Backup Documents 07/14/2020 Item #16A24ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATUA 6 A 24
Print on pink paper. Vt:tkit to of iginaI documew. fhe completed routing .if If and original document. are I be tornarded to the ( ouuts .ktilll'llev Uliicc
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines # 1 through #2 as appropriate for additional signatures, dates, and/or information needed. If the document is already complete with the
exception of the Chairman's signature, draw a line through routine lines # 1 through #2- complete the checklist- and forward to the County Att„mev Off,
Route to Addressees (List in routing order)
Office
Initials
Date
1.
2.
3. County Attorney Office
County Attorney Office
CMG
7/14/20
4. BCC Office
Board of County
Commissioners
j9 to
'
5. Minutes and Records
Clerk of Court's Office
n _ ,20
4.0?0--_
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above may need to contact staff for additional or missing information.
Name of Primary Staff
Jessica Arencibia/GMD
239-252-8345
Contact / Department
Agenda Date Item was
07/14/2020
Agenda Item Number
16A24
Approved by the BCC
Type of Document
Work Order APTIM LGFR
Number of Original
1
Attached
Documents Attached
PO number or account
N/A
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark "N/A" in the Not Applicable column, whichever is
Yes
N/A (Not
appropriate.
(Initial)
Applicable)
1.
Does the document require the chairman's original signature STAMP OK
N/A
2.
Does the document need to be sent to another agency for additional signatures? If yes,
JA
provide the Contact Information(Name; Agency; Address; Phone on an attached sheet.
3.
Original document has been signed/initialed for legal sufficiency. (All documents to be
JA
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney.
4.
All handwritten strike -through and revisions have been initialed by the County Attorney's
JA
Office and all other parties except the BCC Chairman and the Clerk to the Board
5.
The Chairman's signature line date has been entered as the date of BCC approval of the
JA
document or the final negotiated contract date whichever is applicable.
6.
"Sign here" tabs are placed on the appropriate pages indicating where the Chairman's
JA
si nature and initials are required.
7.
In most cases (some contracts are an exception), the original document and this routing slip
JA
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8.
The document was approved by the BCC on 07/14/2020 and all changes made during
JA
N/A is not
the meeting have been incorporated in the attached document. The County
an option for
Attorne 's Office has reviewed the changes, if applicable.
this line.
9.
Initials of attorney verifying that the attached document is the version approved by the
N/A is not
BCC, all changes directed by the BCC have been made, and the document is ready for the
an option for
Chairman's signature.
this line.
I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05; Revised 11/30/12
I6A24
Ann P. Jennejohn
From: Ann P. Jennejohn
Sent: Tuesday, July 21, 2020 4:04 PM
To: 'Jessica.Arencibia@colliercountyfl.gov'
Subject: Item #16A24 (July 14, 2020 BCC Meeting)
Attachments: #18-7432-CZ WO (APTIM LGFR).pdf
Hi Jessica,
An executed copy of Item #16A24
from the July 1.4, 2020 BCC Meeting
is attached for your records.
Thank you.
Ann Jenne, jotin
13MR Senior Deputy Clerk
Clerk to the Value Adjustment Board
Office: 239-252-8406
Fax: 239-252-8408 (if applicable)
Ann.JeviKeiokpi@Co[tierClerk.com
Office of the Clerk of the Circuit Court
& Comptroller of Collier County
3299 Tamiami Trail, Suite *401
Naples, FL 341.12.-5324
www.CollierC(erk.com
i
16A24
WORK ORDER/PURCHASE ORDER
Contract 18-7432-CZ "Professional Services Library Coastal Engineering Category"
Contract Expiration Date: March 9, 2025
This Work Order is for professional Engineering Services for work known as:
Project Name: FDEP LGFR Analysis
Project No: 90065
The work is specified in the proposal dated May 21, 2020 which is attached hereto and made a part of
this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, Work
Order/Purchase Order # is assigned to: APTIM Environmental & Infrastructure, Inc.
Scope of Work: As detailed in the attached proposal and the following:
* Task l South Marco Beach LGFR Application
* Task 2 North County Beaches & Doctors Pass LGFR Application
* Task 3 Wiggins Pass LGFR Application
* Task 4 Sub -Contractor
* Schedule of Work: Complete work within 180 days from the date of the Notice to Proceed which
is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond
the expiration date of Agreement # 18-7432-CZ will survive and remain subject to the terms and
conditions of that Agreement until the completion or termination of this Work Order.
