EXECUTIVE SUMMARY
Recommendation to approve the Fourth Amendment to Agreement No. 17-7198 for
Construction Management at Risk (“CMAR”) contract Phase 1B - Guaranteed Maximum
Price (“GMP”) No. 3 Horizontal and Vertical Work Package to Manhattan Construction
for the next phase of the Sports Complex and Events Center (“SCEC”) in the amount of
$19,665,469.
OBJECTIVE: To continue the construction of the Board approved SCEC through a planned amendment
to the existing CMAR contract to incorporate the next construction phase.
CONSIDERATION: On February 13, 2018 (Agenda Item 16.D.21), the County entered into an
Agreement with Manhattan Construction, Inc., for CMAR services for all preconstruction phases for the
Collier County Sports and Special Events Complex. The process contemplated using individual contract
amendments for each subsequent GMP construction phase. Each phase will clearly identify the terms and
conditions specific to that phase including the fees charged by the construction manager. This phased
approach allows the County to accelerate the project and carefully manage the project within the budget
parameters adopted by the Board. It also maintains strict controls over the relationship between the
owner, construction manager, and design team.
The CMAR process continues to be the most transparent and effective way to manage a complex multi-
phase project of this size and scope. In this process, the contractor participates in design meetings and
identifies high value items that need to be scope managed and features that the design professional desires
but may be unaffordable to the project budget. More importantly, the CMAR approach is an “open book”
delivery system where the owner (the County) sees all transactions and pays only the actual costs paid by
the construction manager. Additionally, the construction manager provides a guaranteed maximum price
for the job. In this project, both the hard construction costs and soft costs are capped independently within
the GMP. The contractor has the flexibility within each cap to adjust values but may not transfer funds
between hard costs and soft costs.
On September 25, 2018 (Agenda Item 11.B), the County entered into the First Amendment to Agreement
No. 17-7198 with Manhattan Construction for work for Phase 0 that included the preparatory work
required in anticipation of Phase 1 where the infrastructure and fields will be installed on the City Gate
parcel owned by the County. Phase 0 included the preponderance of land clearing, full lake excavation, a
construction access road, and preliminary drainage work.
On March 26, 2019 (Agenda Item 11.C), the County entered into the Second Amendment to Agreement
No. 17-7198 with Manhattan Construction for work for Phase 1A. The delivery team has continued to
move the project forward based on prior Board guidance. Phase 1A is well underway, on schedule, and
within budget. Phase 1A completes the primary underground utility work on the City Gate parcel,
provides 5 fields (4 turf, 1 grass), maintenance building, welcome center, market, and restrooms. This
phase also completes City Gate Boulevard South, main entrance improvements on City Gate Boulevard
North, and parking for this phase. This phase is expected to be completed in May of 2020 and is followed
by an overlapping phase for the stadium and Great Lawn (Phase 1B). Subsequent to Phase 1A and 1B, the
next phase (Phase 2) of the complex on Collier County’s adjacent property (CC305 Parcel) will be subject
to zoning, permits, mitigation, and funding at the time of construction.
On October 22, 2019 (Agenda Item 16.D9), the County entered into the Third Amendment to Agreement
No. 17-7198 with Manhattan Construction to revise and correct the Construction Manager’s Standard
Rates in Exhibit “G” to the CMAR and direct that the Contractor’s current invoices reflecting work in the
11.D
Packet Pg. 1030
12/10/2019
categories included in the revised Construction Manager’s Standard Rate Sheet be reimbursed, as
appropriate, for services provided.
The tables below depict the actual and forecast construction values (Hard Costs), the various fees and
other costs indirectly associated with construction (Soft Costs), and projected revenues funding the
project.
