Agenda 12/10/2019 Item #16C 8 (Contract #14-6213/134 - Haskins, Inc.)12/10/2019
EXECUTIVE SUMMARY
Recommendation to approve a $708,665 work order to Haskins, Inc., under Request for Quotation
14-6213-134 for Underground Utility Contracting Services for "Village Walk Wastewater System
Modifications," Project Number 70250.
OBJECTIVE: To bring outdated utility infrastructure into compliance with current standards while
meeting the demand for service, protecting public health and safety, and providing proactive
environmental protections.
CONSIDERATIONS: The proposed scope of work is consistent with Project 70046, “Wastewater
Pump Station TSP,” approved by the Board on September 19, 2019. The Village Walk and Bermuda
Isles developments, located on the southeast corner of the intersection of Livingston Road and Vanderbilt
Beach Road, are comprised of six pump stations (152.00, 152.01, 152.02, 152.03, 152.04 and 152.05) that
serve local gravity sewer systems. Pump station (“PS”) 152.00 serves as a community pump station for
the two developments and discharges into a 16-inch force main that runs along the south side of
Vanderbilt Beach Road. The service area of PS 152.00 contains 861 service accounts as well as
commercial parcels that include clubhouses with community pools and tennis courts.
The primary goal of this project is to eliminate PS 152.00 from the system by installing an eight-inch
force main, allowing wastewater flow to bypass PS 152.00 thereby conveying wastewater to community
pump station 152.02. PS 152.02 wastewater pumps require an upgrade to 25 horsepower to maintain t he
capacity; however, the installation of variable frequency drives will allow the station to operate at reduced
speeds, which reduces pump wear and power cost. The confined space valve vault will be eliminated by
moving piping and appurtenances above grade.
In accordance with Collier County utility standards, this project provides connectivity at PS 152.02 for a
standby diesel pump for operational storm resiliency. Staff is procuring the diesel pump separately
resulting in a sales tax savings of approximately $5,500. The condition of PS 152.00 and PS 152.02 have
regressed to “Red: Level 3 - Risked Compliance” as reported to the Board at the October 1, 2013 Asset
Assessment and Management Workshop.
The Procurement Services Division electronically distributed Request for Quotation # 14-6213-13,
“Village Walk Wastewater System Modifications,” on September 19, 2019, to the six vendors under the
Fixed-Term Underground Utilities Contract No. 14-6213. Four of those contractors submitted quotations
by the October 8, 2019, deadline. The quotations are summarized below.
VENDOR QUOTE
Quality Enterprises $ 630,613
Haskins, Inc. $ 708,665
Mitchell & Stark $ 758,787
Douglas N Higgins $ 784,500
Kyle Construction Did Not Quote
Southwest Utility Systems, Inc. Did Not Quote
16.C.8
Packet Pg. 2124
12/10/2019
Staff reviewed the quotations and determined Quality Enterprises USA, Inc., to be the lowest qualified
and responsive bidder; however, Quality Enterprises withdrew from the project stating an error with its
material prices being saved incorrectly in its system. With Quality Enterprises’ withdrawal, staff
recommends awarding this project to the next lowest bidder, Haskins, Inc. (“Haskins”)
The quotes received were approximately 78 percent above the engineer’s cost estimate. The engineer of
record, Johnson Engineering, Inc., (“Johnson”) explains in their bid evaluation letter (Attachment 4) that
the discrepancy is due to market-based price increases, seasonal market pressure and differences in
electrical components that were not adequately accounted for. Johnson also notes that the three
responsive bids were consistent in pricing, as demonstrated in the quote tabulation and graph,
Attachments 1 and 2, respectively. The Procurement Services Division concluded that bidding was
competitive and representative of market conditions. Johnson also recommends award of this work order
to Haskins.
Haskins has a satisfactory performance and warranty record on other similar county utility-related
construction projects. The bid specifications informed the bidders there may be unforeseen conditions
associated with the project. The project cost includes an allowance of $37,000 for owner -directed work
due to unforeseen corrosive or geological conditions that include, but are not limited to, repairs due to
structural deterioration, and/or replacement of defective mechanical equipment and deficient electrical
components. Subject to the Purchasing Ordinance, staff will negotiate a price for any additional work due
to unforeseen conditions prior to the start of any work.
