-2364045
(Telephone Number)
STATE OF New Jersey
COUNTY OF union
The foregoing instrument was acknowledged before me by means of I] physical presence or ❑
online notarization, this 25th day of June 20 20 by
Rachael Hurley as Attorney -in -Fact
of Liberty Mutual Insurance Company a 'Massachusetts corporation, on
behalf of the corporation. He/she is personally known to me OR has produced
N/A as identification and did (did not)
take an oath.
A
My Commission Expires:
(Signature o Notar Public)
Name: In
(Legibly Printed)
(AFF!X OFrI IAL SEAL) Notary Public, State of:
Commission No.:
CHERYL R COLEMAN
Coninlission # 2182370
Notary Public, Stilts Of New Jersey
Mp commission expires
September 27, 2020
13
Construction Services Agreement: Revised 072118 (v6)
'This Bond replaces and supersedes the previous bonds issued and dated June 19, 2020 and July 14, 2020`
EXHIBIT B-2: PUBLIC PERFORMANCE BOND
ITB# 20-7747-ST
KNOW ALL MEN BY THESE PRESENTS:
as Principal,
as
1200 MacArthur Boulevard, 3rd Floor, Mahwah, NJ 07430
(Business Address) are held
Collier County Government, Purchasing Department
One Million Two Hundred Sixty Six Thousand Ninety Three and 00/100 Dollars
Bond No. 015211551
Contract No. 20-7747-ST
That DEC Contracting Group, Inc.
and Liberty Mutual Insurance Company
Surety, located at
and
firmly bound to
as Obligee in the sum of
($ 1,266,093.00 ) for the payment whereof we bond ourselves, our heirs, executors, personal
representatives, successors and assigns, jointly and severally.
WHEREAS,J Principal has entered into a contract dated as of the day of
11w 1 20 with Obligee for
Immokalee Health Building HVAC & Roof Replacement- Bid No. 20-7747-ST to
accordance with drawings and specifications, which contract is incorporated by reference and
made a part hereof, and is referred to herein as the Contract.
THE CONDITION OF THIS BOND is that if Principal:
Performs the Contract at the times and in the manner prescribed in the Contract; and
2. Pays Obligee any and all losses, damages, costs and attorneys' fees that Obligee sustains
because of any default by Principal under the Contract, including, but not limited to, all delay
damages, whether liquidated or actual, incurred by Obligee; and
3. Performs the guarantee of all work and materials furnished under the Contract for the time
specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in
or under the Contract and compliance or noncompliance with any formalities connected with the
Contract or the changes do not affect Sureties obligation under this Bond.
The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time,
alterations or additions to the terms of the Contract or other work to be performed hereunder, or
the specifications referred to therein shall in anywise affect its obligations under this bond, and it
does hereby waive notice of any such changes, extensions of time, alterations or additions to the
terms of the Contract or to work or to the specifications.
This instrument shall be construed in all respects as a common law bond. It is expressly
understood that the time provisions and statute of limitations under Section 255.05, Florida
Statutes, shall not apply to this bond.
In no event will the Surety be liable in the aggregate to Obligee for more than the penal sum of
this Performance Bond regardless of the number of suits that may be filed by Obligee.
IN WITNESS WHEREOF, the above parties have executed this instrument this 251h day of
June , 20 20 , the name of each party being affixed and these presents duly
signed by its undersigned representative, pursuant to authority of its governing body.
14
Construction Services Agreement: Revised 072118 (v6)
. i
Signed, sealed and delivered
in the presence of:
Witnes es as to Principal
STATE OF Florida
COUNTY OF CEO
PRINCIPAL
DEC Contracting Group, Inc.
BY:
NAME: ��oJGyAS R- il/l&2ax-
ITS: P9jg518GNT-
The foregoing instrument was acknowledged before me by means of ❑ physical presence or ❑
onl, notarization, this Z� day of JJ N E 20Z, by
(_.'5a64t� . i IitAScHn as P E9"AsNT
of DEC Contracting Group, Inc. a Florida corporation, on
behalf of the corporation. He/she is personally known to me OR has produced
as identification and did (di t}'
take an oath.
My Commission Expires:
(S .nature of No ry Public)
p+oL' PATRICK WILLIAM ELEK
C0MNssbA # GG 951733
Expires Apd 30, 2024
(AFFIX OFFICIAL SEAL)
Name: i% 2� c(� &)illl +/w, GL G- k
(Legibly Printed)
Notary Public, State of: /=G c? z ; n r9
Commission No.: Gr Gr 9's'/ ?33
15
Construction Services Agreement: Revised 072118 (v6)
ATTEST:
N/A
Witnesses as to Surety
Lisa Diana, Witness as to Surety
Witnesses
STATE OF New Jersey
COUNTY OF Union
SURETY:
Liberty Mutual Insurance Company
(Printed Name)
N/A
N/A
N/A
(Business Address)
N/A
(Authorized Signature)
N/A
(Printed Name)
OR
As Attorney in;1:�act
(Attach Power of Attorn )
Rachael Hurley, Attorney -in -Fact
(Printed Name)
1200 MacArthur Boulevard
3rd Floor
Mahwah, NJ 07430
(Business Address)
201-236-4045
(Telephone Number)
The foregoing instrument was acknowledged before me by means of O physical presence or ❑
online notarization, this 25th day of June 20 20 by
Rachael Hurley , as Attorney -in -Fact
of Liberty Mutual Insurance Company a Massachusetts corporation, on
behalf of the corporation, He/she is personally known to me OR has produced
N/A as identification and did (did not)
take an oath.
My Commission Expires:
CHERYL R COLEMAN
Commission # 2182370
Notary Public, State Of New Jersey
MY Commission Expires
September 27, 2020
(AFFIX OFFICIAL SEPJ..)
r t xJ �'j 1
(Signature 6f Notary Public)
aLAl
(Legibly Pri ed)
Notary Public, State of:
Commission No.:
16
Construction Services Agreement: Revised 072118 (v6)
Liberty
M_ utual10, �.
SURETY
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
Certificate No: 8200288-969516
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies'), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Marc J.
Michalewsky; Sandra A. Pace; Thomas M. True; Lisa A. Anderson; Kemal Brkanovic; Cheryl R. Coleman; Mary J. D'Amato; Rachael Hurley
all of the city of Westfield state of NJ each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 14th day of January , 2019 .
N
a)
N
c
m State of PENNSYLVANIA
=3 County of MONTGOMERY
20)
Liberty Mutual Insurance Company
P� tNsuR9 P�vf INS& XX %NSU,pq The Ohio Casualty Insurance Company
°aP°�+1� y(1 y`� Boa,rF 9y �Op °oa°O�r� yp West American Insurance Company
fr otn u�1 o Inw? otn
Y �1912 0 0 1919 0 1991
O'VAMPg aaD� 'INDIAN��aD r
By:
1 + M + 1
naviri ne r.n . o«i<f.„ f (Zo—f—
a) On this 14th day of January , 2019 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance `o
0 Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes =
> therein contained by signing on behalf of the corporations by himself as a duly authorized officer. u W
� IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
0 9) COMMONWEALTH OF PENNSYLVANIA
Notarial Seal /�\1�%�
6 O Teresa Past
ella, Notary Public
p � Upper Marion Twp., Montgomery County By:
e My Commission Expires March 28, 2021 Teresa Pastella, Notary Public
aj ... Member. Pennsylvania Association of Notaries
0) to
co
a) This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
o .S; Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
- ARTICLE IV - OFFICERS: Section 12. Power of Attorney.
o Co Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
> N any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
Z� instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 25th day of June , 2020 .
P� 1Nsu POSY INS& a 1NSLI
�J u°aroriyr �(+ `iJ o°av°q"rPgy .�'Pu°av°fyr tiC+
3 Fo m r r� 3 Fo m W g Fo m
1912 0 o= 1919 � 0 a 1991 0
Yd,�l'aSACHUS` ,da S0 ��NAMPS�+ a ! �NDIAN�' D3 By.
Fad Renee C. Llewellyn, Assistant Secretary
+
00
_ cM
Q �
O �
C
0 W
1 O
y O
�o
`o(D
Z,2
n0
>o
�'4'
Y N
o0
M
C00
00
U
O t
LMS-12873 LMIC OCIC WAIC Multi Co 062018
Liberty
Mutual.
SURETY
LIBERTY MUTUAL INSURANCE COMPANY
FINANCIAL STATEMENT — DECEMBER 31, 2019
Assets
Cash and Bank Deposits ......................................... $778,754,989
*Bonds — U.S Government ..................................... 2,780,808,610
*Other Bonds............................................................ 12,645,608,792
*Stocks..................................................................... 16,385,435,431
Real Estate.............................................................. 235,608,378
Agents' Balances or Uncollected Premiums........... 6,217,983,641
Accrued Interest and Rents ..................................... 102,273,390
Other Admitted Assets ............................................ 11,957,106,292
Total Admitted Assets.....................................
.......................................................................... �51.103.579.52
a
Liabilities
Unearned Premiums ................................................
$8,007,146,482
Reserve for Claims and Claims Expense .................
21,532,853,787
Funds Held Under Reinsurance Treaties .................
507,868,920
Reserve for Dividends to Policyholders ..................
1,143,826
Additional Statutory Reserve ..................................
125,722,000
Reserve for Commissions, Taxes and
Other Liabilities ................................................
4,117,460,075
Total.................................................................
$34,292,195,090
Special Surplus Funds .................
$32,768,443
Capital Stock ...............................
10,000,075
Paid in Surplus ............................
10,044,978,933
Unassigned Surplus .....................
6,723,636,983
Surplus to Policyholders.................................16,811,384,434
Total Liabilities and Surplus ................................
S51.103.579.524
PI, INSUR4
ORPOR,T'%
1J�.
Bonds are stated at amortized or investment value; Stocks at Association Market Values.
1912 i The foregoing financial information is taken from Liberty Mutual Insurance Company's financial
m 39ssq���rl� statement filed with the state of Massachusetts Department of Insurance.
f
I, TIM MIKOLAJEWSKI, Assistant Secretary of Liberty Mutual Insurance Company, do hereby certify that the foregoing is a true, and
correct statement of the Assets and Liabilities of said Corporation, as of December 31, 2019, to the best of my knowledge and belief.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Corporation at Seattle, Washington, this 271 day of
March, 2020.
Assistant Secretary
S-1262LMIC/a 3/20
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty
Mutual,
SURETY
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
Certificate No: 8200288-969516
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Marc J.
Michalewsky; Sandra A. Pace; Thomas M. True; Lisa A. Anderson; Kemal Brkanovic; Cheryl R. Coleman; Mary J. D'Amato; Rachael Hurley
all of the city of Westfield state of N1 each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and ail undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 14th day of January , 2019 .
Liberty Mutual Insurance Company
INSUq VSY INS& a %Nsu�p The Ohio Casualty Insurance Company
�Jp4°avo�rF41 yJP4°aro�r'Qyy `oP4°aro�fFy� West American Insurance Company
J3 ot� Q3 Fon �? ot+
�s1912yo 0 1919 0 1991
Yd,�'ss4CH10%�.da SO �k"AMP`+ ,dL� Ys �NDIAN�
By:
David M. Carey, Assistant Secretary
- State of PENNSYLVANIA
�
County of MONTGOMERY ss
a) On this 14th day of January , 2019 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
o :3 Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
> therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
to
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
--p
c 'rn
@O N COMMONWEALTH OF PENNSYLVANIA
Notarial seal
4) O I Teresa Paslella, Notary Public
6 I Upper Merion Twp., Montgomery county By:
C N My Commission Expires March 28, 2021
eresa Paslella, Notary Public
aj Member. Pennsylvania Association of Notaries
C�
M tll
CZ 0) This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
oc Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
" 6 ARTICLE IV— OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 25th day of June , 2020 .
P� 1NS(J POSY INS& a %NSU,pq
`oavowyro � �Jr`oaror�
1912 o = 1919 o 1991
�. By:
�ej 4c"u5 �dL O� "AMpS da �S '"otA"� da Renee C. Llewellyn, Assistant Secretary
2 * 1• Hl + td �,tt + *�
H
N
W
0
M
t*
a
C
t6
E
W
O
Cr)
CD
d
0
0
v
N
cV
M
0
LMS-12873 LMIC OCIC WAIC Multi Co 062018
Liberty
Mutual
_
SURETY
Assets
LIBERTY MUTUAL INSURANCE COMPANY
FINANCIAL STATEMENT — DECEMBER 31, 2019
Cash and Bank Deposits ......................................... $778,754,989
*Bonds — U.S Government ..................................... 2,780,808,610
*Other Bonds............................................................ 12,645,608,792
*Stocks..................................................................... 16,385,435,431
RealEstate.............................................................. 235,608,378
Agents' Balances or Uncollected Premiums........... 6,217,983,641
Accrued Interest and Rents ..................................... 102,273,390
Other Admitted Assets ............................................ 11,957,106,292
Total Admitted Assets.....................................
.......................................................................... 51.10 i.579-5
a
Liabilities
Unearned Premiums ................................................
$8,007,146,482
Reserve for Claims and Claims Expense .................
21,532,853,787
Funds Held Under Reinsurance Treaties .................
507,868,920
Reserve for Dividends to Policyholders ..................
1,143,826
Additional Statutory Reserve ..................................
125,722,000
Reserve for Commissions, Taxes and
Other Liabilities ................................................
4,117,460,075
Total.................................................................
$34,292,195,090
Special Surplus Funds ................. $32,768,443
Capital Stock ............................... 10,000,075
Paid in Surplus ............................ 10,044,978,933
Unassigned Surplus ..................... 6,723,636,983
Surplus to Policyholders.................................16,811,384,434
Total Liabilities and Surplus ................................