Soft Costs
Phase 0 - Fee $106,273
Phase 1A- Fee $919,553
Phase 1B - Fee $668,190
Phase 2 - Fee ~$900,000
5-year Engineering/Permitting/CEI Fees $5,273,646
Impact Fees ~$750,000
Mitigation $ 1,502,050
Total Soft Costs $10,119,712
SCEC-Phases Construction Value
“Cost of Work”
Source of Funds Revenues
Phase 0 - Actual $3,093,711 Bond Proceeds $65,500,000
Phase 1A- Actual $29,838,212 Interest ~$1M
Phase 1B - Actual $18,997,279 Road Impact Fees ~$6 to ~8M
Phase 2 - Budget ~$28,750,000 Naming Rights ~$6 to ~$8M
Phase 3 N/A Grants N/A currently
Sales Tax Pending Phase 3
Total Cost of Work ~$80,679,202 Total Revenues ~$78.5M to ~$82.5M
Soft Costs ~$10,119,712
Total Project Value ~$90,798,914 Negative Variance ~$8M to ~$12M
In order to minimize expenditures in phase 1B, the stadium has been scaled back to the greatest extent
possible. The Great Lawn has been enhanced to include a food truck pavilion and fitness area intended to
exploit the functionality of the area and maximize future revenues. The theater/stage area has been
designed to complement both events inside the stadium to the south and with the flexibility to program
events to the north facing the Great Lawn. The field house is being planned, but the decision to move
forward will be brought back to the Board when the final budget has been refined at the end of all field
construction phases.
As we complete Phase 1B and move into Phase 2 on the Collier County 305 property, we anticipate a
construction value to budget variance of approximately eight (8) to twelve (12) million dollars. This
variance is primarily due to the high cost of fill material, soft costs being covered from the construction
budget, and higher than anticipated construction values. Additionally, the County has not yet secured a
naming rights partner at this time. There are several areas that we can attempt to r ebalance the job to
available budget which include the following:
1. Reduce the number of buildings and move to prefabricated structures for the remaining
buildings;
2. Eliminate the future area reserved for little league/youth baseball and excavate that location
11.D
Packet Pg. 1031
12/10/2019
to take advantage of the fill material on site;
3. Reduce the number of fields to be built at this time and construct them later; and
4. Eliminate the campground area.
Staff does not recommend option 3. The prior Hunden study of facility needs a nd the current facility
manager, Sports Field Inc., do not recommend reducing the number of fields. The other options can be
evaluated prior to bid or placed as bid alternates when Phase 2 receives State and Federal permits and
zoning is complete. Additionally, Phase 2 will be broken out and sequenced to complete the City Gate
Boulevard North/Benfield Road phase to include clearing, grubbing, and lake excavation of the entire
CC305 land as a stand-alone phase. This is identical to the way the project was st arted with Phase 0 and
has proven to be a cost-effective way to stage construction.
We expect the permitting for Phase 2 to be completed in mid-2020 with road construction beginning soon
after. The final construction stage of Phase 2 will be bid in early 2021 or sooner. Tourist Development
Tax (TDT) revenue is currently tracking seven (7) to ten (10) percent above plan. Allocating that
additional revenue to construction over the next five years will offset most of the increased construction
cost for Phase 2.
Once all the construction values have been finalized for Phase 2, the Board will be able to evaluate the
viability of the field house in Phase 3. With respect to the field house in Phase 3, the County has
submitted a grant application for the field house to serve as a shelter and is also seeking an appropriation
from the State to make the field house a dedicated shelter with senior and special needs capacity. Funds
were also identified in the Sales Tax for hurricane resiliency and can be used in this phase.
FISCAL IMPACT: The source of funds is from Tourism Division Capital Projects Fund 758. Funding
has been appropriated for this Project No. 50156 (Sports Complex).
Construction of facilities at the Amateur Sports Complex will be paid from $65.45 million in bond
proceeds which were deposited into the Sports Complex Capital Fund (370) on or about October 24,
2018. The sale of these bonds was sized around a $3,750,000 debt service limit imposed by the Board
during deliberations on Ordinance 2017-35 which provided for an additional 1% Tourist Development
Tax (TDT) and related Tourist Development Plan. The remaining dollars generated from the 1% increase
in the TDT tax, will pursuant to the plan, dedicate additional dollars to beach re-nourishment and
maintain funding levels for destination marketing and County owned and operated museums.
The General Fund is responsible for funding Sports Complex land acquisition under the concept that the
facilities will be enjoyed by Collier County residents as well as for tournament caliber sports events. This
$12.1 million to acquire the primary 61.1+/- acre primary parcel and $975K to purchase an adjacent 4.8-
acre parcel for future Sport’s Complex use. In the event of any funding gap which may exist as facilit ies
are constructed and funds drawn down, the Board will be briefed, and options provided to close any
funding shortfall.
