Loading...
Agenda 05/12/2020 Item #16A 2 (Multi-Way Stop Warrant Study)Proposed Agenda Changes Board of County Commissioners Meeting May 12, 2020 Continue Item 11B to the May 26, 2020 BCC Meeting: Recommendation to approve and authorize the Chairman to sign an Agreement with the Florida Gulf Coast University School of Entrepreneurship for programmatic support to the Collier County Accelerator project, in the annual amount of $377,651.29 and authorize the necessary budget amendments. (Commissioner Taylor’s request) Continue Item 16A2 to the May 26, 2020 BCC Meeting: Recommendation to accept a multi-way stop warrant study and approve the removal of a two-way stop control at the intersection of Manatee Road and Roost Road, for a cost of approximately $400 (Cost Center 163630). (Staff’s request) Time Certain Items: Item 11A to be heard immediately following Item 2A Note: Item 11E a separate presentation on the COVID-19 response in Immokalee is scheduled to be heard at 11:00 a.m. (Commissioner Saunders’ request) 5/12/2020 8:40 AM 05/12/2020 EXECUTIVE SUMMARY Recommendation to accept a multi-way stop warrant study and approve the removal of a two-way stop control at the intersection of Manatee Road and Roost Road, for a cost of approximately $400 (Cost Center 163630). OBJECTIVE: To request the Board of County Commissioners (Board) to accept a multi-way stop warrant study and approve the removal of a two-way stop control at Manatee Road and Roost Road in accordance with any and all applicable Federal, State, and County standards and specifications governing such traffic control devices. CONSIDERATIONS: Florida Statute §316.006 provides that the County “may place and maintain such traffic control devices which conform to the manual and specifications of the Department of Transportation upon all streets and highways under their original jurisdiction as they shall deem necessary…to regulate, warn, or guide traffic.” A traffic engineering study, performed and approved by a Professional Engineer registered to practice in the State of Florida, has concluded with the determination that the subject intersection did not meet the minimum warrants for a multi-way stop, as set forth in the Manual on Uniform Traffic Control Devices (MUTCD). Removal of a two-way stop at this location is within Collier County Access Management Guidelines. The stop signs on Manatee Road at this location had been installed due to the gated fence at the entrance to Manatee Elementary School. As part of a development project, Manatee Road was opened up to U.S. 41 through this area. School representatives recently removed the fence, thus making the stop signs along Manatee Road no longer necessary. The traffic engineering study was performed at the request of concerned residents. The study report was completed on March 18, 2020, in accordance with guidelines promulgated by the Florida Department of Transportation and the MUTCD. FISCAL IMPACT: Cost of this work is estimated to be $400 with no annual maintenance cost associated. Funds are available within the Transportation Operating Fund (101), Traffic Operations Cost Center (163630). GROWTH MANAGEMENT IMPACT: This action will result in no growth management impact. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality, and requires majority vote for approval. -JAK RECOMMENDATION: To accept the findings of the multi-way stop warrant study and approve removal of a two-way stop control at the intersection of Manatee Road and Roost Road in accordance with any and all applicable Federal, State, and County standards and specifications governing such traffic control devices. Prepared by: Daniel G. Hall, P.E., Transportation Engineering Division ATTACHMENT(S) 1. Multi-Way Stop Study (PDF) 16.A.2 Packet Pg. 187 05/12/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.2 Doc ID: 12161 Item Summary: Recommendation to accept a multi-way stop warrant study and approve the removal of a two-way stop control at the intersection of Manatee Road and Roost Road, for a cost of approximately $400 (Cost Center 163630). Meeting Date: 05/12/2020 Prepared by: Title: Project Manager, Senior – Transportation Engineering Name: Daniel Hall 04/03/2020 11:53 AM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 04/03/2020 11:53 AM Approved By: Review: Growth Management Department Judy Puig Level 1 Reviewer Completed 04/03/2020 12:42 PM Growth Management Department Anthony Khawaja Additional Reviewer Completed 04/03/2020 1:16 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 04/07/2020 3:57 PM Transportation Engineering Jay Ahmad Additional Reviewer Completed 04/08/2020 9:10 AM Growth Management Operations Support Heather Meyer Additional Reviewer Completed 04/08/2020 1:55 PM Growth Management Department Gene Shue Additional Reviewer Completed 04/09/2020 9:27 AM Growth Management Department Daniel Hall Deputy Department Head Review Skipped 04/03/2020 11:50 AM Growth Management Department Jeanne Marcella Department Head Review Completed 04/13/2020 9:44 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 04/13/2020 9:58 AM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 04/13/2020 10:21 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/13/2020 11:05 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/04/2020 10:12 AM Board of County Commissioners MaryJo Brock Meeting Pending 05/12/2020 9:00 AM 16.A.2 Packet Pg. 188 16.A.2.aPacket Pg. 189Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd) 16.A.2.aPacket Pg. 190Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd) 16.A.2.aPacket Pg. 191Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd) 16.A.2.a Packet Pg. 192 Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the 16.A.2.aPacket Pg. 193Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd) 16.A.2.aPacket Pg. 194Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd) 16.A.2.aPacket Pg. 195Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd) 16.A.2.a Packet Pg. 196 Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the