S-51 103 579.524
43 p0.70R9r'1'C`
Bonds are stated at amortized or investment value; Stocks at Association Market Values.
1912 og The foregoing financial information is taken from Liberty Mutual Insurance Company's financial
m y9SSACH2 statement filed with the state of Massachusetts Department of Insurance.
I, TIM MIKOLAJEWSKI, Assistant Secretary of Liberty Mutual Insurance Company, do hereby certify that the foregoing is a true, and
correct statement of the Assets and Liabilities of said Corporation, as of December 31, 2019, to the best of my knowledge and belief.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Corporation at Seattle, Washington, this 27t' day of
March, 2020.
Assistant Secretary
S-1262LMIC/a 3/20
EXHIBIT B-3: INSURANCE REQUIREMENTS
The Contractor shall at its own expense, carry and maintain insurance coverage from responsible
companies duly authorized to do business in the State of Florida as set forth in EXHIBIT B of this
solicitation. The Contractor shall procure and maintain property insurance upon the entire project,
if required, to the full insurable value of the scope of work.
The County and the Contractor waive against each other and the County's separate Contractors,
Design Consultant, Subcontractors, agents and employees of each and all of them, all damages
covered by property insurance provided herein, except such rights as they may have to the
proceeds of such insurance. The Contractor and County shall, where appropriate, require similar
waivers of subrogation from the County's separate Contractors, Design Consultants and
Subcontractors and shall require each of them to include similar waivers in their contracts.
Collier County shall be responsible for purchasing and maintaining its own liability insurance.
Certificates issued as a result of the award of this solicitation must identify "For any and all work
performed on behalf of Collier County", or, the specific solicitation number/contract number and
title.
The General Liability Policy provided by Contractor to meet the requirements of this solicitation
shall name Collier County, Florida, as an additional insured as to the operations of Contractor
under this solicitation and shall contain a severability of interests provisions.
The Certificate Holder shall be named as Collier County Board of County Commissioners, OR,
Board of County Commissioners in Collier County, OR Collier County Government, OR Collier
County. The Certificates of Insurance must state the Contract Number, or Project Number, or
specific Project description, or must read: For any and all work performed on behalf of Collier
County.
The amounts and types of insurance coverage shall conform to the minimum requirements set
forth in EXHIBIT B with the use of Insurance Services Office (ISO) forms and endorsements or
their equivalents. If Contractor has any self -insured retentions or deductibles under any of the
below listed minimum required coverage, Contractor must identify on the Certificate of Insurance
the nature and amount of such self- insured retentions or deductibles and provide satisfactory
evidence of financial responsibility for such obligations. All self -insured retentions or deductibles
will be Contractor's sole responsibility.
Coverage(s) shall be maintained without interruption from the date of commencement of the Work
until the date of completion and acceptance of the scope of work by the County or as specified in
this solicitation, whichever is longer.
The Contractor and/or its insurance carrier shall provide thirty (30) days written notice to the
County of policy cancellation or non -renewal on the part of the insurance carrier or the Contractor.
The Contractor shall also notify the County, in a like manner, within twenty-four (24) hours after
receipt, of any notices of expiration, cancellation, non -renewal or material change in coverage or
limits received by Contractor from its insurer and nothing contained herein shall relieve Contractor
of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy
to be provided by Contractor hereunder, Contractor shall immediately take steps to have the
aggregate limit reinstated to the full extent permitted under such policy.
17
Construction Services Agreement: Revised 072118 (v6)
Should at any time the Contractor not maintain the insurance coverage(s) required herein, the
County may terminate the Agreement or at its sole discretion shall be authorized to purchase
such coverage(s) and charge the Contractor for such coverage(s) purchased. If Contractor fails
to reimburse the County for such costs within thirty (30) days after demand, the County has the
right to offset these costs from any amount due Contractor under this Agreement or any other
agreement between the County and Contractor. The County shall be under no obligation to
purchase such insurance, nor shall it be responsible for the coverage(s) purchased or the
insurance company or companies used. The decision of the County to purchase such insurance
coverage(s) shall in no way be construed to be a waiver of any of its rights under the Contract
Documents.
If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of
the scope of work, the Contractor shall furnish to the County renewal or replacement Certificate(s)
of Insurance not later than ten (10) calendar days after the expiration date on the certificate.
Failure of the Contractor to provide the County with such renewal certificate(s) shall be considered
justification for the County to terminate any and all contracts.
18
Construction Services Agreement: Revised 072118 (v6)
Collier County Florida
Insurance and Bonding Requirements
Insurance / Bond Type Required Limits
1. ❑ Worker's Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government
Statutory Limits and Requirements
Evidence of Workers' Compensation coverage or a Certificate of Exemption issued
by the State of Florida is required. Entities that are formed as Sole Proprietorships
shall not be required to provide a proof of exemption. An application for exemption
can be obtained online at https://apps.fldfs.com/bocexempt/
2. ❑ Employer's Liability $ single limit per occurrence
3. ❑ Commercial General Bodily Injury and Property Damage
Liability (Occurrence Form)
patterned after the current $ single limit per occurrence, $2,000,000 aggregate for Bodily Injury
ISO form Liability and Property Damage Liability. This shall include Premises and Operations;
Independent Contractors; Products and Completed Operations and Contractual
Liability.
4. ❑ Indemnification To the maximum extent permitted by Florida law, the ContractorNendor/Consultant
shall defend, indemnify and hold harmless Collier County, its officers and employees
from any and all liabilities, damages, losses and costs, including, but not limited to,
reasonable attorneys' fees and paralegals' fees, to the extent caused by the
negligence, recklessness, or intentionally wrongful conduct of the
ContractorNendor/Consultant or anyone employed or utilized by the
ContractorNendor/Consultant in the performance of this Agreement.
5. ❑ Automobile Liability $ Each Occurrence; Bodily Injury & Property Damage,
Owned/Non-owned/Hired; Automobile Included
6. ❑ Other insurance as ❑ Watercraft $ Per Occurrence
noted:
❑ United States Longshoreman's and Harborworker's Act coverage shall be
maintained where applicable to the completion of the work.
$ Per Occurrence
❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the
completion of the work.
$ Per Occurrence
❑ Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each
occurrence if applicable to the completion of the Services under this Agreement.
$ Per Occurrence
❑ Pollution $ Per Occurrence
❑ Professional Liability $ Per claim & in the aggregate
• $1,000,000 per claim and in the aggregate
• $2,000,000 per claim and in the aggregate
❑ Project Professional Liability $ Per Occurrence
❑ Valuable Papers Insurance $ Per Occurrence
19
Construction Services Agreement: Revised 072118 (v6)
❑ Cyber Liability $ Per Occurrence
❑ Technology Errors & Omissions $ Per Occurrence
7. ❑ Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers'
check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or
proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made
payable to the Collier County Board of County Commissioners on a bank or trust
company located in the State of Florida and insured by the Federal Deposit Insurance
Corporation.
8. ❑ Performance and For projects in excess of $200,000, bonds shall be submitted with the executed
Payment Bonds contract by Proposers receiving award, and written for 100% of the Contract award
amount, the cost borne by the Proposer receiving an award. The Performance and
Payment Bonds shall be underwritten by a surety authorized to do business in the
State of Florida and otherwise acceptable to Owner; provided, however, the surety
shall be rated as "A-" or better as to general policy holders rating and Class V or higher
rating as to financial size category and the amount required shall not exceed 5% of
the reported policy holders' surplus, all as reported in the most current Best Key Rating
Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New
York 10038.
9. ❑ Consultant shall ensure that all subcontractors comply with the same insurance requirements that he
is required to meet. The same Consultant shall provide County with certificates of insurance meeting
the required insurance provisions.
10. ❑ Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for
Commercial General Liability where required. This insurance shall be primary and non-contributory with
respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and
the Contractor's policy shall be endorsed accordingly.
11. ❑ The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board
of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The
Certificates of Insurance must state the Contract Number, or Project Number, or specific Project
description, or must read: For any and all work performed on behalf of Collier County.
12. ❑ Thirty (30) Days Cancellation Notice required.
Consultant's Insurance Statement
We understand the insurance requirements of these specifications and that the evidence of insurability may
be required within five (5) days of the award of this solicitation.
Name of Firm
Consultant
Signature
Print Name
Insurance Agency
Agent Name
Date
Telephone Number
20
Construction Services Agreement: Revised 072118 (v6)
0
EXHIBIT C: RELEASE AND AFFIDAVIT FORM
COUNTY OF (COLLIER)
STATE OF (FLORIDA)
Before me, the undersigned authority, personally appeared
who after being duly sworn, deposes and says:
(1) In accordance with the Contract Documents and in consideration of $ to be
received, ("Contractor") releases and waives for itself and it's
subcontractors, material -men, successors and assigns, all claims demands, damages, costs and expenses,
whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in
any way to the performance of the Agreement between Contractor and Owner, dated
,20 for the period from to . This
partial waiver and release is conditioned upon payment of the consideration described above. It is not effective
until said payment is received in paid funds.
(2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges
for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a
lien or a demand against any payment bond might be filed, shall be fully satisfied and paid upon Owner's payment
to Contractor.
(3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims
of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the
Work covered by this Release and Affidavit.
(4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment
No.
CONTRACTOR
BY:
Witness ITS:
President
DATE:
Witness
STATE OF
COUNTY OF
[Corporate Seal]
The foregoing instrument was acknowledged before me by means of ❑ physical presence or
notarization, this day of 1 20 ,
corporation
He/she
My Commission Expires:
(AFFIX OFFICIAL SEAL)
is
personally
K11
❑ online
by
of
corporation, on behalf of the
known to me OR has produced
as identification and did (did not) take an oath.
(Signature of Notary Public)
NAME:
(Legibly Printed)
Notary Public, State of
Commissioner No.:
21
Construction Services Agreement: Revised 072118 (v6)
0
EXHIBIT D
FORM OF CONTRACT APPLICATION FOR PAYMENT
Collier County Board of County Commissioners the OWNER or Collier County Water -Sewer
Owner's Project
Manager's Name:
Bid No.
Project No.
Count 's Division Name
Purchase Order No.
Submitted by Contractor
Representative: Name
Application Date:
Contractor's Name &
Address:
Payment Application No.
Original Contract Time:
Original Contract Price:
$
Revised Contract Time:
Total Change Orders to Date:
$
Revised Contract Amount:
$
Total Value of Work Completed &
Stored to Date:
$
Retainage @10%
through [Insert Date]
$
Retainage @ 10% through [Insert
date]
$
Retainage @ %
after Insert date
$
Less Retainage
$
Total Earned Less Retainage
$
Less previous payment(s
Percent Work Completed
to Date:
%
AMOUNT DUE THIS
APPLICATION:
$
Percent Contract Time
Completed to Date:
%
Liquidated Damages to
Be Accrued
$
Remaining Contract Balance
$
ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION
CONTRACTOR'S CERTIFICATION:
The undersigned CONTRACTOR certifies that. (1) all previous progress payments received from OWNER on account of
Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR
incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title
to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment
will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such
as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued
and received from the OWNER and that current payment is now due; and (4) CONTRACTOR has only included amounts
in this Application for Payment properly due and owing and CONTRACTOR has not included within the above referenced
amount any claims for unauthorized or changed Work that has not been properly approved by Owner in writing and in
advance of such Work.
Contractor's Name
Contractor's Signature:
Date:
Type Title:
Shall be signed by an authorized
representative of the Contractor.
to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by:
—Payment
Professional's Name:
—Design
Date:
—Signature:
to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by:
-Payment
Owner's Project Manager Name:
Si nature:
I Date:
22
Construction Services Agreement: Revised 072118 (v6)
0
EXHIBIT D (Continued) SCHEDULE OF VALUES
Project Name:
Project Number:
Date:
Period To:
ITEM
NUMBER
DESCRIPTION
SCHEDULED
VALUE
WORK COMPLETED
STORED
MATERIALS
TOTAL
COMPLETEC
& STORED
TO DATE
PERCENT
COMPLETE
BALANCE
TO FINISH
10%
RETAINAGE
_%
RETAINAGE
(reducedrate)
TOTAL
RETAINAGE
WITHHELD
PREVIOUS APPLICATIONS
THIS
PERIOD
THRU DATE
SINCE DATE
TOTALS
*Explanation for the two columns under Previous Applications: The Thru Date is where you will place all information until the contract is complete unless a release or reduction of retainage issue coi
into play. If this happens, all information up to the date of the % change in retainage is placed in the Thru Date column. Information after that date is placed in the Since Date column. This states
what has happened since the change in retainage.
23
Construction Services Agreement: Revised 072118 (v6)
Exhibit D
(Continued) Stored Materials Record
Formu12 A+R -C -n=F
A
B
C
D
E
Date
Description
Supplier
Invoice
Number
Previously
Received
Received
This Period
Previously
Installed
Installed
This Period
Balance To
Install
24
Construction Services Agreement: Revised 072118 (v6)
0
EXHIBIT E: CHANGE ORDER
An electronic data entry form may be found at:
http://bccsp0l /SiteDirectory/ASD/Purchasing/Formsl /Forms/Default.aspx
Change Order Form
Contract#: Change#:= Purchase Order#: Project*
ContractorlFirm Name: Project Name:
PrajectManager Name Department:
CriginaI CGrtrEr-UWort Cirder Amourrt
Original BCC Approval DatE; Agenda Item
Current BCC ADprovedAmourd
Last BCC A"rrsysl Date: Asfends Item*
Current C on tr act,"W orK Order Arn ou nt
SAP C orrtra ct Expif ation Da L- f Mas ter}
Dwlk3rAmountofthisChange
�+DIV.'D!
