Loading...
Agenda 07/14/2020 Item #16C 8 (Work Order for RFQ #14-6213 w/Kyle Construction, Inc.)07/14/2020 EXECUTIVE SUMMARY Recommendation to approve a work order to Kyle Construction Inc., for the amount of $328,300.00 under Request for Quotation 14-6213 for Underground Utility Contracting Services for "Goodland and Bellaire Water Main Replacement" (Project Number 70174), and approve the necessary budget amendment. OBJECTIVE: To meet demand, stay in compliance, and serve customers efficiently by providing a compliant and reliable potable water system to Collier County Water-Sewer District (“CCWSD”) customers. CONSIDERATIONS: The proposed scope of work under Project Number 70174, “Goodland and Bellaire Water Main Replacement,” is consistent with the FY2020 CIP Budget approved by the Board on September 19, 2019. This project consists of replacing approxim ately 1,700 linear feet of 24” polyvinyl chloride (“PVC”) water main with new 10” water main along Goodland Bay Drive and Bellaire Bay Drive in the Heritage Bay commercial area. (See Attachment 1.) The 24” water main in the Heritage Bay commercial area was installed in 2005 when the Heritage Bay subdivision was under development. That size accommodated potable and fire flow required for the immediate commercial area and the housing portions of the Heritage Bay and The Quarry developments. In 2016, the 36” Immokalee Road water main was activated along the frontage of Heritage Bay and The Quarry. Those two subdivisions were then connected to the 36” water main on Immokalee Road, which had been installed as part of the Immokalee Road widening project. This decreased the demand on the 24” water main in the commercial area. Correctly sizing the water mains on Goodland Bay Drive and Bellaire Bay Drive to a 10” will decrease water age and improve water quality. Additionally, the developer-constructed 24” water main has experienced higher than normal water main breaks in this commercial area. When the main fails, water pressure drops significantly throughout the remainder of the northeast portions of the CCWSD. On April 30, 2020, the Public Utilities Department’s Engineering and Project Management Division distributed a request for quotation for “Goodland and Bellaire Water Main Replacement” to the six vendors under the Fixed-Term Underground Utilities Contract No. 14-6213. The County received six quotation by the May 15, 2020, deadline. The quotations are summarized in the below table: VENDOR QUOTE Kyle Construction, Inc. $ 328,300.00 Quality Enterprises, USA, Inc. $ 355,526.20 Mitchell & Stark Construction, Inc $ 365,840.00 Haskins, Inc. $ 392,882.50 Douglas N Higgins, Inc. $396,510.00 Southwest Utility Systems, Inc. $429,965.00 The total bid includes an allowance in the amount of $50,000.00 that will only be used at the Owner's direction to accomplish work arising due to unforeseen conditions and/or as directed by the Owner. Inclusion of the allowance as part of the contract price is not a