Loading...
Agenda 12/10/2019 Item #16A28 (Work Order Contract #16-6663 - Bonness)12/10/2019 EXECUTIVE SUMMARY Recommendation to award a Work Order to Bonness, Inc., under Roadway Contractor’s Agreement No. 16-6663, for construction of the “Vanderbilt Beach Road at Pristine Drive and Buckstone Drive Intersection Improvements” project, in the amount of $542,373.28 (Project 60016). OBJECTIVE: To approve a Work Order for Vanderbilt Beach Road at Pristine Drive and Buckstone Drive Intersection Improvements. CONSIDERATION: This project is at the top of the approved ranked list of projects of the In -House Design Team. It consists of the removal of existing landscaped median and construction of a westbound U-turn lane on Vanderbilt Beach Road at Pristine Drive. It also includes the removal of the existing full median opening and existing pavement, and construction of traffic island with concrete curb & gutter, on Vanderbilt Beach Road at Buckstone Drive. See attached sketch. On September 25, 2019, Transportation Engineering staff sent construction plans and a bid schedule to four (4) construction companies that are currently under contract with the County on “Agreement No. 16- 6663 for Roadway Contractors.” Staff requested quotations from those contractors for construction services for the Vanderbilt Beach Road at Pristine Drive and Buckstone Drive Inte rsection Improvements project. On October 9, 2019, the County received three (3) bids, as follows: Contractor Bid 1 Bonness, Inc. $542,559.48 2 Preferred Materials, Inc. $770,911.35 3 Wright Construction Group, Inc. $1,061,907.84 4 Ajax Paving Industries of Florida, LLC NO BID Staff concluded that the bidding was competitive, that the low bid received is fair and reasonable, and recommends awarding the work order to Bonness, Inc. Bonness’ bid is 2.04% higher than the engineer’s estimate of $531,736.21. The work order and bid analysis are attached for review and recommended approval. FISCAL IMPACT: The anticipated cost for this intersection improvement project is $542,559.48. Funding is available within Gas Tax Fund (313), project 60016 for the roadway work, in the amount of 430,646.95. A budget amendment, in the amount of $111,912.53, will be required within Landscape Fund (112) to transfer funding from project 31112 to project 60016 for the landscaping work. The estimated useful life of the roadway improvements is 20 years with minimal to no repair cost during that duration of time. GROWTH MANAGEMENT IMPACT: This project is consistent with the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval.-SRT RECOMMENDATION: To award a Work Order under Roadway Contractor’s Agreement No. 16-6663 for the “Vanderbilt Beach Road at Pristine Drive and Buckstone Drive Intersection Improvements” project to Bonness, Inc., in the amount of $542,559.48, approve all required budget amendments, and authorize the Chairman to sign the attached Work Order. 16.A.28 Packet Pg. 1897 12/10/2019 Prepared by: Julio F. Ordonez, P.E., Senior Project Manager, Transportation Engineering Division, Growth Management Department. ATTACHMENT(S) 1. 60016 Work Order 16-6663 VBR Pristine & Buckstone (PDF) 2. BID ANALYSIS - VANDERBILT BEACH RD AT PRISTINE & BUCKSTONE DR (PDF) 3. Vanderbilt Beach Rd at Pristine Dr and Buckstone Dr LETTER OF RECCOMENDATION (PDF) 4. 60016 WO BOND 16-6663 VBR Pristine & Buckstone (PDF) 5. 16-6663 Bonness_1of1_2YrRenewal (PDF) 6. 16-6663Amendment#1_Bonness_fullyexecuted_20191016152019.704_X (PDF) 7. 