Loading...
Backup Documents 01/28/2020 Item #16A13 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 6 A 1 3 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO J. THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing_lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office CMG 02/07/20 4. BCC Office Board of County ' j b r Commissioners 1 &f )13 5. Minutes and Records Clerk of Court's Office ,41 13-0P0 I o SFectik PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Heather Meyer/GMD 239-252-5726 Contact/ Department Agenda Date Item was January 28,2020 Agenda Item Number 16A13 Approved by the BCC Type of Document Work Order from Humiston& Moore Engineers Number of Original 1 Attached for State required Annual Monitoring of Collier Documents Attached County Beaches and Inlets for 2020 under Contract No. 15-6382, PO number or account N/A number if document is to be recorded • INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP OK CMG 2. Does the document need to be sent to another agency for additional signatures? If yes, CMG provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be CMG signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's CMG Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the CMG document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's CMG signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip CMG should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on January 28,2020 and all changes made CMG /A is not during the meeting have been incorporated in the attached document. The County " option for Attorney's Office has reviewed the changes,if applicable. I is line. 9. Initials of attorney verifying that the attached document is the version approved by the /A is not BCC,all changes directed by the BCC have been made,and the document is ready for the 11 ' o•tion for Chairman's signature.n r i (1, -( r0(Y� ��al t -fra 9, I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.Q4,$evised 1.26.05,Revised 2.24.05;Revised 11/30/12 l6 A 1 3 / WORK ORDER/PURCHASE ORDER Contract 15-6382 CZ "Grant Funded Professional Services for Coastal Zone" Contract Expiration Date:June 2, 2020 This Work Order is for professional Engineering services forwork known as: Project Name: Collier County Beaches Inlets Annual Monitoring for 2020 Project No: 195-90536 The work is specified in the proposal dated December 10, 2019 which is attached hereto and made a part of this Work Order. I n accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Humiston & Moore Engineers. ✓ Scone of Work: As detailed in the attached proposal and the following: * Task I Collier Beach -SOW and Budget * Task II Wiggins Pass —SOW and Budget * Task III Doctor's Pass—SOW and Budget * Task IV Doctors Pass Erosion Control Structures—SOW and Budget * Task V Central Marco Beach— SOW and Budget * Task VI South Marco Beach—SOW and Budget * Task VII The Entrance to Collier Bay—SOW and Budget * Task VIII Aerial Image Book ✓ Schedule of Work: Complete work within 360 days from the date of the Notice to Proceed which is accompanying this Work Order. The Cons ltant agrees that any Work Order that extends beyond the expiration date of Agreement No, 15-6382ill survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): Negotiated Lump Sum (NLS) ®Lump Sum Plus Reimbursable Costs (LS+RC)®Time & Material (T&M) (established hourly rate —Schedule B)❑ Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task I $ 82,497.50 (L/S —T/M) 'I'ask II $ 33,753.00 (US —T/M) Task III $ 23,564.50 (L/S —T/M)j Task IV $ 21,443.50 (US —T/M) Task V $ 27,300.50 (L/S —T/M) " Task VI $ 10,204.50 (T/M) Task VII $ 21,436.00 (US —T/M) Task VIII $ 6,721.00 (T/M) / TOTAL FEE $226,920.50 (L/S —T/M) ' Page 1 of 3 16A13 PREPARED BY: /VI .w Ili 11 / 1‘?,G-ary M Ipin, CZM Ma ager Date i Digitally signed by Amy Patt9mon APPROVED BY: Amy Patterson Date:2019.121215:27:08-05'00' Amy P ' rson, Department Dir for Date APPROVED B Y: atob 0 Z )A Tha c e s L. Cohen, Department Head GMD Da e — By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that,to the best of their knowledge and belief,all relevant facts concerning past, present, or currently planned interest or activity(financial, contractual,organizational, or otherwise) which relates to the proposed work;and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Humi . Moor Engineers 11110 62.