TctaIChangefram:OriginaIAmount
RevisedConbacFVV Drc C}rder Total
s
0.00
*DIwo'
l Change from Current BCC Approved An -cunt
Cumulative Changes
S
0.00
I+D'v!^'0!
Change from Current An -cunt
e Completion Date, Description of the Task(s) Change. and Rationale for the Change
Notice to Proce I� Original Last Approved Revised Data
Date Completion Dat Date n_s]eerza: an3?
#ofD.aysAdded SelectTasks ❑ Add newtaskfsj ❑ Deletetaskts} ❑ Changetaskfsp ❑ Other -s ete-ow
Provide response to the following: 1.1 detailed and specific e.xplanationlrationale of the requestedchangefsjto thetaskfs� and ! or
the additional days added (ifrequested); 2.1why this changewas not included in the original contract; and, 3.1 describethe impart if
this change is not processed. Allac, a-,: aral irformatiar, from the Desrr Frofess✓oral ar-lvor Corlramtor 9 reec-:3.
Prepared by: Date:
,Project Mara;ier Name act Department;
AcceptarceafthisChargeOmershallcrtirrstituteamosificatior,tocor>.trarx workorcerid'ertified'aboveandwillbesubjecttoa111hesame
terms arti corrditiors as coriaired irth.e comrac4; workorder irdicate3 above, as fully as d thesame were s to t rr this a. p#ar The
adj cstmert, if any, to the Cortract s hall cor:sliitrte a full and firal seiilemeri of ary and all cla ims of the Cortractar r Verdor, Corsurfia:rt l
Desixr- Profess ioral arisirg oul of or related to the c harge set forth hereir, irc ILzirg claims for impact ara delay costs.
Accepted by' ^DData:
oriractor Vsrcor, c -uhart: Desi;r Profess Nameof Firm. if projectappllcabie
Approved by: Date:
(Desgr Frofessioralara Nameof Firm, if prgeiect applicable)
Approved by: Date:
Prx a rern ert Profes s or a l
25
Construction Services Agreement: Revised 072118 (v6)
EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION
OWNER'S Project No.
PROJECT:
CONTRACTOR
Contract For
Contract Date
Design Professional's Project No.
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof:
To
OWNER
And
To
Substantial Completion is the state in the progress of the Work when the Work (or designated
portion) is sufficiently complete in accordance with the Contract Documents so that the Owner can
occupy or utilize the Work for its intended use. The Work to which this Certificate applies has been
inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN PROFESSIONAL, and
that Work is hereby declared to be substantially complete in accordance with the requirements of the
Contract Documents on:
DATE OF SUBSTANTIAL COMPLETION
A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive,
and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the
Work in accordance with the Contract Documents. The items in the tentative list shall be completed or
corrected by CONTRACTOR within days of the above date of Substantial Completion.
The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance,
heat, utilities, insurance and warranties shall be as follows:
26
Construction Services Agreement: Revised 072118 (v6)
0
RESPONSIBILITIES:
►01P1►1:4
CONTRACTOR
The following documents are attached to and made a part of this Certificate:
This certificate does not constitute an acceptance of Work not in accordance with the Contract
Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the
Contract Documents.
Executed by Design Professional on
By:
Design Professional
Type Name and Title
CONTRACTOR accepts this Certificate of Substantial Completion on
20
By:
CONTRACTOR
Type Name and Title
20
OWNER accepts this Certificate of Substantial Completion on 120
By:
OWNER
Type Name and Title
27
Construction Services Agreement: Revised 072118 (v6)
0
EXHIBIT G: FINAL PAYMENT CHECKLIST
Bid No.: Project No.:
Contractor:
The following items have been secured by the
for the Project known as
PO No.: Date:
and have been reviewed and found to comply with the requirements of the Contract Documents.
Original Contract Amount: Final Contract Amount. -
Commencement Date:
Substantial Completion Time as set forth in the Agreement: Calendar Days.
Actual Date of Substantial Completion:
Final Completion Time as set forth in the Agreement: Calendar Days.
Actual Final Completion Date:
YES NO
4.
5.
6.
7.
10
11
12
All Punch List items completed on
Warranties and Guarantees assigned to Owner (attach to this form).
Effective date of General one year warranty from Contractor is:
2 copies of Operation and Maintenance manuals for equipment and
system submitted (list manuals in attachment to this form).
As -Built drawings obtained and dated:
Owner personnel trained on system and equipment operation.
Certificate of Occupancy No.:
issued on (attach to this form).
Certificate of Substantial Completion issued on
Final Payment Application and Affidavits received from Contractor on:
Consent of Surety received on
Operating Department personnel notified Project is in operating phase.
All Spare Parts or Special Tools provided to Owner:
13. Finished Floor Elevation Certificate provided to Owner:
14. Other:
If any of the above is not applicable, indicate by N/A.
explanation.
Acknowledgments:
By Contractor:
By Design
Professional:
By Owner:
If NO is checked for any of the above, attach
(Company Name)
(Signature)
(Typed Name & Title)
(Firm Name)
(Signature)
(Typed Name & Title)
(Department Name)
(Signature)
(Name & Title)
28
Construction Services Agreement: Revised 072118 (v6)
CAn
EXHIBIT H: GENERAL TERMS AND CONDITIONS
1. INTENT OF CONTRACT DOCUMENTS.
1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or
portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials
or equipment that may reasonably be inferred from the Contract Documents as being required to
produce the intended result shall be supplied whether or not specifically called for. When words
which have a well-known technical or trade meaning are used to describe work, materials or
equipment, such words shall be interpreted in accordance with that meaning. Reference to standard
specifications, manuals or codes of any technical society, organization or association or to the laws
or regulations of any governmental authority having jurisdiction over the Project, whether such
reference be specific or by implication, shall mean the latest standard specification, manual, code,
law or regulation in effect at the time the Work is performed, except as may be otherwise specifically
stated herein.
1.2 If before or during the performance of the Work Contractor discovers a conflict, error or
discrepancy in the Contract Documents, Contractor immediately shall report same to the Project
Manager in writing and before proceeding with the Work affected thereby shall obtain a written
interpretation or clarification from the Project Manager; said interpretation or clarification from the
Project Manager may require Contractor to consult directly with Design Professional or some other
third party, as directed by Project Manager. Contractor shall take field measurements and verify field
conditions and shall carefully compare such field measurements and conditions and other
information known to Contractor with the Contract Documents before commencing any portion of the
Work.
1.3 Drawings are intended to show general arrangements, design and extent of Work and are
not intended to serve as shop drawings. Specifications are separated into divisions for convenience
of reference only and shall not be interpreted as establishing divisions for the Work, trades,
subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the
drawings, specifications or other Contract Document provisions, Contractor shall be required to
comply with the provision which is the more restrictive or stringent requirement upon the Contractor,
as determined by the Project Manager. Unless otherwise specifically mentioned, all anchors, bolts,
screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any
portion of the Work to make a complete, serviceable, finished and first quality installation shall be
furnished and installed as part of the Work, whether or not called for by the Contract Documents.
2. INVESTIGATION AND UTILITIES.
2.1 Subject to Section 2.3 below, Contractor shall have the sole responsibility of satisfying itself
concerning the nature and location of the Work and the general and local conditions, and particularly,
but without limitation, with respect to the following: those affecting transportation, access, disposal,
handling and storage of materials; availability and quality of labor; water and electric power;
availability and condition of roads; work area; living facilities; climatic conditions and seasons;
physical conditions at the work -site and the project area as a whole; topography and ground surface
conditions; nature and quantity of the surface materials to be encountered; subsurface conditions;
equipment and facilities needed preliminary to and during performance of the Work; and all other
costs associated with such performance. The failure of Contractor to acquaint itself with any
applicable conditions shall not relieve Contractor from any of its responsibilities to perform under the
Contract Documents, nor shall it be considered the basis for any claim for additional time or
compensation.
29
Construction Services Agreement: Revised 072118 (v6)
CAn
2.2 Contractor shall locate all existing roadways, railways, drainage facilities and utility services
above, upon, or under the Project site, said roadways, railways, drainage facilities and utilities being
referred to in this Sub -Section 2.2 as the "Utilities". Contractor shall contact the owners of all Utilities
to determine the necessity for relocating or temporarily interrupting any Utilities during the
construction of the Project. Contractor shall schedule and coordinate its Work around any such
relocation or temporary service interruption. Contractor shall be responsible for properly shoring,
supporting and protecting all Utilities at all times during the course of the Work. The Contractor is
responsible for coordinating all other utility work so as to not interfere with the prosecution of the
Work (except those utilities to be coordinated by the Owner as may be expressly described
elsewhere in the Contract Documents).
2.3 Notwithstanding anything in the Contract Documents to the contrary, if conditions are
encountered at the Project site which are (i) subsurface or otherwise concealed physical conditions
which differ materially from those indicated in the Contract Documents or (ii) unknown physical
conditions of an unusual nature, which differ materially from those ordinarily found to exist and
generally recognized as inherent in construction activities of the character provided for in the
Contract Documents, and which reasonably should not have been discovered by Contractor as part
of its scope of site investigative services required pursuant to the terms of the Contract Documents,
then Contractor shall provide Owner with prompt written notice thereof before conditions are
disturbed and in no event later than three (3) calendar days after first observance of such conditions.
Owner and Design Professional shall promptly investigate such conditions and, if they differ
materially and cause an increase or decrease in Contractor's cost of, or time required for,
performance of any part of the Work, Owner will acknowledge and agree to an equitable adjustment
to Contractor's compensation or time for performance, or both, for such Work. If Owner determines
that the conditions at the site are not materially different from those indicated in the Contract
Documents or not of an unusual nature or should have been discovered by Contractor as part of its
investigative services, and that no change in the terms of the Agreement is justified, Owner shall so
notify Contractor in writing, stating its reasons. Claims by Contractor in opposition to such
determination by Owner must be made within seven (7) calendar days after Contractor's receipt of
Owner's written determination notice. If Owner and Contractor cannot agree on an adjustment to
Contractor's cost or time of performance, the dispute resolution procedure set forth in the Contract
Documents shall be complied with by the parties.
3. SCHEDULE.
3.1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award, shall
prepare and submit to Project Manager, for their review and approval, a progress schedule for the
Project (herein "Progress Schedule"). The Progress Schedule shall relate to all Work required by
the Contract Documents, and shall utilize the Critical Path method of scheduling and shall provide
for expeditious and practicable execution of the Work within the Contract Time. The Progress
Schedule shall indicate the dates for starting and completing the various stages of the Work.
3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly updates to
the Progress Schedule shall be subject to the Project Manager's review and approval. Contractor
shall submit the updates to the Progress Schedule with its monthly Applications for Payment noted
below. The Project Manager's review and approval of the submitted Progress Schedule updates
shall be a condition precedent to the Owner's obligation to pay Contractor.
3.3 All work under this Agreement shall be performed in accordance with the requirements of all
Collier County Noise Ordinances then in effect. Unless otherwise specified, work will generally be
30
Construction Services Agreement: Revised 072118 (v6)
0
limited to the hours of 7 a.m. to 7 p.m., Monday through Saturday. No work shall be performed
outside the specified hours without the prior approval of the Project Manager.
4. PROGRESS PAYMENTS.
4.1 Prior to submitting its first monthly Application for Payment, Contractor shall submit to Project
Manager, for their review and approval, a schedule of values based upon the Contract Price, listing
the major elements of the Work and the dollar value for each element. After its approval by the
Project Manager, this schedule of values shall be used as the basis for the Contractor's monthly
Applications for Payment. This schedule shall be updated and submitted each month along with a
completed copy of the Application for Payment form signed by the Contractor's authorized
representative and attached to the Agreement as Exhibit D.
4.2 Prior to submitting its first monthly Application for Payment, Contractor shall provide to the
Project Manager the list of its Subcontractors and materialmen submitted with its Bid showing the
work and materials involved and the dollar amount of each subcontract and purchase order.
Contractor acknowledges and agrees that any modifications to the list of Subcontractors submitted
with Contractor's Bid and any subsequently identified Subcontractors are subject to Owner's prior
written approval. The first Application for Payment shall be submitted no earlier than thirty (30) days
after the Commencement Date. Notwithstanding anything herein to the contrary, if approved by
Owner in its sole discretion, Contractor may submit its invoice for any required Payment and
Performance Bonds prior to the first Application of Payment provided that Contractor has furnished
Owner certified copies of the receipts evidencing the premium paid by Contractor for the bonds.
4.3 Unless expressly approved by Owner in advance and in writing, said approval at Owner's
sole discretion, Owner is not required to make any payment for materials or equipment that have not
been incorporated into the Project. If payment is requested on the basis of materials and equipment
not incorporated into the Project, but delivered and suitably stored at the site or at another location,
and such payment and storage have been agreed to by Owner in writing, the Application for Payment
also shall be accompanied by a bill of sale, invoice or other documentation warranting that the Owner
has received the materials and equipment free and clear of all liens, charges, security interests and
encumbrances, together with evidence that the materials and equipment are covered by appropriate
property insurance and other arrangements to protect Owner's interest therein, all of which shall be
subject to the Owner's satisfaction. Thereafter, with each Application for Payment, Contractor also
shall complete and submit to Owner as part of its Application for Payment, the Stored Materials
Record attached hereto and made a part hereof as Exhibit D.
4.4 Contractor shall submit its monthly Application for Payment to the Project Manager or his or
her designee, as directed by Owner (which designee may include the Design Professional). After
the date of each Application for Payment is stamped as received and within the timeframes set forth
in Section 218.735 F.S., the Project Manager, or Design Professional, shall either: (1) Indicate its
approval of the requested payment; (2) indicate its approval of only a portion of the requested
payment, stating in writing its reasons therefore; or (3) return the Application for Payment to the
Contractor indicating, in writing, the reason for refusing to approve payment. Payments of proper
invoices in the amounts approved shall be processed and paid in accordance with Section 218.735,
F.S. and the administrative procedures established by the County's Procurement Services Division
and the Clerk of Court's Finance Department respectively.
