Agenda 02/25/2020 Item #16C 8 (Work Order for RFQ #14-6213 - Kyle Construction)02/25/2020 EXECUTIVE SUMMARY Recommendation to approve a work order to Kyle Construction Inc., in the amount of $308,749.13, under Bid No. 1911-016--01-01 - Request for Quote (“RFQ”) No. 14-6213, “Lakewood Blvd. Force Main and PS 305.17 Improvements,” and authorize the necessary budget amendment (Project Number 70254). OBJECTIVE: To maintain reliable and sustainable wastewater collection in compliance with Florida Department of Environmental Protection (“FDEP”) agency regulations. CONSIDERATIONS: The proposed scope of work under Project Number 70254, “Lakewood Blvd. Force Main and PS 305.17 Improvements,” can be completed consistent with funding in the FY2020 Capital Improvement Project Budget approved by the Board on September 19, 2019. The project is located along Lakewood Boulevard and Boca Ciega Drive. The pump station and force main infrastructure are 34 years old and at the end of their useful life. The scope of work includes: • Coating the interior of the wet well structure to protect the concrete walls from corrosion • Replacing the existing wastewater submersible pumps with more efficient and reliable pumps • Replacing the deteriorating riser pipes inside the wet well with corrosion-proof high-density polyethylene (“HDPE”) pipe material • Removing the underground concrete vault and discharge piping and valves and then replacing them with above ground corrosion-proof HDPE discharge piping and new valves • Replacing the existing 1,085 linear feet of 4-inch cast force main servicing this pump station with a new 6-inch corrosion-proof HDPE force main. The HDPE force main will be installed via directional drilling methods in an effort to minimize impact to the community during construction • The existing 4-inch cast iron force main will be abandoned and grouted in place These improvements will: (1) update the pump station to meet current Collier County utility standards in a coordinated manner that will not interrupt sewer service, (2) improve the performance and reliability of the sewer system in the community, and (3) improve safety during routine maintenance by the county’s Wastewater Division staff. Pump Station 305.17 serves approximately 74 multifamily units, the Lakewood Condominium Association, the ManorCare Nursing & Rehabilitation Center, which consist of 118 total units, and a few commercial businesses along U.S. 41. The surrounding area is fully built-out and no significant additional wastewater flow is expected in the future. The County distributed Bid No. 1911-016--01-01 - RFQ 14-6213 Lakewood Blvd. FM and PS 305.17 Improvements on November 8, 2019, to the six vendors under the County’s Fixed-Term Underground Utilities Agreement No. 14-6213. Five vendors submitted quotes to the County by the November 22, 2019 deadline as summarized in the below table. Kyle Construction, Inc. $308,749.13 Mitchell & Stark Construction Company, Inc. $450,567.70 Quality Enterprises USA, Inc. $494,488.50 Douglas N. Higgins, Inc. $522,399.00 Haskins, Inc. $550,532.31 16.C.8 Packet Pg. 1948 02/25/2020 The County did not receive a quote from Southwest Utility Systems, Inc. The bid specifications informed bidders that there may be unforeseen conditions associated with the project. The quote amount incorporates an owner-directed project allowance of $40,271.63 for unanticipated costs including, but not limited to, repairs due to structural deterioration and/or replacement of defective mechanical equipment and deficient electrical components. Use of the allowance will be billed at the appropriate contract price based on a lump sum, unit price, or time and material basis. County staff determined the lowest bid to be fair and reasonable and recommends awarding the project to Kyle Construction, Inc., the lowest responsive and qualified vendor. The low bid received is 9 percent lower than the engineer’s cost opinion. In its recommendation letter dated December 11, 2019 (Attachment 3), the design professional, Johnson Engineering, Inc., recommends awarding the project to Kyle Construction, Inc., who has a satisfactory performance and warranty record on previous, similar utility-related projects. FISCAL IMPACT: A budget amendment in the amount of $330,000 is required to reallocate funding from another project within the Wastewater User Fee Capital Fund (414) to Project 70254. The additional $21,250.87 is anticipated to be used for permit fees. The project is expected to be completed in 2020. This is an improvement project; however, operating costs are not expected to change. Bonds will be obtained prior to issuing a purchase order. The source of funding is utility user fees. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities, and to remain in compliance with all regulatory programs. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: Approve a $308,749.13 work order under Bid No. 1911-016--01-01 - RFQ No. 14-6213 to Kyle Construction, Inc., authorize the necessary budget amendment, and authorize the Chairman to sign the attached work order. PREPARED BY: Zamira Del Toro, CSM, Project Manager, Engineering and Project Management Division ATTACHMENT(S) 1. Attachment 1 - Bid Tabulation (PDF) 2. Attachment 2 - EPMD bid analysis (PDF) 3. Attachment 3 - Recommendation Letter (PDF) 4. Attachment 4 - Request for Quotation (PDF) 5. Attachment 5 - Work Order (PDF) 6. Attachment 6 - 14-6213Kyle_Contract (PDF) 16.C.8 Packet Pg. 1949 02/25/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.8 Doc ID: 11500 Item Summary: Recommendation to approve a work order to Kyle Construction Inc. in the amount of $308,749.13, under Bid No. 1911-016--01-01 - Request for Quote (“RFQ”) No. 14-6213, “Lakewood Blvd. Force Main and PS 305.17 Improvements,” and authorize the nec essary budget amendment (Project Number 70254). Meeting Date: 02/25/2020 Prepared by: Title: Project Manager – Public Utilities Planning and Project Management Name: Zamira Deltoro 01/27/2020 4:50 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 01/27/2020 4:50 PM Approved By: Review: Public Utilities Planning and Project Management Michael Stevens Additional Reviewer Completed 01/27/2020 6:54 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 01/28/2020 11:31 AM Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 01/28/2020 4:55 PM Wastewater Beth Johnssen Additional Reviewer Completed 01/29/2020 11:06 AM Public Utilities Operations Support AmiaMarie Curry Additional Reviewer Completed 01/29/2020 1:25 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 01/30/2020 11:16 AM Procurement Services Evelyn Colon Additional Reviewer Completed 01/30/2020 2:26 PM Procurement Services Sandra Herrera Additional Reviewer Completed 02/03/2020 4:41 PM Procurement Services Zamira Deltoro Additional Reviewer Skipped 02/03/2020 4:45 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 02/03/2020 5:27 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 02/04/2020 4:50 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 02/06/2020 9:08 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 02/06/2020 9:14 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/06/2020 2:58 PM Budget and Management Office Ed Finn Additional Reviewer Completed 02/14/2020 6:35 PM Office of Management and Budget Susan Usher Additional Reviewer Completed 02/18/2020 3:46 PM 16.C.8 Packet Pg. 1950 02/25/2020 County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 02/18/2020 4:09 PM Board of County Commissioners MaryJo Brock Meeting Pending 02/25/2020 9:00 AM 16.C.8 Packet Pg. 1951 COLLIER COUNTY UTILITIES Lakewood Community Pump Station 305.17 and Force Main Improvements Bid Tabulation Kyle Construction Inc. Mitchell & Stark Cons. Com, Inc. Quality Enterprises USA, Inc. Douglas N. Higgins, Inc. Haskins, Inc. Southwest Utility, Inc. ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 1 Mobilization/Demobilization 1 LS $20,000.00 $20,000.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $25,000.00 $25,000.00 $10,000.00 $10,000.00 2 Maintenance of Pedestrian and Vehicular Traffic 1 LS $8,000.00 $8,000.00 $8,000.00 $8,000.00 $5,000.00 $5,000.00 $25,000.00 $25,000.00 $5,200.00 $5,200.00 3 Pre-Construction Video Recording 1 LS $3,000.00 $3,000.00 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $4,000.00 $4,000.00 $3,200.00 $3,200.00 4 Survey Layout and Record Drawings 1 LS $5,000.00 $5,000.00 $7,500.00 $7,500.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $7,700.00 $7,700.00 5 Furnish and Install Construction Project Sign 1 LS $1,500.00 $1,500.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $37,500.00 $40,000.00 $36,000.00 $61,500.00 $27,600.00 NO QUOTE ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 6 Furnish and Install 4" PVC C900 DR18 Force Main 205 LF $25.00 $5,125.00 $150.00 $30,750.00 $125.00 $25,625.00 $30.00 $6,150.00 $115.00 $23,575.00 7 Furish and Install 6" HDPE DR 11 Horizontal Directional Drill Force Main 1 LS $35,000.00 $35,000.00 $78,000.00 $78,000.00 $58,000.00 $58,000.00 $52,000.00 $52,000.00 $65,000.00 $65,000.00 8 Connect Force Main to Existing Manhole # 5748 1 LS $4,000.00 $4,000.00 $16,800.00 $16,800.00 $7,000.00 $7,000.00 $8,000.00 $8,000.00 $14,000.00 $14,000.00 9 Abandon and Grout in Place Existing 4" Cast Iron Force Main 1,085 LF $2.50 $2,712.50 $15.00 $16,275.00 $6.00 $6,510.00 $4.00 $4,340.00 $12.75 $13,833.75 $46,837.50 $141,825.00 $97,135.00 $70,490.00 $116,408.75 NO QUOTE ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 10 Demolition of Existing Well Piping, Valve Vault Piping, Wet Well Top and Valve Vault 1 LS $3,500.00 $3,500.00 $11,500.00 $11,500.00 $19,500.00 $19,500.00 $15,000.00 $15,000.00 $6,300.00 $6,300.00 11 Furnish and Install FLYGT NP 3102 with 465 Impeller, 5 HP Submersible Pumps 2 EA $25,000.00 $50,000.00 $23,500.00 $47,000.00 $45,000.00 $90,000.00 $34,000.00 $68,000.00 $65,000.00 $130,000.00 12 Furnish and Install Concrete Wet Well Top with Access Hatches and Fall Protection Hatch 1 LS $3,800.00 $3,800.00 $3,500.00 $3,500.00 $13,000.00 $13,000.00 $18,000.00 $18,000.00 $8,000.00 $8,000.00 13 Furnish and Install Wet Well Piping and Above- Ground Piping and Valves 1 LS $70,000.00 $70,000.00 $56,000.00 $56,000.00 $85,000.00 $85,000.00 $112,300.00 $112,300.00 $89,000.00 $89,000.00 14 Furnish and Install SewperCoat Liner for Wet Well 1 LS $12,000.00 $12,000.00 $16,800.00 $16,800.00 $23,000.00 $23,000.00 $16,000.00 $16,000.00 $25,000.00 $25,000.00 15 Bypass Pumping During Construction 1 LS $20,000.00 $20,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $28,000.00 $28,000.00 $12,850.00 $12,850.00 $159,300.00 $159,800.00 $255,500.00 $257,300.00 $271,150.00 NO QUOTE ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 16 General Restoration Along Force Main Route 205 LF $20.00 $4,100.00 $50.00 $10,250.00 $35.00 $7,175.00 $10.00 $2,050.00 $45.00 $9,225.00 17 General Restoration at Pump Station Site 1 LS $5,000.00 $5,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $40,000.00 $40,000.00 $7,500.00 $7,500.00 18 Concrete Sidewalk Restoration 17 SY $200.00 $3,400.00 $35.00 $595.00 $60.00 $1,020.00 $100.00 $1,700.00 $160.00 $2,720.00 19 Repaint Existing Bollard Post Safety Yellow 1 LS $500.00 $500.00 $300.00 $300.00 $60.00 $60.00 $500.00 $500.00 $2,000.00 $2,000.00 $13,000.00 $13,145.00 $13,255.00 $44,250.00 $21,445.00 NO QUOTE ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 20 Furnish and Install 6 FT Tall Clusia Shrubs (Spaced 4 FT on center)1 T&M $2,000.00 $2,000.00 $5,000.00 $5,000.00 $6,600.00 $6,600.00 $120.00 $120.00 $12,500.00 $12,500.00 21 Furnish and Install Irrigation System 1 T&M $500.00 $500.00 $5,000.00 $5,000.00 $4,300.00 $4,300.00 $2,400.00 $2,400.00 $10,000.00 $10,000.00 22 Furnish and Install 6 FT Tall Chain Link Fence and Slide Gate 1 LS $8,500.00 $8,500.00 $23,500.00 $23,500.00 $13,000.00 $13,000.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 23 Furnish and Install <1" Diameter Stone at 4" Thick with Geotextile Filter Fabric 84 SY $10.00 $840.00 $42.00 $3,528.00 $50.00 $4,200.00 $50.00 $4,200.00 $55.00 $4,620.00 $11,840.00 $37,028.00 $28,100.00 $20,720.00 $42,120.00 NO QUOTE $268,477.50 $391,798.00 $429,990.00 $454,260.00 $478,723.75 NO QUOTE ITEM NO.DESCRIPTION EXTENDED PRICE EXTENDED PRICE EXTENDED PRICE EXTENDED PRICE EXTENDED PRICE EXTENDED PRICE 24 Allowance: *Owner-Directed Work for Unforseen Conditions (geological, corrosion, etc.). 15% of Project Total (T&M)$40,271.63 $58,769.70 $64,498.50 $68,139.00 $71,808.56 $40,271.63 $58,769.70 $64,498.50 $68,139.00 $71,808.56 NO QUOTE SUMMARY $37,500.00 $40,000.00 $36,000.00 $61,500.00 $27,600.00 NO QUOTE $46,837.50 $141,825.00 $97,135.00 $70,490.00 $116,408.75 NO QUOTE $159,300.00 $159,800.00 $255,500.00 $257,300.00 $271,150.00 NO QUOTE $13,000.00 $13,145.00 $13,255.00 $44,250.00 $21,445.00 NO QUOTE $11,840.00 $37,028.00 $28,100.00 $20,720.00 $42,120.00 NO QUOTE $268,477.50 $391,798.00 $429,990.00 $454,260.00 $478,723.75 NO QUOTE $40,271.63 $58,769.70 $64,498.50 $68,139.00 $71,808.56 NO QUOTE $308,749.13 $450,567.70 $494,488.50 $522,399.00 $550,532.31 NO QUOTE SECTION 1: GENERAL SECTION 1: GENERAL SUBTOTAL: SECTION 2: FORCE MAIN IMPROVEMENTS SECTION 2: FORCE MAIN IMPROVEMENTS SUBTOTAL: SECTION 3: PUMP STATION UPGRADES SECTION 3: PUMP STATION UPGRADES SUBTOTAL: SECTION 4: RESTORATION SECTION 4: RESTORATION SUBTOTAL: PROJECT TOTAL WITH ALLOWANCE SECTION 1: GENERAL SUBTOTAL: SECTION 2: FORCE MAIN IMPROVEMENTS SUBTOTAL: SECTION 3: PUMP STATION UPGRADES SUBTOTAL: SECTION 4: RESTORATION SUBTOTAL: SECTION 6: ALLOWANCE: PROJECT TOTAL: SECTION 5: BID ALTERNATE SUBTOTAL: SECTION 6: ALLOWANCE SECTION 6: ALLOWANCE SUBTOTAL: SECTION 5: BID ALTERNATES PROJECT TOTAL: SECTION 5: BID ALTERNATE SUBTOTAL: 16.C.8.a Packet Pg. 1952 Attachment: Attachment 1 - Bid Tabulation (11500 : Lakewood Blvd. Force Main and PS 305.17 11/26/2019 BidSync: Agency Reports file:///H:/_PUD Capital Project Files/414 - Wastewater User Fee Fund/70144 - Force Main Transmission System OP/70144.6 - Lakewood FM from PS …1/2 Bid #1911-016 - RFQ 14-6213 Lakewood Blvd. FM and PS 305.17 Improvements Creation Date Nov 8, 2019 