GG MSTU Agenda 12/17/2019Page 1 of 1
GOLDEN GATE BEAUTIFICATION M.S.T.U.
3299 Tamiami Trail East, Suite 103
READ AHEAD Naples, FL 34112 READ AHEAD
AGENDA
DECEMBER 17, 2019
I. CALL TO ORDER
II. ATTENDANCE
Advisory Committee Patricia Spencer – Chair (10/06/2021)
Paula Rogan – Vice Chair (10/06/2019)
Florence “Dusty” Holmes (10/06/2021)
Ron Jefferson (10/06/2022)
- Vacancy -
Staff Michelle Arnold – PTNE Director
Dan Schumacher, Harry Sells – Project Managers
Contractors Mike McGee – Landscape Architect (McGee & Assoc)
Armando Yzaguirre – Grounds Maintenance (A&M Property Maint)
III. PLEDGE OF ALLEGIANCE
IV. APPROVAL OF AGENDA
V. APPROVAL OF MINUTES NOVEMBER 19, 2019
VI. LANDSCAPE MAINTENANCE REPORT – A&M PROPERTY MAINTENANCE
VII. LANDSCAPE ARCHITECT’S REPORTS – MCGEE & ASSOCIATES
A. Tropicana Boulevard
B. Sunshine Boulevard
C. Coronado Parkway & Hunter Boulevard
D. Collier Boulevard, Golden Gate Parkway
VIII. PROJECT MANAGER’S REPORT
A. Budget Report.
B. Bridge Paint.
IX. OLD BUSINESS
X. NEW BUSINESS
XI. PUBLIC COMMENTS
XII. ADJOURNMENT
NEXT MEETING:
JANUARY 20, 2020 AT 4:30PM
GOLDEN GATE COMMUNITY CENTER
November 19, 2019 Golden Gate MSTU 1/4
GOLDEN GATE M.S.T.U. ADVISORY
COMMITTEE
3299 East Tamiami Trail, Suite 103
Naples, FL 34112
NOVEMBER 19, 2019
MINUTES
I. Call to Order
The meeting was called to order at 4:30 P.M. by Ms. Spencer. Attendance was called and a
quorum of three was present.
II. Attendance
Advisory Committee Patricia Spencer – Chair
Paula Rogan (Excused)
Florence “Dusty” Holmes
Ron Jefferson
Vacancy
Staff Dan Schumacher – Project Manager
Landscape Mike McGee – Landscape Architect (McGee & Associates)
Other Wendy Warren – Transcriptionist (Premier)
III. Pledge of Allegiance
The Pledge of Allegiance was recited.
IV. Approval of Agenda
Ms. Spencer moved to approve the Agenda of the Golden Gate Advisory Committee as presented.
Second by Ms. Holmes. Carried unanimously 3 - 0.
V. Minutes
Approval of Minutes: October 15, 2019
Ms. Spencer moved to approve the minutes of the October 15, 2019 meeting as presented.
Second by Ms. Holmes. Carried unanimously 3 - 0.
18.A.2
Packet Pg. 545 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
MINUTES
November 19, 2019 GOLDEN GATE MSTU 2/4
VI. Landscape Maintenance Report
Seventeen (17) pallets of mulch purchased under the Green Effex contract are being stored at the Transit
Station on Radio Road and will be applied to the medians.
VII. Landscape Architect’s Report – McGee & Associates
Mr. McGee summarized the “Landscape Observation Report: - November 4, 2019” noting his
recommendation items highlighted in yellow be addressed immediately.
General
The lack of a maintenance contractor has caused the roadway median landscape plantings
and turf to become heavily weeded. Recent new renovation plantings will be at risk to damage and
replacement because of weed removal, and shrubs located within sight limit areas need to be pruned
for safety purposes. Conditions have been addressed by new contractor.
Tropicana Boulevard
The Restoration Project is complete and there are no issues with new plants.
The WeatherTRAK controller indicated a level amount of water flow, reporting 134,270
gallons of usage for the period from October 1, 2019 to November 2, 2019.
Sunshine Boulevard
Trees specified in the Restoration Project need to be planted.
Newly installed plants are doing well.
Water usage of 170,208 gallons is normal.
Coronado Parkway and Hunter Boulevard
Thirty to forty Garlic plants are missing and should be replaced.
Combined water use as per WeatherTRAK Report was 191,779 gallons.
VIII. Project Manager’s Report
A. Budget Report
Mr. Schumacher summarized the “Golden Gate MSTU Fund Budget 153 dated
November 19, 2019” for information purposes and provided an overview of the budget noting:
FY20 Ad Valorem property tax revenue budget is $443,200.00, an increase of 9% over
FY19. The Millage rate is 0.5000 mils.
Total revenue FY20 is $989,209.50 including investment interest, transfers and
contributions (minus a 5% reserve of $22,600).
Current Operating Expense Budget, excluding Landscape Maintenance and Incidentals, is
$313,309.50 of which Commitments total $119,544.43; Expenditures $798.47.
Uncommitted Operating Expense funds available are $192,966.60.
$29,950.00 recorded on Line 17 for McGee & Associates Landscape Architect is reserved
for median planting restoration.
A Purchase Order for A & M Property Maintenance in the amount of $49,000.00 for
Grounds Maintenance and Landscape Incidentals is reflected on Line 19
Two Purchase Orders for Green Effex in the amount of $24,586.78 will remain active
pending receipt of final invoices.
The Collier County contract with Florida Irrigation Supply (FIS) has expired. The County
opted to “piggyback” off the Lee County contract which includes two contractors, FIS and
Siteone Landscape Supply. Purchase Orders requested for both vendors will be reflected in
the December budget.
18.A.2
Packet Pg. 546 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
MINUTES
November 19, 2019 GOLDEN GATE MSTU 3/4
Florida Power & Light electricity expense, line 21, covers the well pumps and controllers
and decorative street lighting. Median and conventional streetlights are leased. Tropicana
Boulevard lights are converted to LED lamps and should function more efficiently.
Improvements General Fund, Line 35, reserved to fund capital projects, available balance is
$580,000.00.
Total available balance, less committed expenses, is $868,000.12.
B. Grounds Maintenance Service – Interim PO Awarded
Contract Award
Initial bids for interim Landscape Maintenance Service were high, consequently a second
Invitation to Bid was posted on Bid-Sync, the County’s internet-based quote solicitation system.
A & M Property Maintenance was awarded the six-month Contract and a Notice-to-Proceed
issued. Service will be performed on Fridays every two weeks.
In early December, an Invitation to Bid will be posted on Bid-Sync for a multi-year Landscape
Maintenance contract - advertised for thirty (30) days.
Perennial Peanut Maintenance and Mulch
1. Perennial Peanut will be pruned with “String Trimmers” and weeds removed by hand or
with herbicide treatment.
2. Seventeen (17) pallets of mulch purchased under the Green Effex contract, stored at the
Transit Station on Radio Road, possibly applied to the medians prior to the holidays.
IX. Old Business
Mr. Schumacher will contact Sunny Hertz to confirm interest in appointment to the Golden Gate
M.S.T.U. Beautification Advisory Committee.
X. New Business
A new flag will be installed on Median #12, Golden Gate Parkway, by the Golden Gate entrance sign.
XI. Public and Board Comments
Mr. Schumacher will research the paint product used on the bridge overpass in the Bayfront/Tin City
vicinity for potential application to the Canal Bridge fencing on Golden Gate Parkway.
XII. Adjournment
There being no further business to come before the Committee, the meeting was adjourned
by the Chair at 5:05 P.M.
GOLDEN GATE MSTU ADVISORY COMMITTEE
________________________________
Patricia Spencer, Chair
The Minutes were approved by the Committee on ,2019 as presented______, or as
amended ______.