With respect to the impact fees to be assessed for the Amateur Sports Complex, the fees will be calculated
in accordance with Section 74-202 (l) of Chapter 74 of the Collier County Codes of Laws and Ordinances
(The Collier County Consolidated Impact Fee Ordinance), which provides for the calculation of impact
fees for land uses not contemplated under the adopted impact fee land use categories. Currently, the rate
schedules do not contain a land use that is applicable to determine the impact fees for the Sports
Complex. Therefore, staff will work with the County’s Impact Fee Consultants (Tindale-Oliver) to utilize
the adopted impact fee methodologies to calculate the impact fees in accordance with the Code
requirements. Impact fees for Phase 1 are currently estimated at $750,000, which will be validated as
additional information is provided through the building permit process.
11.D
Packet Pg. 1032
12/10/2019
With respect to the fees in the contract for the Construction Manager (CM), they have been modified
slightly. The CM initially requested 4.5% fee for the project. Staff negotiated a 3.5% fee for both Phase 0
and Phase 1A. For Phase 1B, the CM once again requested a 4.5% fee. Staff reviewed the recent market
rates and considered the City of Naples project and agreed to 4% (back-up attached). The .5% increase to
fee causes a net increase to the job of approximately $83,500. With respect to hourly rates, the CM
requested increases across the board ranging from 5% to 20%. The CM noted that their rates increase
annually in all their markets each year and they have not in this project. Staff agreed to a 3% increase in
rates. While one would surmise that it would have an impact to Phase1B, it does not as the General
Conditions (staff time on the job) maximum was negotiated to approximately 5% of construction value
prior to the agreed upon rate increase. This increase in rates will only impact Phase 1B if the County adds
time to the job. It will have a 3% impact in future phases if they are kept the same and if the CM is used
in future phases.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to
this action.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote
for Board approval. -SRT
RECOMMENDATION: That the Board of County Commissioners approves the Fourth Amendment to
Agreement No.17-7198 for Construction Management at Risk (CMAR) contract Phase 1B - Guaranteed
Maximum Price (GMP) No. 3 Horizontal and Vertical Work Package to Manhattan Construction for the
next phase of the Sports Complex and Events Center (SCEC) in the amount of $19,665,469.
Prepared by: Nick Casalanguida, Deputy County Manager
Margaret A. Bishop, P.E., Principal Project Manager, Facilities Management Division
ATTACHMENT(S)
1. Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (PDF)
2. Opinion of Cost Letter Phase 1B 11-26-2019 (PDF)
3. 2019-11-22 SCEC Phase 1B Bid Letter Approval (PDF)
4. SCEC Update 12-10-19 Presentation (PDF)
11.D
Packet Pg. 1033
12/10/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 11.D
Doc ID: 10530
Item Summary: Recommendation to approve the Fourth Amendment to Agreement No. 17-7198
for Construction Management at Risk (CMAR) contract Phase 1B - Guaranteed Maximum Price (GMP)
No. 3 Horizontal and Vertical Work Package to Manhattan Construction for the next phase of the Sports
Complex and Events Center (SCEC) in the amount of $19,665,469. (Nick Casalanguida, Deputy County
Manager)
Meeting Date: 12/10/2019
Prepared by:
Title: Project Manager, Senior – Facilities Management
Name: Margaret Bishop
12/02/2019 4:54 PM
Submitted by:
Title: Director - Facilities Management – Facilities Management
Name: Damon Grant
12/02/2019 4:54 PM
Approved By:
Review:
Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 12/03/2019 9:00 AM
Public Utilities Operations Support MaryJo Brock Additional Reviewer Skipped 12/03/2019 9:40 AM
Facilities Management Damon Grant Director - Facilities Completed 12/03/2019 9:43 AM
Procurement Services MaryJo Brock Additional Reviewer Skipped 12/03/2019 9:50 AM
Public Utilities Department MaryJo Brock Level 1 Division Reviewer Skipped 12/03/2019 9:50 AM
Public Utilities Department Dan Rodriguez Additional Reviewer Completed 12/03/2019 9:51 AM
Procurement Services Ted Coyman Additional Reviewer Completed 12/03/2019 11:20 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 12/03/2019 11:22 AM
County Attorney's Office Scott Teach Level 2 Attorney Review Completed 12/03/2019 1:55 PM
Facilities Management Margaret Bishop Additional Reviewer Completed 12/03/2019 3:28 PM
Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 12/03/2019 3:31 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 12/04/2019 7:49 AM
Budget and Management Office Mark Isackson Additional Reviewer Completed 12/04/2019 8:34 AM
County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 12/04/2019 1:50 PM
Board of County Commissioners MaryJo Brock Meeting Pending 12/10/2019 9:00 AM
11.D
Packet Pg. 1034
11.D.1
Packet Pg. 1035 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1036 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1037 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1038 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1039 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1040 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1041 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1042 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1043 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1044 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1045 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1046 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1047 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1048 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1049 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1050 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1051 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1052 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1053 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1054 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1055 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1056 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1057 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1058 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1059 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1060 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1061 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1062 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1063 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1064 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1065 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1066 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1067 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1068 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1069 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1070 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1071 