guarantee that the Contractor will be paid any portion or the full amount of the allowance. Expenditures of the Owner’s Allowance will be made through the issuance of a Change Order with proper documentation supporting the change. Staff reviewed the bids received and determined the low bid to be fair, reasonable and recommends awarding the project to Kyle Construction Inc., as the lowest, responsive and responsible contractor. The 16.C.8 Packet Pg. 1689 07/14/2020 bid received is 44 percent less than the engineer’s opinion of probable cost as shown in the Bid Analysis (Attachment 2). In its recommendation letter dated May 22, 2020 (Attachment 3), the design professional, Johnson Engineering, also recommends awarding the project to Kyle Construction, who has a satisfactory performance and warranty record on previous, similar, utility-related projects. FISCAL IMPACT: The source of funding is Water User Fees, Fund (412). A budget amendment in the amount of $400,000 is required to reallocate funds within the Water User Fee Fund (412) to cover the construction costs (328,300.00), and materials that the County will purchase ($82,409.86). The project is expected to be completed in 2020. There is no change in operating costs. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: Approve a work order in the amount of $328,300.00 under Request for Quotation 14-6213 to Kyle Construction Inc., approve the necessary budget amendment, and authorize the Chair to sign the attached Work Order. Prepared By: Diana C. Dueri, Senior Project Manager, Public Utilities Engineering and Project Management Division ATTACHMENT(S) 1. Attachment 1 - Location (PDF) 2. Attachment 2 - Bid Analysis (PDF) 3. Attachment 3 - Recommendation Letter JE (PDF) 4. Attachment 4 - Bid Tabulation (PDF) 5. Attachment 5 - Work Order - Purchase Order (PDF) 6. Attachment 6 - Bonds (PDF) 16.C.8 Packet Pg. 1690 07/14/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.8 Doc ID: 12839 Item Summary: Recommendation to approve a work order to Kyle Construction Inc., for the amount of $328,300.00 under Request for Quotation 14-6213 for Underground Utility Contracting Services for "Goodland and Bellaire Water Main Replacement" (Project Number 70174), and approve the necessary budget amendment. Meeting Date: 07/14/2020 Prepared by: Title: Project Manager – Public Utilities Planning and Project Management Name: Diana Dueri 07/02/2020 12:21 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 07/02/2020 12:21 PM Approved By: Review: Wastewater Beth Johnssen Additional Reviewer Completed 07/02/2020 12:28 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 07/02/2020 12:30 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 07/02/2020 12:37 PM Public Utilities Planning and Project Management Benjamin Bullert Additional Reviewer Completed 07/02/2020 1:13 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 07/02/2020 1:24 PM Water Pamela Libby Additional Reviewer Completed 07/02/2020 1:46 