Agenda 04/28/2020 Item #16C 4 (RPS #19-7637 - Golden Gate City Water Main)04/28/2020
EXECUTIVE SUMMARY
Recommendation to approve the selection committee’s ranking of Request for Professional Services
(“RPS”) No. 19-7637, “Golden Gate City Transmission Water Main Improvements Design,” and
authorize staff to begin contract negotiations with the top ranked firm, Johnson Engineering, Inc.,
so that staff can bring a proposed agreement back for the Board’s consideration at a subsequent
meeting.
OBJECTIVE: Obtain expert professional engineering services to design the proposed transmission
water mains in Golden Gate City to serve our customers with full regulatory compliance, reliability and
sustainability.
CONSIDERATIONS: This project is consistent with the proposed scope of work under Project No.
70253, “Golden Gate City Transmission Water Main Improvements,” and is also consistent with the
FY2020 Budget approved by the Board of County Commissioners (“Board”) on September 19, 2019.
On February 27, 2018, the Board authorized closing on the acquisition of the Real and Personal Property
constituting the Golden Gate City System currently owned by the Florida Governmental Utility Authority
(“FGUA”) to provide Water and Wastewater services in Golden Gate City, Collier County, Florida.
The potable water utilities within Golden Gate City have reached the end of their useful lives.
Replacement is necessary to meet demand, stay in compliance, and provide Collier County Water -Sewer
District (“CCWSD”) customers a compliant and reliable utility system. Furthermore, plans to expand
potable water services to Golden Gate City residents requires upsizing of the transmission system.
Currently there is approximately 61% of Golden Gate City served by the CCWSD regional water system,
and approximately 39% serviced by private wells.
The first step to replace the existing water mains and install new water mains within Golden Gate City is
to construct transmission water mains around the city perimeter. These transmission water mains will
connect to the regional water mains on Collier Boulevard and Santa Barbara Boulevard aligned in the
following proposed corridors:
1. Green Boulevard Transmission Water Main Improvements
2. Santa Barbara Boulevard Transmission Water Main Improvements
3. Golden Gate Parkway Transmission Water Main Improvements
4. Sunshine Boulevard Transmission Water Main Improvements
The CCWSD will continue to coordinate with GMD regarding transportation, stormwater, pathways and
the Golden Gate City Incentive area.
On November 15, 2019, the Procurement Services Division released notices of RPS No. 19-7637, Golden
Gate City Transmission Water Main Improvements Design. 10,191 firms were notified, 191 firms
viewed/downloaded the solicitation information, and the County received six (6) proposals by the
December 16, 2019 due date. Staff concluded all proposers to be responsive and responsible.
A Selection Committee met on January 24, 2020, and as described in step 1 of the solicitation documents,
the Committee scored each of the proposals and shortlisted the following top four firms to move o n to
step 2:
Johnson Engineering, Inc.
16.C.4
Packet Pg. 1652
04/28/2020
Tetra Tech, Inc.
AECOM Technical Services, Inc.
Rummel, Klepper & Kahl, LLP d.b.a. RK&K
On February 21, 2020, the Selection Committee reconvened for step 2, heard presentations by the firms,
and ranked the firms as follows:
Respondents:
Company Name City County State Final Ranking Responsive/Responsible
Johnson Engineering,
Inc.
Fort
Myers
Lee FL 1 Yes/Yes
AECOM Technical
Services, Inc.
Fort
Myers
Lee FL 2 Yes/Yes
Tetra Tech, Inc. Estero Lee FL 3 Yes/Yes
Rummel, Klepper &
Kahl, LLP d.b.a. RK&K
Fort
Myers
Lee FL 4 Yes/Yes
DRMP, Inc. Fort
Myers
Lee FL Not Ranked Yes/Yes
TKW Consulting
Engineers, LLC
Fort
Myers
Lee FL Not Ranked Yes/Yes
Johnson Engineering, Inc. is qualified and has experience with designing transmission water main
projects. Staff recommends approval of the Selection Committee’s ranking and authorization to
commence contract negotiations with the top ranked firm, Johnson Engineering, Inc. In the event an
agreement cannot be reached with the top ranked firm, staff would continue negotiating with the
remaining firms in ranked order until a proposed agreement can be brought back for the Board’s
consideration.
FISCAL IMPACT: Once negotiations are completed, the contract will be brought back to a future
meeting for approval. The source of funding will be the water user fees. Budget amendments will be
required to fully fund this project.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to
form and legality, and requires majority vote for approval. -JAK
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
RECOMMENDATIONS: That the Board of County Commissioners, Ex-officio the Governing Board
of the Collier County Water-Sewer District, approve the Selection Committee’s ranking of RPS No. 19-
7637, “Golden Gate City Transmission Water Main Improvements Design” (Project Number 70253), and
authorize staff to begin contract negotiations with the top ranked firm, Johnson Engineering, Inc., and in
the event that an agreement cannot be reached with that firm, to continue negotiating with the remaining
firms in ranked order, so that a proposed agreement can be brought back for the Board’s consideration at
a subsequent meeting.
Prepared by: Benjamin N. Bullert, P.E., Principal Project Manager, Engineering and Project Management
Division
16.C.4
Packet Pg. 1653
04/28/2020
ATTACHMENT(S)
1. 19-7637 Final Ranking (PDF)
2. 19-7637 Johnson_Engineering_Proposal (PDF)
3. 19-7637 NORA.docx (PDF)
4. 19-7637 Solicitation (PDF)
16.C.4
Packet Pg. 1654
04/28/2020
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.4
Doc ID: 11974
Item Summary: Recommendation to approve the selection committee’s ranking of Request for
Professional Services (“RPS”) No. 19-7637, “Golden Gate City Transmission Water Main Improvements
Design,” and authorize staff to begin contract negotiations with the top ranked firm, Johnson Engineering,
Inc., so that staff can bring a proposed agreement back for the Board’s consideration at a subsequent
meeting.
Meeting Date: 04/28/2020
Prepared by:
Title: – Public Utilities Planning and Project Management
Name: Benjamin Bullert
03/09/2020 11:26 AM
Submitted by:
Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management
Name: Tom Chmelik
03/09/2020 11:26 AM
Approved By:
Review:
Wastewater Beth Johnssen Additional Reviewer Completed 03/09/2020 11:29 AM
Procurement Services Sandra Herrera Additional Reviewer Completed 03/09/2020 3:03 PM
Procurement Services Sandra Herrera Level 1 Purchasing Gatekeeper Completed 03/09/2020 3:21 PM
Water Pamela Libby Additional Reviewer Completed 03/10/2020 10:19 AM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 03/10/2020 10:44 AM
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 03/10/2020 11:48 AM
Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/12/2020 12:54 PM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/12/2020 5:56 PM
County Attorney's Office Scott Teach Level 2 Attorney Review Completed 03/19/2020 9:56 AM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/19/2020 10:11 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/19/2020 3:47 PM
Budget and Management Office Ed Finn Additional Reviewer Completed 03/23/2020 6:20 PM
Office of Management and Budget Susan Usher Additional Reviewer Completed 04/11/2020 4:14 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 04/18/2020 10:48 AM
Board of County Commissioners MaryJo Brock Meeting Pending 04/28/2020 9:00 AM
16.C.4
Packet Pg. 1655
Selection CommitteeFinal Ranking SheetRPS #: 19-7637Title: Golden Gate City Transmission Water Main Improvements DesignName of Firm Diana Dueri Pamela LibbyGary PutaansuuLiz GosselinHoward BrogdonTotalSelection CommitteeFinal Rank Johnson Engineering, Inc.112116 1.0000AECOM Technical Services, Inc.2312311 2.0000Tetra Tech, Inc.4244216 3.0000Rummel, Klepper & Kahl, LLP d.b.a. RK&K3433417 4.0000Procurement Professional Sarah HamiltonStep 1: Upon direction by the Procurement professional, the individual selection committee member should provide their ranking of the proposals (from highest being number one (1) to lowest. Step 2: The procurement professional will review the mathematically calculated final rank and discuss the rank order and determine if consensus is reached.Page 1 of 1DocuSign Envelope ID: 24877895-09D1-4AB3-85A9-A6352EFD29F116.C.4.aPacket Pg. 1656Attachment: 19-7637 Final Ranking (11974 : Golden Gate City Transmission Water Main Improvements
Proposal to Provide
GOLDEN GATE CITY
TRANSMISSION WATER MAIN
IMPROVEMENTS DESIGN
RPS NO.: 19-7637 | DECEMBER 16, 2019
16.C.4.b
Packet Pg. 1657 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
Table of ContentsCollier County
Cover Letter
1. Ability of Professional Personnel 1
&HUWLÀHG0LQRULW\%XVLQHVV(QWHUSULVH8
3. Past Performance 9
4. Location 18
5. Recent, Current, and Projected Workloads of the Firm 25
6. Required Form Submittals
)RUP9HQGRU&KHFNOLVW
)RUP&RQÁLFWRI,QWHUHVW$IÀGDYLW
)RUP9HQGRU'HFODUDWLRQ6WDWHPHQW
)RUP,PPLJUDWLRQ$IÀGDYLW&HUWLÀFDWLRQ (YHULI\SURÀOH
)RUP9HQGRU6XEVWLWXWH:
)RUP,QVXUDQFHDQG%RQGLQJ5HTXLUHPHQWV
2WKHU/LFHQVHV&HUWLÀFDWLRQV
16.C.4.b
Packet Pg. 1658 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
Table of ContentsCollier County
2122 Johnson Street ŶPost Office Box 1550 ŶFort Myers, Florida 33902-1550
(239) 334-0046 ŶFax (239) 334-3661
SINCE 1 946
'HFHPEHU
&ROOLHU&RXQW\
3URFXUHPHQW6HUYLFHV'LYLVLRQ
7DPLDPL7UDLO(DVW%/'*&
1DSOHV)/
Re: Golden Gate City Transmission Water Main Improvements Design, RPS No. 19-7637
'HDU6HOHFWLRQ&RPPLWWHH
-RKQVRQ(QJLQHHULQJLVSOHDVHGWRVXEPLWRXUTXDOLÀFDWLRQVIRU&ROOLHU&RXQW\·V*ROGHQ*DWH&LW\7UDQVPLVVLRQ:DWHU0DLQ
,PSURYHPHQW'HVLJQSURMHFW2XUWHDPKDVHQMR\HGDFORVHZRUNLQJUHODWLRQVKLSZLWK&ROOLHU&RXQW\IRUPRUHWKDQWKUHH
GHFDGHV7RJHWKHUZHKDYHVXFFHVVIXOO\FRPSOHWHGPDQ\XWLOLW\SURMHFWVWKURXJKRXW&ROOLHU&RXQW\/DVW\HDURXUWHDPGHVLJQHG
WKUHHLQWHUFRQQHFWVEHWZHHQWKH&RXQW\·VH[LVWLQJV\VWHPDQGWKH*ROGHQ*DWHV\VWHP7KHVHLQWHUFRQQHFWVZHUHGHVLJQHG
DQGFRQVWUXFWHGLQDQH[SHGLWHGWLPHIUDPHWRVXSSRUWWKH&RXQW\·VDFTXLVLWLRQRIWKH*ROGHQ*DWHXWLOLW\V\VWHPV<RXUVWDII
NQRZVXVDQGPRVWLPSRUWDQWO\WUXVWVXVWRJHWWKHMREGRQH
7KLVSURMHFWZLOOEHFKDOOHQJLQJRQVHYHUDOIURQWV)LUVWWKHH[LVWLQJV\VWHPZDVUHFHQWO\DFTXLUHGE\WKH&RXQW\DQGZH
XQGHUVWDQGWKDWGRFXPHQWDWLRQDQGUHFRUGGUDZLQJVDUHODFNLQJLQGHWDLO$FFXUDWHO\FKDUDFWHUL]LQJWKHV\VWHPZLOOEHLPSRUWDQW
WRDYRLGFRQÁLFWVDQGPDLQWDLQVHUYLFHVGXULQJFRQVWUXFWLRQ,QDGGLWLRQWRUHYLHZLQJDYDLODEOHLQIRUPDWLRQ-RKQVRQ(QJLQHHULQJ
ZLOOSURYLGHVXEVXUIDFHXWLOLW\H[SORUDWLRQDQGÀHOGVXUYH\VWRGHYHORSDFRPSUHKHQVLYHSLFWXUHRIWKHH[LVWLQJV\VWHP
%XLOGLQJXSDQGPDLQWDLQLQJSXEOLFVXSSRUWZLOOEHFUXFLDOIRUWKLVSURMHFW2XUWHDPZRUNLQJZLWKRXUVXEFRQVXOWDQW&HOOD
0ROQDUDQG$VVRFLDWHVZLOOSURYLGHSXEOLFLQIRUPDWLRQPDWHULDOVDQGZRUNVKRSVWRGHPRQVWUDWHWKHEHQHÀWVRIWKLVSURMHFW
WRUHVLGHQWV7KHVHPDWHULDOVDQGPHHWLQJVZLOOEHSURYLGHGLQERWK(QJOLVKDQG6SDQLVKVRWKDWDOOUHVLGHQWVZLOOEHDEOHWR
XQGHUVWDQGWKHQHHGIRUWKLVSURMHFWDQGZKDWWRH[SHFWGXULQJFRQVWUXFWLRQ
)LQDOO\RXUWHDPZLOOFROODERUDWHZLWKWKH&RXQW\DQGRWKHUVWDNHKROGHUVWRLGHQWLI\DGGLWLRQDOLQIUDVWUXFWXUHLPSURYHPHQWV
WKDWDUHV\QHUJLVWLFZLWKWKHZDWHUPDLQUHSODFHPHQWSURMHFW-RKQVRQ(QJLQHHULQJFDQSURYLGHUHFRPPHQGDWLRQVDQGSODQV
IRUFRQFXUUHQWLPSURYHPHQWVWRZDVWHZDWHUXWLOLWLHVURDGVGUDLQDJHVLGHZDONVODQGVFDSLQJDQGRWKHULQIUDVWUXFWXUH:RUNLQJ
WRJHWKHUZHZLOOGHYHORSDKROLVWLFGHVLJQWKDWDYRLGVUHSHDWHGFRQVWUXFWLRQWKURXJKQHLJKERUKRRGVDQGPD[LPL]HVYDOXHWR
WKH&RXQW\DQGUHVLGHQWV
:HKDYHHQMR\HGRXUSRVLWLYHDQGSURGXFWLYHUHODWLRQVKLSZLWK&ROOLHU&RXQW\RQSDVWDQGFXUUHQWSURMHFWVDQGZHDSSUHFLDWH
WKHRSSRUWXQLW\WRIXUWKHURXUUHODWLRQVKLS:HDUHFRQÀGHQWWKDWRXUSURSRVHGWHDPH[WHQVLYHH[SHULHQFHDQGKLVWRULFDO
NQRZOHGJHRI&ROOLHU&RXQW\ZLOOSURYHWREHDWUHPHQGRXVEHQHÀWWR\RXDQGZLOOHQVXUHWKHVXFFHVVRIDQ\SURMHFW
6LQFHUHO\
-2+1621(1*,1((5,1*,1&
0LFKDHO'LFNH\3(
'LUHFWRURI8WLOLW\6HUYLFHV
PGLFNH\#MRKQVRQHQJFRP
16.C.4.b
Packet Pg. 1659 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
1. ABILITY OF PROFESSIONAL PERSONNEL
16.C.4.b
Packet Pg. 1660 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
1
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
COMPANY OVERVIEW
Depth of Experience
&HQWXULHVRIFRPELQHGH[SHULHQFH
KDVLPPHUVHGRXUWHDPRIOLFHQVHG
SURIHVVLRQDOVLQWR)ORULGD·VJHRJUDSK\
JLYLQJXVDUDUHSHUVSHFWLYHLQWR
GHYHORSPHQWRIWKHDUHDDQGDQ
DSSUHFLDWLRQRIWKHFKDQJHV
Full Range of Services
6SHFLDOL]HGWHDPVRIOLFHQVHG
HQJLQHHUVODQGSODQQHUVODQGVFDSH
DUFKLWHFWVVXUYH\RUVHFRORJLVWVZDWHU
UHVRXUFHVH[SHUWVWUDQVSRUWDWLRQDQG
XWLOLW\GHVLJQHUVSURYLGHDOODVSHFWV
QHHGHGWRFRPSOHWHHYHU\SURMHFW
Long Term Commitment
2XUWHDP·VDYHUDJHWHQXUHZLWK
-RKQVRQ(QJLQHHULQJLV\HDUV