4.5 In the event of a total denial by Owner and return of the Application for Payment by the Project
Manager, the Contractor may make the necessary corrections and re -submit the Application for
Payment. The Owner shall, within ten (10) business days after the Application for Payment is
31
Construction Services Agreement: Revised 072118 (v6)
stamped and received and after Project Manager approval of an Application for Payment, pay the
Contractor the amounts so approved.
4.6 Owner shall retain ten percent (10%) of the gross amount of each monthly payment request
or ten percent (10%) of the portion thereof approved by the Project Manager for payment, whichever
is less. Such sum shall be accumulated and not released to Contractor until final payment is due
unless otherwise agreed to by the Owner in accordance with Florida Statute 255.078. The Project
Manager shall have the discretion to establish, in writing, a schedule to periodically reduce the
percentage of cumulative retainage held throughout the course of the Project schedule. Owner shall
reduce the amount of the retainage withheld on each payment request subsequent to fifty percent
(50%) completion subject to the guidelines set forth in Florida Statute 255.078 and as set forth in the
Owner's procurement ordinance and policies.
4.7 Monthly payments to Contractor shall in no way imply approval or acceptance of Contractor's
Work.
4.8 Each Application for Payment, subsequent to the first pay application, shall be accompanied
by a Release and Affidavit, in the form attached as Exhibit C, acknowledging Contractor's receipt of
payment in full for all materials, labor, equipment and other bills that are then due and payable by
Owner with respect to the current Application for Payment. Further, to the extent directed by Owner
and in Owner's sole discretion, Contractor shall also submit a Release and Affidavit from each
Subcontractor, sub -subcontractor, or supplier in the form attached as Exhibit C acknowledging that
each Subcontractor, sub -subcontractor or supplier has been paid in full through the previous month's
Application for Payment. The Owner shall not be required to make payment until and unless these
affidavits are furnished by Contractor.
4.9 Contractor agrees and understands that funding limitations exist and that the expenditure of
funds must be spread over the duration of the Project at regular intervals based on the Contract
Amount and Progress Schedule. Accordingly, prior to submitting its first monthly Application for
Payment, Contractor shall prepare and submit for Project Manager's review and approval, a detailed
Project Funding Schedule, which shall be updated as necessary and approved by Owner to reflect
approved adjustments to the Contract Amount and Contract Time. No voluntary acceleration or early
completion of the Work shall modify the time of payments to Contractor as set forth in the approved
Project Funding Schedule.
4.10 Notwithstanding anything in the Contract Documents to the contrary, Contractor
acknowledges and agrees that in the event of a dispute concerning payments for Work performed
under this Agreement, Contractor shall continue to perform the Work required of it under this
Agreement pending resolution of the dispute provided that Owner continues to pay Contractor all
amounts that Owner does not dispute are due and payable.
4.11 Payments will be made for services furnished, delivered, and accepted, upon receipt and
approval of invoices submitted on the date of services or within six (6) months after completion of
contract. Any untimely submission of invoices beyond the specified deadline period is subject to non-
payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the
essence with respect to the timely submission of invoices under this agreement.
4.12 The County may, at its discretion, use VISA/MASTER card credit network as a payment
vehicle for goods and/or services purchased as a part of this contract. The County may not accept
any additional surcharges (credit card transaction fees) as a result of using the County's credit card
for transactions relating to this solicitation
32
Construction Services Agreement: Revised 072118 (v6)
5. PAYMENTS WITHHELD.
5.1 The Project Manager may decline to approve any Application for Payment, or portions
thereof, because of subsequently discovered evidence or subsequent inspections that reveal non-
compliance with the Contract Documents. The Project Manager may nullify the whole or any part of
any approval for payment previously issued and Owner may withhold any payments otherwise due
Contractor under this Agreement or any other agreement between Owner and Contractor, to such
extent as may be necessary in the Owner's opinion to protect it from loss because of:
(a) Defective Work not remedied; (b) third party claims filed or reasonable evidence indicating
probable filing of such claims; (c) failure of Contractor to make payment properly to subcontractors
or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the
unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed
within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any
other material breach of the Contract Documents by Contractor.
5.2 If any conditions described in 5.1. are not remedied or removed, Owner may, after three (3)
days written notice, rectify the same at Contractor's expense. Provided however, in the event of an
emergency, Owner shall not be required to provide Contractor any written notice prior to rectifying
the situation at Contractor's expense. Owner also may offset against any sums due Contractor the
amount of any liquidated or non -liquidated obligations of Contractor to Owner, whether relating to or
arising out of this Agreement or any other agreement between Contractor and Owner.
5.3 In instances where the successful contractor may owe debts (including, but not limited to
taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to
satisfy these debts, the County reserves the right to off -set the amount owed to the County by
applying the amount owed to the vendor or contractor for services performed of for materials
delivered in association with a contract.
6. FINAL PAYMENT.
6.1 Owner shall make final payment to Contractor in accordance with Section 218.735, F.S. and
the administrative procedures established by the County's Procurement Services Division and the
Clerk of Court's Finance Department after the Work is finally inspected and accepted by Project
Manager as set forth with Section 20.1 herein, provided that Contractor first, and as an explicit
condition precedent to the accrual of Contractor's right to final payment, shall have furnished Owner
with a properly executed and notarized copy of the Release and Affidavit attached as Exhibit C, as
well as, a duly executed copy of the Surety's consent to final payment and such other documentation
that may be required by the Contract Documents and the Owner. Prior to release of final payment
and final retainage, the Contractor's Representative and the Project Manager shall jointly complete
the Final Payment Checklist, a representative copy of which is attached to this Agreement as Exhibit
G.
6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and all claims
by Contractor against Owner arising out of this Agreement or otherwise relating to the Project, except
those previously made in writing in accordance with the requirements of the Contract Documents
and identified by Contractor as unsettled in its final Application for Payment. Neither the acceptance
of the Work nor payment by Owner shall be deemed to be a waiver of Owner's right to enforce any
obligations of Contractor hereunder or to the recovery of damages for defective Work not discovered
by the Design Professional or Project Manager at the time of final inspection.
33
Construction Services Agreement: Revised 072118 (v6)
7. SUBMITTALS AND SUBSTITUTIONS.
7.1 Contractor shall carefully examine the Contract Documents for all requirements for approval
of materials to be submitted such as shop drawings, data, test results, schedules and samples.
Contractor shall submit all such materials at its own expense and in such form as required by the
Contract Documents in sufficient time to prevent any delay in the delivery of such materials and the
installation thereof.
7.2 Whenever materials or equipment are specified or described in the Contract Documents by
using the name of a proprietary item or the name of a particular supplier, the naming of the item is
intended to establish the type, function and quality required. Unless the name is followed by words
indicating that no substitution is permitted, materials or equipment of other suppliers may be
accepted by Owner if sufficient information is submitted by Contractor to allow the Owner to
determine that the material or equipment proposed is equivalent or equal to that named. Requests
for review of substitute items of material and equipment will not be accepted by Owner from anyone
other than Contractor and all such requests must be submitted by Contractor to Project Manager
within thirty (30) calendar days after Notice of Award is received by Contractor, unless otherwise
mutually agreed in writing by Owner and Contractor.
7.3 If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor
shall make application to the Project Manager for acceptance thereof, certifying that the proposed
substitute shall adequately perform the functions and achieve the results called for by the general
design, be similar and of equal substance to that specified and be suited to the same use as that
specified. The application shall state that the evaluation and acceptance of the proposed substitute
will not prejudice Contractor's achievement of substantial completion on time, whether or not
acceptance of the substitute for use in the Work will require a change in any of the Contract
Documents (or in the provisions of any other direct contract with Owner for the Project) to adapt the
design to the proposed substitute and whether or not incorporation or use by the substitute in
connection with the Work is subject to payment of any license fee or royalty. All variations of the
proposed substitute from that specified will be identified in the application and available maintenance,
repair and replacement service shall be indicated. The application also shall contain an itemized
estimate of all costs that will result directly or indirectly from acceptance of such substitute, including
costs for redesign and claims of other contractors affected by the resulting change, all of which shall
be considered by the Project Manager in evaluating the proposed substitute. The Project Manager
may require Contractor to furnish at Contractor's expense additional data about the proposed
substitute.
7.4 If a specific means, method, technique, sequence or procedure of construction is indicated
in or required by the Contract Documents, Contractor may furnish or utilize a substitute means,
method, sequence, technique or procedure of construction acceptable to the Project Manager, if
Contractor submits sufficient information to allow the Project Manager to determine that the
substitute proposed is equivalent to that indicated or required by the Contract Documents. The
procedures for submission to and review by the Project Manager shall be the same as those provided
herein for substitute materials and equipment.
7.5 The Project Manager shall be allowed a reasonable time within which to evaluate each
proposed substitute and, if need be, to consult with the Design Professional. No substitute will be
ordered, installed or utilized without the Project Manager's prior written acceptance which shall be
evidenced by a Change Order, a Work Directive Change, a Field Order or an approved Shop
Drawing. The Owner may require Contractor to furnish at Contractor's expense a special
performance guarantee or other surety with respect to any substitute. The Project Manager will
34
Construction Services Agreement: Revised 072118 (v6)
0
record time required by the Project Manager and the Project Manager's consultants in evaluating
substitutions proposed by Contractor and making changes in the Contract Documents occasioned
thereby. Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse Owner
for the charges of the Design Professional and the Design Professional's consultants for evaluating
each proposed substitute.
DAILY REPORTS, SIGNED AND SEALED AS-BUILTS AND MEETINGS.
8.1 Unless waived in writing by Owner, Contractor shall complete and submit to Project Manager
on a weekly basis a daily log of the Contractor's work for the preceding week in a format approved
by the Project Manager. The daily log shall document all activities of Contractor at the Project site
including, but not limited to, the following:
8.1.1 Weather conditions showing the high and low temperatures during work hours,
the amount of precipitation received on the Project site, and any other weather conditions which
adversely affect the Work;
8.1.2 Soil conditions which adversely affect the Work;
8.1.3 The hours of operation by Contractor's and Sub -Contractor's personnel;
8.1.4 The number of Contractor's and Sub -Contractor's personnel present and working
at the Project site, by subcontract and trade;
8.1.5 All equipment present at the Project site, description of equipment use and
designation of time equipment was used (specifically indicating any down time);
8.1.6 Description of Work being performed at the Project site;
8.1.7 Any unusual or special occurrences at the Project site;
8.1.8 Materials received at the Project site;
8.1.9 A list of all visitors to the Project
8.1.10 Any problems that might impact either the cost or quality of the Work or the time
of performance.
The daily log shall not constitute nor take the place of any notice required to be given by Contractor
to Owner pursuant to the Contract Documents.
8.2 Contractor shall maintain in a safe place at the Project site one record copy of the Contract
Documents, including, but not limited to, all drawings, specifications, addenda, amendments,
Change Orders, Work Directive Changes and Field Orders, as well as all written interpretations and
clarifications issued by the Design Professional, in good order and annotated to show all changes
made during construction. The annotated drawings shall be continuously updated by the Contractor
throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt
the Work to field conditions, changes resulting from Change Orders, Work Directive Changes and
Field Orders, and all concealed and buried installations of piping, conduit and utility services. All
buried and concealed items, both inside and outside the Project site, shall be accurately located on
the annotated drawings as to depth and in relationship to not less than two (2) permanent features
35
Construction Services Agreement: Revised 072118 (v6)
0
(e.g. interior or exterior wall faces). The annotated drawings shall be clean and all changes,
corrections and dimensions shall be given in a neat and legible manner in a contrasting color. The
"As -Built" record documents, together with all approved samples and a counterpart of all approved
shop drawings shall be available to the Project Manager or Design Professional for reference. Upon
completion of the Work and as a condition precedent to Contractor's entitlement to final payment,
these "As -Built" record documents, samples and shop drawings shall be delivered to Project
Manager by Contractor for Owner.
8.3 Contractor shall keep all records and supporting documentation, which concern or relate to
the Work hereunder for a minimum of five (5) years from the date of termination of this Agreement
or the date the Project is completed or such longer period as may be required by law, whichever is
later, pursuant to Florida Public Records Law Chapter 119 and comply with specifically those
contractual requirements in 119.0701(2)(a)-(b) as follows:
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF
CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE
PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF
PUBLIC RECORDS AT:
Communication and Customer Relations Division
3299 Tamiami Trail East, Suite 102
Naples, FL 34112-5746
Telephone: (239) 252-8383
The Contractor must specifically comply with the Florida Public Records Law to:
1. Keep and maintain public records required by the public agency to perform the service.
2. Upon request from the public agency's custodian of public records, provide the public
agency with a copy of the requested records or allow the records to be inspected or
copied within a reasonable time at a cost that does not exceed the cost provided in this
chapter or as otherwise provided by law.
3. Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law for the
duration of the contract term and following completion of the contract if the Contractor
does not transfer the records to the public agency.
4. Upon completion of the contract, transfer, at no cost, to the public agency all public
records in possession of the Contractor or keep and maintain public records required by
the public agency to perform the service. If the Contractor transfers all public records to
the public agency upon completion of the contract, the Contractor shall destroy any
duplicate public records that are exempt or confidential and exempt from public records
disclosure requirements. If the Contractor keeps and maintains public records upon
completion of the contract, the Contractor shall meet all applicable requirements for
retaining public records. All records stored electronically must be provided to the public
agency, upon request from the public agency's custodian of public records, in a format
that is compatible with the information technology systems of the public agency.