18.A.2
Packet Pg. 547 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
MINUTES
November 19, 2019 GOLDEN GATE MSTU 4/4
NEXT MEETING:
DECEMBER 17, 2019 – 4:30 PM
GOLDEN GATE COMMUNITY CENTER
4701 GOLDEN GATE PARKWAY
NAPLES, FL 34116
18.A.2
Packet Pg. 548 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
Golden Gate MSTU
FY20
12-17-2019
FY-20 Vendor Item PO# Budget Commitments Expenditures
Budget
Remainder
1 CUR AD VALOREM TAX (443,200.00)$ -$ (94,894.74)$ (348,305.26)$
2 DEL AD VALOREM -$ -$ -$ -$
3 OVERNIGHT INTEREST -$ -$ (194.11)$ 194.11$
4 INVESTMENT INTEREST (8,000.00)$ -$ (1,109.73)$ (6,890.27)$
5 INTEREST TAX COLLECTOR -$ -$ -$ -$
6 INS CO REFUNDS -$ -$ -$ -$
7 REVENUE STRUCTURE (451,200.00)$ -$ (96,198.58)$ (355,001.42)$
8 TRANS FROM PROPERTY APPRAISER -$ -$ -$ -$
9 TRANS FROM TAX COLLECTOR -$ -$ -$ -$
10 CARRY FORWARD GEN (539,400.00)$ -$ -$ (539,400.00)$
11 CARRY FORWARD OF ENCUMB (21,209.50)$ -$ -$ (21,209.50)$
12 NEG 5% EST REV 22,600.00$ -$ -$ 22,600.00$
13 TRANSFERS & CONTRIB (538,009.50)$ -$ -$ (538,009.50)$
14 TOTAL REVENUE (989,209.50)$ -$ (96,198.58)$ (893,010.92)$
15 WORKERS COMPENSATION 100.00$ 3.74$ -$ 96.26$
16 PERSONNEL SERVICES 100.00$ 3.74$ -$ 96.26$
17 ENG. FEES & OTHERS McGee & Associates Landscape Architect 4500199237 50,000.00$ 24,360.00$ 1,590.00$ 24,050.00$
18 INDIRECT COST REIMBURSE Collier County Indirect Cost Direct Pay 6,700.00$ 3,350.00$ 3,350.00$ -$
19 LANDSCAPE INCIDENTALS Incidentals 30,000.00$ -$ -$ 30,000.00$
20 Green Effex Roadway Median Replanting 4500196360 21,209.50$ -$
21 Green Effex Grounds Maint. 4500200198 -$ 3,577.28$
22 A&M Property Maint. Grounds Maint. 4500200209 41,700.00$ 7,300.00$
23 OTHER CONTRACTUAL 171,209.50$ 62,909.50$ 10,877.28$ 97,422.72$
24 ELECTRICITY FPL Electricity 4700004073 3,500.00$ 2,441.47$ 438.53$ 620.00$
25 RENT EQUIPMENT J.M. Todd Shared Copier Lease 4500199713 300.00$ 133.06$ 133.06$ 33.88$
26 INSURANCE GENERAL Collier County Insurance General Direct Pay 600.00$ 600.00$ -$ -$
27 FIS - Florida Irrigation Supply Pumps & related items 4500198923 2,000.00$ 360.00$
28 FIS - Florida Irrigation Supply Pumps & related items 4500200705 2,000.00$
29 Site One Pumps & related items 4500200879 2,000.00$
30 SPRINKLER SYSTEM 10,000.00$ 6,000.00$ 360.00$ 3,640.00$
31 MULCH 16,000.00$ -$ -$ 16,000.00$
32 LIGHTING MAINTENANCE Hart's Electrical Lighting Maintenance 4500198904 12,000.00$ 5,000.00$ -$ 7,000.00$
33 LICENSE & PERMITS Licenses & Permits Collier County - Cartegraph 2,000.00$ -$ -$ 2,000.00$
34 OTHER MISCELLANEOUS Premier Staffing Transcriptionist 4500199301 3,000.00$ 2,306.95$ 193.05$ 500.00$
35 OFFICE SUPPLIES Office Supplies 300.00$ -$ -$ 300.00$
36 COPYING CHARGES J.M. Todd Copier CPC 4500199712 300.00$ 273.35$ 26.65$ (0.00)$
37 FERT HERB CHEM 7,000.00$ -$ -$ 7,000.00$
38 OTHER OPERATING Hydropoint data Provide Irrigation Controller Sup Visa Payment 200.00$ -$ 548.00$ (348.00)$
39 OTHER TRAINING 200.00$ -$ -$ 200.00$
40 OPERATING EXPENSE 313,309.50$ 107,374.33$ 17,516.57$ 188,418.60$
41 IMPROVEMENTS GENERAL 580,000.00$ -$ -$ 580,000.00$
42 CAPITAL OUTLAY 580,000.00$ -$ -$ 580,000.00$
43 TRANS FROM 152 FUND TO 111 FUND Reimbursement for Staff Support 52,600.00$ -$ -$ 52,600.00$
44 TRANS FROM PROPERTY APPRAISER 4,200.00$ -$ 862.67$ 3,337.33$
45 TRANS FROM TAX COLLECTOR 10,000.00$ -$ 2,147.89$ 7,852.11$
46 TRANSFERS 66,800.00$ -$ 3,010.56$ 63,789.44$
47 RESERVES FOR CONTINUING OPERATIONS - INSURANCE 29,000.00$ -$ -$ 29,000.00$
48 RESERVES 29,000.00$ -$ -$ 29,000.00$
49 TOTAL BUDGET 989,209.50$ 107,378.07$ 20,527.13$ 861,304.30$
797,305,507 FY 10 Final Taxable Value Total Available Balance 861,304.30$
548,992,684 FY 11 Final Taxable Value Plus Commited And Not Spent 107,378.07$
478,980,702 FY 12 Final Taxable Value
516,253,177 FY 13 Final Taxable Value Estimated Cash 968,682.37$
533,888,677 FY 14 Final Taxable Value
575,541,732 FY 15 Final Taxable Value
611,031,317 FY 16 Final Taxable Value
673,743,701 FY 17 Final Taxable Value
749,340,700 FY 18 Final Taxable Value
813,136,298 FY 19 Final Taxable Value
886,318,740 FY 20 Final Taxable Value
9.00% Adjustment FY19 to FY20
FY 20 FY 19
Millage 0.5000 0.5000 0.5 mill cap
Extension 443,159 406,568
FY 20 Gross Taxable Value 886,318,740
Minus: New Const. Annex. 4,123,285
Plus: Amendment #1 TV Component 0
Adj. Taxable Value 882,195,455
Prior year FY19 Levy (Proceeds) 406,568
Rolled Back Rate (less Amend One)0.4609
91% of Rolled Back Rate 0.4194
Estimated Cash Less
Uncollected Ad Valorem Taxes 620,377.11$
18.A.2
Packet Pg. 549 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist Page 1 of 1
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: December 2019
Location: Tropicana Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: Contractor’s Representative:
Observation Date: 12/01/2019 Report Date: 12/03/2019 Report No.: 3 (FY-20)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
All locations: X X 25 Recommended all Sabal palms be pruned at this time and have any lower and/or loose
frond boots removed from the trunks.
X X 25 All paver areas need to be pressure washed. M&A: Wet and Forget Product maybe tested
Median #1 X X 25 First Oak tree needs structural and corrective pruning.
Median #2 X X 25 (3) Oaks need minor dead branch pruning.
Pedestrian shelter at 31st Ave.SW
Median #3 Bridge X X 9 Review Blueberry flax lily for insects/snails and/or disease due to the decline of the bed.
Remove dead foliage and pull away any mulch in contact with plant bases.
M&A: 6/10/19 Recommend removing north side Flax lily
and replant with Yellow African iris 1 gal., Approx. 36
plants 4’ o.c., 4’ off back of curbing and guard r ail.
X X 25 North end Oak needs minor dead branch pruning.
Median #4 X X 25 At address 2900: Oak needs minor dead branch pruning
Pedestrian Shelter at 28th Ave.SW
Median #5 X X 25 At address 2600: Oak 18” caliper, 50% damaged in main trunk from broken off large
branch.
Recommend removal and replace. M&A: 7/9/18: Remove
Oak tree and grind stump to planting depth and remove
debris. Backfill any hole to match existing profile with
clean native topsoil (3 c.y. +/-). Install (1) Quercus
virginiana ‘Cathedral’ Live Oak 14’-16’ ht., 7’-8’ spr, 6”-7”
cal., 44” B&B or 100 gal.
X X 25 At address 2582: Holly tree has upper trunk damaged. Needs structural and corrective
pruning to regrow new main leader.
X X 24 At address 2530: Jacaranda tree needs structural and corrective pruning.
QUARTERLY ADDRESSED
Accent/Street Lighting No major issue observed.