0RUHWKDQKDOIRIRXUHPSOR\HHVKDYH
EHHQZLWKXVIRUPRUHWKDQ\HDUV
KDYHEHHQZLWKXVIRUPRUH
WKDQ\HDUVDQGDQXQSUHFHGHQWHG
KDYHEHHQZLWKXVIRUPRUH
WKDQ\HDUVVKRZLQJRXUWHDP·V
FRPPLWPHQWFRQWLQXLW\DQG
GHGLFDWLRQWRWKHDUHD
Local Knowledge
:HFDQSURYLGHLQYDOXDEOHKLVWRULFDO
GDWDRIWKHORFDODUHDDQGRXU
FRQYHQLHQWO\ORFDWHGRIÀFHVDOORZ
XVWRSURYLGHSURPSWVHUYLFH
DQGFRPPXQLFDWLRQWKURXJK
HYHU\VWHSRI\RXUSURMHFW
(VWDEOLVKHG LQ -RKQVRQ (QJLQHHULQJ KDV D WHDP RI PRUH WKDQ SURIHVVLRQDO HQJLQHHUV
FHUWLÀHGODQGSODQQHUVODQGVFDSHDUFKLWHFWVHFRORJLVWVVFLHQWLVWVJHRORJLVWVDQGVXUYH\RUV PDSSHUV
throughout Florida. +HDGTXDUWHUHGLQ)RUW0\HUV)ORULGDWKHFRPSDQ\DOVRKDVRIÀFHVLQ1DSOHV
0LDPL/D%HOOH&OHZLVWRQ3RUW&KDUORWWHDQG/XW]
2XUH[WHQVLYHSRUWIROLRRIZHOONQRZQ)ORULGDURDGVVKRSSLQJFHQWHUVVFKRROVKRVSLWDOVUHVLGHQWLDO
FRPPXQLWLHVUHVRUWVDQGFRPPHUFLDOGHYHORSPHQWVVKRZRXUFRQWLQXHGUHVSRQVLELOLW\LQGHYHORSLQJ
)ORULGD·VFRPPXQLWLHV
2XUÀUPKDVSURYLGHGSURIHVVLRQDOHQJLQHHULQJVHUYLFHVIRU\HDUV:HKDYHRUDUHFXUUHQWO\
SURYLGLQJFRQWLQXLQJVHUYLFHVWRWKHIROORZLQJHQWLWLHV
¬&ROOLHU&RXQW\
¬&LW\RI%RQLWD6SULQJV
¬&LW\RI&OHZLVWRQ
¬&LW\RI'DGH&LW\
¬&LW\RI)RUW0\HUV
¬&LW\RI+ROO\ZRRG
¬&LW\RI/DNHODQG
¬&LW\RI0DUFR,VODQG
¬&LW\RI1DSOHV
¬&KDUORWWH&RXQW\
¬'H6RWR&RXQW\
¬*ODGHV&RXQW\
¬+HQGU\&RXQW\
¬+LJKODQGV&RXQW\
¬/HH&RXQW\
¬/HH&RXQW\3RUW$XWKRULW\
¬/HH0HPRULDO+HDOWK
6\VWHPV
¬0LDPL'DGH&RXQW\
¬0LFFRVXNHH7ULEHRI,QGLDQVRI
)ORULGD
¬2NHHFKREHH&RXQW\
¬3DVFR&RXQW\
¬3RON&RXQW\
¬6DUDVRWD&RXQW\
¬9LOODJHRI(VWHUR
16.C.4.b
Packet Pg. 1661 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
2
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
)RXQGHGLQ-RKQVRQ(QJLQHHULQJKDVEHHQSURYLGLQJHQJLQHHULQJDQGUHODWHGVHUYLFHVLQ6RXWKZHVW
)ORULGDIRUPRUHWKDQ\HDUV:HKDYHSOD\HGDVLJQLÀFDQWUROHLQKXQGUHGVRIPXQLFLSDODQGSULYDWH
SURMHFWVWKDWFRQWULEXWHWRJURZWKRSSRUWXQLWLHVDQGTXDOLW\RIOLIHLQ6RXWKZHVW)ORULGD2XUÀUPKDV
WKHNQRZOHGJHDQGUHVRXUFHVWRPDNHWKLVSURMHFWDVXFFHVV
Project Team
-RKQVRQ(QJLQHHULQJ·V8WLOLWLHVWHDPZLOOOHDGWKLVSURMHFW2XU8WLOLWLHVWHDPLVH[SHULHQFHGZLWKDOO
DVSHFWVRIXWLOLW\HQJLQHHULQJIURPSUHOLPLQDU\GHVLJQWRFRQVWUXFWLRQDGPLQLVWUDWLRQDQGSURMHFW
FORVHRXW:KLOHWKLVSURMHFWEURDGO\IDOOVLQWRWKHVFRSHRIVHUYLFHVSURYLGHGE\RXU8WLOLWLHVWHDPRXU
VXUYH\LQJHQYLURQPHQWDOVXUIDFHZDWHUGUDLQDJHHQJLQHHULQJWUDQVSRUWDWLRQODQGVFDSHDUFKLWHFWXUH
DQGHOHFWULFDOHQJLQHHULQJJURXSVZLOOSURYLGHVXSSRUWLQJVHUYLFHVDVQHFHVVDU\:HZLOODOVRXWLOL]H&HOOD
0ROQDUDVXEFRQVXOWDQWZHKDYHZRUNHGZLWKIRUPRUHWKDQ\HDUVWRGHYHORSSXEOLFLQIRUPDWLRQ
FDPSDLJQVIRUSURMHFWV
7HDPFROODERUDWLRQLVSULRULWL]HGDW-RKQVRQ(QJLQHHULQJ7KLVDOORZVXVWRSURYLGHVSHFLDOL]HG
H[SHUWLVHDQGDKROLVWLFDSSURDFKWRSURMHFWV/RQJWHQXUHVDW-RKQVRQ(QJLQHHULQJDOVR
FRQWULEXWHWRHIIHFWLYHFRRUGLQDWLRQDPRQJRXUVSHFLDOL]HGWHDPVEHFDXVHZHKDYHDOO
ZRUNHGWRJHWKHUIRUPDQ\\HDUVRQGLYHUVHW\SHVRISURMHFWV$VVKRZQLQWKHIROORZLQJ
ÀJXUH-RKQVRQ(QJLQHHULQJ·VVSHFLDOL]HGJURXSVURXWLQHO\FROODERUDWHRQPXOWLGLVFLSOLQH
SURMHFWVWRDFKLHYHVXFFHVVIXORXWFRPHVIRURXUFOLHQWV
Service Areas UtilitiesSurveying & MappingWater ResourcesTransportationEnvironmentalElectricalLandscape ArchitectureCella Molnar & AssociatesArdamanNESA D D D D D D D D D
91st & 92nd Watermain Replacement D D D D
Vanderbilt Cul-De-Sac’s Watermain Replacement D D
Collier County 24" IQ Main D D D D D
Wiggins Pass Watermain Replacement D D D
Vanderbilt Drive Watermain Replacement D D D
Golden Gate Canal 36" Watermain Directional Drill D D D D D
Twin Eagles Pump Station & Force Main Improvements D D D D D
Town of Fort Myers Beach Utility Improvements D D D D D D D
Phase 3-C Utility Improvements D D D D D D D D D
Bembery Sewer Improvements D D D D D
Marion Street Force Main D D D D D D D D
Golden Gate Water Main Interconnects D D D D
Hitching Post Wastewater Improvements D D D
Blue Bill Force Main Directional Drill D D D
Mediterra Pump Station Improvements D D D D D D
Village Walk Utility Improvements D D D
97th Street Utility Improvements D D D D D
Cape Coral Utility Expansion Project D D D D D D D D
Coronado Force Main Improvements D D D D D D D D
Carica Pump Station Improvements D D D
Estero Blvd Force Main Improvements D D D D D
Seagate Water Main Improvements D D D
Pine Ridge Road Force Main D D D D D D
Burnt Store Road Widening D D D D D
Jones Loop Road Force Main D D D D D D D D
Aqua Estes Road & Utility Improvements D D D D D
McGregor - Tanglewood Force Main Replacement D D D D D D D D
Alico Road Widening D D D D D D D
Ben Hill Griffin and Alico Force Main D D D D D D D
Rehabilitation of Pump Station 4 & 27 D D D D
Palm Tree Blvd Potable Water Main, Storage & Re-Pumping
Facility Improvements D D D D D D D
Mcgregor Water Main Improvements D D D D D D
16.C.4.b
Packet Pg. 1662 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
3
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
Collaboration with Stakeholders
&RRUGLQDWLRQZLWKDOOVWDNHKROGHUVLVSULRULWL]HGDW-RKQVRQ(QJLQHHULQJ%ULQJLQJRXUWHDPVWRJHWKHU
ZLWKRWKHUVWRLGHQWLI\UHTXLUHPHQWVFRQVWUDLQWVDQGJRDOVFRQWULEXWHVWRVXFFHVVIXOSURMHFWV:HDUH
FRPPLWWHGWRSURYLGLQJHIIHFWLYHFROODERUDWLRQFRRUGLQDWLRQDQGFRPPXQLFDWLRQWRWKH&RXQW\RQ
WKLVSURMHFW
2XU8WLOLWLHVWHDPKDVHVWDEOLVKHGDVWURQJZRUNLQJUHODWLRQVKLSZLWK&ROOLHU&RXQW\(30'VWDIIDQG
ÀHOGSHUVRQQHO)URPWKHVHUHODWLRQVKLSVZHXQGHUVWDQGWKHLPSRUWDQFHSODFHGRQFRPPXQLFDWLRQ
DQGFROODERUDWLRQ2XUWHDPUHJXODUO\PHHWVZLWK(30'VWDIIWRSURYLGHXSGDWHVJDWKHULQSXWDQG
SUHVHQW LQIRUPDWLRQ:H SURYLGH SURDFWLYH FRPPXQLFDWLRQ WR NHHS VWDNHKROGHUV LQIRUPHG DQG
VXSSRUWGHFLVLRQPDNLQJ)LQDOO\ZHSURYLGHDJLOHUHVSRQVHVWRFKDQJLQJQHHGVQHZFKDOOHQJHVRU
SRWHQWLDORSSRUWXQLWLHVGXULQJWKHFRXUVHRIDSURMHFW7RJHWKHUWKHVHHIIRUWVVXSSRUWDFROODERUDWLYH
UHODWLRQVKLSZLWKWKH&RXQW\WKDWFRQWULEXWHVWRVXFFHVVIXOSURMHFWV
Experience with Golden Gate
2XU8WLOLWLHVWHDPKDVUHFHQWH[SHULHQFHLQ*ROGHQ*DWHWKDWLVUHOHYDQWIRUWKLVSURMHFW,Q
-RKQVRQ(QJLQHHULQJZDVWDVNHGZLWKH[SHGLWLQJGHVLJQDQGSHUPLWWLQJRIWKH*ROGHQ*DWH:DWHU
0DLQ,QWHUFRQQHFWVSURMHFWVRWKDWWKH&RXQW\ZRXOGEHUHDG\WRFRQQHFWWRWKH*ROGHQ*DWHZDWHU
GLVWULEXWLRQV\VWHPXSRQSXUFKDVHIURP)*8$7KHSURMHFWLQFOXGHGFRQQHFWLRQVDORQJ
¬&5DW*UHHQ%RXOHYDUG
¬6DQWD%DUEDUDFRQQHFWLQJDWQG$YHQXH6:
¬7URSLFDQD%RXOHYDUGWKURXJKWKH*ROGHQ*DWH+LJK6FKRROJURXQGVDQGFRQQHFWLQJDW
QG$YHQXH6:
7KHVHFRQQHFWLRQVUHTXLUHGVL]LQJVSHFLDOL]HGSUHVVXUHUHGXFLQJYDOYHVDQGSUHVVXUHUHOLHYLQJYDOYHV
WRDFFRPPRGDWHGLIIHUHQWRSHUDWLQJSDUDPHWHUVEHWZHHQWKHWZRV\VWHP'LUHFWLRQDOO\GULOOLQJWKH
PDLQVXQGHUWKH*ROGHQ*DWH&DQDOZKLFKUHTXLUHGDQ(QYLURQPHQWDO5HVRXUFH3HUPLWWLQJIURPWKH
)'(3DQGSHUPLWWLQJWKURXJK6):0'IRUFRQVWUXFWLRQLQWKHFDQDO52:&RRUGLQDWLRQZLWK&ROOLHU
&RXQW\SXEOLFVFKRROVWDIIZDVDOVRUHTXLUHG$OOWKUHHLQWHUFRQQHFWVZHUHGHVLJQHGSHUPLWWHGDQG
FRQVWUXFWHGLQWLPHWRDOORZIRUWLPHO\FRQQHFWLRQVXSRQSXUFKDVHRIWKHV\VWHP:HDOVRQRWHWKDW
WKUHHRIWKHSURMHFWVDQWLFLSDWHGIRUWKLVFRQWUDFWDUHGLUHFWO\GRZQVWUHDPIURPWKHVHLQWHUFRQQHFWV
:HKDYHDOVRGHVLJQHGDLQFKZDVWHZDWHUIRUFHPDLQWKDWZLOOIROORZWKHVDPHURXWHDVWKHZDWHU
PDLQLQVWDOOHGZLWKLQWKH*ROGHQ*DWH+LJK6FKRROSURSHUW\,QDGGLWLRQRXU8WLOLWLHVWHDPKDVWHVWHG
PXOWLSOHSXPSVWDWLRQVLQVWDOOHGSUHVVXUHWUDQVGXFHUVDWYDULRXVSRLQWVLQWKH*ROGHQ*DWHZDWHU
V\VWHPDQGKDVSHUIRUPHGK\GUDXOLFPRGHOLQJRIERWKWKHZDVWHZDWHUDQGZDWHUV\VWHP
Experience with Local Construction
+DYLQJEHHQLQEXVLQHVVIRURYHU\HDUV-RKQVRQ(QJLQHHULQJKDVEHFRPHYHU\IDPLOLDUZLWKORFDO
FRQWUDFWRUV:HKDYHZRUNHGZLWKDOORIWKHSUHDSSURYHGFRQWUDFWRUVLQ&ROOLHU&RXQW\LQPDQ\
GLIIHUHQWFDSDFLWLHVLQFOXGLQJGHVLJQEXLOGSURMHFWV:HFRRUGLQDWHZLWKWKHVHFRQWUDFWRUVWRHQVXUH
FRQVWUXFWDEOHGHVLJQVDQGHYDOXDWHFRQVWUXFWLRQFRVWV7KURXJKWKLVH[SHULHQFHZHKDYHDOVREHFRPH
IDPLOLDUZLWKWKHLUVWUHQJWKVDQGZHDNQHVVHV:LWKWKLVXQGHUVWDQGLQJZHKDYHVXFFHVVIXOO\SURGXFHG
FRQWUDFWGRFXPHQWVZLWKVSHFLÀFQRWHVWRHQVXUHWKH&RXQW\·VREMHFWLYHVDUHPHW7KLVSURFHVVKHOSV
HOLPLQDWHDQ\FRQIXVLRQGXULQJWKHELGSURFHVVDQGKHOSVVHWXSWKHFRQWUDFWRUIRUDVXFFHVVIXOSURMHFW
ZKLOHPLQLPL]LQJFKDQJHRUGHUVDQGULVNVWRWKH&RXQW\
Experience with Regulatory Conditions
-RKQVRQ (QJLQHHULQJ KDV WKH LQKRXVH NQRZOHGJH DQG UHVRXUFHV WR KDQGOH DOO SHUPLWWLQJ QHHGV
SUHVHQWHG E\ WKLV SURMHFW7KLV SURMHFW ZLOO UHTXLUH )'(3 SHUPLWWLQJ 6):0' SHUPLWWLQJ &ROOLHU
&RXQW\52:&ROOLHU&RXQW\6'3LDQGYDULRXVIRUPVRIHQYLURQPHQWDOSHUPLWWLQJ2XUWHDPVWD\V
XSWRGDWHRQSHUPLWWLQJUHTXLUHPHQWVDQGZHKDYHGHYHORSHGJRRGUHODWLRQVKLSVZLWKUHJXODWRU\
DJHQF\VWDII0DQ\WLPHVZHLGHQWLI\DSSURDFKHVWKDWUHGXFHHQYLURQPHQWDOSHUPLWWLQJEXUGHQVDQG
WKHLUDVVRFLDWHGORQJOHDGWLPHV3UHSDULQJDQGVXEPLWWLQJSHUPLWDSSOLFDWLRQVLVDURXWLQHSDUWRIRXU
ZRUNWKDWZHDUHYHU\IDPLOLDUZLWK
16.C.4.b
Packet Pg. 1663 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
4
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
ORGANIZATIONAL CHART
0LFKDHO'LFNH\3(
Project Manager
2XUXWLOLWLHVPDUNHWJURXSLVDKLJKO\PRWLYDWHGDQGHQHUJHWLFJURXSRISURIHVVLRQDOVGHGLFDWHGWRWKH
ZDWHUDQGZDVWHZDWHULQGXVWU\2XUH[SHUWLVHKDVEURXJKWZDWHUWRÀUHK\GUDQWVGULQNLQJIRXQWDLQV
DQGVZLPPLQJSRROVWKURXJKRXW)ORULGDDQGSURYLGHGZDVWHZDWHUV\VWHPVIRUHQWLUHFRPPXQLWLHV$V
WKHSRSXODWLRQJURZVXWLOLWLHVLQIUDVWUXFWXUHPXVWEHHQJLQHHUHGZLWKH[SDQVLRQLQPLQG)RUHVLJKW
ZKLFKVDYHVPRQH\DQGWLPHLVDVWUHQJWKRIRXUWHDP
-DUHG%URZQ3(/(('$3
Local Liaison/
Permitting
0DUN7KRPDV3(
8WLOLW\(QJLQHHU
'DYH7URXWHDXG3(
3URMHFW(QJLQHHU
Kim Arnold, PG
Water Use Permitting
-RKQ&XUWLV&6(
(QYLURQPHQWDO
:D\QH:ULJKW3(
(OHFWULFDO
%DUU\6\UHQ360
Design Survey
Mark Texter, PSM
Subsurface Utility
([SORUDWLRQ68(
Mike Tiseo
Designer
%LOO\6DXP(,
8WLOLW\(QJLQHHU
Josh Hildebrand,
3(372(
Transportation
$QG\7LOWRQ3(
Water Resources
(QJLQHHU
Public Involvement
Cella Molnar & Associates
'%(
*HRWHFKQLFDO(QJLQHHULQJ
Ardaman & Associates
16.C.4.b
Packet Pg. 1664 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
5
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
Michael Dickey, PE
Director of Utilities
0LNHMRLQHG-RKQVRQ(QJLQHHULQJLQDQGVHUYHVDVWKHGLUHFWRURIWKH8WLOLWLHVPDUNHWJURXS
0LNHKDVGHVLJQHGXWLOLWLHVIRUYDULRXVGHYHORSPHQWVSULYDWHXWLOLW\FRPSDQLHVDQGPXQLFLSDOLWLHV3ULRU
WRMRLQLQJ-RKQVRQ(QJLQHHULQJ0LNHZRUNHGIRUDORFDOXWLOLW\FRQWUDFWRUZKLFKJDYHKLPDXQLTXH
SHUVSHFWLYHRQKRZWKHXWLOLWLHVKHGHVLJQVFRPHWRJHWKHULQWKHÀHOG:LWKERWKXWLOLW\GHVLJQDQG
FRQVWUXFWLRQH[SHULHQFH0LNHKDVDFRPSUHKHQVLYHXQGHUVWDQGLQJRIWKHHQWLUHXWLOLW\GHYHORSPHQW
SURFHVVIURPSODQQLQJWRGHVLJQDQGSHUPLWWLQJWKURXJKFRQVWUXFWLRQ+HNQRZVKRZWRGHYHORSD
GHVLJQWKDWZRUNVERWKLQWKHRU\DQGLQSUDFWLFH
Jared Brown, PE, LEED AP
Local Liaison/Permitting
-DUHG MRLQHG -RKQVRQ (QJLQHHULQJ LQ DV D SURMHFW PDQDJHU UHVSRQVLEOH IRU WKH GD\ WR GD\
RSHUDWLRQVRIWKH1DSOHVRIÀFH$UHVLGHQWRI&ROOLHU&RXQW\VLQFH-DUHGKDVZRUNHGRQD
ZLGHUDQJHRISURMHFWVLQDQGDURXQG1DSOHV+HKDVZRUNHGZLWKQRQSURÀWVORFDOPXQLFLSDOLWLHV
GHYHORSHUVDUFKLWHFWVHQJLQHHUVDQGFRQWUDFWRUVRQPXOWLSOHVLPXOWDQHRXVSURMHFWV6HUYLQJDVWKH
SRLQWRIFRQWDFWIRUFOLHQWVSURMHFWGHVLJQWHDPVDQGVXEFRQVXOWDQWV-DUHGKDVEHHQUHVSRQVLEOHIRU
SURMHFWPDQDJHPHQWFLYLOGHVLJQGUDZLQJSUHSDUDWLRQVSHFLÀFDWLRQVDQGFRQVWUXFWLRQREVHU YDWLRQIRU
FRPPHUFLDOLQVWLWXWLRQDODQGUHVLGHQWLDOSURMHFWV,QFOXGLQJSURMHFWHQJLQHHUIRUXWLOLW\DQGURDGZD\
LQIUDVWUXFWXUHDW$YH0DULDDQGSURMHFWPDQDJHUIRUWKHGHYHORSPHQWRIWKH1DSOHV%RWDQLFDO*DUGHQ
Dave Trouteaud, PE
3URMHFW(QJLQHHU
'DYHMRLQHG-RKQVRQ(QJLQHHULQJLQDQGPDQDJHVYDULRXVXWLOLW\UHODWHGSURMHFWV$VSURMHFW
PDQDJHUKHVSHFLDOL]HVLQXWLOLW\PDVWHUSODQQLQJK\GUDXOLFPRGHOLQJGHVLJQRIZDWHUGLVWULEXWLRQ
V\VWHPVZDVWHZDWHUFROOHFWLRQV\VWHPVDQGLUULJDWLRQV\VWHPV'DYLGIUHTXHQWO\ZRUNVZLWK-RKQVRQ
(QJLQHHULQJ·VODQGGHYHORSPHQWJURXSDVVLVWLQJZLWKWKHGHVLJQRIXWLOLW\V\VWHPVIRUGHYHORSPHQWV
WKURXJKRXW)ORULGD$VRQHRIWKH(QJLQHHUVRI5HFRUGIRU6RXWKZHVW 8WLOLW\([WHQVLRQ3URMHFW
IRU&DSH&RUDOKHLVIDPLOLDUZLWKFXUUHQWVWDQGDUGVDQGVWDII6RPHRI'DYH·VSUHYLRXVZRUNLQFOXGHV
GHVLJQRIXWLOLWLHVZLWKLQWKH/HH&RXQW\%RVWRQ5HG6R[6SULQJ7UDLQLQJ)DFLOLW\SURMHFWPDQDJHUIRU
WKH,QVSHFWLRQRI0F*UHJRU$UHD:DWHUOLQHVIRUWKH&LW\RI)RUW0\HUVDVVLVWDQWSURMHFWPDQDJHUIRU
6SULQJ&UHHN9LOODJHZDWHUDQGVHZHUUHSODFHPHQWSURMHFWWRWDORIIHHWRISLSHIRU%RQLWD
6SULQJV8WLOLWLHV
Mark Thomas, PE
8WLOLW\(QJLQHHU
0DUNEHHQDVVRFLDWHGZLWK-RKQVRQ(QJLQHHULQJVLQFHZKHQKHMRLQHGWKHÀUP·VXWLOLW\JURXS
0DUNVSHFLDOL]HVLQK\GUDXOLFPRGHOLQJDQGDQDO\VLVIRUZDWHUZDVWHZDWHUDQGLUULJDWLRQV\VWHPV$V
SDUWRIK\GUDXOLFPRGHOLQJ0DUNKDVGHYHORSHGORQJWHUPÁRZSURMHFWLRQVGHYHORSHGFXVWRPGDWD
DQDO\VLVWRROVDQGSUHVHQWHGUHFRPPHQGDWLRQVWRFOLHQWV0DUNDOVRKDVH[SHULHQFHZLWKXWLOLW\GHVLJQ
DQGSHUPLWWLQJLQFOXGLQJSLSHOLQHVDQGSXPSLQJVWDWLRQV+HREWDLQHGSURIHVVLRQDOOLFHQVXUHLQ
Billy Saum, EI
8WLOLW\(QJLQHHU
%LOO\FXUUHQWO\VHUYHVDVDQ(QJLQHHULQJ,QWHUQLQWKHXWLOLWLHVPDUNHWJURXS$6RXWK)ORULGDQDWLYH
KHEHJDQKLVFDUHHUDW-RKQVRQ(QJLQHHULQJDIWHUJUDGXDWLQJIURP)ORULGD*XOI&RDVW8QLYHUVLW\LQ
%LOO\KDVH[SHULHQFHLQSURMHFWPDQDJHPHQWGDWDFROOHFWLRQDQGDQDO\VLVK\GUDXOLFPRGHOLQJ
DQGFDOFXODWLRQVSXPSVWDWLRQDQGSLSHOLQHGHVLJQ)'27XWLOLW\FRRUGLQDWLRQTXDQWLW\WDNHRIIVDQG
FRQVWUXFWLRQ FRVW HVWLPDWHV SODQ SURGXFWLRQ SHUPLWWLQJ DQG RQVLWH FRQVWUXFWLRQ LQVSHFWLRQ IRU
FOLHQWVWKURXJKRXW6RXWK)ORULGD%LOO\DOVRKDVH[SHULHQFHZRUNLQJZLWK-RKQVRQ(QJLQHHULQJ·V/DQG
'HYHORSPHQWDQG:DWHU5HVRXUFHJURXSVDVVLVWLQJZLWKXWLOLW\DQDO\VLVSHUPLWWLQJDQGGHVLJQ:KLOH
PRVWRIKLVH[SHULHQFHWKXVIDUKDVEHHQZLWKPXQLFLSDOSURMHFWVKHKDVFRPSOHWHGYDULRXVWDVNVIRU