9. CONTRACT TIME AND TIME EXTENSIONS.
9.1 Contractor shall diligently pursue the completion of the Work and coordinate the Work being
done on the Project by its subcontractors and material -men, as well as coordinating its Work with all
36
Construction Services Agreement: Revised 072118 (v6)
ON
work of others at the Project Site, so that its Work or the work of others shall not be delayed or
impaired by any act or omission by Contractor. Contractor shall be solely responsible for all
construction means, methods, techniques, sequences, and procedures, as well as coordination of
all portions of the Work under the Contract Documents, and the coordination of Owner's suppliers
and contractors as set forth in Paragraph 12.2. herein.
9.2 Should Contractor be obstructed or delayed in the prosecution of or completion of the Work
as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or
neglect, including but not restricted to acts of Nature or of the public enemy, acts of government,
fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner
in writing within forty-eight (48) hours after the commencement of such delay, stating the cause or
causes thereof, or be deemed to have waived any right which Contractor may have had to request
a time extension.
9.3 No interruption, interference, inefficiency, suspension or delay in the commencement or
progress of the Work from any cause whatever, including those for which Owner may be responsible,
in whole or in part, shall relieve Contractor of its duty to perform or give rise to any right to damages
or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall
receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to
seek an extension to the Contract Time; provided, however, the granting of any such time extension
shall not be a condition precedent to the aforementioned "No Damage For Delay" provision. This
paragraph shall expressly apply to claims for early completion, as well as to claims based on late
completion.
9.4 In no event shall any approval by Owner authorizing Contractor to continue performing Work
under this Agreement or any payment issued by Owner to Contractor be deemed a waiver of any
right or claim Owner may have against Contractor for delay damages hereunder.
10. CHANGES IN THE WORK.
10.1 Owner shall have the right at any time during the progress of the Work to increase or
decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized
estimate of any cost or time increases or savings it foresees as a result of the change. Except in an
emergency endangering life or property, or as expressly set forth herein, no addition or changes to
the Work shall be made except upon written order of Owner, and Owner shall not be liable to the
Contractor for any increased compensation without such written order. No officer, employee or agent
of Owner is authorized to direct any extra or changed work orally. Any alleged changes must be
approved by Owner in writing prior to starting such items. Owner will not be responsible for the costs
of any changes commenced without Owner's express prior written approval. Failure to obtain such
prior written approval for any changes will be deemed: (i) a waiver of any claim by Contractor for
such items and (ii) an admission by Contractor that such items are in fact not a change but rather
are part of the Work required of Contractor hereunder.
10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be issued and
executed promptly after an agreement is reached between Contractor and Owner concerning the
requested changes. Contractor shall promptly perform changes authorized by duly executed Change
Orders. The Contract Amount and Contract Time shall be adjusted in the Change Order in the
manner as Owner and Contractor shall mutually agree.
10.3 If Owner and Contractor are unable to agree on a Change Order for the requested change,
Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work
37
Construction Services Agreement: Revised 072118 (v6)
Directive. In that event, the Contract Amount and Contract Time shall be adjusted as directed by
Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make
a claim pursuant to Section 11 of these General Conditions or else be deemed to have waived any
claim on this matter it might otherwise have had.
10.4 In the event a requested change results in an increase to the Contract Amount, the amount
of the increase shall be limited to the Contractor's reasonable direct labor and material costs and
reasonable actual equipment costs as a result of the change (including allowance for labor burden
costs) plus a maximum ten percent (10%) markup for all overhead and profit. In the event such
change Work is performed by a Subcontractor, a maximum ten percent (10%) markup for all
overhead and profit for all Subcontractors' and sub -subcontractors' direct labor and material costs
and actual equipment costs shall be permitted, with a maximum five percent (5%) markup thereon
by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent
(15%). All compensation due Contractor and any Subcontractor or sub -subcontractor for field and
home office overhead is included in the markups noted above. No markup shall be placed on sales
tax, shipping or subcontractor markup.
10.5 Owner shall have the right to conduct an audit of Contractor's books and records to verify the
accuracy of the Contractor's claim with respect to Contractor's costs associated with any Change
Order or Work Directive Change.
10.6 The Project Manager shall have authority to order minor changes in the Work not involving
an adjustment to the Contract Amount or an extension to the Contract Time and not inconsistent with
the intent of the Contract Documents. Such changes may be effected by Field Order or by other
written order. Such changes shall be binding on the Contractor.
10.7 Any modifications to this Contract shall be in compliance with the County procurement
ordinance and policies and Administrative Procedures in effect at the time such modifications are
authorized.
11. CLAIMS AND DISPUTES.
11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation
of the terms of the Contract Documents, payment of money, extension of time or other relief with
respect to the terms of the Contract Documents. The term "Claim" also includes other disputes and
matters in question between Owner and Contractor arising out of or relating to the Contract
Documents. The responsibility to substantiate a Claim shall rest with the party making the Claim.
11.2 Claims by the Contractor shall be made in writing to the Project Manager within forty-eight
(48) hours from when the Contractor knew or should have known of the event giving rise to such
Claim or else the Contractor shall be deemed to have waived the Claim. Written supporting data
shall be submitted to the Project Manager within fifteen (15) calendar days after the occurrence of
the event, unless the Owner grants additional time in writing, or else the Contractor shall be deemed
to have waived the Claim. All Claims shall be priced in accordance with the provisions of Subsection
10.4.
11.3 The Contractor shall proceed diligently with its performance as directed by the Owner,
regardless of any pending Claim, action, suit or administrative proceeding, unless otherwise agreed
to by the Owner in writing. Owner shall continue to make payments in accordance with the Contract
Documents during the pendency of any Claim.
38
Construction Services Agreement: Revised 072118 (v6)
12. OTHER WORK.
12.1 Owner may perform other work related to the Project at the site by Owner's own forces, have
other work performed by utility owners or let other direct contracts. If the fact that such other work
is to be performed is not noted in the Contract Documents, written notice thereof will be given to
Contractor prior to starting any such other work. If Contractor believes that such performance will
involve additional expense to Contractor or require additional time, Contractor shall send written
notice of that fact to Owner and Design Professional within forty-eight (48) hours of being notified of
the other work. If the Contractor fails to send the above required forty-eight (48) hour notice, the
Contractor will be deemed to have waived any rights it otherwise may have had to seek an extension
to the Contract Time or adjustment to the Contract Amount.
12.2 Contractor shall afford each utility owner and other contractor who is a party to such a direct
contract (or Owner, if Owner is performing the additional work with Owner's employees) proper and
safe access to the site and a reasonable opportunity for the introduction and storage of materials
and equipment and the execution of such work and shall properly connect and coordinate its Work
with theirs. Contractor shall do all cutting, fitting and patching of the Work that may be required to
make its several parts come together properly and integrate with such other work. Contractor shall
not endanger any work of others by cutting, excavating or otherwise altering their work and will only
cut or alter their work with the written consent of the Project Manager and the others whose work will
be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of
such utility owners and other Contractors to the extent that there are comparable provisions for the
benefit of Contractor in said direct contracts between Owner and such utility owners and other
contractors.
12.3 If any part of Contractor's Work depends for proper execution or results upon the work of any
other contractor or utility owner (or Owner), Contractor shall inspect and promptly report to Project
Manager in writing any delays, defects or deficiencies in such work that render it unavailable or
unsuitable for such proper execution and results. Contractor's failure to report will constitute an
acceptance of the other work as fit and proper for integration with Contractor's Work.
13. INDEMNIFICATION AND INSURANCE.
13.1 To the maximum extent permitted by Florida law, the Contractor shall defend, indemnify and
hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses
and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent
caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or
anyone employed or utilized by the Contractor in the performance of this Agreement.
13.2 The duty to defend under this Article 13 is independent and separate from the duty to
indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, Owner
and any indemnified party. The duty to defend arises immediately upon presentation of a claim by
any party and written notice of such claim being provided to Contractor. Contractor's obligation to
indemnify and defend under this Article 13 will survive the expiration or earlier termination of this
Agreement until it is determined by final judgment that an action against the Owner or an indemnified
party for the matter indemnified hereunder is fully and finally barred by the applicable statute of
limitations.
13.3 Contractor shall obtain and carry, at all times during its performance under the Contract
Documents, insurance of the types and in the amounts set forth in Exhibit B-3 to the Agreement.
39
Construction Services Agreement: Revised 072118 (v6)
(C OO
Further, the Contractor shall at all times comply with all of the terms, conditions, requirements and
obligations set forth under Exhibit B-3.
14. COMPLIANCE WITH LAWS.
14.1 Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes,
statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not
limited to those dealing with taxation, worker's compensation, equal employment and safety
(including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor
observes that the Contract Documents are at variance therewith, it shall promptly notify Project
Manager in writing. To the extent any law, rule, regulation, code, statute, or ordinance requires the
inclusion of certain terms in this Agreement in order for this Agreement to be enforceable, such terms
shall be deemed included in this Agreement. Notwithstanding anything in the Contract Documents
to the contrary, it is understood and agreed that in the event of a change in any applicable laws,
ordinances, rules or regulations subsequent to the date this Agreement was executed that increases
the Contractor's time or cost of performance of the Work, Contractor is entitled to a Change Order
for such increases, except to the extent Contractor knew or should have known of such changes
prior to the date of this Agreement.
14.2 By executing and entering into this agreement, the Contractor is formally acknowledging
without exception or stipulation that it is fully responsible for complying with the provisions of the
Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations
relating thereto, as either may be amended. Failure by the Contractor to comply with the laws
referenced herein shall constitute a breach of this agreement and the County shall have the
discretion to unilaterally terminate this agreement immediately.
14.3 Statutes and executive orders require employers to abide by the immigration laws of the United
States and to employ only individuals who are eligible to work in the United States.
The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland
Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet -
based means of verifying employment eligibility of workers in the United States; it is not a substitute
for any other employment eligibility verification requirements. The program will be used for Collier
County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional
services and construction services.
Exceptions to the program:
• Commodity based procurement where no services are provided.
• Where the requirement for the affidavit is waived by the Board of County Commissioners
Contractors / Bidders are required to enroll in the E-Verify program, and provide acceptable evidence
of their enrollment, at the time of the submission of the Contractor's/bidder's proposal. Acceptable
evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of
the fully executed E-Verify Memorandum of Understanding for the company. Contractors are also
required to provide the Collier County Procurement Services Division an executed affidavit certifying
they shall comply with the E-Verify Program. The affidavit is attached to the solicitation documents.
If the Bidder/Contractor does not comply with providing both the acceptable E-Verify
evidence and the executed affidavit the bidder's / Contractor's proposal may be deemed non-
responsive.
40
Construction Services Agreement: Revised 072118 (v6)
0
Additionally, Contractors shall require all subcontracted Contractors to use the E-Verify system for
all purchases not covered under the "Exceptions to the program" clause above.
For additional information regarding the Employment Eligibility Verification System (E-Verify)
program visit the following website: http://www.dhs.gov/E-Verif . It shall be the Contractor's
responsibility to familiarize themselves with all rules and regulations governing this program.
Contractor acknowledges, and without exception or stipulation, any firm(s) receiving an award shall
be fully responsible for complying with the provisions of the Immigration Reform and Control Act of
1986 as located at 8 U.S.C. 1324, et seg. and regulations relating thereto, as either may be amended
and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with
the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award
agreement and the County shall have the discretion to unilaterally terminate said agreement
immediately.
15. CLEANUP AND PROTECTIONS.
15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste
materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris,
rubbish and waste materials from and about the Project site, as well as all tools, appliances,
construction equipment and machinery and surplus materials, and shall leave the Project site clean
and ready for occupancy by Owner.
15.2 Any existing surface or subsurface improvements, including, but not limited to, pavements,
curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery, not indicated in the
Contract Documents to be removed or altered, shall be protected by Contractor from damage during
the prosecution of the Work. Subject to the Section 2.3 above, any such improvements so damaged
shall be restored by Contractor to the condition equal to that existing at the time of Contractor's
commencement of the Work.
16. ASSIGNMENT.
16.1 Contractor shall not assign this Agreement or any part thereof, without the prior consent in
writing of Owner. Any attempt to assign or otherwise transfer this Agreement, or any part herein,
without the Owner's consent, shall be void. If Contractor does, with approval, assign this Agreement
or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor
all of the obligations and responsibilities that Contractor has assumed toward Owner.
17. PERMITS, LICENSES AND TAXES.
17.1 Pursuant to Section 218.80, F.S., Owner will pay for all Collier County permits and fees,
including license fees, permit fees, impact fees or inspection fees applicable to the Work through an
internal budget transfer(s). Contractor is not responsible for paying for permits issued by Collier
County, but Contractor is responsible for acquiring all permits. Owner may require the Contractor to
deliver internal budget transfer documents to applicable Collier County agencies when the
Contractor is acquiring permits. Owner will not be obligated to pay for any permits obtained by
Subcontractors.
17.2 All permits, fees and licenses necessary for the prosecution of the Work which are not issued
by Collier County shall be acquired and paid for by the Contractor.
41
Construction Services Agreement: Revised 072118 (v6)
(a
17.3 Contractor shall pay all sales, consumer, use and other similar taxes associated with the
Work or portions thereof, which are applicable during the performance of the Work.