PM Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 07/02/2020 2:00 PM Board of County Commissioners Jim Flanagan Additional Reviewer Completed 07/02/2020 3:43 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 07/02/2020 4:25 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 07/02/2020 4:38 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 07/06/2020 9:51 AM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 07/06/2020 9:52 AM Procurement Services Sandra Herrera Additional Reviewer Completed 07/06/2020 11:56 AM Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 07/06/2020 12:13 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 07/06/2020 1:07 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 07/06/2020 4:22 PM 16.C.8 Packet Pg. 1691 07/14/2020 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 07/07/2020 10:52 AM Board of County Commissioners MaryJo Brock Meeting Pending 07/14/2020 9:00 AM 16.C.8 Packet Pg. 1692 Goodland Bay Drive and Bellaire Drive Water Main Replacement 16.C.8.a Packet Pg. 1693 Attachment: Attachment 1 - Location (12839 : Goodland and Bellaire WM Replacement) $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 Eng Est Kyle Construction, Inc. Quality Enterprises USA, Inc. Mitchell & Stark Construction Co., Inc. Haskins Inc.Douglas N. Higgins Inc. Southwest Utility Systems, Inc. KEY: Dashed Green- AVERAGE BID Dashed black- +/-1 std dev of avg bid Dotted red- +/-20% of eng estimate for horizontal construction Bid Results for RFQ Goodland and Bellaire Water Main Replacement 16.C.8.b Packet Pg. 1694 Attachment: Attachment 2 - Bid Analysis (12839 : Goodland and Bellaire WM Replacement) 2122 Johnson Street ŶPost Office Box 1550 ŶFort Myers, Florida 33902-1550 (239) 334-0046 ŶFax (239) 334-3661 SINCE 1946 May 22, 2020 Via Email Only: Diana.Dueri@colliergov.net Ms. Diana Dueri, P.M.P. Collier County Public Utilities – EPMD 3339 Tamiami Trail East, Suite 303 Naples, FL 34112-5361 RE: Bid Recommendation for Goodland and Bellaire Water Main Replacement Low Bidder: Kyle Construction Dear Ms. Dueri, The bid opening for the above-referenced project took place on Friday, May 15, 2020 at 3:00 PM. The County received six responsive bids. The bids received by the County are tabulated below. For comparison purposes, Johnson Engineering provided the County with an opinion of probable construction cost for the in the amount of $587,550. BIDDER TOTAL BID RESPONSIVE Douglas N. Higgins, Inc. $ 396,510.00 YES Haskins, Inc. $ 392,882.50 YES Kyle Construction, Inc. $ 328,300.00 YES Mitchell & Stark Construction Co., Inc. $ 365,840.00 YES Quality Enterprises USA, Inc. $ 355,526.20 YES Southwest Utility Systems, Inc. $ 429,965.00 YES Following the bid opening, Johnson Engineering prepared the enclosed Bid Tabulation Analysis, which includes an analysis for mathematical errors. No errors were discovered. The results show Kyle Construction Inc. as the low bidder. Based upon our review, Kyle Construction Inc. appears