Lighting Disconnect & Sensor
Locations
East R/W between 13th Ave. & PL. Lighting Disconnect & Sensor
West Alley off 28th Ave. SW Lighting Disconnect & Sensor
West R/W in Alley between G.G. Pkwy. & 26th PL. SW, Lighting Disconnect & Sensor
West R/W at corner of 30th PL. SW & Tropicana Lighting Disconnect & Sensor
Fertilizations: X X Refer to FY-19-20 schedule.
Irrigation: X Previous month water use total per WeatherTrak controller estimate data was 91,307
gallons. The pump master valve register indicates 88,222 gallons used.
18.A.2
Packet Pg. 550 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
Page 1 of 2
12/3/2019 7:54:19 AM PT
Do Not Distribute without Permission.
Copyright (c) 2019 Hydropoint Data Systems, Inc.All rights reserved.
Created by Mik McGee
(mcgeeassoc@aol.com)
Collier County
09012040 - 2001 Tropicana
Site: Golden Gate MTSU Single Controller
Measured Usage History Report
18.A.2
Packet Pg. 551 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist Page 1 of 3
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: December 2019
Location: Sunshine Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: A & M Property Management Contractor’s Representative:
Observation Date: 12/01/2019 Report Date: 12/03/2019 Report No.: 3 (FY-20)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
All locations X X 14 All turf areas need to be treated for broadleaf weeds.
X 16 Median numbers on the ends of medians need to be refreshed.
X X 16 Recommended all Sabal palms be pruned at this time and have any lower and/or loose
frond boots removed from the trunks.
Median #1 X 31 There exist considerable areas within the turf invested with weeds and/or dead spots.
X 43 On the north end about 60 L.F. of Juniper has been damaged. It appears to have been
run over. Prune out damaged and dead foliage. (Photo)
M&A 11/12/18: Review Juniper bed for replacements.
X 55 Two Juniper plants have been damaged and need to be replaced with 3 gal. size.
Median #2 X X 16 At address 2184: South end of Plumbago shrub bed needs to have dead plants removed
and new plants installed. (9) 3 gal. size Plumbago.
X X 16 At address 2160: North end of Plumbago shrub bed needs to have dead plants removed
and new plants installed. (5) 3 gal. size Plumbago.
X X 19 At address 2172: Plumbago shrub beds contain defoliated plants. Review for insects and
prune out dead wood.
M&A: 1/7/19 Shrubs are dry and irrigation coverage needs to
be reviewed, as well as possible additional heads added.
X X 25 At address 2052: Juniper runover. 4-5 plants damaged. Review to remove damaged or
dead and provide count for replacements. 3 gal. size.
X X 25 At address 2184 & 2160: Plumbago shrubs are in poor condition. Review for insects
and/or water stress.
M&A: 8/13/18 Remove dead and replace with same in 3 gal.
size containers. M&A: 1/7/19 Shrubs are dry and irrigation
coverage needs to be reviewed, as well as possible additional
heads added.
X X 25 At address 2224: (1) Tabebuia ‘Ipe’ has lifted and needs to be reset. (1) Tabebuia ‘Ipe’
has been removed. Recommend replacement.
The Tabebuia if reset could use additional soil backfill around
base to cover exposed root system. M&A: 09/11/18 Additional
review of lifted Tabebuia tree has revealed upper canopy
damage from hurricane Irma that will require the tree to be
removed and replaced. M&A: 1/7/19: Install Tabebuia ‘Ipe’,
11’–13’ ht., 3.5” cal., 5’-6’ spr., 36” B&B or 65 Gal.
X X 25 At address 2184: (1) Tabebuia ‘Ipe’ has lifted and needs to be reset.
X X 25 At address 2160: (2) Tabebuia ‘Ipe’ have been removed. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X X 25 At address 2112: (1) Golden Tabebuia damaged. Remove and replace. M&A: 1/7/19: Install Tabebuia ‘Golden’, 11’–13’ ht., 3.5” cal.,
5’-6’ spr., 36” B&B or 65 Gal.
X X 25 At address 2112: (2) Tabebuia ‘Ipe’ damaged. Remove and replace. Alternate tree type could be considered (e,g, Crape myrtle)
Commented [MM1]:
18.A.2
Packet Pg. 552 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 2 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X X 25 At address 2101: (1) Golden Tabebuia damaged. Remove and replace. M&A: 1/7/19: Install Tabebuia ‘Golden’, 11’–13’ ht., 3.5” cal.,
5’-6’ spr., 36” B&B or 65 Gal.
X 32 Address 2112: Replant (13) dwarf Bougainvillea ‘Helen Johnson’ 3 gal. size at location
where water service repair occurred.
X 39 At address 2236: Dead turf area on east side of median apparently due to irrigation
coverage issue. (5' x 40')
X 40 At address 2190- 2196: Dead turf area on east side of median apparently due to irrigation
coverage issue.
X 42 At address 2224 & 2236: Dead turf area on east side of median apparently due to
irrigation coverage issue.
M&A: 7/13/16 Proposals being solicited. M&A: 8/8/16
Replacements approved and installation being scheduled
X 46 At addresses 2184 & 2160: Two Plumbago beds are water stressed. Recommend adding
two sprinkler heads on risers and with rebar supports in the center of the beds. Sprinklers
should have 4' by 15' center strip nozzles.
X 49 At address 20th Ct. SW: 3' x 30' turf area is in decline with dead areas. Review for
replacement.
M&A: 9/17/15 It is indicated this turf area decline is due to
grubs. Recommend to treat entire median for grubs and
review all other turf areas.
X 64 At address 2274: Replace auto accident damaged Juniper on south end of median. M&A: Appears 3-3 gal. plants will be needed. M&A: 7/8/14
another accident has occurred in same location. Approx. 50
L.F. of Juniper damaged. Review and remove damaged and
provide count for replacements. M&A: 11-11-15 Review area
and provide count for replacement Juniper 3 gal. size.(photo)
Median #3 - Pump Station
Location- 5 hp, 6” well, VFD
X X 25 At address 1991: Reset Tabebuia ‘Ipe’.
X X 25 At address 1960: Oak tree needs structural and corrective pruning.
X X X 25 At address 1944: (2) Tabebuia ‘Ipe’ damaged. Remove and replace. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X 25 At address 1944: (1) Silk Floss tree has upper trunk damage. Structural and corrective
pruning needed to regrow main leader.
X X X 25 At address 1945: (2) Tabebuia ‘Ipe’ damaged. Remove and replace. Alternate tree type could be considered (e,g, Crape myrtle)
M&A: 1/7/19: Install Tabebuia ‘Ipe’, 11’–13’ ht., 3.5” cal., 5’-6’
spr., 36” B&B or 65 Gal.
X X 25 At address 1936: Oak tree needs structural and corrective pruning.
X X 25 At address 1900: Oak tree needs structural and corrective pruning.
X 26 Address 1991: Tabebuia tree staking has come apart and need to be removed or reset.
X 27 Address 1960 to 1944: Bougainvillea shrubs have been runover. Prune out damaged
wood and provide count for replacements. (photo)
X 50 At address 1900: 10' x 15' turf area is in decline with dead areas. Review for replacement.
X 59 Light pole accident on south end of median. Multiple Juniper have been run over and are
damaged and broken. Prune out damaged foliage and branches and review in 30 days
for replacements.
M&A: 12-12-14 Damaged plants have been removed. M&A:
11-11-15 Review Juniper for replacement count and submit
estimate.
Commented [MAM2]:
Commented [MM3]:
18.A.2
Packet Pg. 553 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 3 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
Median #4 No major issues
Median #5 X X 25 Oak trees need structural and corrective pruning. M&A: 5/7/28 Prune back branches a minimum of 4-feet away
from fixture.
X 26 Prune Oak tree branches away from light poles. M&A 5-13-19: Light is being blocked by the Oak tree foliage.
Median #6 X 32 Address 1750: Remove (3) declined dwarf Bougainvillea and replant (3) dwarf
Bougainvillea ‘Helen Johnson’ 3 gal. size. Review existing soil and plant roots for any
issues.
X 37 At address 1771: Cut surface circling root. Cut to remove or cut minimum 1-inch wide
section out of the center of the root.
X 42 Previous light pole accident has left some dead and damaged Juniper plants. Provide
count and replacement proposal. (5-6) 3 gal. size replacements.
