Agenda 05/12/2020 Item #16A 2 (Multi-Way Stop Warrant Study)Proposed Agenda Changes
Board of County Commissioners Meeting
May 12, 2020
Continue Item 11B to the May 26, 2020 BCC Meeting: Recommendation to approve and authorize
the Chairman to sign an Agreement with the Florida Gulf Coast University School of
Entrepreneurship for programmatic support to the Collier County Accelerator project, in the
annual amount of $377,651.29 and authorize the necessary budget amendments. (Commissioner
Taylor’s request)
Continue Item 16A2 to the May 26, 2020 BCC Meeting:
Recommendation to accept a multi-way stop warrant study and
approve the removal of a two-way stop control at the intersection of
Manatee Road and Roost Road, for a cost of approximately $400
(Cost Center 163630). (Staff’s request)
Time Certain Items:
Item 11A to be heard immediately following Item 2A
Note:
Item 11E a separate presentation on the COVID-19 response in Immokalee is scheduled to be heard
at 11:00 a.m. (Commissioner Saunders’ request)
5/12/2020 8:40 AM
05/12/2020
EXECUTIVE SUMMARY
Recommendation to accept a multi-way stop warrant study and approve the removal of a two-way
stop control at the intersection of Manatee Road and Roost Road, for a cost of approximately $400
(Cost Center 163630).
OBJECTIVE: To request the Board of County Commissioners (Board) to accept a multi-way stop
warrant study and approve the removal of a two-way stop control at Manatee Road and Roost Road in
accordance with any and all applicable Federal, State, and County standards and specifications governing
such traffic control devices.
CONSIDERATIONS: Florida Statute §316.006 provides that the County “may place and maintain such
traffic control devices which conform to the manual and specifications of the Department of
Transportation upon all streets and highways under their original jurisdiction as they shall deem
necessary…to regulate, warn, or guide traffic.” A traffic engineering study, performed and approved by a
Professional Engineer registered to practice in the State of Florida, has concluded with the determination
that the subject intersection did not meet the minimum warrants for a multi-way stop, as set forth in the
Manual on Uniform Traffic Control Devices (MUTCD). Removal of a two-way stop at this location is
within Collier County Access Management Guidelines.
The stop signs on Manatee Road at this location had been installed due to the gated fence at the entrance
to Manatee Elementary School. As part of a development project, Manatee Road was opened up to U.S.
41 through this area. School representatives recently removed the fence, thus making the stop signs along
Manatee Road no longer necessary.
The traffic engineering study was performed at the request of concerned residents. The study report was
completed on March 18, 2020, in accordance with guidelines promulgated by the Florida Department of
Transportation and the MUTCD.
FISCAL IMPACT: Cost of this work is estimated to be $400 with no annual maintenance cost
associated. Funds are available within the Transportation Operating Fund (101), Traffic Operations Cost
Center (163630).
GROWTH MANAGEMENT IMPACT: This action will result in no growth management impact.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to
form and legality, and requires majority vote for approval. -JAK
RECOMMENDATION: To accept the findings of the multi-way stop warrant study and approve
removal of a two-way stop control at the intersection of Manatee Road and Roost Road in accordance
with any and all applicable Federal, State, and County standards and specifications governing such traffic
control devices.
Prepared by: Daniel G. Hall, P.E., Transportation Engineering Division
ATTACHMENT(S)
1. Multi-Way Stop Study (PDF)
16.A.2
Packet Pg. 187
05/12/2020
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.2
Doc ID: 12161
Item Summary: Recommendation to accept a multi-way stop warrant study and approve the
removal of a two-way stop control at the intersection of Manatee Road and Roost Road, for a cost of
approximately $400 (Cost Center 163630).
Meeting Date: 05/12/2020
Prepared by:
Title: Project Manager, Senior – Transportation Engineering
Name: Daniel Hall
04/03/2020 11:53 AM
Submitted by:
Title: Division Director - Transportation Eng – Transportation Engineering
Name: Jay Ahmad
04/03/2020 11:53 AM
Approved By:
Review:
Growth Management Department Judy Puig Level 1 Reviewer Completed 04/03/2020 12:42 PM
Growth Management Department Anthony Khawaja Additional Reviewer Completed 04/03/2020 1:16 PM
Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 04/07/2020 3:57 PM
Transportation Engineering Jay Ahmad Additional Reviewer Completed 04/08/2020 9:10 AM
Growth Management Operations Support Heather Meyer Additional Reviewer Completed 04/08/2020 1:55 PM
Growth Management Department Gene Shue Additional Reviewer Completed 04/09/2020 9:27 AM
Growth Management Department Daniel Hall Deputy Department Head Review Skipped 04/03/2020 11:50 AM
Growth Management Department Jeanne Marcella Department Head Review Completed 04/13/2020 9:44 AM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 04/13/2020 9:58 AM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 04/13/2020 10:21 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/13/2020 11:05 AM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/04/2020 10:12 AM
Board of County Commissioners MaryJo Brock Meeting Pending 05/12/2020 9:00 AM
16.A.2
Packet Pg. 188
16.A.2.aPacket Pg. 189Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd)
16.A.2.aPacket Pg. 190Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd)
16.A.2.aPacket Pg. 191Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd)
16.A.2.a
Packet Pg. 192 Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the
16.A.2.aPacket Pg. 193Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd)
16.A.2.aPacket Pg. 194Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd)
16.A.2.aPacket Pg. 195Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the intersection of Manatee Rd and Roost Rd)
16.A.2.a
Packet Pg. 196 Attachment: Multi-Way Stop Study (12161 : Recommendation to remove two-way stop control at the