- It-11 rctt D. Moore,P.E.,President Date Page 2 of 3 6 A 1 3 ATTEST: ' • BOARD OF COUNTY COMMISSIONERS Crystal K. Kinzel,;Clerk Collier ty, Florida �? y ByrA� • ,� By: Deputy.Clerk. A ,"�.t 'Itairifi‘ii Burt L.Saunders $Eggattire 0:'1 y. Chairman ATTEST: By: (Print Name/Titi- Approved as to Form and gality: "ssistant County Attorne Page 3 of 3 16A13 HUMISTON & MOORE • ENGINEERS (��I COASTAL 5679 STRAND COURT ENGINEERING DESIGN NAPLES,FLORIDA 34110 FAX:239 594 2025 AND PERMITTING PHONE 239 594 2021 December 10, 2019 Gary McAlpin, Manager Coastal Zone Management Collier County Government 2685 South Horseshoe Drive Unit 103 Naples, FL 34104 Re: Proposal for Collier County Beaches and Inlets Annual Monitoring for 2020 Collier County Contract 15-6382; HM File No 25-026.2019Beach-Monitor Dear Gary: Enclosed is a proposal for the Collier County Beaches and Inlets monitoring surveys and monitoring reports for 2020. The completion date for all work is estimated to be 360 days from the date of the Notice to Proceed. Rectified aerial images acquired for 2020, provided by the Collier County Property Appraiser's Office, are to be submitted to the DEP as part of the work described below for all projects. Note,the dates shown in the Task Description Title Line for the Scope of Work (SOW) and Budget reflect an anticipated date for the survey and are dependent upon the authorization date, project construction timing, release of the rectified aerial images, and other unforeseen conditions such as weather. Task 3. Collier Beach-SOW and Budget—Anticipated January/February 2020 Conduct the annual monitoring survey for Collier Beach Nourishment Project consistent with the monitoring plan approved by the Department of Environmental Protection(DEP).This scope of work consists of DEP monuments R-10 to R-84*. (90 profiles). A summary including beach profiles will be issued to the County for the preliminary assessment of beach fill needs for Collier County Beaches per the Design Standard beach width, established in 2003, and a complete monitoring report is to be submitted to the DEP in compliance with the annual monitoring. I � Task la. Sub Total Data Collection Budget (SDI) $ 47,520 LS Task 1b Final Report(H&M) $ 34,977 TM Total Task 1 Subtotal (SDI + H&M) $ 82,497.50 Deliverable: Copy of Monitoring Report in hard copy and provided electronically in pdf format *Includes beach profiles R58A, R60+518, R61+408, R61+816, and half monuments from R10 to R22. Page 1 of 4 16A13 Task 2 Wiggins Pass-SOW and Budget—Anticipated January/February 2020 Conduct the annual monitoring survey for the Wiggins Pass Navigation Channel Expansion and Maintenance Dredging Project consistent with the monitoring plan approved by DEP. This scope of work consists of FDEP monuments R-10 to R-22 including half monuments*, the MHWL from R-17 NE for a minimum of 1500 feet. Stations-2+00 to 15+00 (from R-15 to R-18.5) and the navigation channel with grid lines 100 feet apart (C-3 thru C-34, CN-35 thru CN37). A complete monitoring report is to be submitted to the DEP in compliance with the annual monitoring. Task 2a. Sub Total Data Collection Budget(SDI) $ 17,510 LS (*Included in la) Task 2b Final Report (H&M) $ 16,243 TM Total Task 2 Subtotal(SDI + H&M) $ 33,753 Deliverable: Copy of Monitoring Report in hard copy and provided electronically in pdf format *Beach profile surveys for R10 to R22 collected as part of Task la. Task 3 Doctors Pass-SOW and Budget—Anticipated January/February 2020 Conduct the annual monitoring survey for Doctors Pass Maintenance Dredging Project consistent with the monitoring plan approved by the DEP. This scope of work consists of 77 Dredge Template Profiles and 9 beach profiles R-58A, R-58, R-59, R-60, R-60+518, R-61, R-61+408, R-61+816, and R-62.