18th Place SW Median X X X 37 Auto accident damaged 10-15 plants (photo) Recommend removing all the Bougainvillea
and replant median with Perennial Peanut “Ecoturf” variety in 1 gal. 12” o.c., 36” offset
from back of curbing. If all is not approved then recommend doing area of damaged
Bougainvillea. In either case hand watering will be required so it should be included in the
proposal.
M&A: 12/01/19 Bougainvillea not pruned and median contains
weeds.
18th Ave. S.W. Median X X 14 Weeds in perennial peanut. The entire median weeds and Perennial peanut plants have
been apparently killed with herbicide. M&A: 4/8/19 Median will
be replanted in rainy season due to no irrigation. M&A: 9/9/19
Median replanted with perennial peanut, but plants look water
stressed and bed contains weeds. M&A: 12/01/19 Median
contains weeds.
QUARTERLY ADDRESSED
Accent/Street Lighting
Lighting Electric Meters &
Irrigation Controller Electric
Source Locations
Lighting Electric Meter 2271 Sunshine Blvd., 1 SUN, Alley off 23 rd Ave. SW
Lighting Electric Meter & Irrigation Controller Electric, 1995 Sunshine Blvd., 2 SUN, Alley
off 20th PL. SW
Lighting Electric Meter 4642 18th Pl. SW, 3 SUN, North R/W
Fertilizations: X Refer to schedule.
Irrigation: Previous month water use total per WeatherTrak controller estimate data was 149,152
gallons.
Commented [MAM4]:
18.A.2
Packet Pg. 554 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
Page 1 of 2
12/3/2019 8:16:01 AM PT
Do Not Distribute without Permission.
Copyright (c) 2019 Hydropoint Data Systems, Inc.All rights reserved.
Created by Mik McGee
(mcgeeassoc@aol.com)
Collier County
09013515 - 2002 Sunshine
Site: Golden Gate MTSU Single Controller
Measured Usage History Report
18.A.2
Packet Pg. 555 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708 Page 1 of 3
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: December 2019
Location: Coronado Parkway & Hunter Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: A & M Property Management Contractor’s Representative:
Observation Date: 12/01/2019 Report Date: 12/03/2019 Report No.: 3 (FY-20)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
Coronado Pkwy. - All locations X X All areas need mulch applied.
X X All Perennial peanut plantings under weed control process.
X 5 Renovation preparations are underway. M&A 10/14/19: Renovation plantings not complete and on
hold due to contractor closing operations.
X X 18 Recommend that all paver areas be pressure washed following the irrigation conduit
installation.
M&A: “Wet & Forget” test area recommended
X 18 Median numbers need to be refreshed.
X X 25 All canopy type trees need minor broken branches removed.
Median #1- Pavers X 24 Pressure cleaning recommended
Median #2- Pavers X 24 Pressure cleaning recommended
Median #3 X Perennial peanut plantings under weed control process.
X 16 North end Foxtail palm is in serious decline with no new center frond. Removal is
recommended, and any replanting of a new Foxtail should include soil amendments to the
backfill soil. If one more fertilization attempt is to be performed it is recommended t o apply
3 lbs. per palm of Manganese Sulfate within a curb to curb and 10-foot north and south
area away from the trunk.
M&A 11/12/18: Palm is dead and needs to be removed.
Replacement is recommended with review of soil after
removal for amendments. M&A: 12/01/19 Palm removed
replacement recommended.
Median #4 X Perennial peanut plantings under weed control process.
Median #5 X Perennial peanut plantings under weed control process.
Median #6 X Perennial peanut plantings under weed control process.
Median #7 X Juniper plantings need to be reviewed for replacements.
Median #8 X X Juniper plantings need to be reviewed for replacements.
Median #9 - Pavers X Pressure cleaning recommended
Median #10 X Perennial peanut plantings under weed control process.
X X 25 At address 5256: Sabal palm leaning. Reset.
25 At address 5273: (2) Jatropha removed. Consider replacement with alternate plant (e.g. Crape
Myrtles) or leave unplanted and increase shrub or ground
cover plantings. M&A: 7/9/18 Install (1) 15 gal. multi-stem
shrub 4’ ht.
X X X 25 At address 5301: (2) Jatropha removed. Consider replacement with alternate plant (e.g. Crape
Myrtles) or leave unplanted and increase shrub or ground
cover plantings. M&A: 7/9/18 Install (1) 15 gal. multi-stem
shrub 4’ ht.
18.A.2
Packet Pg. 556 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 2 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X X 25 At address 5327: (2) Jatropha removed. Consider replacement with alternate plant (e.g. Crape
Myrtles) or leave unplanted and increase shrub or ground
cover plantings. M&A: 7/9/18 Install (1) 15 gal. multi-stem
shrub 4’ ht.
Median #11 Bridge X Perennial peanut plantings under weed control process.
Median #12 X Perennial peanut plantings under weed control process.
X 39 One Alexander palm on the east end of the median has been cut off at ground level.
Replacement is recommended.
M&A: 10/7/16 Recommend replacement of Alexander palm,
10 ft. clear trunk ht. min.
Median #13 No issues observed
Median #14 No issues observed
Hunter Blvd. - All locations X All areas need mulch applied.
X 5 Renovation preparations are underway.
X 19 Median numbers need to be refreshed.
X X 25 All canopy type trees need minor broken branches removed.
Median #1 X X Juniper plantings need to be reviewed for replacements.
Median #2 X 36 See recommendations for "All Locations" above.
X 56 (3) Big Rose plant is dead. Provide estimate for replacement at 1 gal. size. M&A:
4/15/15 Contractor is trying to locate a nursery supplier.
M&A 7/9/18: Install (3) 1 or 3 gal. Crown of thorn ‘Big Rose’
Median #3 X X X 24 Median received additional flooding during storm and planting bed soil has been removed.
All shrub or ground cover plantings need to be removed. Median will need an additional 4
to 6-inch layer of soil added prior to any renovation planting work. Existing Alexander
palms and Crape myrtles need additional soil placed around exposed root systems as
soon as possible.
M&A: 7/9/18 Renovation Recommendation: Install by
topdressing/backfilling entire median with clean native
topsoil (85 c.y. +/-). Median soil profile to be 4-inch below
top of curbing or pavers and elevate to 4” to 8” above curb
along centerline of median.
Median #4 X 27 Fourth Alexander palm from the north end has died. Please review for possible cause.
Replacement should include fungicide soil drench.
M&A: Do not remove Alexander palm. New Frond has
emerged from the bud. Treat with fungicide and fertilize with
4 lbs. 13-3-13 palm special fertilizer. M&A: 7/9/18 Install (1)
Alexander palm 10’ clear trunk. (24) 3 gal. Juniper ‘Parsonii’
at missing locations between palms.
Median #5
Pump station – Median #5, 7.5
hp, 8” well feeds Hunter &
Coronado, Irrinet in median
controls Piccolos
X Perennial peanut plantings under weed control process.
Median #6 X X 12 At address 2007: Reset Oak.
X X 12 At address 2043: Reset Oak.
X 18 Additional median flooding has washed soil onto the east and west roadways along the
middle to south end of the median. Removal should occur as soon as possible.
X X 25 At address 2116: Reset Oak.
X X 25 At address 2100: Reset Oak.
18.A.2
Packet Pg. 557 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 3 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X X 25 At address 2018: (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4” ht.
Median #7 No issues observed.
Median #8 X At address 5375: Tree removed and planting hole open and coned off.
X At address 5395: Replacement Oak needs to be reviewed for replacement.
Perennial peanut plantings under weed control process.
X X 25 At address 5281: (1) Oak tree reset.
X X X 25 (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4’ ht.
X X 25 At address 5325: Oak tree reset.
25 (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4’ ht.
X X X 25 (1) Jatropha removed. Consider replacement with alternate plant or leave
unplanted and increase shrub or ground cover plantings.
M&A: 7/9/18 Install (1) 15 gal. multi-stem shrub 4’ ht.
Median #9 X X X 42 17 – Big Rose crown of thorn have been partially up rooted due to recent storm winds
and/or fallen trees. It is recommended to dig, replant and hand water in plants. Cut back
plants as required in order for plants to stand upright. 1 – Big Rose plant has been broken
at base and needs to be replaced.