to be a reasonable and responsive bid. Subject to concurrence with the County’s Purchasing and Contracts Administration Division, we believe selection of Kyle Construction Inc. for the intended work contained within the bid documents is an appropriate choice. Should you have any questions, or require additional information, please let me know. Sincerely, Mark W. Thomas, P.E. MWT/MSD/ljb Enclosure 20149700-228 16.C.8.c Packet Pg. 1695 Attachment: Attachment 3 - Recommendation Letter JE (12839 : Goodland and Bellaire WM Replacement) DIGITAL SIGNATURE SHEET 0$<0$< This item has been digitally signed and sealed by Mark Wayne Thomas, P.E.on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. 000000000000000$$$$$$$$$$$$$$$<<<<<<<<<<<<<<  16.C.8.c Packet Pg. 1696 Attachment: Attachment 3 - Recommendation Letter JE (12839 : Goodland and Bellaire WM Replacement) COLLIER COUNTYGOODLAND AND BELLAIRE WATER MAIN IMPROVEMENTSBID ANALYSISITEM NO.DESCRIPTIONEST. QTY.UNITUNITPRICEEXTENDED PRICEUNITPRICEEXTENDED PRICE1 Mobilization/Demobilization1 LS 38,000.00$ 38,000.00$ 24,953.50$ 24,953.50$ 2 Maintenance of Traffic1 LS18,000.00$ 18,000.00$ 11,770.00$ 11,770.00$ 3 Survey Layout & Record Drawings1 LS8,000.00$ 8,000.00$ 7,700.00$ 7,700.00$ 4 Pre- and Post-Construction Video1 LS5,000.00$ 5,000.00$ 2,750.00$ 2,750.00$ SECTION 1 SUBTOTAL: 69,000.00$ SECTION 1 SUBTOTAL: 47,173.50$ ITEM NO.DESCRIPTIONEST. QTY.UNITUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE5 Install Water Main Pipelines [LABOR ONLY]a. 8" DIP CL35060 LF48.00$ 2,880.00$ 60.00$ 3,600.00$ b. 10" DIP CL3501,680 LF52.00$ 87,360.00$ 52.00$ 87,360.00$ 6 Install Gate Valves and Boxes [LABOR ONLY]a. 8-inch Gate Valve3 EA1,000.00$ 3,000.00$ 1,476.00$ 4,428.00$ b. 10-inch Gate Valve8 EA1,200.00$ 9,600.00$ 2,237.00$ 17,896.00$ 7 Relocate Bacteriological Sample Point [LABOR ONLY]1 EA1,400.00$ 1,400.00$ 1,050.00$ 1,050.00$ 8 Connect to Existing Water Main [LABOR ONLY]a. Connect to Existing 8-inch Water Main3 EA2,000.00$ 6,000.00$ 5,000.00$ 15,000.00$ b. Connect to Existing 10-inch Water Main5 EA2,400.00$ 12,000.00$ 3,600.00$ 18,000.00$ c. Connect to Existing 24-inch Water Main2 EA4,200.00$ 8,400.00$ 5,500.00$ 11,000.00$ SECTION 2 SUBTOTAL: 130,640.00$ SECTION 2 SUBTOTAL: 158,334.00$ ITEM NO.DESCRIPTIONEST. QTY.UNITUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE9 Abandon and Grout Water Maina. 10-inch Water Main20 LF15.00$ 300.00$ 32.00$ 640.00$ b. 24-inch Water Main1,600 LF15.00$ 24,000.00$ 15.00$ 24,000.00$ 10 Abandon and Remove Water Maina. 8-inch Water Main40 LF8.00$ 320.00$ 48.00$ 1,920.00$ b. 10-inch Water Main60 LF10.00$ 600.00$ 49.00$ 2,940.00$ c. 24-inch Water Main60 LF30.00$ 1,800.00$ 50.00$ 3,000.00$ 11 General Restoration1 LS35,000.00$ 35,000.00$ 29,650.00$ 29,650.00$ 12 Sidewalk Restoration550 SY71.00$ 39,050.00$ 49.00$ 26,950.00$ 13 Asphalt Driveway Restoration220 SY65.00$ 14,300.00$ 35.00$ 7,700.00$ 14 Roadway Trench Repair with Temporary Asphalt Patch75 SY60.00$ 4,500.00$ 