Agenda 04/28/2020 Item #16C 2 (Agmt. #14-6213 Work Order w/Quality Enterprises, USA)04/28/2020 EXECUTIVE SUMMARY Recommendation to approve a $502,447.35 work order, under Agreement No. 14-6213, to Quality Enterprises USA, Inc., to install an 8” HDPE forcemain pipe to convey leachate from the existing Collier County Landfill Leachate Master Pump Station to the new Deep Injection Well located in the Resource Recovery Business Park and authorize the Chairman to sign the attached work order. OBJECTIVE: To install a new leachate force main pipe from the existing landfill master pump station to route the leachate to the board approved Deep Injection Well (“DIW”), located at the Resource Recovery Business Park (“RRBP”). CONSIDERATIONS: The Public Utilities Department is responsible for the construction, operation, and maintenance of the Collier County Landfill leachate DIW. The Board approved the DIW drilling on October 8, 2019. Construction commenced in March 2020 and is expected to be completed in September 2021. The DIW project consists of multiple construction components, including a pump station, SCADA monitoring system, and conveyance pipe. The DIW will relieve the wastewater treatment plants from processing the landfill leachate. Furthermore, the DIW will save the County money by reducing processing costs and providing a more sustainable and long-term landfill leachate disposal solution. The proposed transmission line construction is the part of the project that will convey leachate from the existing Master Pump Station (“MPS”) to the DIW. The leachate transmission main will be constructed in accordance with plans and specifications provided by Davidson Engineering. Construction will include installation of the following utilities: • 3,650 linear feet of 8” HDPE Force Main. • 14,780 linear feet (4 runs @ 3,695 LF each) 2” HDPE Orange Conduit for SCADA conduits. The County advertised Request for Quotation “8 in. Leachate FM from MPS to DIW” on January 13, 2020 and distributed it to all contractors on the County’s Fixed-Term Underground Utilities Agreement No. 14-6213. Four of the six contractors on that contract submitted quotations by the February 7, 2020 deadline, as summarized in the below table: VENDOR QUOTE Quality Enterprises USA, Inc. $502,447.35 Mitchell & Stark Construction, Co. $548,677.14 DN Higgins, Inc. $556,985.00 Haskins, Inc. $658,504.83 County staff determined the lowest bid to be fair and reasonable and recommends awarding the attached work order to Quality Enterprises USA, Inc., the lowest, responsive and responsible vendor. In its attached letter dated February 20, 2020, Davidson Engineering recommends awarding the work order to Quality Enterprises USA, Inc., who has a satisfactory performance and warranty record on previous, similar, utility-related projects. A ten percent (10%) allowance in the amount of $45,677.03 is included for owner-directed additional work that may include but is not limited to un-located utilities and unknown site conditions. The price for any additional work will be negotiated prior to commencement in accordance with the County’s 16.C.2 Packet Pg. 1616 04/28/2020 Procurement Ordinance and the terms of the agreement. The payment and performance bonds required to be obtained by the contractor before work on this project can commence are attached. FISCAL IMPACT: Funding is available in the SHW Compliance Assurance Program Project 70101 with in the Solid Waste Capital Fund (474). The source of funding is the solid waste user fees. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: To approve a $502,447.35 work order under Agreement No. 14-6213 to Quality Enterprises USA, Inc., “8 in. Leachate FM from MPS to DIW,” and to authorize the Chairman to sign the attached work order (Project Number 70101). Prepared by: Kari Ann Hodgson, P.E., Director, Solid and Hazardous Waste Management Division, Public Utilities Department ATTACHMENT(S) 1. 2020-02-21-QE LEACHATE Bid Letter Approval (PDF) 2. 