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1072 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1073 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1074 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1075 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1076 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1077 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1078 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1079 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1080 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1081 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1082 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1083 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1084 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1085 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1086 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1087 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1088 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1089 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1090 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1091 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1092 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1093 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1094 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1095 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1096 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1097 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1098 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1099 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1100 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1101 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1102 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1103 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1104 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1105 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1106 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1107 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1108 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1109 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1110 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1111 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1112 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1113 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1114 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1115 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1116 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1117 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1118 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1119 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1120 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1121 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1122 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1123 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1124 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1125 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1126 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1127 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1128 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1129 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1130 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1131 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1132 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1133 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1134 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1135 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1136 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1137 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1138 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1139 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1140 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1141 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1142 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1143 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1144 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1145 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1146 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1147 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1148 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1149 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1150 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1151 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1152 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1153 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1154 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1155 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1156 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
11.D.1
Packet Pg. 1157 Attachment: Fourth Amendment to Agreement 17-7198 (2)_SIGNED GK 12.3.19_reduced (flat) (10530 : Sports Complex Amendment 4)
PARKER/MUDGETT/SMITH ARCHITECTS, INC.
2136 McGREGOR BOULEVARD, FORT MYERS, FLORIDA 33901
(239) 332-1171 FAX (239) 332-3537 www.pmsarch.com
26 November, 2019
COLLIER COUNTY SPORTS COMPLEX AND EVENTS CENTER – PHASE 1B
ARCHITECT’S OPINION OF BID RESULTS
The current phase of the overall project includes the following:
Stadium Building and surrounding sitework
Food Truck Pavilion and Surrounding sitework
Fitness Pavilion and surrounding sitework
Great Lawn area
Parker / Mudgett / Smith Architects is satisfied that the bids that have been received by
Manhattan Construction for the vertical construction elements of this phase fairly
represent the current construction market and a reasonable cost of construction for the
project.
The majority of bid packages for the vertical construction had three or more bidding
companies. For the remainder only one bid package, sports lighting, received only one
bid. Though three bids for every package is optimal, it is not common in today’s
construction market across Southwest Florida as there is more demand for sub-
contractors than there are qualified companies.
As mentioned above, the bid package for sports lighting was the only vertical
construction element to receive only one bid. This is due in large part to a year-long
exercise with various sports lighting companies to identify the best product for Collier
County. Part of this exercise included comparing pricing from each of the major
vendors and so therefore was competitive prior to bidding.
The only other bid package that might seem to be out of the ordinary is the electrical
and low voltage package. It represents 10.01percent of the overall project cost. This is
not an unusual figure when we analyze our projects bid in the last 5 years.
Parker / Mudgett / Smith Architects recommends acceptance of the vertical
construction elements of Manhattan’s GMP.
W. Jeffrey Mudgett, AIA
Parker/Mudgett/Smith Architects, Inc.