18. TERMINATION FOR DEFAULT.
18.1 Contractor shall be considered in material default of the Agreement and such default shall be
considered cause for Owner to terminate the Agreement, in whole or in part, as further set forth in
this Section, if Contractor: (1) fails to begin the Work under the Contract Documents within the time
specified herein; or (2) fails to properly and timely perform the Work as directed by the Project
Manager or as provided for in the approved Progress Schedule; or (3) performs the Work unsuitably
or neglects or refuses to remove materials or to correct or replace such Work as may be rejected as
unacceptable or unsuitable; or (4) discontinues the prosecution of the Work; or (5) fails to resume
Work which has been suspended within a reasonable time after being notified to do so; or (6)
becomes insolvent or is declared bankrupt, or commits any act of bankruptcy; or (7) allows any final
judgment to stand against it unsatisfied for more than ten (10) days; or (8) makes an assignment for
the benefit of creditors; or (9) fails to obey any applicable codes, laws, ordinances, rules or
regulations with respect to the Work; or (10) materially breaches any other provision of the Contract
Documents.
18.2 Owner shall notify Contractor in writing of Contractor's default(s). If Owner determines that
Contractor has not remedied and cured the default(s) within seven (7) calendar days following receipt
by Contractor of said written notice or such longer period of time as may be consented to by Owner
in writing and in its sole discretion, then Owner, at its option, without releasing or waiving its rights
and remedies against the Contractor's sureties and without prejudice to any other right or remedy it
may be entitled to hereunder or by law, may terminate Contractor's right to proceed under the
Agreement, in whole or in part, and take possession of all or any portion of the Work and any
materials, tools, equipment, and appliances of Contractor, take assignments of any of Contractor's
subcontracts and purchase orders, and complete all or any portion of Contractor's Work by whatever
means, method or agency which Owner, in its sole discretion, may choose.
18.3 If Owner deems any of the foregoing remedies necessary, Contractor agrees that it shall not
be entitled to receive any further payments hereunder until after the Project is completed. All moneys
expended and all of the costs, losses, damages and extra expenses, including all management,
administrative and other overhead and other direct and indirect expenses (including Design
Professional and attorneys' fees) or damages incurred by Owner incident to such completion, shall
be deducted from the Contract Amount, and if such expenditures exceed the unpaid balance of the
Contract Amount, Contractor agrees to pay promptly to Owner on demand the full amount of such
excess, including costs of collection, attorneys' fees (including appeals) and interest thereon at the
maximum legal rate of interest until paid. If the unpaid balance of the Contract Amount exceeds all
such costs, expenditures and damages incurred by the Owner to complete the Work, such excess
shall be paid to the Contractor. The amount to be paid to the Contractor or Owner, as the case may
be, shall be approved by the Project Manager, upon application, and this obligation for payment shall
survive termination of the Agreement.
18.4 The liability of Contractor hereunder shall extend to and include the full amount of any and
all sums paid, expenses and losses incurred, damages sustained, and obligations assumed by
Owner in good faith under the belief that such payments or assumptions were necessary or required,
in completing the Work and providing labor, materials, equipment, supplies, and other items therefore
or re -letting the Work, and in settlement, discharge or compromise of any claims, demands, suits,
and judgments pertaining to or arising out of the Work hereunder.
42
Construction Services Agreement: Revised 072118 (v6)
18.5 If, after notice of termination of Contractor's right to proceed pursuant to this Section, it is
determined for any reason that Contractor was not in default, or that its default was excusable, or
that Owner is not entitled to the remedies against Contractor provided herein, then the termination
will be deemed a termination for convenience and Contractor's remedies against Owner shall be the
same as and limited to those afforded Contractor under Section 19 below.
18.6 In the event (i) Owner fails to make any undisputed payment to Contractor within thirty (30)
days after such payment is due or Owner otherwise persistently fails to fulfill some material obligation
owed by Owner to Contractor under this Agreement, and (ii) Owner has failed to cure such default
within fourteen (14) days of receiving written notice of same from Contractor, then Contractor may
stop its performance under this Agreement until such default is cured, after giving Owner a second
fourteen (14) days written notice of Contractor's intention to stop performance under the Agreement.
If the Work is so stopped for a period of one hundred and twenty (120) consecutive days through no
act or fault of the Contractor or its Subcontractors or their agents or employees or any other persons
performing portions of the Work under contract with the Contractor or any Subcontractor, the
Contractor may terminate this Agreement by giving written notice to Owner of Contractor's intent to
terminate this Agreement. If Owner does not cure its default within fourteen (14) days after receipt
of Contractor's written notice, Contractor may, upon fourteen (14) additional days' written notice to
the Owner, terminate the Agreement and recover from the Owner payment for Work performed
through the termination date, but in no event shall Contractor be entitled to payment for Work not
performed or any other damages from Owner.
19. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION.
19.1 Owner shall have the right to terminate this Agreement without cause upon seven (7)
calendar days written notice to Contractor. In the event of such termination for convenience,
Contractor's recovery against Owner shall be limited to that portion of the Contract Amount earned
through the date of termination, together with any retainage withheld and reasonable termination
expenses incurred, but Contractor shall not be entitled to any other or further recovery against
Owner, including, but not limited to, damages or any anticipated profit on portions of the Work not
performed.
19.2 Owner shall have the right to suspend all or any portions of the Work upon giving Contractor
not less than two (2) calendar days' prior written notice of such suspension. If all or any portion of
the Work is so suspended, Contractor's sole and exclusive remedy shall be to seek an extension of
time to its schedule in accordance with the procedures set forth in the Contract Documents. In no
event shall the Contractor be entitled to any additional compensation or damages. Provided,
however, if the ordered suspension exceeds six (6) months, the Contractor shall have the right to
terminate the Agreement with respect to that portion of the Work which is subject to the ordered
suspension.
20. COMPLETION.
20.1 When the entire Work (or any portion thereof designated in writing by Owner) is ready for its
intended use, Contractor shall notify Project Manager in writing that the entire Work (or such
designated portion) is substantially complete. Within a reasonable time thereafter, Owner, Contractor
and Design Professional shall make an inspection of the Work (or designated portion thereof) to
determine the status of completion. If Owner, after conferring with the Design Professional, does
not consider the Work (or designated portion) substantially complete, Project Manager shall notify
Contractor in writing giving the reasons therefore. If Owner, after conferring with the Design
Professional, considers the Work (or designated portion) substantially complete, Project Manager
43
Construction Services Agreement: Revised 072118 (v6)
0
shall prepare and deliver to Contractor a Certificate of Substantial Completion which shall fix the
date of Substantial Completion for the entire Work (or designated portion thereof) and include a
tentative punch -list of items to be completed or corrected by Contractor before final payment. Owner
shall have the right to exclude Contractor from the Work and Project site (or designated portion
thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable
access to complete or correct items on the tentative punch -list. The Project Manager, shall
coordinate with the Contractor the return of any surplus assets, including materials, supplies, and
equipment.
20.2 Upon receipt of written certification by Contractor that the Work is completed in accordance
with the Contract Documents and is ready for final inspection and acceptance, Project Manager and
Design Professional will make such inspection and, if they find the Work acceptable and fully
performed under the Contract Documents shall promptly approve payment, recommending that, on
the basis of their observations and inspections, and the Contractor's certification that the Work has
been completed in accordance with the terms and conditions of the Contract Documents, that the
entire balance found to be due Contractor is due and payable. Neither the final payment nor the
retainage shall become due and payable until Contractor submits:
(1) Receipt of Contractor's Final Application for Payment.
(2) The Release and Affidavit in the form attached as Exhibit C.
(3) Consent of surety to final payment.
(4) Receipt of the final payment check list.
(5) If required by Owner, other data establishing payment or satisfaction of all obligations,
such as receipts, releases and waivers of liens, arising out of the Contract
Documents, to the extent and in such form as may be designated by Owner.
Owner reserves the right to inspect the Work and make an independent determination as to the
Work's acceptability, even though the Design Professional may have issued its recommendations.
Unless and until the Owner is completely satisfied, neither the final payment nor the retainage shall
become due and payable.
21. WARRANTY.
21.1 Contractor shall obtain and assign to Owner all express warranties given to Contractor or any
subcontractors by any subcontractor or material men supplying materials, equipment or fixtures to
be incorporated into the Project. Contractor warrants to Owner that any materials and equipment
furnished under the Contract Documents shall be new unless otherwise specified, and that all Work
shall be of good quality, free from all defects and in conformance with the Contract Documents.
Contractor further warrants to Owner that all materials and equipment furnished under the Contract
Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in
accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors
except as otherwise provided for in the Contract Documents. If, within one (1) year after Substantial
Completion, any Work is found to be defective or not in conformance with the Contract Documents,
Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also
be responsible for and pay for replacement or repair of adjacent materials or Work which may be
damaged as a result of such replacement or repair. Further, in the event of an emergency, Owner
may commence to correct any defective Work, without prior notice to Contractor, at Contractor's
expense. These warranties are in addition to those implied warranties to which Owner is entitled as
a matter of law.
44
Construction Services Agreement: Revised 072118 (v6)
0
21.2 No later than 30 days prior to expiration of the warranty, the Project Manager, or another
representative of the Owner, shall conduct an inspection of the warranted work to verify compliance
with the requirements of the Agreement. The Contractor's Representative shall be present at the
time of inspection and shall take remedial actions to correct any deficiencies noted in the inspection.
Failure of the Contractor to correct the cited deficiencies shall be grounds for the Owner to disqualify
the Contractor from future bid opportunities with the Owner, in addition to any other rights and
remedies available to Owner.
22. TESTS AND INSPECTIONS.
22.1 Owner, Design Professional, their respective representatives, agents and employees, and
governmental agencies with jurisdiction over the Project shall have access at all times to the Work,
whether the Work is being performed on or off of the Project site, for their observation, inspection
and testing. Contractor shall provide proper, safe conditions for such access. Contractor shall
provide Project Manager with timely notice of readiness of the Work for all required inspections, tests
or approvals.
22.2 If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public
authority having jurisdiction over the Project requires any portion of the Work to be specifically
inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in
connection therewith and furnish Project Manager the required certificates of inspection, testing or
approval. All inspections, tests or approvals shall be performed in a manner and by organizations
acceptable to the Project Manager.
22.3 Contractor is responsible, without reimbursement from Owner, for re -inspection fees and
costs; to the extent such re -inspections are due to the fault or neglect of Contractor.
22.4 If any Work that is to be inspected, tested or approved is covered without written concurrence
from the Project Manager, such work must, if requested by Project Manager, be uncovered for
observation. Such uncovering shall be at Contractor's expense unless Contractor has given Project
Manager timely notice of Contractor's intention to cover the same and Project Manager has not acted
with reasonable promptness to respond to such notice. If any Work is covered contrary to written
directions from Project Manager, such Work must, if requested by Project Manager, be uncovered
for Project Manager's observation and be replaced at Contractor's sole expense.
22.5 The Owner shall charge to Contractor and may deduct from any payments due Contractor all
engineering and inspection expenses incurred by Owner in connection with any overtime work. Such
overtime work consisting of any work during the construction period beyond the regular eight (8) hour
day and for any work performed on Saturday, Sunday or holidays.
22.6 Neither observations nor other actions by the Project Manager or Design Professional nor
inspections, tests or approvals by others shall relieve Contractor from Contractor's obligations to
perform the Work in accordance with the Contract Documents.
23. DEFECTIVE WORK.
23.1 Work not conforming to the requirements of the Contract Documents or any warranties made
or assigned by Contractor to Owner shall be deemed defective Work. If required by Project Manager,
Contractor shall as directed, either correct all defective Work, whether or not fabricated, installed or
completed, or if the defective Work has been rejected by Project Manager, remove it from the site
and replace it with non -defective Work. Contractor shall bear all direct, indirect and consequential
45
Construction Services Agreement: Revised 072118 (v6)
,ram'
`� A41
costs of such correction or removal (including, but not limited to fees and charges of engineers,
architects, attorneys and other professionals) made necessary thereby, and shall hold Owner
harmless for same.
23.2 If the Project Manager considers it necessary or advisable that covered Work be observed
by Design Professional or inspected or tested by others and such Work is not otherwise required to
be inspected or tested, Contractor, at Project Manager's request, shall uncover, expose or otherwise
make available for observation, inspection or tests as Project Manager may require, that portion of
the Work in question, furnishing all necessary labor, material and equipment. If it is found that such
Work is defective, Contractor shall bear all direct, indirect and consequential costs of such
uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction
(including, but not limited to, fees and charges of engineers, architects, attorneys and other
professionals), and Owner shall be entitled to an appropriate decrease in the Contract Amount. If,
however, such Work is not found to be defective, Contractor shall be allowed an increase in the
Contract Amount and/or an extension to the Contract Time, directly attributable to such uncovering,
exposure, observation, inspection, testing and reconstruction.
23.3 If any portion of the Work is defective, or if Contractor fails to supply sufficient skilled workers,
suitable materials or equipment or fails to finish or perform the Work in such a way that the completed
Work will conform to the Contract Documents, Project Manager may order Contractor to stop the
Work, or any portion thereof, until the cause for such order has been eliminated. The right of Project
Manager to stop the Work shall be exercised, if at all, solely for Owner's benefit and nothing herein
shall be construed as obligating the Project Manager to exercise this right for the benefit of Design
Engineer, Contractor, or any other person.
23.4 Should the Owner determine, at its sole opinion, it is in the Owner's best interest to accept
defective Work, the Owner may do so. Contractor shall bear all direct, indirect and consequential
costs attributable to the Owner's evaluation of and determination to accept defective Work. If such
determination is rendered prior to final payment, a Change Order shall be executed evidencing such
acceptance of such defective Work, incorporating the necessary revisions in the Contract
Documents and reflecting an appropriate decrease in the Contract Amount. If the Owner accepts
such defective Work after final payment, Contractor shall promptly pay Owner an appropriate amount
to adequately compensate Owner for its acceptance of the defective Work.