020720 8in_Leachate_FM Bid Tab revised (PDF) 3. QUALITY - Ext._8in_Leachate_FM_from_MPS_to_DIW,_14-6213 (PDF) 4. leachate force main quote analysis (PDF) 5. mcohen@qe-usa.com_20200306_164429 (PDF) 6. Work Order - Quality 8 in leachate (PDF) 16.C.2 Packet Pg. 1617 04/28/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.2 Doc ID: 11872 Item Summary: Recommendation to approve a $502,447.35 work order under Agreement No. 14- 6213 to Quality Enterprises USA, Inc., to install an 8” HDPE forcemain pipe to convey leachate from the existing Collier County Landfill Leachate Master Pump Station to the new Deep Injection Well located in the Resource Recovery Business Park and authorize the Chairman to sign the attached work order. Meeting Date: 04/28/2020 Prepared by: Title: Project Manager – Solid and Hazardous Waste Name: Dayne Atkinson 03/13/2020 12:17 PM Submitted by: Title: – Solid and Hazardous Waste Name: Kari Hodgson 03/13/2020 12:17 PM Approved By: Review: Board of County Commissioners Jim Flanagan Additional Reviewer Completed 03/18/2020 12:58 PM Procurement Services Sandra Herrera Additional Reviewer Completed 03/19/2020 12:08 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 03/20/2020 11:38 AM Public Utilities Department Dan Rodriguez Additional Reviewer Completed 03/23/2020 10:29 AM Solid and Hazardous Waste Kari Hodgson Additional Reviewer Completed 03/23/2020 8:34 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/26/2020 9:49 AM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/27/2020 2:36 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 03/31/2020 1:32 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/31/2020 1:36 PM Budget and Management Office Ed Finn Additional Reviewer Completed 03/31/2020 6:33 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/01/2020 9:52 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 04/11/2020 4:22 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 04/18/2020 10:46 AM Board of County Commissioners MaryJo Brock Meeting Pending 04/28/2020 9:00 AM 16.C.2 Packet Pg. 1618 Civil Engineering • Planning • Permitting 4365 Radio Road · Suite 201 · Naples, FL 34104 · P: (239) 434.6060 · F: (239) 434-6084 www.davidsonengineering.com 1990 Main Street · Suite 750 · Sarasota, FL 34236 · P: (941) 309-5180 February 21, 2020 Collier County Board of Commissioners 3301 Tamiami Trail East Naples, Florida 34112 Re: Collier County Leachate Main Install / Extension To Whom It May Concern, We have received the Bid Tabulation Sheets from Collier County and have reviewed the following bid items pertaining to the noted construction related to the Collier County deep injection well project. • Unit Pricing • Full Summary of Scope • Understanding of Overall Construction Documents Upon review, it is apparent that all sub-contractors are qualified bidders. The core list of contractors clearly met all specifications, prepared thorough bids, and met the overall bid requirements. Davidson Engineering reviewed all bids received and found consistency with the monetary values and material take-offs for all scope items requested / items noted above. The schedule of values with unit price breakdowns were also found to be consistent with most of the recent horizontal construction activity in Collier County. DE recommends that Quality Enterprises be awarded the work as noted in the bid schedule / final bid because of the above noted items and the low bid received. Please note that the alternative bid requested was not considered for the overall scope of work. Thank you, Josh Fruth Davidson Engineering, Inc. Vice President 16.C.2.a Packet Pg. 1619 Attachment: 2020-02-21-QE LEACHATE Bid Letter Approval (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14- Davidson Engineering 4365 Radio Road, Suite 201 Naples, FL 34104 RESPONSIVE Low Bid RESPONSIVE RESPONSIVE RESPONSIVE Line No.Description Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization/General Conditions 1 LS 48,568.00$ 48,568.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 20,000.00$ 20,000.00$ 2 Silt Fence 4,500 LF 1.20$ 5,400.00$ 2.50$ 11,250.00$ 2.70$ 12,150.00$ 1.50$ 6,750.00$ 3 Clearing 0.16 AC 22,219.00$ 3,555.04$ 30,000.00$ 4,800.00$ 8,700.00$ 1,392.00$ 100,000.00$ 16,000.00$ 4 Bush Hogging 0.64 AC 1,137.00$ 727.68$ 6,000.00$ 3,840.00$ 7,000.00$ 4,480.00$ 5,000.00$ 3,200.00$ 5 Survey Stake out/Suvery As-built 1 LS 6,023.00$ 6,023.00$ 12,000.00$ 12,000.00$ 7,600.00$ 7,600.00$ 8,000.00$ 8,000.00$ 6 Site Grading Rough/Final 8,300 SY 3.20$ 26,560.00$ 4.00$ 33,200.00$ 1.00$ 8,300.00$ 1.00$ 8,300.00$ 7 Pot Holing 1 LS 2,257.00$ 2,257.00$ 14,000.00$ 14,000.00$ 5,400.00$ 5,400.00$ 6,000.00$ 6,000.00$ 8 Crushed Concrete 285 CY 59.50$ 16,957.50$ 70.00$ 19,950.00$ 42.50$ 12,112.50$ 30.00$ 8,550.00$ 9 Rock Removal 455 CY 41.90$ 19,064.50$ 44.00$ 20,020.00$ 6.75$ 3,071.25$ 50.00$ 22,750.00$ 10 Geotechnical Testing 1 LS 6,563.00$ 6,563.00$ 4,000.00$ 4,000.00$ 11,000.00$ 11,000.00$ 5,000.00$ 5,000.00$ 11 Sod - Bahia 