11.D.2
Packet Pg. 1158 Attachment: Opinion of Cost Letter Phase 1B 11-26-2019 (10530 : Sports Complex Amendment 4)
Civil Engineering • Planning • Permitting
4365 Radio Road · Suite 201 · Naples, FL 34104 · P: (239) 434.6060 · F: (239) 434-6084
www.davidsonengineering.com
1990 Main Street · Suite 750 · Sarasota, FL 34236 · P: (941) 309-5180
November 22, 2019
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, Florida 34112
Re: Collier County Sports Complex and Events Center - Phase 1B Horizontal Construction
To Whom It May Concern,
We have received the Bid Tabulation Sheets from the Construction Manager at Risk (CMAR), Manhattan
Construction Company (MCC), and have reviewed the following bid items pertaining to the Phase 1B Horizontal
Construction for the proposed Collier County Sports Complex and Events Center (SCEC). The bulleted documents
below were provided to MCC during the bidding process.
• Scope 2.01 – City Gate Blvd North Streetscaping
• Scope 2.02 – City Gate Commerce Park Tract RL (Multi-purpose Pathway, Etc.)
• Scope 2.03 – City Gate Commerce Park MPUD Perimeter Buffer Construction Plans
• Scope 2.04 – Construction Documents – Great Lawn / Stadium, Etc.
• Scope 2.05 – Great Lawn / Tract RL – Fitness Areas
Upon internal review and meetings with MCC, it is apparent that all of MCC’s sub-contractors are qualified bidders.
The core sub-contractors clearly met all specifications, prepared thorough bids, and met the overall bid
requirements. Formal solicitation took place in October of 2019 with an advertised pre-bid meeting at MCC
offices, which Davidson Engineering attended. MCC received several formal proposals in the major categories
previously outlined. Davidson Engineering reviewed all bids received and found consistency with the monetary
values and material take-offs during reviews. As noted, DE also attended several post-bid meetings with the
CMAR. Material values were found to be consistent with engineering take-offs and estimates. The schedule of
values with unit price breakdowns were also found to be consistent with most of the recent horizontal
construction activity in Collier County.
Based on our review of the overall project scope as outlined in the construction documents, DE supports an award
of the Phase 1B horizontal scope items at the proposed Collier County Sports Complex and Events Center as
presented by Manhattan Construction Company. The Construction Documents noted above should be referenced
or included with the MCC contract as exhibits.
Thank you,
Josh Fruth
Davidson Engineering, Inc.
Vice President
Attached: Bid Summary from MCC
11.D.3
Packet Pg. 1159 Attachment: 2019-11-22 SCEC Phase 1B Bid Letter Approval (10530 : Sports Complex Amendment 4)
Bid Pkg No. Scope of Work
GMP SUMMARY 2019.11.07PHASE 1B
Number of Bids % of Total Comments
GENERAL CONDITIONS: STAFF $980,110 5.00%
GENERAL REQUIREMENTS $145,853 0.74% BP02A SURVEYS $119,300 2 0.61%
BP02B CONSTRUCTION MATERIALS TESTING $35,360 2 0.18%BP03A CONCRETE/MASONRY (FORM / REBAR / PLACE & FINISH / CRANES) $959,090 5 4.90%BP05A STRUCTURAL STEEL - METAL JOIST - METAL DECK $1,049,400 3 5.36%BP05C DECORATIVE RAILINGS - ORNAMENTAL METALS $344,000 4 1.76%BP06C MILLWORK - ARCHITECTURAL WOODWORK $96,000 3 0.49%BP07A DAMPPROOFING - WATERPROOFING - JOINT SEALANTS $159,746 4 0.82%BP07D WALL AND SIDING PANELS / ROOF SCREENING $191,428 2 0.98%BP07E MEMBRANE ROOFING $315,000 3 1.61%BP08A HM DOORS / HM FRAMES / WOOD DOORS / HARDWARE & INSTALLATION $144,936 2 0.74%BP08B ENTRANCES / STOREFRONTS / WINDOWS / GLASS & GLAZING $124,250 