End Date Nov 22, 2019 1:00:00 PM MST Start Date Nov 8, 2019 2:48:56 PM MST Awarded Date Not Yet Awarded 1911-016--01-01 RFQ 14-6213 Lakewood Blvd. FM and PS 305.17 Improvements Supplier Unit Price Qty/Unit Total Price Attch. Docs Kyle Construction Inc First Offer - $308,749.13 1 / each $308,749.13 Product Code: Agency Notes: Supplier Product Code: Supplier Notes: Mitchell & Stark Const. Co. Inc First Offer - $450,567.70 1 / each $450,567.70 Product Code: Agency Notes: Supplier Product Code: Supplier Notes: Quality Enterprises USA, Inc. First Offer - $494,488.50 1 / each $494,488.50 Product Code: Agency Notes: Supplier Product Code: Supplier Notes: Douglas N. Higgins, Inc. First Offer - $522,399.00 1 / each $522,399.00 Product Code: Agency Notes: Supplier Product Code: Supplier Notes: Haskins Inc. First Offer - $550,532.31 1 / each $550,532.31 Product Code: Agency Notes: Supplier Product Code: Supplier Notes: Supplier Totals f Kyle Construction Inc $308,749.13 Bid Contact Kyle Abraham kyleconstinc@aol.com Ph 239-595-0438 Address 3636 Prospect Ave Naples, FL 34104 Qualifications 14-6213 Agency Notes:Supplier Notes:Head Attch: f Mitchell & Stark Const. Co. Inc $450,567.70 Bid Contact brian penner mwesthafer@mitchellstark.com Ph 239-597-2165 Address 6001 Shirley Street Naples, FL 34109 Qualifications 14-6213 Agency Notes:Supplier Notes:Head Attch: f Quality Enterprises USA, Inc.$494,488.50 Bid Contact Louis Gaudio mcohen@qeusa.com Ph 239-435-7200 Fax 239-435-7202 Address 3494 Shearwater Street Naples, FL 34117-8414 Qualifications 14-6213 Agency Notes:Supplier Notes:Head Attch: f Douglas N. Higgins, Inc.$522,399.00 Bid Contact Matthew DeLuca Address 4485 Enterprise Avenue 16.C.8.a Packet Pg. 1953 Attachment: Attachment 1 - Bid Tabulation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 11/26/2019 BidSync: Agency Reports file:///H:/_PUD Capital Project Files/414 - Wastewater User Fee Fund/70144 - Force Main Transmission System OP/70144.6 - Lakewood FM from PS …2/2 tammyl@dnhiggins.com Ph 941-465-8358 Fax 239-774-4266 Naples, FL 34104 Qualifications 14-6213 Agency Notes:Supplier Notes:Head Attch: f Haskins Inc.$550,532.31 Bid Contact Ryan MacPhee rmacphee@haskinsinc.net Ph 239-947-1846 Fax 239-947-3857 Address 10956 Enterprise Avenue BONITA SPRINGS, FL 34135 Qualifications 14-6213 Agency Notes:Supplier Notes:Head Attch: **All bids/proposals submitted for the designated project are reflected on this tabulation sheet. However, the listing of the bid/proposal on this tabulation sheet shall not be construed as a comment on the responsiveness of such bid/proposal or as any indication that the agency accepts such bid/proposal as being responsive. The agency will make a determination as to the responsiveness of the vendor responses submitted based upon compliance with all applicable laws, purchasing guidelines and project documents, including but not limited to the project specifications and contract documents. The agency will notify the successful vendor upon award of the contract and, as according to the law, all bid/proposal responses received may be available for inspection at that time. Print 16.C.8.a Packet Pg. 1954 Attachment: Attachment 1 - Bid Tabulation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 55 66 Vendors that have been notified for Bid 1911 -016 - RFQ 14 -6213 Lakewood Blvd. FM and PS 305.17 Improvements Vendors Viewed Org Name Phone ST First Viewed Last Viewed Mitchell & Stark Const. Co. Inc 239 -597 -2165 FL Nov 11, 2019 7:45:39 AM EST Nov 22, 2019 10:26:51 AM EST Douglas N. Higgins, Inc. 239 -774 -3130 FL Nov 11, 2019 8:10:10 AM EST Nov 22, 2019 1:39:43 PM EST Quality Enterprises USA, Inc. 239 -435 -7200 FL Nov 11, 2019 8:15:09 AM EST Nov 22, 2019 10:38:19 AM EST Haskins Inc. 239 -947 -1846 FL Nov 11, 2019 11:45:22 AM EST Nov 22, 2019 2:12:29 PM EST Kyle Construction Inc 2395950438 FL Nov 15, 2019 10:52:12 AM EST Nov 22, 2019 2:52:45 PM EST NAME EMAIL FAX SENT DATE SENT Supplier Notification Report - Bid #1911-016 Collier County 12/18/2019 p. 1 16.C.8.a Packet Pg. 1955 Attachment: Attachment 1 - Bid Tabulation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 55 66 Suppliers Successfully Invited: 9 Successful Invitation Qualification Totals: 14 -6213(8) Successfully Responded Qualification Totals: 14 -6213(5) Bid Invite Email Org Name Email Name Phone  ST Date Failed Collier County Zamira.Deltoro@colliercountyfl.gov Zamira Del Toro 2392526279 FL Nov 8, 2019 5:04:52 PM EST Douglas N. Higgins, Inc. mattd@dnhiggins.com Matthew DeLuca 9414658358 FL Nov 8, 2019 5:04:51 PM EST tammyl@dnhiggins.com Tammy Ludwig 2397743130 FL Nov 8, 2019 5:04:51 PM EST haskins inc benelwell@haskinsinc.net ben elwell 2392893629 FL Nov 8, 2019 