Compensation: In accordance with the Agreement referenced above, the County will compensate the
Firm in accordance with following method(s): []Negotiated Lump Sum (NLS) NLump Sum Plus
Reimbursable Costs (LS+RC) ®Time & Material (T&M) (established hourly rate — Schedule B) ❑
Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the
attached proposal.
Task 1— South Marco Beach LGFR Application
Task 2 — North County Beaches & Doctors Pass LGFR Application
Task 3 — Wiggins Pass LGFR Application
Task 4 - Sub -Contractor
Total Project Fees:
PREPARED BY:
Andy Miller, rinci al Project Manager
$4,945.00 T&M
$7,770.00 T&M
$4,945.00 T&M
$5,053.99 LS
$22,713.99
4i — /— ?,-b
16A24
Date
APPROVED BY: � a��As►�tJ���l- J ZU
Amy Nate son, Department Director Date
APPROVED BY:
S
Thaddeus Cohen, Department Head Date
By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby disclose
to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned intt
activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on v
the Firm has a potential conflict have been fully disclosed.
Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any
or potential conflict of interest that arises during the Work Order and/or project duration.
ACCEPTED BY: APTIM l>rtvu m cnMI & hifiastructurc, Inc.
o)
lvffre .-Anrhrws 1 ate
16A24
IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or
agent, have executed this Work Order on the date and year first written below.
ATTEST, P.7,0 0
borkofCourts
Diital:�
',i SEAL).
Attest*i6 Chairman
signature only:
First Witness°
TType/print witness nameT
Second Witness
TType/print witness nameT
4M�F,m a ality:
Assistant County Attorney
C A I IL/ujY1 I V L ��iCl►"`
Print Name
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
By:
Chairman
Name of Firm
By:
Signature
TType/print signature and tide%
Item #
Agenda L-A
Date
Redd
Page 3 of 3
,OA
APTIM
May 21, 2020
Gary McAlpin, Director
Collier County Coastal Zone Management
2685 S. Horseshoe Drive
Naples, FL 34104
16A24
APTIM
2481 NW Boca Raton Blvd.
Boca Raton, FL 33431
Tel: +1 561 391 8102
www.aptim.corn
Re: 2021-2022 Local Government Funding Request (LGFR) Preparation (Contract No. 184432)
Dear Gary:
This letter is in response to Collier County's (County) request for a proposal for Aptim Environmental &
Infrastructure, LLC (APTIM) and Coastal Protection Engineering LLC (CPE), herein referenced as the
APTIM Team, to support the County with submittal of the 2021-2022 Local Government Funding
Requests (LGFR). The APTIM Team will assist the County with preparation of the 2021-2022 LGFR for
Collier County's: South Marco Island Beach Renourishment Project, North County Beach Renourishment
program including Doctors Pass, and the County's inlet project at Wiggins Pass.
Included as Exhibits are; the Scope of Work (Exhibit A), Fee Proposal (Exhibit B), sub -consultant proposal
(Exhibit C) and the Rates Schedule (Exhibit D). The APTIM Team proposes to provide these services on
a time and materials basis not -to -exceed $22,713.99 under the terms and conditions of the existing
Contract No. 18-7432-CZ Amendment #1 dated May 7, 2020. Sub -consultant will provide services on a
lump sum basis. The APTIM Team will conduct this work collaboratively, and in line with previous Collier
County roles and responsibilities, resulting in an efficient work effort without duplication of efforts. Barring
any unforeseen circumstances, all work will be completed within 180 days of receiving the Notice to
Proceed.
Sincerely,
Holly Berckenhoff, EIT
Coastal EIT
Aptim Environmental & Infrastructure, LLC
cc Tara Brenner, PG, PE, CPE
Erica E. Carr -Betts, El, APTIM
Beau Suthard, PG, APTIM
Authdnzed orporate Signature
Jeffrey Andrews
Name
Director of Operations
Title
16A24.
APTIM
Exhibit A
Scope of Work
16A2
2021-2022 Local Government Funding Requests (LGFR)
Collier County, Florida
Scope of Work
Contract Number 15-6382
Introduction
In order to distribute state funds for shore protection and inlet management projects, the Florida
Department of Environmental Protection (FDEP) requests that local sponsors submit an annual
Local Government Funding Request (LGFR) for their projects. The FDEP is in the process of
modifying the LGFR application and ranking system, which is expected to be implemented with
the submittal of the 2021-2022 LGFR. This scope of work details the tasks required to assist the
County with preparing and submitting the 2021-2022 LGFRs to the FDEP, and responding to both
the FDEP's Application Review and Project Assessment for Collier County's South Marco and
North County Beach Renourishment projects, and inlet maintenance projects at Doctors Pass,
and Wiggins Pass.