2 0.63%BP08E OVERHEAD & COILING DOORS $49,078 2 0.25%BP09B DRYWALL & METAL FRAMING $406,566 3 2.08%BP09D CARPET / VCT / VINYL / TILE $116,735 3 0.60%BP09F PAINTING / WALLCOVERINGS $161,012 3 0.82%BP10B DIV 10 SPECIALTIES: TLT PARTITION & ACCESS / MISC SPECIALTIES $159,824 4 0.82%BP10D LOCKERS $28,000 6 0.14%BP11D FOOD SERVICE EQUIPMENT $543,441 3 2.77%BP11E PROJECTION SCREENS - AUDIO-VISUAL EQUIPMENT / SCOREBOARDS $895,000 4 4.57%BP12L GRANDSTAND SEATING $823,000 2 4.20%BP14A ELEVATORS $96,000 2 0.49%BP21A FIRE SUPPRESSION $147,220 2 0.75%BP22A PLUMBING $801,000 2 4.09%BP23A HEATING, VENTING & AIR-CONDITIONING (HVAC) $349,825 4 1.79%
BP26A ELECTRICAL / FIRE ALARM / AV / ACCESS CONTROL / SECURITY $1,961,545 2 10.01%
BP26B FIELD/SPORTS LIGHTING $589,966 1 3.01%BP31A EARTHWORK $299,200 2 1.53%BP32B CONCRETE PAVING / COLORED CONCRETE $1,498,965 1 7.65%
BP32C UNIT PAVING - BRICK PAVERS $133,359 1 0.68%BP32D BRICK / STONE WORK $93,000 2 0.47%BP32E SYNTHETIC TURF / SURFACES $1,305,500 2 6.66%
BP32F CHAIN LINK FENCE & GATES $392,814 3 2.01%BP32H PLANTINGS - SOD - TREES - MULCH & IRRIGATION $1,162,926 4 5.94%BP32K SITE FURNISHINGS (EXERCISE EQUIPMENT) $745,878 3 3.81%
RESIDENTIAL EQUIPMENT (ALLOWANCE)$10,000 0.05%SIGNAGE (ALLOWANCE )$15,000 0.08%
Subtotal 17,449,327 89.08%
Cross Check Subtotal 17,449,327 Buy Out
6.000%Sales Tax (Included in Items Above)Incl Above
1.500%Subcontractor Default Insurance 244,850
Subtotal Cost of Work 17,694,177 90.33%
3.000%Owner's Contingency (By Owner)530,825
2.000%MCF Construction Contingency 353,884
Subtotal Cost of Work 18,578,886 94.85%
MCF Warranty ReserveBuilder's Risk (By Owner)
Building Permit & Plan Review Fees (By Owner)-
Subtotal 18,578,886 94.85%
1.175%Construction Manager Insurances 218,302
Subtotal 18,797,188 95.96%
0.736%CM Payment & Performance Bond 138,360
4.00%MCF Profit & Fee 652,935
TOTAL PROPOSED PHASE 1B STADIUM EVENTS CENTER AND GREAT LAWN 19,588,483 100.00%
GMP SUMMARY FOR PHASE 1B STADIUM EVENTS CENTER AND GREAT LAWNMANHATTAN CONSTRUCTION
Estimate Dated: February 22, 2019
Project Name: COLLIER COUNTY SPORTS COMPLEX
Revised Date: 11/21/2019
11.D.3
Packet Pg. 1160 Attachment: 2019-11-22 SCEC Phase 1B Bid Letter Approval (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1161 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
PHAS£0NE �
CON:5> TRUC-llON
COLLIER COUNTY PROPERTY 305
TEMPORARY PARKING 30S 11.D.4
Packet Pg. 1162 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1163 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
... •• ":• • •• .. • I ·�
11.D.4
Packet Pg. 1164 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1165 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1166 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1167 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
,
-
-· ...
-,
-..
, �
� , -
•
•
r • ...
..
• -..
r
1F-, -
..... .. -·• -'-,
11.D.4
Packet Pg. 1168 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
•
..
r J
, •
•
11.D.4
Packet Pg. 1169 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1170 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1171 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
-
-� ,
•
11.D.4
Packet Pg. 1172 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1173 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
•• '' .. ___ .!
�::··= ·�· . . i I ··-·! .. • .. • .. .. .,_ ·--� .. i..... � ... �·-·-... ---
11.D.4
Packet Pg. 1174 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1175 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
..
•• '' .. ___ .!