5:04:52 PM EST Failed Haskins Inc KHaskins@Haskinsinc.net;HHaskins@Haskinsinc.net Harlan Haskins 2399471846 FL Nov 8, 2019 5:04:52 PM EST Failed Haskins Inc. rmacphee@haskinsinc.net Ryan MacPhee 239 -947 - 1846 FL Nov 8, 2019 5:04:51 PM EST Kyle Construction Inc kyleconstinc@aol.com Kyle Abraham 2395950438 FL Nov 8, 2019 5:04:51 PM EST Mitchell & Stark Const. Co. Inc mwesthafer@mitchellstark.com Mike Westhafer 2393321632 FL Nov 8, 2019 5:04:50 PM EST bpenner@mitchellstark.com brian penner 2395972165 FL Nov 8, 2019 5:04:51 PM EST jdina@mitchellstark.com John Dina 2395972165 FL Nov 8, 2019 5:04:51 PM EST Mitchell & Stark Construction Company Inc bpenner@mitchellstark.com;mwesthafer@mitchellstark.com Brian Penner 2395972165 FL Nov 8, 2019 5:04:52 PM EST Quality Enterprises USA, Inc. rskalicky@qeusa.com Bob Skalicky 2394357200 FL Nov 8, 2019 5:04:50 PM EST Failed lgaudio@qeusa.com Louis Gaudio 2394357200 FL Nov 8, 2019 5:04:50 PM EST MNEGRON@QEUSA.COM Margarita Negron 2394357200 FL Nov 8, 2019 5:04:50 PM EST HSAWYER@QEUSA.COM Harlan Sawyer 2394357200 FL Nov 8, 2019 5:04:51 PM EST mcasey@qeusa.com Matt Casey 2394357200 FL Nov 8, 2019 5:04:51 PM EST mcohen@qeusa.com Marcie Cohen 2394357200 FL Nov 8, 2019 5:04:51 PM EST Southwest Utility Systems officestaff@swutility.net RichardT Cowart 2392670200 FL Nov 8, 2019 5:04:52 PM EST Southwest Utility Systems, Inc. brett@swutility.net Brett Eckenrode 2392670200 FL Nov 8, 2019 5:04:50 PM EST NAME EMAIL FAX SENT DATE SENT Supplier Notification Report - Bid #1911-016 Collier County 12/18/2019 p. 2 16.C.8.a Packet Pg. 1956 Attachment: Attachment 1 - Bid Tabulation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 55 66 Suppliers Successfully Invited: 9 Successful Invitation Qualification Totals: 14 -6213(8) Successfully Responded Qualification Totals: 14 -6213(5) Bid Invite Email Org Name Email Name Phone  ST Date FailedCollier County Zamira.Deltoro@colliercountyfl.gov Zamira Del Toro 2392526279 FL Nov 8, 2019 5:04:52 PM EST Douglas N. Higgins, Inc. mattd@dnhiggins.com Matthew DeLuca 9414658358 FL Nov 8, 2019 5:04:51 PM EST tammyl@dnhiggins.com Tammy Ludwig 2397743130 FL Nov 8, 2019 5:04:51 PM EST haskins inc benelwell@haskinsinc.net ben elwell 2392893629 FL Nov 8, 2019 5:04:52 PM EST FailedHaskins Inc KHaskins@Haskinsinc.net;HHaskins@Haskinsinc.net Harlan Haskins 2399471846 FL Nov 8, 2019 5:04:52 PM EST FailedHaskins Inc. rmacphee@haskinsinc.net Ryan MacPhee 239 -947 -1846 FL Nov 8, 2019 5:04:51 PM EST Kyle Construction Inc kyleconstinc@aol.com Kyle Abraham 2395950438 FL Nov 8, 2019 5:04:51 PM EST Mitchell & Stark Const. Co. Inc mwesthafer@mitchellstark.com Mike Westhafer 2393321632 FL Nov 8, 2019 5:04:50 PM EST bpenner@mitchellstark.com brian penner 2395972165 FL Nov 8, 2019 5:04:51 PM EST jdina@mitchellstark.com John Dina 2395972165 FL Nov 8, 2019 5:04:51 PM EST Mitchell & Stark Construction Company Inc bpenner@mitchellstark.com;mwesthafer@mitchellstark.com Brian Penner 2395972165 FL Nov 8, 2019 5:04:52 PM EST Quality Enterprises USA, Inc. rskalicky@qeusa.com Bob Skalicky 2394357200 FL Nov 8, 2019 5:04:50 PM EST Failed lgaudio@qeusa.com Louis Gaudio 2394357200 FL Nov 8, 2019 5:04:50 PM EST MNEGRON@QEUSA.COM Margarita Negron 2394357200 FL Nov 8, 2019 5:04:50 PM EST HSAWYER@QEUSA.COM Harlan Sawyer 2394357200 FL Nov 8, 2019 5:04:51 PM EST mcasey@qeusa.com Matt Casey 2394357200 FL Nov 8, 2019 5:04:51 PM EST mcohen@qeusa.com Marcie Cohen 2394357200 FL Nov 8, 2019 5:04:51 PM EST Southwest Utility Systems officestaff@swutility.net RichardT Cowart 2392670200 FL Nov 8, 2019 5:04:52 PM EST Southwest Utility Systems, Inc. brett@swutility.net Brett Eckenrode 2392670200 FL Nov 8, 2019 5:04:50 PM EST NAME EMAIL FAX SENT DATE SENT Supplier Notification Report - Bid #1911-016 Collier County 12/18/2019 p. 3 16.C.8.a Packet Pg. 1957 Attachment: Attachment 1 - Bid Tabulation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) $0.00 $100,000.00 $200,000.00 $300,000.00 $400,000.00 $500,000.00 $600,000.00 Eng Est Kyle Construction Inc.Mitchell & Stark Const. Co. Inc. Quality Enterprises USA, Inc. Douglas N. Higgins, Inc. Haskins Inc. Results for Bid No. 1911 -016--01-01 (RFQ 14-6213 Lakewood Blvd. FM and PS 305.17 Improvements) KEY: Dashed Green- AVERAGE BID Dashed black- +/-1 std dev of avg bid Dotted red- +/-20% of eng estimate for horizontal construction 16.C.8.b Packet Pg. 1958 Attachment: Attachment 2 - EPMD bid analysis (11500 : Lakewood Blvd. Force Main and PS 305.17 2122 Johnson Street ■Post Office Box 1550 ■Fort Myers, Florida 33902-1550 (239) 334-0046 ■ Fax (239) 334-3661 SINCE 1946 December 11, 2019 Via Email Only: Zamira.Deltoro@colliercountyfl.gov Zamira Deltoro, CSM Project Manager Collier County – EPMD 3339 