M&A: Additional storm damage to the crown of thorn has
occurred. Recommend removal of all plants and replant
median with dwarf Bougainvillea ‘Helen Johnson’ in 3 gal.
size containers. Provide count and proposal recommended.
M&A 7/9/18: Remove Big Rose install (68) Yellow African
Iris 4’ o.c., 4.5’ off back of curbing in 3 rows.
Median #10 No issues observed.
Median #11 X X 25 35 -40 Society Garlic plants are missing. Replacement recommended. M&A 7/9/18: Install 40 Society Garlic plants, 1 gal., 24” o.c.
in missing locations.
Median #12 No issues observed.
QUARTERLY ADDRESSED
Fertilization: X Refer to schedule.
General Irrigation: X Previous month water use total per WeatherTrak controller estimate data was 100,540
gallons.
18.A.2
Packet Pg. 558 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
Page 1 of 2
12/3/2019 9:03:04 AM PT
Do Not Distribute without Permission.
Copyright (c) 2019 Hydropoint Data Systems, Inc.All rights reserved.
Created by Mik McGee
(mcgeeassoc@aol.com)
Collier County
09105378 - 2003 Hunter Coronado
Site: Golden Gate MTSU Single Controller
Measured Usage History Report
18.A.2
Packet Pg. 559 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708 Page 1 of 3
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: December 2019
Location: Collier Blvd. Part A & B
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division.
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Contractor: Superb Landscaping Contractor’s Representative: Robert Kindelan
Observation Date: 11/04/19 Report Date: 11/05/19 Report No.: 3 (FY20)
AC - Indicates major items recommended to be discussed by Advisory Committee, S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
This report is prepared strictly to provide recommendations only and in no manner is to imply any authorization to the Contra ctor or its Sub-Contractors to perform services for Collier County.
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
Median# 66, 67 & 68 X X 25 It is recommended, post hurricane Irma that a complete renovation review take place to
fully access the existing condition of the plants and to provide a plan for renovation to
occur.
X 32 Magnolia trees need to have the dead branches removed and then the trees need to have
an organic soil top dress added around the root zone (2 to 3-inch depth) and additional 12-
4-8 fertilizer applied at a rate of 1 pound of fertilizer per inch of trunk caliper.
M&A: Post hurricane Irma remaining Magnolia trees should be
reviewed for removal or treatment as listed.
Median# 66 - 74 X 25 Planting beds could use top dressing of mulch. M&A: 5/10/16 Bare ground is present along perimeter of many
planting beds.
Part “A” - West R/W Sign Area X 17 Tabebuia tree was blown over in Irma and needs to be removed.
Median #66 (M.P. #3) X X 25 (3) Magnolia trees have been removed by hurricane. Remove and replace. M&A: 12/11/17 Consider replacement with alternative tree
such as Crape myrtle.
25 (1) Sabal palm has been damaged. Remove and replace.
25 (1) Oak have major main trunk damage and should be removed and replaced.
X 56 Recommend removing Thryallis shrubs and install Sand Cordgrass. M&A: 12/11/17 Post Irma storm has created worst conditions
and renovation is recommended.
Median #67 (M.P. #4) X 5 Just north of pump station (1) large Oak tree has died and needs to be removed.
25 (1) Sabal palm damaged. Remove and replace. M&A: Sabals removed.
25 (7) Magnolia trees have been damaged. Remove and replace. M&A: 12/11/17 Consider replacement with alternative tree
such as Crape myrtle.
25 (2) Maple trees have been damaged. Remove and replace. M&A: 12/11/17 Consider replacement with alternative tree
such as Crape myrtle.
X X 25 Multiple Juniper plants on the north median end are missing.
X X 58 Recommend removing two remaining beds of Red Fountain grass and replant areas with
Silver Saw palmetto’s.
Median #68 (M.P. #5) X X 11 Auto accident on north end east side that damaged Plumbago, Bougainvillea and crown of
thorn plants. Review and replace as required.
X X 25 Multiple Juniper plants on the south median end are missing.
X X 25 (3) Oak trees damaged. Remove and replace.
X X 26 (3) Magnolia trees damaged. Remove and replace. M&A: 12/11/17 Consider replacement with alternative tree
such as Crape myrtle.
X X 31 Dead Sabal needs to be removed. (photo) M&A: 2/14/17 Tree removed and location staked.
Commented [MM1]:
18.A.2
Packet Pg. 560 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Collier Blvd. A & B Report Date: 12/03/19 Report No.: 3 (FY20)
Page 2 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X 33 Remove existing stump of removed tree located on north south side of first Sabal palm
group. (photo)
M&A: 2/14/17 Tree removed and location staked.
X X 38 North end east side auto accident in Big Rose Crown of thorn (10-15) damaged M&A: 10/8/18 Additional auto damage to Crown of thorn and
irrigation heads on north end east side.
X X 42 Review Big Rose crown of thorn on north end for snail activity and/or auto damage.
X X 61 Prune back the deadwood within the Magnolia at the northernmost end. (photo) M&A: Review Magnolia tree appears to be declined enough
for removal. M&A: 10/7/16 Tree cut down. M&A: 11-5-16 Tree
stump needs to be removed and replacement considered.
M&A: 2/14/17 Tree removed and location staked. M&A:
12/11/17 Consider replacement with alternative tree such as
Crape myrtle.
Median #69 (M.P. #6) – Paved
separator
Part “B” - Median# 70 - 74 X X 25 It is recommended, post hurricane Irma that a complete renovation review take place to
fully access the existing condition of the plants and to provide a plan for renovation to
occur.
X 10 One Tabebuia ‘Ipe’ removed from middle of median.
Median #70 (M.P. #7) X X 17 Crape myrtle on north end is defoliated and appears dead.
X X 25 At address 11655: (1) Tabebuia trees needs to be reset.
X X 25 Understory plantings need to be reviewed for replacements. On south end Flax lily and
Plumbago shrubs could be removed and the areas replanted with yellow African iris.
X X 25 Planting beds could use mulch. Bare ground is present along perimeter of many planting
beds.
X 62 Juniper bed on south end of median contains dead plants and brown foliage. Remove both
and provide count for replacements.
Median #71 (M.P. #8) X X 25 At address 11845: Add (2) Crape myrtles.
X X 25 Understory plantings need to be reviewed for replacements. Flax lily, Plumbago and
Thryallis shrubs could be removed and the areas replanted with yellow African iris.
X X 63 Juniper bed on south end of median contains dead plants and brown foliage. Remove both
and provide count for replacements.
X X 66 Plant replacements are needed in multiple areas. Hannula 12/20/13: An estimate cannot be submitted without
knowing the recommended species for replacement and a
plant count. M&A 1-15-14: Please call our office to schedule
an on-site meeting to review median.
Median #72 (M.P. #9) X X 25 Understory plantings need to be reviewed for replacements. Flax lily, Plumbago and
Thryallis shrubs could be removed and the areas replanted with yellow African iris.
X X 25 At address 12025: (2) Oak trees damaged. Remove and replace. (1) Tabebuia trees needs
to be reset. (1) Tabebuia tree damaged. Remove and replace.
M&A: 12/11/17 Consider replacement with alternative tree
such as Crape myrtle.
25 At address 12045: (1) Tabebuia tree damaged. Remove and replace. M&A: 12/11/17 Consider replacement with alternative tree
such as Crape myrtle.
X X 72 Review Juniper on north and south end for replacements due to auto damaged. Hannula 12/20/13: Plant count is needed by next drive
through
Median #73 (M.P. #10) X X 24 At address 12135: (1) Oak tree damaged. Remove and replace.
24 At address 12125: (1) Oak trees damaged. Remove and replace.
X X 66 Review south end Juniper bed for replacements.
Commented [MM2]:
Commented [MM3]:
18.A.2
Packet Pg. 561 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Collier Blvd. A & B Report Date: 12/03/19 Report No.: 3 (FY20)
Page 3 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X 66 Turf areas need to be reviewed for dead areas that need to be replaced. Provide proposal with square footages per median.
Median #74 (M.P. #11) X X 18 On north side of pump station auto accident which damaged existing Cypress tree. Trim off
loose bark around damaged area and allow bark to callus over(photo)
X X 25 At address 12225: (1) Oak tree damaged. Remove and replace.
25 At address 12215: (2) Oak tree damaged. Remove and replace.
25 (1) sabal palm damaged. Remove and replace.
