Loading...
Backup Documents 01/28/2020 Item #16A26 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP l k TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office SRT 01/28/20 4. BCC Office Board of County b. Commissioners • ) J L �,�'p� 5. Minutes and Records Clerk of Court's Office I 2020 land PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Chad Sweet/GMD Contact Information 239-252-5762 Contact/Department Agenda Date Item was January 14,2020 Agenda Item Number 16A26 Approved by the BCC 12G3Type of Work Order to Mitchell and Stark Number of Original 1 Document Attached Construction Company, Inc., under Documents Attached Underground Utility Contracting Agreement No. 14-6213, for construction of the Neptune Canal Maintenance Access. Boat Ramp project, in the amount of $140,313.51 PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A (Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP OK N/A 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information (Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be CS signed by the Chairman,with the exception of most letters, must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's SS Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the CS document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's CS signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip CS should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 1/14/2020 and all changes made during CS t the meeting have been incorporated in the attached document. The County an optiot Attorney's Office has reviewed the changes, if applicable. this line;. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC, all changes directed by the BCC have been made,and the document is ready for the III ', an option for. Chairman's signature. this line Rc6-ed rorn OlituJe Tral 1 6 A 26 WORK ORDER/PURCHASE ORDER Contract#14-6213 "Underground Utility Contracting" Contract Expiration Date: July 7,2020 This Work Order is for professional services for work known as: Project Name:Neptune Canal Maintenance Access Boat Ramp Project No: 60221 The work is specified in the proposal dated November 11, 2019, which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Mitchell and Stark Construction Co. Inc. Scope of Work: As detailed in the attached proposal and the following: Task I: Neptune Canal Maintenance Access Boat Ramp Improvements Schedule of Work: Complete work within 60 days from the date of the Notice to Proceed which is accompanying this Work Order. The Contractor agrees that any Work Order that extends beyond the expiration date of Agreement# 14-6213 will survive and remain subject to the terms and conditions of that Agreement until the\completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above,the County will compensate the Firm in accordance with following method: ® Negotiated Lump Sum (NLS) as provided in the attached Bid Schedule. Task I:Neptune Canal Boat Ramp Improvements $ 140,313.51 TOTAL FEE $ 140,313.51 0\\ y'. 4 7/ 4 „tit( PREPARED BY Chad Sweet, P.E,PMP, Senior Project Manager Date Transportation Engineering Division 4 APPROVED BY: `� _ _. /DaJ Tranypprtation '.ngineering 1 ivisivn APPROVED BY: /1/All,„(// _ (, f'lg / _._._. Thaddeus Cohen,Department Head [)ate Growth Management Department Page 1 of 3 16 26 By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that,to the best of their knowledge and belief, all relevant facts concerning past,present, or currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Mitchel and Stark Construction Co. Inc. - /r A-A.It 5 Brian Penner,President Date a Page 2 of 3 CM) 16 A 26 IN WITNESS WHEREOF,the parties hereto, have each,respectively, by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: ,'. R.' ,c., BOARD OF C S COMMISSIONERS Crystals :'.k.inzet;Clerr1 of Courts COLLIE CO Y,FLS . *A BY 3\ V't :' '' :j..* - . .s:. .. BY ' AA / William L. McDaniel,Jr. Dated. (_......•......_.......__ _..._ Chairman t.as Chairman's Mitchell and Stark Construction Co. Inc. Cst'lfpt l t OniV. By:4----- •/ � ' first Witness Signature 2f2Z4,,/,yt �4d.te- Brian Penner,President TT whnts.ss amet Seeonl Witness /�J AAAA �( TType/print witness name Ap oved as to F / d Legality: ounty Attorney Prn tt t Name Page 3 of 3 • 40 16A26 Neptune Canal Maintenance Access Boat Ramp County Project No.60221 BID SCHEDULE OF VALUES ITEM PANIOTEM DESCRIPTION UNIT QTY. UNIT PRICE PAY ITEM TOTAL 1 101-1 MOBILIZATION ® 1 $15,000.00 $15,000.00 2 110-1-1 CLEARING AND GRUBBING(INCLUDES ASPHALT PAVEMENT, m 0.1 $100,000.00 $10,000.00 GUARDRAIL OBJECT MARKERS ETC. 3 101-1-1 PROVIDE/MAINTAIN"AS BUILT"PLANS(SIGNED AND SEALED) ® 1 $1,200.00 $1,200.00 4 104-10-3 SEDIMENT BARRIER-STAKED SILT FENCE Ell 140 $10.00 $1,400.00 5 104-11 FLOATING TURBIDITY BARRIER(5'CURTAIN MIN.) El 120 $50.00 $6,000.00 6 120-1 REGULAR EXCAVATION m 700 $20.00 $14,000.00 7 160-4 SUB-GRADE STABILIZATION WITH 12"GRAVEL SUB-BASE ® 130 $27.00 $3,510.00 INCLUDES WOVEN FILTER FABRIC 8 522-2 RAMP CONCRETE APPROACH SLAB m 5 $1,308.00 $6,540.00 9 530-3-1 TYPE'A'RIP-RAP SCOUR PROTECTION(INCLUDES GEOTEXTILE ® 50 $105.45 $5,272.50 FABRIC AND 6"BEDDING 10 530-3-4 TYPE'D'RIP-RAP SCOUR PROTECTION(INCLUDES GEOTEXTILE 11125 $105.45 $2,636.25 FABRIC AND 6"BEDDING 11 550-10-222 FENCING,TYPE B,5.1-6.0,W/VINYL COAT,BLACK ® 60 $50.00 $3,000.00 12 570-1-2 PERFORMANCE TURF(SOD) ® 220 $8.00 $1,760.00 13 700-1-11 SINGLE POST SIGN(F&I)(GROUND MOUNT)(UP TO 12 SF) m 1 $750.00 $750.00 14 700-1-50 SINGLE POST SIGN(RELOCATED) m 1 $500.00 $500.00 15 999-1 ARTICULATED CONC.MAT(BOAT RAMP)(F&I)(INCL GEOGRID, ® 1264 $47.84 $60,469.76 GEOTEXTILE,BEDDING STONE 16 999-2 ACCESS SWING BARRIER GATE(20 FOOT-BLACK COATED)(INCL. Ill 1 $2,500.00 $2,500.00 POST FTGS,HARDWARE&OM4-1 SIGNS-2 EA 17 101-1-2 PROVIDE CONSTRUCTION SURVEYING AND LAYOUT ® 1 $5,775.00 $5,775.00 TOTAL$140,313.51