Loading...
Agenda 02/11/2020 Item #16A 1 (Work Order/APTIM Environmental & Infrastructure, Inc.)02/11/2020 EXECUTIVE SUMMARY Recommendation to approve a professional services Work Order with APTIM Environmental and Infrastructure, Inc., for a not to exceed cost of $44,202.60 under Contract 15-6382 to support Phase II of the Collier County Hurricane and Storm Damage Reduction (HSDR) Feasibility Study performed by the United States Army Corps of Engineers, approve all Budget Amendments and make a finding that this item promotes tourism (Project 80366). OBJECTIVE: To provide technical support and program review during Phase II of the U.S. Army Corps of Engineers (USACE) Collier County Hurricane and Storm Damage Reduction (HSDR) Feasibility Study. CONSIDERATION: An April 30, 1992, resolution adopted by the Committee on Public Works and Transportation, United States House of Representatives, in accordance with Section 110 of the River and Harbor Act of 1962, Public Law 87-874, authorized a survey of the shores of Collier County, Florida and adjacent shorelines, in the interest of hurricane protection, storm damage reduction, beach erosion control, and other related purposes. The Bipartisan Budget Act of 2018 (BBA), Public Law 115 -123, enacted February 9, 2018, authorized the Federal Government to conduct the study at full Federal expense to the extent that appropriations provided under the Investigations heading of the BBA 2018 are available and use for such purpose. On September 11, 2018, the Board approved (Item 16A26) the submittal of an agreement between the Department of the Army, US Army Corps of Engineers and Collier County for the Feasibility Shoreline Protection Study. On October 9, 2018, an agreement was executed between the County and the USACE to execute this study. This agreement will target the completion of the feasibility study within three years at a total cost of no more than $3 million. After execution of the agreement, a Project Management Plan will be developed and agreed upon by Collier County, FL, and USACE. On January 8, 2019, the Board approved (Item 16A20) for APTIM Environmental and Infrastructure, Inc.to provide the professional services for technical support, conceptual plan development and agency coordination to assure that Collier County’s resiliency program, shoreline protection, and storm surge reduction goals are incorporated throughout this study and incorporated into the USACE preferred plan for agency approval. This activity was to continue through the submittal of the USACE preferred plan (Tentative Selected Plan) which is anticipated to occur in January/March 2020. Phase II of this activity will allow continued analysis and development of the Tentative Selected Plan (TSP) through review and authorization. FISCAL IMPACT: Funding is available in the TDC Fund (195), Project No 80366. Grant Funding for this activity may be solicited through the Florida Department of Environmental Protection. ADVISORY COMMITTEE RECOMMENDATIONS: At the January 23, 2020 Coastal Advisory Committee meeting this item was unanimously approved by an 8 to 0 vote. This item was also approved unanimously (9-0) via the Tourist Development Council’s consent agenda on January 27, 2020. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for approval. - CMG RECOMMENDATION: To approve a professional services Work Order with APTIM Environmental and Infrastructure, Inc., for a not to exceed cost of $44,202.60 under Contract 15 -6382 to support Phase II 16.A.1 Packet Pg. 56 02/11/2020 of the Collier County Hurricane and Storm Damage Reduction (HSDR) Feasibility Study performed by the United States Army Corps of Engineers, approve all Budget Amendments and make a finding that this item promotes tourism (Project 80366). Prepared by: J. Gary McAlpin, P.E., Coastal Zone Management, Capital Project Planning, Impact Fees and Program Management Division ATTACHMENT(S) 1. Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (PDF) 2. 15-6382Aptim_Contract_FullyExec_20200103161307.952_X (PDF) 3. 15-6382 Work Order FINAL (PDF) 16.A.1 Packet Pg. 57 02/11/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.1 Doc ID: 11146 Item Summary: Recommendation to approve a professional services Work Order with APTIM Environmental and Infrastructure, Inc., for a not to exceed cost of $44,202.60 under Contract 15 -6382 to support Phase II of the Collier County Hurricane and Storm Damage Reduction (HSDR) Feasibility Study performed by the United States Army Corps of Engineers, approve all Budget Amendments and make a finding that this item promotes tourism (Project 80366). Meeting Date: 02/11/2020 Prepared by: Title: Accountant – Capital Project Planning, Impact Fees, and Program Management Name: Gail Hambright 12/31/2019 8:30 AM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 12/31/2019 8:30 AM Approved By: Review: Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 01/21/2020 2:24 PM Growth Management Department Jeanne Marcella Level 1 Reviewer