X X 35 On north end one of two Slash pines is declining and removal is recommended. M&A: Recommend replacement with Floss Silk tree. M&A:
12/11/17 One tree damaged and needs to be removed. The
other tree remains but should be removed. M&A: 4/9/18 One
tree removed other should be removed and both replaced with
Floss Silk trees.
X X 39 Median turf areas have dead spots from previous water stressed.
X X 62 Remove dead Indian hawthorn plants and replace. (8) 3 gal. size.
X X 66 Turf areas need to be reviewed for dead areas that need to be replaced. Provide proposal with square footages per median.
West R/W X X 41 Tree branches are below ten feet over sidewalks.
Irrigation: Previous month water use: Part A – 81,771 gallons, Part B – 167,955 gallons.
Part A Pump Station- Median 67 (M.P.#4), New pump station installed 1/18, 5 hp, 6” well, VFD, Motorola controller Electric meter on west R/W at
pump station
Part B Pump Station-Median 74 (M.P. #11), New pump station installed 1/18, 7.5 hp, 6” well, VFD, Motorola controller, Electric Meter West R/W adjacent to Median #9 Address #12225
QUARTERLY ADDRESSED
Part “A” - West R/W Sign Area
Part “A” Medians #66 thru 68 X X 65 These medians need to have renovation plantings. The future roadway construction
appears to be more than 10 years out.
Hannula 12/20/13: An estimate cannot be submitted without
knowing the recommended species for replacement and a
plant count, Area(s) must be white lined during drive-through
upon acceptance of estimate. M&A 1-15-14: Please call our
office to schedule an on-site meeting to review medians.
Part “B” - West R/W Areas
Part “B” Medians #70 thru 74 X 46 Multiple medians and multiple beds need plant replacements.
Commented [MM4]:
18.A.2
Packet Pg. 562 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A Page 1 of 6
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: December 2019
Location: Golden Gate Pkwy.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: Superb Landscaping Contractor’s Representative: Robert Kindelan
Observation Date: 12/01/19 Report Date: 12/0319 Report No.: 3 (FY20)
AC - Indicates major items recommended to be discussed by Advisory Committee, S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
This report is prepared strictly to provide recommendations only and in no manner is to imply any authorization to the Contra ctor or its Sub-Contractors to perform services for Collier County.
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED
Post Hurricane Irma Damage
Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
Median #15 – 21 X 32 Turf has dead areas due to being previously very water stress. M&A: 8/13/18 Dead areas have become overgrown with
weeds.
Median #12 – 29 (3-19) X 64 Medians that contain turf areas. M&A: 02-13-14 The broadleaf weed treatment program
needs to continue for all turf areas. M&A: 12-12-14 It is
estimated that all median with turf have broadleaf
weeds within over 75% to 90% of the turf areas. M&A:
06/11/15 Turf replacement planning is in process. Multiple
medians have been reviewed for replacement by County
staff and the Contractor. An on-site meeting was held and
the following issues were discussed. The broadleaf weed
coverage within the turf areas has improved, but many
median turf areas still need review for replacement of the
turf. It is also recommended that all planting beds be
reviewed with regards to the turf edges being too close to
the plants causing a conflict to occur between the plants,
mowers and edger’s. If the turf is too close then it is
recommended to remove one or two strips of turf with a
sod cutter so to expand the plant bed and create a open
mulch area between the plants and turf. In some locations
this type of turf removal may result in a turf area that is too
small to mow between the back of curb and the plants. It is
recommended that these small turf areas be removed
entirely and the areas be mulched. There will also be areas
between planting beds that will become smaller turf areas
and it may be better to remove these small turf areas and
expand the plantings from the existing beds to cover these
areas where the turf is removed thus tying the planting
beds together. M&A: 8/13/15 Plan preparation is underway
for turf renovations in all medians. M&A: 10/15/15 Sod
Renovation plan completed and submitted. Contractor has
been contacted to prepare proposal/estimate. M&A: 12 -10-
15 Staff response was waiting on proposal from contractor
18.A.2
Packet Pg. 563 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 2 of 6
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
and 2016 rainy season.
Median #32 (1) X 16 Auto has run into the crown of thorn bed. Remove and /or prune out damaged plants.
Review for replacements.
M&A: 10/14/19 Crown of thorn has sutty mold, and all
should be removed and area planted with perennial
peanut. 1 gal. size 18” o.c., 4’ off pavement, curbing or
other plants.
X 63 West end: Indian hawthorn shrubs have multiple dead and/or missing plants. Provide
count of dead, missing or declining plants. If over 50 percent of plants are found to be
dead missing or declining then it is recommended the area be renovated with Blueberry
Flax lily 1 gal. size 36” o.c., 48” over back of curbing and other plants.
M&A: 7/9/14 There are over 50 plants that are dead,
missing or in decline that need to be removed. Provide
proposal to remove existing plants and install Flax lily 1
gal. size
Median #31 (2) X 64 Review Juniper on east end: Provide count of declined, missing or damaged Juniper due
to pedestrian traffic. Approx. (4) plants have brown foliage and (4) plants are damaged.
Median #30 (2A) (Pavers only)
Median #29 (3) X 55 Transplanted Carissa plants are in transplant shock and water stress. Increase irrigation
if it is not already.
2/11/15 M&A: Some plants have turned brown due to
transplant shock. Review for removal if stems are not alive.
M&A: 4/15/15 Dead transplanted Carissa have been
removed. Please update status of any replacements.
M&A:8/13/15 Replacements being addressed in turf
renovation plans.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #28 (4) X X 13 East end bed: Auto accident has damaged Sabal palm and African Iris plants. Sabal must
be removed and replaced. African Iris should be cut back and reviewed for replacements
(6) +/- in 3 gal. size.
X X 20 West end bed: Oak tree sprouts need to be removed from within Liriope plants.
X X 25 At address 4149: Ligustrum tree damaged. Remove and replace.
X 65 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #27 (5) X 63 East end: 3 (5) (10) – Flax lily are dead or missing. Replace with 1 gal. size.
X 65 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #26 (6) X X 25 West end bed: (8 – 10) Thryallis shrubs missing. M&A: 12/11/17 recommend replanting per pervious
renovation plan or with yellow African iris. 1 gal. size.
X X 25 Existing large Pine tree was damaged and removed. Recommend replacement with palm
species due to median width.
X 49 West end bed: Liriope contains large amount of Torpedo grass weed. M&A: 11/11/15 The torpedo grass is taking over the Liriope
plants.
X 55 West end bed: (5) Dead and/or missing Flax lily plants. Install 1gal. size.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #25 (7)
Pump Station- Median #25 (7) east
end, 15 hp, 8” well, VFD, Motorola
Scorpio controller S3405-operates
G.G. Pkwy. Medians 22-32 (1-10)
X 55 Transplanted Carissa plants west of pump station are in transplant shock and water
stress. Increase irrigation if it is not already.
2/11/15 M&A: Some plants have turned brown due to
transplant shock. Review for removal if stems are not alive.
M&A: 4/15/15 Dead transplanted Carissa have been
removed. Please update status of any replacements.
M&A:8/13/15 Replacements being addressed in turf
renovation plans.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #24 (8) X 43 Bahia turf placed in median after Traffic signal installation should be removed and area
mulched. Median never contained turf and if it remains irrigation should be reviewed to
M&A. 03/09/16 Remove Bahia grass and extend Flax lily
plants in 1 gal. size.
18.A.2
Packet Pg. 564 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 3 of 6
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
see if there is proper coverage.
X 72 Provide count to fill in missing Liriope plants in middle area of median. Hannula 1/13/14: Estimate #14-0005; submitted 1/10/14.
Pending fund 111 staff approval, M&A 4/13/16: An updated
proposal should be submitted.
Median #23 (9) X X 22 East End Bed: Sabal palm foliage is beginning to cover face of left turn traffic signal.
X X 25 At address 4463: (1) Sabal palm and (1) Bottle brush trees were damaged. Remove and
replace Sabal.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
X 80 Damaged area has grown over with native grasses and weeds. Apparent auto damage to
turf on west median end. Provide proposal for repair and replacement. (photo)
Plant material to be replaced; sod will not be replaced.
Hannula 1/13/14: Estimate #14-0005; submitted 1/10/14.