* A complete monitoring report is to be submitted to the DEP in compliance with the annual monitoring. Task 3a.Sub Total Data Collection Budget (SDI) $ 11,439 LS (*Included in la) Task 3b Final Report(H&M) $ 12,125.50 TM Total Task 3 Subtotal(SDI + H&M) $23,564.50 Deliverable: Copy of Monitoring Report in hard copy and provided electronically in pdf format *Beach profile surveys for R58A to R62 collected as part of Task la. Task 4 Doctors Pass Erosion Control Structures-SOW and Budget—Anticipated September 2020 Provide the annual monitoring report for the Doctors Pass Erosion Control Structures Project consistent with the monitoring plan approved by the DEP.This scope of work is based on the survey of DEP monuments R58A-400 south to R-64(17 profiles)*. One report is to be submitted to the DEP in compliance with the annual monitoring. Task 4a. Sub Total Data Collection Budget (SDI) $ 9,900 LS Task 4b Final Report(H&M) $ 11,543.50 TM Total Task 4 Subtotal (SDI + H&M) $ 21,443.50 Page 2 of 4 16A13 3 Deliverable: Copy of Monitoring Report in hard copy and provided electronically in pdf format *Includes beach profiles R58A-400, R58A-300, R58A-150, R58A, R58A+150, R58A+300, R58A+425, R58, R58+150, R58+300, R58+600,and R59 to R64. Task 5 Central Marco Beach-SOW and Budget—Anticipated February/March 2020 Conduct the annual monitoring survey for the Central Marco Beach Regrade Project consistent with the DEP permit and the requirements of the US Fish & Wildlife Service (FWS). This scope of work consists of DEP monuments R-130 to R-146*. One report is to be submitted to the DEP and FWS in compliance with the annual monitoring. Task 5a.Sub Total Data Collection Budget(SDI) $ 17,550 LS Task 5b Final Report(H&M) $ 9,750.50 TM Total Task 5 Subtotal (SDI +H&M) $ 27,300.50 Deliverable: Copy of Monitoring Report in hard copy and provided electronically in pdf format. *Survey to include R130 thru R135, R135.5, R136, R136.5, R137, R137.5, and R138 thru R148, G1 thru G5, K1 and K2 for a total of 29 profiles. Task 6 South Marco Beach-SOW and Budget—Anticipated February/March 2020 Conduct the annual monitoring survey for South Marco Beach Nourishment Project consistent with the monitoring plan approved by the DEP.This scope of work consists of DEP monuments R-139 to R-148, G-1 thru G-5, and K-1 thru K-2*. This survey scope does not include the Caxambas Pass borrow area surveyed pre and post-construction for the 2019/2020 project. One report is to be submitted to the DEP in compliance with the annual monitoring. Task 6a.Sub Total Data Collection Budget (SDI) No Charge (Included in 5a) Task 6b Final Report (H&M) $ 10,204.50 TM Total Task 6 Subtotal (SDI+ H&M) $ 10,204.50 Deliverable: Copy of Monitoring Report in hard copy and provided electronically in pdf format *Beach profile surveys for R139 south to K2 collected as part of Task 5a. Task 7 The Entrance to Collier Bay-SOW and Budget—Anticipated January/February 2020 Conduct the annual monitoring survey for the Collier Bay Entrance Channel Dredging Project to be consistent with the monitoring plan approved by the DEP as described in the permit.This scope of work consists of (1) Hideaway Beach Profile: H-15; and (13) Channel profiles: Cl thru C11, and H16*. A report Is to be submitted to the County. Task 7a.Sub Total Data Collection Budget (SDI) $ 11,250 LS Page 3 of 4 16A13 3 Task 7b Final Report (H&M) $ 10,186 TM Total Task 7 Subtotal (SDI + H&M) $ 21,436 *Survey to include H15, Cl, C2, C3, C3.5, H16 (3), C6, C7, C8, C9, C10, C11. (14 Profiles) Task 8 2020 Aerial Image Book-SOW and Budget—Anticipated May/June 2020 Prepare an aerial image book for the Collier County Beaches ranging from DEP reference monument R-1 south to R-89 and from Hideaway Beach reference monument H-16 including the entrance to Collier Bay south to DEP reference monument R-148 including Caxambas Pass. The monument locations will be overlaid along with the names of existing structures as noted in the 2019 book. The rectified images will be the latest available from the County Appraiser's Office. The ECL, latest MHWL, and vegetation line will be shown along with the distance from each to the 2003 Baseline. A CD/DVD will be supplied containing the pdf file for the book and a total of three hardcopies will be supplied. Task Option 8.Aerial Image Book (3 and CD) (H&M) $ 6,721TM Task 8 Subtotal (HM—No SDI) $ 6,721 Deliverable: Copy of Aerial Book in hard copy and provided electronically in pdf format Grand Total (SDI+ H&M) $ 226,920.50 Tasks 1 thru 8 Tasks will be billed on a time and materials basis, unless otherwise noted. The budgets for these tasks may therefore be considered as not-to-exceed amounts with the understanding that in the event regulatory requirements or requests from County staff result in Additional Services exceeding the estimated budget amounts, a budget amendment will be requested. Please call if you have any questions. Sincerely yours, HUMISTON & MOORE ENGINEERS %\ Brett D. Moore, P.E. President Page 4 of 4 1 