FRPPHUFLDODQGUHVLGHQWLDOSURMHFWVDVZHOO
KEY PERSONNEL BIOS
16.C.4.b
Packet Pg. 1665 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
6
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
Josh Hildebrand, PE, PTOE
Transportation
-RVKVHUYHVDVDQHQJLQHHUDQGSURMHFWPDQDJHULQRXUWUDQVSRUWDWLRQJURXSDQGKDV\HDUVRI
H[SHULHQFH:LWKKLVSULPDU\IRFXVRQFRUULGRUGHVLJQDQGSRVWGHVLJQFRQVWUXFWLRQDVVLVWDQFH-RVK
XQGHUVWDQGVZKDWPXVWEHGRQHWRVXFFHVVIXOO\SODQIRUDQGGHVLJQURDGZD\SURMHFWVWREHVWVHUYH
ERWKWKHFOLHQWDQGWKHSXEOLF·VQHHGV8QGHUWKHGLUHFWLRQRI5\DQ%HOO-RVKKDVZRUNHGRQYDULRXV
SURMHFWVWKURXJKRXW6RXWKZHVW)ORULGDLQFOXGLQJVHYHUDOURDGZD\DQGSDWKZD\SURMHFWVLQ&ROOLHU/HH
+HQGU\DQG&KDUORWWH&RXQWLHV+LVH[SHULHQFHVKDYHSURYLGHGKLPZLWKDQLQGHSWKXQGHUVWDQGLQJ
RIWUDIÀFVWXGLHVWUDIÀFGDWDFROOHFWLRQURDGZD\GHVLJQLQWHUVHFWLRQGHVLJQDQGVLJQLQJDQGPDUNLQJ
DQDO\VLV
Andy Tilton, PE
:DWHU5HVRXUFHV(QJLQHHU
$QG\LVWKHGLUHFWRURIRXUZDWHUUHVRXUFHVJURXSDQGKDV\HDUVRIH[SHULHQFH$QG\KDVVHUYHGDV
WKHVHQLRUHQJLQHHUIRUVXUIDFHZDWHURQPDQ\RIWKHÀUP·VPXQLFLSDOURDGZD\SURMHFWVLQ6RXWKZHVW
)ORULGDDQGIRUWKH)ORULGD'HSDUWPHQWRI7UDQVSRUWDWLRQ+HGHVLJQVSURMHFWFRPSRQHQWVWRIRU
VWRUPZDWHUV\VWHPVLQFOXGLQJSRQGVORZLPSDFWV\VWHPVDQGYDULRXVRWKHUW\SHVRIZDWHUTXDOLW\
WUHDWPHQWIDFLOLWLHV1XWULHQWUHPRYDOFDOFXODWLRQVDUHDPDMRUSDUWRIWKHVHGHVLJQV+HKDVGHVLJQHG
VHYHUDOZDWHUTXDOLW\SURMHFWVIRUSXEOLFDQGSULYDWHHQWLWLHVIURPDFUHVLQDQXUEDQVHWWLQJWR
RYHUDFUHVLQDGLVWULEXWHGVWRUDJHSURMHFW+HKDVEHHQWKHSULQFLSDOLQFKDUJHRIWKHYDULRXV
HQYLURQPHQWDOVLWHDVVHVVPHQWVGRQHE\WKHÀUPRYHUWKHSDVW\HDUV7KHVHKDYHEHHQGRQHIRU
)'(3LQWKHLUODQGSXUFKDVHSURJUDP/HHDQG+HQGU\&RXQWLHVDQGIRUPDQ\SULYDWHFOLHQWV
Kim Arnold, PG
Water Use Permitting
.LPMRLQHG-RKQVRQ(QJLQHHULQJLQDQGLVDK\GURJHRORJLVWLQWKHFRPSDQ\·VZDWHUUHVRXUFHV
JURXS6KHLVUHVSRQVLEOHIRUSHUIRUPLQJK\GURJHRORJLFLQYHVWLJDWLRQVZDWHUUHVRXUFHDVVHVVPHQWV
DTXLIHUSHUIRUPDQFHWHVWLQJK\GURORJLFPRQLWRULQJSURJUDPGHYHORSPHQWDQGUHJXODWRU\SHUPLWWLQJ
.LPKDVZRUNHGRQ3XEOLF6HUYLFH&RPPLVVLRQ36&XWLOLW\FHUWLÀFDWLRQFDVHVFRPSUHKHQVLYHSODQ
DPHQGPHQW DSSOLFDWLRQV DQG 'HYHORSPHQW RI 5HJLRQDO ,PSDFW '5, DSSOLFDWLRQV IRU ODUJHVFDOH
GHYHORSPHQWV6KHLVIDPLOLDUZLWKWKHK\GURJHRORJ\RI6RXWKZHVW)ORULGDDQGUHJXODWRU\UHTXLUHPHQWV
.LPMRLQHG-RKQVRQ(QJLQHHULQJZLWK\HDUVRISUHYLRXVH[SHULHQFHDVDK\GURJHRORJLVWZLWKWKH
6):0'ZKHUHVKHUHYLHZHGRYHUZDWHUXVHSHUPLWDSSOLFDWLRQVDPRQJRWKHUGXWLHV
Barry Syren, PSM
Design Survey
%DUU\KDVEHHQVXUYH\LQJIRU-RKQVRQ(QJLQHHULQJIRU\HDUVDQGKDVPDQDJHGWKHÀUP·V1DSOHV
VXUYH\LQJJURXSIRUWKHODVW\HDUV+HKDVSHUIRUPHGDQGPDQDJHGFRQVWUXFWLRQVWDNLQJERXQGDU\
VXUYH\VWRSRJUDSKLFVXUYH\VGHVLJQVXUYH\V+HKDVSURYLGHGVWDNLQJIRU)ORULGD3RZHUDQG/LJKW
GLVWULEXWLRQDQGWUDQVPLVVLRQOLQHVDQGKDVSUHSDUHGVRYHUHLJQVXEPHUJHGODQGVOHDVHVDQGHDVHPHQWV
%DUU\UHJXODUO\SURYLGHVGHVLJQVXUYH\VIRUDOOPDUNHWJURXSVZLWKLQWKHFRPSDQ\
John Curtis, CSE
(QYLURQPHQWDO
-RKQLVD&HUWLÀHG6HQLRU(FRORJLVWZLWKRYHU\HDUVRIHQYLURQPHQWDOFRQVXOWLQJH[SHULHQFHLQ
6RXWKZHVW)ORULGD+LVGXWLHVLQFOXGHDOODVSHFWVRIVWDWHIHGHUDODQGORFDOHQYLURQPHQWDOUHVRXUFH
SHUPLWWLQJZHWODQGGHWHUPLQDWLRQVHQYLURQPHQWDOLPSDFWVXUYH\VDQGDVVHVVPHQWVPLWLJDWLRQSODQ
GHVLJQDQGFRQVWUXFWLRQRYHUVLJKWZLOGOLIHVXUYH\VHQGDQJHUHGVSHFLHVUHORFDWLRQH[SHUWZLWQHVV
WHVWLPRQ\DYLDQÁLJKWSDWWHUQPRQLWRULQJKDELWDWPDSSLQJ)'27ELRORJLFDODVVHVVPHQWVDQGSURWHFWHG
VSHFLHVDQGPLWLJDWLRQPRQLWRULQJUHSRUWV
16.C.4.b
Packet Pg. 1666 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
7
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
1. Ability of Professional PersonnelCollier County
Mike Tiseo
Designer
0LNHMRLQHG-RKQVRQ(QJLQHHULQJDVDVXUYH\WHFKQLFLDQLQDQGKDVZRUNHGRQODUJHVFDOHSURMHFWV
LQFOXGLQJWKH&DSH&RUDO8WLOLW\H[SDQVLRQSURMHFWDQGDYDULHW\RISURMHFWVIRU)ORULGD3RZHU /LJKW
+HKDVGRQHGHVLJQZRUNRQDZLGHUDQJHRIXWLOLW\DQGFRQVWUXFWLRQSURMHFWVWKURXJKRXW/HH&RXQW\
LQFOXGLQJ'DQLHOV)RUFH0DLQ([WHQVLRQDQG*UHHQ0HDGRZV3URSRVHG5RDGZD\ 8WLOLW\'HVLJQ
0LNHDOVRFRRUGLQDWHGWKHGDWDFROOHFWLRQDQGFRPSOHWHGWKH&RUNVFUHZDQG3LQHZRRG:HOO)LHOG
&DWDORJ%RRNVIRU/HH&RXQW\8WLOLWLHV
Mark Texter, PSM
6XEVXUIDFH8WLOLW\([SORUDWLRQ68(
0DUNMRLQHG-RKQVRQ(QJLQHHULQJLQDQGLVWKHÀHOGFUHZVXSHUYLVRUIRURXUVXUYH\LQJDQG
PDSSLQJWHDP+HEULQJV\HDUVRIODQGVXUYH\LQJH[SHULHQFHUDQJLQJIURPDURGPDQRQDVXUYH\
FUHZWRWKHRZQHURIDODQGVXUYH\LQJEXVLQHVVZLWKDQHPSKDVLVRQFRQVWUXFWLRQVXUYH\LQJ0DUNKDV
ZRUNHGH[WHQVLYHO\RQFRQVWUXFWLRQVLWHVDQGQXPHURXVERXQGDU\VXUYH\VUDQJLQJIURPRQHTXDUWHU
DFUHORWVWRDFUHWUDFWV
Wayne Wright, PE
(OHFWULFDO
:D\QH:ULJKW3(KDV\HDUVRIH[SHULHQFHZRUNLQJDVDQHOHFWULFDOHQJLQHHU+LVH[SHULHQFHLQFOXGHV
GHVLJQRIHOHFWULFDOSRZHUV\VWHPVHPHUJHQF\SRZHUVXSSO\V\VWHPVORZYROWDJHPRWRUFRQWURO
FHQWHUVDQGVZLWFKJHDUSURFHVVDQGLQVWUXPHQWDWLRQFRQWUROV\VWHPVVXUJHSURWHFWLRQDQGJURXQGLQJ
V\VWHPVFRQGXLWDQGFDEOHWUD\OD\RXWVFRQWUROSDQHOOD\RXWVDQGVFKHPDWLFV6&$'$V\VWHPGHVLJQ
DXWRPDWLRQVRIWZDUHSURJUDPPLQJIRU3/&·VDQGJUDSKLFDOXVHULQWHUIDFHVIRU6&$'$V\VWHPVDQG
2SHUDWRU,QWHUIDFH7HUPLQDOVGHVLJQRIQHWZRUNLQJDQGWHOHPHWU\DUFKLWHFWXUHDQGFRQVWUXFWLRQDQG
ELGGLQJUHODWHGVHUYLFHV
Cella Molnar & Associates, Inc.
Public Involvement
7KHFRPSDQ\ZDVHVWDEOLVKHGLQDQGSURYLGHVSURIHVVLRQDOFRQVXOWLQJVHUYLFHVLQDOODVSHFWVRI
SXEOLFLQYROYHPHQWSURMHFWPDQDJHPHQWHYHQWSODQQLQJDQGFRRUGLQDWLRQWUDQVSRUWDWLRQSODQQLQJDQG
FRQVWUXFWLRQHQJLQHHULQJLQVSHFWLRQWRSULPHFRQVXOWDQWVDQGJRYHUQPHQWDODJHQFLHVLQ6RXWKZHVW
)ORULGD2YHUWKHSDVWVHYHQWHHQ\HDUV&HOOD0ROQDU $VVRFLDWHV,QFKDVFRQGXFWHGRYHU
VXFFHVVIXOSXEOLFLQYROYHPHQWDQGRXWUHDFKSURJUDPVIRUWUDQVSRUWDWLRQDQGXWLOLW\SURMHFWV&HOOD
0ROQDU $VVRFLDWHVLVYHU\XQLTXHLQWKHSXEOLFLQIRUPDWLRQLQGXVWU\EHFDXVHRIWKHLUVSHFLÀFLQGHSWK
WHFKQLFDOH[SHUWLVHLQWUDQVSRUWDWLRQDQGXWLOLW\SODQQLQJGHVLJQDQGFRQVWUXFWLRQ&HOOD0ROQDU
$VVRFLDWHVLVLQWLPDWHO\IDPLOLDUZLWKWKH&LW\RI)RUW0\HUVDQGZLOOVSHDUKHDGWKHSXEOLFLQYROYHPHQW
SURJUDP
Ardaman & Associates, Inc.
*HRWHFKQLDO(QJLQHHULQJ
$UGDPDQLVRQHRI)ORULGD·VODUJHVWJHRWHFKQLFDOPDWHULDOVHQJLQHHULQJDQGHQYLURQPHQWDOFRQVXOWLQJ
ÀUPV6LQFHLWVIRXQGLQJLQWKHFRPSDQ\KDVJURZQDQGH[SDQGHGLWVVFRSHIURP)ORULGD
WRQDWLRQDODQGLQWHUQDWLRQDORSHUDWLRQV$UGDPDQ·VSURMHFWVLQFOXGHURDGZD\VKLJKULVHEXLOGLQJV
WUHDWPHQWSODQWVDLUSRUWVHOHYDWHGZDWHUWDQNVSDYHPHQWVHIÁXHQWGLVSRVDOV\VWHPVEULGJHVHYDOXDWLRQ
RIKLVWRULFDOVWUXFWXUHVUHVLGHQWLDOVWUXFWXUHVDQGDZLGHYDULHW\RIRWKHUW\SHVRISURMHFWV
16.C.4.b
Packet Pg. 1667 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
2. CERTIFIED MINORITY BUSINESS ENTERPRISE
16.C.4.b
Packet Pg. 1668 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
8
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
&HUWLÀHG0%(
Collier County
While Johnson Engineering is not a
Minority Business Enterprise (MBE),
we take great pride in being an equal
opportunity employer and having a
IHGHUDOO\ DSSURYHG DIÀUPDWLYH DFWLRQ
plan. Our goal is to establish a team in
the best interest of Collier County while maintaining the standard of quality demanded. We are
committed to promoting other MBEs and have included Cella Molnar & Associates, Inc. o n our
team.
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
-RKQVRQ(QJLQHHULQJLVDQ(TXDO(PSOR\PHQW2SSRUWXQLW\DQG$IÀUPDWLYH$FWLRQ(PSOR\HUDQGVHHNV
WRUHFUXLWTXDOLÀHGZRPHQTXDOLÀHGPLQRULWLHVTXDOLÀHGLQGLYLGXDOVZLWKGLVDELOLWLHVDQGTXDOLÀHG
SURWHFWHGYHWHUDQV,WLVWKHSROLF\RI-RKQVRQ(QJLQHHULQJQRWWRGLVFULPLQDWHDJDLQVWDQ\HPSOR\HH
RUDSSOLFDQWIRUHPSOR\PHQWEDVHGRQUDFHJHQGHUDJHGLVDELOLW\RUQDWLRQDORULJLQRUEHFDXVHKHRU
VKHLVDTXDOLÀHGLQGLYLGXDOZLWKDGLVDELOLW\DGLVDEOHGYHWHUDQDQHZO\VHSDUDWHGYHWHUDQDFDPSDLJQ
YHWHUDQRUDQDUPHGIRUFHVVHUYLFHPHGDOYHWHUDQ
Woman Business Certification
Cella Molnar & Associates, Inc.
09/09/2019 09/09/2021
16.C.4.b
Packet Pg. 1669 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
3. PAST PERFORMANCE
16.C.4.b
Packet Pg. 1670 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
9
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County
2XUWHDPKDVSHUIRUPHGKXQGUHGVRIXWLOLW\SURMHFWVLQ6RXWKZHVW)ORULGDLQFOXGLQJPDQ\LQ&ROOLHU
&RXQW\2XUSRUWIROLRLQFOXGHVVPDOOVWUHHWVFDOHSURMHFWVDQGODUJHSURMHFWVFRQVLVWLQJRIWKRXVDQGV
RIIHHWRIXWLOLW\PDLQV2XUSDVWSHUIRUPDQFHLVWKHUHVXOWRIDWKRXJKWIXODSSURDFKWRWKHVHFULWLFDO
FRPSRQHQWVRIVXFFHVVIXOSURMHFWV
¬Technical expertise: 2XUWHDPKDVDQH[WHQVLYHSRUWIROLRRIWHFKQLFDOFDSDELOLWLHV
+LJKOLJKWVLQFOXGHXWLOL]LQJGHSOR\DEOHGDWDFROOHFWRUVWRPRQLWRUV\VWHPSUHVVXUHVWHVWLQJ
OLIWVWDWLRQVRYHUH[WHQGHGSHULRGVDQGV\VWHPPRGHOLQJZLWKH[WHQGHGSHULRGVLPXODWLRQV
DQGGLXUQDOSDWWHUQVZDWHUDQGZDVWHZDWHU
¬Community involvement: :HXWLOL]H&HOOD0ROQDUDVDVXEFRQVXOWDQWWRKDQGOHSXEOLF
LQIRUPDWLRQDQGFRPPXQLW\LQYROYHPHQWDVSHFWVRISURMHFWV:HKDYHZRUNHGWRJHWKHU
IRUPRUHWKDQ\HDUVRQPDQ\SURMHFWV7\SLFDODFWLYLWLHVLQFOXGHSUHSDULQJPDLOHUVDQG
GRRUKDQJHUVLQFOXGLQJPDWHULDOVIRUQRQ(QJOLVKVSHDNHUVKROGLQJSXEOLFPHHWLQJVVHWWLQJ
XSSURMHFWLQIRUPDWLRQZHEVLWHVDQGSODFLQJLQIRUPDWLRQDOVLJQV'LIIHUHQWSURMHFWVUHTXLUH
GLIIHUHQWDSSURDFKHVWRFRPPXQLW\LQYROYHPHQWDQGZHZLOOGHYHORSWDLORUHGVROXWLRQVIRU
WKLVSURMHFW
¬Project delivery: 2XU WHDP HQVXUHV WLPHO\ FRPSOHWLRQ RI DOO SURMHFW GRFXPHQWV
LQFOXGLQJSODQVVSHFLÀFDWLRQVELGGRFXPHQWVSHUPLWDSSOLFDWLRQVHWF:HKDYHDWKRURXJK
XQGHUVWDQGLQJRI&ROOLHU&RXQW\·VUHTXLUHPHQWVWRHQVXUHSURMHFWGRFXPHQWVFRQIRUPWR
WKH&RXQW\·VVWDQGDUGV
-RKQVRQ (QJLQHHULQJ LV D PHPEHU RI D GHVLJQEXLOG
WHDP WKDW LV FRQVWUXFWLQJ DQ LQWHULP ZDVWHZDWHU
WUHDWPHQW SODQW ::73 SRWDEOH ZDWHU SXPSLQJ
DQG VWRUDJH IDFLOLWLHV LUULJDWLRQ ZDWHU IDFLOLWLHV DQG
SLSHOLQHLQIUDVWUXFWXUHIRU&ROOLHU&RXQW\7KHLQWHULP
::73ZLOOKDYHDFDSDFLW\RI0*'DQGZLOOVHUYH
&ROOLHU &RXQW\·V 1RUWKHDVW 6HUYLFH $UHD -RKQVRQ
(QJLQHHULQJ·VUROHLQWKHSURMHFWLQFOXGHVVXUYH\LQJVLWH
GHYHORSPHQW SODQV SLSHOLQH GHVLJQ HOHFWULFDO GHVLJQ
GHYHORSPHQWRIDJURXQGZDWHUPRQLWRULQJSODQDQG
SHUPLWWLQJDVVLVWDQFH7KLVSURMHFWDOVRLQFOXGHVDSXEOLF
UHODWLRQV FDPSDLJQ KHDGHG XS E\ &HOOD 0ROQDU7KH
SURMHFWLVH[SHFWHGWREHFRPSOHWHGLQDWDFRVW
RIDSSUR[LPDWHO\PLOOLRQ
COLLIER COUNTY
UTILITIES
Northeast Service
Area (NESA) Interim
Wastewater Treatment
Plant
7KH REMHFWLYH RI WKLV SURMHFW ZDV WR UHSODFH DQ
DJLQJFRQFUHWHZDWHUPDLQDHULDOFURVVLQJRYHUWKH
*ROGHQ*DWH&DQDO-RKQVRQ(QJLQHHULQJGHVLJQHG
DIRRWLQFKGLUHFWLRQDOGULOOXQGHUQHDWKWKH
FDQDODQGDGMDFHQWWR&5WRDFFRPSOLVKWKLV
REMHFWLYH2XUWHDPH[SHGLWHGWKHGHVLJQWRPHHW
WKH&RXQW\·VVFKHGXOH-RKQVRQ(QJLQHHULQJSURYLGHG
GHVLJQSHUPLWWLQJFRQVWUXFWLRQDGPLQLVWUDWLRQDQG
SURMHFW FORVHRXW VHUYLFHV &RQVWUXFWLRQ FRVW ZDV
COLLIER COUNTY
36-Inch Golden Gate
Canal HDD
SIMILAR PROJECT
EXPERIENCE
16.C.4.b
Packet Pg. 1671 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
10
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County
7KLV SURMHFW FRQVLVWHG RI UHSODFLQJ DSSUR[LPDWHO\
IHHW RI LQFK DQG LQFK ZDWHU PDLQV
DORQJVWDQGQG6WUHHWVORFDWHGLQ1DSOHV3DUN
2XU WHDP LGHQWLÀHG DOLJQPHQWV ZLWKLQ FRQJHVWHG
QHLJKERUKRRG 52:V WKDW PLQLPL]HG LPSDFWV RQ
UHVLGHQWVDQGDOORZHGH[LVWLQJDVEHVWRVFHPHQW$&
ZDWHUPDLQVWRUHPDLQLQVHUYLFHGXULQJFRQVWUXFWLRQ
7KHGHVLJQDOVRLQFOXGHGSURYLVLRQVWRUHPRYHWKH
HQWLUH$& ZDWHU PDLQ RQFH WKH QHZ V\VWHP ZDV
SODFHGLQVHUYLFH-RKQVRQ(QJLQHHULQJSURYLGHGWKH
VXUYH\GHVLJQSHUPLWWLQJDQGELGGLQJVHUYLFHVIRUWKLV
SURMHFW&RQVWUXFWLRQFRVWZDVPLOOLRQ
COLLIER COUNTY
91st & 92nd Water Main
Replacement
7KH REMHFWLYH RI WKLV SURMHFW ZDV LQVWDOOLQJ
DSSUR[LPDWHO\IHHWRILQFKLUULJDWLRQTXDOLW\
,4ZDWHUPDLQDORQJDSRUWLRQRI*RRGOHWWH)UDQN
5RDG DQG WKURXJK WKH H[SDQGHG$UWKUH[ FDPSXV
.H\GHVLJQIHDWXUHVLQFOXGHGVHYHQGLUHFWLRQDOGULOOV
WRWDOLQJDSSUR[LPDWHO\IHHWWRDYRLGLPSDFWV
RQ URDGZD\V DQG D GHWHQWLRQ SRQG7KLV SURMHFW
UHTXLUHG VLJQLÀFDQW FRRUGLQDWLRQ ZLWK $UWKUH[ WR
DFFRPPRGDWH DFWLYH RQJRLQJ FRQVWUXFWLRQ LQ WKH
$UWKUH[ FDPSXV -RKQVRQ (QJLQHHULQJ SURYLGHG
VXUYH\ URXWH DQDO\VLV GHVLJQ SHUPLWWLQJ ELGGLQJ
DVVLVWDQFHDQGFRQVWUXFWLRQDGPLQLVWUDWLRQVHUYLFHV
IRUWKLVSURMHFW&RQVWUXFWLRQFRVWZDVPLOOLRQ
COLLIER COUNTY
NCWRF - 24 Irrigation
Quality Water Main
7KLV SURMHFW FRQVLVWHG RI UHSODFLQJ DSSUR[LPDWHO\
IHHW RI LQFK LQFK DQG LQFK ZDWHU
PDLQVDORQJ:LJJLQV3DVV5RDGDQGUHVLGHQWLDOVLGH
VWUHHWVLQEHWZHHQ9DQGHUELOW'ULYHDQG867KH
GHVLJQUHTXLUHGLGHQWLI\LQJDQDOLJQPHQWZLWKLQWKH
FRQJHVWHG:LJJLQV3DVV5RDG52:DQGUHVLGHQWLDO
52:VWRPLQLPL]HLPSDFWVRQUHVLGHQWVDQGZRXOG
DOORZWKHFRPPXQLW\VLGHZDONWRUHPDLQRSHQGXULQJ
FRQVWUXFWLRQ'LUHFWLRQDOGULOOVZHUHGHVLJQHGWRFURVV
9DQGHUELOW'ULYHDQGRWKHUHQYLURQPHQWDOO\VHQVLWLYH
DUHDV DQG PLQLPL]H VLGHZDON FORVXUHV -RKQVRQ
(QJLQHHULQJSURYLGHGWKHVXUYH\GHVLJQGLUHFWLRQDO
GULOOFDOFXODWLRQVSHUPLWWLQJELGGLQJDQGFRQVWUXFWLRQ
DGPLQLVWUDWLRQVHUYLFHVIRUWKLVSURMHFW&RQVWUXFWLRQ
FRVWZDV
COLLIER COUNTY
Wiggins Pass Water Main
Replacement
16.C.4.b
Packet Pg. 1672 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
11
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County
7KLV SURMHFW LQFOXGHG WKH GHVLJQ DQG SHUPLWWLQJ RI
DSSUR[LPDWHO\ IHHW RI LQFK ZDWHU PDLQ
&RQVWUXFWLRQFRVWZDVPLOOLRQ
COLLIER COUNTY
Vanderbilt Drive Water
Main Water Main
Replacement
FUTURE DANI
E
L
S
F
O
R
C
E
M
A
I
N
HYDRAULIC M
O
D
E
L
I
N
G
R
E
P
O
R
T
December 21, 20
1
0
Prepared for:
1500 Monroe S
t
r
e
e
t
Fort Myers, Flori
d
a
3
3
9
0
2
-
0
3
9
8
Prepared by:
P.O. Box 1550
2122 Johnson St
r
e
e
t
Fort Myers, Flor
i
d
a
3
3
9
0
1
-
1
5
5
0
E.B. 642 & L.B.