FISCAL IMPACT: The source of funding is Wastewater User Fees Capital Fund (414). A budget
amendment in the amount of $850,000 is required to reallocate funds within the Wastewater User Fee
Capital Fund (414) to cover the construction cost ($708,665), Engineer of Record construction services
(estimated $56,000) and diesel pump and miscellaneous supplies purchase (estimated $85,335). The
project is expected to be completed in 2020. Because a pump station will be eliminated with this pr oject,
operating costs are expected to decrease.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote
for Board approval. -SRT
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
RECOMMENDATION: That the Board of County Commissioners, Ex-officio Governing Board of the
Collier County Water-Sewer District, approve a $708,665 work order under Request For Quotation 14-
6213-134, “Village Walk Wastewater System Modifications,” (Project No. 70250) to Haskins, Inc.,
authorize the necessary budget amendments, and authorize the Chairman to sign the attached Work Order.
Prepared By: Corinne Trtan, PMP, Project Manager, Engineering and Project Management Division
ATTACHMENT(S)
1. Attachment 1 - Quote Tabulation (PDF)
2. Attachment 2 - EPMD Quote Analysis (PDF)
3. Attachment 3 - Request for Quotation (PDF)
4. Attachment 4 - Recommendation Letter (PDF)
5. Attachment 5 - Work Order (PDF)
16.C.8
Packet Pg. 2125
12/10/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.8
Doc ID: 10884
Item Summary: Recommendation to approve a $708,665 work order to Haskins, Inc., under
Request for Quotation 14-6213-134 for Underground Utility Contracting Services for "Village Walk
Wastewater System Modifications," Project Number 70250.
Meeting Date: 12/10/2019
Prepared by:
Title: Project Manager – Public Utilities Planning and Project Management
Name: Corinne Trtan
11/15/2019 1:27 PM
Submitted by:
Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management
Name: Tom Chmelik
11/15/2019 1:27 PM
Approved By:
Review:
Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 11/15/2019 1:49 PM
Wastewater Steve Nagy Additional Reviewer Completed 11/15/2019 2:03 PM
Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 11/15/2019 3:08 PM
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 11/15/2019 3:20 PM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 11/15/2019 3:44 PM
Public Utilities Planning and Project Management Craig Pajer Additional Reviewer Completed 11/15/2019 4:31 PM
Procurement Services Evelyn Colon Additional Reviewer Completed 11/18/2019 9:48 AM
Wastewater Beth Johnssen Additional Reviewer Completed 11/18/2019 9:50 AM
Procurement Services Patrick Boyle Additional Reviewer Completed 11/18/2019 10:22 AM
Procurement Services Ted Coyman Additional Reviewer Completed 11/19/2019 1:41 PM
Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 11/19/2019 3:20 PM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 11/22/2019 9:07 AM
County Attorney's Office Scott Teach Level 2 Attorney Review Completed 11/25/2019 8:33 AM
Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 11/25/2019 8:46 AM
Office of Management and Budget Susan Usher Additional Reviewer Completed 11/25/2019 11:33 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/25/2019 1:06 PM
16.C.8
Packet Pg. 2126
12/10/2019
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 12/03/2019 9:23 AM
Board of County Commissioners MaryJo Brock Meeting Pending 12/10/2019 9:00 AM
16.C.8
Packet Pg. 2127