16-6663Bonness_Contact_FullExec_20191016152005.062_X (PDF) 8. VBR AT BUCKSTONE AND PRISTINE OVERALL SKETCH (flat) (PDF) 16.A.28 Packet Pg. 1898 12/10/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.28 Doc ID: 10749 Item Summary: Recommendation to award a Work Order to Bonness, Inc., under Roadway Contractor’s Agreement No. 16-6663, for construction of the “Vanderbilt Beach Road at Pristine Drive and Buckstone Drive Intersection Improvements” project, in the amount of $542,373.28 (Project 60016.39). Meeting Date: 12/10/2019 Prepared by: Title: Project Manager, Principal – Transportation Engineering Name: Julio Ordonez 11/05/2019 8:20 AM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 11/05/2019 8:20 AM Approved By: Review: Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 11/05/2019 8:33 AM Capital Project Planning, Impact Fees, and Program Management Lisa Taylor Additional Reviewer Completed 11/05/2019 8:47 AM Transportation Engineering Mark McCleary Additional Reviewer Completed 11/05/2019 9:00 AM Transportation Engineering Jay Ahmad Additional Reviewer Completed 11/05/2019 2:02 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 11/05/2019 3:32 PM Growth Management Department Anthony Khawaja Additional Reviewer Completed 11/13/2019 3:49 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 11/15/2019 7:42 AM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 11/15/2019 10:53 AM Procurement Services Evelyn Colon Additional Reviewer Completed 11/15/2019 11:17 AM Growth Management Department Gene Shue Additional Reviewer Completed 11/16/2019 10:50 AM Procurement Services Geoff Thomas Additional Reviewer Completed 11/20/2019 10:01 AM Growth Management Department Judy Puig Deputy Department Head Review Skipped 11/05/2019 3:27 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 11/20/2019 10:32 AM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 11/21/2019 10:58 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 11/21/2019 11:17 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/21/2019 11:48 AM 16.A.28 Packet Pg. 1899 12/10/2019 Budget and Management Office Ed Finn Additional Reviewer Completed 11/22/2019 10:12 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 11/24/2019 10:43 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 11/29/2019 11:50 AM Board of County Commissioners MaryJo Brock Meeting Pending 12/10/2019 9:00 AM 16.A.28 Packet Pg. 1900 16.A.28.a Packet Pg. 1901 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1902 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1903 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1904 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1905 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1906 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1907 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.a Packet Pg. 1908 Attachment: 60016 Work Order 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT Low Bid Eng. Est.Average Engineer's Estimate 101-1 MOBILIZATION LS 1 $27,266.90 $27,266.90 $74,500.00 $74,500.00 $177,211.87 $177,211.87 $0.00 $0.00 $19,467.31 $19,467.31 $27,266.90 $19,467.31 $92,992.92 140.07% 102-1 MAINTENANCE OF TRAFFIC LS 1 $21,922.73 $21,922.73 $47,050.00 $47,050.00 $32,712.63 $32,712.63 $0.00 $0.00 $31,147.70 $31,147.70 $21,922.73 $31,147.70 $33,895.12 70.38% 110-1-1 STANDARD CLEARING & GRUBBING LS 1 $9,717.48 $9,717.48 $14,500.00 $14,500.00 $54,957.46 $54,957.46 $0.00 $0.00 $10,901.70 $10,901.70 $9,717.48 $10,901.70 $26,391.65 89.14% 120-1 EXCAVATION CY 877 $17.95 $15,742.15 $32.50 $28,502.50 $29.61 $25,967.97 $0.00 $0.00 $20.00 $17,540.00 $17.95 $20.00 $26.69 89.75% 120-6 