265.00$ 19,875.00$ 15 Final Roadway Milling and 1.5-inch SP9.5 Asphalt Overlay600 SY45.00$ 27,000.00$ 34.50$ 20,700.00$ SECTION 3 SUBTOTAL: 146,870.00$ SECTION 3 SUBTOTAL: 137,375.00$ ITEM NO.DESCRIPTIONEST. QTY.UNITUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE16Allowance: An allowance for unforeseen conditions will be made at the appropriate contract price of time & materials, lump sum, and / or contract unit price. Use of allowance must be approved by Collier County prior to the execution of the work.1 T&M50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ SECTION 4 SUBTOTAL: 50,000.00$ SECTION 4 SUBTOTAL: 50,000.00$ SECTION 1: GENERAL $ 69,000.00 SECTION 1: GENERAL $ 47,173.50 SECTION 2: WATER SYSTEM $ 130,640.00 SECTION 2: WATER SYSTEM $ 158,334.00 SECTION 3: RESTORATION $ 146,870.00 SECTION 3: RESTORATION $ 137,375.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 TOTAL: 396,510.00$ TOTAL: 392,882.50$ SECTION 1: GENERALSECTION 2: WATER SYSTEMHASKINS INC.SECTION 3: RESTORATIONSECTION 4: ALLOWANCEDOUGLAS N HIGGINS INC.5/22/20201 of 2P.O. BOX 1550, FORT MYERS, FL 33902-1550Phone: (239) 334-0046 * Fax: (239) 334-3661Email: MWT@johnsoneng.com16.C.8.cPacket Pg. 1697Attachment: Attachment 3 - Recommendation Letter JE (12839 : Goodland and Bellaire WM Replacement) COLLIER COUNTYGOODLAND AND BELLAIRE WATER MAIN IMPROVEMENTSBID ANALYSISUNITPRICEEXTENDED PRICEUNITPRICEEXTENDED PRICEUNITPRICEEXTENDED PRICEUNITPRICEEXTENDED PRICE15,000.00$ 15,000.00$ 16,250.00$ 16,250.00$ 58,350.00$ 58,350.00$ 20,000.00$ 20,000.00$ 2,000.00$ 2,000.00$ 5,000.00$ 5,000.00$ 6,300.00$ 6,300.00$ 10,000.00$ 10,000.00$ 3,000.00$ 3,000.00$ 15,650.00$ 15,650.00$ 5,664.00$ 5,664.00$ 16,000.00$ 16,000.00$ 1,800.00$ 1,800.00$ 1,100.00$ 1,100.00$ 900.00$ 900.00$ 3,000.00$ 3,000.00$ SECTION 1 SUBTOTAL: 21,800.00$ SECTION 1 SUBTOTAL: 38,000.00$ SECTION 1 SUBTOTAL: 71,214.00$ SECTION 1 SUBTOTAL: 49,000.00$ UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE45.00$ 2,700.00$ 36.00$ 2,160.00$ 70.00$ 4,200.00$ 55.00$ 3,300.00$ 50.00$ 84,000.00$ 36.00$ 60,480.00$ 51.64$ 86,755.20$ 54.50$ 91,560.00$ 1,000.00$ 3,000.00$ 900.00$ 2,700.00$ 1,400.00$ 4,200.00$ 1,500.00$ 4,500.00$ 1,500.00$ 12,000.00$ 900.00$ 7,200.00$ 2,100.00$ 16,800.00$ 1,700.00$ 13,600.00$ 1,000.00$ 1,000.00$ 1,200.00$ 1,200.00$ 2,100.00$ 2,100.00$ 1,500.00$ 1,500.00$ 4,500.00$ 13,500.00$ 3,500.00$ 10,500.00$ 2,100.00$ 6,300.00$ 5,000.00$ 15,000.00$ 4,500.00$ 22,500.00$ 3,500.00$ 17,500.00$ 1,680.00$ 8,400.00$ 6,000.00$ 30,000.00$ 6,500.00$ 13,000.00$ 5,400.00$ 10,800.00$ 2,100.00$ 4,200.00$ 7,000.00$ 14,000.00$ SECTION 2 SUBTOTAL: 151,700.00$ SECTION 2 SUBTOTAL: 112,540.00$ SECTION 2 SUBTOTAL: 132,955.20$ SECTION 2 SUBTOTAL: 173,460.00$ UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE20.00$ 400.00$ 10.00$ 200.00$ 111.90$ 2,238.00$ 80.00$ 1,600.00$ 15.00$ 24,000.00$ 35.00$ 56,000.00$ 22.43$ 35,888.00$ 30.00$ 48,000.00$ 10.00$ 400.00$ 15.00$ 600.00$ 52.50$ 2,100.00$ 25.00$ 1,000.00$ 