�::··= ·�· . . i I ··-· !.. • .. .. .,_ ·--� .. i�� ... --·-·-... ---
11.D.4
Packet Pg. 1176 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1177 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1178 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1179 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1180 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1181 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1182 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1183 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
C �erCounty-,.__ ....ws -
Yoga
Fitness Court
11.D.4
Packet Pg. 1184 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1185 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1186 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1187 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1188 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1189 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
*Subject to funding
ilt end of phase 2
11.D.4
Packet Pg. 1190 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
I - --,--
..
..
. ,, ..
� � . . ' ; ,. . ·. • s . .,,. . .
--� "' .
COLLIER COUNTY SPORTS FACILITY
•
•
.--
I •
PARK LEGEND
1. MAIN ENTRANCE
2. PICNIC GROVE
3.PLAYGROUND (2•5 YEARS OLD)
• •
(i)
4. PLAYGROUND (6·12 YEARS OLD)
5.SHADE SHELTER/CHANGING ROOMS
6.WATER PARK
7. SHADE CANOPY (FABRIC)
8.5 lEVEl CHALLENGE ROPES COURSE
9.9 HOLE MINI GOLF COURSE
EB n..r, I THE t -t 1' }:; t.-.. · � � ., SPORTS--------------------------------------------
AMENITY AREA CONCEPT PLAN May 20, 2019 I FORCE
O!V1lOPJ.l: Sl'ORIS PAR.IS Of DISTll>tl!CN
11.D.4
Packet Pg. 1191 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
I - --,--
.. � ..•
COLLIER COUNTY SPORTS FACILITY
·�?')'·.·.\.� s.•
•
.--
I•
PARK LEGEND
1, MAIN ENTRANCE
2. PICNIC GROVE
3.PLAYGROUND (2•5 YEARS OLD)
• •
(i)
4. PLAYGROUND (6·12 YEARS OLD)
5, SHADE SHELTER/CHANGING ROOMS
6, WATER PARK
7. SHADE CANOPY (FABRIC)
8.5 lEVEl CHALLENGE ROPES COURSE
9.9 HOLE MINI GOLF COURSE
EB n..r, I THE t -t 1' }:; t.-.. · � � ., SPORTS--------------------------------------------
AMENITY AREA CONCEPT PLAN May 20, 2019 I FORCE
O!V1lOPJ.l: Sl'ORIS PAR.IS Of DISTll>tl!CN
11.D.4
Packet Pg. 1192 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
l - --�--=-=-."---�--�-;::-=----=-=___:.--�::::i }ifl
O!V1lOPJ.l: Sl'ORIS PAR-<S Of DISTll>tl!CN
11.D.4
Packet Pg. 1193 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
I - --,--
COLLIER COUNTY SPORTS FACILITY
.--
I •
PARK LEGEND
1. MAIN ENTRANCE
2. PICNIC GROVE
3.PLAYGROUND (2•5 YEARS OLD)
• •
(i)
4. PLAYGROUND (6·12 YEARS OLD)
5.SHADE SHELTER/CHANGING ROOMS
6.WATER PARK
7. SHADE CANOPY (FABRIC)
8.5 lEVEl CHALLENGE ROPES COURSE
9.9 HOLE MINI GOLF COURSE
EB n..r, I THE t -t 1' }:; t.-.. · � � ., SPORTS --------------------------------------------
AMENITY AREA CONCEPT PLAN May 20, 2019 I FORCE
O!V1lOPJ.l: Sl'ORIS PAR.IS Of DISTll>tl!CN
11.D.4
Packet Pg. 1194 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
O!V1lOPJ.l: Sl'ORIS PAR.IS Of DISTll>tl!CN
11.D.4
Packet Pg. 1195 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
I - --,--
•
.. . ,, ..
� � . . ' ; ,. . ·. • s .