EMBANKMENT CY 670 $30.48 $20,421.60 $41.20 $27,604.00 $23.90 $16,013.00 $0.00 $0.00 $30.00 $20,100.00 $30.48 $30.00 $31.86 101.60% 245-7-15 OPTIONAL BASE GROUP 15 (9" THICK)SY 590 $58.73 $34,650.70 $71.15 $41,978.50 $90.00 $53,100.00 $0.00 $0.00 $125.00 $73,750.00 $58.73 $125.00 $73.29 46.98% 327-70-1 MILLING EXISTING PAVEMENT (1" THICK AVE.) (1' MIN WIDE) SY 42 $240.91 $10,118.22 $63.50 $2,667.00 $67.00 $2,814.00 $0.00 $0.00 $10.00 $420.00 $240.91 $10.00 $123.80 2409.10% 334-1-12 SUPERPAVE ASPH. CONC. TYPE SP 12.5 (TRAFFIC C, 2" THICK) TN 70 $1,158.41 $81,088.70 $160.00 $11,200.00 $165.00 $11,550.00 $0.00 $0.00 $200.00 $14,000.00 $1,158.41 $200.00 $494.47 579.21% 337-7-42 ASPH. CONC. FRICTION COURSE TYPE FC- 9.5 (TRAFFIC C, 1") (INC. 1" RESURF.) TN 40 $206.98 $8,279.20 $193.00 $7,720.00 $205.00 $8,200.00 $0.00 $0.00 $300.00 $12,000.00 $206.98 $300.00 $201.66 68.99% 520-1-10 CONCRETE CURB & GUTTER TYPE "F" LF 348 $27.27 $9,489.96 $45.00 $15,660.00 $68.85 $23,959.80 $0.00 $0.00 $22.00 $7,656.00 $27.27 $22.00 $47.04 123.95% 520-70 TRAFFIC SEPARATOR TYPE I, VAR. WIDTH (OPTION II, LAY-ON) SF 3 $762.04 $2,286.12 $210.00 $630.00 $208.93 $626.79 $0.00 $0.00 $100.00 $300.00 $762.04 $100.00 $393.66 762.04% 522-2 CONCRETE (6" THICK)SY 5 $457.22 $2,286.10 $250.00 $1,250.00 $151.25 $756.25 $0.00 $0.00 $60.00 $300.00 $457.22 $60.00 $286.16 762.03% 526-1-1 BRICK PAVERS SY 9 $121.40 $1,092.60 $240.00 $2,160.00 $534.53 $4,810.77 $0.00 $0.00 $125.00 $1,125.00 $121.40 $125.00 $298.64 97.12% 700-1-11-(SBA)SIGN, SINGLE POST W/ (SPECIAL) SLIP BASE ASSEMBLY EA 1 $993.62 $993.62 $1,740.00 $1,740.00 $1,000.00 $1,000.00 $0.00 $0.00 $600.00 $600.00 $993.62 $600.00 $1,244.54 165.60% 705-11-4 DELINEATOR, FLEXIBLE TUBULAR (2.375"X48"), WHITE EA 2 $370.38 $740.76 $210.00 $420.00 $300.00 $600.00 $0.00 $0.00 $150.00 $300.00 $370.38 $150.00 $293.46 246.92% 706-3 REFLECTIVE PAVEMENT MARKINGS EA 22 $4.56 $100.32 $4.80 $105.60 $4.00 $88.00 $0.00 $0.00 $80.00 $1,760.00 $4.56 $80.00 $4.45 5.70% 710-11-1 PAINTED (ISLAND NOSE) (WHITE)SY 1 $20.52 $20.52 $21.60 $21.60 $18.00 $18.00 $0.00 $0.00 $25.00 $25.00 $20.52 $25.00 $20.04 82.08% 710-11-2 PAINTED (ISLAND NOSE) (YELLOW)SY 1 $20.52 $20.52 $21.60 $21.60 $18.00 $18.00 $0.00 $0.00 $25.00 $25.00 $20.52 $25.00 $20.04 82.08% 711-11-121 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (6" WHITE) LF 127 $2.28 $289.56 $2.40 $304.80 $2.00 $254.00 $0.00 $0.00 $2.50 $317.50 $2.28 $2.50 $2.23 91.20% 711-11-122 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (8" WHITE) LF 300 $3.08 $924.00 $3.25 $975.00 $2.70 $810.00 $0.00 $0.00 $5.00 $1,500.00 $3.08 $5.00 $3.01 61.60% 711-11-124 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (18" WHITE) LF 28 $6.84 $191.52 $7.20 $201.60 $6.00 $168.00 $0.00 $0.00 $6.00 $168.00 $6.84 $6.00 $6.68 114.00% 711-11-170 DIRECTIONAL ARROWS (THERMOPLASTIC) EA 3 $113.99 $341.97 $120.00 $360.00 $100.00 $300.00 $0.00 $0.00 $150.00 $450.00 $113.99 $150.00 $111.33 75.99% 711-11-221 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (6" YELLOW) LF 317 $2.28 $722.76 $2.40 $760.80 $2.00 $634.00 $0.00 $0.00 $2.50 $792.50 $2.28 $2.50 $2.23 91.20% 711-11-241 TRAFFIC STRIPE, SKIP, (6'-10' ) GAP EXTENSION, THERMO. (6" YELLOW) LF 73 $2.28 $166.44 $2.40 $175.20 $2.00 $146.00 $0.00 $0.00 $1.50 $109.50 $2.28 $1.50 $2.23 152.00% 711-17 REMOVE EXIST. PAVEMENT MARKINGS (GRIND) LS 1 $2,849.80 $2,849.80 $1,200.00 $1,200.00 $870.00 $870.00 $0.00 $0.00 $2,500.00 $2,500.00 $2,849.80 $2,500.00 $1,639.93 113.99% $251,724.25 $281,708.20 $417,586.54 $0.00 $217,255.21 101-1 MOBILIZATION LS 1 $19,874.66 $19,874.66 $74,500.00 $74,500.00 $170,046.16 $170,046.16 $0.00 $0.00 $17,427.38 $17,427.38 $19,874.66 $17,427.38 $88,140.27 114.04% 102-1 MAINTENANCE OF TRAFFIC LS 1 $21,276.40 $21,276.40 $47,050.00 $47,050.00 $33,973.28 $33,973.28 $0.00 $0.00 $27,883.80 $27,883.80 $21,276.40 $27,883.80 $34,099.89 76.30% 110-1-1 STANDARD CLEARING & GRUBBING LS 1 $9,717.48 $9,717.48 $20,000.00 $20,000.00 $68,038.68 $68,038.68 $0.00 $0.00 $9,759.33 $9,759.33 $9,717.48 $9,759.33 $32,585.39 99.57% 120-1 EXCAVATION CY 456 $27.32 $12,457.92 $32.50 $14,820.00 $35.59 $16,229.04 $0.00 $0.00 $20.00 $9,120.00 $27.32 $20.00 $31.80 136.60% 120-6 EMBANKMENT CY 414 $35.58 $14,730.12 $41.20 $17,056.80 $29.01 $12,010.14 $0.00 $0.00 $30.00 $12,420.00 $35.58 $30.00 $35.26 118.60% 245-7-15 OPTIONAL BASE GROUP 15 (9" THICK)SY 158 $70.80 $11,186.40 $75.65 $11,952.70 $180.00 $28,440.00 $0.00 $0.00 $125.00 $19,750.00 $70.80 $125.00 $108.82 56.64% 327-70-1 MILLING EXIST. PAVEMENT (3" THICK AVE.) (1' MIN WIDE)(INC. TRAFFIC ISLAND)SY 1,075 $17.06 $18,339.50 $8.00 $8,600.00 $9.00 $9,675.00 $0.00 $0.00 $7.00 $7,525.00 $17.06 $7.00 $11.35 243.71% 334-1-12 SUPERPAVE ASPH. CONC. TYPE SP 12.5 (TRAFFIC C, 2" THICK) TN 22 $312.46 $6,874.12 $245.00 $5,390.00 $255.00 $5,610.00 $0.00 $0.00 $200.00 $4,400.00 $312.46 $200.00 $270.82 156.23% 337-7-42 ASPH. CONC. FRICTION COURSE TYPE FC-9.5 (TRAFFIC C, 1") (INC. 1" RESURF.) TN 62 $121.44 $7,529.28 $155.00 $9,610.00 $165.00 $10,230.00 $0.00 $0.00 $300.00 $18,600.00 $121.44 $300.00 $147.15 40.48% 520-1-10 CONCRETE CURB & GUTTER TYPE "F" LF 777 $16.56 $12,867.12 $45.00 $34,965.00 $99.29 $77,148.33 $0.00 $0.00 $22.00 $17,094.00 $16.56 $22.00 $53.62 75.27% 520-70 TRAFFIC SEPARATOR TYPE I, VAR. WIDTH (OPTION II, LAY-ON) SF 8 $285.76 $2,286.08 $192.50 $1,540.00 $233.72 $1,869.76 $0.00 $0.00 $100.00 $800.00 $285.76 $100.00 $237.33 285.76% 522-2 CONCRETE (6" THICK)SY 10 $241.95 $2,419.50 $160.40 $1,604.00 $151.25 $1,512.50 $0.00 $0.00 $60.00 $600.00 $241.95 $60.00 $184.53 403.25% 526-1-1 BRICK PAVERS SY 249 $54.24 $13,505.76 $240.00 $59,760.00 $332.09 $82,690.41 $0.00 $0.00 $125.00 $31,125.00 $54.24 $125.00 $208.78 43.39% 700-1-11-(SBA)SIGN, SINGLE POST W/ (SPECIAL) SLIP BASE ASSEMBLY EA 3 $825.04 $2,475.12 $1,740.00 $5,220.00 $1,000.00 $3,000.00 $0.00 $0.00 $600.00 $1,800.00 $825.04 $600.00 $1,188.35 137.51% 700-1-60 SIGN, SINGLE POST (REMOVE) (INC. PANEL REMOVAL AND DELINEATORS)EA 7 $72.25 $505.75 $90.00 $630.00 $350.00 $2,450.00 $0.00 $0.00 $85.00 $595.00 $72.25 $85.00 $170.75 85.00% 705-11-4 DELINEATOR, FLEXIBLE TUBULAR (2.375"X48"), WHITE EA 4 $133.35 $533.40 $210.00 $840.00 $300.00 $1,200.00 $0.00 $0.00 $150.00 $600.00 $133.35 $150.00 $214.45 88.90% 706-3 REFLECTIVE PAVEMENT MARKINGS EA 116 $4.56 $528.96 $4.80 $556.80 $4.00 $464.00 $0.00 $0.00 $80.00 $9,280.00 $4.56 $80.00 $4.45 5.70% 710-11-1 PAINTED (ISLAND NOSE) (WHITE)SY 2 $20.52 $41.04 $21.60 $43.20 $18.00 $36.00 $0.00 $0.00 $25.00 $50.00 $20.52 $25.00 $20.04 82.08% 710-11-2 PAINTED (ISLAND NOSE) (YELLOW)SY 2 $20.52 $41.04 $21.60 $43.20 $18.00 $36.00 $0.00 $0.00 $25.00 $50.00 $20.52 $25.00 $20.04 82.08% 711-11-121 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (6" WHITE) LF 160 $2.28 $364.80 $2.40 $384.00 $2.00 $320.00 $0.00 $0.00 $2.50 $400.00 $2.28 $2.50 $2.23 91.20% 711-11-122 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (8" WHITE) LF 750 $3.08 $2,310.00 $3.25 $2,437.50 $2.70 $2,025.00 $0.00 $0.00 $5.00 $3,750.00 $3.08 $5.00 $3.01 61.60% 711-11-124 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (18" WHITE) LF 90 $6.84 $615.60 $7.20 $648.00 $6.00 $540.00 $0.00 $0.00 $6.00 $540.00 $6.84 $6.00 $6.68 114.00% 711-11-125 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (24" WHITE) LF 12 $9.12 $109.44 $9.60 $115.20 $8.00 $96.00 $0.00 $0.00 $10.00 $120.00 $9.12 $10.00 $8.91 91.20% 711-11-160 PAVEMENT MESSAGES EA 4 $170.99 $683.96 $180.00 $720.00 $150.00 $600.00 $0.00 $0.00 $200.00 $800.00 $170.99 $200.00 $167.00 85.50% 711-11-170 DIRECTIONAL ARROWS (THERMOPLASTIC) EA 8 $113.99 $911.92 $120.00 $960.00 $100.00 $800.00 $0.00 $0.00 $150.00 $1,200.00 $113.99 $150.00 $111.33 75.99% 711-11-221 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (6" YELLOW) LF 1,264 $2.28 $2,881.92 $2.40 $3,033.60 $2.00 $2,528.00 $0.00 $0.00 $2.50 $3,160.00 $2.28 $2.50 $2.23 91.20% 711-11-224 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (18" YELLOW) LF 379 $6.84 $2,592.36 $7.20 $2,728.80 $6.00 $2,274.00 $0.00 $0.00 $6.00 $2,274.00 $6.84 $6.00 $6.68 114.00% 711-11-241 TRAFFIC STRIPE, SKIP, (6'-10' ) GAP EXTENSION, THERMO. (6" YELLOW) LF 119 $2.28 $271.32 $2.40 $285.60 $2.00 $238.00 $0.00 $0.00 $1.50 $178.50 $2.28 $1.50 $2.23 152.00% 711-17 REMOVE EXIST. PAVEMENT MARKINGS (GRIND) LS 1 $991.73 $991.73 $1,045.00 $1,045.00 $870.00 $870.00 $0.00 $0.00 $2,500.00 $2,500.00 $991.73 $2,500.00 $968.91 39.67% $168,922.70 $326,539.40 $534,950.30 $0.00 $0.00 $203,802.01 $420,646.95 $608,247.60 $952,536.84 $0.00 $421,057.21 1 Sabal palmetto EA 16 296.38$ $4,742.08 420.00$ $6,720.00 260.00$ $4,160.00 $0.00 $0.00 300.00$ $4,800.00 $296.38 $300.00 $325.46 98.79% 2 Ligustrum japonicum EA 5 320.32$ $1,601.60 420.00$ $2,100.00 281.00$ $1,405.00 $0.00 $0.00 300.00$ $1,500.00 $320.32 $300.00 $340.44 106.77% 3 Shrub removals (group)EA 1 3,488.15$ $3,488.15 4,455.00$ $4,455.00 3,060.00$ $3,060.00 $0.00 $0.00 1,000.00$ $1,000.00 $3,488.15 $1,000.00 $3,667.72 348.82% 4 Tree removals EA 3 320.32$ $960.96 420.00$ $1,260.00 281.00$ $843.00 $0.00 $0.00 250.00$ $750.00 $320.32 $250.00 $340.44 128.13% $10,792.79 $14,535.00 $9,468.00 $0.00 $8,050.00 5 Sabal palmetto EA 3 262.18$ $786.54 407.85$ $1,223.55 230.00$ $690.00 $0.00 $0.00 400.00$ $1,200.00 $262.18 $400.00 $300.01 65.55% 6 Liriope muscari "Emerald Goddess"EA 90 13.96$ $1,256.40 15.20$ $1,368.00 12.25$ $1,102.50 $0.00 $0.00 12.00$ $1,080.00 $13.96 $12.00 $13.80 116.33% 7 Podocarpus macrophylla "Pringles"EA 5 12.73$ $63.65 15.20$ $76.00 11.17$ $55.85 $0.00 $0.00 12.00$ $60.00 $12.73 $12.00 $13.03 106.08% 8 Muhlenbergia capillaris EA 88 11.40$ $1,003.20 13.80$ $1,214.40 10.00$ $880.00 $0.00 $0.00 12.00$ $1,056.00 $11.40 $12.00 $11.73 95.00% 9 Mulch CY 43 91.56$ $3,937.08 175.90$ $7,563.70 80.32$ $3,453.76 $0.00 $0.00 75.00$ $3,225.00 $91.56 $75.00 $115.93 122.08% 10 Soil CY 172 50.16$ $8,627.52 69.60$ $11,971.20 44.00$ $7,568.00 $0.00 $0.00 50.00$ $8,600.00 $50.16 $50.00 $54.59 100.32% $15,674.39 $23,416.85 $13,750.11 $0.00 $15,221.00 11 Spray nozzles EA 40 39.90$ $1,596.00 94.50$ $3,780.00 35.00$ $1,400.00 $0.00 $0.00 60.00$ $2,400.00 $39.90 $60.00 $56.47 66.50% 12 Irritrol Bubblers EA 6 11.11$ $66.66 43.60$ $261.60 9.75$ $58.50 $0.00 $0.00 6.25$ $37.50 $11.11 $6.25 $21.49 177.76% 13 Control Valve EA 2 216.58$ $433.16 1,214.10$ $2,428.20 190.00$ $380.00 $0.00 $0.00 775.00$ $1,550.00 $216.58 $775.00 $540.23 27.95% 14 Valve boxes EA 2 111.71$ $223.42 133.45$ $266.90 98.00$ $196.00 $0.00 $0.00 200.00$ $400.00 $111.71 $200.00 $114.39 55.86% 15 Splice boxes EA 2 111.71$ $223.42 133.45$ $266.90 98.00$ $196.00 $0.00 $0.00 200.00$ $400.00 $111.71 $200.00 $114.39 55.86% 16 Wiring LF 5300 0.46$ $2,438.00 3.50$ $18,550.00 0.40$ $2,120.00 $0.00 $0.00 0.30$ $1,590.00 $0.46 $0.30 $1.45 153.33% 17 1" PVC Pipe LF 530 0.58$ $307.40 4.10$ $2,173.00 0.51$ $270.30 $0.00 $0.00 6.00$ $3,180.00 $0.58 $6.00 $1.73 9.67% 18 3" HDPE pipe LF 831 29.41$ $24,439.71 13.60$ $11,301.60 25.80$ $21,439.80 $0.00 $0.00 22.00$ $18,282.00 $29.41 $22.00 $22.94 133.68% 19 Omniballs EA 4 34.20$ $136.80 43.60$ $174.40 30.00$ $120.00 $0.00 $0.00 20.00$ $80.00 $34.20 $20.00 $35.93 171.00% 20 Green Reflective Paving Marker EA 12 37.62$ $451.44 28.15$ $337.80 33.00$ $396.00 $0.00 $0.00 5.00$ $60.00 $37.62 $5.00 $32.92 752.40% $30,316.01 $39,540.40 $26,576.60 $0.00 $27,979.50 $56,783.19 $77,492.25 $49,794.71 $0.00 $51,250.50 21 Veitchia montgomeryana EA 8 327.16$ $2,617.28 420.00$ $3,360.00 287.00$ $2,296.00 $0.00 $0.00 300.00$ $2,400.00 $327.16 $300.00 $344.72 109.05% 22 Shrub removals (group)EA 1 1,744.08$ $1,744.08 4,455.00$ $4,455.00 1,530.00$ $1,530.00 $0.00 $0.00 300.00$ $300.00 $1,744.08 $300.00 $2,576.36 581.36% $4,361.36 $7,815.00 $3,826.00 $0.00 $2,700.00 23 Veitchia montgomeryana EA 7 897.12$ $6,279.84 990.00$ $6,930.00 787.00$ $5,509.00 $0.00 $0.00 300.00$ $2,100.00 $897.12 $300.00 $891.37 299.04% 24 Liriope muscari "Emerald Goddess"EA 238 13.96$ $3,322.48 15.20$ $3,617.60 12.25$ $2,915.50 $0.00 $0.00 12.00$ $2,856.00 $13.96 $12.00 $13.80 116.33% 25 Podocarpus macrophylla "Pringles"EA 30 12.77$ $383.10 15.20$ $456.00 11.20$ $336.00 $0.00 $0.00 12.00$ $360.00 $12.77 $12.00 $13.06 106.42% 26 Dianella tasmanica EA 75 13.96$ $1,047.00 15.20$ $1,140.00 12.25$ $918.75 $0.00 $0.00 12.00$ $900.00 $13.96 $12.00 $13.80 116.33% 27 Mulch CY 27 91.56$ $2,472.12 175.90$ $4,749.30 80.32$ $2,168.64 $0.00 $0.00 75.00$ $2,025.00 $91.56 $75.00 $115.93 122.08% 28 Soil CY 72 50.16$ $3,611.52 69.60$ $5,011.20 44.00$ $3,168.00 $0.00 $0.00 50.00$ $3,600.00 $50.16 $50.00 $54.59 100.32% $17,116.06 $21,904.10 $15,015.89 $0.00 $11,841.00 29 Spray nozzles EA 42 39.90$ $1,675.80 94.50$ $3,969.00 35.00$ $1,470.00 $0.00 $0.00 60.00$ $2,520.00 $39.90 $60.00 $56.47 66.50% 30 Irritrol Bubblers EA 14 11.11$ $155.54 43.60$ $610.40 9.75$ $136.50 $0.00 $0.00 6.25$ $87.50 $11.11 $6.25 $21.49 177.76% 31 Control Valve EA 2 216.58$ $433.16 1,214.10$ $2,428.20 190.00$ $380.00 $0.00 $0.00 775.00$ $1,550.00 $216.58 $775.00 $540.23 27.95% 32 Valve boxes EA 2 111.71$ $223.42 133.45$ $266.90 98.00$ $196.00 $0.00 $0.00 200.00$ $400.00 $111.71 $200.00 $114.39 55.86% 33 Splice boxes EA 2 111.71$ $223.42 133.45$ $266.90 98.00$ $196.00 $0.00 $0.00 200.00$ $400.00 $111.71 $200.00 $114.39 55.86% 34 Wiring LF 4300 0.46$ $1,978.00 3.50$ $15,050.00 0.40$ $1,720.00 $0.00 $0.00 0.30$ $1,290.00 $0.46 $0.30 $1.45 153.33% 35 3" HDPE pipe LF 610 29.41$ $17,940.10 13.60$ $8,296.00 25.80$ $15,738.00 $0.00 $0.00 22.00$ $13,420.00 $29.41 $22.00 $22.94 133.68% 36 1" PVC Pipe LF 800 0.58$ $464.00 4.10$ $3,280.00 0.51$ $408.00 $0.00 $0.00 6.00$ $4,800.00 $0.58 $6.00 $1.73 9.67% 37 HDPE to PVC mechanical clamp EA 2 60.36$ $120.72 442.70$ $885.40 52.95$ $105.90 $0.00 $0.00 150.00$ $300.00 $60.36 $150.00 $185.34 40.24% 38 Omniballs EA 4 34.20$ $136.80 43.60$ $174.40 30.00$ $120.00 $0.00 $0.00 20.00$ $80.00 $34.20 $20.00 $35.93 171.00% 39 Green Reflective Paving Marker EA 8 37.62$ $300.96 28.15$ $225.20 33.00$ $264.00 $0.00 $0.00 5.00$ $40.00 $37.62 $5.00 $32.92 752.40% $23,651.92 $35,452.40 $20,734.40 $0.00 $24,887.50 $45,129.34 $65,171.50 $39,576.29 $0.00 $39,428.50 $101,912.53 $142,663.75 $89,371.00 $0.00 $90,679.00 $522,559.48 $750,911.35 $1,041,907.84 $0.00 $511,736.21 CC-10000 ROADWAY ALLOWANCE FIXED 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $10,000.00 Landscaping