Description Quality Enterprises Haskins Inc.Mitchell & Stark Higgins Kyle Construction Southwest
Section 1: General
Mobilization/Demobilization (5% Base Bid Maximum)$30,000.00 $12,700.00 $25,000.00 $37,000.00
Section 1: Subtotal $30,000.00 $12,700.00 $25,000.00 $37,000.00
SECTION 2: FORCE MAIN
Force Main Piping $145,258.00 $116,700.00 $191,000.00 $260,000.00
SECTION 2: SUBTOTAL $145,258.00 $116,700.00 $191,000.00 $260,000.00
Section 3: LIFT STATION 152.02 UPGRADES
Lift Station Upgrades $418,355.00 $542,265.00 $505,787.00 $450,500.00
SECTION 3: SUBTOTAL $418,355.00 $542,265.00 $505,787.00 $450,500.00
SECTION 4: ALLOWANCES
Allowance $37,000.00 $37,000.00 $37,000.00 $37,000.00
SECTION 4: SUBTOTAL $37,000.00 $37,000.00 $37,000.00 $37,000.00
Total Bid $630,613.00 $708,665.00 $758,787.00 $784,500.00 NO BID NO BID
BID TABULATION
ULITILIZING CONTRACT 14-6213 UNDERGROUND UTILITIES
14-6213-134 Village Walk Wastewater System Modifications
1 of 1
16.C.8.a
Packet Pg. 2128 Attachment: Attachment 1 - Quote Tabulation (10884 : Village Walk WW System Modifications)
$0$100,000$200,000$300,000$400,000$500,000$600,000$700,000$800,000$900,000Eng Est Quality Enterprises Haskins Inc. DN Higgins, Inc. Mitchell & StarkQuote Results for Village Walk Wastewater System ModificationsKEY:Dashed Green‐AVERAGE BIDDashed black‐+/‐1 std devof avgbidDottedred‐+/‐20% of engestimate forhorizontalconstruction16.C.8.bPacket Pg. 2129Attachment: Attachment 2 - EPMD Quote Analysis (10884 : Village Walk WW System Modifications)
16.C.8.cPacket Pg. 2130Attachment: Attachment 3 - Request for Quotation (10884 : Village Walk WW System Modifications)
16.C.8.cPacket Pg. 2131Attachment: Attachment 3 - Request for Quotation (10884 : Village Walk WW System Modifications)
Collier County
COLLIER COUNTY PUBLIC UTILITIES
Solicitation 14-6213-134
ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE
1 Mobilization/Demobilization (5% Base Bid Maximum)1 LS $ 12,700.00 $ 12,700.00
$ 12,700.00
ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE
2 Force Main Piping 1 LS $ 116,700.00 $ 116,700.00
$ 116,700.00
ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE
3 Lift Station 152.02 Upgrades 1 LS $ 542,265.00 $ 542,265.00
$ 542,265.00
ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE
4
Allowance: An allowance for unforeseen conditions will be made at
the appropriate contract price of Time & Materials, Lump Sum, and/or
Contract Unit Price. Use of the Allowance must be approved by
Collier County prior to the
execution of the work.
1
T&M/ LS/
Unit
$ 37,000.00
$ 37,000.00
9/20/2019 1:38 PM 1
p. 7
Village Walk Wastewater System Modifications BID SCHEDULE
SECTION 1: GENERAL
SECTION 1 SUBTOTAL:
SECTION 2: FORCE MAIN PIPING
SECTION 2 SUBTOTAL:
SECTION 3: LIFT STATION 152.02 UPGRADES
SECTION 3 SUBTOTAL:
SECTION 4: ALLOWANCE
SECTION 4 SUBTOTAL:
SUMMARY
Section 1: General 12,700.00$
TOTAL:708,665.00$
Section 2: Force Main Piping 116,700.00$
Section 3: Lift Station Upgrades 542,265.00$
Section 4: Allowance 37,000.00$
16.C.8.c
Packet Pg. 2132 Attachment: Attachment 3 - Request for Quotation (10884 : Village Walk WW System Modifications)
2122 Johnson Street ■ Post Office Box 1550 ■ Fort Myers, Florida 33902-1550
(239) 334-0046 ■ Fax (239) 334-3661
SINCE 1946
December 2, 2019
Via Email Only: Corinne.Trtan@colliercountyfl.gov
Ms. Corinne Trtan
Collier County Public Utilities - EPMD
3339 Tamiami Trail East, Suite 303
Naples, FL 34112-5361
RE: Bid Recommendation for Collier County 14-6213-134
Project: Village Walk Wastewater System Modifications
Low Bidder: Haskins, Inc.