6 A 1 3 Proposal for Professional Services Collier County 2020 Physical Monitoring Survey �� Collier Beach,Wiggins Pass,Doctors Pass,Doctors Pass Structures, �`J Central&South Marco Beach and Collier Creek Collier County,Florida November 18,2019 Page 3 of 4 profile with positive ranges extending seaward of the monument and negative ranges extending landward of the monument. Offshore Profile Data Collection-Bathymetric Bathymetric profile data shall be collected as close to high tide as practical and shall extend landward to a depth that overlaps the onshore portion of the survey a minimum distance of fifty (50) feet. Bathymetric profile data collection shall extend seaward to the negative thirteen (-13) feet NGVD29 contour (approximately -14.5' NAVDRR) at Collier Beach and South Marco Beach, and negative fifteen (-15) feet NGVD29 contour (approximately -16.3' NAVD88) at Doctors Pass Structures, or two thousand (2,000) feet from the shoreline, whichever is the greater distance. Bathymetric data collection shall occur as close to the time of the onshore topographic survey as practical, which shall not exceed seven (7) days of time difference between the two (2) survey events. Maximum wave height during the course of bathymetric data collection shall be three(3)feet. Bathymetric data shall be collected using an automated hydrographic system comprised of a survey launch equipped with a marine grade sounder, differential global positioning system and computer-based navigation / data collection system, and when deemed necessary may be interfaced with a DMS-05 Motion Sensor System. The motion sensor will be employed as necessary to reduce the effects of vessel heave,pitch and roll during the course of data collection. The sounder shall be calibrated via bar checks prior to the start of the survey. Prior to the start of the survey a tide staff or gauge will be established in proximity to the project for recording water levels during the course of the data collection activities. The tide staff or gauge will be set relative to published control in the vicinity of the project. Digital Ground Photography During the course of field data collection, digital photographs shall be taken at approximate mid-beach along each profile line. Three (3) photographs shall be captured, one each shore-parallel north and south of the profile and one towards the monument location. An additional photograph of the monument or TBM shall be taken with sufficient clarity to read the monument stamping. Digital images shall be provided to H&M in .jpg format at a minimum 640 x 480 resolution. Data Processing and Final Deliverables Upon completion of field survey activities, data will be edited and reduced to the project datum and translated to an x,y,z,ASCII format for submittal to H&M. H&M will be provided the following deliverables: 1. Survey report certified by a Professional Surveyor and Mapper. 2, Description of all monuments and TBM's used for the survey, including identification, stamping, coordinates, elevations and profile azimuths. Control description shall be provided in both hardcopy and digital formats(ASCII and Excel), as applicable. 3. Bathymetric data and/or profile data in ASCII x,y,z format 4. Digital photographs in .jpg format with appropriate labeling 5. Metadata files Cost Breakdown: Task One: $47,520.00 Lump Sum Task Two: $ 17,510.00 Lump Sum Task Three: $ 11,439.00 Lump Sum Task Four: $ 9,900.00 Lump Sum Task Five/Six: $ 17,550.00 Lump Sum Task Seven: $ 11,250.00 Lump Sum Surveying • Engineering • Applications 16A13 /.� Proposal for Professional Services Collier County 2020 Physical Monitoring Survey SEA Collier Beach,Wiggins Pass,Doctors Pass,Doctors Pass Structures, Central&South Marco Beach and Collier Creek Collier County,Florida November 18,2019 Page 4 of 4 Should you have questions or require additional information please do not hesitate to contact us at your convenience. We appreciate this opportunity to assist you with this project and look forward to hearing from you soon. Best Regards, Approved this day of ,2019 William T. Sadler Jr., P.E.,P.S.M. Mr. Steve Foge,P.E. or Authorized President Humiston&Moore Engineers Representative Sea Diversified, Inc. I I I I Surveying • Engineering • Applications 16 A 1 3 Sea Diversified, Inc. EA 160 Congress Park Drive, #114 1900 S. Harbor City Blvd., #110 ``J Delray Beach, Florida 33445 