Allowance FIXED 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $10,000.00 $542,559.48 $770,911.35 $1,061,907.84 $0.00 $531,736.21 By: Julio F. Ordonez Date: 10-14-2019 PROJECT GRAND TOTAL: PROJECT TOTAL: Total Pristine Drive: Total Relocations: Total Planting: Total Irrigation: Total Buckstone Drive: Total Landscaping: SUB-TOTAL ROADWAY 1 - PRISTINE: SUB-TOTAL ROADWAY 2 - BUCKSTONE: TOTAL ROADWAY: Total Relocations: Total Planting: Total Irrigation: Engineer's Estimate Unit Price Comparison Low Bid Percentage VANDERBILT BEACH ROAD AT PRISTINE AND BUCKSTONE DRIVES BID ANALYISIS MEDIAN IMPROVEMENTS COLLIER COUNTY PROJECT No. 60016.39 ITEM No. DESCRIPTION Bonness, Inc. Preferred Materials,Inc. Wright Construction, Inc. Ajax Paving Ind of FL,LLC UNIT QUANTITY 10/14/2019 Prepared by: J.F.O. TRAFFIC OPERATIONS 16.A.28.c Packet Pg. 1909 Attachment: BID ANALYSIS - VANDERBILT BEACH RD AT PRISTINE & BUCKSTONE DR (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.dPacket Pg. 1910Attachment: Vanderbilt Beach Rd at Pristine Dr and Buckstone Dr LETTER OF RECCOMENDATION (10749 : Vanderbilt Beach Road 16.A.28.ePacket Pg. 1911Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.ePacket Pg. 1912Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.ePacket Pg. 1913Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.ePacket Pg. 1914Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.ePacket Pg. 1915Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.ePacket Pg. 1916Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.ePacket Pg. 1917Attachment: 60016 WO BOND 16-6663 VBR Pristine & Buckstone (10749 : Vanderbilt Beach Road Intersection Improvements) 11/5/18 Jeff Janco, Executive Vice President Bonness, Inc. 1900 Seward Avenue Naples, Florida 34109 Email: jjanco@bonnessinc.com RE: Contract Renewal for # 16-6663 “Roadway Contractors” Dear Mr. Janco: Collier County would like to renew the above contract under the same terms and conditions for an additional two (2) year period in accordance with the renewal clause in the contract. If you are agreeable please indicate your intentions by providing the information requested below and executing the acceptance section: _______ I am agreeable to renewing the above referenced contract under the same terms, conditions, and pricing as the existing contract. _______ I am not agreeable to the renewal of this contract. By executing the section below, this contract will be in effect from 3/28/19 until 3/27/21. Acceptance of Contract Renewal Company Name _________________________________________________________ Company Signature _________________________________________________________ Print Name _________________________________________________________ Signature Date _________________________________________________________ DocuSign Envelope ID: 130DCC78-2CFC-4403-BE8C-A8DDED5E190A Brad Thornton 11/7/2018 Bonness Inc 16.A.28.f Packet Pg. 1918 Attachment: 16-6663 Bonness_1of1_2YrRenewal (10749 : Vanderbilt Beach Road Intersection Improvements) Page 2 of 2 RE: Contract Renewal for # 16-6663 “Roadway Contractors” Updated Contact Information (Only if addressee information on the first page is incorrect) Contact Name _________________________________________________________ Telephone Number _________________________________________________________ FAX Number _________________________________________________________ Email Address _________________________________________________________ Collier County Procurement Services is pleased to announce, it has partnered with BidSync to provide