10.00$ 600.00$ 25.00$ 1,500.00$ 35.00$ 2,100.00$ 38.00$ 2,280.00$ 10.00$ 600.00$ 20.00$ 1,200.00$ 70.00$ 4,200.00$ 85.00$ 5,100.00$ 27,000.00$ 27,000.00$ 32,300.00$ 32,300.00$ 6,450.00$ 6,450.00$ 36,500.00$ 36,500.00$ 41.00$ 22,550.00$ 50.00$ 27,500.00$ 52.42$ 28,831.00$ 47.00$ 25,850.00$ 15.00$ 3,300.00$ 85.00$ 18,700.00$ 20.90$ 4,598.00$ 50.00$ 11,000.00$ 50.00$ 3,750.00$ 100.00$ 7,500.00$ 32.16$ 2,412.00$ 93.00$ 6,975.00$ 37.00$ 22,200.00$ 33.00$ 19,800.00$ 20.90$ 12,540.00$ 32.00$ 19,200.00$ SECTION 3 SUBTOTAL: 104,800.00$ SECTION 3 SUBTOTAL: 165,300.00$ SECTION 3 SUBTOTAL: 101,357.00$ SECTION 3 SUBTOTAL: 157,505.00$ UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ SECTION 4 SUBTOTAL: 50,000.00$ SECTION 4 SUBTOTAL: 50,000.00$ SECTION 4 SUBTOTAL: 50,000.00$ SECTION 4 SUBTOTAL: 50,000.00$ SECTION 1: GENERAL $ 21,800.00 SECTION 1: GENERAL $ 38,000.00 SECTION 1: GENERAL $ 71,214.00 SECTION 1: GENERAL $ 49,000.00 SECTION 2: WATER SYSTEM $ 151,700.00 SECTION 2: WATER SYSTEM $ 112,540.00 SECTION 2: WATER SYSTEM $ 132,955.20 SECTION 2: WATER SYSTEM $ 173,460.00 SECTION 3: RESTORATION $ 104,800.00 SECTION 3: RESTORATION $ 165,300.00 SECTION 3: RESTORATION $ 101,357.00 SECTION 3: RESTORATION $ 157,505.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 TOTAL: 328,300.00$ TOTAL: 365,840.00$ TOTAL: 355,526.20$ TOTAL: 429,965.00$ KYLE CONSTRUCTION INC.MITCHELL & STARK CONSTR. CO. INC.QUALITY ENTERPRISES USA INC.SOUTHWEST UTILITY SYSTEMS INC.5/22/20202 of 2P.O. BOX 1550, FORT MYERS, FL 33902-1550Phone: (239) 334-0046 * Fax: (239) 334-3661Email: MWT@johnsoneng.com16.C.8.cPacket Pg. 1698Attachment: Attachment 3 - Recommendation Letter JE (12839 : Goodland and Bellaire WM Replacement) COLLIER COUNTY GOODLAND AND BELLAIRE WATER MAIN IMPROVEMENTS BID ANALYSIS 7/2/2020 1 of 1 P.O. BOX 1550, FORT MYERS, FL 33902-1550 Phone: (239) 334-0046 * Fax: (239) 334-3661 Email: MWT@johnsoneng.com ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 1 Mobilization/Demobilization 1 LS 15,000.00$ 15,000.00$ 58,350.00$ 58,350.00$ 16,250.00$ 16,250.00$ 24,953.50$ 24,953.50$ 38,000.00$ 38,000.00$ 20,000.00$ 20,000.00$ 2 Maintenance of Traffic 1 LS 2,000.00$ 2,000.00$ 6,300.00$ 6,300.00$ 5,000.00$ 5,000.00$ 11,770.00$ 11,770.00$ 18,000.00$ 18,000.00$ 10,000.00$ 10,000.00$ 3 Survey Layout & Record Drawings 1 LS 3,000.00$ 3,000.00$ 5,664.00$ 5,664.00$ 15,650.00$ 15,650.00$ 7,700.00$ 7,700.00$ 8,000.00$ 8,000.00$ 16,000.00$ 16,000.00$ 4 Pre- and Post-Construction Video 1 LS 1,800.00$ 1,800.00$ 900.00$ 900.00$ 1,100.00$ 1,100.00$ 2,750.00$ 2,750.00$ 5,000.00$ 5,000.00$ 3,000.00$ 3,000.00$ SECTION 1 SUBTOTAL:21,800.00$ SECTION 1 SUBTOTAL:71,214.00$ SECTION 1 SUBTOTAL:38,000.00$ SECTION 1 SUBTOTAL:47,173.50$ SECTION 1 SUBTOTAL:69,000.00$ SECTION 1 SUBTOTAL:49,000.00$ ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 5 Install Water Main Pipelines [LABOR ONLY] a.8" DIP CL350 60 LF 45.00$ 2,700.00$ 70.00$ 4,200.00$ 36.00$ 2,160.00$ 60.00$ 3,600.00$ 48.00$ 2,880.00$ 