Dear Ms. Trtan:
The bid opening for the above-referenced project took place on Tuesday, October 8th, 2019 at
3:00 p.m. Collier County received four responsive bids for this project. Quality Enterprises has
been allowed to withdraw their bid, leaving three responsive bids for this project.
BIDDER TOTAL BID
Quality Enterprises BID WITHDRAWN
Haskins, Inc. $708,665
Mitchell & Stark $758,787
Higgins $784,500
Kyle Construction NO RESPONSE
Southwest NO RESPONSE
Following the bid opening, Collier County prepared the enclosed Bid Tabulation Analysis, which
includes an analysis for mathematical errors. No errors were discovered. The results show Haskins,
Inc. as the low bidder.
For comparison purposes, Johnson Engineering provided Collier County with an Opinion of
Probable Construction Cost (OPC) in the amount of $398,700 for the project. Johnson Engineering
acknowledges that the OPC provided to the County was approximately 78% lower than the lowest
responsive bid received. The discrepancy between the OPC and bids received is evident in Item
No. 3. Lift Station 152.02 Upgrades. For clarification, we offer that our OPC was developed using
bid results for Collier County projects 16-6652 Rehabilitation of Duplex Wastewater Pump
Stations Group 1 and 16-6659 Wastewater Basin 306 Duplex Stations Group 2. These projects are
similar in scope to the Village Walk project with respect to lift station rehabilitation. Lift station
16.C.8.d
Packet Pg. 2133 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System Modifications)
Ms. Corinne Trtan
Re: Collier County RFB 14-6213-134
Low Bidder: Haskins, Inc.
December 2, 2019
Page 2 of 2
rehabilitations for these comparison projects ranged between approximately $170,000 and
$525,000, with most station rehabilitations costing approximately $250,000 (see attached).
Upon further review, we believe the discrepancy is due to the following:
• Market-based price increases that occurred between bidding of the comparison projects
and this project.
• Electrical component differences between the comparison projects and this project were
not adequately accounted for. These changes increase material costs. For example, the
comparison projects utilized off-the-shelf Data Flow Systems components for the control
panel and SCADA. Pump Station 152.02 will utilize a programmable logic controller
(PLC) and supporting hardware that increases the material cost for the control panel.
• Market pressures may have increased costs as we approach the end of the year. Different
types of work may experience unique pricing pressures based on labor demands. In general,
it is difficult to identify pricing pressures except through the bid process. The contribution
of market pricing pressures to the discrepancy is difficult to quantify but may be a
contributing factor.
We note that the three responsive bids for this project are consistent in pricing. This is evidence
that the County has received competitive market pricing for this project. It is unlikely that lower
bids would be received if the County were to re-advertise this project.
In our opinion, Haskins, Inc. appears to be a reasonable and responsive bid. Subject to concurrence
with the County’s Purchasing and Contracts Administration Division, we believe selection of
Haskins, Inc. by Collier County for the intended work contained within the bid documents would
be an appropriate choice. Should you have any questions, or require additional information, please
let me know.
Very truly yours,
David B. Trouteaud, P.E.