Tamiami Trail East, Suite 303 Naples, FL 34112-5361 RE: Bid Recommendation for Bid No. 1911-016-01-01, RFQ 14-6213 - Lakewood Blvd FM and PS 305.17 Improvements; Low Bidder: Kyle Construction, Inc. Dear Zamira: The bid opening for the above-referenced project took place on Friday, November 22, 2019. Collier County provided the results of the bid opening to Johnson Engineering and we performed an evaluation of the results and our recommendation is contained herein. The table below lists the responsive bidders and their bid amount submitted from lowest to highest: BIDDER BID AMOUNT Kyle Construction, Inc. $308,749.13 Mitchell & Start Construction Co., Inc. $450,567.70 Quality Enterprises USA, Inc. $494,488.50 Douglas N. Higgins, Inc. $522,399.00 Haskins, Inc $550,532.31 Johnson Engineering prepared the enclosed Bid Tabulation Analysis which includes an analysis for mathematical errors. No errors were discovered. For comparison purposes, Johnson Engineering provided Collier County with an Opinion of Probable Construction Cost in the amount of $339,390.25. All bidders acknowledged Bid Addendums #1 and #2. The results show Kyle Construction, Inc. as the low bidder. Based upon our review, the low bidder, Kyle Construction, Inc., appears to be a reasonable and responsive bid. Subject to concurrence with the County’s Purchasing and Contracts Administration Division, we believe selection of Kyle Construction, Inc. by Collier County for the intended work contained within the bid documents would be an appropriate choice. Should you have any questions, or require additional information, please let us know. Very truly yours, William H. Saum, E.I. WHS/ljb 20149700-231 16.C.8.c Packet Pg. 1959 Attachment: Attachment 3 - Recommendation Letter (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) COLLIER COUNTY UTILITIES LAKEWOOD COMMUNITY PUMP STATION 305.17 AND FORCE MAIN IMPROVEMENTS BID TABULATION ANALYSIS Bid Opening: Novmeber 22, 2019 ITEM NO.DESCRIPTION EST. QUANT.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Low Bidder Unit Price Average Unit Price Deviation from Average Unit Price % Diff. Deviation from OPC Unit Price % Diff. Minimum Unit Price Maximum Unit Price 1 Mobilization/Demobilization 1 LS 20,000.00$ 20,000.00$ $20,000.00 20,000.00$ 21,000.00$ 21,000.00$ $25,000.00 25,000.00$ 10,000.00$ 10,000.00$ 20,000.00$ 20,000.00$ $20,000.00 19,200.00$ 800.00$ 4%$0.00 0%$10,000 $25,000 2 Maintenance of Pedestrian and Vehicular Traffic 1 LS 8,000.00$ 8,000.00$ $8,000.00 8,000.00$ 5,000.00$ 5,000.00$ $25,000.00 25,000.00$ 5,200.00$ 5,200.00$ 10,000.00$ 10,000.00$ $8,000.00 10,240.00$ ($2,240.00)-22% $2,000.00 20% $5,000 $25,000 3 Pre-Construction Video Recording 1 LS 3,000.00$ 3,000.00$ $3,000.00 3,000.00$ 1,500.00$ 1,500.00$ $4,000.00 4,000.00$ 3,200.00$ 3,200.00$ 1,000.00$ 1,000.00$ $3,000.00 2,940.00$ $60.00 2%($2,000.00)-200% $1,500 $4,000 4 Survey Layout and Record Drawings 1 LS 5,000.00$ 5,000.00$ $7,500.00 7,500.00$ 6,000.00$ 6,000.00$ $6,000.00 6,000.00$ 7,700.00$ 7,700.00$ 5,000.00$ 5,000.00$ $5,000.00 6,440.00$ ($1,440.00)-22% $0.00 0% $5,000 $7,700 5 Furnish and Install Construction Project Sign 1 LS 1,500.00$ 1,500.00$ $1,500.00 1,500.00$ 2,500.00$ 2,500.00$ $1,500.00 1,500.00$ 1,500.00$ 1,500.00$ 1,500.00$ 1,500.00$ $1,500.00 1,700.00$ ($200.00)-12% $0.00 0% $1,500 $2,500 ITEM NO.DESCRIPTION EST. QUANT.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Low Bidder Unit Price Average Unit Price Deviation from Average Unit Price % Diff. Deviation from OPC Unit Price % Diff. Minimum Unit Price Maximum Unit Price 6 Furnish and Install 4" PVC C900 DR18 Force Main 205 LF 25.00$ 5,125.00$ 150.00$ 30,750.00$ 125.00$ 25,625.00$ 30.00$ 6,150.00$ 115.00$ 23,575.00$ 50.00$ 10,250.00$ $25.00 89.00$ ($64.00)-72%$25.00 50%$25 $150 7 Furish and Install 6" HDPE DR 11 Horizontal Directional Drill Force Main 1 LS 35,000.00$ 35,000.00$ 78,000.00$ 78,000.00$ 58,000.00$ 58,000.00$ 52,000.00$ 52,000.00$ 65,000.00$ 65,000.00$ 38,000.00$ 38,000.00$ $35,000.00 57,600.00$ ($22,600.00)-39%$3,000.00 8%$35,000 $78,000 8 Connect Force Main to Existing Manhole # 5748 1 LS 4,000.00$ 4,000.00$ 16,800.00$ 16,800.00$ 7,000.00$ 7,000.00$ 8,000.00$ 8,000.00$ 14,000.00$ 14,000.00$ 15,000.00$ 15,000.00$ $4,000.00 9,960.00$ ($5,960.00)-60%$11,000.00 73%$4,000 $16,800 9 Abandon and Grout in Place Existing 4" Cast Iron Force Main 1,085 LF 2.50$ 2,712.50$ 15.00$ 16,275.00$ 6.00$ 6,510.00$ 4.00$ 4,340.00$ 12.75$ 13,833.75$ 7.00$ 7,595.00$ $2.50 8.05$ ($5.55)-69% $4.50 64% $3 $15 ITEM NO.DESCRIPTION EST. QUANT.