23.5 If Contractor fails, within a reasonable time after the written notice from Project Manager, to
correct defective Work or to remove and replace rejected defective Work as required by Project
Manager or Owner, or if Contractor fails to perform the Work in accordance with the Contract
Documents, or if Contractor fails to comply with any of the provisions of the Contract Documents,
Owner may, after seven (7) days written notice to Contractor, correct and remedy any such
deficiency. Provided, however, Owner shall not be required to give notice to Contractor in the event
of an emergency. To the extent necessary to complete corrective and remedial action, Owner may
exclude Contractor from any or all of the Project site, take possession of all or any part of the Work,
and suspend Contractor's services related thereto, take possession of Contractor's tools, appliances,
construction equipment and machinery at the Project site and incorporate in the Work all materials
and equipment stored at the Project site or for which Owner has paid Contractor but which are stored
elsewhere. Contractor shall allow Owner, Design Professional and their respective representatives,
agents, and employees such access to the Project site as may be necessary to enable Owner to
exercise the rights and remedies under this paragraph. All direct, indirect and consequential costs
of Owner in exercising such rights and remedies shall be charged against Contractor, and a Change
Order shall be issued, incorporating the necessary revisions to the Contract Documents, including
an appropriate decrease to the Contract Amount. Such direct, indirect and consequential costs shall
46
Construction Services Agreement: Revised 072118 (v6)
include, but not be limited to, fees and charges of engineers, architects, attorneys and other
professionals, all court costs and all costs of repair and replacement of work of others destroyed or
damaged by correction, removal or replacement of Contractor's defective Work. Contractor shall not
be allowed an extension of the Contract Time because of any delay in performance of the Work
attributable to the exercise by Owner of Owner's rights and remedies hereunder.
24. SUPERVISION AND SUPERINTENDENTS.
24.1 Contractor shall plan, organize, supervise, schedule, monitor, direct and control the Work
competently and efficiently, devoting such attention thereto and applying such skills and expertise
as may be necessary to perform the Work in accordance with the Contract Documents. Contractor
shall be responsible to see that the finished Work complies accurately with the Contract Documents.
Contractor shall keep on the Work at all times during its progress a competent resident
superintendent, who shall be subject to Owner's approval and not be replaced without prior written
notice to Project Manager except under extraordinary circumstances. The superintendent shall be
employed by the Contractor and be the Contractor's representative at the Project site and shall have
authority to act on behalf of Contractor. All communications given to the superintendent shall be as
binding as if given to the Contractor. Owner shall have the right to direct Contractor to remove and
replace its Project superintendent, with or without cause. Attached to the Agreement as Exhibit A-1
is a list identifying Contractor's Project Superintendent and all of Contractor's key personnel who are
assigned to the Project; such identified personnel shall not be removed without Owner's prior written
approval, and if so removed must be immediately replaced with a person acceptable to Owner.
24.2 Contractor shall have a competent superintendent on the project at all times whenever
contractor's work crews, or work crews of other parties authorized by the Project Manager are
engaged in any activity whatsoever associated with the Project. Should the Contractor fail to comply
with the above condition, the Project Manager shall, at his discretion, deduct from the Contractor's
monthly pay estimate, sufficient moneys to account for the Owner's loss of adequate project
supervision, not as a penalty, but as liquidated damages, separate from the liquidated damages
described in Section 5.6, for services not rendered.
25. PROTECTION OF WORK.
25.1 'Contractor shall immediately notify Project Manager and Design Professional. The Owner
or Design Professional shall re-establish the benchmarks and Contractor shall be liable for all costs
incurred by Owner associated therewith.
26. EMERGENCIES.
26.1 In the event of an emergency affecting the safety or protection of persons or the Work or
property at the Project site or adjacent thereto, Contractor, without special instruction or authorization
from Owner or Design Professional is obligated to act to prevent threatened damage, injury or loss.
Contractor shall give Project Manager written notice within forty-eight (48) hours after Contractor
knew or should have known of the occurrence of the emergency, if Contractor believes that any
significant changes in the Work or variations from the Contract Documents have been caused
thereby. If the Project Manager determines that a change in the Contract Documents is required
because of the action taken in response to an emergency, a Change Order shall be issued to
document the consequences of the changes or variations. If Contractor fails to provide the forty-eight
(48) hour written notice noted above, the Contractor shall be deemed to have waived any right it
otherwise may have had to seek an adjustment to the Contract Amount or an extension to the
Contract Time.
47
Construction Services Agreement: Revised 072118 (v6)
27. USE OF PREMISES.
27.1 Contractor shall maintain all construction equipment, the storage of materials and equipment
and the operations of workers to the Project site and land and areas identified in and permitted by
the Contract Documents and other lands and areas permitted by law, rights of way, permits and
easements, and shall not unreasonably encumber the Project site with construction equipment or
other material or equipment. Contractor shall assume full responsibility for any damage to any such
land or area, or to the owner or occupant thereof, or any land or areas contiguous thereto, resulting
from the performance of the Work.
28. SAFETY.
28.1 Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Contractor shall take all necessary
precautions for the safety of, and shall provide the necessary protection to prevent damage, injury
or loss to:
28.1.1 All employees on or about the project site and other persons and/or organizations
who may be affected thereby;
28.1.2 All the Work and materials and equipment to be incorporated therein, whether in
storage on or off the Project site; and
28.1.3 Other property on Project site or adjacent thereto, including trees, shrubs, walks,
pavements, roadways, structures, utilities and any underground structures or improvements not
designated for removal, relocation or replacement in the Contract Documents.
28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and regulations of
any public body having jurisdiction for the safety of persons or property or to protect them from
damage, injury or loss. Contractor shall erect and maintain all necessary safeguards for such safety
and protection. Contractor shall notify owners of adjacent property and of underground structures
and improvements and utility owners when prosecution of the Work may affect them, and shall
cooperate with them in the protection, removal, relocation or replacement of their property.
Contractor's duties and responsibilities for the safety and protection of the Work shall continue until
such time as the Work is completed and final acceptance of same by Owner has occurred.
All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device
Coordination and Arc Flash Studies where relevant as determined by the engineer.
All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE
Protective labels.
28.3. Contractor shall designate a responsible representative located on a full time basis at the
Project site whose duty shall be the prevention of accidents. This person shall be Contractor's
superintendent unless otherwise designated in writing by Contractor to Owner.
28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner property. All
employees of Contractor, as well as those of all subcontractors and those of any other person or
entity for whom Contractor is legally liable (collectively referred to herein as "Employees"), shall not
possess or be under the influence of any such substances while on any Owner property. Further,
48
Construction Services Agreement: Revised 072118 (v6)
Employees shall not bring on to any Owner property any gun, rifle or other firearm, or explosives of
any kind.
28.5 Contractor acknowledges that the Work may be progressing on a Project site which is located
upon or adjacent to an existing Owner facility. In such event, Contractor shall comply with the
following:
28.5.1 All Owner facilities are smoke free. Smoking is strictly prohibited;
28.5.2 All Employees shall be provided an identification badge by Contractor. Such
identification badge must be prominently displayed on the outside of the Employees' clothing at all
times. All Employees working at the Project site must log in and out with the Contractor each day;
28.5.3 Contractor shall strictly limit its operations to the designated work areas and
shall not permit any Employees to enter any other portions of Owner's property without Owner's
expressed prior written consent;
28.5.4 All Employees are prohibited from distributing any papers or other materials
upon Owner's property, and are strictly prohibited from using any of Owner's telephones or other
office equipment;
28.5.5 All Employees shall at all times comply with the OSHA regulations with respect
to dress and conduct at the Project site. Further, all Employees shall comply with the dress, conduct
and facility regulations issued by Owner's officials onsite, as said regulations may be changed from
time to time;
28.5.6 All Employees shall enter and leave Owner's facilities only through the ingress
and egress points identified in the site utilization plan approved by Owner or as otherwise designated,
from time to time, by Owner in writing;
28.5.7 When requested, Contractor shall cooperate with any ongoing Owner
investigation involving personal injury, economic loss or damage to Owner's facilities or personal
property therein;
28.5.8 The Employees may not solicit, distribute or sell products while on Owner's
property. Friends, family members or other visitors of the Employees are not permitted on Owner's
property; and
28.5.9 At all times, Contractor shall adhere to Owner's safety and security
regulations, and shall comply with all security requirements at Owner's facilities, as said regulations
and requirements may be modified or changed by Owner from time to time.
29. PROJECT MEETINGS.
Prior to the commencement of Work, the Contractor shall attend a pre -construction conference with
the Project Manager, Design Professional and others as appropriate to discuss the Progress
Schedule, procedures for handling shop drawings and other submittals, and for processing
Applications for Payment, and to establish a working understanding among the parties as to the
Work. During the prosecution of the Work, the Contractor shall attend any and all meetings convened
by the Project Manager with respect to the Project, when directed to do so by Project Manager or
49
Construction Services Agreement. Revised 072118 (v6)
Design Professional. The Contractor shall have its subcontractors and suppliers attend all such
meetings (including the pre -construction conference) as may be directed by the Project Manager.
30. VENDOR PERFORMANCE EVALUATION.
Owner has implemented a Vendor Performance Evaluation System for all contracts awarded in
excess of $25,000. To this end, vendors will be evaluated on their performance upon
completion/termination of this Agreement.
31. MAINTENANCE OF TRAFFIC POLICY.
For all projects that are conducted within a Collier County Right -of -Way, the Contractor shall provide
and erect Traffic Control Devices as prescribed in the current edition of the Manual On Uniform
Traffic Control Devices (MUTCD), where applicable on local roadways and as prescribed in the
Florida Department of Transportation's Design Standards (DS), where applicable on state roadways.
These projects shall also comply with Collier County's Maintenance of Traffic Policy, #5807,
incorporated herein by reference. Copies are available through Risk Management and/or
Procurement Services Division, and is available on-line at colliergov.net/purchasing.
The Contractor will be responsible for obtaining copies of all required manuals, MUTCD, FDOT
Roadway & Traffic Design Standards Indexes, or other related documents, so to become familiar
with their requirements. Strict adherence to the requirements of the Maintenance of Traffic ("MOT")
policy will be enforced under this Contract.
All costs associated with the Maintenance of Traffic shall be included on the line item on the bid
page. If MOT is required, MOT is to be provided within ten (10) days of receipt of Notice of Award.
32. SALES TAX SAVINGS AND DIRECT PURCHASE.
32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated with the
Work or portions thereof, which are applicable during the performance of the Work. No markup shall
be applied to sales tax. Additionally, as directed by Owner and at no additional cost to Owner,
Contractor shall comply with and fully implement the sales tax savings program with respect to the
Work, as set forth in section 32.2 below:
32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from sales tax
and may wish to generate sales tax savings for the Project, Owner reserves the right to make direct
purchases of various construction materials and equipment included in the Work ("Direct Purchase").
Contractor shall prepare purchase orders to vendors selected by Contractor, for execution by Owner,
on forms provided by Owner. Contractor shall allow two weeks for execution of all such purchase
orders by Owner. Contractor represents and warrants that it will use its best efforts to cooperate
with Owner in implementing this sales tax savings program in order to maximize cost savings for the
Project. Adjustments to the Contract Amount will be made by appropriate Change Orders for the
amounts of each Owner Direct Purchase, plus the saved sales taxes. A Change Order shall be
processed promptly after each Direct Purchase, or group of similar or related Direct Purchases,
unless otherwise mutually agreed upon between Owner and Contractor. With respect to all Direct
Purchases by Owner, Contractor shall remain responsible for coordinating, ordering, inspecting,
accepting delivery, storing, handling, installing, warranting and quality control for all Direct
Purchases. Notwithstanding anything herein to the contrary, Contractor expressly acknowledges
and agrees that all Direct Purchases shall be included within and covered by Contractor's warranty
to Owner to the same extent as all other warranties provided by Contractor pursuant to the terms of
50
Construction Services Agreement: Revised 072118 (v6)
(;A()
the Contract Documents. In the event Owner makes a demand against Contractor with respect to
any Direct Purchase and Contractor wishes to make claim against the manufacturer or supplier of
such Direct Purchase, upon request from Contractor Owner shall assign to Contractor any and all
warranties and Contract rights Owner may have from any manufacturer or supplier of any such Direct
Purchase by Owner.
32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for sale tax
under Chapter 212, Florida Statutes, and for its responsibilities for Federal excise taxes.
33. SUBCONTRACTS.
33.1 Contractor shall review the design and shall determine how it desires to divide the sequence
of construction activities. Contractor will determine the breakdown and composition of bid packages
for award of subcontracts, based on the current Project Milestone Schedule, and shall supply a copy
of that breakdown and composition to Owner and Design Professional for their review and approval
prior to submitting its first Application for Payment. Contractor shall take into consideration such
factors as natural and practical lines of severability, sequencing effectiveness, access and availability
constraints, total time for completion, construction market conditions, availability of labor and
materials, community relations and any other factors pertinent to saving time and costs.
33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying or providing
any portion of the Work pursuant to a contract with Contractor. Contractor shall be solely responsible
for and have control over the Subcontractors. Contractor shall negotiate all Change Orders, Work
Directive Changes, Field Orders and Requests for Proposal, with all affected Subcontractors and
shall review the costs of those proposals and advise Owner and Design Professional of their validity
and reasonableness, acting in Owner's best interest, prior to requesting approval of any Change
Order from Owner. All Subcontractors performing any portion of the Work on this Project must be
"qualified" as defined in Collier County Ordinance 2013-69, meaning a person or entity that has the
capability in all respects to perform fully the Agreement requirements with respect to its portion of
the Work and has the integrity and reliability to assure good faith performance.
33.3 In addition to those Subcontractors identified in Contractor's bid that were approved by
Owner, Contractor also shall identify any other Subcontractors, including their addresses, licensing
information and phone numbers, it intends to utilize for the Project prior to entering into any
subcontract or purchase order and prior to the Subcontractor commencing any work on the Project.