Project Manager
DBT / ljb
Enclosures
20149700-157
16.C.8.d
Packet Pg. 2134 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System Modifications)
Description Quality Enterprises Haskins Inc.Mitchell & Stark Higgins Kyle Construction Southwest
Section 1: General
Mobilization/Demobilization (5% Base Bid Maximum)$30,000.00 $12,700.00 $25,000.00 $37,000.00
Section 1: Subtotal $30,000.00 $12,700.00 $25,000.00 $37,000.00
SECTION 2: FORCE MAIN
Force Main Piping $145,258.00 $116,700.00 $191,000.00 $260,000.00
SECTION 2: SUBTOTAL $145,258.00 $116,700.00 $191,000.00 $260,000.00
Section 3: LIFT STATION 152.02 UPGRADES
Lift Station Upgrades $418,355.00 $542,265.00 $505,787.00 $450,500.00
SECTION 3: SUBTOTAL $418,355.00 $542,265.00 $505,787.00 $450,500.00
SECTION 4: ALLOWANCES
Allowance $37,000.00 $37,000.00 $37,000.00 $37,000.00
SECTION 4: SUBTOTAL $37,000.00 $37,000.00 $37,000.00 $37,000.00
Total Bid $630,613.00 $708,665.00 $758,787.00 $784,500.00 NO BID NO BID
BID TABULATION
ULITILIZING CONTRACT 14-6213 UNDERGROUND UTILITIES
14-6213-134 Village Walk Wastewater System Modifications
1 of 1
16.C.8.d
Packet Pg. 2135 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System
Notifications Sent: 2120
Downloaded: 106
Submittals: 8
1 Mobilization / Demobilization LS (Limited to 10% of
Total Bid) $168,321.79 $120,000.00 $90,000.00 $45,000.00 $22,750.00 $142,092.00 $337,000.00 $385,000.00
2 Pump Station 303.01 LS $177,673.78 $179,820.00 $208,910.00 $215,000.00 $230,396.28 $234,874.00 $324,000.00 $445,200.00
3 Pump Station 303.02 LS $178,278.12 $183,000.00 $225,660.00 $220,000.00 $237,554.38 $242,646.00 $328,000.00 $452,200.00
4 Pump Station 303.04 LS $234,759.91 $285,000.00 $359,950.00 $396,000.00 $405,585.48 $418,230.00 $525,000.00 $485,000.00
5 Pump Station 303.06 LS $183,410.80 $186,000.00 $212,010.00 $228,000.00 $237,800.80 $224,448.00 $338,000.00 $426,200.00
6 Pump Station 303.07 LS $184,423.47 $184,000.00 $214,760.00 $215,000.00 $233,811.87 $222,630.00 $309,000.00 $437,250.00
7 Pump Station 306.01 LS $184,887.18 $202,000.00 $224,410.00 $215,000.00 $243,414.78 $237,504.00 $332,000.00 $522,500.00
8 Pump Station 306.02 LS $185,760.18 $220,000.00 $224,560.00 $230,000.00 $253,235.96 $254,312.00 $346,000.00 $452,000.00
9 Pump Station 306.03 LS $182,415.27 $198,000.00 $222,460.00 $283,000.00 $246,182.67 $222,343.00 $345,000.00 $445,600.00
10 Pump Station 306.04 LS $183,069.51 $192,000.00 $223,360.00 $275,000.00 $251,730.65 $227,920.00 $327,000.00 $465,000.00
11 Landscaping Allowance for Use as Directed by
Owner TM $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00
12 General Allowance for Use as Directed by Owner TM $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00
$2,013,000.01 $2,099,820.00 $2,356,080.00 $2,472,000.00 $2,512,462.87 $2,576,999.00 $3,661,000.00 $4,665,950.00
E Verify Yes Yes Yes Yes No Yes Yes Yes
Florida Division of Corporations Yes Yes Yes Yes Yes Yes Yes Yes
Material Manufacturers Yes Yes Yes Yes Yes Yes Yes Yes
List of Major Subcontractors Yes Yes Yes Yes Yes Yes Yes Yes
Statement of Experience Yes Yes Yes Yes Yes Yes Yes Yes
Trench Safety Act Yes Yes Yes Yes Yes Yes Yes Yes
Substitute W-9 Yes Yes Yes Yes Yes Yes Yes Yes
Bid Bond Yes Yes Yes Yes Yes Yes Yes Yes
Bidders Check List Yes Yes Yes Yes Yes Yes Yes Yes
Insurance Certificate Yes Yes Yes Yes Yes Yes Yes Yes
Project Manager; John Eick
Procurement Strategist: Swainson Hall
Douglas N.