6
4
2
Vanderbilt Drive Cul-de-Sacs Page 1 of 10
Public Utility Renewal Project
DAILY REPORT OF CONSTRUCTION
VANDERBILT DRIVE CUL-DE-SACS
PUBLIC UTILITY RENEWAL PROJECT
Date: 10/18/2016
Inspector: Sam Randazzo Stantec PIN: 177310814 Accidents ܆Yes ܈No
Day of Week: Tuesday Contract Day: 2 Total Days: 660/750 Accident Report #:
HIGH TEMP (F): 88 AM Conditions: Sunny PM Conditions: Sunny NA
LOW TEMP (F): 71
Water System
Remarks
#1 - Prime Contractor Mitchell & Stark:
110th and Vanderbilt Drive - Contractor uncovered the remaining portions of the existing 6 A/C water
main. Excavations were dewatered to existing swales during activities. Contractor utilized a chain
snap to cut the A/C line in three locations. A/C pipe was removed from the excavation, cut into smaller
pieces with chain snap, then wrapped/labeled/transported to Collier County Water Department for
proper disposal at the landfill. Contractor tied into existing 6 A/C water main using new 6C900 P VC
DR 14, two (2) 6 gate valves and two 6x6 DI tees. Excavation backfilled by contractor with plate
compactor in 12 lifts.
109th and Vanderbilt Drive - Contractor uncovered the remaining portions of the existing 6 A/C water
main. During excavation activities, contractor observed several cracks in the existing RCP storm piping.
Excavations were dewatered to existing swales during activities. Contractor utilized a chain snap to cut
the A/C line in three locations. A/C pipe was removed from the excavation, cut into smaller pieces
with chain snap, then wrapped/labeled/transported to Collier County Water Department for proper
disposal at the landfill. Contractor tied into existing 6 A/C water main us ing new 6C900 PVC DR 14,
two (2) 6 gate valves and two 6x6 DI tees. Excavation backfilled by contractor with plate
compactor in 12 lifts.
108th and Vanderbilt Drive - Contractor uncovered the remaining portions of the existing 6 A/C water
main. Excavations were dewatered to existing swales during activities. Contractor utilized a chain
snap to cut the A/C line in three locations. A/C pipe was removed from the excavation, cut into smaller
pieces with chain snap, then wrapped/labeled/transported to Collier County Water Department for
proper disposal at the landfill. Contractor tied into existing 6 A/C water main using new 6C900 P VC
DR 14, two (2) 6 gate valves and two 6x6 DI tees. Excavation backfilled by contractor with plate
compactor in 12 lifts.
Stantec verified contractor A/C pipe certifications prior to pipe cutting activities. Contractor PPE (Tyvek,
gloves, respirators, and respirator cartridges) was also verified prior to contractor entry to exclusion zone.
Stantec observed the wrapping of removed A/C piping, tape and labeling of A/C piping, loading of wrapped
A/C piping to vehicles for transport.
Stantec verified MOT setup. Contractor continued to provide flaggers at each tie-in location as specified in
MOT plan.
Stantec discussed photo ID requirement with site foreman.
12
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County
LEE COUNTY
Alico Road
Potable Water Main
LEE COUNTY
%HQ+LOO*ULIÀQ$OLFR
Force Main
7KHREMHFWLYHRIWKLVSURMHFWZDVUHSODFHPHQWRI
SDUDOOHOLQFKDQGLQFKZDWHUPDLQVZLWKRQH
LQFK LQFK GXFWLOH LURQ ZDWHU PDLQ DORQJ
$OLFR5RDGEHWZHHQ%HQ+LOO*ULIÀQ3DUNZD\DQG
$LUSRUW+DXO5RDG,QWRWDODSSUR[LPDWHO\
IHHW UHSODFHPHQW ZDWHU PDLQ ZDV FRQVWUXFWHG
7KLVSURMHFWZDVFRQVWUXFWHGLQFRQMXQFWLRQZLWK
ZLGHQLQJ$OLFR 5RDG WR IRXU ODQHV &RRUGLQDWLRQ
ZLWK/HH&RXQW\'27GHYHORSHUVDORQJWKHURXWH
DQGWKHURDGZD\HQJLQHHULQJWHDPZDVFULWLFDOWR
WKLVSURMHFW-RKQVRQ(QJLQHHULQJLVSURYLGLQJGHVLJQ
SHUPLWWLQJELGGLQJDQGFRQVWUXFWLRQSKDVHVHUYLFHV
IRUWKLVSURMHFW7KHVXUYH\GHVLJQSHUPLWWLQJDQGELGGLQJSKDVHVKDYHEHHQFRPSOHWHGDQGZH
KDYHDSRVWGHVLJQVHUYLFHVFRQWUDFWZLWKWKH&(,WHDPWKURXJKRXWWKHRQJRLQJFRQVWUXFWLRQ
&RQVWUXFWLRQFRVWZDVPLOOLRQ
7KLV SURMHFW LQFOXGHG K\GUDXOLF DQDO\VLV GHVLJQ
SHUPLWWLQJELGGLQJDQGFRQVWUXFWLRQSKDVHVHUYLFHV
IRU D SURSRVHG WUXQNOLQH IRUFH PDLQ ZLWKLQ WKH
7KUHH 2DNV ::73 VHUYLFH DUHD 7KH LQLWLDO
K\GUDXOLFDQDO\VLVLQFOXGHGSUHSDULQJDVHUYLFHDUHD
VFDOH PRGHO DQG GHYHORSLQJ D XQLTXH DSSURDFK
WR FDOLEUDWLRQ WKDW LQYROYHG VWDWLVWLFDO DQDO\VLV RI
FROOHFWHGGDWD2YHUPLOOLRQGDWDSRLQWVZHUH
FROOHFWHG DQG DQDO\]HG 7KH K\GUDXOLF PRGHO LQ
FRQMXQFWLRQZLWKÁRZSURMHFWLRQVZDVXVHGWRVL]H
DSSUR[LPDWHO\ PLOHV RI LQFK DQG LQFK
IRUFHPDLQDORQJ%HQ+LOO*ULIÀQ3DUNZD\DQG$OLFR
5RDG7KHSURSRVHGIRUFHPDLQLQFUHDVHGFDSDFLW\LQWKHH[LVWLQJVHUYLFHDUHDDQGHQDEOHGVHU YLFH
WREHH[WHQGHGDORQJ$OLFR5RDGIRUIXWXUHFRQQHFWLRQV&HOOD0ROQDUSURYLGHGSXEOLFLQIRUPDWLRQ
PDWHULDOVIRUWKLVSURMHFW&RQVWUXFWLRQFRVWZDVPLOOLRQ
16.C.4.b
Packet Pg. 1674 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
13
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County 16.C.4.b
Packet Pg. 1675 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
14
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County 16.C.4.b
Packet Pg. 1676 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
15
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County
Reference Questionnaire
Solicitation: RPS No. 19-7637 Golden Gate City Transmission Water Main Improvements Design
Reference Questionnaire for:
Johnson Engineering, Inc.
(Name of Company Requesting Reference Information)
David Trouteaud, PE
(Name of Individuals Requesting Reference Information)
Name: Mr. Steve Adams, PE
(Evaluator completing reference questionnaire)
Company: City of Punta Gorda
(Evaluators Company completing reference)
Email: sadams@pgorda.us FAX: (941) 575-5044 Telephone: (941) 575-3339
Collier County has implemented a process that collects reference information on firms and their key personnel to be
used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed
you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to
the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the
firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual
again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or
form will be scored 0.
Project Description: Jones Loop Road Force Main
Completion Date: Ongoing
Project Budget: $393,650 Project Number of Days: 1,095
Item Criteria Score
1 Ability to manage the project costs (minimize change orders to scope).
10
2 Ability to maintain project schedule (complete on-time or early).
10
3 Quality of work.
10
4 Quality of consultative advice provided on the project.
10
5 Professionalism and ability to manage personnel.
10
6 Project administration (completed documents, final invoice, final product turnover;
invoices; manuals or going forward documentation, etc.)
10
7 Ability to verbally communicate and document information clearly and succinctly.
10
8 Abiltity to manage risks and unexpected project circumstances.
10
9 Ability to follow contract documents, policies, procedures, rules, regulations, etc.
10
10 Overall comfort level with hiring the company in the future (customer satisfaction).
10
TOTAL SCORE OF ALL ITEMS 100
16.C.4.b
Packet Pg. 1677 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
16
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County 16.C.4.b
Packet Pg. 1678 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
17
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3. Past PerformanceCollier County
Reference Questionnaire
Solicitation: RPS No. 19-7637 Golden Gate City Transmission Water Main Improvements Design
Reference Questionnaire for:
Johnson Engineering, Inc.
(Name of Company Requesting Reference Information)
David Trouteaud, PE
(Name of Individuals Requesting Reference Information)
Name: Mr. Brian Hickey, P.E., PMP
(Evaluator completing reference questionnaire)
Company: Lee County
(Evaluators Company completing reference)
Email: BHickey@leegov.com FAX: (239)485-8778 Telephone: (239)533-8155
Collier County has implemented a process that collects reference information on firms and their key personnel to be
used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed
you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to
the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the
firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual
again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the it em or
form will be scored 0.
Project Description: Pine Ridge Force Main Replacement
Completion Date: Ongoing (out to bid)
Project Budget: $237,265 (Consultant fees) Project Number of Days: 790
Item Citeria Score
1 Ability to manage the project costs (minimize change orders to scope).
10
2 Ability to maintain project schedule (complete on-time or early).
10
3 Quality of work.
9
4 Quality of consultative advice provided on the project.
9
5 Professionalism and ability to manage personnel.
10
6 Project administration (completed documents, final invoice, final product turnover;
invoices; manuals or going forward documentation, etc.)
9*
7 Ability to verbally communicate and document information clearly and succinctly.
10
8 Abiltity to manage risks and unexpected project circumstances.
10
9 Ability to follow contract documents, policies, procedures, rules, regulations, etc.
10
10 Overall comfort level with hiring the company in the future (customer satisfaction).
10
TOTAL SCORE OF ALL ITEMS 97
*Project on-going, in bid phase, havent closed the project out yet.
16.C.4.b
Packet Pg. 1679 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
4. PROJECT APPROACH, WILLINGNESS TO
MEET TIME & BUDGET REQUIREMENTS
16.C.4.b
Packet Pg. 1680 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
18
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3URMHFW$SSURDFK7LPH %XGJHW
Collier County
2XUDSSURDFKWRWKLVSURMHFWLVEDVHGRQ\HDUVRIH[SHULHQFHDQGKXQGUHGVRISURMHFWVLQ&ROOLHU
&RXQW\:HKDYHEXLOWHIIHFWLYHUHODWLRQVKLSVZLWK&RXQW\VWDIIUHJXODWRU\DJHQFLHVRWKHUHQJLQHHULQJ
FRQVXOWDQWVDQGORFDOFRQWUDFWRUVWKDWZLOOEHEHQHÀFLDOIRUWKLVODUJHPXOWLSKDVHSURMHFW7KHIRXQGDWLRQ
RIRXUDSSURDFKLVGHYHORSLQJDWKRURXJKXQGHUVWDQGLQJRIWKH*ROGHQ*DWHFRPPXQLW\DQGXWLOLW\
V\VWHPZRUNLQJZLWKWKH&RXQW\WRGHÀQHSURMHFWREMHFWLYHVLGHQWLI\LQJFRQÁLFWVDQGFRQVWUDLQWV
SUHSDULQJGHWDLOHGSODQVWKDWUHGXFHWKHULVNRIFKDQJHRUGHUVVXFFHVVIXOO\ELGGLQJWKHYDULRXVSKDVHV
DQGHQVXULQJKLJKTXDOLW\VDIHDQGFRVWHIIHFWLYHFRQVWUXFWLRQ
Project Understanding
7KLVSURMHFWLVORFDWHGLQ*ROGHQ*DWH&LW\DQDSSUR[LPDWHO\IRXUVTXDUHPLOHDUHDORFDWHGEHWZHHQ
6DQWD%DUEDUD%RXOHYDUGDQG&ROOLHU%RXOHYDUGQRUWKRI,DQGVRXWKRI*ROGHQ*DWH&DQDO:H
XQGHUVWDQGWKDWWKH&RXQW\UHFHQWO\SXUFKDVHGWKHH[LVWLQJXWLOLW\V\VWHPIURP)*8$DQGLVZRUNLQJ
WRLPSURYHDQGLQWHJUDWHXWLOLW\VHUYLFHVLQWRWKH&RXQW\·VV\VWHPV,QIDFWRXUWHDPUHFHQWO\FRPSOHWHG
WKHGHVLJQELGGLQJDQGFRQVWUXFWLRQDGPLQLVWUDWLRQRIWKUHHLQWHUFRQQHFWVEHWZHHQWKH&RXQW\·V
ZDWHUGLVWULEXWLRQV\VWHPDQGWKHV\VWHPLQ*ROGHQ*DWH7KHSURMHFWZDVH[SHGLWHGWRDFFRPPRGDWH
WKH&RXQW\·VSXUFKDVHDQGLWZDVVXFFHVVIXOO\FRPSOHWHGZLWKLQWKHVKRUWWLPHIUDPHUHTXLUHG
$YDLODEOH UHFRUG GUDZLQJV DQG XWLOLW\ GDWD DUH ODFNLQJ LQ
FRPSOHWHQHVV DQG DFFXUDF\ )LHOG LQYHVWLJDWLRQV LQFOXGLQJ
VXEVXUIDFHXWLOLW\H[SORUDWLRQZLOOEHFULWLFDOIRUWKLVSURMHFW
:HKDYHVHHQWKLVÀUVWKDQGGXULQJDUHFHQWSURMHFWZKHUH
DQ XQGRFXPHQWHG GLUHFWLRQDO GULOO ZDV GLVFRYHUHG GXULQJ
FRQVWUXFWLRQ2XUWHDP·VDELOLW\WRTXLFNO\SXWVWDIILQWKH
ÀHOGWRDQDO\]HDQGLQVWUXFWFRQWUDFWRUVGXULQJFRQVWUXFWLRQ
ZLOOEHQHÀWWKH&RXQW\E\UHGXFLQJWKHLPSDFWRIFRQÁLFWV
DQGVXUSULVHV$YDLODEOHLQIRUPDWLRQLQGLFDWHVDSSUR[LPDWHO\
IHHWRIWRLQFKPDLQVORFDWHGZLWKLQWKHDUHD
RIZKLFKDSSUR[LPDWHO\IHHWDUHLQFKDQGODUJHU
WUDQVPLVVLRQ PDLQV 2XU WHDP ZLOO ZRUN FORVHO\ ZLWK WKH
&RXQW\WRLGHQWLI\FULWLFDOWUDQVPLVVLRQPDLQVWKDWVKRXOGEH
UHSODFHGDQGGHYHORSDUDWLRQDOEDVLVIRUSURMHFWSKDVLQJ
(IIHFWLYH SURMHFW PDQDJHPHQW ZLOO FRQWULEXWH WR PHHWLQJ
WKH &RXQW\·V REMHFWLYHV LQ DQ HIÀFLHQW DQG FRVWHIIHFWLYH
PDQQHU:HXQGHUVWDQGWKDWPXOWL\HDUSURMHFWVFDQOHDGWR
PDQDJHPHQWIDWLJXHDQGRXUWHDPVWDQGVUHDG\WRDVVLVWWKH
&RXQW\ZLWKWKLVWDVN:HDUHH[SHULHQFHGZLWKODUJHPXOWL
SKDVHDQGPXOWL\HDUSURMHFWVDQGXQGHUVWDQGWKHFULWLFDO
FRPSRQHQWVWRDGGUHVV
/RFDO GHPRJUDSKLFV LQGLFDWH D ODUJH 6SDQLVKVSHDNLQJ
FRPPXQLW\ZLWKLQ*ROGHQ*DWH3XEOLFUHODWLRQVPDWHULDOV
DQG PHHWLQJV ZLOO QHHG WR DFFRPPRGDWH QRQ(QJOLVK
VSHDNHUVWRPDLQWDLQVXSSRUWGXULQJGHVLJQDQGFRQVWUXFWLRQ
2XUSXEOLFUHODWLRQVVXEFRQVXOWDQW&HOOD0ROQDUZLOOHQVXUH
WKHVHHIIRUWVDUHHIIHFWLYHDQGDSSURSULDWHIRUORFDOUHVLGHQWV
16.C.4.b
Packet Pg. 1681 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
19
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3URMHFW$SSURDFK7LPH %XGJHW
Collier County
Project Management
3URMHFWPDQDJHPHQWLVDNH\FRPSRQHQWRIVXFFHVVIXOPXOWLSKDVHSURMHFWV2XUWHDPZLOOSURYLGHD
SURMHFWPDQDJHPHQWSODQWRWKH&RXQW\DWWKHVWDUWRIWKHSURMHFW7KURXJKRXWWKHSURMHFWRXUWHDP
ZLOOSURYLGHSURMHFWPDQDJHPHQWDVVLVWDQFHDVQHFHVVDU\DQGGHVLUHGE\WKH&RXQW\%DVHGRQRXU
H[SHULHQFHZLWKWKH&RXQW\ZHNQRZWKDWVRPHSURMHFWPDQDJHUVSUHIHUWREHYHU\KDQGVRQDQG
RWKHUVSUHIHUXVWRKDQGOHWKHPDMRULW\RIWKHFRRUGLQDWLRQDQGPDQDJHPHQWDVLGHIURPIXQFWLRQV
LQWHUQDOWRWKH&RXQW\:HZLOOSURYLGHDWDLORUHGDSSURDFKWRSURMHFWPDQDJHPHQWSHUWKH&RXQW\·V
SUHIHUHQFHV:HDUHYHU\H[SHULHQFHGZLWKPDQDJLQJODUJHPXOWLSKDVHDQGPXOWL\HDUSURMHFWVEDVHG
RQZRUNERWKZLWKLQDQGRXWVLGHRI&ROOLHU&RXQW\.H\FRQVLGHUDWLRQVIRUPDQDJLQJWKLVSURMHFW
LQFOXGH
¬Identifying milestone tasks²WKHVHDUHWDVNVWKDWPXVWEHFRPSOHWHGSULRUWREHJLQQLQJVXEVHTXHQW
WDVNV0LOHVWRQHWDVNVFRXOGLQFOXGHLGHQWLI\LQJDQGUHSODFLQJLQRSHUDEOHYDOYHVWRHQDEOHV\VWHP
LVRODWLRQ IRU FRQQHFWLQJ QHZ PDLQV LGHQWLI\LQJ ERWWOHQHFNV WKDW QHHG WR EH XSVL]HG SULRUWR
UHSODFLQJXSVWUHDPPDLQVGHWHUPLQLQJORQJOHDGSHUPLWWLQJQHHGVVRWKDWSODQVFDQEHSUHSDUHG
DQGDSSOLFDWLRQVVXEPLWWHGWRUHGXFHWKHULVNRIGHOD\VDQGRWKHUV
¬(YDOXDWLQJ\HDURYHU\HDUFKDQJHVLQPDWHULDOFRVWV²PXOWL\HDUSURMHFWVLQWURGXFHSULFLQJULVNVDV
PDWHULDOFRVWVJHQHUDOO\LQFUHDVHRYHUWLPH:HZLOOHYDOXDWHSULFLQJULVNVDQGPDNHUHFRPPHQGDWLRQV
IRUPDWHULDOSXUFKDVHVVKRXOGWKH&RXQW\HOHFWWRSURFHHGZLWKGLUHFWSXUFKDVLQJ