The list identifying each Subcontractor cannot be modified, changed, or amended without prior
written approval from Owner. Any and all Subcontractor work to be self -performed by Contractor
must be approved in writing by Owner in its sole discretion prior to commencement of such work.
Contractor shall continuously update that Subcontractor list, so that it remains current and accurate
throughout the entire performance of the Work.
33.4 Contractor shall not enter into a subcontract or purchase order with any Subcontractor, if
Owner reasonably objects to that Subcontractor. Contractor shall not be required to contract with
anyone it reasonably objects to. Contractor shall keep on file a copy of the license for every
Subcontractor and sub -subcontractor performing any portion of the Work, as well as maintain a log
of all such licenses. All subcontracts and purchase orders between Contractor and its Subcontractors
shall be in writing and are subject to Owner's approval. Further, unless expressly waived in writing
by Owner, all subcontracts and purchase orders shall (1) require each Subcontractor to be bound to
Contractor to the same extent Contractor is bound to Owner by the terms of the Contract Documents,
as those terms may apply to the portion of the Work to be performed by the Subcontractor, (2) provide
for the assignment of the subcontract or purchase order from Contractor to Owner at the election of
51
Construction Services Agreement: Revised 072118 (v6)
9
Owner upon termination of Contractor, (3) provide that Owner will be an additional indemnified party
of the subcontract or purchase order, (4) provide that Owner, Collier County Government, will be an
additional insured on all liability insurance policies required to be provided by the Subcontractor
except workman's compensation and business automobile policies, (5) assign all warranties directly
to Owner, and (6) identify Owner as an intended third -party beneficiary of the subcontract or
purchase order. Contractor shall make available to each proposed Subcontractor, prior to the
execution of the subcontract, copies of the Contract Documents to which the Subcontractor will be
bound. Each Subcontractor shall similarly make copies of such documents available to its sub -
subcontractors.
33.5 Each Subcontractor performing work at the Project Site must agree to provide field (on -site)
supervision through a named superintendent for each trade (e.g., general concrete forming and
placement, masonry, mechanical, plumbing, electrical and roofing) included in its subcontract or
purchase order. In addition, the Subcontractor shall assign and name a qualified employee for
scheduling direction for its portion of the Work. The supervisory employees of the Subcontractor
(including field superintendent, foreman and schedulers at all levels) must have been employed in a
supervisory (leadership) capacity of substantially equivalent level on a similar project for at least two
years within the last five years. The Subcontractor shall include a resume of experience for each
employee identified by it to supervise and schedule its work.
33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and purchase orders
shall provide:
33.6.1 That the Subcontractor's exclusive remedy for delays in the performance of the
subcontract or purchase order caused by events beyond its control, including delays claimed to be
caused by Owner or Design Professional or attributable to Owner or Design Professional and
including claims based on breach of contract or negligence, shall be an extension of its contract time.
33.6.2 In the event of a change in the work, the Subcontractor's claim for adjustments in
the contract sum are limited exclusively to its actual costs for such changes plus no more than 10%
for overhead and profit.
33.6.3 The subcontract or purchase order, as applicable, shall require the Subcontractor
to expressly agree that the foregoing constitute its sole and exclusive remedies for delays and
changes in the Work and thus eliminate any other remedies for claim for increase in the contract
price, damages, losses or additional compensation. Further, Contractor shall require all
Subcontractors to similarly incorporate the terms of this Section 33.6 into their sub -subcontracts and
purchase orders.
33.6.4 Each subcontract and purchase order shall require that any claims by
Subcontractor for delay or additional cost must be submitted to Contractor within the time and in the
manner in which Contractor must submit such claims to Owner, and that failure to comply with such
conditions for giving notice and submitting claims shall result in the waiver of such claims.
34. CONSTRUCTION SERVICES.
34.1 Contractor shall maintain at the Project site, originals or copies of, on a current basis, all
Project files and records, including, but not limited to, the following administrative records:
34.1.1 Subcontracts and Purchase Orders
34.1.2 Subcontractor Licenses
52
Construction Services Agreement: Revised 072118 (v6)
34.1.3
Shop Drawing Submittal/Approval Logs
34.1.4
Equipment Purchase/Delivery Logs
34.1.5
Contract Drawings and Specifications with Addenda
34.1.6
Warranties and Guarantees
34.1.7
Cost Accounting Records
34.1.8
Labor Costs
34.1.9
Material Costs
34.1.10
Equipment Costs
34.1.11
Cost Proposal Request
34.1.12
Payment Request Records
34.1.13
Meeting Minutes
34.1.14
Cost -Estimates
34.1.15
Bulletin Quotations
34.1.16
Lab Test Reports
34.1.17
Insurance Certificates and Bonds
34.1.18
Contract Changes
34.1.19
Permits
34.1.20
Material Purchase Delivery Logs
34.1.21
Technical Standards
34.1.22
Design Handbooks
34.1.23
"As -Built" Marked Prints
34.1.24
Operating & Maintenance Instruction
34.1.25
Daily Progress Reports
34.1.26
Monthly Progress Reports
34.1.27
Correspondence Files
34.1.28
Transmittal Records
34.1.29
Inspection Reports
34.1.30
Punch Lists
34.1.31
PMIS Schedule and Updates
34.1.32
Suspense (Tickler) Files of Outstanding
Requirements
The Project files and records shall be available at all times to Owner and Design Professional or their
designees for reference, review or copying.
34.2 Contractor Presentations
At the discretion of the County, the Contractor may be required to provide a brief update on the
Project to the Collier County Board of County Commissioners, "Board", up to two (2) times per
contract term. Presentations shall be made in a properly advertised Public Meeting on a schedule
to be determined by the County Manager or his designee. Prior to the scheduled presentation date,
the Contractor shall meet with appropriate County staff to discuss the presentation requirements and
format. Presentations may include, but not be limited to, the following information: Original contract
amount, project schedule, project completion date and any changes to the aforementioned since
Notice to Proceed was issued.
35. SECURITY.
The Contractor is required to comply with County Ordinance 2004-52, as amended. Background
checks are valid for five (5) years and the Contractor shall be responsible for all associated costs. If
required, Contractor shall be responsible for the costs of providing background checks by the Collier
County Facilities Management Division for all employees that shall provide services to the County
53
Construction Services Agreement: Revised 072118 (v6)
0
under this Agreement. This may include, but not be limited to, checking federal, state and local law
enforcement records, including a state and FBI fingerprint check, credit reports, education, residence
and employment verifications and other related records. Contractor shall be required to maintain
records on each employee and make them available to the County for at least four (4) years.
All of Contractor's employees and subcontractors must wear Collier County Government
Identification badges at all times while performing services on County facilities and properties.
Contractor ID badges are valid for one (1) year from the date of issuance and can be renewed each
year at no cost to the Contractor during the time period in which their background check is valid, as
discussed below. All technicians shall have on their shirts the name of the contractor's business.
The Contractor shall immediately notify the Collier County Facilities Management Division via e-mail
(DL-FMOPS(a-�colliergov.net) whenever an employee assigned to Collier County separates from their
employment. This notification is critical to ensure the continued security of Collier County facilities
and systems. Failure to notify within four (4) hours of separation may result in a deduction of $500
per incident.
CCSO requires separate fingerprinting prior to work being performed in any of their locations. This
will be coordinated upon award of the contract. If there are additional fees for this process, the
Contractor is responsible for all costs.
36. VENUE.
Any suit or action brought by either party to this Agreement against the other party relating to or
arising out of this Agreement must be brought in the appropriate federal or state courts in Collier
County, Florida, which courts have sole and exclusive jurisdiction on all such matters.
37. VALUE ENGINEERING.
All projects with an estimated cost of $10 million or more shall be reviewed for consideration of a
Value Engineering (VE) study conducted during project development. A "project" shall be defined as
the collective contracts, which may include but not be limited to: design, construction, and
construction, engineering and inspection (CEI) services. Additionally, any project with an estimated
construction value of $2 million or more may be reviewed for VE at the discretion of the County.
38. ABOVEGROUND/UNDERGROUND TANKS.
38.1 The contractor shall ensure compliance with all NFPA regulations: specifically 110 & 30/30A;
FDEP chapter 62 regulations: specifically 761, 762, 777, and 780; 376 & 403 Florida Statutes; and
STI, UL, PEI, ASME, NACE, NLPA, NIST & API referenced standards pertaining to the storage of
hazardous materials and petroleum products.
38.2 The contractor shall notify the Solid & Hazardous Waste Management Department (SHWMD)
prior to the installation, removal, or maintenance of any storage tank, including day tanks for
generators, storing / will be storing petroleum products or hazardous materials. The contractor shall
provide a 10 day and 48-hour notice to SHWMD 239-252-2508 prior to commencement.
The contractor shall provide the plans pertaining to the storage tank systems containing hazardous
materials / petroleum products to the SHWMD prior to plans submittal to a permitting entity and then
SHWMD must approve the plans prior to contractor's submittal for permitting.
54
Construction Services Agreement: Revised 072118 (v6)
{' 0
39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES.
The Contractor shall employ people to work on Owner's projects who are neat, clean, well-groomed
and courteous. Subject to the Americans with Disabilities Act, Contractor shall supply competent
employees who are physically capable of performing their employment duties. The Owner may
require the Contractor to remove an employee it deems careless, incompetent, insubordinate or
otherwise objectionable and whose continued employment on Owner's projects is not in the best
interest of the County.
40. DISPUTE RESOLUTION.
Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes
between the parties, the parties shall make a good faith effort to resolve any such disputes by
negotiation. The negotiation shall be attended by representatives of Contractor with full decision -
making authority and by Owner's staff person who would make the presentation of any settlement
reached during negotiations to Owner for approval. Failing resolution, and prior to the
commencement of depositions in any litigation between the parties arising out of this Agreement, the
parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court
Mediator certified by the State of Florida. The mediation shall be attended by representatives of
Contractor with full decision -making authority and by Owner's staff person or designee who would
make the presentation of any settlement reached at mediation to Owner's Board for approval.
Should either party fail to submit to mediation as required hereunder, the other party may obtain a
court order requiring mediation under Section 44.102, Fla. Stat.
Any suit or action brought by either party to this Agreement against the other party relating to or
arising out of this Agreement must be brought in the appropriate federal or state courts in Collier
County, Florida, which courts have sole and exclusive jurisdiction on all such matters.
55
Construction Services Agreement: Revised 072118 (v6)
EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS
"N/A
56
Construction Services Agreement: Revised 072118 (v6)
0
A� �® CERTIFICATE OF LIABILITY INSURANCE
ATE (MM/DD/YYYY)
6/19/2020
r
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Five County Insurance Agency Inc
14120 Metropolis Ave
Fort Myers FL 33912
CONTACT
NAME: Certificate Department
PHONE FAX
N E:: 239-939-1400 A/C No): 239-939-3813
ADDRESS: certs@fivecountyinsurance.com
INSURER(S) AFFORDING COVERAGE
NAIC #
INSURER A: American Builders Insurance
11240
INSURED DECCO-1
DEC Contracting Group Inc
1560 Matthew Dr Unit B
INSURERB: National Builders Insurance
16632
INsuRERc: Old Dominion Insurance
40231
INSURER D :
Fort Myers FL 33907
INSURER E :
INSURER F :
CnVFRAGFS CERTIFICATE NUMBER:402645819 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR I
LTR
TYPE OF INSURANCE
ADDL
SUBR
POLICY NUMBER
POLICY EFF
MMIDD/YYYY
POLICY EXP
MM DD/YYYY
LIMITS
B
X
COMMERCIALGENERALLIABILITY
CLAIMS -MADE X OCCUR
Y
PKGO16751708
3/6/2020
3/6/2021
EACH OCCURRENCE
$1,000,000
DAMAGE TO RENTED
PREMISES Ea occurrence
$ 300,000
MED EXP (Any one person)
$ 10,000
PERSONAL & ADV INJURY
$ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PRO ❑ LOC
X JECT
OTHER:
GENERAL AGGREGATE
$ 2,000,000
PRODUCTS -COMP/OP AGG
$ 2,000,000
$
C
AUTOMOBILE LIABILITY
X ANY AUTO
OWNED SCHEDULED
AUTOS ONLY AUTOS
HIRED NON -OWNED
AUTOS ONLY AUTOS ONLY
B1 PO157N
5/8/2020
5/8/2021
COMBINED SINGLE LIMIT
Ea accident
$ 1,000,000
BODILY INJURY (Per person)
$
BODILY INJURY (Per accident)
$
PROPERTY DAMAGE
Per accident
$
A
X
UMBRELLALIAB
EXCESS LAB
X
OCCUR
CLAIMS -MADE
UMB018902305
3/6/2020
3/6/2021
EACH OCCURRENCE
$ 1,000,000
AGGREGATE
$ 1,000,000
DED RETENTION $
$
A
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y
ANYPROPRIETOR/PARTNER/EXECUTIVE ❑
OFFICER/M EMBER EXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
N / A
WCV016799205
3/6/2020
3/6/2021
X PER OTH-
STATUTE ER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
Certificate holder is named as an additional insured when required per written contractual agreement with respects to General Liability. Contract # 20-7747-ST
Immokalee Health Building HVAC & Roof Replacement
GtKI It -ILA It MULLJCK l+/11Yl,GLLMIIVIY
COLLIER COUNTY BOARD OF COUNTY
COMMISSIONERS
3295 TAMIAMI TRAIL EAST
NAPLES FL 34112
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED
REPRESENTATIVE
v C�
U 1988-2U15 ACUKD GUKPUKA I IUN. All rlgntS reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD