Agenda 12/10/2019 Item #16C 8 (Contract #14-6213/134 - Haskins, Inc.)12/10/2019 EXECUTIVE SUMMARY Recommendation to approve a $708,665 work order to Haskins, Inc., under Request for Quotation 14-6213-134 for Underground Utility Contracting Services for "Village Walk Wastewater System Modifications," Project Number 70250. OBJECTIVE: To bring outdated utility infrastructure into compliance with current standards while meeting the demand for service, protecting public health and safety, and providing proactive environmental protections. CONSIDERATIONS: The proposed scope of work is consistent with Project 70046, “Wastewater Pump Station TSP,” approved by the Board on September 19, 2019. The Village Walk and Bermuda Isles developments, located on the southeast corner of the intersection of Livingston Road and Vanderbilt Beach Road, are comprised of six pump stations (152.00, 152.01, 152.02, 152.03, 152.04 and 152.05) that serve local gravity sewer systems. Pump station (“PS”) 152.00 serves as a community pump station for the two developments and discharges into a 16-inch force main that runs along the south side of Vanderbilt Beach Road. The service area of PS 152.00 contains 861 service accounts as well as commercial parcels that include clubhouses with community pools and tennis courts. The primary goal of this project is to eliminate PS 152.00 from the system by installing an eight-inch force main, allowing wastewater flow to bypass PS 152.00 thereby conveying wastewater to community pump station 152.02. PS 152.02 wastewater pumps require an upgrade to 25 horsepower to maintain t he capacity; however, the installation of variable frequency drives will allow the station to operate at reduced speeds, which reduces pump wear and power cost. The confined space valve vault will be eliminated by moving piping and appurtenances above grade. In accordance with Collier County utility standards, this project provides connectivity at PS 152.02 for a standby diesel pump for operational storm resiliency. Staff is procuring the diesel pump separately resulting in a sales tax savings of approximately $5,500. The condition of PS 152.00 and PS 152.02 have regressed to “Red: Level 3 - Risked Compliance” as reported to the Board at the October 1, 2013 Asset Assessment and Management Workshop. The Procurement Services Division electronically distributed Request for Quotation # 14-6213-13, “Village Walk Wastewater System Modifications,” on September 19, 2019, to the six vendors under the Fixed-Term Underground Utilities Contract No. 14-6213. Four of those contractors submitted quotations by the October 8, 2019, deadline. The quotations are summarized below. VENDOR QUOTE Quality Enterprises $ 630,613 Haskins, Inc. $ 708,665 Mitchell & Stark $ 758,787 Douglas N Higgins $ 784,500 Kyle Construction Did Not Quote Southwest Utility Systems, Inc. Did Not Quote 16.C.8 Packet Pg. 2124 12/10/2019 Staff reviewed the quotations and determined Quality Enterprises USA, Inc., to be the lowest qualified and responsive bidder; however, Quality Enterprises withdrew from the project stating an error with its material prices being saved incorrectly in its system. With Quality Enterprises’ withdrawal, staff recommends awarding this project to the next lowest bidder, Haskins, Inc. (“Haskins”) The quotes received were approximately 78 percent above the engineer’s cost estimate. The engineer of record, Johnson Engineering, Inc., (“Johnson”) explains in their bid evaluation letter (Attachment 4) that the discrepancy is due to market-based price increases, seasonal market pressure and differences in electrical components that were not adequately accounted for. Johnson also notes that the three responsive bids were consistent in pricing, as demonstrated in the quote tabulation and graph, Attachments 1 and 2, respectively. The Procurement Services Division concluded that bidding was competitive and representative of market conditions. Johnson also recommends award of this work order to Haskins. Haskins has a satisfactory performance and warranty record on other similar county utility-related construction projects. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The project cost includes an allowance of $37,000 for owner -directed work due to unforeseen corrosive or geological conditions that include, but are not limited to, repairs due to structural deterioration, and/or replacement of defective mechanical equipment and deficient electrical components. Subject to the Purchasing Ordinance, staff will negotiate a price for any additional work due to unforeseen conditions prior to the start of any work. FISCAL IMPACT: The source of funding is Wastewater User Fees Capital Fund (414). A budget amendment in the amount of $850,000 is required to reallocate funds within the Wastewater User Fee Capital Fund (414) to cover the construction cost ($708,665), Engineer of Record construction services (estimated $56,000) and diesel pump and miscellaneous supplies purchase (estimated $85,335). The project is expected to be completed in 2020. Because a pump station will be eliminated with this pr oject, operating costs are expected to decrease. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio Governing Board of the Collier County Water-Sewer District, approve a $708,665 work order under Request For Quotation 14- 6213-134, “Village Walk Wastewater System Modifications,” (Project No. 70250) to Haskins, Inc., authorize the necessary budget amendments, and authorize the Chairman to sign the attached Work Order. Prepared By: Corinne Trtan, PMP, Project Manager, Engineering and Project Management Division ATTACHMENT(S) 1. Attachment 1 - Quote Tabulation (PDF) 2. Attachment 2 - EPMD Quote Analysis (PDF) 3. Attachment 3 - Request for Quotation (PDF) 4. Attachment 4 - Recommendation Letter (PDF) 5. Attachment 5 - Work Order (PDF) 16.C.8 Packet Pg. 2125 12/10/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.8 Doc ID: 10884 Item Summary: Recommendation to approve a $708,665 work order to Haskins, Inc., under Request for Quotation 14-6213-134 for Underground Utility Contracting Services for "Village Walk Wastewater System Modifications," Project Number 70250. Meeting Date: 12/10/2019 Prepared by: Title: Project Manager – Public Utilities Planning and Project Management Name: Corinne Trtan 11/15/2019 1:27 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 11/15/2019 1:27 PM Approved By: Review: Public Utilities Operations Support Tara Castillo Additional Reviewer Completed 11/15/2019 1:49 PM Wastewater Steve Nagy Additional Reviewer Completed 11/15/2019 2:03 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 11/15/2019 3:08 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 11/15/2019 3:20 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 11/15/2019 3:44 PM Public Utilities Planning and Project Management Craig Pajer Additional Reviewer Completed 11/15/2019 4:31 PM Procurement Services Evelyn Colon Additional Reviewer Completed 11/18/2019 9:48 AM Wastewater Beth Johnssen Additional Reviewer Completed 11/18/2019 9:50 AM Procurement Services Patrick Boyle Additional Reviewer Completed 11/18/2019 10:22 AM Procurement Services Ted Coyman Additional Reviewer Completed 11/19/2019 1:41 PM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 11/19/2019 3:20 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 11/22/2019 9:07 AM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 11/25/2019 8:33 AM Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 11/25/2019 8:46 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 11/25/2019 11:33 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/25/2019 1:06 PM 16.C.8 Packet Pg. 2126 12/10/2019 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 12/03/2019 9:23 AM Board of County Commissioners MaryJo Brock Meeting Pending 12/10/2019 9:00 AM 16.C.8 Packet Pg. 2127 Description Quality Enterprises Haskins Inc.Mitchell & Stark Higgins Kyle Construction Southwest Section 1: General Mobilization/Demobilization (5% Base Bid Maximum)$30,000.00 $12,700.00 $25,000.00 $37,000.00 Section 1: Subtotal $30,000.00 $12,700.00 $25,000.00 $37,000.00 SECTION 2: FORCE MAIN Force Main Piping $145,258.00 $116,700.00 $191,000.00 $260,000.00 SECTION 2: SUBTOTAL $145,258.00 $116,700.00 $191,000.00 $260,000.00 Section 3: LIFT STATION 152.02 UPGRADES Lift Station Upgrades $418,355.00 $542,265.00 $505,787.00 $450,500.00 SECTION 3: SUBTOTAL $418,355.00 $542,265.00 $505,787.00 $450,500.00 SECTION 4: ALLOWANCES Allowance $37,000.00 $37,000.00 $37,000.00 $37,000.00 SECTION 4: SUBTOTAL $37,000.00 $37,000.00 $37,000.00 $37,000.00 Total Bid $630,613.00 $708,665.00 $758,787.00 $784,500.00 NO BID NO BID BID TABULATION ULITILIZING CONTRACT 14-6213 UNDERGROUND UTILITIES 14-6213-134 Village Walk Wastewater System Modifications 1 of 1 16.C.8.a Packet Pg. 2128 Attachment: Attachment 1 - Quote Tabulation (10884 : Village Walk WW System Modifications) $0$100,000$200,000$300,000$400,000$500,000$600,000$700,000$800,000$900,000Eng Est Quality Enterprises Haskins Inc. DN Higgins, Inc. Mitchell & StarkQuote Results for Village Walk Wastewater System ModificationsKEY:Dashed Green‐AVERAGE BIDDashed black‐+/‐1 std devof avgbidDottedred‐+/‐20% of engestimate forhorizontalconstruction16.C.8.bPacket Pg. 2129Attachment: Attachment 2 - EPMD Quote Analysis (10884 : Village Walk WW System Modifications) 16.C.8.cPacket Pg. 2130Attachment: Attachment 3 - Request for Quotation (10884 : Village Walk WW System Modifications) 16.C.8.cPacket Pg. 2131Attachment: Attachment 3 - Request for Quotation (10884 : Village Walk WW System Modifications) Collier County COLLIER COUNTY PUBLIC UTILITIES Solicitation 14-6213-134 ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE 1 Mobilization/Demobilization (5% Base Bid Maximum)1 LS $ 12,700.00 $ 12,700.00 $ 12,700.00 ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE 2 Force Main Piping 1 LS $ 116,700.00 $ 116,700.00 $ 116,700.00 ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE 3 Lift Station 152.02 Upgrades 1 LS $ 542,265.00 $ 542,265.00 $ 542,265.00 ITEM NO.DESCRIPTION EST. QTY.UNIT UNIT PRICE EXTENDED PRICE 4 Allowance: An allowance for unforeseen conditions will be made at the appropriate contract price of Time & Materials, Lump Sum, and/or Contract Unit Price. Use of the Allowance must be approved by Collier County prior to the execution of the work. 1 T&M/ LS/ Unit $ 37,000.00 $ 37,000.00 9/20/2019 1:38 PM 1 p. 7 Village Walk Wastewater System Modifications BID SCHEDULE SECTION 1: GENERAL SECTION 1 SUBTOTAL: SECTION 2: FORCE MAIN PIPING SECTION 2 SUBTOTAL: SECTION 3: LIFT STATION 152.02 UPGRADES SECTION 3 SUBTOTAL: SECTION 4: ALLOWANCE SECTION 4 SUBTOTAL: SUMMARY Section 1: General 12,700.00$ TOTAL:708,665.00$ Section 2: Force Main Piping 116,700.00$ Section 3: Lift Station Upgrades 542,265.00$ Section 4: Allowance 37,000.00$ 16.C.8.c Packet Pg. 2132 Attachment: Attachment 3 - Request for Quotation (10884 : Village Walk WW System Modifications) 2122 Johnson Street ■ Post Office Box 1550 ■ Fort Myers, Florida 33902-1550 (239) 334-0046 ■ Fax (239) 334-3661 SINCE 1946 December 2, 2019 Via Email Only: Corinne.Trtan@colliercountyfl.gov Ms. Corinne Trtan Collier County Public Utilities - EPMD 3339 Tamiami Trail East, Suite 303 Naples, FL 34112-5361 RE: Bid Recommendation for Collier County 14-6213-134 Project: Village Walk Wastewater System Modifications Low Bidder: Haskins, Inc. Dear Ms. Trtan: The bid opening for the above-referenced project took place on Tuesday, October 8th, 2019 at 3:00 p.m. Collier County received four responsive bids for this project. Quality Enterprises has been allowed to withdraw their bid, leaving three responsive bids for this project. BIDDER TOTAL BID Quality Enterprises BID WITHDRAWN Haskins, Inc. $708,665 Mitchell & Stark $758,787 Higgins $784,500 Kyle Construction NO RESPONSE Southwest NO RESPONSE Following the bid opening, Collier County prepared the enclosed Bid Tabulation Analysis, which includes an analysis for mathematical errors. No errors were discovered. The results show Haskins, Inc. as the low bidder. For comparison purposes, Johnson Engineering provided Collier County with an Opinion of Probable Construction Cost (OPC) in the amount of $398,700 for the project. Johnson Engineering acknowledges that the OPC provided to the County was approximately 78% lower than the lowest responsive bid received. The discrepancy between the OPC and bids received is evident in Item No. 3. Lift Station 152.02 Upgrades. For clarification, we offer that our OPC was developed using bid results for Collier County projects 16-6652 Rehabilitation of Duplex Wastewater Pump Stations Group 1 and 16-6659 Wastewater Basin 306 Duplex Stations Group 2. These projects are similar in scope to the Village Walk project with respect to lift station rehabilitation. Lift station 16.C.8.d Packet Pg. 2133 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System Modifications) Ms. Corinne Trtan Re: Collier County RFB 14-6213-134 Low Bidder: Haskins, Inc. December 2, 2019 Page 2 of 2 rehabilitations for these comparison projects ranged between approximately $170,000 and $525,000, with most station rehabilitations costing approximately $250,000 (see attached). Upon further review, we believe the discrepancy is due to the following: • Market-based price increases that occurred between bidding of the comparison projects and this project. • Electrical component differences between the comparison projects and this project were not adequately accounted for. These changes increase material costs. For example, the comparison projects utilized off-the-shelf Data Flow Systems components for the control panel and SCADA. Pump Station 152.02 will utilize a programmable logic controller (PLC) and supporting hardware that increases the material cost for the control panel. • Market pressures may have increased costs as we approach the end of the year. Different types of work may experience unique pricing pressures based on labor demands. In general, it is difficult to identify pricing pressures except through the bid process. The contribution of market pricing pressures to the discrepancy is difficult to quantify but may be a contributing factor. We note that the three responsive bids for this project are consistent in pricing. This is evidence that the County has received competitive market pricing for this project. It is unlikely that lower bids would be received if the County were to re-advertise this project. In our opinion, Haskins, Inc. appears to be a reasonable and responsive bid. Subject to concurrence with the County’s Purchasing and Contracts Administration Division, we believe selection of Haskins, Inc. by Collier County for the intended work contained within the bid documents would be an appropriate choice. Should you have any questions, or require additional information, please let me know. Very truly yours, David B. Trouteaud, P.E. Project Manager DBT / ljb Enclosures 20149700-157 16.C.8.d Packet Pg. 2134 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System Modifications) Description Quality Enterprises Haskins Inc.Mitchell & Stark Higgins Kyle Construction Southwest Section 1: General Mobilization/Demobilization (5% Base Bid Maximum)$30,000.00 $12,700.00 $25,000.00 $37,000.00 Section 1: Subtotal $30,000.00 $12,700.00 $25,000.00 $37,000.00 SECTION 2: FORCE MAIN Force Main Piping $145,258.00 $116,700.00 $191,000.00 $260,000.00 SECTION 2: SUBTOTAL $145,258.00 $116,700.00 $191,000.00 $260,000.00 Section 3: LIFT STATION 152.02 UPGRADES Lift Station Upgrades $418,355.00 $542,265.00 $505,787.00 $450,500.00 SECTION 3: SUBTOTAL $418,355.00 $542,265.00 $505,787.00 $450,500.00 SECTION 4: ALLOWANCES Allowance $37,000.00 $37,000.00 $37,000.00 $37,000.00 SECTION 4: SUBTOTAL $37,000.00 $37,000.00 $37,000.00 $37,000.00 Total Bid $630,613.00 $708,665.00 $758,787.00 $784,500.00 NO BID NO BID BID TABULATION ULITILIZING CONTRACT 14-6213 UNDERGROUND UTILITIES 14-6213-134 Village Walk Wastewater System Modifications 1 of 1 16.C.8.d Packet Pg. 2135 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System Notifications Sent: 2120 Downloaded: 106 Submittals: 8 1 Mobilization / Demobilization LS (Limited to 10% of Total Bid) $168,321.79 $120,000.00 $90,000.00 $45,000.00 $22,750.00 $142,092.00 $337,000.00 $385,000.00 2 Pump Station 303.01 LS $177,673.78 $179,820.00 $208,910.00 $215,000.00 $230,396.28 $234,874.00 $324,000.00 $445,200.00 3 Pump Station 303.02 LS $178,278.12 $183,000.00 $225,660.00 $220,000.00 $237,554.38 $242,646.00 $328,000.00 $452,200.00 4 Pump Station 303.04 LS $234,759.91 $285,000.00 $359,950.00 $396,000.00 $405,585.48 $418,230.00 $525,000.00 $485,000.00 5 Pump Station 303.06 LS $183,410.80 $186,000.00 $212,010.00 $228,000.00 $237,800.80 $224,448.00 $338,000.00 $426,200.00 6 Pump Station 303.07 LS $184,423.47 $184,000.00 $214,760.00 $215,000.00 $233,811.87 $222,630.00 $309,000.00 $437,250.00 7 Pump Station 306.01 LS $184,887.18 $202,000.00 $224,410.00 $215,000.00 $243,414.78 $237,504.00 $332,000.00 $522,500.00 8 Pump Station 306.02 LS $185,760.18 $220,000.00 $224,560.00 $230,000.00 $253,235.96 $254,312.00 $346,000.00 $452,000.00 9 Pump Station 306.03 LS $182,415.27 $198,000.00 $222,460.00 $283,000.00 $246,182.67 $222,343.00 $345,000.00 $445,600.00 10 Pump Station 306.04 LS $183,069.51 $192,000.00 $223,360.00 $275,000.00 $251,730.65 $227,920.00 $327,000.00 $465,000.00 11 Landscaping Allowance for Use as Directed by Owner TM $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 12 General Allowance for Use as Directed by Owner TM $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $2,013,000.01 $2,099,820.00 $2,356,080.00 $2,472,000.00 $2,512,462.87 $2,576,999.00 $3,661,000.00 $4,665,950.00 E Verify Yes Yes Yes Yes No Yes Yes Yes Florida Division of Corporations Yes Yes Yes Yes Yes Yes Yes Yes Material Manufacturers Yes Yes Yes Yes Yes Yes Yes Yes List of Major Subcontractors Yes Yes Yes Yes Yes Yes Yes Yes Statement of Experience Yes Yes Yes Yes Yes Yes Yes Yes Trench Safety Act Yes Yes Yes Yes Yes Yes Yes Yes Substitute W-9 Yes Yes Yes Yes Yes Yes Yes Yes Bid Bond Yes Yes Yes Yes Yes Yes Yes Yes Bidders Check List Yes Yes Yes Yes Yes Yes Yes Yes Insurance Certificate Yes Yes Yes Yes Yes Yes Yes Yes Project Manager; John Eick Procurement Strategist: Swainson Hall Douglas N. Higgins, Inc Jafer Construction Corp Coastal Concrete Products Hinterland GroupBLDM USABid Item and Description Basis of Payment Mitchell & StarkHaskins Inc Opened By: Swainson Hall, Procurement