¬(YDOXDWLQJODERUFRVWV²WKURXJKRXUUHODWLRQVKLSVZLWKORFDOFRQWUDFWRUVZHZLOOHYDOXDWHWKH
RYHUDOOOHYHORIDFWLYLW\LQWKHDUHDDQGLWVHIIHFWVRQODERUFRVWV:HFDQPDNHUHFRPPHQGDWLRQV
IRUELGGLQJYDULRXVSKDVHVRIWKLVSURMHFWWKDWFRQVLGHUWKHDPRXQWRIUHVRXUFHVDYDLODEOHIRU
FRQVWUXFWLRQ,IRYHUDOOFRQVWUXFWLRQDFWLYLW\LVKLJKWKHQFRQVWUXFWLRQFRVWVPD\QRWEHIDYRUDEOHWR
WKH&RXQW\DQGGHOD\LQJWKHELGPLJKWEHSUXGHQW&RQYHUVHO\LGHQWLI\LQJVODFNLQWKHODERUPDUNHW
FDQLQFUHDVHVFRPSHWLWLYHQHVV2XUWHDPZLOOLGHQWLI\RSSRUWXQLWLHVWRUHGXFHFRQVWUXFWLRQFRVWV
WKURXJKELGWLPLQJ
¬&RRUGLQDWLRQZLWKRWKHU&RXQW\SURMHFWV²ZHZLOOHYDOXDWHWKLVSURMHFWLQWKHFRQWH[WRIZDWHU
DQGVHZHUPDVWHUSODQVWRLGHQWLI\RXWVLGHLPSURYHPHQWVWKDWDUHV\QHUJLVWLFRUUHTXLUHGWRPHHWWKH
REMHFWLYHVRIWKLVSURMHFW:HFRRUGLQDWHFORVHO\ZLWKWKH&RXQW\WRPDLQWDLQDEURDGXQGHU VWDQGLQJ
RIV\VWHPRSHUDWLRQVFRQVWUDLQWVXSJUDGHVDQGLVVXHV$Q\LPSDFWVRIRXWVLGHSURMHFWVRULPSDFWV
WKLVSURMHFWZLOOKDYHRQWKHH[WHUQDOV\VWHPZLOOEHSUHVHQWHGWRWKH&RXQW\IRUFRQVLGHUDWLRQ
¬&RRUGLQDWLRQZLWKRWKHUSURMHFWVZLWKLQ*ROGHQ*DWH²ZHXQGHUVWDQGWKDWWKH&RXQW\LV
XQGHUWDNLQJODUJHVFDOHLPSURYHPHQWVZLWKLQWKH*ROGHQ*DWHFRPPXQLW\2XUWHDPZLOOFRRUGLQDWH
ZLWKWKH&RXQW\DQGRWKHUÀUPVWRUHGXFHVHTXHQWLDOZRUNZLWKLQWKHSURMHFWDUHD5HVLGHQWVGR
QRWOLNHKDYLQJWKHLUQHLJKERUKRRGVUHSHDWHGO\GLVUXSWHGIRUPXOWLSOHSURMHFWV2XUWHDPZLOOIRFXV
RQLGHQWLI\LQJZRUNWKDWFDQEHSHUIRUPHGVLPXOWDQHRXVO\ZLWKRWKHUSURMHFWVVRFRQVWUXFWLRQFDQ
EHDQ´LQDQGRXWµDFWLYLW\
¬Identify future utility improvement phases²ZHXQGHUVWDQGWKDWWKH&RXQW\KDVLGHQWLÀHGIRXU
LQLWLDOSURMHFWSKDVHVIRUWKLVFRQWUDFW2XUWHDPFDQDVVLVWWKH&RXQW\ZLWKLGHQWLI\LQJIXWXUHSURMHFW
SKDVHVDVQHHGVDQGIXQGLQJDOORZ
¬Identify additional non-utility improvements²DVSDUWRIWKHSURMHFWVFRSHDGGLWLRQDOLPSURYHPHQWV
RXWVLGHRIZDWHUGLVWULEXWLRQV\VWHPDUHQRWHG2XUWHDPFDQSXWVWDIILQWKHÀHOGWRLGHQWLI\
SRWHQWLDOLPSURYHPHQWVDQGSURYLGHUHFRPPHQGDWLRQVWRWKH&RXQW\:HKDYHVSHFLDOL]HGJURXSV
ZLWKLQWKHFRPSDQ\WRDVVLVWZLWKGHVLJQLQJQRQXWLOLW\LPSURYHPHQWV:HUHJXODUO\LQWHJUDWHQRQ
XWLOLW\LPSURYHPHQWVZLWKXWLOLW\SURMHFWVDQGZHZLOOXVHWKLVH[SHULHQFHWRGHYHORSHIIHFWLYH
PDQDJHPHQWSODQVIRUSURMHFWSKDVHVWKDWLQFOXGHQRQXWLOLW\ZRUN
¬Cost controls²RXUWHDPZLOOUHJXODUO\FRRUGLQDWHZLWKWKH&RXQW\UHJDUGLQJSURMHFWFRVWV
&RQVWUXFWLRQFRVWVDUHDGGUHVVHGGXULQJGHVLJQDQGELGGLQJ+RZHYHUZHZDQWWRKLJKOLJKWWKH
FRVWHIIHFWLYHVHUYLFHVSURYLGHGE\RXU8WLOLWLHVWHDP,QPDQ\ZD\VWKLVLVGXHWRRXUGHSWKRI
H[SHULHQFHDQGDELOLW\WRSURYLGHVXSSRUWLQJVHUYLFHVXVLQJLQKRXVHUHVRXUFHV3DUWRIWKHUHDVRQ
ZHDUHVRFRVWHIIHFWLYHLVRXUÀUPGRHVQRWKDYHUHSHWLWLYHKLJKOHYHOIXQFWLRQV,QRWKHUZRUGV
\RXWKHFOLHQWGRQRWKDYHWRSD\IRUVRPHRQHLQ&DOLIRUQLDWRSURYLGHDFXUVRU\KLJKOHYHOUHYLHZ
RIWKHZRUNSHUIRUPHGORFDOO\<RXUSURMHFWVDUHKDQGOHGSULPDULO\LQKRXVHZLWKFHUWDLQVSHFLDOL]HG
DFWLYLWLHVSHUIRUPHGE\ORFDOVXEFRQVXOWDQWV
16.C.4.b
Packet Pg. 1682 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
20
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3URMHFW$SSURDFK7LPH %XGJHW
Collier County
Meetings and Coordination
8SRQUHFHLYLQJWKH173RXUWHDPZLOOFRRUGLQDWHZLWK38'DQGRWKHU&RXQW\VWDIIWRVFKHGXOHD
SURMHFWNLFNRIIPHHWLQJ$WWKLVPHHWLQJZHZLOOGHYHORSDKLJKOHYHOV\QRSVLVRISURMHFWJRDOVDQG
REMHFWLYHV'HVLJQSKDVHVZLOOLQFOXGHUHJXODUSURJUHVVPHHWLQJVWRSURYLGHXSGDWHVDQGGHYHORS
FROODERUDWLYHVROXWLRQV:HUHJXODUO\PHHWZLWK38'VWDIIVRZHDUHIDPLOLDUZLWKWKHLUIRUPDWDQG
H[SHFWDWLRQV%HFDXVHZHDUHDORFDOHQJLQHHULQJÀUPRXUWHDPFDQPHHWDQGFRRUGLQDWHZLWK&RXQW\
VWDIIDVQHHGHGDQGRQGHPDQG:HDUHQHYHUPRUHWKDQDSKRQHFDOOHPDLORUPLQXWHGULYHDZD\
2XU WHDP ZLOO DOVR FRRUGLQDWH ZLWK RWKHU FRQVXOWDQWV LQYROYHG ZLWK SURMHFWV LQ WKH DUHD &ORVH
FRRUGLQDWLRQDYRLGVGHVLJQDQGFRQVWUXFWLRQFRQÁLFWV:HDUHIRUWXQDWHWRKDYHZRUNHGZLWKPRVW
ORFDODQGQDWLRQDOHQJLQHHULQJÀUPVWKDWDUHDFWLYHLQWKHDUHD7KHVHUHODWLRQVKLSVZLOODOORZRXUWHDP
WRFRRUGLQDWHGHVLJQDQGFRQVWUXFWLRQVFKHGXOLQJDQGDYRLGFRQÁLFWVZLWKRWKHUZRUNLQWKHDUHD
Preliminary Engineering Design
7KHIROORZLQJDFWLYLWLHVDUHSUHVHQWHGDVSUHOLPLQDU\SKDVHWDVNV3HUIRUPLQJWKHVHWDVNVDWWKHVWDUW
RIWKLVSURMHFWHQVXUHVDKLJKTXDOLW\GHVLJQWKDWLVFRVWHIIHFWLYHDQGPHHWVWKH&RXQW\·VREMHFWLYHV
Land Surveying
2XULQKRXVHVXUYH\WHDPVZLOOSHUIRUPWKHERXQGDU\DQGIHDWXUHVXUYH\ZRUNIRUWKLVSURMHFW:H
KDYHGHFDGHVRIH[SHULHQFHZLWKVXUYH\ZRUNLQ&ROOLHU&RXQW\2XUVXUYH\WHDPVSURYLGHDFFXUDWH
KLJKTXDOLW\LQIRUPDWLRQWKDWLVWKHIRXQGDWLRQRIRXUXWLOLW\GHVLJQV
Subsurface Investigations of Underground Utilities
-RKQVRQ (QJLQHHULQJ ZLOO SURYLGH WKH &RXQW\ ZLWK LQKRXVH VXEVXUIDFH XWLOLW\ H[SORUDWLRQ 68(
VHUYLFHVLQFOXGLQJD6WDU9DFK\GURH[FDYDWLRQWUXFNDQGJURXQGSHQHWUDWLQJUDGDUWRDFFXUDWHO\ORFDWH
H[LVWLQJXWLOLWLHVDQGDYRLGFRQÁLFWV7KLVZLOOEHDFULWLFDOFRPSRQHQWRIWKLVSURMHFW$VZHOHDUQHGRQ
WKH*ROGHQ*DWHLQWHUFRQQHFWVSURMHFWVUHFRUGGUDZLQJVDUHQRWDYDLODEOHIRUPXFKRIWKH*ROGHQ
*DWHXWLOLW\V\VWHPDQGXWLOLW\ORFDWLRQVDUHQRWDFFXUDWHO\NQRZQ8WLOL]LQJ68(ZLOOKHOSDYRLGVXUSULVHV
GXULQJFRQVWUXFWLRQWKDWOHDGWRFKDQJHRUGHUV:HDOVRZLOOFRRUGLQDWHZLWKRWKHUXWLOLW\SURYLGHUV
LQFRUSRUDWHWKHLULQIUDVWUXFWXUHLQWRFRQVWUXFWLRQSODQV
Geotechnical Investigation
*HRWHFKQLFDOLQYHVWLJDWLRQLVDFULWLFDOFRPSRQHQWRIXWLOLW\SURMHFWVSDUWLFXODUO\ZKHQGLUHFWLRQDO
GULOOLQJZLOOEHXWLOL]HG:HZLOOXWLOL]HRXUVXEFRQVXOWDQW$UGDPDQDQG$VVRFLDWHVIRUJHRWHFKQLFDOZRUN
RQWKLVSURMHFW-RKQVRQ(QJLQHHULQJDQG$UGDPDQKDYHZRUNHGWRJHWKHURQKXQGUHGVRISURMHFWVRYHU
\HDUV,GHQWLI\LQJVXEVXUIDFHFRQGLWLRQVVXFKDVWKHSUHVHQFHRIURFNDOORZVIRUFRQVWUXFWDEOHGHVLJQV
WREHGHYHORSHG,WDOVRJXLGHVGHFLVLRQPDNLQJZLWKUHVSHFWWRSLSHPDWHULDOFRQVWUXFWLRQPHWKRGV
DQGGHYHORSLQJFRVWHVWLPDWHV
Hydraulic Analysis / Infrastructure Modeling
-RKQVRQ(QJLQHHULQJURXWLQHO\XWLOL]HVK\GUDXOLFPRGHOLQJWRGHYHORSWKHEDVLVRIGHVLJQIRURXUSURMHFWV
:HKDYHGHYHORSHGPRGHOVRIHQWLUHVHUYLFHDUHDVDQGLPSOHPHQWHGH[WHQGHGSHULRGVLPXODWLRQWR
HYDOXDWHV\VWHPG\QDPLFV:HLQFRUSRUDWHGDWDFROOHFWHGLQWKHÀHOGIRUFDOLEUDWLRQDQGPRGHOWHVWLQJ
2XUWHDPFDQKDQGOHDQ\PRGHOLQJQHHGHGIRUWKLVSURMHFW:HZLOODOVRFRRUGLQDWHZLWK&DUROORDV
QHHGHGWRUHYLHZXWLOL]HWKHK\GUDXOLFPRGHOWKH\PDLQWDLQIRUWKH&RXQW\
Project Phasing
3URMHFWSKDVLQJUHFRPPHQGDWLRQVZLOOEHPDGHXVLQJWKHLQIRUPDWLRQREWDLQHGIURPÀHOGLQYHVWLJDWLRQV
PRGHOLQJDQGLQSXWIURPWKH&RXQW\,QSDUWLFXODUZHZLOOLGHQWLI\FULWLFDOLWHPVWKDWPXVWRFFXUSULRU
WRFRQVWUXFWLRQVXFKDVUHSODFLQJLQRSHUDEOHYDOYHVWRDOORZIRUVDIHV\VWHPLVRODWLRQ
,QIUDVWUXFWXUH3UHOLPLQDU\'HVLJQDQG3ODQV
2XUWHDPZLOOZRUNZLWK(30'VWDIIWRGHYHORSGHVLJQFRQFHSWVIRUWKHLQIUDVWUXFWXUHLPSURYHPHQWV
:HZLOOSUHVHQWUHFRPPHQGDWLRQVIRUVL]LQJDOLJQPHQWSLSHPDWHULDOFRQVWUXFWLRQPHWKRGVDQG
SKDVLQJWRWKH&RXQW\IRUFRQVLGHUDWLRQ2XUWHDPZLOODOVRSUHSDUHEDVLVRIGHVLJQUHSRU WVDWWKLVWLPH
16.C.4.b
Packet Pg. 1683 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
21
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3URMHFW$SSURDFK7LPH %XGJHW
Collier County
Design Phase
7KHGHVLJQSKDVHLVZKHUHDOOWKHFRPSRQHQWVRIWKHSUHOLPLQDU\HQJLQHHULQJGHVLJQDUHLQWHJUDWHG
DQGXVHGWRÀQDOL]HWKHFRQVWUXFWLRQSODQV2XUWHDPZLOOXWLOL]HLQKRXVHUHVRXUFHVDQGZRUNFORVHO\
ZLWKWKH&RXQW\WRGHYHORSHIIHFWLYHGHVLJQVDFTXLUHQHFHVVDU\SHUPLWVDQGVXFFHVVIXOO\ELGWKH
YDULRXVFRQVWUXFWLRQSKDVHV:HZLOODOVRSURYLGHDJLOHUHVSRQVHVWRFKDQJLQJQHHGVGXULQJWKHGHVLJQ
SKDVHWRDYRLGGHOD\VDQGHQVXUHWLPHO\FRPSOHWLRQ
Final Design and Permitting
-RKQVRQ(QJLQHHULQJZLOOSUHSDUHWKHGHVLJQDQGFRQVWUXFWLRQGRFXPHQWVXVLQJLQKRXVHUHVRXUFHV
7KLVDOORZVRXUWHDPWRTXLFNO\DQGHIÀFLHQWO\SUHSDUHWKHFRQVWUXFWLRQSODQVDQGGRFXPHQWV:H
KDYHDWKRURXJKXQGHUVWDQGLQJRIWKH&RXQW\·VVWDQGDUGVDQGGRFXPHQWUHTXLUHPHQWV)ROORZLQJ
WKHGHVLJQZHZLOOSUHSDUHSODQVZLWKYHUWLFDODOLJQPHQWV$IWHUUHYLHZZLWK(30'VWDIIZH
ZLOOLQFRUSRUDWHFRPPHQWVDQGPRYHWRDQGWKHQFRQVWUXFWLRQSODQV:HZLOOPHHWZLWK
&RXQW\VWDIIDWHDFKVWDJHIRUUHYLHZTXHVWLRQVDQGFRPPHQWV)LQDOFKDQJHVZLOOEHPDGHDQGWKH
FRQVWUXFWLRQGRFXPHQWVZLOOEHSUHSDUHG
3HUPLWWLQJHIIRUWVZLOOJHQHUDOO\VWDUWDWWKHSODQOHYHO/RQJOHDGSHUPLWVVXFKDVDQ\SHUPLWWLQJ
WKURXJKWKH$UP\&RUSVRU86)LVKDQG:LOGOLIHZLOOEHVWDUWDVHDUO\DVSRVVLEOH3URMHFWVLQ*ROGHQ
*DWHDUHZLOOUHTXLUH)'(3SHUPLWWLQJ6):0'SHUPLWWLQJ&ROOLHU&RXQW\52:&ROOLHU&RXQW\
6'3LDQGSRVVLEO\YDULRXVIRUPVRIHQYLURQPHQWDOSHUPLWWLQJ:HZLOOZRUNFORVHO\ZLWK(30'VWDIIWR
SUHSDUHDQGVXEPLWDSSOLFDWLRQVDVZHOODVUHVSRQGWR5$,VWKDWPD\EHUHFHLYHG
%LGGLQJ
2XUWHDPUHJXODUO\ZRUNVZLWK(30'VWDIIGXULQJWKHELGGLQJSURFHVV:HZLOOSUHSDUHDOOUHTXLUHGELG
GRFXPHQWVDWWHQGSUHELGPHHWLQJVDQGSUHSDUHDGGHQGDDVQHFHVVDU\)ROORZLQJVXFFHVVIXOELGGLQJ
ZHZLOOSUHSDUHDUHFRPPHQGDWLRQOHWWHUIRUWKH&RXQW\
16.C.4.b
Packet Pg. 1684 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
22
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
3URMHFW$SSURDFK7LPH %XGJHW
Collier County
Construction Phase Services
2XU8WLOLWLHVWHDPKDVSURYLGHGFRQVWUXFWLRQSKDVHVHUYLFHVWRWKH&RXQW\RQPDQ\UHFHQWSURMHFWV
:HZLOOEXLOGXSRQWKDWH[SHULHQFHRQWKLVSURMHFWWRHQVXUHFRQVWUXFWLRQSURFHHGVLQDWLPHO\VDIH
DQGFRVWHIIHFWLYHPDQQHU:HKDYHSHUIRUPHGDOOVXEWDVNVLQWKHSURMHFWGRFXPHQWV·7DVNDQGVHH
QRLVVXHVZLWKWKHSURSRVHGVFRSH6KRXOGLVVXHVDULVHGXULQJFRQVWUXFWLRQRXUWHDPFDQTXLFNO\EH
RQWKHJURXQGWRHYDOXDWHFRQGLWLRQVDGYLVHWKH&RXQW\DQGPDNHUHFRPPHQGDWLRQV,QDGGLWLRQRXU
WHDPZLOOKDQGOHFRRUGLQDWLQJZDUUDQW\ZRUNGXULQJWKHFRXUVHRIWKLVSURMHFW
Public Relations
&RPPXQLW\DZDUHQHVVDQGFRPPXQLFDWLRQDUHLPSRUWDQWIRUSURMHFWVWKDWDUHGLVUXSWLYHWRUHVLGHQWV
DQGEXVLQHVVHV:HZLOOXWLOL]HRXUVXEFRQVXOWDQW&HOOD0ROQDU&0$IRUSXEOLFUHODWLRQVHIIRUWV
,QDGGLWLRQRXU8WLOLWLHVWHDPLVDYDLODEOHIRUSXEOLFPHHWLQJVDQGSURYLGLQJVXSSRUWLQJJUDSKLFVDQG
H[KLELWV$OOPDWHULDOVZLOOEHSUHSDUHGLQ(QJOLVKDQG6SDQLVK2XUWHDPLVSUHSDUHGWRSURYLGHSXEOLF
LQIRUPDWLRQPDWHULDOVDQGPHHWLQJVGXULQJGHVLJQDQGFRQVWUXFWLRQSKDVHV7KHIROORZLQJLVDQRYHUYLHZ
RIWKHSXEOLFUHODWLRQVFDPSDLJQ
¬0DLOHUVQHZVOHWWHUVGRRUKDQJHUVDQGDGYHUWLVHPHQWVLQORFDOPHGLDWRJHQHUDWHSXEOLF
DZDUHQHVV2XUWHDPZLOOZRUNFORVHO\ZLWK\RXUVWDIIWRHQVXUHWKHVHLWHPVFRQYH\WKH
EHQHÀWVRIDSURMHFWDQGSUHSDUHWKHSXEOLF·VH[SHFWDWLRQV
¬3UHGHVLJQSXEOLFLQIRUPDWLRQZRUNVKRSVWRDOORZWKHSXEOLFWREHFRPHDZDUHRIDSURMHFW
DVNTXHVWLRQVDQGSURYLGHFRPPHQWV
¬3UHFRQVWUXFWLRQSXEOLFLQIRUPDWLRQZRUNVKRSVZLOOEHKHOGWRLQIRUPWKHVXUURXQGLQJ
FRPPXQLW\DERXWZKDWWRH[SHFWGXULQJFRQVWUXFWLRQ7KHSXEOLFLQIRUPDWLRQZRUNVKRS
ZLOODOORZWKHSXEOLFWRUHYLHZWKHSODQVDQGKDYHRQHRQRQHGLVFXVVLRQVZLWKWKHSURMHFW
WHDPLQFOXGLQJWKH'HVLJQ%XLOG7HDP&ROOLHU&RXQW\SHUVRQQHODQGWKHFRQWUDFWRU7KH
SURSRVHGPDLQWHQDQFHRIWUDIÀF027ZLOODOVREHDYDLODEOHWRJLYHWKHSXEOLFDQLQLWLDO
ORRNDWDQ\IXWXUHWUDYHOSDWWHUQFKDQJHVGXULQJFRQVWUXFWLRQ
¬,IDQ\XWLOLW\GLVUXSWLRQVRFFXURQWKHSURMHFWWKHSXEOLFZLOOEHLQIRUPHGWKURXJKWKHPHGLD
DQGE\GRRUWRGRRUÁ\HUV
¬3URMHFWZHEVLWHVZLWKXSWRGDWHLQIRUPDWLRQDERXWWUDIÀFLPSDFWVGHWRXUVXSGDWHVDQG
QRWLFHV
¬KRXUSKRQHKRWOLQHIRUUHVLGHQWVWRFDOOLQDQGUHSRUWDQ\LVVXHV
¬3RLQWRIFRQWDFWFDUGVLVVXHGWRFRQWUDFWRUVDQGLQVSHFWRUVWKDWZLOOEHJLYHQWRWKHSXEOLF
DQGWKHPHGLDLQWKHÀHOGGLUHFWLQJWKHPWRFRQWDFW&0$IRULQIRUPDWLRQFRQFHUQLQJWKH
SURMHFW7KLVDOORZVWKHFRQWUDFWRUVWRFRQWLQXHZRUNLQJXQLQWHUUXSWHGDQGZLOOHQVXUHWKDW
WKHSXEOLFDQGPHGLDDUHUHFHLYLQJWKHPRVWWLPHO\DQGDFFXUDWHLQIRUPDWLRQ3ROLWLFDOO\
VHQVLWLYHLVVXHVZLOOEHLPPHGLDWHO\EURXJKWWRWKHDWWHQWLRQRI&RXQW\VWDII
16.C.4.b
Packet Pg. 1685 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
ID Task Name Duration
1 GOLDEN GATE CITY TRANSMISSION WATER MAIN
IMPROVEMENTS DESIGN
280 days
2 TASK 1 Phase 1: Preliminary Engineering Design 78 days
3 Task 1.1 - Project Start-Up 7 days
4 Task 1.2 - Hydraulic Analysis 14 days
5 Task 1.3 - Surveying Services 21 days
6 Task 1.4 - Geotechnical Investigation 21 days
7 Task 1.5 - Soft Dig Investigation 21 days
8 Task 1.6 - 30% Plans Preparation 60 days
9 TASK 2 Phase 2: Design 75 days
10 Task 2.1 - Final Design and Permitting Phase 45 days
11 Task 2.2 - Bidding and Award Phase 30 days
12 Task 2.3 - Public Involvement 15 days
13 TASK 3 Phase 3: Consultation Services During
Construction
121 days
14 Task 3.1 - Construction Administration 120 days
15 Task 3.2 - Public Involvement 120 days
16 Task 3.3 - Warranty Services 1 day
17 1 day?
1 Year from Date of Final Completion
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
GOLDEN GATE CITY TRANSMISSION WATER MAIN IMPROVEMENTS DESIGN - RPS NO.: 19-7637
PROJECT SCHEDULE
As demostrated on past projects with Collier County, Johnson Engineering has the resources and experience to expedite design on projects to meet the County’s schedule.
16.C.4.b
Packet Pg. 1686 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
5. LOCATION
16.C.4.b
Packet Pg. 1687 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
24
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
5. LocationCollier County
OFFICE LOCATIONS -RKQVRQ(QJLQHHULQJKDVPDLQWDLQHGD&ROOLHU&RXQW\RIÀFHIRUPRUHWKDQ\HDUV:HDUHORFDWHG
DFURVV$LUSRUW5RDGIURPWKH&ROOLHU&RXQW\*RYHUQPHQW&HQWHU'XULQJWKDWWLPHZHKDYHGHVLJQHG
SHUPLWWHGDQGPDQDJHGWKHFRQVWUXFWLRQRIDZLGHYDULHW\RISULYDWHSXEOLFDQGLQVWLWXWLRQDOSURMHFWV
:HFRQWLQXHWRPDQDJHPDQ\VLPLODUSURMHFWVDQGKDYHGHYHORSHGORQJVWDQGLQJUHODWLRQVKLSVZLWK
ORFDOFRQWUDFWRUVLQVSHFWRUVDQGSHUPLWDJHQF\VWDII
,WLVRXUEHOLHIWKDWJRRGFRPPXQLFDWLRQLVPRQXPHQWDOWRWKHVXFFHVVRIDQ\SURMHFW:HSULGH
RXUVHOYHVRQTXLFNDQGLPPHGLDWHUHVSRQVHVWR\RXUQHHGVRUFRQFHUQV1RWRQO\ZLOO\RXEHDEOHWR
FRQWDFWXVDWDQ\WLPHEXWZHGRQRWKHVLWDWHWRFRQWDFW\RXRXUFOLHQWDVVRRQDVDQ\LQIRUPDWLRQ
SHUWDLQLQJWRWKHSURMHFWQHHGVWREHUHOD\HG:KLOHZRUNLQJZLWK\RX\RXULQWHUHVWVDQGEXGJHWDUH
RXUVROHREOLJDWLRQDQGZLWKWKHORFDWLRQRIRXU1DSOHVRIÀFHZHFDQUHVSRQGTXLFNO\WR\RXUQHHGV
DQGHOLPLQDWHWUDYHOFRVWV
Port Charlotte
0XUGRFN&LUFOH6XLWH%
Port Charlotte, FL 33948
3KRQH
)D[
&OHZLVWRQ
%HUQHU5RDG
&OHZLVWRQ)/
3KRQH
)D[
Lutz
+XQWLQJ%RZ&LUFOH
Suite 101, Lutz, FL 33558
3KRQH
)D[
/D%HOOH
251 West Hickpochee Avenue
/D%HOOH)/
3KRQH
)D[
Naples
2350 Stanford Court
Naples, FL 34112
3KRQH
)D[
&25325$7(+($'48$57(56
Fort Myers
2122 Johnson Street
Fort Myers, FL 33901
3KRQH
)D[
16.C.4.b
Packet Pg. 1688 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
6. RECENT, CURRENT, & PROJECTED WORKLOADS OF THE FIRM
16.C.4.b
Packet Pg. 1689 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
25
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
5HFHQW&XUUHQW 3URMHFWHG:RUNORDGVCollier County
:LWKWKHXQGHUVWDQGLQJWKDWFHUWDLQDVSHFWVRIWKHVHSRWHQWLDOSURMHFWVDUHRQDQ´DVQHHGHGµEDVLVDOO