55.00$ 3,300.00$ b.10" DIP CL350 1,680 LF 50.00$ 84,000.00$ 51.64$ 86,755.20$ 36.00$ 60,480.00$ 52.00$ 87,360.00$ 52.00$ 87,360.00$ 54.50$ 91,560.00$ 6 Install Gate Valves and Boxes [LABOR ONLY] a.8-inch Gate Valve 3 EA 1,000.00$ 3,000.00$ 1,400.00$ 4,200.00$ 900.00$ 2,700.00$ 1,476.00$ 4,428.00$ 1,000.00$ 3,000.00$ 1,500.00$ 4,500.00$ b.10-inch Gate Valve 8 EA 1,500.00$ 12,000.00$ 2,100.00$ 16,800.00$ 900.00$ 7,200.00$ 2,237.00$ 17,896.00$ 1,200.00$ 9,600.00$ 1,700.00$ 13,600.00$ 7 Relocate Bacteriological Sample Point [LABOR ONLY]1 EA 1,000.00$ 1,000.00$ 2,100.00$ 2,100.00$ 1,200.00$ 1,200.00$ 1,050.00$ 1,050.00$ 1,400.00$ 1,400.00$ 1,500.00$ 1,500.00$ 8 Connect to Existing Water Main [LABOR ONLY] a.Connect to Existing 8-inch Water Main 3 EA 4,500.00$ 13,500.00$ 2,100.00$ 6,300.00$ 3,500.00$ 10,500.00$ 5,000.00$ 15,000.00$ 2,000.00$ 6,000.00$ 5,000.00$ 15,000.00$ b.Connect to Existing 10-inch Water Main 5 EA 4,500.00$ 22,500.00$ 1,680.00$ 8,400.00$ 3,500.00$ 17,500.00$ 3,600.00$ 18,000.00$ 2,400.00$ 12,000.00$ 6,000.00$ 30,000.00$ c.Connect to Existing 24-inch Water Main 2 EA 6,500.00$ 13,000.00$ 2,100.00$ 4,200.00$ 5,400.00$ 10,800.00$ 5,500.00$ 11,000.00$ 4,200.00$ 8,400.00$ 7,000.00$ 14,000.00$ SECTION 2 SUBTOTAL:151,700.00$ SECTION 2 SUBTOTAL:132,955.20$ SECTION 2 SUBTOTAL:112,540.00$ SECTION 2 SUBTOTAL:158,334.00$ SECTION 2 SUBTOTAL:130,640.00$ SECTION 2 SUBTOTAL:173,460.00$ ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 9 Abandon and Grout Water Main a.10-inch Water Main 20 LF 20.00$ 400.00$ 111.90$ 2,238.00$ 10.00$ 200.00$ 32.00$ 640.00$ 15.00$ 300.00$ 80.00$ 1,600.00$ b.24-inch Water Main 1,600 LF 15.00$ 24,000.00$ 22.43$ 35,888.00$ 35.00$ 56,000.00$ 15.00$ 24,000.00$ 15.00$ 24,000.00$ 30.00$ 48,000.00$ 10 Abandon and Remove Water Main a.8-inch Water Main 40 LF 10.00$ 400.00$ 52.50$ 2,100.00$ 15.00$ 600.00$ 48.00$ 1,920.00$ 8.00$ 320.00$ 25.00$ 1,000.00$ b.10-inch Water Main 60 LF 10.00$ 600.00$ 35.00$ 2,100.00$ 25.00$ 1,500.00$ 49.00$ 2,940.00$ 10.00$ 600.00$ 38.00$ 2,280.00$ c.24-inch Water Main 60 LF 10.00$ 600.00$ 70.00$ 4,200.00$ 20.00$ 1,200.00$ 50.00$ 3,000.00$ 30.00$ 1,800.00$ 85.00$ 5,100.00$ 11 General Restoration 1 LS 27,000.00$ 27,000.00$ 6,450.00$ 6,450.00$ 32,300.00$ 32,300.00$ 29,650.00$ 29,650.00$ 35,000.00$ 35,000.00$ 36,500.00$ 36,500.00$ 12 Sidewalk Restoration 550 SY 41.00$ 22,550.00$ 52.42$ 28,831.00$ 50.00$ 27,500.00$ 49.00$ 26,950.00$ 71.00$ 39,050.00$ 47.00$ 25,850.00$ 13 Asphalt Driveway Restoration 220 SY 15.00$ 3,300.00$ 20.90$ 4,598.00$ 85.00$ 18,700.00$ 35.00$ 7,700.00$ 65.00$ 14,300.00$ 50.00$ 11,000.00$ 14 Roadway Trench Repair with Temporary Asphalt Patch 75 SY 50.00$ 3,750.00$ 32.16$ 2,412.00$ 100.00$ 7,500.00$ 265.00$ 19,875.00$ 60.00$ 4,500.00$ 93.00$ 6,975.00$ 15 Final Roadway Milling and 1.5-inch SP9.5 Asphalt Overlay 600 SY 37.00$ 22,200.00$ 20.90$ 12,540.00$ 33.00$ 19,800.00$ 34.50$ 20,700.00$ 45.00$ 27,000.00$ 32.00$ 19,200.00$ SECTION 3 SUBTOTAL:104,800.00$ SECTION 3 SUBTOTAL:101,357.00$ SECTION 3 SUBTOTAL:165,300.00$ SECTION 3 SUBTOTAL:137,375.00$ SECTION 3 SUBTOTAL:146,870.00$ SECTION 3 SUBTOTAL:157,505.00$ ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 16 Allowance: An allowance for unforeseen conditions will be made at the appropriate contract price of time & materials, lump sum, and / or contract unit price. Use of allowance must be approved by Collier County prior to the execution of the work. 1 T&M 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ SECTION 4 SUBTOTAL:50,000.00$ SECTION 4 SUBTOTAL:50,000.00$ SECTION 4 SUBTOTAL:50,000.00$ SECTION 4 SUBTOTAL:50,000.00$ SECTION 4 SUBTOTAL:50,000.00$ SECTION 4 SUBTOTAL:50,000.00$ SECTION 1: GENERAL $ 21,800.00 SECTION 1: GENERAL $ 71,214.00 SECTION 1: GENERAL $ 38,000.00 SECTION 1: GENERAL $ 47,173.50 SECTION 1: GENERAL $ 69,000.00 SECTION 1: GENERAL $ 49,000.00 SECTION 2: WATER SYSTEM $ 151,700.00 SECTION 2: WATER SYSTEM $ 132,955.20 SECTION 2: WATER SYSTEM $ 112,540.00 SECTION 2: WATER SYSTEM $ 158,334.00 SECTION 2: WATER SYSTEM $ 130,640.00 SECTION 2: WATER SYSTEM $ 173,460.00 SECTION 3: RESTORATION $ 104,800.00 SECTION 3: RESTORATION $ 101,357.00 SECTION 3: RESTORATION $ 165,300.00 SECTION 3: RESTORATION $ 137,375.00 SECTION 3: RESTORATION $ 146,870.00 SECTION 3: RESTORATION $ 157,505.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 SECTION 4: ALLOWANCE $ 50,000.00 TOTAL:328,300.00$ TOTAL:355,526.20$ TOTAL:365,840.00$ TOTAL:392,882.50$ TOTAL:396,510.00$ TOTAL:429,965.00$ SOUTHWEST UTILITY SYSTEMS INC. SECTION 2: WATER SYSTEM SECTION 3: RESTORATION SECTION 4: ALLOWANCE SECTION 1: GENERAL DOUGLAS N HIGGINS INC.HASKINS INC.KYLE CONSTRUCTION INC.MITCHELL & STARK CONSTR. CO. INC.QUALITY ENTERPRISES USA INC. 16.C.8.d Packet Pg. 1699 Attachment: Attachment 4 - Bid Tabulation (12839 : Goodland and Bellaire WM Replacement) 16.C.8.e Packet Pg. 1700 Attachment: Attachment 5 - Work Order - Purchase Order (12839 : Goodland and Bellaire WM Replacement) 16.C.8.e Packet Pg. 1701 Attachment: Attachment 5 - Work Order - Purchase Order (12839 : Goodland and Bellaire WM Replacement) 16.C.8.e Packet Pg. 1702 Attachment: Attachment 5 - Work Order - Purchase Order (12839 : Goodland and Bellaire WM Replacement) 16.C.8.e Packet Pg. 1703 Attachment: Attachment 5 - Work Order - Purchase Order (12839 : Goodland and Bellaire WM Replacement) 16.C.8.e Packet Pg. 1704 Attachment: Attachment 5 - Work Order - Purchase Order (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1705Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1706Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1707Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1708Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1709Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1710Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1711Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement) 16.C.8.fPacket Pg. 1712Attachment: Attachment 6 - Bonds (12839 : Goodland and Bellaire WM Replacement)