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Low Bidder Unit Price Average Unit Price Deviation from Average Unit Price % Diff. Deviation from OPC Unit Price % Diff. Minimum Unit Price Maximum Unit Price 10 Demolition of Existing Well Piping, Valve Vault Piping, Wet Well Top and Valve Vault 1 LS 3,500.00$ 3,500.00$ 11,500.00$ 11,500.00$ 19,500.00$ 19,500.00$ 15,000.00$ 15,000.00$ 6,300.00$ 6,300.00$ 15,000.00$ 15,000.00$ $3,500.00 11,160.00$ ($7,660.00)-69%$11,500.00 77%$3,500 $19,500 11 Furnish and Install FLYGT NP 3102 with 465 Impeller, 5 HP Submersible Pumps 2 EA 25,000.00$ 50,000.00$ 23,500.00$ 47,000.00$ 45,000.00$ 90,000.00$ 34,000.00$ 68,000.00$ 65,000.00$ 130,000.00$ 13,000.00$ 26,000.00$ $25,000.00 38,500.00$ ($13,500.00)-35%($12,000.00)-92%$23,500 $65,000 12 Furnish and Install Concrete Wet Well Top with Access Hatches and Fall Protection Hatch 1 LS 3,800.00$ 3,800.00$ 3,500.00$ 3,500.00$ 13,000.00$ 13,000.00$ 18,000.00$ 18,000.00$ 8,000.00$ 8,000.00$ 25,000.00$ 25,000.00$ $3,800.00 9,260.00$ ($5,460.00)-59%$21,200.00 85%$3,500 $18,000 13 Furnish and Install Wet Well Piping and Above-Ground Piping and Valves 1 LS 70,000.00$ 70,000.00$ 56,000.00$ 56,000.00$ 85,000.00$ 85,000.00$ 112,300.00$ 112,300.00$ 89,000.00$ 89,000.00$ 50,000.00$ 50,000.00$ $70,000.00 82,460.00$ ($12,460.00)-15%($20,000.00)-40%$56,000 $112,300 14 Furnish and Install SewperCoat Liner for Wet Well 1 LS 12,000.00$ 12,000.00$ 16,800.00$ 16,800.00$ 23,000.00$ 23,000.00$ 16,000.00$ 16,000.00$ 25,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ $12,000.00 18,560.00$ ($6,560.00)-35%$3,000.00 20%$12,000 $25,000 15 Bypass Pumping During Construction 1 LS 20,000.00$ 20,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 28,000.00$ 28,000.00$ 12,850.00$ 12,850.00$ 15,000.00$ 15,000.00$ $20,000.00 22,170.00$ ($2,170.00)-10%($5,000.00)-33% $12,850 $28,000 ITEM NO.DESCRIPTION EST. QUANT.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Low Bidder Unit Price Average Unit Price Deviation from Average Unit Price % Diff. Deviation from OPC Unit Price % Diff. Minimum Unit Price Maximum Unit Price 16 General Restoration Along Force Main Route 205 LF 20.00$ 4,100.00$ 50.00$ 10,250.00$ 35.00$ 7,175.00$ 10.00$ 2,050.00$ 45.00$ 9,225.00$ 50.00$ 10,250.00$ $20.00 32.00$ ($12.00)-38%$30.00 60%$10 $50 17 General Restoration at Pump Station Site 1 LS 5,000.00$ 5,000.00$ 2,000.00$ 2,000.00$ 5,000.00$ 5,000.00$ 40,000.00$ 40,000.00$ 7,500.00$ 7,500.00$ 5,000.00$ 5,000.00$ $5,000.00 11,900.00$ ($6,900.00)-58%$0.00 0%$2,000 $40,000 18 Concrete Sidewalk Restoration 17 SY 200.00$ 3,400.00$ 35.00$ 595.00$ 60.00$ 1,020.00$ 100.00$ 1,700.00$ 160.00$ 2,720.00$ 120.00$ 2,040.00$ $200.00 111.00$ $89.00 80%($80.00)-67%$35 $200 19 Repaint Existing Bollard Post Safety Yellow 1 LS 500.00$ 500.00$ 300.00$ 300.00$ 60.00$ 60.00$ 500.00$ 500.00$ 2,000.00$ 2,000.00$ 1,000.00$ 1,000.00$ $500.00 672.00$ ($172.00)-26% $500.00 50% $60 $2,000 13,000.00$ 21,019.00$ ($8,019.00)-38% (5,290.00)$ -40%$13,000 $44,250 ITEM NO.DESCRIPTION EST. QUANT.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Low Bidder Unit Price Average Unit Price Deviation from Average Unit Price % Diff. Deviation from OPC Unit Price % Diff. Minimum Unit Price Maximum Unit Price 20 Furnish and Install 6FT Tall Clusia Shrubs (Spaced 4' on center) 1 LF 2,000.00$ 2,000.00$ 5,000.00$ 5,000.00$ 6,600.00$ 6,600.00$ 120.00$ 120.00$ 12,500.00$ 12,500.00$ 3,000.00$ 3,000.00$ $2,000.00 5,244.00$ ($3,244.00)-62%1,000.00$ 33%$120 $12,500 21 Furnish and Install Irrigation System 1 LS 500.00$ 500.00$ 5,000.00$ 5,000.00$ 4,300.00$ 4,300.00$ 2,400.00$ 2,400.00$ 10,000.00$ 10,000.00$ 4,000.00$ 4,000.00$ $500.00 4,440.00$ ($3,940.00)-89%$3,500.00 88%$500 $10,000 22 Furnish and Install 6' Tall Chain Link Fence and Slide Gate 1 SY 8,500.00$ 8,500.00$ 23,500.00$ 23,500.00$ 13,000.00$ 13,000.00$ 14,000.00$ 14,000.00$ 15,000.00$ 15,000.00$ 7,000.00$ 7,000.00$ $8,500.00 14,800.00$ ($6,300.00)-43%($1,500.00)-21%$8,500 $23,500 23 Funish and Install <1" Diameter Stone at 4" Tichk with Geotextile Filter Fabric 84 LS 10.00$ 840.00$ 42.00$ 3,528.00$ 50.00$ 4,200.00$ 50.00$ 4,200.00$ 55.00$ 4,620.00$ 100.00$ 8,400.00$ $10.00 41.40$ ($31.40)-76% $90.00 90% $10 $55 $37,500.00 40,520.00$ ($3,020.00)-7% $0.00 0% $27,600 $61,500 $46,837.50 94,539.25$ ($47,701.75)-50% $24,007.50 34% $46,838 $141,825 $159,300.00 220,610.00$ ($61,310.00)-28%($13,300.00)-9% $159,300 $271,150 $13,000.00 21,019.00$ ($8,019.00)-38% $5,290.00 29% $13,000 $44,250 $11,840.00 27,961.60$ ($16,121.60)-58% $10,560.00 47% $11,840 $42,120 $40,271.63 60,697.48$ ($20,425.85)-34% $3,983.63 9% $40,272 $71,809 $308,749.13 465,347.33$ (156,598.20)$ -34% 428,596.00$ 10%$308,749 $550,532 37,028.00$ 28,100.00$ 18,290.00$ 22,400.00$ 37,500.00$ 70,845.00$ 295,035.00$ 256,637.50$ 354,770.00$ 401,890.00$ 433,540.00$ 436,603.75$ 272,635.00$ HASKINS 257,300.00$ 271,150.00$ DOUGLAS N HIGGINS HASKINS 44,250.00$ 21,445.00$ 271,150.00$ 44,250.00$ 21,445.00$ 20,720.00$ 42,120.00$ 68,139.00$ 71,808.56$ 522,399.00$ 550,532.31$ Bid Analysis - Part 5DOUGLAS N HIGGINS HASKINS 22,400.00$ DOUGLAS N HIGGINS HASKINS 61,500.00$ 27,600.00$ DOUGLAS N HIGGINS HASKINS 70,490.00$ 116,408.75$ DOUGLAS N HIGGINS 454,260.00$ 478,723.75$ 20,720.00$ 42,120.00$ DOUGLAS N HIGGINS HASKINS 61,500.00$ 27,600.00$ MITCHELL & STARK 450,567.70$ 40,000.00$ SECTION 4: RESTORATION SUBTOTAL: SECTION 4: RESTORATION PROJECT TOTAL (Sections 1-5): SECTION 5: BID ALTERNATES KYLE CONSTRUCTION MITCHELL & STARK QUALITY ENTERPRISES Project Total (Sections 1-4 ONLY) 268,477.50$ 391,798.00$ 429,990.00$ SECTION 5: BID ALTERNATES SUBTOTAL: 11,840.00$ 37,028.00$ 28,100.00$ SECTION 5: BID ALTERNATES SUBTOTAL: 11,840.00$ SECTION 3: PUMP STATION UPGRADES QUALITY ENTERPRISESKYLE CONSTRUCTION MITCHELL & STARK 13,145.00$ 13,255.00$ 13,000.00$ 18,290.00$ SECTION 3 PUMP STATION UPGRADES SUBTOTAL: Engineer's Projected Estimate SECTION 6: ALLOWANCE (15% of Project Total (T&M)): SUMMARY BID TOTAL: SECTION 1 GENERAL SUBTOTAL: SECTION 3 PUMP STATION UPGRADES SUBTOTAL: SECTION 2 FORCE MAIN IMPROVEMENTS SUBTOTAL: SECTION 4: RESTORATION SUBTOTAL: QUALITY ENTERPRISESKYLE CONSTRUCTION MITCHELL & STARK 46,837.50$ KYLE CONSTRUCTION SECTION 1: GENERAL SECTION 1 GENERAL SUBTOTAL: MITCHELL & STARK 141,825.00$ 37,500.00$ 36,000.00$ SECTION 2: FORCE MAIN IMPROVEMENTS SECTION 2 FORCE MAIN IMPROVEMENTS SUBTOTAL: QUALITY ENTERPRISES 97,135.00$ 37,500.00$ 44,255.25$ Bid Analysis - Part 3 339,290.25$ 308,749.13$ SUMMARY 13,000.00$ KYLE CONSTRUCTION 46,837.50$ 159,300.00$ 255,500.00$ 159,800.00$ KYLE CONSTRUCTION 37,500.00$ 159,300.00$ 494,488.50$ 64,498.50$ 40,271.63$ 36,000.00$ 141,825.00$ QUALITY ENTERPRISES Engineer's Projected Estimate Bid Analysis - Part 1 58,769.70$ 40,000.00$ 146,000.00$ Engineer's Projected Estimate Engineer's Projected Estimate Projected Estimate Bid Analysis - Part 5 13,145.00$ 13,255.00$ MITCHELL & STARK QUALITY ENTERPRISES Engineer's Projected Estimate 97,135.00$ 70,845.00$ 159,800.00$ 255,500.00$ 146,000.00$ 70,490.00$ 116,408.75$ 257,300.00$ Bid Analysis - Part 2 12/11/2019 1 16.C.8.c Packet Pg. 1960 Attachment: Attachment 3 - Recommendation Letter (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.d Packet Pg. 1961 Attachment: Attachment 4 - Request for Quotation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.d Packet Pg. 1962 Attachment: Attachment 4 - Request for Quotation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.d Packet Pg. 1963 Attachment: Attachment 4 - Request for Quotation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.d Packet Pg. 1964 Attachment: Attachment 4 - Request for Quotation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.d Packet Pg. 1965 Attachment: Attachment 4 - Request for Quotation (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.e Packet Pg. 1966 Attachment: Attachment 5 - Work Order (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.e Packet Pg. 1967 Attachment: Attachment 5 - Work Order (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.e Packet Pg. 1968 Attachment: Attachment 5 - Work Order (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.e Packet Pg. 1969 Attachment: Attachment 5 - Work Order (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.e Packet Pg. 1970 Attachment: Attachment 5 - Work Order (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1971 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1972 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1973 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1974 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1975 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1976 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1977 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1978 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1979 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1980 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1981 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1982 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1983 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1984 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1985 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1986 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1987 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1988 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1989 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements) 16.C.8.f Packet Pg. 1990 Attachment: Attachment 6 - 14-6213Kyle_Contract (11500 : Lakewood Blvd. Force Main and PS 305.17 Improvements)