It is anticipated that the FDEP will revise their ranking methodology document based upon
changes to the LGFR. This new document, as well as participation in the LGFR workshops, will
serve as a guide when formulating responses on behalf of the County. Members of the APTIM
Team have been closely following the LGFR changes and will prepare Collier County's
applications collaboratively in order to maximize the County's scoring opportunity. Once a draft of
the LGFR application has been completed, a copy will be provided to Collier County for review
and comment prior to submittal to the FDEP.
Following application submission, the FDEP will review the applications in detail and provide initial
project rankings and initial project assessments. The APTIM Team will perform a review of the
initial project assessment on behalf of Collier County and, if warranted, provide the County with a
draft letter to the FDEP identifying the areas within the applications that may provide additional
points to the County.
11 South Marco Beach LGFR Application
The APTIM Team will assist the County with preparation of the 2021-2022 LGFR for Collier
County's South Marco Island Renourishment Project. Building upon past LGFR applications, the
APTIM Team will update the application response to account for the latest application format,
rating guidelines and rules, and current project cost information. All the elements of the projects
as they apply to the 626-36 Rule and the LGFR application and guidance document will be
evaluated in order to optimize FDEP ranking and cost sharing opportunities where practical. This
will include research to identify qualifying public lodging establishments and updated County
zoning.
2. North i,.;unty Beaches s Dut-turs Pass L6R Application•
The APTIM Team will assist the County with preparation of the 2021-2022 LGFR for Collier
County's North County beaches (Vanderbilt, Park Shore, and Naples Beach) and Doctors Pass
projects. Building upon past LGFR applications, the APTIM Team will update the application
response to account for the latest application format, rating guidelines and rules, and current
project cost information. All the elements of the projects as they apply to the 6213-36 Rule and the
LGFR application and guidance document will be evaluated in order to optimize FDEP ranking
1 A24
and cost sharing opportunities where practical. This will include research to identify qualifying
public lodging establishments and updated County zoning.
Wiggins Pass LGFR Applicatio:
The APTIM Team will assist the County with preparation of the 2021-2022 LGFR for Collier
County's Wiggins Pass inlet maintenance project and will determine if Collier Creek will qualify
for future funding within the modified LGFR application process. All the elements of the projects
as they apply to the 626-36 Rule, LGFR application, and guidance document will be evaluated in
order to increase FDEP ranking and cost sharing opportunities where practical. Additionally, maps
will be updated and the FDEP's application response will be reviewed and, if required, a response
to the draft assessment will be completed.
Sub -Contractor
CPE will provide professional services in support of Tasks 1-3.
16A24
APTIM
Exhibit B
Fee Proposal
16A2
EXHIBIT 8
ESTIMATED FEE PROPOSAL FOR
2021-2022 LOCAL GOVERNMENT FUNDING REQUEST (LGFR) PREPARATION
COLLIER COUNTY, Contract No. 15-7432.CZ
May 21. 2020
Talc Item
cad
Salvor PmJaci
Manapar
~a""a'
Oq Soavdld
Ckdcau
AMYnh4ratlm
Sub -Contractor
(CPE LLC)
Mars
llwrs
Hour
Cod
1 South Marco Beach LGFR AppBcrtbn (T&M)
$4,945.00 1
3
16
8
10
2
2 North County Baachn a Doctors Pa" LGFR AppBcobw (TSM)
ST.770A0
6
20
13
16
2
3 Wlppins Pass LGFR App9catlon (TW
— $4,946.00 V
3
16
—_._. 8
10
2
4 SubCon -- \ '(. (Ls)
$6.053.99 V
4.813.32
Total Hours -
14
52 ✓
29 /
36 J
6 ✓
$4.813.32 /
Rate a
$203
$730
$120 /
$115
S73 /
1.05
Cost=
$2.842
$6,760✓
$3.480✓
$4,140 ✓
$436 /
S5,053.99
/
TIME 3 MATERIALS TOTAL
LUMP TOTAL
$17,660.00
SUM
S6,063.99
TOTAL
$22 713.99 ✓
raa.rr�w.r..wa�.a. t.aa.rfeasOoaflDtotlr.-rrtf� iararyars-c.s. iofa me-n-coat
,> APTIM
Exhibit C
Sub-Consukant Proposal
16A24
C OlilFl Z11
P1oiFcno■
Eamume
April 20, 2020
Revised May 21, 2020
Holly Berckenhoff
Coastal Engineer
Aptim Environmental & Infrastructure, LLC
Submitted via email to ily.Berckenhoff@aptir
COASTAL PROTECTION ENGINEERING
5301 N. FEDERAL Hwy, SUITE 335
BOLA RATON, FL 33487
561-565-5100
Re: Proposal to Assist with Collier Local Government Funding Request Applications
Dear Holly
This proposal is in response to Aptim Environmental & Infrastructure's (APTIM) request for Coastal
Protection Engineering LLC (CPE) to assist APTIM with review of Collier County's three (3) Local
Government Funding Request (LGFR) applications. We propose to provide professional services as
Principal, Project Manager, and Senior Marine Biologist to participate in phone calls with APTIM, the
County, or Florida Department of Environmental Protection (FDEP) related to preparation of this year's
LGFR applications. CPE will also review draft applications prepared by APTIM for South Marco, Collier's
North County Beach Renourishment, and Wiggins Pass prior to submittal.