Pending fund 111 staff approval, M&A:8/13/15
Replacements being addressed in turf renovation plans.
Median #22 (10) X X 13 West end bed: Dwarf Bougainvillea shrubs contain Torpedo grass weed.
X X 25 On west end (1) Oak damaged. Remove and replace.
X 48 2nd bed from east end: Yellow Iris have torpedo grass within them.
X 49 East end bed: Juniper Parsoni bed is missing (2) plants. Replace with 3 gal. size.
X 52 The invasive exotic Wedelia is taking hold again in the east end turf area. Treat to
remove.
M&A: 5/11/15: Continue treatments. M&A:8/13/15
Replacements being addressed in turf renovation plans.
X X 55 Median in need of renovation due to amount of missing plants in multiple beds. M&A:8/13/15 Replacements being addressed in turf
renovation plans. See Median #12-29 comments above.
X 58 West end bed: (10) Juniper parsoni are missing. Replace with 3 gal. size. M&A:8/13/15 Replacements being addressed in turf
renovation plans. See Median #12-29 comments above.
X 63 East end bed: 3 – White African Iris are dead or missing. Replace with 1 gal. size. M&A: 8-14-14 (3) more additional Iris have declined or
have died. M&A: 11-13-14 There are only (3) remaining Iris
and (2) of those are in decline. It is recommended to
remove the Iris and install a planting of Variegated
Arboricola 'Trinette’ in a three row planting. (45) 3 gal. size
plants would be required. These Iris were originally planted
by the Contractor as a bed expansion. M&A:8/13/15
Replacements being addressed in turf renovation plans.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
X 38 West end turf area: Area has grown over with native grasses and weeds. Previously
water stressed and/or chinch bug damage. Review irrigation coverag e and treat as
required. Remove dead turf and resod. (photo)
Hannula: 11-12-13 On monthly schedule. Hannula's
1/13/14: 1st Treatment Completed on 12/2/13; 2nd
Treatment Scheduled for 01/20/14. 12/27/14 Irrigation
coverage reviewed; irrigation coverage is fine. Estimate
#14-0005; submitted 1/10/14. Pending fund 111 staff
approval
Median #21 (11) X 30 African Iris beds need to have dead foliage removed.
X 31 The east end Flax lily plants are declining and dying. M&A:8/7/17 Bare areas of missing plants exist in the Flax
lily bed. M&A: 8/13/18 Additional Flax lily plants are gone.
Recommend replanting open bed areas with Perennial
Peanut, 1 gal., 18” o.c.
X 56 On the west end of the median there is a pile of construction debris/dirt & rocks at the
back side of the pavers that has been overgrown with weeds. Please review and provide
comments as to how this happened and who may have caused this.
M&A:8/13/15 Being addressed in turf renovation plans.
Commented [s21]:
Commented [s22]:
18.A.2
Packet Pg. 565 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 4 of 6
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X 66 Turf areas in need of replacement. See Quart erly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
X 82 East end bed: Flax lily has Torpedo grass in them. Continue to remove and treat
Torpedo grass in Iris plants.
Hannula: 11-12-13 On weekly schedule. Hannula 1/13/14:
Fucilade to be applied during next herbicide application on
Jan 20th 2014, M&A: 4-12-14 Continue to review and hand
remove Torpedo grass. M&A; 5-14-14 Still minor amounts
of Torpedo grass exist. Continue to review, treat, and
hand remove. M&A: 4/9/18 Due to poor performance of
Flax lily plants it is recommended that African Iris be used.
Median # 20 (12)
Pump Station- Median #20 (12)
west end, 15 hp, 8” well, VFD,
Motorola Irrinet controller #34-
operates G.G. Pkwy. Medians 21-
15 east side of canal, (11-18) &
Hunter Blvd. & Coronado Pkwy.
X 30 Fakahatchee grass and African Iris beds need to have dead foliage removed. Coontie for
insect issues.
X 49 Auto accident on west end bed south side. 3 or 4 Big Rose plants damaged. M&A: 9/17/15 Remove damaged plants. M&A: 10/15/15
Replacements needed. M7A: 03/09/16 There are now 22
dead, missing and/or declining plants. Unsure of the cause,
because it could be due to previous cutback, vehicular or
work within the area.
X 49 Three (3) Fakahatchee grass beds are or have been damaged by insects and the foliage
is typically all brown. Recommend heavy cutback and then retreat for insects. Any
completely dead plants should be replaced with 3 gal. size plants.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #19 (13) X X 39 On the west end south side there are two variegated Pittosporum shrubs that were
damaged during the traffic signal installation. Removal & replacement is recommended.
X X X 39 Previous water stress issues have created dead turf areas.
X 65 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #18 (14) X X 3 Red fountain grass needs pruning to remove dead foliage.
X X 5 Median numbers need to painted on west end of median where new signal was installed.
X X 25 (1) Oak tree damaged. Remove and replace.
X X X 39 Previous water stress issues have created dead turf areas.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
X 68 Turf areas look very bad. Unless an auto accident is to blame the Contractor needs to
address this bad turf area that was under its maintenance. (photo)
Hannula 1/13/14: Estimate #14-0005; submitted 1/10/14.
Pending fund 111 staff approval. M&A:8/13/15
Replacements being addressed in turf renovation plans.
Median #17 (15) X X Ilex tree in middle planting bed is dead and should be removed.
X X 5 Median numbers need to painted on east end of median where new signal was installed.
X X X 39 Previous water stress issues have created dead turf areas.
X 43 At address 4930: Large turf area dead due to water stress from no irrigation coverage. M&A: 4/13/16 The area of turf lost due to lack of water has
increased throughout the median.
X 49 One (1) Fakahatchee grass bed has been damaged by insects and the foliage is typically
all brown. Recommend heavy cutback and then retreat for insects. Any completely dead
M&A: 4/13/16 Plants are water stressed.
Commented [s23]:
18.A.2
Packet Pg. 566 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 5 of 6
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
plants should be replaced with 3 gal. size plants.
X 49 Turf area on south side of median at Sabal palm has had the turf killed by some
chemical. Review and submit proposal for replacement.
M&A:8/13/15 Replacements being addressed in turf
renovation plans.
X 55 2nd bed from west end: Remove remaining Pittosporum and Indian hawthorn shrubs and
then expand adjacent Flax lily plants. (60) 1 gal. size.
M&A:9/17/15 Replacements being addressed in turf
renovation plans. M&A: 3/13/17 Dead plants removed.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #16 (16) X X 11 Prune dead and/or remove Fakahatchee grasses. Replace as needed.
X X X 39 Previous water stress issues have created dead turf areas.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #15 (17 – East of canal) X X 11 Prune dead and/or remove Fakahatchee grasses. Replace as needed.
X X X 39 Previous water stress issues have created dead turf areas.
X X 52 Existing Liriope and Big Rose bed sustained damage. Big Rose plants and Ligustrum
tree has been cut back or removed. It is recommended to remove remaining Big Rose,
Liriope and Ligustrum tree stump and then expand Flax lily plants to the west. It is
estimated about (75) 1 gal. plants will be needed. Review and provide plant count based
upon 36-inch on center spacing and 36 inch offset from back of curbing. bed preparation
should be included to lower existing grade below curbing so that mulch can be retained.
Recommend providing proposal to proper County staff.
See Median #12-29 comments above. M&A:8/13/15
Replacements being addressed in turf renovation plans.
M&A: 4/9/18 Due to poor performance of Flax lily plants it
is recommended that African Iris be used.
X 66 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
X 72 4th bed from east end: Expand Flax lily bed into area of removed plants. Remove all
Indian hawthorn plants. (photo)
Hannula 7/16/13: County postponed replacements until
Oct. 2013., M&A: 9-12-13 Provide proposal to staff for
replacements. M&A: 12-12-13 (1) Indian hawthorn still
needs to be removed at base of Oak tree. Hannula
1/13/14: Indian hawthorn removed.
Median #15 (17) (Old #18 –West of
canal)
X 55 Review Flax lily plants and provide count of dead or missing plants. 1 gal. size. M&A: 4/15/15 Flax lily: Treat for rust disease with systemic
type chemical. Treat for root rot and snails. Remove dead
foliage within and around base of plants. In the f uture
reduce mulch in contact and inside of Lily plants. Existing
mulch depth and caking is not permitting water to penetrate
the soil. Interior sides of plants are dry below mulch. M&A:
4/9/18 Due to poor performance of Flax lily plants it is
recommended that African Iris be used.