Higgins, Inc
Jafer
Construction
Corp
Coastal
Concrete
Products
Hinterland
GroupBLDM USABid Item and Description Basis of Payment Mitchell &
StarkHaskins Inc
Opened By: Swainson Hall, Procurement Strategist
Witnessed By: Matthew Catoe, Procurement Strategist
US Water
Services
COLLIER COUNTY PUBLIC UTILITIES
16-6652 REHABILITATION OF DUPLEX WASTEWATER PUMP STATIONS GROUP 1
BID TABULATION
TOTAL BID (Add Items No.1 Through No.12)
16.C.8.d
Packet Pg. 2136 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System
Notifications Sent: 2126
Downloaded: 84
Submittals: 8
1 Mobilization / Demobilization LS (Limited to 10% of
Total Bid) $151,557.00 $100,000.00 $199,543.99 -$80,000.00 $144,000.00 $100,000.00 $220,000.00
2 Pump Station 304.01 LS $167,817.97 $199,000.00 $191,629.22 $235,800.00 $224,660.00 $233,000.00 $271,270.00 $299,000.00
3 Pump Station 304.04 LS $159,559.25 $177,000.00 $173,753.06 $205,000.00 $209,560.00 $218,000.00 $271,270.00 $268,500.00
4 Pump Station 304.05 LS $165,408.23 $184,000.00 $177,516.01 $212,000.00 $218,960.00 $225,000.00 $271,270.00 $275,500.00
5 Pump Station 304.06 LS $164,608.22 $169,000.00 $162,167.87 $202,000.00 $189,460.00 $215,000.00 $271,270.00 $259,000.00
6 Pump Station 304.12 LS $166,127.41 $176,000.00 $172,843.62 $202,000.00 $204,410.00 $212,000.00 $271,270.00 $263,000.00
7 Pump Station 304.13 LS $159,994.86 $169,000.00 $161,603.85 $202,000.00 $191,060.00 $211,000.00 $271,270.00 $250,000.00
8 Pump Station 304.14 LS $165,556.48 $171,000.00 $172,107.47 $202,000.00 $196,110.00 $213,000.00 $271,270.00 $257,950.00
9 Pump Station 304.15 LS $162,773.70 $176,820.00 $165,449.85 $202,000.00 $192,760.00 $209,800.00 $271,270.00 $256,900.00
10 Pump Station 304.16 and Gravity Connection
to 304.05 LS $152,768.88 $198,000.00 $268,825.00 $225,000.00 $273,210.00 $153,000.00 $271,270.00 $200,000.00
11 Landscaping Allowance for Use as Directed by
Owner TM $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00
12 General Allowance for Use as Directed by Owner TM $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00
$1,766,172.00 $1,869,820.00 $1,995,439.94 $2,037,800.00 $2,130,190.00 $2,183,800.00 $2,691,430.00 $2,699,850.00
E Verify Yes Yes Yes Yes Yes Yes Yes Yes
Florida Division of Corporations Yes Yes Yes Yes Yes Yes Yes Yes
Material Manufacturers Yes Yes Yes Yes Yes Yes Yes Yes
List of Major Subcontractors Yes Yes Yes Yes Yes Yes Yes Yes
Statement of Experience Yes Yes Yes Yes Yes Yes Yes Yes
Trench Safety Act Yes Yes Yes Yes Yes Yes Yes Yes
Substitute W-9 Yes Yes Yes Yes Yes Yes Yes Yes
Bid Bond Yes Yes Yes Yes Yes Yes Yes Yes
Bidders Check List Yes Yes Yes Yes Yes Yes Yes Yes
Insurance Certificate Yes Yes Yes Yes Yes Yes Yes Yes
BLDM USA Jafer
Construction
Witnessed By: Matthew Catoe, Procurement Strategist
Project Manager; John Eick
Procurement Strategist: Swainson Hall
US Water
COLLIER COUNTY PUBLIC UTILITIES
16-6659 WASTEWATER BASIN 306 DUPLEX STATIONS GROUP 2
BID TABULATION
Opened By: Swainson Hall, Procurement Strategist
Haskins Inc Hinterland Group DN Higgins TV Diversified Quality
Enterprises
TOTAL BID (Add Items No.1 Through No.12)
Bid Item and Description Basis of Payment
16.C.8.d
Packet Pg. 2137 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System
16.C.8.e
Packet Pg. 2138 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)
16.C.8.e
Packet Pg. 2139 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)
16.C.8.e
Packet Pg. 2140 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)
16.C.8.e
Packet Pg. 2141 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)
16.C.8.e
Packet Pg. 2142 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)
16.C.8.e
Packet Pg. 2143 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)
16.C.8.e