NH\WHDPPHPEHUVDUHFRPPLWWHGWRSURYLGLQJDYDLODELOLW\DQGDUHSUHSDUHGWRGHGLFDWHWKHQHFHVVDU\
WLPHDQGHIIRUWWRWKHLUUHVSHFWLYHWDVNVRQIXWXUH&ROOLHU&RXQW\SURMHFWV:HDOVRKDYHÁH[LELOLW\
DQGFRQVLGHUDEOHDGGLWLRQDOUHVRXUFHVVKRXOGWKH\EHQHHGHG$VXPPDU\RIWKH-RKQVRQ(QJLQHHULQJ·V
ZRUNORDGSURMHFWLRQVLVSURYLGHGEHORZ
AVAILABILITY
0LNH'LFNH\3(
-DUHG%URZQ3(
'DYH7URXWHDXG3(
0DUN7KRPDV3(
$QG\7LOWRQ3(
(ULN+RZDUG3(360
Mike Tiseo
-RVK+LOGHEUDQG3(360
Mark Texter, PSM
Kim Arnold, PG
%LOO\6DXP(,
-RKQ&XUWLV&6(
Cella Molnar & Associates
40%
25%
30%
35%
20%
25%
40%
20%
20%
20%
40%
20%
30%
Availability of Team
Percentage of time
available for this
project
Percentage of time
committed to other
projects
Percentage of time
committed to future
projects
16.C.4.b
Packet Pg. 1690 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
7. FORMS
16.C.4.b
Packet Pg. 1691 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Form 2: Vendor Check List
Updated: October 24th 2019
IMPORTANT: THIS SHEET MUST BE SIGNED. Please read carefully, sign in the spaces indicated and submit with your
Proposal through Bidsync.
Vendor should check off each of the following items as the necessary action is completed:
The Solicitation Submittal has been signed.
The Solicitation Pricing Document (Bid Schedule/Quote Schedule/etc.) has been completed and attached.
All applicable forms have been signed and included, along with licenses to complete the requirements of the project.
Any addenda have been signed and included.
Affidavit for Claiming Status as a Local Business, if applicable. Collier or Lee County Business Tax Receipt MUST be
included.
Proof of status from Division of Corporations - Florida Department of State (If work performed in the State) -
http://dos.myflorida.com/sunbiz/.
Proof of E-Verify (Memorandum of Understanding or Company Profile page) and Immigration Affidavit MUST be
included - https://www.e-verify.gov/.
Grant Provisions and Assurances package in its entirety, if applicable.
Reference Questionnaires MUST be included or you may be deemed non-responsive.
ALL SUBMITTALS MUST HAVE THE SOLICITATION NUMBER AND TITLE
Name of Firm:
________________________________________________________
Address:
________________________________________________________
City, State, Zip:
________________________________________________________
Telephone:
________________________________________________________
Email:
________________________________________________________
Representative Signature:
________________________________________________________
Representative Name:
________________________________________ Date ___________
¥
¥
¥
¥
¥
¥
¥
¥
-RKQVRQ(QJLQHHULQJ,QF
2122 Johnson Street
Fort Myers, FL 33901
239.461.2455
mdickey@johnsoneng.com
0LFKDHO'LFNH\3(
N/A
16.C.4.b
Packet Pg. 1692 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Form 3: Conflict of Interest Affidavit
The Vendor certifies that, to the best of its knowledge and belief, the past and current work on any Collier County project affiliated
with this solicitation does not pose an organizational conflict as described by one of the three categories below:
Biased ground rules The firm has not set the ground rules for affiliated past or current Collier County project identified
above (e.g., writing a procurements statement of work, specifications, or performing systems engineering and technical
direction for the procurement) which appears to skew the competition in favor of my firm.
Impaired objectivity The firm has not performed work on an affiliated past or current Collier County project identified
above to evaluate proposals / past performance of itself or a competitor, which calls into question the contractors ability to
render impartial advice to the government.
Unequal access to information The firm has not had access to nonpublic information as part of its performance of a
Collier County project identified above which may have provided the contractor (or an affiliate) with an unfair competitive
advantage in current or future solicitations and contracts.
In addition to this signed affidavit, the contractor / vendor must provide the following:
1. All documents produced as a result of the work completed in the past or currently being worked on for the above-mentioned
project; and,
2. Indicate if the information produced was obtained as a matter of public record (in the sunshine) or through non -public (not in
the sunshine) conversation (s), meeting(s), document(s) and/or ot her means.
Failure to disclose all material or having an organizational conflict in one or more of the three categories above be identified, may
result in the disqualification for future solicitations affiliated with the above referenced project(s).
By the signature below, the firm (employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge
and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational,
or otherwise) which relates to the project identified above has been fully disclosed and does not pose an organizational conflict.
Firm: ____________________________________________________________________________
Signature and Date: _________________________________________________________________
Print Name: _______________________________________________________________________
Title of Signatory: __________________________________________________________________
-RKQVRQ(QJLQHHULQJ,QF
12/16/19
0LFKDHO'LFNH\3(
Vice President
16.C.4.b
Packet Pg. 1693 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Form 4: Vendor Declaration Statement
BOARD OF COUNTY COMMISSIONERS
Collier County Government Complex
Naples, Florida 34112
Dear Commissioners:
The undersigned, as Vendor declares that this response is made without connection or arrangement with any other person and this
proposal is in every respect fair and made in good faith, without collusion or fraud.
The Vendor agrees, if this solicitation submittal is accepted, to execute a Collier County document for the purpose of establishing a
formal contractual relationship between the firm and Collier County, for the performance of all requirements to which the solicitation
pertains. The Vendor states that the submitted is based upon the documents listed by the above referenced Solicitation. Further, the
vendor agrees that if awarded a contract for these goods and/or services, the vendor will not be eligible to compete, submit a
proposal, be awarded, or perform as a sub-vendor for any future associated with work that is a result of this awarded contract.
IN WITNESS WHEREOF, WE have hereunto subscribed our names on this _____ day of _____________, 20__ in the County of
_______________, in the State of _____________.
Firms Legal Name:
Address:
City, State, Zip Code:
Florida Certificate of
Authority Document
Number
Federal Tax
Identification Number
*CCR # or CAGE Code
*Only if Grant Funded
__________________________________________________________________________
Telephone:
Signature by:
(Typed and written)
Title:
-RKQVRQ(QJLQHHULQJ,QF
2122 Johnson Street
Fort Myers, FL 33901
322710
59-1173834
4R4K3
0LFKDHO'LFNH\3(
Vice President
16th December 19
Lee Florida
16.C.4.b
Packet Pg. 1694 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Additional Contact Information
Send payments to:
(required if different from
above)
Company name used as payee
Contact name:
Title:
Address:
City, State, ZIP
Telephone:
Email:
Office servicing Collier
County to place orders
(required if different from
above)
Contact name:
Title:
Address:
City, State, ZIP
Telephone:
Email:
-RKQVRQ(QJLQHHULQJ,QF
Mercedes Niles
Accounts Receivable
2122 Johnson Street
Fort Myers, FL 33901
acpay@johnsoneng.com
VDPHDVDERYH
16.C.4.b
Packet Pg. 1695 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Form 5: Immigration Affidavit Certification
This Affidavit is required and should be signed, by an authorized principal of the firm and submitted with formal solicitation
submittals. Further, Vendors are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at
the time of the submission of the Vendors p roposal. Acceptable evidence consists of a copy of the properly completed E-Verify
Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Failure to include
this Affidavit and acceptable evidence of enrollment in the E-Verify program may deem the Vendors proposal as non -
responsive https://www.e-verify.gov/.
Collier County will not intentionally award County contracts to any Vendor who knowingly employs unauthorized alien workers,
constituting a violation of the employment provision contained in 8 U.S.C. Section 1324 a(e) Section 274A(e) of the Immigration
and Nationality Act (INA).
Collier County may consider the employment by any Vendor of unauthorized aliens a violation of Section 274A (e) of the INA. Such
Violation by the recipient of the Employment Provisions contained in Section 274A (e) of the INA shall be grounds for unilateral
termination of the contract by Collier County.
Vendor attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration Act and
subsequent Amendment(s)) and agrees to comply with the provisions of the Memorandum of Understanding with E-Verify and to
provide proof of enrollment in The Employment Eligibility Verification System (E-Verify), operated by the Department of Homeland
Security in partnership with the Social Security Administration at the time of submission of the Vendors proposal.
Company Name ____________________________________________________________________
Print Name
Title _______________________
Signature
Date _______________________
-RKQVRQ(QJLQHHULQJ,QF
0LFKDHO'LFNH\3( Vice President
12/1/19
Florida
Lee
16.C.4.b
Packet Pg. 1696 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
31
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
5HTXLUHG)RUPVCollier County
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
16.C.4.b
Packet Pg. 1697 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Form 6: Vendor Substitute W 9
Request for Taxpayer Identification Number and Certification
In accordance with the Internal Revenue Service regulations, Collier County is required to collect the following information
for tax reporting purposes from individuals and companies who do business with the County (including social security numbers
if used by the individual or company for tax reporting purposes). Florida Statute 119.071(5) requires that the county
notify you in writing of the reason for collecting this information, which will be used for no other purpose than herein stated.
Please complete all information that applies to your business and return with your quote or proposal.
1. General Information (provide all information)
Taxpayer Name ________________________________________________________________________________
(as shown on income tax return)
Business Name (if different from taxpayer name)
Address ____________________________________ City ______________________________________________
State ______________________________________ Zip______________________________________________
Telephone __________________ Email_____________________
Order Information (Must be filled out)
Address ___________________________________
Remit / Payment Information (Must be filled out)
Address ____________________________________________
City __________
State ________ Zip ___________
City _____________
State _________ Zip______________
Email ____________________________________
Email _____________________________________________
2. Company Status (check only one)
Individual / Sole Proprietor Corporation Partnership
Tax Exempt (Federal income tax-exempt entity
under Internal Revenue Service guidelines IRC
501 (c) 3)
Limited Liability Company
Enter the tax classification
(D = Disregarded Entity, C = Corporation, P = Partnership)
3. Taxpayer Identification Number (for tax reporting purposes only)
Federal Tax Identification Number (TIN) _______________________________________________________________
(Vendors who do not have a TIN, will be required to provide a social security number prior to an award).
4. Sign and Date Form: Certification:
Under penalties of perjury, I certify that the information shown on this form is correct to my knowledge.
Signature
___________________________________________________________
Date
______________________________
Title
_______________________________________________________________
Phone Number
________________________
-RKQVRQ(QJLQHHULQJ,QF
2122 Johnson Street Fort Myers
Florida 33901
32%R[
Fort Myers Florida 33902
acpay@johnsoneng.com
32%R[
Fort Myers Florida 33902
acpay@johnsoneng.com
acpay@johnsoneng.com
X
59-1173834
Vice President
12/16/19
C
16.C.4.b
Packet Pg. 1698 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
INSURANCE AND BONDING REQUIREMENTS
Insurance / Bond Type Required Limits
1. Workers Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government
Statutory Limits and Requirements
Evidence of Workers Compensation coverage or a Certificate of Exem ption issued
by the State of Florida is required. Entities that are formed as Sole Proprietorships
shall not be required to provide a proof of exemption. An application for exemption
can be obtained online at https://apps.fldfs.com/bocexempt/
2. Employers Liability
$_1,000,000_ single limit per occurrence
3. Commercial General
Liability (Occurrence Form)
patterned after the current
ISO form
Bodily Injury and Property Damage
$__1,000,000____single limit per occurrence, $2,000,000 aggregate for Bodily Injury
Liability and Property Damage Liability. This shall include Premises and Operations;
Independent Contractors; Products and Completed Operations and Contractual
Liability.