Completed 01/02/2020 9:13 AM Zoning Gary McAlpin Additional Reviewer Completed 01/02/2020 2:33 PM Growth Management Operations Support Heather Meyer Additional Reviewer Completed 01/06/2020 2:13 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 01/06/2020 2:33 PM Procurement Services Sandra Herrera Additional Reviewer Completed 01/06/2020 3:12 PM Procurement Services Gail Hambright Additional Reviewer Skipped 01/06/2020 3:15 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 01/06/2020 4:21 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 01/06/2020 4:42 PM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 01/09/2020 10:02 AM Growth Management Department Gail Hambright Deputy Department Head Review Skipped 12/18/2019 10:01 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 01/10/2020 11:54 AM Grants Erica Robinson Level 2 Grants Review Completed 01/10/2020 12:54 PM Grants Carrie Kurutz Additional Reviewer Completed 01/10/2020 3:29 PM 16.A.1 Packet Pg. 58 02/11/2020 County Attorney's Office Colleen Greene Level 2 Attorney Review Completed 01/16/2020 3:13 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 01/16/2020 4:12 PM Budget and Management Office Ed Finn Additional Reviewer Completed 01/21/2020 10:31 AM Grants Therese Stanley Additional Reviewer Completed 01/21/2020 11:28 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 02/03/2020 4:34 PM Board of County Commissioners MaryJo Brock Meeting Pending 02/11/2020 9:00 AM 16.A.1 Packet Pg. 59 16.A.1.a Packet Pg. 60 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) cc: Stephen Keehn, PE, APTIM Lauren Floyd, CPE Tara Brenner, PG, PE, CPE 16.A.1.a Packet Pg. 61 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) Exhibit A Scope of Work 16.A.1.a Packet Pg. 62 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) Phase II Consulting Services in Support of the U.S. Army Corps of Engineers Feasibility Study for the Collier County Hurricane and Storm Damage Reduction (HSDR) Project Collier County, Florida Contract Number 15-6382 INTRODUCTION The purpose of this work is to provide continued support to Collier County (County) throughout the U.S. Army Corps of Engineers (Corps) Feasibility Study for the Collier County Hurricane and Storm Damage Reduction (HSDR) Project. Aptim Environmental & Infrastructure, LLC (APTIM) and their sub-consultant, Coastal Protection Engineering LLC (CPE), herein referenced as the APTIM Team, will provide the professional services described below as required by Collier County during the second phase of the Corps Feasibility Study process. Task 1. Agency Coordination & Meetings In support of the Feasibility Study process, the APTIM Team will prepare for, and attend planning meetings with County and Corps staff. It is anticipated that there will be one meeting within Collier County and one meeting either in Tallahassee with the Florida Department of Environmental Protection (FDEP) or in Norfolk with the Corps; up to two representatives from the APTIM Team will participate in these in-person meetings. The APTIM Team will also participate in regular Project Delivery Team (PDT) and In Progress Review (IPR) meetings via conference call, as well as any other conference calls requested by the County and/or Corps. Task 2. Technical Support & Plan Review The APTIM Team has technical experience in all aspects of the Corps planning process, which we will use to advise the County on technical matters including: planning, design and optimization criteria, parking, access, benefit analysis, cost apportionment, project partnership agreements, easements, and other technical matters. This support will be directed towards assisting in the development of a federal project that maximizes the County’s resiliency goals, identifies and develops any components of their preferred resiliency program beyond that covered by the Corps’ recommended project, and maximizes the cost effectiveness in implementing a combined project. Under Phase II of consulting services, the APTIM Team will continue coordination of comments on the Tentatively Selected Plan (which is being reviewed under APTIM’s Phase I assignment) and provide review and analysis of the draft Feasibility Report (March 2020) and the Agency Decision (June 2020) milestone results. In consultation with the County staff, we will prepare pertinent comments for consideration by the Corps. Task 3. Sub-Consultants CPE will provide engineering consulting services in support of Tasks 1 and 2. Task 4. Reimbursable Expenses Estimated reimbursable expenses to support work conducted for Tasks 1 and 2. 