I; ... ----�
COLLIER COUNTY SPORTS FACILITY
.--
I •
PARK LEGEND
1. MAIN ENTRANCE
2. PICNIC GROVE
3.PLAYGROUND (2•5 YEARS OLD)
• •
(i)
4. PLAYGROUND (6·12 YEARS OLD)
5.SHADE SHELTER/CHANGING ROOMS
6.WATER PARK
7. SHADE CANOPY (FABRIC)
8.5 lEVEl CHALLENGE ROPES COURSE
9.9 HOLE MINI GOLF COURSE
EB n..r, I THE t -t 1' }:; t.-.. · � � ., SPORTS--------------------------------------------
AMENITY AREA CONCEPT PLAN May 20, 2019 I FORCE
O!V1lOPJ.l: Sl'ORIS PAR.IS Of DISTll>tl!CN
11.D.4
Packet Pg. 1196 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1197 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1198 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1199 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
CONTACT US
Progress
Project Phases
11/20 Update
11.D.4
Packet Pg. 1200 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
CONTACT US 11.D.4
Packet Pg. 1201 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
PROGRESS TOURNAMENTS EXPLORE THE PARK PLAN YOUR TRIP THE GREAT LAWN NEWS CONTACT US
The Great Lawn
The Great Lawn will be the new social scene of Collier County with great food, cold drinks and a slew of famlly entertainment events. From fitness groups. social leagues and btath
volleyball to fire-pit nights. football Saturdays and famlly movie nights on the video board: the Great Lawn will have something for everyone. The Great Lawn wlll be anchored on
three sides by beach. an amphitheater and a food truck pavilion with bar area. Whether you are In town as part of a tournament or a live In the area. we can't wait to see you ln
WANT TO BRING YOUR FOOD TRUCK TO
THE GREAT LAWN?
CONTACT US
11.D.4
Packet Pg. 1202 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4
Packet Pg. 1203 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
SCEC-Phases/Fees Soft Costs
$106,273
$919,553
Phase lB -Fee $668,190
-$900,000
5-year Engineering/Pe1mitting/CEI Fees $5,273,646
Impact Fees -$750,000
$1,502,050
Total Soft Costs -$10,119,712
11.D.4
Packet Pg. 1204 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
SCEC-Phases "Cost of Work" Source of Funds Revenues
Phase O -Actual $3,093,711 Bond Proceeds $65,500,000
Phase IA-Actual $29,838,212 Interest -$11'1
Phase lB -Actual $18,997,279 Road Impact Fees -$6 to-$8M
Phase 2 -Budget -$28,750,000 Naming Rights -$6 to-$8M
Phase 3 <'Field House» NIA (S16�I)Grants NI A cmTently
Sales Tax Pending Phase 3
Total Cost of Work -$SOM Total Revenues
-$10,119,712
Total Project Cost -$90,798,914 Negative Variance -$8 to -$12M
11.D.4
Packet Pg. 1205 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
Construction "'9M "'29M (1A) "'19M Value
Fee* 4% 3.5% 4%
Owner "'10% 3% 3% Contingency*
General
Conditions "'9% "'5% "'5%
Staffing*
Duration to Final 556 Days 397 Days 365 Days Completion
Request for Proposals (RFP) No. 2015·129-ME for Construction Manager at Risk Services
May 20, 2015
Page 3of5
Year• Const. Cost Fee ... .-, ...... -�., ......·-···-· .. --..... -..-· . ·----··· . ..,.. '"'··---··--... ----
Miami Marlins Ballpark HunVMossJV 2012 $620m _ .......... _ ... ____ .,_····-·----·-
Miami Science Museum Suffolk Current -------·
Boston Conv. & Expo Center Clark/Hubert 2004 $463m Hunt
Amway Center Orlando Hunt 2010 $480m
Orlando Performing Arts Center Balfour Beatty 2014 $200m
Orlando Phase V HunVClark JV 2003 $520m
Phoenix CC Expansion Hunt 2008 $552m --------
Music City Center Nashville Clark $372m
McCormick Place HQ Hotel Clark $335m
McCormick Place Events Center Clark $142m
MIA South Terminal Parsons-2007 $840m Odebrecht
MIA North Terminal Parsons-2014 $1,450m Odebrecht
'Date Completed
,P,,:),pj�"�-·b Q..9r,�·-D:).QO,:,,�!!Jl�� ... .,.,..v,,J
3.15% ---------·
3.5% -··------
< 3.95%
<4%
<4%
4%
4%
4.25%
4.50%
6%
6%
11.D.4
Packet Pg. 1206 Attachment: SCEC Update 12-10-19 Presentation (10530 : Sports Complex Amendment 4)
11.D.4