4. Indemnification To the maximum extent permitted by Florida law, the Contractor/Vendor shall defend,
indemnify and hold harmless Collier County, its officers and employees from any and
all liabilities, damages, losses and costs, including, but not limited to, reasonable
attorneys fees and paralegals fees, to the extent caused by the negli gence,
recklessness, or intentionally wrongful conduct of the Contractor/ Vendor or anyone
employed or utilized by the Contractor/Vendor in the performance of this Agreement.
5. Automobile Liability $___1,000,000_ Each Occurrence; Bodily Injury & Property Damage,
Owned/Non-owned/Hired; Automobile Included
6. Other insurance as noted:
Watercraft $ __________ Per Occurrence
United States Longshoreman’s and Harborworker’s Act coverage shall be
maintained where applicable to the completion of the work.
$ __________ Per Occurrence
Maritime Coverage (Jones Act) shall be maintained where applicable to the
completion of the work.
$ __________ Per Occurrence
Aircraft Liability coverage shall be carried in limits of not less than $5,000,000
each occurrence if applicable to the completion of the Services under this Agreement.
$ __________ Per Occurrence
Pollution $ __________ Per Occurrence
Professional Liability $ __1,000,000__ Per claim & in the aggregate
Project Professional Liability $__________ Per Occurrence
Valuable Papers Insurance $__________ Per Occurrence
Cyber Liability $__________ Per Occurrence
Technology Errors & Omissions $__________ Per Occurrence
7. Bid bond
Shall be submitted with proposal response in the form of certified funds, cashiers
check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or
proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made
payable to the Collier County Board of County Commissioners on a bank or trust
company located in the State of Florida and insured by the Federal Deposit Insurance
Corporation.
16.C.4.b
Packet Pg. 1699 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
8. Performance and Payment
Bonds
For projects in excess of $200,000, bonds shall be submitted with the executed
contract by Proposers receiving award, and written for 100% of the Contract award
amount, the cost borne by the Proposer receiving an award. The Performance and
Payment Bonds shall be underwritten by a surety authorized to do business in the
State of Florida and otherwise acceptable to Owner; provided, however, the surety
shall be rated as A - or better as to general policy holders rating and Class V or
higher rating as to financial size category and the amount required shall not exceed
5% of the reported policy holders surplus, all as reported in the most current B est
Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New
York, New York 10038.
9. Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The
same Vendor shall provide County with certificates of insurance meeting the required insurance provisions.
10. Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General
Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained
by, or available for the benefit of, the Additional Insured and the Vendors policy shall be endorsed accordingly.
11. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County
Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state
the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on
behalf of Collier County.
12. On all certificates, the Certificate Holder must read: Collier County Board of Commissioners, 3295 Tamiami Trail East,
Naples, FL 34112
13. Thirty (30) Days Cancellation Notice required.
14. Collier County shall procure and maintain Builders Risk Insurance on all construction projects where it is deemed necessary.
Such coverage shall be endorsed to cover the interests of Collier County as well as the Contractor. Premiums shall be billed to
the project and the Contractor shall not include Builders Risk premiums in its project proposal or project billings. All questions
regarding Builders Risk Insurance will be addressed by the Collier Co unty Risk Management Division.
9/6/19 - CC
___________________________________________________________________________________________________________
Vendors Insurance Statement
We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five
(5) days of the award of this solicitation. The insurance submitted must provide coverage for a minimum of six (6) months from the
date of award.
Name of Firm
_______________________________________ Date ____________________________
Vendor Signature
_________________________________________________________________________
Print Name
_________________________________________________________________________
Insurance Agency
_________________________________________________________________________
Agent Name
___________________________________ Telephone Number ________________
-RKQVRQ(QJLQHHULQJ,QF
0LFKDHO'LFNH\3(
%.63DUWQHUV
7RGG6SHDV
16.C.4.b
Packet Pg. 1700 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
The ACORD name and logo are registered marks of ACORD
CERTIFICATE HOLDER
' 1988-2014 ACORD CORPORATION. All rights reserved.
ACORD 25 (2014/01)
AUTHORIZED REPRESENTATIVE
CANCELLATION
DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE
LOCJECT
PRO-POLICY
GEN’L AGGREGATE LIMIT APPLIES PER:
OCCURCLAIMS-MADE
COMMERCIAL GENERAL LIABILITY
PREMISES (Ea occurrence)$DAMAGE TO RENTED
EACH OCCURRENCE $
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $
PRODUCTS - COMP/OP AGG $
$RETENTIONDED
CLAIMS-MADE
OCCUR
$
AGGREGATE $
EACH OCCURRENCE $
UMBRELLA LIAB
EXCESS LIAB
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
INSR
LTR TYPE OF INSURANCE POLICY NUMBER
POLICY EFF
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)LIMITS
PER
STATUTE
OTH-
ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE
E.L. DISEASE - POLICY LIMIT
$
$
$
ANY PROPRIETOR/PARTNER/EXECUTIVE
If yes, describe under
DESCRIPTION OF OPERATIONS below
(Mandatory in NH)
OFFICER/MEMBER EXCLUDED?
WORKERS COMPENSATION
AND EMPLOYERS’ LIABILITY Y / N
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWNED SCHEDULED
HIRED AUTOS
NON-OWNED
AUTOS AUTOS
AUTOS
COMBINED SINGLE LIMIT
BODILY INJURY (Per person)
BODILY INJURY (Per accident)
PROPERTY DAMAGE $
$
$
$
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSD
ADDL
WVD
SUBR
N / A
$
$
(Ea accident)
(Per accident)
OTHER:
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER:REVISION NUMBER:
INSURED
PHONE
(A/C, No, Ext):
PRODUCER
ADDRESS:
E-MAIL
FAX
(A/C, No):
CONTACT
NAME:
NAIC #
INSURER A :
INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
INSURER(S) AFFORDING COVERAGE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
%.6 3DUWQHUV32%R[)RUW 0\HUV )/
<DULW]D 6RWR
\DULW]DVRWR#ENVSDUWQHUVFRP
&RQWLQHQWDO &DVXDOW\ &RPSDQ\
-2+16$PHULFDQ &DV &R RI 5HDGLQJ 3$-RKQVRQ (QJLQHHULQJ ,QF32 %R[)RUW 0\HUV )/
&RQWLQHQWDO ,QVXUDQFH &RPSDQ\
9DOOH\ )RUJH ,QVXUDQFH &R
$;
;
;;&8
;;
<<
%
;
;;
;3,3
3,3
&;;
;
'
1
:&;
352-(&7&ROOLHU &RXQW\ ± *ROGHQ *DWH &LW\ 7UDQVPLVVLRQ :DWHU 0DLQ ,PSURYHPHQWV 'HVLJQ536 1R &ROOLHU &RXQW\ LV OLVWHG DV DGGLWLRQDO LQVXUHG ZLWK UHVSHFW WR JHQHUDO OLDELOLW\ DV SHU HQGRUVHPHQW &1$;; $ ZDLYHU RI VXEURJDWLRQ DSSOLHV WR WKH JHQHUDOOLDELOLW\SROLF\ GD\V QRWLFH RI FDQFHOODWLRQ DSSOLHV H[FHSW GD\V IRU QRQSD\PHQW
&ROOLHU &RXQW\7DPLDPL 7UDLO (DVW1DSOHV)/
16.C.4.b
Packet Pg. 1701 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
36
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
5HTXLUHG)RUPVCollier County
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
INSR ADDL SUBR
LTR INSD WVD
PRODUCER CONTACT
NAME:
FAXPHONE
(A/C, No):(A/C, No, Ext):
E-MAIL
ADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATION
AND EMPLOYERS’ LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence)
MED EXP (Any one person)$
PERSONAL & ADV INJURY $
GEN’L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $
PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT
OTHER:$
COMBINED SINGLE LIMIT $(Ea accident)
ANY AUTO BODILY INJURY (Per person)$
OWNED SCHEDULED
BODILY INJURY (Per accident)$AUTOS ONLY AUTOS
HIRED NON-OWNED
PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY
(Per accident)
$
OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $
PER OTH-
STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below
INSURER(S) AFFORDING COVERAGE NAIC #
COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER:REVISION NUMBER:
CERTIFICATE HOLDER CANCELLATION
' 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03)
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
JOHNS-1 OP ID: BB
12/13/2019
Lauren Hampton
JCJ Insurance Agency
2208 Hillcrest Street
Orlando, FL 32803
321-445-1117 321-445-1076
certs@jcj-insurance.com
Berkley Insurance Company
Johnson Engineering, Inc.
2122 Johnson St.Fort Myers, FL 33901
A AEC-9031940-04 09/15/2019 09/15/2020 Per Claim 2,000,000
Aggregate 2,000,000
RE: Collier County - Golden Gate City Transmission Water Main Improvements
Design, RPS No. 19-7637. 30 Day Notice of Cancellation, except for 10 days
for non-payment.
COLL329
Collier County
3295 Tamiami Trail East
Naples, FL 34112
321-445-1117
32603
Professional Liab
16.C.4.b
Packet Pg. 1702 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
37
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
5HTXLUHG)RUPVCollier County
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
-Ѵv;;v_;-uvķ";1u;|-u!om ;"-m|bvķo;umou
"$$
!
!$$
&""" !
""!&$
!
!
""!"
$!
""!!"" & !$
!(""
$!ƓƕƐķ
! "$$&$"
$!&$& ķ ( !
omo|-Ѵ|;u|_bv7o1l;m|bm-m=oulĺ
ѵƓƕƔ !(
"&!ĹѵƖƕѶƒ
*!$ $Ĺ
!&!+ƑѶķƑƏƑƐ
$_bvbvouѴb1;mv;ĺ|bvmѴ-=Ѵ=ou-mom;o|_;u|_-m|_;Ѵb1;mv;;|ov;|_bv7o1l;m|ĺ
!$
!$+!"
ƒƒƖƐƕ
Ѵ-v;ub=Ѵb1;mv;vomѴbm;-|
Ѵoub7-b1;mv;ĺ1ol
-Ѵv;;v_;-uvķ";1u;|-u!om ;"-m|bvķo;umou
"$$
!
!$$
&""" !
""!&$
!
!
""!"
$!
""!!"" & !$
!(""
$!ƓƕƐķ
! "$$&$"
+ķ"$$
omo|-Ѵ|;u|_bv7o1l;m|bm-m=oulĺ
ƐƕƏѵƏ" +!(
"&!ĹѵƏƏƔƕ
*!$ $Ĺ
!&!+ƑѶķƑƏƑƐ
$_bvbvouѴb1;mv;ĺ|bvmѴ-=Ѵ=ou-mom;o|_;u|_-m|_;Ѵb1;mv;;|ov;|_bv7o1l;m|ĺ
!
ƒƒƖƏƖ
Ѵ-v;ub=Ѵb1;mv;vomѴbm;-|
Ѵoub7-b1;mv;ĺ1ol
-Ѵv;;v_;-uvķ";1u;|-u!om ;"-m|bvķo;umou
"$$
!
!$$
&""" !
""!&$
!
!
""!"
$!
""!!"" & !$
!(""
$!ƓƕƐķ
! "$$&$"
$"ķ!)+
omo|-Ѵ|;u|_bv7o1l;m|bm-m=oulĺ
ƒƒƑѵƖ$(
"&!ĹѶѵƓƔƓ
*!$ $Ĺ
!&!+ƑѶķƑƏƑƐ
$_bvbvouѴb1;mv;ĺ|bvmѴ-=Ѵ=ou-mom;o|_;u|_-m|_;Ѵb1;mv;;|ov;|_bv7o1l;m|ĺ
!
ƒƒƖƏƖ
Ѵ-v;ub=Ѵb1;mv;vomѴbm;-|
Ѵoub7-b1;mv;ĺ1ol
BUSINESS &
PROFESSIONAL LICENSES
6WDWH RI )ORULGD
'HSDUWPHQW RI 6WDWH
,FHUWLI\IURP WKH UHFRUGV RI WKLV RIILFH WKDW -2+1621 (1*,1((5,1* ,1&LV
D FRUSRUDWLRQ RUJDQL]HG XQGHU WKH ODZV RI WKH 6WDWH RI )ORULGDILOHG RQ
1RYHPEHU
7KH GRFXPHQW QXPEHU RI WKLV FRUSRUDWLRQ LV
, IXUWKHU FHUWLI\ WKDW VDLG FRUSRUDWLRQ KDV SDLG DOO IHHV GXH WKLV RIILFH WKURXJK
'HFHPEHU WKDW LWV PRVW UHFHQW DQQXDO UHSRUWXQLIRUP EXVLQHVV UHSRUW
ZDV ILOHG RQ 0DUFK DQG WKDW LWV VWDWXV LV DFWLYH
, IXUWKHU FHUWLI\ WKDW VDLG FRUSRUDWLRQ KDV QRW ILOHG $UWLFOHV RI 'LVVROXWLRQ
*LYHQ XQGHU P\KDQG DQG WKH
*UHDW 6HDO RI WKH 6WDWH RI )ORULGD
DW 7DOODKDVVHHWKH &DSLWDO WKLV
WKH 7ZHQW\HLJKWK GD\ RI 0DUFK
7UDFNLQJ 1XPEHU &&
7R DXWKHQWLFDWH WKLV FHUWLILFDWHYLVLW WKH IROORZLQJ VLWHHQWHU WKLV QXPEHU DQG WKHQIROORZ WKH LQVWUXFWLRQV GLVSOD\HG
KWWSVVHUYLFHVVXQEL]RUJ)LOLQJV&HUWLILFDWH2I6WDWXV&HUWLILFDWH$XWKHQWLFDWLRQ
16.C.4.b
Packet Pg. 1703 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
38
(TXDO2SSRUWXQLW\$IÀUPDWLYH$FWLRQ(PSOR\HU
5HTXLUHG)RUPVCollier County
Collier County
Golden Gate City - Transmission Water Main Improvements Design
RPS No. 19-7637 | December 16, 2019
Chair, Board of Professional Certification President, Ecological Society of America
The Ecological Society of America
Founded 1915
The Ecological Society of America,
upon recommendation of the
Board of Professional Certification, hereby certifies that
John Curtis
meets the requirements as a certified
Senior Ecologist
and is governed by the Societys Code of Ethics.
Certified by the Ecological Society of America from
June 1, 2018 through June 30, 2023
16.C.4.b
Packet Pg. 1704 Attachment: 19-7637 Johnson_Engineering_Proposal (11974 : Golden Gate City Transmission Water Main Improvements Design)
Date: February 24, 2020
Notice of Recommended Award
Solicitation: 19-7637 Title: Golden Gate City Transmission Water Main Improvements Design
Due Date and Time: December 16, 2019 at 3:00 P.M.
Respondents:
Company Name City County State Final Ranking Responsive/Responsible
Johnson Engineering, Inc. Fort Myers Lee FL 1
Yes/Yes
AECOM Technical Services,
Inc.
Fort Myers Lee FL 2 Yes/Yes
Tetra Tech, Inc. Estero Lee FL 3 Yes/Yes
Rummel, Klepper & Kahl,
LLP d.b.a. RK&K
Fort Myers Lee FL 4 Yes/Yes
DRMP, Inc. Fort Myers Lee FL Not Ranked Yes/Yes
TKW Consulting Engineers,
LLC
Fort Myers Lee FL Not Ranked Yes/Yes
Utilized Local Vendor Preference: Yes No
Recommended Vendor(s) For Award:
On November 15, 2019 the Procurement Services Division released notices of Request for Professional Services
19-7637, Golden Gate City Transmission Water Main Improvements Design. 10,191 firms were notified, 191
firms viewed/downloaded the bid information and six (6) proposals were received by the due date of
December 16, 2019, as shown above. All six proposers were found to be responsive and responsible. The
Selection Committee met on January 24, 2020, and as described in step 1 of the solicitation documents, the
Committee scored each of the proposals and shortlisted the following top four firms to move on to step 2:
Johnson Engineering, Inc.
Tetra Tech, Inc.
AECOM Technical Services, Inc.
Rummel, Klepper & Kahl, LLP d.b.a. RK&K
On February 21, 2020 the Selection Committee reconvened for step 2, presentations were given, and the
Committee ranked the firms as follows:
Johnson Engineering, Inc. ranked as 1
AECOM Technical Services, Inc. ranked as 2
Tetra Tech, Inc. ranked as 3
Rummel, Klepper & Kahl, LLP d.b.a. RK&K ranked as 4
DocuSign Envelope ID: 24877895-09D1-4AB3-85A9-A6352EFD29F1
16.C.4.c
Packet Pg. 1705 Attachment: 19-7637 NORA.docx (11974 : Golden Gate City Transmission Water Main Improvements Design)
Staff is recommending negotiations with the top ranked firm, Johnson Engineering, Inc.
Required Signatures
Project Manager:
Procurement Strategist:
Procurement Services Director:
__________________________________ _________________
Sandra Herrera Date
DocuSign Envelope ID: 24877895-09D1-4AB3-85A9-A6352EFD29F1
2/24/2020
16.C.4.c
Packet Pg. 1706 Attachment: 19-7637 NORA.docx (11974 : Golden Gate City Transmission Water Main Improvements Design)
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
REQUEST FOR PROFESSIONAL SERVICES (RPS)
In accordance with Florida Statute 287.055
Consultants’ Competitive Negotiation Act
FOR
GOLDEN GATE CITY
TRANSMISSION WATER MAIN IMPROVEMENTS DESIGN
RPS NO.: 19-7637
SARAH HAMILTON, PROCUREMENT STRATEGIST
PROCUREMENT SERVICES DIVISION
3295 TAMIAMI TRAIL EAST, BLDG C-2
NAPLES, FLORIDA 34112
TELEPHONE: (239) 252-8987
Sarah.Hamilton@colliercountyfl.gov (Email)
This proposal solicitation document is prepared in a Microsoft Word format (rev 8/16/17). Any
alterations to this document made by the Consultant may be grounds for rejection of proposal,
cancellation of any subsequent award, or any other legal remedies available to the Collier County
Government.
16.C.4.d
Packet Pg. 1707 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
SOLICITATION PUBLIC NOTICE
REQUEST FOR PROFESSIONAL
SERVICES (RPS) NUMBER:
19-7637
PROJECT TITLE: Golden Gate City Transmission Water Main Improvements Design
RPS OPENING DAY/DATE/TIME: December 16, 2019 at 3:00 P.M.
PLACE OF RPS OPENING: Procurement Services Division
3295 Tamiami Trail East, Bldg. C-2
Naples, FL 34112
All proposals shall be submitted online via the Collier County Procurement Services Division Online Bidding System:
https://www.bidsync.com/bidsync-cas/
INTRODUCTION
As requested by the Public Utilities Engineering & Project Management Division (hereinafter, the “Division or Department”), the
Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for
Professional Services (hereinafter, “RPS”) with the intent of obtaining proposals from interested and qualified Consultants for design
services in accordance with the terms, conditions and specifications stated or attached. The Consultant, at a minimum, must achieve
the requirements of the Specifications or Scope of Work stated.
The results of this solicitation may be used by other County departments once awarded according to the Board of County
Commissioners Procurement Ordinance, as amended.
The selected design team(s) shall perform a comprehensive design of all Collier County Water-Sewer District (CCWSD) existing
water systems and future water systems within the Golden Gate City area. The selected Design team(s) will perform preliminary
design, subsurface utility engineering, modeling, final design, permitting, bidding packages, opinion of probable costs, public
involvement services, construction-related support services, and construction warranty services.
BACKGROUND
The Engineering and Project Management Division (EPMD) of the Public Utilities Department (PUD) has program areas funded
annually for the evaluation and upgrading of the Water Systems throughout Collier County. Due to the age and condition of the
Public Utilities water infrastructure in Golden Gate City, a program has been established to systematically replace the existing aging
water systems and install additional water distribution and water transmission water systems. The Stormwater Management (SWM)
section of the Growth Management Department (GMD) have already started designing improvements to their infrastructure.
Transportation Planning has completed a sidewalk master plan. Their improvements may be incorporated with Public Utilities
Department transmission water main improvement projects to deliver a complete infrastructure replacement project.
The purpose of this solicitation is to select a qualified engineering firm to provide design services included in the scope below on
transmission water main projects within Golden Gate City. This work also includes coordinating with other PUD staff and GMD
staff when applicable, to complete the construction of CCWSD transmission water infrastructure projects in this area.
The proposing firm’s designated staff (and their alternates) shall have experience providing water design services, understand Collier
County Utilities Standards Manual, and be familiar with the Florida Department of Environmental Protection (FDEP) requirements.
The transmission water main work within Golden Gate City includes or may include various quantities of the following public utility
components:
• Transmission water mains, valves, hydrants and other appurtenances
• Wastewater
• Irrigation Quality
• Electrical and SCADA
• Storm Water improvement and treatment concepts, quantity attenuation, storage and runoff rate management and reduction
• Roadway
• Pathway/sidewalk
• Landscaping
• Ancillary repair and replacement
16.C.4.d
Packet Pg. 1708 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
• Other construction projects within Golden Gate City designed by other professionals for other Collier County Departments
• Other utility relocations
At this time, the construction projects anticipated for this contract include the following, which may occur concurrently, sequentially,
or as funding is available:
• Green Boulevard Transmission Water Main Improvements
• Santa Barbara Boulevard Transmission Water Main Improvements
• Golden Gate Parkway Transmission Water Main Improvements
• Sunshine Boulevard Transmission Water Main Improvements
TERM OF CONTRACT
County reserves the right to modify this scope during negotiations for budgetary reasons.