Our fee proposal to provide these services is $4,813.32 as detailed in the attached and will be billed on a
lumpsum basis. All work will be performed in accordance with the existing Master Service Agreement
between APTIM and CPE executed July 24, 2019. This cost is limited to a projection of hours and
estimate of effort based on information known at this time. Should the project or client require
additional services beyond these estimated hours, we will discuss adjustments with APTIM as deemed
appropriate.
If you have any questions, please feel free to contact me directly at 631-896-9137.
Sincerely,
rara SrfVLKer
Tara Brenner, PG, PE
Senior Coastal Engineer
Coastal Protection Engineering LLC
Mobile: 631-896-9137
tbrenner@coastaIprotectioneng.com
16A24
Cuue
Attachment 1
COASTAL PROTECTION ENGINEERING
Page 12
1�A24
. YaY. .
Quote No. 2020034 COAST,
PIITICTl11
Eosivifvivs
Submitted to: Provided by:
APTIM Environrrwntal & Infrastructure LLC Coastal Protection Engineering LLC
2481 NW Boca Raton Blvd, Boca Raton, 5301 N. Federal Hwy, Suite #335
Florida, 33431 Boca Raton, FL, 33487
Client Contact: Project manager.
Sherifa Dindial Tara Brenner
sherifa.dindial@aptim.com Phone: +16318969137
E-mail: tbrenner@ooastalprotectioneng.com
Project Name:
Date: 05/212020
Collier - Principal Engineer (TP) 4 220.00
880.00
Collier - Project Manager (TB) 24 152.38
3,657.12
Collier - Senior Marine Biologist (LF) 2 138.10
276.20
Subtotal:
4,813.32
Tax:
0.00
Total (USD):
4,813.32
� 1.
t 2- LAD.
-�1�53 dal
ibA24
,> APTIM
Exhibit D
Rate Schedule
1 6AL4
DocuSign Envelope ID: 80882885-B4714CCC-BC63-021 FDAD6CEBB
SCHEDULE B-ATTACHMENT 1
RATE SCHEDULE
- ---- —Tide
-- - - Principal
Senior Project Manager.
Project Manager
Senior Engineer
- ---Engineer
_Senior Ins_ tor
_Inspector
Senior Planner
Plattner
Heu!t Rate
--- - - -
-
5160
-- $177
5130
_ 5126
$150 -
$120
Senior Desi
$140
Designer
- --
-
- - $105 ---
r
Environmental Specialist
_
Sly _--
_ Senior Environmental Specialist
5167
$115
----ScientiWGeologist
— Senior SciexttisVGeologist
-- - -
5153
Biologist/Hydrogeolowist
5120
-- --
- - - -Marine
Senior Marine Biol- i"ydrogeologist
5145
- -
—Senior GIS Specialist
—j
5155
GIS Specialist
_ _
Sills
ClericaUAdministative
S73
Senior Technician
$1e3
Technician --
—
- S83
Surveyor and Mapper
5125
CADD Technician
--__--Survey
Crew - 2 man
5145
St !q Crew _3 man
sloe
Survey Crew - 4 man
5215
- —
- Senior Architect —
$160
Architect
$125
The above hourly rates are applicable to Time and Materials task(s) only. The above list may not be all
inclusive. Hourly rates for additional categories required to provide particular project services shall be
mutually agreed upon by the County and firm, in writing, on a project by project basis, as needed, and will
be set forth in the Work Order agreed upon by the parties.
