Agenda 04/28/2020 Item #16C 5 (Public Utilities Budget Amendments)04/28/2020 EXECUTIVE SUMMARY Recommendation to authorize the necessary budget amendments to reallocate Public Utilities Department project funds. OBJECTIVE: To remain in compliance and meet the demand throughout the water, wastewater and solid waste systems. CONSIDERATIONS: In FY2018, Project No. 50154, “Hurricane Irma,” was established to fund post- storm repair and rehabilitation projects. The initial budget amendments from other projects provided $14.2 million in total for the Water User Fee Fund 412, the Wastewater User Fee Fund 414, and the Solid Waste Fund 474. A great majority of the work is complete, indicating that over $5 million in resources were returned to reserves within Funds 412, 414 and 474 to replenish borrowed funds needed to execute other projects. Projects to benefit from the reallocated funding are listed below. The requested budget amendment total from reserves is $5,166,000.  Fund 412 Project 71067 Isles of Capri Surge Tank: The reallocated funds will be used to complete the design of a surge tank at the Isle of Capri Re-pump station. Surge tanks minimize the water hammer intensity that occurs in the water distribution system. Reducing the water hammer intensity decreases the likelihood of failure and shut down. One surge tank exists at the SCRWTP, and by installing another further away in the distribution system at the Isles of Capri, the level of protection and reliability will increase. ($225,000.00 budget amendment)  Fund 412 Project 70172 Gulfshore Drive AC Water Main Phase 2: The reallocated funds will be used to reimburse Road Maintenance for milling & overlaying Gulfshore Drive from Bluebill Avenue to Vanderbilt Beach Road. Public Utilities completed a water project on Gulfshore Drive, which required multiple open cut road crossings on Gulfshore Drive. Also, the roadway was showing age and an asphalt overlay project was programmed to be completed. Public Utilities and Road Maintenance agreed to cost share the mill & overlay where Public Utilities funded 57% and Road Maintenance funded 43% based on where utility construction occurred. ($175,000.00 budget amendment)  Fund 412 Project 70136 Water Plant Capital - SCRWTP Annex: The reallocated funds will be used to complete the design of expanding the equipment annex building at the South County Regional Water Treatment Plant (SCRWTP). The existing annex building at the SCRWTP needs additional space to store all the required materials & parts to keep this water treatment plant operating with minimal disruptions. ($108,000.00 budget amendment)  Fund 412 Project 70258 NCRWTP Degasifier Modifications: The reallocated funds will be used to design and construct additional piping on the existing degasifiers at the NCRWTP. This project will allow staff to complete the maintenance of these units without affecting the normal operation of the water treatment plant. ($200,000.00 budget amendment)  Fund 414 Project 70259 MPS 316 Force Main Relocation: The reallocated funds will provide for a new wastewater force main that will eli minate repumping of wastewater and reduce the likelihood of overflows at Pump Station 316.04 during power outages. ($1,000,000 budget amendment) 16.C.5 Packet Pg. 1717 04/28/2020  Fund 414 Project 70256 I-75 Force Main Replacement: The reallocated funds will provide a replacement force main under I-75 to convey flow from pump stations in the Whitelake Industrial Corporation Park near the SCRWTP as well as pump stations in the Collier County landfill. The existing force main is nearly 30 years old and has reached the end of its useful li fe. ($500,000 budget amendment)  Fund 414 Project 70243 Golden Gate WWTP: The reallocated funds provide partial funding to construct compliance improvements at the Golden Gate City Wastewater Treatment Plant. ($1,410,000 budget amendment)  Fund 474 Project 70219 Leachate Deep Injection Well (DIW): The reallocated funds will be used for ancillary DIW projects such as aboveground storage tanks, DIW pump station and force main. ($1,548,000 budget amendment) The following budget amendment is a reallocation of budget within projects in the Wastewater User Fee Capital Fund 414. They are required to optimize the use of existing funds prior to the FY2021 Budget. Projects to benefit from this reallocated funding are listed below. The total for all four pr ojects is $975,000.  