Agenda 06/09/2020 Item #16A13 (Work Order for #14-6213-137 w/Quality Enterprises USA)06/09/2020 EXECUTIVE SUMMARY Recommendation to approve a $523,550 Work Order to Quality Enterprises USA, Inc., under Request for Quotation (“RFQ”) # 14-6213-137 for Underground Utility Contracting Services for Lely Area Branch 11 Channel Restoration (Project No. 51101) and authorize the necessary budget amendments. OBJECTIVE: To restore a section of a contributory channel within the Lely Area’s stormwater management system by reshaping the bank and bottom and placing rip-rap to prevent future erosion. CONSIDERATIONS: The Lely Area Stormwater Improvement Project (“LASIP”), which began in the 1990s and was finished in 2017, encompasses approximately 11,000 acres of land, improved 22.8 miles of canals, and added or replaced various weirs, structures, and pipes that had been needed for many years. Not all stormwater facilities, however, were included as part of the initial design and permitting efforts that started in the late 1980s. During construction of LASIP, which occurred from 2006 through 2017, staff observed small but significant areas of concern, as construction progressed and old facilities were exposed, including Branch 11. This channel has a sharp turn in it that has caused scouring over the years during heavy flows, indicated by erosion on one side of the bank with silt deposits on the other. The proposed work under this Work Order is to address the disfiguration of Branch 11. The bank will be reshaped, the bottom will be leveled out, and rip-rap will be placed on the shore of the scoured side to prevent future erosion. In addition, the work will involve removing some large nuisance vegetation within the drainage easement. On February 20, 2020, the Capital Project Planning, Impact fees, and Program Management Division released RFQ # 14-6213-137 to the six contractors on County Agreement Number 14-6213 for Underground Utility Contractors. Staff only received quotes from two of the six contractors by the March 12, 2020 deadline. Staff followed up to inquire why the other four vendors did not submit qu otes and discovered that one of the contractors was too busy to prepare a quote in time to submit, another was unable to prepare a quote because he was out of town, and the other two offered no response for their non-submittal. Company Name City County State Bid Amount Responsive/ Responsible Quality Enterprises USA, Inc. Naples Collier FL $523,550.00 Yes Douglas Higgins, Inc. Naples Collier FL $733,850.00 Yes Haskins, Inc Bonita Springs Lee FL No submittal - Kyle Construction, Inc. Fort Myers Lee FL No submittal - Southwest Utility Systems, Inc. Naples Collier FL No submittal - Mitchell & Stark Construction Co., Inc. Naples Collier FL No submittal - Staff and the Design Consultants noted no discrepancies in the bids received. The lowest bid is 7% below the Engineer’s Opinion of Probable Cost of $564,250. After review, staff and consultant CDM Smith, Inc., recommends awarding this RFQ to the lowest, responsive/responsible bidder, Quality Enterprises USA, Inc., for a total contract amount of $523,550. 16.A.13 Packet Pg. 580 06/09/2020 FISCAL IMPACT: Total project cost is $523,550. A budget amendment will be required to transfer funding, in the amount of $523,550, within Stormwater Capital Improvement Fund (325) to Project Number 51101 (Lely Area Stormwater Improvement Project). Funding will be transferred from Project Number 60222 (Cocohatchee Interconnect Project) and from Project Number 60234 (Palm River Stormwater Project) in the amounts of $305,282.50 and $218,267.50 respectively. The sources of funds are transfers from the General Fund (001) and Unincorporated Area General Fund (111). GROWTH MANAGEMENT IMPACT: The proposed construction project is in accordance with the goals, objectives, and policies of all applicable sections of the Stormwater Management and the Conservation and Coastal Management elements of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: To approve a $523,550 Work Order under Request for Quotation # 14-6213- 137, “Lely Area Branch 11 Restoration Project,” in the amount of $523,550, authorize the Chairman to sign the attached Work Order, and authorize the necessary budget amendments. Prepared By: Shane Cox P.E., Sr. Project Manager / Capital Project Planning, Impact Fees, and Program Management Division ATTACHMENT(S) 1. WO complete (PDF) 2. Payment & Performance Bonds (PDF) 16.A.13 Packet Pg. 581 06/09/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.13 Doc ID: 12290 Item Summary: Recommendation to approve a $523,550 Work Order to Quality Enterprises USA, Inc., under Request for Quotation (“RFQ”) # 14-6213-137 for Underground Utility Contracting Services for Lely Area Branch 11 Channel Restoration (Project No. 51101) and any necessary budget amendments. Meeting Date: 06/09/2020 Prepared by: Title: Project Manager, Senior – Capital Project Planning, Impact Fees, and Program Management Name: Shane Cox 04/28/2020 1:11 PM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 04/28/2020 1:11 PM Approved By: Review: Growth Management Department Judy Puig Level 1 Reviewer Completed 04/28/2020 1:29 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 04/28/2020 1:52 PM Capital Project Planning, Impact Fees, and Program Management Gerald Kurtz Additional Reviewer Completed 04/28/2020 2:00 PM Growth Management Department Lisa Taylor Additional Reviewer Completed 04/30/2020 1:10 PM Board of County Commissioners Jim Flanagan Additional Reviewer Completed 04/30/2020 4:30 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 05/05/2020 12:11 PM Procurement Services Sandra Herrera Additional Reviewer Completed 05/06/2020 11:14 AM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 05/07/2020 9:51 AM Growth Management Department Shane Cox Deputy Department Head Review Skipped 04/28/2020 1:08 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/08/2020 9:25 AM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 05/11/2020 9:40 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 05/11/2020 9:51 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/11/2020 3:23 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 05/14/2020 8:06 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 05/18/2020 4:34 PM 16.A.13 Packet Pg. 582 06/09/2020 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 06/01/2020 9:01 AM Board of County Commissioners MaryJo Brock Meeting Pending 06/09/2020 9:00 AM 16.A.13 Packet Pg. 583 16.A.13.aPacket Pg. 584Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 585Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 586Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 587Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 588Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 589Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 590Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 591Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.aPacket Pg. 592Attachment: WO complete (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 593 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 594 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 595 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 596 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 597 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 598 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration) 16.A.13.b Packet Pg. 599 Attachment: Payment & Performance Bonds (12290 : Branch 11 Restoration)