® Grunt Funded: The above rates are for purposes of providing estimate(s), as required by the grantor
agency.
Page 2 of 3
First Amendment to Agreement P 18-7432-CZ
Apdm Environmental dt tnfrashuctum LLC
16A2
OvaresRaquel
From: ColonEvelyn
Sent: Tuesday, May 05, 2020 2:00 PM
To: MeyerHeather
Cc: HerreraSandra; MillerAndrew; OvaresRaquel; JohnsonChristopher, ZimmermanSue;
DoriaPriscilla; BigelowCatherine; JonesRandall
Subject: RE: Contract 18-7432-CZ
Attachments: 18-7432-CZ Hourly Rate Schedule - CC.xlsx
Heather,
The rates in the CZ contract are incorrect, Taylor Engineering is correct. Our Contract's team is currently working on an
Amendment to correct the rates and we are hoping to get this fixed as quickly as possible. I have discussed this with
staff here internally and we have agreed that you could go ahead and use the rates attached to this email for your work
order. The Amendment should be fully executed by the time your first invoice is submitted. I have copied both the
Contract's team and Operations so they are both aware of how you will be proceeding.
Thank you,
Evelyn Colon
Procurement Manager
Collier County Procurement Services Division
New Address:
3295 Tamiami Trail East, Bldg C-2
Naples, Florida 34112
email: _v - ',)coiliercriuntvfi.gov
Tel: (239) 252-2667
Fax: (239)252-2810
Collier County Procurement Services is pleased to announce, it has partnered with BidSync to
provide Free web -based Bidding services to its vendors, suppliers and contractors.
We are now 'live on the new bidding platform.
Register today at
For Registration Assistance, please contact BidSync customer service at
800-990-9339 Or email: w�portiG��s-n _wry
From: MeyerHeather <Heather.Meyer@col liercountyfl.gov>
Sent: Tuesday, May 05, 2020 10:04 AM
To: ColonEvelyn <Evelyn.Colon@colliercountyfl.gov>
Cc: HerreraSandra <Sandra.Herrera @colliercountyfl.gov>; MillerAndrew <Andrew.Miller@colliercountyfl.gov>;
OvaresRaquel <Raquel.Ovares@colliercountyfl.gov>; JohnsonChristopher <Christopher.Johnson@colliercountyfl.gov>
Subject: Contract 18-7432-CZ
Good morning Evelyn,
I have a work order for Taylor Eng under contract 18-7432-CZ, however the vendor's proposal has different rates than
the rate sheet attached to the Contract. I was told that the contract rate sheet is incorrect and that the vendor has
quoted at the correct rates, however I have no way of verifying this. Coastal Zone is under a time constraint to get this
work started. How can I get a PO approved when the rates differ from the Board approved contract?
Thank you,
16A24
Heather Meyer
Management/Budget Analyst
Co jer County
Growth Marvigeiment Cepaftnent
Operations Support Division 1
2885 South Horseshoe Drive I Naples, FL 34104 1
Phone: 239.252.5765 1 -feather MeyeLq_rolli rc ntvtl.aov_ I
Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a
public records request, do not send electronic mail to this entity. Instead. contact this office by telephone or in writing.
18-7432-CZ 16 A 2 4
Hourly Rate Schedule
Principal
$231
Senior Project Manager
$203
Project Manager
$160
Senior Engineer
$177
Engineer
$130
Senior Inspector
$126
Inspector
$93
Senior Planner
$150
Planner
$120
Senior Designer
$140
Designer
$105
Environmental Specialist
$120
Senior Environmental Specialist
$167
Scientist/Geologist
$115
Senior Scientist/Geologist
$153
Marine Biologist/Hydrogeologist
$120
Senior Marine
Biologist/Hydrogeologist
$145
Senior GIS Specialist
$155
GIS S ecialist
$115
Clerical/Administrative
$73
SeniorTechnician
$103
Technician
S83
Surveyor and Map
$125
CADD Technician
$107
Survey Crew - 2 man
$145
Survey Crew - 3 man
$180
Survey Crew - 4 man
$215
Senior Architect
$160
Architect
$125