Strategist Witnessed By: Matthew Catoe, Procurement Strategist US Water Services COLLIER COUNTY PUBLIC UTILITIES 16-6652 REHABILITATION OF DUPLEX WASTEWATER PUMP STATIONS GROUP 1 BID TABULATION TOTAL BID (Add Items No.1 Through No.12) 16.C.8.d Packet Pg. 2136 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System Notifications Sent: 2126 Downloaded: 84 Submittals: 8 1 Mobilization / Demobilization LS (Limited to 10% of Total Bid) $151,557.00 $100,000.00 $199,543.99 -$80,000.00 $144,000.00 $100,000.00 $220,000.00 2 Pump Station 304.01 LS $167,817.97 $199,000.00 $191,629.22 $235,800.00 $224,660.00 $233,000.00 $271,270.00 $299,000.00 3 Pump Station 304.04 LS $159,559.25 $177,000.00 $173,753.06 $205,000.00 $209,560.00 $218,000.00 $271,270.00 $268,500.00 4 Pump Station 304.05 LS $165,408.23 $184,000.00 $177,516.01 $212,000.00 $218,960.00 $225,000.00 $271,270.00 $275,500.00 5 Pump Station 304.06 LS $164,608.22 $169,000.00 $162,167.87 $202,000.00 $189,460.00 $215,000.00 $271,270.00 $259,000.00 6 Pump Station 304.12 LS $166,127.41 $176,000.00 $172,843.62 $202,000.00 $204,410.00 $212,000.00 $271,270.00 $263,000.00 7 Pump Station 304.13 LS $159,994.86 $169,000.00 $161,603.85 $202,000.00 $191,060.00 $211,000.00 $271,270.00 $250,000.00 8 Pump Station 304.14 LS $165,556.48 $171,000.00 $172,107.47 $202,000.00 $196,110.00 $213,000.00 $271,270.00 $257,950.00 9 Pump Station 304.15 LS $162,773.70 $176,820.00 $165,449.85 $202,000.00 $192,760.00 $209,800.00 $271,270.00 $256,900.00 10 Pump Station 304.16 and Gravity Connection to 304.05 LS $152,768.88 $198,000.00 $268,825.00 $225,000.00 $273,210.00 $153,000.00 $271,270.00 $200,000.00 11 Landscaping Allowance for Use as Directed by Owner TM $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 12 General Allowance for Use as Directed by Owner TM $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $1,766,172.00 $1,869,820.00 $1,995,439.94 $2,037,800.00 $2,130,190.00 $2,183,800.00 $2,691,430.00 $2,699,850.00 E Verify Yes Yes Yes Yes Yes Yes Yes Yes Florida Division of Corporations Yes Yes Yes Yes Yes Yes Yes Yes Material Manufacturers Yes Yes Yes Yes Yes Yes Yes Yes List of Major Subcontractors Yes Yes Yes Yes Yes Yes Yes Yes Statement of Experience Yes Yes Yes Yes Yes Yes Yes Yes Trench Safety Act Yes Yes Yes Yes Yes Yes Yes Yes Substitute W-9 Yes Yes Yes Yes Yes Yes Yes Yes Bid Bond Yes Yes Yes Yes Yes Yes Yes Yes Bidders Check List Yes Yes Yes Yes Yes Yes Yes Yes Insurance Certificate Yes Yes Yes Yes Yes Yes Yes Yes BLDM USA Jafer Construction Witnessed By: Matthew Catoe, Procurement Strategist Project Manager; John Eick Procurement Strategist: Swainson Hall US Water COLLIER COUNTY PUBLIC UTILITIES 16-6659 WASTEWATER BASIN 306 DUPLEX STATIONS GROUP 2 BID TABULATION Opened By: Swainson Hall, Procurement Strategist Haskins Inc Hinterland Group DN Higgins TV Diversified Quality Enterprises TOTAL BID (Add Items No.1 Through No.12) Bid Item and Description Basis of Payment 16.C.8.d Packet Pg. 2137 Attachment: Attachment 4 - Recommendation Letter [Revision 1] (10884 : Village Walk WW System 16.C.8.e Packet Pg. 2138 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications) 16.C.8.e Packet Pg. 2139 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications) 16.C.8.e Packet Pg. 2140 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications) 16.C.8.e Packet Pg. 2141 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications) 16.C.8.e Packet Pg. 2142 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications) 16.C.8.e Packet Pg. 2143 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications) 16.C.8.e Packet Pg. 2144 Attachment: Attachment 5 - Work Order (10884 : Village Walk WW System Modifications)