16.A.1.a Packet Pg. 63 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) Exhibit B Fee Proposal 16.A.1.a Packet Pg. 64 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) F:\Marketing\_Proposals\Florida Counties\Collier\2019\Phase 2 USACE Feasibility Support\REVISED Exhibit B Fee Proposal.xlsx SUB-CONTRACTOR (Hours)(Hours)(Hours)(Hours)(Hours)(Lump Sum) 1 Agency Coordination & Meetings (T&M)$16,504.00 80 24 2 Technical Support & Plan Review (T&M)$15,062.00 60 24 8 8 2 3 Sub-Consultants (LS)$10,813.90 $10,298.95 4 Reimbursable Expenses (T&M)$1,822.70 4 260 1 1 2 2 Total Hours = 140 48 8 8 2 $10,298.95 4 260 1 1 2 2 Rate = $173 $111 $103 $119 $121 1.05 $36.00 $0.45 $88.00 $75.00 $500.00 $200.00 Cost = $24,220 $5,328 $824 $952 $242 $10,813.90 $144.00 $115.70 $88.00 $75.00 $1,000.00 $400.00 $33,388.70 $10,813.90 $44,202.60 REIMBURSABLE EXPENSES EXHIBIT B FEE PROPOSAL FOR PHASE II CONSULTING SERVICES IN SUPPORT OF THE U.S. ARMY CORPS OF ENGINEERS FEASIBILITY STUDY FOR THE COLLIER COUNTY HURRICANE AND STORM DAMAGE REDUCTION (HSDR) PROJECT December 17, 2019 Cost LABOR COSTS Meals Mileage Tolls & Parking Rental Car Airfare Senior Scientist/ Geologist Hotel Senior Project Manager Coastal Protection Engineering (CPE) Planner/ Coastal Engineer I TIME & MATERIALS TOTAL LUMP SUM TOTAL TOTAL GIS Specialist/ CAD Specialist Surveyor & Mapper/ Professional Surveyor & MapperTask Item 16.A.1.a Packet Pg. 65 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) Exhibit C Rate Schedule 16.A.1.a Packet Pg. 66 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) 16.A.1.a Packet Pg. 67 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) Exhibit D CPE Proposal 16.A.1.a Packet Pg. 68 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM)  COASTAL PROTECTION ENGINEERING  5301 N. FEDERAL HWY, SUITE 335  BOCA RATON, FL 33487  561‐565‐5100    December 17, 2019    Beau Suthard, PG  Client Program Manager  Aptim Environmental & Infrastructure, LLC  Submitted via email to Beau.Suthard@aptim.com     Re: Proposal to Assist with Collier County, Phase II, Consulting Services in Support of the U.S. Army  Corps of Engineers Feasibility Study for the Collier County Hurricane and Storm Damage  Reduction (HSDR) Project    Dear Beau    This proposal is in response to Aptim Environmental & Infrastructure’s (APTIM) request for Coastal  Protection Engineering LLC (CPE) to assist APTIM in providing consulting services to Collier County  related to the U.S. Army Corps of Engineers Feasibility Study for the Collier County Hurricane and Storm  Damage Reduction (HSDR) Project. Lauren Floyd, Senior Marine Biologist will plan to attend project  meetings throughout the work and will review and comment on environmental, biological, and  permitting components of the draft Feasibility Report and Agency Decision milestone results. Tara  Brenner, Project Manager and Tom Pierro, Principal will be available to support Steve Keehn in  reviewing engineering sections of the reports.    Our fee proposal of estimated hours to provide these services is attached. All work will be performed in  accordance with the existing Master Service Agreement between APTIM and CPE executed July 24,  2019. This cost is limited to a projection of hours and estimate of effort based on information known at  this time. Should the project or client require additional services beyond these estimated hours, we will  discuss adjustments with APTIM as deemed appropriate.    If you have any questions, please feel free to contact me directly at 631‐896‐9137.    Sincerely,      Tara Brenner, PG, PE  Senior Coastal Engineer  Coastal Protection Engineering LLC    Mobile: 631‐896‐9137  tbrenner@coastalprotectioneng.com  16.A.1.a Packet Pg. 69 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) Quote No. 2019086 APTIM 2481 NW BOCA RATON BLVD, 33431 Boca Raton, Florida, United States of America Date: 12/10/2019 Comment: Collier's USACE Feasibility Study - Phase II Project manager: Tara Brenner Phone: +16318969137 E-mail: tbrenner@coastalprotectioneng.com Product name & additional info Quantity Price Sum Collier - Principal Engineer (TP)4 196.65 786.60 Collier - Project Manager (TB)16 140.60 2,249.60 Collier - Senior Marine Biologist (LF)55 132.05 7,262.75 Subtotal:10,298.95 Tax:0.00 Total (USD):10,298.95 Powered by TCPDF (www.tcpdf.org) Coastal Protection Engineering LLC 5301 N. Federal Hwy, Suite 335 Boca Raton 33487 +15615655100 16.A.1.a Packet Pg. 70 Attachment: Proposal Phase II Consulting Services Collier County HSDR Feasibility Study (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 71Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 72Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 73Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 74Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 75Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 76Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 77Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 78Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 79Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 80Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 81Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 82Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 83Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM) 16.A.1.cPacket Pg. 84Attachment: 15-6382 Work Order FINAL (11146 : Phase II Feasibility Study APTIM)