Melbourne, Florida 32901 Phone: 561-243-4920 Phone: 321-984-7268 Facsimile: 561-243-4957 Facsimile: 321-984-7270 December 10, 2019 Mr. Steve Foge,P.E. Sent via electronic mail 12/10/2019 Humiston&Moore Engineers (SF@HumistonandMoore.com) 5679 Strand Court, Suite 110 Naples,Florida 34110 Re: Proposal/Agreement for Professional Services Collier County 2020 Physical Monitoring Survey Collier Beach,Wiggins Pass,Doctors Pass, Doctors Pass Structures, Central&South Marco Beach and Collier Creek Collier County,Florida Sea Diversified P.N. 19-2845 Dear Mr. Foge: In accordance with your request, Sea Diversified, Inc. (SDI) is pleased to submit the following proposal for professional services. The scope of work shall include onshore/offshore beach profile surveys of Collier Beach and Doctors Pass structures, and South Marco Island project areas. In accordance with your summary of scope provided on November 8,2019, the 2020 monitoring survey effort shall encompass the following: Task One: Collier Beach &Offshore Profiles (Collier Beach,Wiggins Pass &Doctors Pass) Beach profiles at R-10 to R-22, including intermediate profiles(R-10.5, R-11.5, R-12.5, R-13.5, R-14.5, R-15.5, R-17.5, R-18.5, R-19.5, R-20.5, R-21.5), R-23 to R-42, U-55 to R-84, and R- 58A,R-60+518,R-61+408, R-61+816,totaling 78 profiles Collier Beach &Offshore Profiles(Park Shore) Beach profiles at R-43 to T-54,totaling 12 profiles Task Two: Wiggins Pass Bathymetry and Beach Profiles • MIIWL from R-17 to the NE 1,500 feet on the south side of the inlet • Entrance channel, Stations-2+00 to 15+00 (R-15 to R-18.5), totaling 18 transects • Internal channels C-3 to C-34,CN-35,CN-36 and CN-37, totaling 35 transects Task Three: Doctors Pass Bathymetry Dredge template profiles,totaling 77 transects Task Four: Doctors Pass Structures Beach &Offshore Profiles Beach profiles at R58A-400,R58A-300, R58A-150, R58A, R58A+150,R58A+300, R58A+425, R-58, R58+150, R58+300, R58+600,and R-59 to R-64, totaling 17 profiles Task Five/Six: Central& South Marco Island Beach& Offshore Profiles Beach profiles at U-130 to R-148, R-135.5, R-136.5, R-137.5, 0-1 to G-5, and K-1 to K-2, totaling 29 profiles Task Seven: Collier Creek Bathymetry(West Collier Creek) Channel profiles at C-1 through C-11, H-15 and 1-1-16,totaling 17 transects Surveying • Engineering • Applications 1 1 6 A 1 3 ,rte Proposal for Professional Services Collier County 2020 Physical Monitoring Survey ST� Collier Beach,Wiggins Pass,Doctors Pass,Doctors Pass Structures, /{{. Central&South Marco Beach and Collier Creek Collier County,Florida II i November 18,2019 Page 2 of 4 General: SDI shall provide supervision,field/office support staff and equipment to perform the scope of work described, herewith. All work shall be conducted to the highest level of industry standards and under the responsible charge of a Professional Surveyor and Mapper registered in the State of Florida. All work shall meet or exceed the Standards of Practice (Standards) set forth by the Florida Board of Professional Surveyors and Mappers in Chapter 5J-17, Florida Administrative Code, pursuant to Section 472.027, Florida Statutes, and in compliance with the Florida Department of Environmental Protection (FDEP) Bureau of Beaches and Coastal Systems Monitoring Standards for Beach Erosion Control Projects, Sections 01000 and 01 100 (Updated October 2014). If time permits, deviations from the scope of work shall be addressed via formal approved addendum to the executed Agreement for Professional Services. Horizontal and Vertical Data: Horizontal Datum: Feet, relative to the Florida State Plane Coordinate System, East Zone,North American Datum of 1983(NAD83) Vertical Datum:Feet,relative to the North American Vertical Datum of 1988 (NAVD88) Horizontal/Vertical Control Verification SDI will verify the horizontal and vertical position of all found and used monuments for the survey. Horizontal and vertical positions will be verified via Real-Time Kinematic GPS procedures. In the event vertical obstructions prohibit the use of GPS,conventional methodologies will be employed. Temporary control points (TBM's) will be set in the event a monument cannot be readily found. As practical, the TBM will be set at the reference monument location. If the specified location is not practical, the TBM will be set at a more suitable location either landward or seaward along the