The contract term, if an award is made is intended to be for five (5) years with two (2) one (1) year renewal options.
A Purchase Order will be issued for all work assignments. Board approval will be required for projects greater than $200,000.
Prices shall remain firm for the initial term of the awarded contract.
Surcharges will not be accepted in conjunction with this award, and such charges should be incorporated into the pricing structure.
The County Manager, or designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in
this Agreement for up to one hundred eighty (180) days. The County Manager, or designee, shall give the Consultant written notice
of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in
effect.
DETAILED SCOPE OF WORK
The Design team will provide design project management consisting of, but not be limited to, the following:
a. Attend progress meetings with PUD staff as needed
b. Attend public informational meetings with PUD staff as needed
c. Graphics/exhibit preparation
d. Project phasing for Construction
e. Progress meeting assistance
f. Public meeting assistance
g. Project management assistance
h. Project management plan preparation
i. Public Relations assistance
j. Infrastructure Modeling
k. Infrastructure preliminary design
l. Infrastructure design
m. Subsurface investigations of underground utilities
n. Geotechnical surveys
o. Land surveying
p. Permitting
q. Bid package per phase
Attend Project Design Progress Meetings: Design meetings with PUD representatives will be conducted, as requested by the Project
Manager, throughout the program to keep staff informed of the project progress, to make certain that the Engineer is productively
conducting its consulting services and to obtain input and direction as required for outstanding project issues. A firm day and time
will be established for all progress meetings. Meeting objectives will be to provide progress updates and, reach decisions on pertinent
issues relative to the specific topics being addressed.
The Engineer of Record (EOR) will prepare and distribute agendas and minutes for each meeting incorporating agenda items and
meeting minute corrections provided by PUD staff. Agendas will be submitted to the project delivery team at least two days prior to
the meeting. Draft minutes will be submitted to the team no more than two working days following each meeting; staff will provide
comments no more than two working days after receipt of draft minutes.
16.C.4.d
Packet Pg. 1709 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
1. Phase 1: Preliminary Engineering Design
TASK 1.1 – Project Start-up
a. Initial Kick-Off Meeting – The EOR will organize an initial kick-off meeting with PUD staff to review the project scope,
project objectives/goals, project standards and project schedule for completing the work; this effort should also include the
review of available fund sources. The EOR team shall prepare a project agenda and written meeting minutes summarizing
the discussion and project action plan.
b. Utility Master Plans – The EOR team will review the CCWSD’s utility master plans prior to the kick-off meeting to
determine if any master plan work is required in or around the project area.
c. Initial Project Timeline – EOR team will prepare an initial project timeline and submit to PUD staff at the Initial Kick-Off
Meeting. The EOR team shall update the schedule throughout the duration of the project and shall provide a copy of the
updated schedule to PUD staff at their request.
TASK 1.2 – Hydraulic Analysis
a. Gather and review record drawings of existing utilities within the project corridor.
b. Review the water hydraulic model completed by Carollo, Inc.
TASK 1.3 –Surveying Services.
Tasks may include, but are not limited to:
a. Establish vertical and horizontal controls throughout project area. Elevations will be in NAVD 1988 Datum and Coordinates
will be State Plane 83 for the Florida West Zone. The conversion from NAVD 1988 to NGVD 29 will be clearly identified
on each plan sheet.
b. Complete a boundary and topographic survey from right of way to right of way. Utilize local (Collier County)
knowledgeable registered land surveyors to determine all the easements and/or property boundaries; collect and record the
limits of property or easement boundaries as well as the physical location of the existing infrastructure components. As part
of this task, call Sunshine State One-Call System to have the existing utilities located and to determine utility ownership
(water, irrigation quality water gas, electric, force mains, etc.) prior to performing any field survey efforts. The survey shall
collect, but not be limited to, the following items:
• Existing utilities, both above ground and below ground
• Existing Stormwater Management pipes (size and type), swales, channels structures
• Existing driveways
• Existing trees
• Existing mailboxes
• Fencing/Bollards (conditions and sufficiency for future expansion)
• Landscaping (code considerations) and irrigation facilities
• Right of Way & Roadway Cross Sections every 50 feet
• County Utilities Easement boundaries
c. Submit two (2) full size and one (1) half size copies of the boundary and topographic survey to PUD staff. Submit an
AutoCad file (dwg) of the boundary and topographic survey to PUD staff. The boundary and topographic map shall include
the latest aerial photography as a background.
TASK 1.4 - Geotechnical Investigation
a. Perform all necessary soil borings within project area to install proposed utility line(s). Soil borings shall be completed as
per the latest ASTM standards.
b. Prepare a complete geotechnical investigation report detailing soil conditions, water table elevations, soil classifications,
rock elevation and other items that will affect the construction. Report shall also include recommendation from geotechnical
engineer on bedding material, subsurface conditions and any other items that pertain to the construction project.
c. EOR team shall submit two (2) signed and sealed reports to PUD Staff.
16.C.4.d
Packet Pg. 1710 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
TASK 1.5 - Soft Dig Investigation
a. Meet with PUD Staff on-site to review procedures to complete the soft dig investigations.
b. Excavate existing utilities within the project area to include, but not be limited to, horizontal and vertical location of existing
utility pipe, type of utility pipe, size of utility pipe, utility pipe material and condition of existing pipe material. EOR team
will call Sunshine One if the utility mark-ups need to be refreshed. Soft dig investigations shall be performed using an
approved air/vacuum piece of equipment that will keep the disturbance to a minimum and shall not damage any existing
facilities.
c. Field mark all existing utilities found either by wooden lathes or by marking on the pavement (nail & paint). Marks need
to remain during the design phase, but lathes need to be removed after the final plans have been approved.
d. EOR team shall repair all excavation holes in the natural ground and/or pavement to a condition as equal to or better than
the original condition.
e. EOR team shall provide one (1) full size, one (1) half size plan and AutoCad file (dwg format) of the soft dig investigation
in the project area to PUD Staff.
TASK 1.6 - 30% Plans Preparation
The EOR shall prepare 30% construction plans.
a. Incorporate all record drawings within the project area and the soft dig investigation into the 30% construction plans.
b. Incorporate the boundary and topographic survey into the 30% construction plans.
c. Prepare 30% construction plans detailing the proposed running line within the project area. Include on these plans the survey
work, soft dig investigation work, any pertinent geotechnical information and the aerial photo in the background. The profile
view does not need to be completed.
d. Submit three (3) full size and one (1) half size of the 30% construction plans at least two (2) weeks prior to the meeting with
PUD Staff.
e. Organize and conduct a 30% plan review meeting with PUD staff to discuss the preliminary construction plans. Revise
construction plans as required to reflect PUD comments.
2. Phase 2: Design
Task 2.1 Final Design and Permitting Phase
a. Based on the accepted 30% construction plans, EOR will prepare final drawings and specifications, which provide the
general scope, extent and character of the work to be furnished, and performed by the Contractor. Consultant will prepare
and submit drawings and specifications at the 60-, 90- and 100-percent complete stages for review and approval. An
engineer’s opinion of probable construction cost will accompany each submittal. EOR shall meet with PUD’s design and
operations staff and obtain their written acceptance (signature approval) of the work completed to date.
b. Technical specifications will be based on the 16-Division format of the Construction Specifications Institute (CSI) in MS
Word format. In addition to technical specifications, EOR will coordinate with PUD staff to develop necessary General
Conditions, Supplemental Conditions, and Special Provisions Specifications specifically for the project being constructed
and recollection of all lessons learned of similar completed projects. Standard Collier County Specifications may be used
for reference, but the Engineer shall not rely on them as a replacement for sound engineering judgment and responsibility.
Current County Right-of-Way construction specifications shall be utilized. Documents shall include drawings and project
specifications ready for bidding, consistent with Collier County standards, including, but not limited to, the following or as
approved by the Project Manager:
• Cover sheet, index and key map
• Civil Site Plan including fencing and landscaping
• Existing Conditions map
• Civil Details
• Demolition Plan
• Infrastructure Plan and Profile
16.C.4.d
Packet Pg. 1711 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
• Details
• Operational Contingency Plans
c. Prepare applications for all GMD’s Right-of-Way permits, Insubstantial Change to a Site Improvement Plan when required
from Collier County Growth Management Division and respond to requests for additional information. Prepare all other
required permit applications. Permitting fees will be paid by EPMD.
d. Furnish copies of Contract Documents that include engineering drawings and specifications. Present and review them in
person with PUD staff at the agreed upon completion stages in the project and make appropriate changes requested.
e. Assist EPMD staff in the application process for grants.
f. Prepare a permit application for submittal to the Florida Department of Environmental Protection (FDEP) and provide
backup documentation including drawings and specifications. Respond to all requests for additional information (RAI) from
the FDEP. Permitting fees will be paid by the EOR team and reimbursed by EPMD.
g. Prepare a permit application for submittal to the South Florida Water Management District (SFWMD) and/or Big Cypress
Basin and provide backup documentation including drawings and specifications. Respond to all requests for additional
information (RAI) from the FDEP. Permitting fees will be paid by the EOR team and reimbursed by EPMD.
h. Prepare a permit application for submittal to the United States Army Corps of Engineers (USACOE) and provide backup
documentation including drawings and specifications. Respond to all requests for additional information (RAI) from the
USACOE. Permitting fees will be paid by the EOR team and reimbursed by EPMD.
i. South Florida Water Management District (SFWMD) Notice General or Individual permit and dewatering permit.
j. Preparation of Notice of Intent (NOI) to use the Generic Permit for Discharge of Ground Water.
k. Dewatering Operations: Offsite discharge of produced groundwater requires submittal of a Notice of Intent (NOI) through
the FDEP NPDES program. The NOI that will be signed by the Owner/Applicant requires certification that contaminants
are not present in groundwater. The consultant must prepare the NOI for Owner signature, prepare an application letter, and
submit the form to the FDEP. The application letter will include details regarding the dewatering plan, temporary
storage/treatment of dewatering effluent for turbidity, the location of offsite discharge points, and a review of potential
contaminated sites from FDEP databases. FDEP offsite discharge permits have a duration of 5 years.
Task 2.2 Bidding and Award Phase
With the exception of the following, bid/quote services will be performed by the Collier County Purchasing Division. EOR will
assist the County with the following:
a. Assist in preparing addenda, as required, to interpret, clarify, or expand the Bidding Documents.
b. Consult with and advise the County as to the acceptability of the contractor and subcontractors, suppliers and other persons
and organizations proposed by the Prime Contractor for those portions of the work as to which such acceptability is required
by the Bidding Documents.
c. Consult with the County concerning, and determine the acceptability of, substitute material and equipment proposed by the
Contractor when substitution prior to the award of contracts is allowed by the Bidding Documents.
d. Attend a pre-bid/quote conference.
e. Attend the bid opening, review bids, qualifications.
f. Provide a recommendation letter of award along with a “Reference Log” showing date, time, and comments of all contacted
references provided by the prospective contractor.
Task 2.3 Public Involvement
EOR and their subconsultant(s) shall complete all required public involvement services throughout the design phase. Work under
this item is to include, but not be limited to, the following:
a. Preparing a comprehensive mailing list for all property and business owners who will be affected by the construction with
limits as shown on the most current set of construction documents.
16.C.4.d
Packet Pg. 1712 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
b. Preparing informational newsletter(s) which describes the project and addresses frequently asked questions. Newsletter(s)
to be written in English and Spanish.
c. Press releases as necessary for notification to the public. Press Releases to be written in English and Spanish.
d. Establishing and maintaining a public “Hotline.” Coordination with PUD staff will be included should this interface be
required.
e. Maintaining the Project Customer Service Log using PUD provided template.
f. Responding to public concerns.
g. Attending design progress meetings, as needed, for the duration of the design.
h. Secure site and develop meeting materials for the design public meeting(s).
i. Create web page for project and update it weekly.
3. Phase 3 – Consultation Services During Construction
Task 3.1 – Construction Administration
a. Pre-Construction Meeting - The EOR will chair the pre-construction meeting to review the project scope, discuss project
submittals and identify issues that need to be addressed prior to the project starting. The EOR will prepare a DRAFT Agenda
at least two business days in advance of the pre-construction meeting and issue written meeting notes identifying a summary
of the discussion, conclusions and any risks that have been encountered or are expected, within two days after the meeting
to the Project Delivery Team.
b. Construction Progress Meetings – The EOR will chair the weekly/bi-weekly progress meetings to review project status and
identify issues that may affect the Project. The EOR will prepare a DRAFT Agenda at least two business days in advance
of each meeting and issue written meeting notes identifying a summary of the discussion, conclusions and any risks that
have been encountered or are expected, within two days after the meeting to the Project Delivery Team.
c. Shop Drawing Reviews - EOR shall review and approve (or take other appropriate action in respect of) Shop Drawings,
Samples and other data which Contractor is required to submit, but only for conformance with the design information given
in the Contract Documents and compatibility with the design concept of the completed project as a functioning whole as
indicated in the Contract Documents. Such reviews and approvals or other action will not extend to means, methods,
techniques, sequences or procedures of construction or to safety precautions and programs incident thereto. Review of a
specific item shall not indicate the EOR has reviewed the entire assembly of which the item is a component. EOR shall not
be required to review partial submissions or those for which submissions of correlated items have not been received. EOR
shall maintain a complete log of all submittals of shop drawings, noting the dates of first submittal and subsequent reviews
and resubmittals, approval, etc.
d. As-Equal Materials - EOR shall evaluate and determine the acceptability of substitute or “or-equal” materials and equipment
proposed by Contractor.
e. Project Schedule - The EOR shall be responsible for the review and acceptance of the Contractor’s progress schedule. The
EOR shall review the schedule to ensure that all general work efforts are addressed, that the schedule is following a logical
approach to the job, that it is following sound engineering and construction practices and that it identifies all critical path
work. The EOR shall monitor the schedule on a monthly basis, and after a review with the Contractor, advise the Project
Manager of any areas where the Contractor appears to be falling behind.
f. Project Pay Applications - The EOR shall review and approve/reject any payment requested by the contractor in an
Application for Payment before the pay application is submitted to the Clerk’s office. Payment shall constitute a
representation by the EOR to PUD based on the Construction inspector’s on-site observations of the work in progress as an
experienced and qualified construction professional and on the EOR’s review of the applications for payment and the
accompanying data and schedules that the work has progressed to the point indicated; that to the best of the EOR’s
knowledge, information and belief, the quality of the work is in accordance with the Contract Documents and that the
Contractor is entitled or is not entitled to the payment of the amount recommended. The EOR will process pay requests in
accordance with the Florida Prompt Payment Act. All incoming pay requests processed by the EOR shall be mechanically
stamped with the date received.
g. Request for Information - EOR shall review and respond to all Requests for Information (RFI’s) that the Contractor submits.
16.C.4.d
Packet Pg. 1713 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
If required by PUD staff, EOR shall revise construction plans based on response to RFI. EOR shall maintain a complete log
of all RFIs, noting the dates of first submittal and subsequent reviews and resubmittals, approval, etc.
h. Change Orders & Work Directives - EOR shall prepare all Change Orders and Work Change Directives during the course
of the project for the Project Manager’s review and approval.
i. Review the pre-construction video and pictures assessment book provided by the selected contractor. Generate a list of
issues and submit to the Project Manager no later than two (2) business days after receiving the materials from the contractor.
j. Material Testing Records - Maintain records of all density, sampling and testing accomplished and analyze such records
required to ascertain acceptability of materials and completed work items. The field reports for records of work and testing
results shall be submitted within one week to the Project Manager.
k. Preparation of Monthly Report – EOR shall prepare a monthly report of all the construction activity completed. Sections in
the report should include, but not be limited to, Executive Summary, Contract Cost Status, Project Schedule, Critical Issues,
RFI Status, Submittal Status, Allowance Log, Project Payment Application and Observation Reports and Project Photos.
l. Permit Requirements – EOR shall monitor the construction contract to the extent necessary to determine whether
construction activities violate the requirements of any permits. EOR shall notify the Contractor of any violations or potential
violations and require immediate resolution of the problem. Violations must be reported to the Project Manager
immediately.
m. Florida Department of Environmental Protection Certifications - The EOR shall prepare and submit certification packages
to the FDEP for the completed sections of the CCWSD’S water and wastewater systems.
n. Final Construction Certification – Upon issuance of a “notice of final acceptance and recommendation for final payment,”
the EOR will provide a signed and sealed certification stating that the Project has been completed by the construction
contractor in accordance with the Plans and Specifications of the Contract Documents as amended by the EOR. All services
related to the Final Construction Certification shall be provided to the Project Manager of the Project.
o. Asset Management Record Information – EOR shall provide all information in the electronic format stipulated by PUD staff
required to populate the PUD’s GIS and Asset Management system in place at the time of project completion.
p. Final Project Submittal - EOR shall provide PUD with one complete file, itemized and indexed, of all project related records
at the conclusion of the Project.
Task 3.2– Public Involvement
Public Involvement – EOR and their subconsultant(s) shall complete all required public involvement services throughout the project.
Work under this item is to include, but not be limited to, the following:
a. Preparing a comprehensive mailing list for all property and business owners who will be affected by the construction with
limits as shown on the most current set of construction documents.
b. Preparing project contact cards which allow the contractor to continue working uninterrupted and will ensure that the public
and media are receiving the most timely and accurate information. Politically sensitive issues would be immediately brought
to the attention of the Project Manager.
c. Coordination with property owners and public services affected by construction (e.g. garbage pickup, USPS, public schools
(buses), development of road closure notices by GMD staff, etc.).
d. Preparing as required newsletter(s) which describes the project and addresses frequently asked questions on a monthly basis.
e. Press releases as necessary for notification to the public of relevant construction activity.
f. Contacting businesses individually, either personally or by phone, as necessary to inform those businesses closely affected
by the construction activities.
g. Establishing and maintaining a public complaint “Hotline.” Coordination with PUD staff will be included should this
interface be required.
h. Maintaining the Project Customer Service Log using PUD provided template.
i. Responding to public concerns.
16.C.4.d
Packet Pg. 1714 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
j. Attending weekly/bi-weekly progress meetings, as needed, especially during heavy construction, for the duration of the
project.
k. Attending other meetings as needed, (e.g. Palm River Master Association annual meeting).
l. Secure site and develop meeting materials for the construction public meeting.
m. Create web page for project and update monthly.
Task 3.3 – Warranty Services
The EOR and their team will provide warranty services for one (1) year after the final completion of the project construction. Work
under this item is to include, but not be limited to, the following:
a. Post Construction walk thru: Generate a list of warranty issues and coordinate with the contractor and residents until the
issues are solved.
b. Review the post construction video and pictures provided by the contractor.
c. Keep a log of all warranty issues.
d. One (1) Year Warranty walk thru with the contractor and County Staff.
Task 3.4 – Additional Services
Additional Services (only as authorized in writing) – In accordance with the contract or purchase order, in the event that other services
may arise during the course of the work but were not envisioned as part of the original or amended scope of work; EOR shall submit
a proposal to perform Additional Services prior to the performance of the work. The proposal shall include the specific services to be
performed, time to complete, compensation, and an explanation as to why the services were not previously envisioned as part of the
scope of work. The proposed Additional Services must be approved by the Project Manager in writing in advance of performance of
said Additional Services. Failure to notify the Project Manager in writing of Additional Services shall be deemed a waiver of any
claim by the EOR team that such services were Additional Services. Written authorization from the Project Manager will be required
for any charges that exceed the predetermined upper limit.
RESPONSE FORMAT AND SCORING CRITERIA FOR DEVELOPMENT OF SHORTLIST:
Proposals must be assembled, at minimum, in the order of the Evaluation Criteria listed or your proposal
may be deemed non-responsive
Evaluation Criteria Maximum Points
1. Ability of Professional Personnel 20 Points
2. Certified Minority Business Enterprise 5 Points
3. Past Performance 25 Points
4. Project Approach, Willingness to Meet Time and Budget Requirements 20 Points
5. Location 10 Points
6. Recent, Current, and Projected Workloads of the Firm 20 Points
TOTAL POSSIBLE POINTS 100 Points
For complete explanation of each evaluation criteria, please see the file titled “RPS Instructions” included with this
advertisement.
VENDOR CHECKLIST
Vendor should check off each of the following items as the necessary action is completed (please see, Form 2: Vendor
Check List):
The Solicitation Submittal has been signed.
All applicable forms have been signed and included, along with licenses to complete the requirements of the project.
16.C.4.d
Packet Pg. 1715 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)
Required Reference Questionnaires have been completed for previous projects and included with the proposal.
Any addenda have been signed and included.
All grant requirements have been reviewed and forms completed (if applicable).
Division of Corporations - Florida Department of State – http://dos.myflorida.com/sunbiz/ (If work performed in the State).
E-Verify/Immigration Affidavit (Memorandum of Understanding).
16.C.4.d
Packet Pg. 1716 Attachment: 19-7637 Solicitation (11974 : Golden Gate City Transmission Water Main Improvements Design)