Free web-based Bidding services to its vendors, suppliers and contractors. We are now “live on the new bidding platform. Register today at www.bidsync.com. For Registration Assistance, please contact BidSync customer service at 800-990-9339 Or email: support@bidsync.com. Please return this letter to the Procurement Services Division with your response no later than 11/13/18. You may email your response to: email renewals@colliergov.net. If you have any questions you may contact me at 239-252-8407. Respectfully, Sandra Herrera Procurement Contract Manager – Procurement Services Division C: Mark McClearly / Transportation Engineering HerreraSandra Digitally signed by HerreraSandra DN: dc=net, dc=colliergov, dc=bcc, ou=Divisions, ou=ASD, ou=ASD Purchasing, ou=Purchasing User Accounts, cn=HerreraSandra, email=Sandra.Herrera@colliercountyfl.gov Date: 2018.11.05 14:28:52 -05'00' DocuSign Envelope ID: 130DCC78-2CFC-4403-BE8C-A8DDED5E190A (239) 597-6221 bthornton@bonnessinc.com (239) 597-7416 Brad Thornton 16.A.28.f Packet Pg. 1919 Attachment: 16-6663 Bonness_1of1_2YrRenewal (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.g Packet Pg. 1920 Attachment: 16-6663Amendment#1_Bonness_fullyexecuted_20191016152019.704_X (10749 : Vanderbilt Beach Road Intersection 16.A.28.g Packet Pg. 1921 Attachment: 16-6663Amendment#1_Bonness_fullyexecuted_20191016152019.704_X (10749 : Vanderbilt Beach Road Intersection 16.A.28.g Packet Pg. 1922 Attachment: 16-6663Amendment#1_Bonness_fullyexecuted_20191016152019.704_X (10749 : Vanderbilt Beach Road Intersection 16.A.28.hPacket Pg. 1923Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1924Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1925Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1926Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1927Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1928Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1929Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1930Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1931Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1932Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1933Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1934Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1935Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1936Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1937Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1938Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1939Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1940Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1941Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1942Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1943Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1944Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1945Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1946Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1947Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1948Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1949Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1950Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1951Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1952Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.hPacket Pg. 1953Attachment: 16-6663Bonness_Contact_FullExec_20191016152005.062_X (10749 : Vanderbilt Beach Road Intersection Improvements) 16.A.28.i Packet Pg. 1954 Attachment: VBR AT BUCKSTONE AND PRISTINE OVERALL SKETCH (flat) (10749 : Vanderbilt Beach Road Intersection Improvements)