6,184 SY 4.25$ 26,282.00$ 4.00$ 24,736.00$ 2.50$ 15,460.00$ 3.00$ 18,552.00$ 161,957.72$ 197,796.00$ 90,965.75$ 123,102.00$ 12 6" Force Main HDPE DR8 60 LF 106.00$ 6,360.00$ 90.00$ 5,400.00$ 148.00$ 8,880.00$ 75.00$ 4,500.00$ 13 6" Gate Valve & Tapping Sleeve 1 EA 4,687.00$ 4,687.00$ 8,000.00$ 8,000.00$ 5,900.00$ 5,900.00$ 6,220.00$ 6,220.00$ 14 8" Force Main HDPE DR9 3,650 LF 47.90$ 174,835.00$ 44.00$ 160,600.00$ 79.00$ 288,350.00$ 49.00$ 178,850.00$ 15 8" Plug Valve 4 EA 4,743.00$ 18,972.00$ 9,000.00$ 36,000.00$ 10,500.00$ 42,000.00$ 4,980.00$ 19,920.00$ 16 ARV 1 EA 10,398.00$ 10,398.00$ 11,000.00$ 11,000.00$ 12,150.00$ 12,150.00$ 8,870.00$ 8,870.00$ 215,252.00$ 221,000.00$ 357,280.00$ 218,360.00$ 17 2" HDPE Conduit, Orange w/ Pull Tape (4 runs @ 3,695 LF each) 14,780 LF 4.77$ 70,500.60$ 4.30$ 63,554.00$ 9.25$ 136,715.00$ 8.93$ 131,985.40$ 18 Pull Box 6 EA 1,510.00$ 9,060.00$ 4,000.00$ 24,000.00$ 2,280.00$ 13,680.00$ 4,225.00$ 25,350.00$ 79,560.60$ 87,554.00$ 150,395.00$ 157,335.40$ -$ -$ -$ -$ 24 10% Project Allowance 1 LS 45,677.03$ 45,677.03$ 50,635.00$ 50,635.00$ 59,864.08$ 59,864.08$ 49,879.74$ 49,879.74$ 45,677.03$ 50,635.00$ 59,864.08$ 49,879.74$ 502,447.35$ 556,985.00$ 658,504.83$ 548,677.14$ 25 Directional Drill (For 8" HDPE DR9 Forcemain)3,650 LF 65.50$ 239,075.00$ 65.00$ 237,250.00$ 60.00$ 219,000.00$ 90.47$ 330,215.50$ 26 Directional Drill (For 2" HDPE, Orange)14,780 LF 10.30$ 152,234.00$ 9.00$ 133,020.00$ 12.00$ 177,360.00$ 36.14$ 534,149.20$ 391,309.00$ 370,270.00$ 396,360.00$ 864,364.70$ 648,420.75$ 703,101.00$ 629,799.83$ 1,102,206.44$ ** Alternate Bid was to determine if open cut or direction drill would be more cost effective. 2/7/2020 Mitchell & Stark Construction, Co. Bid Alternates (Not included in Site Construction Total) Bid Alternates Subtotal (Not included in Site Construction Total) Collier County - Landfill_Ext. 8" Leachate FM from MPS to DIW Bid Tabulation Site Work 2/7/2020 Douglas N. Higgins, Inc. 2/7/2020 Quality Enterprises USA, Inc. 2/7/2020 Haskins, Inc. (Site Construction Base Bid) - (Line items 14 + 17) + (Bid Alternates Subtotal) = Total Site Work Subtotal Sanitary Utilities Site Construction Base Bid Total Miscellaneous Miscellaneous Subtotal Sanitary Utilities Subtotal Project Allowance Project Allowance Subtotal Electrical Subtotal Electrical 16.C.2.b Packet Pg. 1620 Attachment: 020720 8in_Leachate_FM Bid Tab revised [Revision 1] (11872 : Recommendation to approve 16.C.2.c Packet Pg. 1621 Attachment: QUALITY - Ext._8in_Leachate_FM_from_MPS_to_DIW,_14-6213 (11872 : Recommendation to approve a $502,447.35 work order 16.C.2.c Packet Pg. 1622 Attachment: QUALITY - Ext._8in_Leachate_FM_from_MPS_to_DIW,_14-6213 (11872 : Recommendation to approve a $502,447.35 work order 16.C.2.c Packet Pg. 1623 Attachment: QUALITY - Ext._8in_Leachate_FM_from_MPS_to_DIW,_14-6213 (11872 : Recommendation to approve a $502,447.35 work order 16.C.2.c Packet Pg. 1624 Attachment: QUALITY - Ext._8in_Leachate_FM_from_MPS_to_DIW,_14-6213 (11872 : Recommendation to approve a $502,447.35 work order $250,000.00 $300,000.00 $350,000.00 $400,000.00 $450,000.00 $500,000.00 $550,000.00 $600,000.00 $650,000.00 $700,000.00 $750,000.00 Eng Est Quality Enterprises USA, Inc. Mitchell & Stark Construction, Co. DN Higgins, Inc.Haskins, Inc. Results for RFQ 14-6213 -8 in Leachate Force Main KEY: Dashed Red AVERAGE BID Dashed black- +/-1 std dev of avg bid 16.C.2.d Packet Pg. 1625 Attachment: leachate force main quote analysis (11872 : Recommendation to approve a $502,447.35 16.C.2.e Packet Pg. 1626 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1627 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1628 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1629 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1630 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1631 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1632 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.e Packet Pg. 1633 Attachment: mcohen@qe-usa.com_20200306_164429 (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 16.C.2.f Packet Pg. 1634 Attachment: Work Order - Quality 8 in leachate (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 to 16.C.2.f Packet Pg. 1635 Attachment: Work Order - Quality 8 in leachate (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 to 16.C.2.f Packet Pg. 1636 Attachment: Work Order - Quality 8 in leachate (11872 : Recommendation to approve a $502,447.35 work order under RFQ No. 14-6213 to