specified profile azimuth. I-I&M shall be notified of any missing monuments and shall be provided with the horizontal and vertical position of all.TBM's. Onshore Profile Data Collection-Topographic Onshore profile data collection shall extend from the FDEP profile control monument seaward to approximate wading depth or as required to overlap the offshore profile data a minimum distance of fifty (50) feet. Profile data collection shall extend landward to the seawalls or fifty(50) feet landward of the five-foot(+5.0')NAVD88 contour line and shall include location of the seaward vegetation line. In the event there is a physical barrier on line between the beach and the monument, every reasonable attempt shall be made to extend the survey beyond the barrier to the reference monument position. It is understood that certain physical barriers may be considered impassible such as large buildings, private residences with difficult access, waterbodies, mangroves or other heavy vegetation requiring line clearing. At the discretion of the surveyor, data collection will be terminated at the first physical barrier if deemed impassible using practical means of extending the survey landward. Profiles terminated due to impassible barriers will be noted in the field books. Profile data will be collected using either conventional differential leveling or Real-time Kinematic Differential Global Positioning techniques. Data points will be collected at a maximum interval of twenty-five(25) feet and at all grade breaks (exceeding one-foot) and material changes along the profile. In the event the profile control monument is located more than three hundred (300) feet landward of the vegetation line, data points shall be extended to intervals of one hundred (100) feet from two hundred (200) feet landward of the approximate vegetation line to the monument location. The reference monument shall be recorded as range 0.0 along the Surveying • Engineering • Applications 1 6A13 Estimated Summary SUMMARY BREAKDOWN BY TASK Task 1 Collier Beach $ 82,497.50 Task 2 Wiggins Pass $ 33,753.00 Task 3 Doctors Pass $ 23,564.50 Task 4 Doctors Pass-Structures $ 21,443.50 Task 5 Central Marco $ 27,300.50 Task 6 South Marco $ 10,204.50 Task 7 Entrance to Collier Bay $ 21,436.00 Task 8 2020 Aerial Image Book $ 6,721.00 $ 226,920.50 SUMMARY BREAKDOWN BY SUB-TASK Task la Collier Beach Data collection $ 47,520.00 LS Task lb Final Report $ 34,977,50 TM Task 2a Wiggins Pass Data Collection $ 17,510.00 LS Task 2b Final Report $ 16,243.00 TM Task 3a Doctors Pass Data Collection $ 11,439.00 LS Task 3b Final Report $ 12,125.50 TM Task 4a Doctors Pass Structures Data Collection $ 9,900.00 LS Task 4b Final Report $ 11,543.50 TM Task 5a Central Marco Data Collection $ 17,550.00 LS Task Sb Final Report $ 9,750.50 TM Task 6a South Marco Data Collection $ - LS Task 6b Final Report $ 10,204.50 TM Task 7a Entrance to Collier Bay Data Collection $ 11,250.00 LS Task 7b Final Report $ 10,186.00 TM Task 8 2020 Aerial Image Book $ 6,721.00 TM SUMMARY Sea Diversified Survey $ 115,169.00 (LS) 16A13 Rate Time Budget Principle Engineer $206.0067.75 $ 13,956.50 Engineer $123.00 / 598.5 $ 73 615.50 Senior Designer $114.00 / 100 $ 11,400.00 Senior Technician $ 85.00 113.5 $ 9,647.50 Technician $ 72.00 43.5 $ 3,132.00 Humiston & Moore Engineers $ 111,751.50 (TM) V TOTAL $ 226,920.50 Iii 16A13 SCHEDULE B RATE SCHEDULE Title Rate Principal $206.00 Senior Project Manager $172.00 Project Manager $147,00 Senior Engineer $157.00 Engineer $123.00 Senior Inspector $96.00 Inspector $76.00 Senior Planner $139.00 Planner $110.00 Senior Designer $114,00 Designer $94.00 Environmental Specialist $109.00 Senior Environmental Specialist $134.00 Scientist/Geologist $93.00 Senior Scientist/Geologist $118.00 Marine Biologist/Hydrogeologist $110.00 Senior Marine Biologist/Hydrogeologist $138,00 Senior GIS Specialist $139.00 GIS Specialist $102.00 Clerical/Administrative $62.00 Senior Technician $85.00 Technician $72.00 Surveyor and Mapper $120.00 CAD Technician $81.00 Survey Crew-2 man $130.00 Survey Crew-3 man $161,00 Survey Crew-4 man $189.00 Senior Architect $154.00 Architect $121.00 This list is not intended to be all Inclusive. Hourly rates for other categories of professional, support and other services shall be mutually negotiated by Collier County and firm on a project by project basis as needed. ii B-1