Median #14 (#19 – Paver only)
Median #13 (18) (Old #20) X X 11 At address 5263: Auto accident into Firebush bed. Remove damaged and dead and
replace as needed with (2 +/-) 3 gal. size.
X X 25 On east end: (1) Mahogany tree had a large lower branch break off an d the main trunk
has been damaged as a result. Based upon the main trunk damage it is recommended
the tree be considered for removal because of the long-term potential of the main trunk
rotting from standing water and debris. The tree will try to compartmentalize around the
damaged area, but we feel it will have weaken the main trunk to a point of possible major
failure in the future.
M&A: Tree has been removed. Recommend replanting
with Crape myrtle eastward and northward of original
Mahogany tree locations.
X X 25 At address 5251: (1) Oak tree damaged. Remove and replace.
X 63 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #12 (19) (Old #21, Sign)
Pump Station- Median #12 (19) (Old
#21) east end bed, 7.5 hp, 6” well,
X X 15 Auto accident in east end bed Juniper at pump station. Remove damaged and prune out
dead. (8+/-) plants involved (photo)
Commented [s24]:
Commented [MM5]:
18.A.2
Packet Pg. 567 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Date: 12/03/19 Report No.: 3 (FY20)
Page 6 of 6
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
VFD, Motorola Scorpio controller
S3401-operates G.G. Pkwy. Medians
11-15 west side of canal (19-22).
X 63 Turf areas in need of replacement. See Quarterly Addressed section for comments. M&A: 06/11/15 See Median #12-29 comments above.
Median #11 (20) (Old #22)
Irrigation General: No major issues observed. Previous month combined water use: 415,493 gallons
QUARTERLY ADDRESSED
All medians with turf: X 63 Turf areas in need of replacement. Provide proposal to show required turf replacement square
footage for each median. M&A: 06/11/15 See Median #12-
29 comments above. M&A: 8/13/15 Plan preparation is
underway for turf renovations in all medians.
Median #23 (9) X 68 3rd bed from east end: Add 12- 3 gal. Fakahatchee grass in middle of bed. Hannula 7/16/13: County postponed replacements until
Oct. 2013., M&A: 9-12-13 Provide proposal to staff for
replacements. Hannula 1/13/14: Estimate #14-0005;
submitted 1/10/14. Pending fund 111 staff approval. See
Median #12-29 comments above.
Median #17 (15) X 67
2nd bed from west end: Remove declining Variegated Pittosporum and Indian hawthorn
shrubs and replant area with Blueberry Flax Lily. 60 – 1 gal. plants will be needed to
expand westward from existing Flax lily bed.
Hannula 7/16/13: County postponed replacements until
Oct. 2013., Removal on schedule to completed by
9/15/13., M&A: 11-13-14 remove all Pittosporum shrubs
and then replant with Flax lily. Provide proposal. Hannula
1/13/14: Estimate #14-0005; submitted 1/10/14. Pending
fund 111 staff approval, M&A: 4-12-14 Remove additional
dead and dying variegated Pittosporum shrubs. See
Median #12-29 comments above. M&A: 3/13/17 Dead
plants removed. M&A: 2/12/18 Alternate plant choice
instead of Lily could be yellow African Iris. M&A: 4/9/18
Due to poor performance of Flax lily plants it is
recommended that African Iris be used.
18.A.2
Packet Pg. 568 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate Beautification MSTU - December 17,
GG MSTU Collier Blvd. Part A & B , Well Annual Water Use for 2019
12/03/19
Water Use Goal: (Original Part A =1.63 ac. of plants, Part B = 2.74 ac. of plants and turf, Revised Part B = 1.86, New Total Irrigated Area = 3.49 ac.)
Recommended: Supplemental watering rate of .5 to .75 inch per week. Three-quarter inch per week equals 71,076 gallons per week or 284,305 gallons per month.
Combined 2012 total water use: 2,222,816 gallons or 18.73 inches of supplemental water pumped.
Combined 2013 total water use: 3,705,865 gallons or 31.23 inches of supplemental water pumped.
2014 Part B well & pump station relocated on 7/24/14. New well active 09/2014
Combined 2014 total water use: 3,147,554 gallons or 26.26 inches of supplemental water pumped.
Combined 2015 total water use: 1,691,015 gallons or 5.95 inches of supplemental water pumped, data not fully accurate, meter malfunctions A & B
Combined 2016 total water use: 1,866,471 gallons or 26.26 95 inches of supplemental water pumped, data not fully accurate, meter malfunctions A & B
2017: Hurricane Irma delayed readings from 09/17 to 12/17, readings are average over 3 months.
Combined 2017 total water use: 3,620,703 gallons or 50.94 inches of supplemental water pumped. New pump stations installed.
Combined 2018 total water use: 3,147,554 gallons or 31.99 inches of supplemental water pumped.
0
100,000
200,000
300,000
400,000
500,000
Jan-19Feb-19Mar-…Apr-19May-…Jun-19Jul-19Aug-19Sep-19Oct-19Nov-…Dec-19104659A77,05492045189,00768,42832,22233,62259,88974,98981,771098,872146,205B98,264118,971106,501318,90384,981107,08250,136143,813180,525167,9550185,235308,822262,296140,918155,539301,725189,483Non-Potable A
Non-Potable B
2012 AVG (185,235 gal.)
2013 AVG (308,822 gal.)
2014 AVG (262,296 gal.)
2015 AVG (140,918 gal.)
2016 AVG (155,539 gal.)
2017 AVG (301,725 gal.)
2018 AVG (189,483 gal.)
18.A.2
Packet Pg. 569 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate
GG MSTU Golden Gate Parkway Median #12, 20, & 25 Well Annual Water Use for 2019
Water Use Goal: (5.73 ac. of Plants & Turf)
Recommended: Supplemental watering rate of .75 to 1 inch per week. One inch per week equals 155,594 gallons per week or 622,376 gallons per month.
2012 total water use: 10,915,815 gallons or 70.16 inches of supplemental water pumped.
2013 total water use: 6,828,673 gallons or 43.89 inches of supplemental water pumped.
2014 total water use: 7,285,490 gallons or 46.83 inches of supplemental water pump ed.
2015 total water use: 3,111,667 gallons or 20.00 inches of supplemental water pumped, data not fully accurate, meter malfunctions #20 & 25.
2016 total water use: 2,830,251 gallons or 18.19 inches of supplemental water pumped, data not fully accurate, meter malfunctions #20 & 25.
2017: New Meter & Pump stations installed in Median #12, #20 & 25. Readings not annually complete. Hurricane Irma delayed readings 09/17 – 11/17
2017 total water use: 12,287,390 gallons or 78.97 inches of supplemental water pump ed.
2018 total water use: 7,262,588 gallons or 46.67 inches of supplemental water pumped. 12/03/19 Median#12 (19)Median#20 (12)Median#25 (7)2012 AVG (909,651 gal.)2013 AVG (569,056 gal.)2014 AVG (607,124 gal.)2015 AVG (259,306 gal.)2016 AVG (235,854 gal.)2017 AVG (290,616 gal.)2018 AVG (605,215 gal.)0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
Jan-18Feb-18Mar-18Apr-18May-18Jun-18Jul-18Aug-18Sep-18Oct-18Nov-18Dec-1849,212#1238162#1246861#1239871#1230844#1233712#1213959#1214025#1249208#1272126#1258233#120#12183,344#20232863#2085581#20243423#20139671#20115624#2060278#2030436#20107744#20129870#20165293#200#20319,338#25357918#2561943#25291430#25349352#25171153#25142630#2571170#25143813#25186913#25191967#250#25909,651569,056607,124259,306235,854290,616605,215Median#12 (19)
Median#20 (12)
Median#25 (7)
2012 AVG (909,651 gal.)
2013 AVG (569,056 gal.)
2014 AVG (607,124 gal.)
2015 AVG (259,306 gal.)
2016 AVG (235,854 gal.)
2017 AVG (290,616 gal.)
2018 AVG (605,215 gal.)
18.A.2
Packet Pg. 570 Attachment: Golden Gate MSTU Meeting Agenda & Backup - December 17, 2019 (11186 : Golden Gate