Fund 414 Project 70117 Remote Sites Maintenance Support: The reallocated funds will provide for renovations at several master pump installations including roof repair and replacements and new HVAC units. ($250,000 budget amendment)  Fund 414 Project 50196 Chiller NCWRF Ops Building: The reallocated funds will provide for replacement of the existing failing HVAC system at the North Water Reclamation Facility with a new chiller system that will be more efficient. ($500,000 budget amendment)  Fund 414 Project 72505 Wastewater Security Systems: The reallocated funds will provide for security cameras and systems at 14 master pump stations ($200,000 budget amendment)  Fund 414 Project 75019 Growth Management Comprehensive Planning: The reallocated funds will provide consulting services on utility planning studies and data analyses and to fill gaps in planning staff needs. ($25,000 budget amendment) Attachment 1 is a summary of all requested budget amendments. All projects will be procured separately in accordance with the County’s Procurement Ordinance. FISCAL IMPACT: Budget amendments are necessary to reallocate funds to execute prioritized projects. The sources of funding for the budget amendments are user fees within the County Water Capital Fund (412), the County Sewer Capital Fund (414), and the Solid Waste Capital Fund (474) as distributed below. Water (412) Wastewater (414) Solid Waste (474) Total Reserves $708,000 $2,910,000 $1,548,000 $5,166,000 Re-Allocation within Projects N/A $975,000 N/A $975,000 Total Budget Amendment $708,000 $3,885,000 $1,548,000 $6,141,000 LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT 16.C.5 Packet Pg. 1718 04/28/2020 GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities and to remain in compliance with all regulatory programs. RECOMMENDATION: To authorize the necessary budget amendments as set forth in the above Fiscal Impact section. Prepared By: Tom S. Chmelik, Public Utilities Engineering and Project Management Director ATTACHMENT(S) 1. Attachment 1 - Budget Amendment Summary (PDF) 16.C.5 Packet Pg. 1719 04/28/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.5 Doc ID: 12001 Item Summary: Recommendation to authorize the necessary budget amendments to reallocate Public Utilities Department project funds. Meeting Date: 04/28/2020 Prepared by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 03/19/2020 3:41 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 03/19/2020 3:41 PM Approved By: Review: Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 03/20/2020 11:35 AM Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 03/20/2020 1:09 PM Solid and Hazardous Waste Kari Hodgson Additional Reviewer Completed 03/20/2020 2:47 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/23/2020 5:47 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/27/2020 2:35 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 03/29/2020 11:08 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/30/2020 8:16 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/30/2020 9:54 AM Budget and Management Office Ed Finn Additional Reviewer Completed 04/13/2020 12:10 PM Office of Management and Budget Susan Usher Additional Reviewer Completed 04/15/2020 10:19 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 04/18/2020 10:55 AM Board of County Commissioners MaryJo Brock Meeting Pending 04/28/2020 9:00 AM 16.C.5 Packet Pg. 1720 Fund Project Project Name Source Budget Amendment 412 71067 Isles of Capri Surge Tank Reserves $225,000 412 70172 Gulfshore Drive AC Water Main Phase 2 Reserves $175,000 412 70136 Water Plant Capital Projects Reserves $108,000 412 70258 NCRWTP Degasifier Modifications Reserves $200,000 Sub-Total 412 Reserves $708,000 414 70259 MPS 316 Force Main Relocation Reserves $1,000,000 414 70256 I-75 Force Main Replacement Reserves $500,000 414 70243 Golden Gate WWTP Reserves $1,410,000 Sub-Total 414 Reserves $2,910,000 414 70117 Remote Sites Maintenance Support Other $250,000 414 50196 Chiller NCWRF Ops Building Other $500,000 414 72505 Wastewater Security Systems Other $200,000 414 75019 Growth Management Comprehensive Planning Other $25,000 Sub-Total 414 Other $975,000 474 70219 Leachate Deep Injection Well Reserves $1,548,000 Sub-Total 474 Reserves $1,548,000 Total $6,141,000 Attachment 1 Budget Amendment Summary by Fund 16.C.5.d Packet Pg. 1721 Attachment: Attachment 1 - Budget Amendment Summary [Revision 2] (12001 : PUD BAs)